1 National Occupational Standards Development Pack for Sub-Structure Work Occupations (Construction) NOS WORK 2014 Full suite review (See Standard Template Update 2010 and for full details of generic template changes) Development Legend 1 st and 2 nd NWG Red rd NWG - Green 4 th NWG - Blue 5 th NWG Red underlined 6 th NWG Green underlined 7 th NWG Blue underlined Practitioner Group suggestions in red italics

2 Contents Page no Revised NOS: VR132 v2 Assist with underpinning activities 1 VR161 v3 Erect and strike underpinning formwork 11 VR164 v2 Install reinforcement steel for underpinning 21 VR167 v2 Set out for basic underpinning 27 VR168 v2 Excavate for underpinning 33 VR169 v2 Install drypacking 39 VR170 v2 Install mini-piles 45 VR171 v2 Repair sub-structure after underpinning 51 VR172 v2 Reinstate ground condition 57 VR173 v3 Provide temporary support to deep underpinning 63 VR225 v2 Place and compact concrete 69 VR486 v2 Prepare to install well point dewatering systems 75 VR487 v2 Install well point dewatering systems 81 VR488 v2 Prepare to install deep wells or ejectors as dewatering systems 87 VR489 v2 Install deep well dewatering systems 93 VR490 v2 Install ejector dewatering systems 99 VR491 v2 Prepare backgrounds surfaces for structural waterproofing 105 VR492 v2 Carry out structural waterproofing 111 VR513 v2 Prepare to install ground anchors 117 VR514 v2 Install mechanical ground anchors 123 VR515 v2 Install open hole ground anchors 129 VR516 v2 Install self drilling ground anchors 135 VR517 v2 Stress and test ground anchors 141 VR518 v2 Prepare to install post tensioning system as sub-structural repair 147 VR519 v2 Install post tensioning system as sub-structural repair 153 VR520 v2 Prepare for chemical grouting and soil injection 159 VR521 v2 Carry out chemical grouting and soil injection 165 VR522 v2 Prepare to install preformed piles 171 VR523 v2 Install preformed piles 177 VR563 v2 Install mass gravity retaining structures 183 VR564 v2 Install precast concrete retaining structures 189 VR565 v2 Install reinforced soil retaining structures and slopes 195 VR566 v2 Stabilise steep cutting slopes 201 VR610 v2 Prepare for resin and grout injection operations 207 VR611 v2 Carry out resin and grout injection operations 213 VR612 v2 Prepare to install gas membranes 219 VR613 v2 Install gas membranes 225 VR132 only has 5 PC s

3 All NOS in Sub-Structure Work Occupations Suite VR132 Assist with underpinning activities VR161 Erect and strike underpinning formwork VR164 Install reinforcement steel for underpinning VR167 Set out for basic underpinning VR168 Excavate for underpinning VR169 Install drypacking VR170 Install mini-piles VR171 Repair sub-structure after underpinning VR172 Reinstate ground condition VR173 Provide temporary support to deep underpinning Mandatory VR209 Confirm work activities and resources for the work Mandatory VR210 Develop and maintain good working relationships Mandatory VR211 Confirm the occupational method of work VR225 Place and compact concrete VR299 Plant or machinery operator maintenance Import VR360 Establish work area protection and safety Import VR387 Operate plant or machinery to lift and transfer loads Import VR388 Operate plant or machinery to extract Import VR389 Operate plant or machinery to excavate Import VR391 Operate plant or machinery to receive and transport loads Import VR392 Operate plant or machinery for accessing Import VR393 Operate plant or machinery to lay and distribute Import VR394 Operate plant or machinery to compact Import VR400 Operate specialised powered tools and equipment Import VR401 Set out secondary dimensional work control Import VR402 Slinging and signalling the movement of loads VR486 Prepare to install well point dewatering systems VR487 Install well point dewatering systems VR488 Prepare to install deep wells or ejectors as dewatering systems VR489 Install deep well dewatering systems VR490 Install ejector dewatering systems VR491 Prepare backgrounds for structural waterproofing VR492 Carry out structural waterproofing VR513 Prepare to install ground anchors VR514 Install mechanical ground anchors VR515 Install open hole ground anchors VR516 Install self drilling ground anchors VR517 Stress and test ground anchors VR518 Prepare to install post tensioning system as sub-structural repair VR519 Install post tensioning system as sub-structural repair VR520 Prepare for chemical grouting and soil injection VR521 Carry out chemical grouting and soil injection VR522 Prepare to install preformed piles VR523 Install preformed piles VR563 Install mass gravity retaining structures VR564 Install precast concrete retaining structures VR565 Install reinforced soil retaining structures and slopes VR566 Stabilise steep cutting slopes VR610 Prepare for resin and grout injection operations VR611 Carry out resin and grout injection operations VR612 Prepare to install gas membranes VR613 Install gas membranes Mandatory VR641 Conform to general workplace health, safety and welfare Mandatory VR642 Conform to productive work practices Mandatory VR643 Move, handle or store resources

4 COSVR132 Assist with underpinning activities Overview This standard is about interpreting instructions, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components, tools and equipment as instructed and assisting with underpinning activities as directed????? This standard is for people working as underpinning operatives in the occupational area of sub structure work occupations and can be used by operatives, supervisors and managers????? 1

5 COSVR132 Assist with underpinning activities Performance criteria You must be able to: P1 comply with the given, relevant legislation and official guidance to carry out your work and maintain safe and healthy work practices safe P2 select the required quantity and quality of resources for the methods of work P3 comply with organisational procedures to minimise the risk of damage to the work and surrounding area P4 comply with the given contract instructions / information to carry out the work efficiently to the required specification P5 complete the work within the allocated time, in accordance with the programme of work 2

6 COSVR132 Assist with underpinning activities Knowledge and understanding Performance Criteria 1 Safe work practices You need to know and understand: K1 K2 K3 K4 K5 K6 K7 the types of instructions / information the level of understanding operatives must have of relevant, current legislation and official guidance and how it is applied how emergencies should be responded to and who should respond the organisational security procedures for tools, equipment and personal belongings what the accident reporting procedures are and who is responsible for making the report why, when and how personal protective equipment (PPE) health and safety control equipment should be used how to comply with environmentally responsible work practices to meet current legislation and official guidance Performance Criteria 2 Selection of resources You need to know and understand: K8 K9 the characteristics, quality, uses, sustainability, limitations and defects associated with the resources how the resources should be used K10 the hazards associated with the resources and methods of work 3

7 COSVR132 Assist with underpinning activities Performance Criteria 3 Minimise the risk of damage You need to know and understand: K11 how to protect work from damage and the purpose of protection K12 why disposal of waste should be carried out safely and how it is achieved Performance Criteria 4 Given / Meet the contract instructions / information????? You need to know and understand: K13 how methods of work are carried out and problems reported K14 how maintenance of tools and equipment is carried out Performance Criteria 5 Allocated time You need to know and understand: K15 what the programme is for the work to be carried out and why deadlines should be kept 4

8 COSVR132 Assist with underpinning activities Additional Information Scope/range related to performance criteria Performance Criteria 1 1 safe use of personal protective equipment (PPE) to carry out the activity, in accordance with legislation and/or organisational requirements avoidance of risk by complying with the given instructions / information relating to / at least?? of the following 1.1 methods of work 1.2 safe use of health and safety control equipment 1.3 safe use of access equipment???? 1.4 safe use, storage and handling of materials, tools and equipment 2 specific risks to health???? Performance Criteria 2 3 selection of resources associated with own work 3.1 materials, components and fixings 3.2 tools and equipment Performance Criteria 3 4 protection of the work and its surrounding area from damage 5 minimise damage and maintain a clean work space 6 disposal of waste in accordance with current legislation Performance Criteria 4 7 demonstration of work skills to prepare, mix, compact, cut, fix, join, measure, mark out, position, clean, store and secure 8 use and maintain hand tools, portable power tools and ancillary equipment 9 assist the underpinning operation to given working instructions relating to the following 9.1 prepare area of work, equipment and materials 9.2 mix dry pack, mortar and concrete 9.3 compact soils, sands and sub bases 9.4 fix steel, mesh, ducts, pipes, timber flags and blocks 9.5 clean, store and secure equipment, tools and materials Performance Criteria 5 10 completion of own work within the time allowed/estimated, allocated time to meet the needs of other occupations and/or client 5

