1 B OPSS GENERAL HL,, Mixture, and/or Mix, is hot mixed, hot laid asphaltic concrete, used for pavement construction and other uses. 1. HL 1 This dense graded surface course mix is used on main highways carrying in excess of 5000 AADT/2 lanes. It consists of traprock coarse aggregate and local fine aggregates. When economical, Dense Friction Course Mixes should be considered in lieu of standard HL 1 mixes. 2. HL 2 HL 2 hot mix material is used as: i) a levelling course laid on existing pavement in order to correct irregularities of lines, crossfall or superelevation, ii) a surface course used for special applications in low speed areas where a thin layer of asphalt is required. The placing of HL 2 is sometimes a design requirement for main highways, using conventional pavement design, interchanges, speed change lanes, widening of roadway in excess of 2.0 m and elsewhere as recommended by the Regional Geotechnical Section. When the widening is less than 2.0 m, the Regional Geotechnical Section may recommend another mix. HL 2 is not normally used for shoulders and intersecting side roads or for patrol yards, private or commercial entrances and deep strength pavement construction. Where the total of required HL 2 is less than 300 t, this material should not be used unless specifically recommended by the Regional Geotechnical Section. 3. HL 3 This type of mix is designated as a surface course mix for heavy and medium traffic roads. The coarse aggregate AAA(13.2 mm) has to meet the quality requirements of OPSS HL 4 This mix is mainly used in Northern Ontario and in some parts of Southern Ontario as a surface of binder course B

2 In Southern Ontario the used of HL 4 for surface and binder courses is based on the availability and quality of local aggregates and on traffic volumes. Therefore, HL 3 may be recommended to be used as an alternative. The maximum coarse aggregate size is 19 mm. 5. HL 8 This type of mix is used as a binder course and may be surfaced with any type of hot mix surface course. The maximum particle size is 26.5 mm. 6. HL 4 and 8 Open Binder Course These open graded mixes are designed as binder courses for use over concrete pavement to delay reflection cracking. The modification of these mixes will be specified in a special provision. 7. Temporary This mix is used for seasonal asphalt applications, usually on secondary highways/temporary detours, and not to be used on 400 series highways and QEW Non-Driving Pavement Asphalt Applications In addition to the use of mixes in the pavement structure, some of the above-mentioned types of hot mixes are also employed for the paving of shoulders and ditches and median strips, construction of asphalt curb and gutters, gutter outlets, spillways, sidewalks and repairs or patching of the existing pavement Paving of Private Entrances and Side Roads The limits of paving of entrances and side roads will be established by the designer, and the depth of paving decided by the Regional Geotechnical Section. Previously paved private entrances are to be restored to their former condition. Gravel entrances in urban areas are paved between the curb and gutter and sidewalk. In rural areas where curb and gutter is used, gravel entrances may be paved at the discretion of the designer Policy of Local Municipality The designer shall contact the local Municipality with regard to local established policies on paving of private entrances. The Ministry will normally apply the policy of that Municipality provided the extent of the work does not exceed the normal Ministry cost B

3 If the Municipality insists on the application of their policy and standards, then they must agree to accept any additional costs before the work is carried out Paving of Commercial Entrances Commercial entrances should be paved according to the Commercial Site Access Policy and Standards Manual and should be approved by the designer and Regional Geotecnical Section. The limits of paving will sometimes be determined by alignment, grade and cross-section. For paving of entrances behind curb and gutter refer to section Miscellaneous Deferral of Paving Operations pavement is not to be placed before it is required for vehicular traffic because: a) the pavement is vulnerable to be damaged by construction vehicles, b) capital is tied up unnecessarily, c) hot mix pavements depreciate in the absence of traffic. On contracts where the fine grading is completed but the roadway will not be placed into service for some time, no paving operation shall commence until needed. A note on the plans on complex freeway staging work or direction by special provision is necessary to prevent the premature paving operation Padding Padding of the existing roadway is sometimes required to restore the roadway opr superelevation crossfall or to remove other pavement distortions prior to resurfacing. Pavement types and depths are contained in the Pavement Design Report. See paragraph for documentation procedure Pavement Widening on Curves An additional amount of is to be considered when calculating the required paving on curves. The widths and details of the pavement widening on curves is to be obtained from the Geometric Design Standards for Ontario Highway Manual, Chapter D Paved Shoulders The warrant and design of fully or partial paved shoulders is documented in the Geometric Design Manual Chapter D. The depth and width of paved shoulders should be clearly shown on a typical section or on a table Asphalt Quantities on Pavement Widening Contracts Pavement widening of up to 0.5 m may require an additional amount of asphalt quantities due to outward shoving of the asphalt by compaction equipment. The decision to adjust hot mix quantities on these widening contracts is the responsibility of the Regional Geotechnical Section based on the need of the individual contract B