9 COSVR132 Assist with underpinning activities Scope/range related to knowledge and understanding Disposal of waste 1 environmental responsibilities, organisational procedures, manufacturers information, statutory regulations and official guidance Emergencies 2 operative's response to situations in accordance with organisational authorisation and personal skills when involved with 2.1 fires, spillages, injuries 2.2 emergencies relating to occupational activities Hazards 3 those identified by risk assessment, method of work, manufacturers technical information, statutory regulations and official guidance Health and safety control equipment 4 identified by the principles of protection for occupational use, types and purpose of each type, work situations and general work environment 4.1 collective protective measures 4.2 personal protective equipment (PPE) 4.3 respiratory protective equipment (RPE) 4.4 local exhaust ventilation (LEV) Instructions / Information??? 5 manufacturers' information, oral/written and sketches Legislation and official guidance 6 this relates to the operative's responsibilities regarding potential accidents, health hazards and the environment whilst working in the workplace, below ground level, in confined spaces, at height, with tools and equipment, with materials and substances, with movement/storage of materials and by manual handling and mechanical lifting Maintenance 7 operative care of hand tools, and/or portable power tools and ancillary equipment 6

10 COSVR132 Assist with underpinning activities Methods of work 8 application of knowledge for safe and healthy work practices, procedures and skills relating to the method/area of work and materials used to 8.1 assist with the underpinning activity 8.2 prepare area of work, equipment and materials 8.3 mix dry pack, mortar and concrete 8.4 compact soils, sands and sub bases 8.5 fix steel, mesh, ducts, pipes, timber, flags and blocks 8.6 clean, store and secure equipment, tools and materials 8.7 recognise and determine when specialist skills and knowledge are required and report accordingly????? 8.8 determine specific requirements for structures of special interest, traditional build (pre 1919) and historical significance????? 8.9 use hand tools, portable power tools and equipment 8.10 work at above and below ground level 8.11 use access equipment???? 9 team work and communication 10 needs of other occupations associated with underpinning Personal protective equipment (PPE) 10 occupational use, types, purpose of each type and work situations Problems 11 those arising from information, resources and methods of work 11.1 own authority to rectify 11.2 organisational reporting procedures Programme 12 agreed starting and finishing times 13 types of progress charts, timetables and estimated times 14 organisational procedures for reporting circumstances which will affect the work programme Protect work 15 protect work against damage from general workplace activities, other occupations and adverse weather conditions 7

11 COSVR132 Assist with underpinning activities Resources 16 materials, components and equipment relating to types, quantity, quality, sizes and the sustainability of standard and/or specialist 16.1 sand, cement, soils, concrete, timber, reinforcing steel, surfacing and ducts 16.2 hand tools, and/or portable powered tools and equipment 17 methods of calculating quantity, length, area and wastage associated with the method/procedure to assist with underpinning activities????? Security procedures 18 site, workplace, company and operative 8

12

13 10

14 COSVR161 Erect and strike underpinning formwork Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components, tools and equipment and erecting and striking formwork for underpinning operations. This standard is for people working as underpinning operatives in the occupational area of sub-structure work occupations and can be used by operatives, supervisors and managers 11

15 COSVR161 Erect and strike underpinning formwork Performance criteria You must be able to: P1 interpret the given information relating to the work and resources to confirm its relevance P2 comply with the given, relevant legislation and official guidance to carry out your work and maintain safe and healthy work practices P3 select the required quantity and quality of resources for the methods of work P4 comply with organisational procedures to minimise the risk of damage to the work and surrounding area P5 comply with the given contract information to carry out the work efficiently to the required specification P6 complete the work within the allocated time, in accordance with the programme of work 12

16 COSVR161 Erect and strike underpinning formwork Knowledge and understanding Performance Criteria 1 Interpretation of information You need to know and understand: K1 K2 K3 the organisational procedures developed to report and rectify inappropriate information and unsuitable resources, and how they are implemented the types of information, their source and how they are interpreted the organisational procedures to solve problems with the information and why it is important they are followed Performance Criteria 2 Safe work practices You need to know and understand: K4 K5 K6 K7 K8 K9 the level of understanding operatives must have of information for relevant, current legislation and official guidance and how it is applied how emergencies should be responded to and who should respond the organisational security procedures for tools, equipment and personal belongings what the accident reporting procedures are and who is responsible for making the report why, when and how health and safety control equipment should be used how to comply with environmentally responsible work practices to meet current legislation and official guidance 13

17 COSVR161 Erect and strike underpinning formwork Performance Criteria 3 Selection of resources You need to know and understand: K10 the characteristics, quality, uses, sustainability, limitations and defects associated with the resources and how defects should be rectified K11 how the resources should be used and how any problems associated with the resources are reported K12 the organisational procedures to select resources, why they have been developed and how they are used K13 the hazards associated with the resources and methods of work and how they are overcome Performance Criteria 4 Minimise the risk of damage You need to know and understand: K14 how to protect work from damage and the purpose of protection K15 why disposal of waste should be carried out safely and how it is achieved Performance Criteria 5 Meet the contract specification You need to know and understand: K16 how methods of work, to meet the specification, are carried out and problems reported K17 how maintenance of tools and equipment is carried out Performance Criteria 6 Allocated time You need to know and understand: K18 what the programme is for the work to be carried out in the estimated, allocated time and why deadlines should be kept 14

18 COSVR161 Erect and strike underpinning formwork Additional Information Scope/range related to performance criteria Performance Criteria 1 1 interpretation of drawings, specifications, schedules, method statements, risk assessments and manufacturers' information related to the work to be carried out Performance Criteria 2 2 avoidance of risk by complying with the given information relating to / at least?? of the following 2.1 methods of work 2.2 safe use of health and safety control equipment 2.3 safe use of access equipment 2.4 safe use, storage and handling of materials, tools and equipment 2.5 specific risks to health Performance Criteria 3 3 selection of resources associated with own work 3.1 materials, components and fixings 3.2 tools and equipment Performance Criteria 4 4 protection of the work and its surrounding area from damage 5 minimise damage and maintain a clean work space 6 disposal of waste in accordance with current legislation Performance Criteria 5 7 demonstration of work skills to measure, mark out, fit, level, plumb, finish, remove, position and secure 8 use and maintain hand tools, portable power tools and ancillary equipment 9 erect and strike formwork at, above or below ground level, to given working instructions to underpin structures and for at least two one of the following 9.1 walls 9.2 columns 9.3 beams (ground or suspended) 9.4 suspended floor slabs or roofs 15

19 COSVR161 Erect and strike underpinning formwork Performance Criteria 6 10 completion of own work within the estimated, allocated time to meet the needs of other occupations and/or client 16

20 COSVR161 Erect and strike underpinning formwork Scope/range related to knowledge and understanding Disposal of waste 1 environmental responsibilities, organisational procedures, manufacturers information, statutory regulations and official guidance Emergencies 2 operative's response to situations in accordance with organisational authorisation and personal skills when involved with 2.1 fires, spillages, injuries 2.2 emergencies relating to occupational activities Hazards 3 those identified by risk assessment, method of work, manufacturers technical information, statutory regulations and official guidance Health and safety control equipment 4 identified by the principles of protection for occupational use, types and purpose of each type, work situations and general work environment 4.1 collective protective measures Order 4.2 local exhaust ventilation (LEV) 4.3 personal protective equipment (PPE) 4.4 respiratory protective equipment (RPE) Information 5 drawings, specifications, schedules, method statements, risk assessments, manufacturers' information and current regulations governing buildings and associated with underpinning Legislation and official guidance 6 this relates to the operative's responsibilities regarding potential accidents, health hazards and the environment whilst working in the workplace, below ground level, at ground level, in confined spaces, at height, with tools and equipment, with materials and substances, with movement/storage of materials and by manual handling and mechanical lifting Maintenance 7 operative care of hand tools, portable power tools and ancillary equipment 17

21 COSVR161 Erect and strike underpinning formwork Methods of work 8 application of knowledge for safe and healthy work practices, procedures and skills relating to the method/area of work and materials used to 8.1 erect and strike formwork for columns, walls, beams, floor slabs, including kickers, stop ends and for pre-cast units 8.2 attach and remove soldiers and walings 8.3 position and strike box-outs and bolt boxes, grout checks, level controls, angle fillets and features 8.4 position and remove tie systems 8.5 install water stops 8.6 apply release agents 8.7 recognise and determine when additional specialist skills and knowledge are required and report accordingly 8.8 determine specific requirements for structures of special interest, traditional build (pre 1919) and historical significance 8.9 use hand tools, portable power tools and equipment 8.10 strike formwork 8.11 work at height 8.12 use access equipment 9 team work and communication 10 needs of other occupations associated with underpinning formwork Problems 11 those arising from information, resources and methods of work 11.1 own authority to rectify 11.2 organisational reporting procedures Programme 12 types of progress charts, timetables and estimated times 13 organisational procedures for reporting circumstances which will affect the work programme Protect work 14 protect work against damage from general workplace activities, other occupations and adverse weather conditions 18

22 COSVR161 Erect and strike underpinning formwork Resources 15 materials, components and equipment relating to types, quantity, quality, sizes and the sustainability of standard and/or specialist 15.1 formwork, timber, timber and non-timber based sheet material, tie systems, proprietary soldiers and walings, release agents, fixings, fittings, associated items 15.2 hand tools, portable powered tools and equipment 16 methods of calculating quantity, length, area and wastage associated with the method/procedure to erect and strike formwork Security procedures 17 site, workplace, company and operative 19

23 20

24 COSVR164 Install reinforcement steel for underpinning Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components, tools and equipment and installing in-situ and/or prefabricated reinforcing steel for concrete structures in underpinning operations This standard is for people working as underpinning operatives to fix steel in the occupational area of sub-structure work occupations and can be used by operatives, supervisors and managers 21

25 COSVR164 Install reinforcement steel for underpinning Additional Information Scope/range related to performance criteria Performance Criteria 1 1 interpretation of drawings, specifications, schedules, method statements, risk assessments and manufacturers' information related to the work to be carried out Performance Criteria 2 2 avoidance of risk by complying with the given information relating to / at least?? of the following 2.1 methods of work 2.2 safe use of health and safety control equipment 2.3 safe use of access equipment 2.4 safe use, storage and handling of materials, tools and equipment 2.5 specific risks to health Performance Criteria 3 3 selection of resources associated with own work 3.1 materials, components and fixings 3.2 tools and equipment Performance Criteria 4 4 protection of the work and its surrounding area from damage 5 minimise damage and maintain a clean work space 6 disposal of waste in accordance with current legislation 22

26 COSVR164 Install reinforcement steel for underpinning Performance Criteria 5 7 demonstration of work skills to sort, measure, mark out, cut, fit, position and secure 8 use and maintain hand tools, portable power tools and ancillary equipment 9 installation of in-situ and/or prefabricated reinforcement steel to support concrete structures for underpinning to given working instructions and incorporating at least two of the following: mesh, steel bar, spacers, cover blocks or ties in at least one of the following areas 9.1 mesh 9.2 steel bar 9.3 spacers 9.4 cover blocks 9.5 ties 9.6 below ground level 9.7 at ground level 9.8 above ground level 10 form at least one of the following to given working instructions 10.1 beams 10.2 bases 10.3 columns 10.4 piers 10.5 slabs 10.6 steps 10.7 walls Performance Criteria 6 10 completion of own work within the estimated, allocated time to meet the needs of other occupations and/or client 23

27 COSVR164 Install reinforcement steel for underpinning Scope/range related to knowledge and understanding Disposal of waste 1 environmental responsibilities, organisational procedures, manufacturers information, statutory regulations and official guidance Emergencies 2 operative's response to situations in accordance with organisational authorisation and personal skills when involved with 2.1 fires, spillages, injuries 2.2 emergencies relating to occupational activities Hazards 3 those identified by risk assessment, method of work, manufacturers technical information, statutory regulations and official guidance Health and safety control equipment 4 identified by the principles of protection for occupational use, types and purpose of each type, work situations and general work environment 4.1 collective protective measures Order 4.2 local exhaust ventilation (LEV) 4.3 personal protective equipment (PPE) 4.4 respiratory protective equipment (RPE) Information 5 drawings, specifications, schedules, shape codes, method statements, risk assessments, manufacturers' information, oral and written instructions and specific industrial guidance relating to steelfixing for underpinning Legislation and official guidance 6 this relates to the operative's responsibilities regarding potential accidents, health hazards and the environment whilst working in the workplace, below ground level, in confined spaces, at height, with tools and equipment, with materials and substances, with movement/storage of materials and by manual handling and mechanical lifting Maintenance 7 operative care of hand tools, portable power tools and ancillary equipment 24

28 COSVR164 Install reinforcement steel for underpinning Methods of work 8 application of knowledge for safe and healthy work practices, procedures and skills relating to the method/area of work and materials used to 8.1 prepare mesh and steel bar reinforcement 8.2 position and support mesh and steel bar reinforcement (e.g. chairs, cover blocks) 8.3 form associated wire ties to tie and secure mesh and steel bar reinforcement and tie and secure cover blocks and spacers 8.4 recognise and determine when additional specialist skills and knowledge are required and report accordingly 8.5 determine specific requirements for structures of special interest, traditional build (pre 1919) and historical significance 8.6 use hand tools, portable power tools and equipment 8.7 work at height 8.8 use access equipment 9 team work and communication 10 needs of other occupations associated with installing in-situ and/or prefabricated reinforcement steel Problems 11 those arising from information, resources and methods of work 11.1 own authority to rectify 11.2 organisational reporting procedures Programme 12 types of progress charts, timetables and estimated times 13 organisational procedures for reporting circumstances which will affect the work programme Protect work 14 protect work against damage from general workplace activities, other occupations and adverse weather conditions 25

29 COSVR164 Install reinforcement steel for underpinning Resources 15 materials, components and equipment relating to types, quantity, quality, sizes and the sustainability of standard and/or specialist 15.1 prefabricated cages, wire mesh, reinforcement steel, tie wire, ancillary steelfixing components 15.2 hand tools, portable powered tools and equipment 16 methods of calculating quantity, length, area and wastage associated with the method/procedure to install in-situ and/or prefabricated reinforcement steel Security procedures 17 site, workplace, company and operative 26

30 COSVR167 Set out for basic underpinning Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components, tools and equipment and preparing and setting out positions for trenches, pits, ground beams, jacks and stools for traditional excavated or mini-piled underpinning operations???? This standard is for people working as underpinning operatives in the occupational area of sub-structure work occupations and can be used by operatives, supervisors and managers????? 27