4 Resurfacing in Rock Blasting Areas On projects where there is rock blasting adjacent to existing pavement which is not listed for removal or resurfacing, it has been found that, irrespective of the type of protection employed, damage to the pavement usually resulted. Therefore, where widening of rock cuts with a height of 1.5 m or more above the roadway surface is required adjacent to existing pavement as noted above, an allowance for the resurfacing of that area of the highway exposed to falling rock will be made. In general, a minimum length of 40 m of surface course is required, with sections separated by less than 60 m being connected with a continuous course. The extent of applicability is subject to circumstances on a project specific basis Tender Items HL.. HL.. Modified Asphalt Cement HL 1-5.2% HL 2-6.5% HL 3-5.4% HL 4-6.0% HL 3A - 5.3% HL 4-5.4% HL 8-5.4% HL 4 and 8 Open Binder Course - 3.0% The percentage of asphalt cement shown above will vary in each Region with the gradation and type of aggregates chosen. The contractor will supply the asphalt cement on all contracts. For contracts which require more than 400 t of asphalt cement, the designer will include a special provision which will provide for a payment adjustment when the Ministry s asphalt cement price index at the time of paving varies by more than 15% from the asphalt cement price index at the time of tender opening. The penetration grade and the percent of asphalt cement is documented in the special provision provided in Chapter E of this manual Specifications Details of the work of production, placing and compaction of HL are contained in OPSS Special Provisions B

5 The designer should refer to Chapter E of this manual to review the special provisions applicable to these tender items Standards The designer must base his work on highway engineering standards pertaining to the above tender items. Pavement design related standards are contained in the OPSD 500 series. Pavement design depths are shown on pages B and B of this section. Cross section elements are illustrated in the 200 series Temporary Pavement Whenever a temporary hot mix pavement (detours, widenings, etc.), which is intended to be removed within the same construction season, is included into a contact package, the use of the special provision for Temporary Pavement should be considered. This special provision offers the Contractor the option to construct and repair hot mix used for Temporary Pavement which is not subject to the normal payment adjustments for asphalt cement content, aggregate gradation and pavement compaction, and is inserted into a contract package upon the recommendation of the Manager of the Regional Construction Office. This special provision should not be used for detours or other temporary placement, if it is expected that the time frame for the temporary pavement will extend beyond the same construction season. The Regional Geotechnical Section is to be consulted in the selection of the type of mix for the temporary hot mix pavement from the following mix types: HL 3, 4, 8 Recycled. See paragraph and for documentation procedure COMPUTATION Source of Information All paving requirements with respect to HL types and depths including the paving of shoulders as recommended by the Regional Geotechnical Section are stated in the Pavement Design Report Method of Calculation The unit of measurement for HL mixes is the tonne. Each type of asphalt paving mixture used on a project will form a separate tender item. The computed tonnage for each type is the product of the calculated area of paving in square metres. The applicable mass in kg for the required depth and tonnage per kilometre for various paving widths is shown in the table below Type of Mix B

6 Type of Mix Course Depth mm Kg/m2 1.0 m width Tonnes per kilometer 6.0 m width 6.5 m width 7.0 m width 7.5 m width HL kg/m2/ 10 mm deep HL kg/m2/ 10 mm deep HL 3, 4 & kg/m2/ 10 mm deep HL 4, & 8 Open Binder Course 23.5 kg/m2/ 10 mm deep The above figures are based on traprock course and local fine aggregates for HL 1 and local coarse and fine aggregates for HL 2, 3, 4 and DOCUMENTATION The type of each hot mix used and the recommended depths of the appropriate paving course must be indicated on the contract plans, profiles or typical sections. It is necessary to ensure that this information is indicated for all asphalt paving to be carried out on a project and must include the types and depths of paving courses for roadway, private and commercial entrances, side roads, detours, patrol yards, interchange ramps, pavement widening, paved shoulders, etc. When padding, temporary hot mix pavement or superelevation correction is requested for a project, the exact locations and required tonnages for each location where this work is B

7 to be carried out must be indicated by a note on the contract plans. In case of superelevation correction, the rate of proposed superelevation must also be shown. The hot mix quantities computed for the various parts of a project are summarized on the Quantities and Granular sheet with separate entries under the appropriate HL heading as follows: - Roadway (incl. Partial Paved Shoulders) - Commercial Entrances - Interchange Ramps - Private Entrances - Channelization Legs - Patrol Yards - Side Roads - Fully Paved Shoulders - Detours - Temporary, etc. - Medians, Islands - Paving Under Guiderails When any of the following tender items are being used on a project, the asphalt material designated for this work must be calculated in tonnes and indicated under the appropriate item as a separate line entry on the Quantity Sheet. - Asphalt Curb and Gutter - Asphalt Surfacing of Gutter - Asphalt Spillways - Asphalt Gutter Outlets - Asphalt Sidewalks - Sidewalk Resurfacing - Crack Repair The calculated quantities are recorded on the Quantities and Granular Sheets in tonnes, and totalled. This total is the tender total and is transferred to the Tender Document Documentation Accuracy Calculated hot mix quantities are recorded in tonnes to the nearest whole number. Stations are recorded to the nearest whole metre B

8 PAVEMENT THICKNESS TABLES Course Freeways and Arterials 2 Lane Highways Present Traffic AADT > > = Present Traffic AADT Asphalt Courses in Comp. Pav t Bridge Decks Asphalt S walk 1. Surface HL1,3or HL1,3 or 4 HL3 or 4 40 mm HL3 or 4 50 mm HL3 or 4 6. HL3 or 4 HL 1, 3 or 4 HL 1, 3 or mm HL 3 or 4 Binder 50 mm 1@40mm 1@50mm 2@40mm or 1@40mm 1@50mm 1@ 50 mm HL 4 or 8 Nil Nil 40 HL 4 or 8 40 HL 4 or 8 Nil Total Thickness mm or 130 mm Course Airport Runways Taxiways And Aprons 4. Paved Medians, Guide Rail Areas, Parking Areas and Islands Built up Area & Emergency Parking 7. No Parking Patrol Yards Service Centres and Parking Lots Buses and Trucks Cars 1. Surface HL2,3 or 4 50 mm Binder 50 mm 30mm HL4 or 40mm HL4 or 8 Nil 50 mm 50 mm Nil Total Thickness mm or B

9 3. 80 mm NOTES: 1. Thickness as shown with 30 mm minimum. 2. Thickness selected to be determined by traffic densities, growth potential, %truck traffic, etc. 3. For deep strength & full depth construction, consult OPSD Design suitable for aircraft up to DC3. For airports with low traffic or mainly aircraft use 40 mm thickness only or surface treatment. Loadings higher than DC3 require special consideration. 5. May be modified to be sandier or richer mm thickness to be used in Districts 1 to A single 50 mm course should be used for small, low traffic areas. 8. For urban freeways, open friction course 25 mm should be used. 9. For main highways carrying in excess of 5000 AADT/lane, dense friction course to be used. 10. For main highways carrying in excess of 5000 AADT/2 lanes, HL1 to be used except N Ont. A For full depth recycling use thicknesses shown. B When resurfacing existing pavements consult table on page B C Both through and approach lanes on truck inspection and freeway service stations shall have the same pavement as adjacent lanes on traffic lanes. Minimum totat thickness to be 100 mm. D Thicknesses shown are in millimetres of consolidated bituminous pavement. THICKNESS FOR CONVENTIONAL PAVEMENTS AND FULL DEPTH RECYCLING OF FLEXIBLE PAVEMENTS Course Freeways and Arterials 2 Lane Highways Present AADT > 2000 Present AADT < 2000 Short Term Treatment (5 Years or less) Long Term Treatment Short Term Long Term Treatment Short Term Long Term Treatment Treatment Treatment (5 Years or (5 Years or less) less) Conventional Paving Recycling Conventional Paving Recycling Conventional Paving Recycling Surface 50 HL 1, 3 or 4 40 HL 1, 3 or >40-50 HL1,3 or 4 1. >40-50 HL1,3 or 4 1. > Binder 5. Nil Nil 0 or or Nil Nil Nil Levelling Nil Nil Nil Nil Nil Nil B

10 Padding Refer to 2. for all cases NOTES: >1. For surface course hot mix types, refer to PHY C-16. Use 25mm thickness when specifying open friction course on urban freeways. 2. Amount of padding dictated by: a. Performance. b. Cross section data. c. Extent of transverse and longitudinal corrections to give acceptable crossfall. 3. Thickness to be 20 mm average. 4. Normally HL2 is placed beneath the binder course, but occasionally this order may be reversed. If sandwiched between other hot mix layers it could result in wheel truck rutting at stop locations. 5. The need for a binder or levelling course will be determined at the design stage. >6. No recycled surface courses are permitted on highways with traffic greater than 5000 AADT/2 lanes. THICKNESS FOR RESURFACING AND PARTIAL DEPTH RECYCLING OF FLEXIBLE PAVEMENTS B

313-1 HOT MIX ASPHALT - OPSS.PROV 313

313-1 HOT MIX ASPHALT - OPSS.PROV 313 313-1 - OPSS.PROV 313 313-1.1 GENERAL Hot mix asphalt consists of several mix types, which are grouped into two categories: Stone Mastic Asphalt and Superpave as detailed below. The type of hot mix asphalt

More information

313-1 HOT MIX ASPHALT - OPSS.PROV 313

313-1 HOT MIX ASPHALT - OPSS.PROV 313 313-1 - OPSS.PROV 313 313-1.1 GENERAL Hot mix asphalt consists of several mix types, which are grouped into two categories: Stone Mastic Asphalt and Superpave as detailed below. The type of hot mix asphalt

More information

B HOT MIX ASPHALT - OPSS.PROV 313

B HOT MIX ASPHALT - OPSS.PROV 313 B313-1 - - OPSS.PROV 313 313-1.1 GENERAL Hot mix asphalt consists of several mix types, which are grouped into two categories: Stone Mastic Asphalt and Superpave as detailed below. The type of hot mix

More information

B313-1 HOT MIX ASPHALT OPSS.PROV 313

B313-1 HOT MIX ASPHALT OPSS.PROV 313 B313-1 OPSS.PROV 313 313-1.1 GENERAL Hot mix asphalt consists of several mix types, which are grouped into two categories: Stone Mastic Asphalt and Superpave as detailed below. The type of hot mix asphalt

More information

Cold In-Place Recycling with Expanded Asphalt B-335 COLD IN-PLACE RECYCLING WITH EXPANDED ASPHALT OPSS 335