31 COSVR167 Set out for basic underpinning Additional Information Scope/range related to performance criteria Performance Criteria 1 1 interpretation of drawings, specifications, schedules, method statements, risk assessments and manufacturers' information related to the work to be carried out Performance Criteria 2 2 safe use of personal protective equipment (PPE) to carry out the activity, in accordance with legislation and/or organisational requirements avoidance of risk by complying with the given information relating to / at least?? of the following 2.1 methods of work 2.2 safe use of health and safety control equipment 2.3 safe use of access equipment???? 2.4 safe use, storage and handling of materials, tools and equipment 2.5 installation of appropriate signing and guarding 2.6 ensure secure access/egress 2.7 specific risks to health???? Performance Criteria 3 3 selection of resources associated with own work 3.1 materials, components and fixings 3.2 tools and equipment 3.3 setting out equipment Performance Criteria 4 4 protection of the work and its surrounding area from damage 5 minimise damage and maintain a clean work space 6 disposal of waste in accordance with current legislation 28

32 COSVR167 Set out for basic underpinning Performance Criteria 5 7 demonstration of work skills to measure, mark out, level, position and secure 8 use and maintain hand tools, portable power tools and ancillary equipment 9 set out from base line and transfer levels to given working instructions for at least two of the following 9.1 excavations 9.2 ground beams 9.3 jacks and stools 9.4 piles Performance Criteria 6 10 completion of own work within the estimated, allocated time to meet the needs of other occupations and/or client 29

33 COSVR167 Set out for basic underpinning Scope/range related to knowledge and understanding Disposal of waste 1 environmental responsibilities, organisational procedures, manufacturers information, statutory regulations and official guidance Emergencies 2 operative's response to situations in accordance with organisational authorisation and personal skills when involved with 2.1 fires, spillages, injuries 2.2 emergencies relating to occupational activities Hazards 3 those identified by risk assessment, method of work, manufacturers technical information, statutory regulations and official guidance Health and safety control equipment 4 identified by the principles of protection for occupational use, types and purpose of each type, work situations and general work environment 4.1 collective protective measures Order 4.2 local exhaust ventilation (LEV) 4.3 personal protective equipment (PPE) 4.4 respiratory protective equipment (RPE) Information 5 drawings, specifications, schedules, method statements, risk assessments, manufacturers' information and current regulations governing buildings/associated with???? Legislation and official guidance 6 this relates to the operative's responsibilities regarding potential accidents, health hazards and the environment whilst working in the workplace, below ground level, in confined spaces, at height, with tools and equipment, with materials and substances, with movement/storage of materials and by manual handling and mechanical lifting Maintenance 7 operative care of hand tools, and/or portable power tools and ancillary equipment 30

34 COSVR167 Set out for basic underpinning Methods of work 8 application of knowledge for safe and healthy work practices, procedures and skills relating to the method/area of work and materials used to 8.1 set out from base line for underpinning excavations, ground beams, jacks and stools, piles 8.2 transfer levels by non-optical methods 8.3 recognise and determine when specialist skills and knowledge are required and report accordingly????? 8.4 determine specific requirements for structures of special interest, traditional build (pre 1919) and historical significance????? 8.5 use hand tools, portable power tools and equipment 8.6 use setting out equipment and materials 8.7 work at height???? 8.8 use access equipment???? 9 team work and communication 10 needs of other occupations associated with setting out for underpinning Personal protective equipment (PPE) 10 occupational use, types, purpose of each type and work situations Problems 11 those arising from information, resources and methods of work 11.1 own authority to rectify 11.2 organisational reporting procedures Programme 12 types of progress charts, timetables and estimated times 13 organisational procedures for reporting circumstances which will affect the work programme Protect work 14 protect work against damage from general workplace activities, other occupations and adverse weather conditions 31

35 COSVR167 Set out for basic underpinning Resources 15 materials, components and equipment relating to types, quantity, quality, sizes and the sustainability of standard and/or specialist 15.1 timber and fixings 15.2 hand tools, portable power tools and equipment 15.3 setting out equipment 16 methods of calculation associated with the method/procedure to set out for underpinning Security procedures 17 site, workplace, company and operative 32

36 COSVR168 Excavate for underpinning Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components, tools and equipment and preparing and excavating trenches and pits and providing temporary excavation support This standard is for people working in the occupational area of sub-structure work occupations and can be used by operatives, supervisors and managers????? 33

37 COSVR168 Excavate for underpinning Additional Information Scope/range related to performance criteria Performance Criteria 1 1 interpretation of drawings, specifications, schedules, method statements, risk assessments and manufacturers' information related to the work to be carried out Performance Criteria 2 2 safe use of personal protective equipment (PPE) to carry out the activity, in accordance with legislation and/or organisational requirements avoidance of risk by complying with the given information relating to / at least?? of the following 2.1 methods of work 2.2 safe use of health and safety control equipment 2.3 safe use of access equipment???? 2.4 safe use, storage and handling of materials, tools and equipment 2.5 specific risks to health???? Performance Criteria 3 3 selection of resources associated with own work 3.1 materials, components and fixings 3.2 tools and equipment Performance Criteria 4 4 protection of the work and its surrounding area from damage 5 installation of appropriate signing and guarding 6 minimise damage and maintain a clean work space 7 disposal of waste in accordance with current legislation Performance Criteria 5 8 demonstration of work skills to measure, mark out, excavate, position and secure 9 use and maintain hand tools, portable power tools and ancillary equipment 10 excavate and support pits and trenches for underpinning to given working instructions 11 locate, mark and protect services Performance Criteria 6 12 completion of own work within the estimated, allocated time to meet the needs of other occupations and/or client 34

38 COSVR168 Excavate for underpinning Scope/range related to knowledge and understanding Disposal of waste 1 environmental responsibilities, organisational procedures, manufacturers information, statutory regulations and official guidance Emergencies 2 operative's response to situations in accordance with organisational authorisation and personal skills when involved with 2.1 fires, spillages, injuries 2.2 emergencies relating to occupational activities Hazards 3 those identified by risk assessment, method of work, manufacturers technical information, statutory regulations and official guidance Health and safety control equipment 4 identified by the principles of protection for occupational use, types and purpose of each type, work situations and general work environment 4.1 collective protective measures Order 4.2 local exhaust ventilation (LEV) 4.3 personal protective equipment (PPE) 4.4 respiratory protective equipment (RPE) Information 5 drawings, specifications, schedules, method statements, risk assessments, manufacturers' information and current regulations governing buildings/associated with???? Legislation and official guidance 6 this relates to the operative's responsibilities regarding potential accidents, health hazards and the environment whilst working in the workplace, below ground level, in confined spaces, at height, with tools and equipment, with materials and substances, with movement/storage of materials and by manual handling and mechanical lifting Maintenance 7 operative care of hand tools, and/or portable power tools and ancillary equipment 35

39 COSVR168 Excavate for underpinning Methods of work 8 application of knowledge for safe and healthy work practices, procedures and skills relating to the method/area of work and materials used to 8.1 excavate pits and trenches for underpinning 8.2 support excavations 8.3 locate, mark and protect services 8.4 remove ground water 8.5 recognise and determine when specialist skills and knowledge are required and report accordingly????? 8.6 determine specific requirements for structures of special interest, traditional build (pre 1919) and historical significance????? 8.7 use hand tools, portable power tools and equipment 8.8 work at height???? 8.9 use access equipment???? 9 team work and communication 10 needs of other occupations associated with underpinning excavations Personal protective equipment (PPE) 10 occupational use, types, purpose of each type and work situations Problems 11 those arising from information, resources and methods of work 11.1 own authority to rectify 11.2 organisational reporting procedures Programme 12 types of progress charts, timetables and estimated times 13 organisational procedures for reporting circumstances which will affect the work programme Protect work 14 protect work against damage from general workplace activities, other occupations and adverse weather conditions 36

40 COSVR168 Excavate for underpinning Resources 15 materials, components and equipment relating to types, quantity, quality, sizes and the sustainability of standard and/or specialist 15.1 excavation support, fixings, fittings 15.2 hand tools, and/or portable powered tools and equipment 16 methods of calculating quantity, length, area and wastage associated with the method/procedure for underpinning excavations Security procedures 17 site, workplace, company and operative 37

41 38

42 COSVR169 Install dry packing Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components, tools and equipment and preparing and installing stools or dry packing support between new foundations and existing structures This standard is for people working in the occupational area of sub-structure work occupations and can be used by operatives, supervisors and managers????? 39

43 COSVR169 Install dry packing Additional Information Scope/range related to performance criteria Performance Criteria 1 1 interpretation of drawings, specifications, schedules, method statements, risk assessments and manufacturers' information related to the work to be carried out Performance Criteria 2 2 safe use of personal protective equipment (PPE) to carry out the activity, in accordance with legislation and/or organisational requirements avoidance of risk by complying with the given information relating to / at least?? of the following 2.1 methods of work 2.2 safe use of health and safety control equipment 2.3 safe use of access equipment???? 2.4 safe use, storage and handling of materials, tools and equipment 2.5 specific risks to health???? Performance Criteria 3 3 selection of resources associated with own work 3.1 materials, components and fixings 3.2 tools and equipment Performance Criteria 4 4 protection of the work and its surrounding area from damage 5 minimise damage and maintain a clean work space 6 disposal of waste in accordance with current legislation Performance Criteria 5 7 demonstration of work skills to measure, mark out, remove, mix, place, position and secure 8 use and maintain hand tools, portable power tools and ancillary equipment 9 prepare and install temporary or permanent support to given working instructions 9.1 cut pockets 9.2 jacks/stools position 9.3 formation/foundations 9.4 structural members 9.5 dry pack Performance Criteria 6 10 completion of own work within the estimated, allocated time to meet the needs of other occupations and/or client 40

44 COSVR169 Install dry packing Scope/range related to knowledge and understanding Disposal of waste 1 environmental responsibilities, organisational procedures, manufacturers information, statutory regulations and official guidance Emergencies 2 operative's response to situations in accordance with organisational authorisation and personal skills when involved with 2.1 fires, spillages, injuries 2.2 emergencies relating to occupational activities Hazards 3 those identified by risk assessment, method of work, manufacturers technical information, statutory regulations and official guidance Health and safety control equipment 4 identified by the principles of protection for occupational use, types and purpose of each type, work situations and general work environment 4.1 collective protective measures Order 4.2 local exhaust ventilation (LEV) 4.3 personal protective equipment (PPE) 4.4 respiratory protective equipment (RPE) Information 5 drawings, specifications, schedules, method statements, risk assessments, manufacturers' information and current regulations governing buildings/associated with???? Legislation and official guidance 6 this relates to the operative's responsibilities regarding potential accidents, health hazards and the environment whilst working in the workplace, below ground level, in confined spaces, at height, with tools and equipment, with materials and substances, with movement/storage of materials and by manual handling and mechanical lifting Maintenance 7 operative care of hand tools, and/or portable power tools and ancillary equipment 41

45 COSVR169 Install dry packing Methods of work 8 application of knowledge for safe and healthy work practices, procedures and skills relating to the method/area of work and materials used to 8.1 form pockets to position jacks/stools 8.2 prepare formation/foundations and structural members 8.3 place and compact dry pack 8.4 cure dry pack 8.5 recognise and determine when specialist skills and knowledge are required and report accordingly????? 8.6 determine specific requirements for structures of special interest, traditional build (pre 1919) and historical significance????? 8.7 use hand tools, portable power tools and equipment 8.8 work at height???? 8.9 use access equipment???? 9 team work and communication 10 needs of other occupations associated with underpinning Personal protective equipment (PPE) 10 occupational use, types, purpose of each type and work situations Problems 11 those arising from information, resources and methods of work 11.1 own authority to rectify 11.2 organisational reporting procedures Programme 12 types of progress charts, timetables and estimated times 13 organisational procedures for reporting circumstances which will affect the work programme Protect work 14 protect work against damage from general workplace activities, other occupations and adverse weather conditions 42

46 COSVR169 Install dry packing Resources 15 materials, components and equipment relating to types, quantity, quality, sizes and the sustainability of standard and/or specialist 15.1 jacks, stools, footing pads, grouts, shims, packings, cement, aggregates, admixtures 15.2 hand tools, and/or portable powered tools and equipment 16 methods of calculating quantity, length, area and wastage associated with the method/procedure for underpinning operations Security procedures 17 site, workplace, company and operative 43

47 44

48 COSVR170 Install mini-piles Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components, tools and equipment and preparing rig and attachments, operating rig and installing underpinning mini-piles???? This standard is for people working in the occupational area of sub-structure work occupations and can be used by operatives, supervisors and managers????? 45

49 COSVR170 Install mini-piles Additional Information Scope/range related to performance criteria Performance Criteria 1 1 interpretation of drawings, specifications, schedules, method statements, risk assessments and manufacturers' information related to the work to be carried out Performance Criteria 2 2 safe use of personal protective equipment (PPE) to carry out the activity, in accordance with legislation and/or organisational requirements avoidance of risk by complying with the given information relating to / at least?? of the following 2.1 methods of work 2.2 safe use of health and safety control equipment 2.3 safe use of access equipment???? 2.4 safe use, storage and handling of materials, tools and equipment 2.5 specific risks to health???? Performance Criteria 3 3 selection of resources associated with own work 3.1 materials, components and fixings 3.2 tools and equipment Performance Criteria 4 4 protection of the work and its surrounding area from damage 5 minimise damage and maintain a clean work space 6 disposal of waste in accordance with current legislation Performance Criteria 5 7 demonstration of work skills to measure, fit, position, secure and operate 8 use and maintain hand tools, portable power tools and ancillary equipment 9 install mini-pile underpinning to given working instructions by two from the following 9.1 open auger 9.2 hollow stem auger 9.3 down-hole hammer 9.4 in-hole support drilling 9.5 drop hammer 9.6 jacked down piling 9.7 pneumatic displacement piling 9.8 proprietary micro piling systems 46

50 COSVR170 Install mini-piles Performance Criteria 6 10 completion of own work within the estimated, allocated time to meet the needs of other occupations and/or client 47

51 COSVR170 Install mini-piles Scope/range related to knowledge and understanding Disposal of waste 1 environmental responsibilities, organisational procedures, manufacturers information, statutory regulations and official guidance Emergencies 2 operative's response to situations in accordance with organisational authorisation and personal skills when involved with 2.1 fires, spillages, injuries 2.2 emergencies relating to occupational activities Hazards 3 those identified by risk assessment, method of work, manufacturers technical information, statutory regulations and official guidance Health and safety control equipment 4 identified by the principles of protection for occupational use, types and purpose of each type, work situations and general work environment 4.1 collective protective measures Order 4.2 local exhaust ventilation (LEV) 4.3 personal protective equipment (PPE) 4.4 respiratory protective equipment (RPE) Information 5 drawings, specifications, schedules, method statements, risk assessments, manufacturers' information and current regulations governing buildings/associated with???? Legislation and official guidance 6 this relates to the operative's responsibilities regarding potential accidents, health hazards and the environment whilst working in the workplace, below ground level, in confined spaces, at height, with tools and equipment, with materials and substances, with movement/storage of materials and by manual handling and mechanical lifting Maintenance 7 operative care of hand tools, and/or portable power tools and ancillary equipment 48