Cold In-Place Recycling with Expanded Asphalt B-335 COLD IN-PLACE RECYCLING WITH EXPANDED ASPHALT OPSS 335 B-335 COLD IN-PLACE RECYCLING WITH EXPANDED ASPHALT OPSS 335 335.1 GENERAL Use of Cold In-Place Recycled Expanded Asphalt Mix (CIREAM) is recommended by the Regional Geotechnical Section on a work-project

More information

INDEX Warrant for Reclaiming Asphalt Pavement - Partial Depth Warrant for Reclaiming Asphalt Pavement - Full Depth

INDEX Warrant for Reclaiming Asphalt Pavement - Partial Depth Warrant for Reclaiming Asphalt Pavement - Full Depth 399-2 - INDEX 399-2.1 GENERAL 399-2.1.1 Tender Items 399-2.1.2 Traffic Warrant 399-2.1.3 Reference Publication 399-2.1.4 Warrant for Reclaiming Asphalt Pavement - Partial Depth 399-2.1.5 Warrant for Reclaiming

More information

MICRO-SURFACING - OPSS 336

MICRO-SURFACING - OPSS 336 - OPSS 336 336.1 GENERAL 336.1.1 Definitions Micro-surfacing is recommended by the Regional Geotechnical Section on a work project specific basis. It is generally used as a preventive maintenance treatment

More information

B351 - CONCRETE SIDEWALK - OPSS 351

B351 - CONCRETE SIDEWALK - OPSS 351 B351 - - OPSS 351 351.1 GENERAL The design and construction of concrete sidewalks, when justified and approved in accordance with Provincial Engineering Memorandum, Director s Office #2011-01 (February

More information

Select Subgrade Material, Compacted

Select Subgrade Material, Compacted 314.1 GENERAL B314 SHOULDER, SELECTED SUBGRADE, AND STOCKPILING OPSS.PROV 314 Granular materials meeting the requirements of OPSS.PROV 1010 are obtained from pits and quarries, and recycled materials.

More information

FULL-DEPTH RECLAMATION WITH EXPANDED ASPHALT STABILIZATION

FULL-DEPTH RECLAMATION WITH EXPANDED ASPHALT STABILIZATION B331 - FULL-DEPTH RECLAMATION WITH EXPANDED ASPHALT STABILIZATION - OPSS 331 331.1 GENERAL The work of Full-Depth Reclamation with Expanded Asphalt Stabilization consists of in-place full-depth reclamation

More information

CONSTRUCTION SPECIFICATION FOR HOT IN-PLACE RECYCLING AND HOT IN-PLACE RECYCLING WITH INTEGRAL OVERLAY

CONSTRUCTION SPECIFICATION FOR HOT IN-PLACE RECYCLING AND HOT IN-PLACE RECYCLING WITH INTEGRAL OVERLAY ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 332 SEPTEMBER 1996 CONSTRUCTION SPECIFICATION FOR HOT IN-PLACE RECYCLING AND HOT IN-PLACE RECYCLING WITH INTEGRAL OVERLAY 332.01 SCOPE 332.02 REFERENCES

More information

Special Provision No. 103F31 December 2014

Special Provision No. 103F31 December 2014 ASPHALTIC CONCRETE SURFACE SMOOTHNESS Special Provision No. 103F31 December 2014 Asphaltic Concrete Payment Adjustment for Surface Smoothness Based on Quality Assurance Measurements Taken by an Inertial

More information

304 - SURFACE TREATMENTS - OPSS 304

304 - SURFACE TREATMENTS - OPSS 304 04 - S - OPSS 04 04.1 GENERAL For economic reasons, roadways having low traffic volumes will often be selected for double surface treatment or prime and surface treatment in place of Hot Mix paving. Primed

More information

Special Provision No. 103F31 June This Special Provision covers all surface smoothness requirements for hot mix asphalt construction.

Special Provision No. 103F31 June This Special Provision covers all surface smoothness requirements for hot mix asphalt construction. ASPHALTIC CONCRETE SURFACE SMOOTHNESS - Asphaltic Concrete Payment Adjustment for Surface Smoothness Based on Quality Assurance Measurements Taken by an Inertial Profiler Special Provision No. 103F31 June

More information

Special Provision No. 103F31 January 2014

Special Provision No. 103F31 January 2014 AMENDMENT TO OPSS 313, APRIL 2007 Special Provision No. 103F31 January 2014 Asphaltic Concrete Payment Adjustment for Surface Smoothness Based on Quality Assurance Measurements Taken by an Inertial Profiler

More information

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement B510-5 OPSS 510 510-5.1 GENERAL This section is for Pavement Work removal tender items. The work covered by these tender items includes the removal and disposal of materials. 510-5.2 REFERENCES CDED B510-0

More information

B366 - REPAIRING CONCRETE PAVEMENT AND CONCRETE BASE - OPSS 366

B366 - REPAIRING CONCRETE PAVEMENT AND CONCRETE BASE - OPSS 366 B366 - - OPSS 366 366.1 GENERAL The specification for repair of concrete pavement and concrete base includes full depth and partial depth repairs using conventional or high early strength concrete, and

More information

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement B510-5 OPSS 510 510-5.1 GENERAL This section is for Pavement Work removal tender items. The work covered by these tender items includes the removal and disposal of materials. 510-5.2 REFERENCES CDED B510-0