52 COSVR170 Install mini-piles Methods of work 8 application of knowledge for safe and healthy work practices, procedures and skills relating to the method/area of work and materials used to 8.1 install, operate and dismantle mini-piling rigs 8.2 install piles by means of: open auger, hollow stem auger, down-hole hammer, in-hole support drilling, drop hammer, jacked down piling, pneumatic displacement piling, proprietary micro- piling systems 8.3 complete piling documentation 8.4 recognise and determine when specialist skills and knowledge are required and report accordingly????? 8.5 determine specific requirements for structures of special interest, traditional build (pre 1919) and historical significance????? 8.6 use hand tools, portable power tools and equipment 8.7 work at height???? 8.8 use access equipment???? 9 team work and communication 10 needs of other occupations associated with the installation of underpinning mini-piles Personal protective equipment (PPE) 10 occupational use, types, purpose of each type and work situations Problems 11 those arising from information, resources and methods of work 11.1 own authority to rectify 11.2 organisational reporting procedures Programme 12 types of progress charts, timetables and estimated times 13 organisational procedures for reporting circumstances which will affect the work programme Protect work 14 protect work against damage from general workplace activities, other occupations and adverse weather conditions 49

National Occupational Standards for Piling Operations

National Occupational Standards for Piling Operations National Occupational Standards for Piling Operations Review 2015 As @ 120215 Version 2 Development Legend 1 st and 2 nd NWG - Red 3 rd NWG Green 4 th NWG - Blue 5 th NWG Red underlined 6 th NWG Green

More information

COSVR509 - SQA Unit Code FW18 04 Fabricate and maintain timber and proprietary formwork systems

COSVR509 - SQA Unit Code FW18 04 Fabricate and maintain timber and proprietary formwork systems Fabricate and maintain timber and proprietary formwork systems Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components

More information

COSVR166 (SQA Unit Code - FW1E 04) Cut and bend reinforcement steel to shape

COSVR166 (SQA Unit Code - FW1E 04) Cut and bend reinforcement steel to shape Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing, cutting and bending reinforcement steel

More information

COSVR71 SQA Unit Code HL77 04 Install mechanically fixed plasterboard

COSVR71 SQA Unit Code HL77 04 Install mechanically fixed plasterboard Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components, tools and equipment and preparing

More information

COSVR322 (SQA Unit Code - H0HR 04) Apply insulation and finishes to cylindrical and flat surfaces

COSVR322 (SQA Unit Code - H0HR 04) Apply insulation and finishes to cylindrical and flat surfaces Apply insulation and finishes to cylindrical and flat surfaces Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components

More information

COSVR130 Install plasterboard linings

COSVR130 Install plasterboard linings Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components, tools and equipment, preparing,

More information

COSVR324 (SQA Unit Code - H0HT 04) Fit sheet metal insulation protection

COSVR324 (SQA Unit Code - H0HT 04) Fit sheet metal insulation protection Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 fitting sheet metal protection to insulated surfaces

More information

Overview COSVR130. Install plasterboard linings

Overview COSVR130. Install plasterboard linings Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components, tools and equipment, preparing,

More information

COSVR400 Operate powered units, tools or pedestrian plant, machinery or equipment

COSVR400 Operate powered units, tools or pedestrian plant, machinery or equipment Operate powered units, tools or pedestrian plant, machinery or equipment Overview This standard is about Interpreting information, adopting safe, healthy and environmentally responsible work practices,

More information

COSVR50 - SQA Unit Code DY9V 04 Repair and maintain masonry structures

COSVR50 - SQA Unit Code DY9V 04 Repair and maintain masonry structures Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 repairing and maintaining existing brick and/or

More information

COSVR767 SQA Unit Code HG63 04 Prepare and mix earth plasters and earth renders

COSVR767 SQA Unit Code HG63 04 Prepare and mix earth plasters and earth renders Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components, tools and equipment and preparing

More information

COSVR374 - SQA Unit Code DY9N 04 Reinstate excavation and highway surfaces

COSVR374 - SQA Unit Code DY9N 04 Reinstate excavation and highway surfaces Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing for and reinstating excavations and

More information

COSVR296 Install supplementary steel frame finishings

COSVR296 Install supplementary steel frame finishings Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 installing internal finishings, fire stops, insulation,

More information

COSVR290 - SQA Unit Code H36A 04 Erect timber roof structures

COSVR290 - SQA Unit Code H36A 04 Erect timber roof structures Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 constructing roofs in situ and erecting pre-assembled

More information

FY66 04 Operate Ancillary Equipment (Auger)

FY66 04 Operate Ancillary Equipment (Auger) FY66 04 Operate Ancillary Equipment (Auger) Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 using plant, machinery, materials, components, tools

More information

COSVR69 - SQA Unit Code DY3K 04 Lay sand and cement screeds

COSVR69 - SQA Unit Code DY3K 04 Lay sand and cement screeds Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing materials and laying sand and cement

More information

FY68 04 Operate Ancillary Equipment (Pecker/hammer)

FY68 04 Operate Ancillary Equipment (Pecker/hammer) FY68 04 Operate Ancillary Equipment (Pecker/hammer) Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 using plant, machinery, materials, components,

More information

COSVR274 SQA Unit Code HM24 04 Install single-lap roof tiles to a variable gauge

COSVR274 SQA Unit Code HM24 04 Install single-lap roof tiles to a variable gauge Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components, tools and equipment and installing

More information

Proposed National Occupational Standards for Wood Occupations Timber Frame Erection (Construction)

Proposed National Occupational Standards for Wood Occupations Timber Frame Erection (Construction) @15/05/13 Proposed National Occupational Standards for Wood Occupations Timber Frame Erection (Construction) Project 2013 (VR289, 290, 295) Contents Page no. Revised NOS: VR289 v4 Erect timber walls and

More information

COSVR188 SQA Unit Code HP85 04 Produce standard stonemasonry components

COSVR188 SQA Unit Code HP85 04 Produce standard stonemasonry components Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing and producing profiled natural stone

More information

COSVR389 SQA Unit Code HN4K 04 Operate plant or machinery to excavate

COSVR389 SQA Unit Code HN4K 04 Operate plant or machinery to excavate Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components and equipment for plant or machinery

More information

COSVR67 - SQA Unit Code DY92 04 Produce external solid render finishes

COSVR67 - SQA Unit Code DY92 04 Produce external solid render finishes Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials and equipment 4 preparing materials and applying render to external backgrounds

More information

Overview. COSVR204 - SQA Unit Code HP7M 04. Contribute to stone cladding lifting procedures

Overview. COSVR204 - SQA Unit Code HP7M 04. Contribute to stone cladding lifting procedures Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components, tools and equipment, and working

More information

COSVR358 SQA Unit Code HM34 04 Install fire resisting timber door assemblies and doorsets

COSVR358 SQA Unit Code HM34 04 Install fire resisting timber door assemblies and doorsets Install fire resisting timber door assemblies and doorsets Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and

More information

COSVR11 - SQA Unit Code DY13 04 Erect structural carcassing components

COSVR11 - SQA Unit Code DY13 04 Erect structural carcassing components Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing and carrying out the erection of carcassing

More information

COSVR143 SQA Unit Code HN48 04 Produce tiled, mosaic and stone surface finishes

COSVR143 SQA Unit Code HN48 04 Produce tiled, mosaic and stone surface finishes Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 setting out geometrical patterns and fixing wall

More information

COSVR67 SQA Unit Code HL75 04 Apply solid render to background surfaces and produce finishes

COSVR67 SQA Unit Code HL75 04 Apply solid render to background surfaces and produce finishes Apply solid render to background surfaces and produce finishes Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting

More information

COSVR448 - SQA Unit Code H1RK 04 Install external wall insulation

COSVR448 - SQA Unit Code H1RK 04 Install external wall insulation Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing and installing external wall insulation

More information

COSVR557 SQA Unit Code HG61 04 Conserve, restore or repair solid plaster or render surfaces

COSVR557 SQA Unit Code HG61 04 Conserve, restore or repair solid plaster or render surfaces Conserve, restore or repair solid plaster or render surfaces Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and

More information

COSVR402 SQA Unit Code HE3C 04 Slinging and signalling the movement of suspended loads

COSVR402 SQA Unit Code HE3C 04 Slinging and signalling the movement of suspended loads Slinging and signalling the movement of suspended loads Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices and selecting components

More information

COSVR141 Prepare backgrounds for tiling

COSVR141 Prepare backgrounds for tiling Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing new and/or existing solid and manufactured

More information

COSVR202 - SQA Unit Code DY0H 04 Erect complex stonemasonry structures

COSVR202 - SQA Unit Code DY0H 04 Erect complex stonemasonry structures Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing and erecting complex stonemasonry structures

More information

FY5P 04 Operate Road Rail Plant (Road Rail - rough terrain forklift truck)

FY5P 04 Operate Road Rail Plant (Road Rail - rough terrain forklift truck) FY5P 04 Operate Road Rail Plant (Road Rail - rough terrain forklift truck) Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 using plant or machinery,

More information

Overview COSVR182. Erect precast concrete structural units

Overview COSVR182. Erect precast concrete structural units Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components, tools and equipment, preparing

More information

COSVR157 - SQA Unit Code H1P0 04 Demolish/dismantle timber-framed structures

COSVR157 - SQA Unit Code H1P0 04 Demolish/dismantle timber-framed structures Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting equipment 4 demolishing/dismantling timber framed structures and roof components using

More information

COSVR676 SQA Unit Code HM1L 04 Install door systems

COSVR676 SQA Unit Code HM1L 04 Install door systems Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components, consumables and equipment 4 installing industrial and/or pedestrian

More information

COSVR221 - SQA Unit Code HM0W 04 Form drill holes or core in the structural fabric

COSVR221 - SQA Unit Code HM0W 04 Form drill holes or core in the structural fabric Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing for and drilling holes/cores in concrete,

More information

COSVR221 (SQA Unit Code - H1P5 04) Form drill holes or core in the structural fabric

COSVR221 (SQA Unit Code - H1P5 04) Form drill holes or core in the structural fabric Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing for and drilling holes/cores in concrete,

More information

COSVR248 HL4T 04 Erect and dismantle mobile and static scaffold towers

COSVR248 HL4T 04 Erect and dismantle mobile and static scaffold towers Erect and dismantle mobile and static scaffold towers Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment

More information

COSVR278 SQA Unit Code HN36 04 Install natural roof slate to mitred and vertical roof details

COSVR278 SQA Unit Code HN36 04 Install natural roof slate to mitred and vertical roof details Install natural roof slate to mitred and vertical roof details Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting

More information

Preparing Areas for Concrete Flooring in the Workplace Unit Level 2. CITB Unit 316 v2

Preparing Areas for Concrete Flooring in the Workplace Unit Level 2. CITB Unit 316 v2 Unit Specification for Regulated Qualifications Unit title Preparing Areas for Concrete Flooring in the Workplace Unit Level 2 Credit 15 Guided Learning Hours 60 SQA Unit code HW25 68 Regulator Unit code

More information

V COSVR??? Dynamic load and integrity testing of piles

V COSVR??? Dynamic load and integrity testing of piles V3 200717 COSVR??? Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components, tools and

More information

COSVR257 HL4M 04 Commission lightning conductor installation systems

COSVR257 HL4M 04 Commission lightning conductor installation systems Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing and commissioning lightning conductor

More information

COSVR133 - SQA Unit Code DY1W 04 Install raised access flooring systems

COSVR133 - SQA Unit Code DY1W 04 Install raised access flooring systems Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing/installing raised flooring systems with

More information

COSVR329 - SQA Unit Code H0XR 04 Produce decorative metal roofing and weathering details

COSVR329 - SQA Unit Code H0XR 04 Produce decorative metal roofing and weathering details Produce decorative metal roofing and weathering details Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment

More information

COSVR186 - SQA Unit Code FW1A 04 Remove existing wall cladding systems

COSVR186 - SQA Unit Code FW1A 04 Remove existing wall cladding systems Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 removing existing proprietary wall cladding systems

More information

COSVR391 SQA Unit Code HN0C 04 Operate plant or machinery to receive and transport loads

COSVR391 SQA Unit Code HN0C 04 Operate plant or machinery to receive and transport loads Operate plant or machinery to receive and transport loads Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and

More information

COSVR618 - SQA Unit Code FW1L 04 Finish dry lining walls or ceilings

COSVR618 - SQA Unit Code FW1L 04 Finish dry lining walls or ceilings Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing and carrying out finishing to dry lining

More information

COSVR402 revised Nov 2013 Slinging and signalling the movement of suspended loads

COSVR402 revised Nov 2013 Slinging and signalling the movement of suspended loads Overview This standard is about Interpreting information, adopting safe, and healthy and environmentally responsible working practices, selecting materials, components and equipment, preparing lifting

More information

COSVR339 - SQA Unit Code F Apply coatings by the airless spray method

COSVR339 - SQA Unit Code F Apply coatings by the airless spray method Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting and preparing materials and associated equipment 4 providing protection to the work

More information

FY52 04 Operate Plant or Machinery to lay and distribute (Asphalt paver)

FY52 04 Operate Plant or Machinery to lay and distribute (Asphalt paver) FY52 04 Operate Plant or Machinery to lay and distribute (Asphalt paver) Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting and/or using

More information

COSVR09 Install first fixing components

COSVR09 Install first fixing components Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing and carrying out first fixing 1 Performance

More information

COSVR664 - SQA Unit Code H4HB 04 Diagnose faults in plant or machinery systems or components

COSVR664 - SQA Unit Code H4HB 04 Diagnose faults in plant or machinery systems or components Diagnose faults in plant or machinery systems or components Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components, consumables

More information

COSVR184 - SQA Unit Code FW15 04 Install wall cladding systems

COSVR184 - SQA Unit Code FW15 04 Install wall cladding systems Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing and installing proprietary wall cladding

More information

COSVR49 SQA Unit HN2H 04 Erect complex masonry structures

COSVR49 SQA Unit HN2H 04 Erect complex masonry structures Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing and erecting brickwork and blockwork

More information

Recommended Qualification Structure for Sub-structure Work Occupations (Construction) Level 2

Recommended Qualification Structure for Sub-structure Work Occupations (Construction) Level 2 Recommended Qualification Structure for Sub-structure Work Occupations (Construction) Level 2 This structure has been recommended by employers and stakeholders from the above occupational area for organisations

More information

COSVR96 - SQA Unit Code DY2G 04 Install roof sheeting and cladding rainwater goods

COSVR96 - SQA Unit Code DY2G 04 Install roof sheeting and cladding rainwater goods Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 installing roof sheeting and cladding rainwater

More information

COSVR654(SQA Unit Code-H4X9 04) Fabricate joints in thermal insulation protection using sheet metal

COSVR654(SQA Unit Code-H4X9 04) Fabricate joints in thermal insulation protection using sheet metal Fabricate joints in thermal insulation protection using sheet metal Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components

More information

COSVR254 - SQA Unit Code DY0A 04 Erect and remove specialist access equipment

COSVR254 - SQA Unit Code DY0A 04 Erect and remove specialist access equipment Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing, positioning, securing and removing

More information

National Occupational Standards Developer s pack for Passive Fire Protection (Construction)

National Occupational Standards Developer s pack for Passive Fire Protection (Construction) National Occupational Standards Developer s pack for Passive Fire Protection (Construction) Project 2016 (COSVR350, COSVR351, COSVR352, COSVR353, COSVR354, COSVR355, COSVR356, COSVR357, COSVR358) To be

More information

COSVR333 - SQA Unit Code F Apply paint systems by brush and roller

COSVR333 - SQA Unit Code F Apply paint systems by brush and roller Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting and preparing materials and associated equipment 4 providing protection to the work