More information

B723 ENERGY ATTENUATORS - OPSS 723

B723 ENERGY ATTENUATORS - OPSS 723 B723 - OPSS 723 723.1 GENERAL Various proprietary permanent and temporary energy attenuators are used to reduce the hazard associated with the ends of permanent and temporary concrete barriers. Tables

More information

CONSTRUCTION SPECIFICATION FOR HOT IN-PLACE RECYCLING AND HOT IN-PLACE RECYCLING WITH INTEGRAL OVERLAY

CONSTRUCTION SPECIFICATION FOR HOT IN-PLACE RECYCLING AND HOT IN-PLACE RECYCLING WITH INTEGRAL OVERLAY ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 332 APRIL 2004 CONSTRUCTION SPECIFICATION FOR HOT IN-PLACE RECYCLING AND HOT IN-PLACE RECYCLING WITH INTEGRAL OVERLAY TABLE OF CONTENTS 332.01 SCOPE

More information

Special Provision No. 399F02 January 2017 CONSTRUCTION SPECIFICATION FOR TEMPORARY HOT MIX PAVEMENT

Special Provision No. 399F02 January 2017 CONSTRUCTION SPECIFICATION FOR TEMPORARY HOT MIX PAVEMENT TEMPORARY HOT MIX PAVEMENT - Item No. Special Provision No. 399F02 January 2017 CONSTRUCTION SPECIFICATION FOR TEMPORARY HOT MIX PAVEMENT 1.0 SCOPE This Special Provision covers the requirements for the

More information

B723 ENERGY ATTENUATORS - OPSS 723

B723 ENERGY ATTENUATORS - OPSS 723 B723 - OPSS 723 723.1 GENERAL Various proprietary permanent and temporary energy attenuators are used to reduce the hazard associated with the ends of permanent and temporary concrete barriers. Tables

More information

THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION

THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION Standard Specifications for Restoration INDEX PAGE R.1 GENERAL...1 R.2 SCOPE...1 R.3 MATERIALS...1 R.4 CONSTRUCTION...2 R.4.1 General...2

More information

CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLED MIX

CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLED MIX ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 333 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLED MIX TABLE OF CONTENTS 333.01 SCOPE 333.02 REFERENCES 333.03 DEFINITIONS 333.04

More information

Contract Design, Estimating and Documentation (CDED) Manual REVISION PACKAGE #203

Contract Design, Estimating and Documentation (CDED) Manual REVISION PACKAGE #203 Contract Design, Estimating and Documentation (CDED) Manual REVISION PACKAGE #203 Dated: December 17, 2015 Portable Document Format (PDF) copies of this revision package as well as the individual documents

More information

CONSTRUCTION SPECIFICATION FOR SLURRY SEAL

CONSTRUCTION SPECIFICATION FOR SLURRY SEAL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 337 APRIL 1999 CONSTRUCTION SPECIFICATION FOR SLURRY SEAL TABLE OF CONTENTS 337.01 SCOPE 337.02 REFERENCES 337.03 DEFINITIONS 337.04 SUBMISSION AND

More information

MATERIAL SPECIFICATION FOR HOT MIX ASPHALT

MATERIAL SPECIFICATION FOR HOT MIX ASPHALT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1150 NOVEMBER 2008 MATERIAL SPECIFICATION FOR HOT MIX ASPHALT TABLE OF CONTENTS 1150.01 SCOPE 1150.02 REFERENCES 1150.03 DEFINITIONS 1150.04 DESIGN

More information

CONSTRUCTION SPECIFICATION FOR STOCKPILING OF PATCHING MATERIALS AND PATCHING OF ASPHALT PAVEMENT

CONSTRUCTION SPECIFICATION FOR STOCKPILING OF PATCHING MATERIALS AND PATCHING OF ASPHALT PAVEMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 307 NOVEMBER 2017 (Formerly OPSS 307, April 2012) Note: The PROV published in November 2017 replaces OPSS 307 COMMON, April 2012 with no technical content

More information

CONSTRUCTION SPECIFICATION FOR OPEN GRADED DRAINAGE LAYER

CONSTRUCTION SPECIFICATION FOR OPEN GRADED DRAINAGE LAYER ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 320 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR OPEN GRADED DRAINAGE LAYER TABLE OF CONTENTS 320.01 SCOPE 320.02 REFERENCES 320.03 DEFINITIONS 320.04

More information

CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLING

CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 333 NOVEMBER 2003 CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLING TABLE OF CONTENTS 333.01 SCOPE 333.02 REFERENCES 333.03 DEFINITIONS 333.04

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 353 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS TABLE OF CONTENTS 353.01 SCOPE 353.02 REFERENCES 353.03 DEFINITIONS

More information

902 - EXCAVATION AND BACKFILL FOR STRUCTURES - OPSS Bridges - Working slabs/pads - footings for piers and abutments - wingwalls

902 - EXCAVATION AND BACKFILL FOR STRUCTURES - OPSS Bridges - Working slabs/pads - footings for piers and abutments - wingwalls 902 - - OPSS 902 902.1 GENERAL 902.1.1 Excavation for Structures Excavation for structures deals with excavation in earth or rock for the placement of the following structures: - Bridges - Working slabs/pads

More information

Special Provision No. 313F51 March Section of OPSS 313 is amended by the addition of the following:

Special Provision No. 313F51 March Section of OPSS 313 is amended by the addition of the following: SMA 9.5 -... mm LIFT THICKNESS - Item No. SMA 12.5 -... mm LIFT THICKNESS - Item No. SUPERPAVE 9.5 -... mm LIFT THICKNESS - Item No. SUPERPAVE 12.5 -... mm LIFT THICKNESS - Item No. SUPERPAVE 12.5FC 1

More information

CONSTRUCTION SPECIFICATION FOR SLURRY SEAL

CONSTRUCTION SPECIFICATION FOR SLURRY SEAL ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 337 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR SLURRY SEAL TABLE OF CONTENTS 337.01 SCOPE 337.02 REFERENCES 337.03 DEFINITIONS 337.04 DESIGN AND SUBMISSION

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 353 NOVEMBER 2016 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS TABLE OF CONTENTS 353.01 SCOPE 353.02 REFERENCES 353.03 DEFINITIONS

More information

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 492 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES TABLE OF

More information

B STEEL BEAM GUIDE RAIL - OPSS 721

B STEEL BEAM GUIDE RAIL - OPSS 721 B721-2 - - OPSS 721 721-2.1 GENERAL Design guidance and a description of Steel Beam Guide Rail systems, including various types and treatments, are provided in the Roadside Design Manual (RDM). 721-2.2

More information

CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING

CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 314 DECEMBER 1993 CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING 314.01 SCOPE 314.02 REFERENCES

More information

CONSTRUCTION SPECIFICATION FOR STOCKPILING OF PATCHING MATERIALS AND PATCHING OF ASPHALT PAVEMENT

CONSTRUCTION SPECIFICATION FOR STOCKPILING OF PATCHING MATERIALS AND PATCHING OF ASPHALT PAVEMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 307 APRIL 2012 CONSTRUCTION SPECIFICATION FOR STOCKPILING OF PATCHING MATERIALS AND PATCHING OF ASPHALT PAVEMENT TABLE OF CONTENTS 307.01 SCOPE 307.02

More information

CONSTRUCTION SPECIFICATION FOR SINGLE AND DOUBLE SURFACE TREATMENT

CONSTRUCTION SPECIFICATION FOR SINGLE AND DOUBLE SURFACE TREATMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 304 NOVEMBER 2016 CONSTRUCTION SPECIFICATION FOR SINGLE AND DOUBLE SURFACE TREATMENT TABLE OF CONTENTS 304.01 SCOPE 304.02 REFERENCES 304.03 DEFINITIONS

More information

MATERIAL SPECIFICATION FOR HOT MIX ASPHALT

MATERIAL SPECIFICATION FOR HOT MIX ASPHALT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1150 NOVEMBER 2010 MATERIAL SPECIFICATION FOR HOT MIX ASPHALT TABLE OF CONTENTS 1150.01 SCOPE 1150.02 REFERENCES 1150.03 DEFINITIONS 1150.04 DESIGN

More information

City of Regina Standard Construction Specification SECTION 2350 PLACEMENT OF ASPHALTIC CONCRETE SURFACE 1.0 GENERAL. 1.1 Scope

City of Regina Standard Construction Specification SECTION 2350 PLACEMENT OF ASPHALTIC CONCRETE SURFACE 1.0 GENERAL. 1.1 Scope 1.0 GENERAL 1.1 Scope 2.0 PRODUCTS 1.1.1 The work shall consist of placing asphaltic concrete to a compacted thickness conforming to the lines, grades, and cross-sections as shown on the plan or as designated

More information

B STEEL BEAM GUIDE RAIL - OPSS 552

B STEEL BEAM GUIDE RAIL - OPSS 552 B552-2 - - OPSS 552 552-2.1 GENERAL Steel Beam Guide Rail (SBGR) is a semi-rigid barrier system which restrains and redirects vehicles by a combination of beam bending (W-shaped steel section), tension,

More information

B STEEL BEAM GUIDE RAIL - OPSS 721

B STEEL BEAM GUIDE RAIL - OPSS 721 B721-2 - - OPSS 721 721-2.1 GENERAL Steel Beam Guide Rail (SBGR) is a semi-rigid barrier system which restrains and redirects vehicles by a combination of beam bending (W-shaped steel section), tension,

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 353 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS TABLE OF CONTENTS 353.01 SCOPE 353.02 REFERENCES 353.03 DEFINITIONS

More information

CONSTRUCTION SPECIFICATION FOR IN-PLACE FULL DEPTH RECLAMATION OF BITUMINOUS PAVEMENT AND UNDERLYING GRANULAR

CONSTRUCTION SPECIFICATION FOR IN-PLACE FULL DEPTH RECLAMATION OF BITUMINOUS PAVEMENT AND UNDERLYING GRANULAR ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 330 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR IN-PLACE FULL DEPTH RECLAMATION OF BITUMINOUS PAVEMENT AND UNDERLYING GRANULAR TABLE OF CONTENTS