More information

COSVR10 - SQA Unit Code F Install second fixing components

COSVR10 - SQA Unit Code F Install second fixing components Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing and carrying out second fixing COSVR10

More information

COSVR95 - SQA Unit Code DY2K 04 Install roof sheeting and cladding systems

COSVR95 - SQA Unit Code DY2K 04 Install roof sheeting and cladding systems Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 installing roof sheeting and cladding systems

More information

COSVR375 SQA Unit Code HL5P 04 Lay flexible pavement materials

COSVR375 SQA Unit Code HL5P 04 Lay flexible pavement materials Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components, tools and equipment, preparing

More information

COSVR546 SQA Unit Code HG66 04 Working on conservation and restoration projects

COSVR546 SQA Unit Code HG66 04 Working on conservation and restoration projects Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 sampling and selecting materials, components and equipment 4 preparing, matching, maintaining

More information

FY4N 04 Operate Plant or Machinery to Receive and Transport Loads (Dump Truck - rigid chasis all sizes wheeled)

FY4N 04 Operate Plant or Machinery to Receive and Transport Loads (Dump Truck - rigid chasis all sizes wheeled) FY4N 04 Operate Plant or Machinery to Receive and Transport Loads (Dump Truck - rigid chasis all sizes wheeled) Operate plant or machinery to receive and transport loads Overview This standard is about

More information

COSVR242 (SQA Unit Code - H1PF 04) Install insulated cladding walls

COSVR242 (SQA Unit Code - H1PF 04) Install insulated cladding walls Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 installing sandwich panels/cladding walls for

More information

COSVR660 - SQA Unit Code H4HL 04 Service plant or machinery

COSVR660 - SQA Unit Code H4HL 04 Service plant or machinery Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components, consumables and equipment 4 servicing plant or machinery COSVR660

More information

COSVR639 SQA Unit HL87 04 Install drainage

COSVR639 SQA Unit HL87 04 Install drainage Overview This standard is about interpreting information, adopting safe and healthy working practices, selecting materials, components and equipment and preparing for and laying pipes, installing and testing

More information

COSVR643(SQA Unit Code-FN2V 04) Move, handle or store resources

COSVR643(SQA Unit Code-FN2V 04) Move, handle or store resources Overview This standard, in the context of your occupation and work environment, is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting aids or equipment to move,

More information

COSVR649 - SQA Unit Code H0WP 04 Produce stencils designs using pre-cut stencil plates

COSVR649 - SQA Unit Code H0WP 04 Produce stencils designs using pre-cut stencil plates Produce stencils designs using pre-cut stencil plates Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting and preparing materials and associated

More information

National Occupational Standards Development Pack for Plant Operations (Construction)

National Occupational Standards Development Pack for Plant Operations (Construction) As @ 081013 For FPS 24 Oct 2013 National Occupational Standards Development Pack for Plant Operations (Construction) Project 2013 (See Standard Template Update 2010 and 2011-12 for full details of generic

More information

COSVR256 HL53 04 Install lightning conductor systems

COSVR256 HL53 04 Install lightning conductor systems Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing and installing lightning conductor systems

More information

COSVR252 HL56 04 Utilise provision of fall protection systems

COSVR252 HL56 04 Utilise provision of fall protection systems Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing and utilising provision of fall protection

More information

COSVR250 - SQA Unit Code DX8Y 04 Erect and dismantle access/working platforms

COSVR250 - SQA Unit Code DX8Y 04 Erect and dismantle access/working platforms Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 erecting and dismantling access equipment suitable

More information

COSVR670 - SQA Unit Code H4HC 04 Determine and complete service to maintain plant or machinery

COSVR670 - SQA Unit Code H4HC 04 Determine and complete service to maintain plant or machinery Determine and complete service to maintain plant or machinery Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components,

More information

FY4W 04 Operate Plant or Machinery for Accessing (Mobile elevated working platform boom self propelled)

FY4W 04 Operate Plant or Machinery for Accessing (Mobile elevated working platform boom self propelled) FY4W 04 Operate Plant or Machinery for Accessing (Mobile elevated working platform boom self propelled) Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices

More information

SKSVR249 [Erect and Dismantle Basic Cantilever Scaffolds]

SKSVR249 [Erect and Dismantle Basic Cantilever Scaffolds] Overview This unit is about: interpreting information adopting safe and healthy working practices selecting materials, components and equipment preparing, erecting and dismantling basic cantilever scaffolds

More information

COSVR81 - SQA Unit Code DY8P 04 Produce complex plasterwork moulds

COSVR81 - SQA Unit Code DY8P 04 Produce complex plasterwork moulds Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 setting out and producing casting moulds for intricate

More information

COSVR121 SQA Unit Code HN8E 04 Install fitted furniture

COSVR121 SQA Unit Code HN8E 04 Install fitted furniture Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing for and installing proprietary and/or

More information

Cutting and Bending Reinforcement Steel to Shape in the Workplace T/504/9585

Cutting and Bending Reinforcement Steel to Shape in the Workplace T/504/9585 Unit Title Ofqual unit reference number (code) Organisation Reference Unit Level Unit Sub Level Cutting and Bending Reinforcement Steel to Shape in the Workplace T/504/9585 QCF 166v2 Two Unit Credit Value

More information

COSVR550 SQA Unit Code HG6M 04 Select, prepare and apply surface finishing to structures

COSVR550 SQA Unit Code HG6M 04 Select, prepare and apply surface finishing to structures Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 selecting, preparing and applying surface finishing

More information

COSVR785 Install metal decking and edge trims

COSVR785 Install metal decking and edge trims Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components, tools and equipment This standard

More information

COSVR477 SQA Unit Code HM2F 04 Machinery and equipment maintenance

COSVR477 SQA Unit Code HM2F 04 Machinery and equipment maintenance Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing and maintaining machinery and equipment

More information

COSVR284 - SQA Unit Code DY0E 04 Install double-lap concrete roof slates

COSVR284 - SQA Unit Code DY0E 04 Install double-lap concrete roof slates Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing and installing double-lap concrete slates

More information

SKSVR254 [Erect and remove specialist access equipment]

SKSVR254 [Erect and remove specialist access equipment] Overview This unit is about: interpreting information adopting safe and healthy working practices selecting materials, components and equipment preparing, positioning, securing and removing ladders, crawler

More information

COSVR118 SQA Unit Code HM2D 04 Thatch structures

COSVR118 SQA Unit Code HM2D 04 Thatch structures Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 thatching the main coatwork and forming eaves,

More information

COSVR118 SQA Unit Code HG6X 04 Thatch structures

COSVR118 SQA Unit Code HG6X 04 Thatch structures Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 thatching the main coatwork and forming eaves,

More information

COSVR628 SQA Unit Code HM3J 04 Set up and use transportable cutting and shaping machines

COSVR628 SQA Unit Code HM3J 04 Set up and use transportable cutting and shaping machines Set up and use transportable cutting and shaping machines Overview This standard is about interpreting information, adopting safe and healthy working practices and selecting materials, components and equipment

More information

Overview COSVR367. Lay modular pavement

Overview COSVR367. Lay modular pavement Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components, tools and equipment, preparing

More information

COSVR121 - SQA Unit Code F7A7 04 Install fitted furniture

COSVR121 - SQA Unit Code F7A7 04 Install fitted furniture Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing for and installing proprietary and/or

More information

COSVR555 - SQA Unit Code HL4J 04 Conserve, restore or maintain wall and floor tiling

COSVR555 - SQA Unit Code HL4J 04 Conserve, restore or maintain wall and floor tiling Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 selecting, matching, repairing, refurbishing,

More information

COSVR107 Apply reinforced bitumen membrane systems

COSVR107 Apply reinforced bitumen membrane systems Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting materials, components and equipment for applying reinforced bitumen

More information