More information

Special Provision No. 399F01 December 2014

Special Provision No. 399F01 December 2014 FULL DEPTH CRACK REPAIRS Item No. Special Provision No. 399F01 December 2014 1.0 SCOPE This Special Provision covers the requirements for full depth crack repairs in asphaltic concrete pavements. 2.0 REFERENCES

More information

CONSTRUCTION SPECIFICATION FOR INERTIAL BARRIER MODULES

CONSTRUCTION SPECIFICATION FOR INERTIAL BARRIER MODULES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 550 JUNE 1995 CONSTRUCTION SPECIFICATION FOR INERTIAL BARRIER MODULES 550.01 SCOPE 550.02 REFERENCES 550.03 DEFINITIONS 550.04 Not Used 550.05 MATERIALS

More information

TOWN OF AJAX DESIGN CRITERIA SECTION B ROADWAYS

TOWN OF AJAX DESIGN CRITERIA SECTION B ROADWAYS TOWN OF AJAX DESIGN CRITERIA SECTION B ROADWAYS B1 B 1.00 B 1.01 CLASSIFICATIONS STREET CLASSIFICATION All roadways in new developments shall be classified according to the traffic volume expected and

More information

DESIGN BULLETIN #13 (Revised September Supersedes March 2017)

DESIGN BULLETIN #13 (Revised September Supersedes March 2017) DESIGN BULLETIN #3 (Revised September 208. Supersedes March 207) Revisions to Pavement Design Manual for Selection of ACP Mix Types and Asphalt Binder Grades Updates to Design Bulletin #3 (September 208)

More information

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL This section covers the restoration of roadways and sidewalks, in whole or in part, with bituminous concrete paving. WITHIN 4 DAYS OF BACKFILLING IN AREAS

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 350 MARCH 1998 CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE 350.01 SCOPE 350.02 REFERENCES 350.03 DEFINITIONS TABLE OF CONTENTS

More information

CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLED MIX

CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLED MIX ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 333 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLED MIX TABLE OF CONTENTS 333.01 SCOPE 333.02 REFERENCES 333.03 DEFINITIONS

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 351 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK TABLE OF CONTENTS 351.01 SCOPE 351.02 REFERENCES 351.03 DEFINITIONS 351.04 DESIGN

More information

CONSTRUCTION SPECIFICATION FOR OPEN GRADED DRAINAGE LAYER

CONSTRUCTION SPECIFICATION FOR OPEN GRADED DRAINAGE LAYER ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 320 April 2016 CONSTRUCTION SPECIFICATION FOR OPEN GRADED DRAINAGE LAYER TABLE OF CONTENTS 320.01 SCOPE 320.02 REFERENCES 320.03 DEFINITIONS 320.04

More information

CONSTRUCTION SPECIFICATION FOR TACK COATING AND JOINT PAINTING

CONSTRUCTION SPECIFICATION FOR TACK COATING AND JOINT PAINTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 308 APRIL 2012 CONSTRUCTION SPECIFICATION FOR TACK COATING AND JOINT PAINTING TABLE OF CONTENTS 308.01 SCOPE 308.02 REFERENCES 308.03 DEFINITIONS

More information

Engineering & Construction Services Division Standard Drawings for Road Works. T No. Revision T No. Revision Remarks All T- drawings

Engineering & Construction Services Division Standard Drawings for Road Works. T No. Revision T No. Revision Remarks All T- drawings Engineering & Construction Services Division Standard Drawings for Road Works Revision No. 9 November 4 All T- drawings New title block for each drawing is now standardized. Revision numbers now added

More information

Revision No. 14. September Engineering & Construction Services Division Standard Specifications for Road Works. Revised/New (Insert) TS No.

Revision No. 14. September Engineering & Construction Services Division Standard Specifications for Road Works. Revised/New (Insert) TS No. Engineering & Construction Services Division Standard Specifications for Road Works Revision 14 September 2017 TS TS 1.00 Apr 2014 Sep 2017 TS 1.10 Apr 2014 Sep 2017 Construction Specification for Maintenance

More information

CONSTRUCTION SPECIFICATION FOR SINGLE AND DOUBLE SURFACE TREATMENT

CONSTRUCTION SPECIFICATION FOR SINGLE AND DOUBLE SURFACE TREATMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 304 APRIL 1999 CONSTRUCTION SPECIFICATION FOR SINGLE AND DOUBLE SURFACE TREATMENT TABLE OF CONTENTS 304.01 SCOPE 304.02 REFERENCES 304.03 DEFINITIONS

More information

Special Provision No. 335S03 April 2015

Special Provision No. 335S03 April 2015 COLD IN-PLACE RECYCLED EXPANDED ASPHALT MIX Item No. Special Provision No. 335S03 April 2015 Amendment to OPSS 335, November 2009 OPSS 335, November 2009, Construction Specification for Cold In-Place Recycling

More information

STANDARD DETAIL SPECIFICATIONS FOR STREET CONSTRUCTION, WALKWAYS, AND PAVEMENT RESTORATION CITY OF EDEN PRAIRIE, MINNESOTA INDEX

STANDARD DETAIL SPECIFICATIONS FOR STREET CONSTRUCTION, WALKWAYS, AND PAVEMENT RESTORATION CITY OF EDEN PRAIRIE, MINNESOTA INDEX Rev. 2016 STANDARD DETAIL SPECIFICATIONS FOR STREET CONSTRUCTION, WALKWAYS, AND PAVEMENT RESTORATION CITY OF EDEN PRAIRIE, MINNESOTA INDEX ARTICLE PAGE 1. Pavement Removal and Restoration... P-1 2. Street

More information

Special Provision No. 308F01 May 2010

Special Provision No. 308F01 May 2010 TACK COAT Item No. Special Provision No. 308F01 May 2010 OPSS.PROV 308, April 2007, Construction Specification for Tack Coating and Joint Painting, is deleted in its entirety and replaced with the following:

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3 CITY OF TORONTO TS 3.70 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS 3.70.01 SCOPE...3 TS

More information

CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING

CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 314 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING TABLE OF CONTENTS

More information

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 507 JULY 1991 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES 507.01 SCOPE 507.02 REFERENCES 507.03 Not Used 507.04 Not Used

More information

CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR SUBBASE, BASE, SURFACE, SHOULDER, AND STOCKPILING

CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR SUBBASE, BASE, SURFACE, SHOULDER, AND STOCKPILING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 314 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR SUBBASE, BASE, SURFACE, SHOULDER, AND STOCKPILING TABLE OF CONTENTS 314.01 SCOPE

More information

CONSTRUCTION SPECIFICATION FOR HOT MIXED, HOT LAID ASPHALTIC CONCRETE PAVING, AND HOT MIX PATCHING, INCLUDING RECYCLED AND SPECIALTY MIXES

CONSTRUCTION SPECIFICATION FOR HOT MIXED, HOT LAID ASPHALTIC CONCRETE PAVING, AND HOT MIX PATCHING, INCLUDING RECYCLED AND SPECIALTY MIXES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 313 MARCH 1993 CONSTRUCTION SPECIFICATION FOR HOT MIXED, HOT LAID ASPHALTIC CONCRETE PAVING, AND HOT MIX PATCHING, INCLUDING RECYCLED AND SPECIALTY

More information

Webinar on: Concrete Overlay Design Details and Joints. Dale S. Harrington P.E. March 5, 2015

Webinar on: Concrete Overlay Design Details and Joints. Dale S. Harrington P.E. March 5, 2015 Webinar on: Concrete Overlay Design Details and Joints Dale S. Harrington P.E. March 5, 2015 System of Concrete Overlays Concrete Overlays Bonded Overlay System Unbonded Overlay System Concrete Pavements

More information

CONSTRUCTION SPECIFICATION FOR IN-PLACE FULL DEPTH RECLAMATION OF BITUMINOUS PAVEMENT AND UNDERLYING GRANULAR

CONSTRUCTION SPECIFICATION FOR IN-PLACE FULL DEPTH RECLAMATION OF BITUMINOUS PAVEMENT AND UNDERLYING GRANULAR ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 330 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR IN-PLACE FULL DEPTH RECLAMATION OF BITUMINOUS PAVEMENT AND UNDERLYING GRANULAR TABLE OF CONTENTS

More information

THE REGIONAL MUNICIPALITY OF PEEL BASIS OF PAYMENT FOR RESTORATION

THE REGIONAL MUNICIPALITY OF PEEL BASIS OF PAYMENT FOR RESTORATION THE REGIONAL MUNICIPALITY OF PEEL BASIS OF PAYMENT FOR RESTORATION INDEX Page PR.1 ASPHALT RESTORATION... 1 PR.2 SODDING AND SEEDING... 2 PR.3 COLD MIX... 3 PR.4 COLD PLANING... 4 PR.5 SAWCUT EXISTING

More information

Curtis Bouteillier, Proform Management Inc. Wayne Gustafson, The City of Red Deer

Curtis Bouteillier, Proform Management Inc. Wayne Gustafson, The City of Red Deer Life Cycle Cost Analysis Considerations in Pavement Type Selection in Red Deer and Construction Challenges Bozena Czarnecki, Ph.D., P.Eng., Principal Specialist, Engineering Practice, Tetra Tech Canada

More information

Plan Preparation Guide. Chapter 2. Typical Sections - Pavement Design

Plan Preparation Guide. Chapter 2. Typical Sections - Pavement Design Plan Preparation Guide Chapter 2 Typical Sections - Pavement Design Section Description Page 1 Typical Sections 2-1 2 Secondary ( C projects) Typical Sections 2-3 3 Base Course 2-4 4 Full Depth Asphalt

More information

Appendix A General Conditions to Utility Cut Permanent Restoration

Appendix A General Conditions to Utility Cut Permanent Restoration Appendix A General Conditions to Utility Cut Permanent Restoration Abilities and Experience Appendix A General Conditions to Utility Cut Permanent Restoration All Contractors retained by the utility must

More information

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects 2.0 ROADWAYS 2.1 Road Classification 2.1.1 Standard Drawing Classification All Road Widths and Road Allowances shall be designed in accordance with the most recent Town of New Tecumseth Standards: TNT.SD

More information

B STEEL BEAM GUIDE RAIL - OPSS 721

B STEEL BEAM GUIDE RAIL - OPSS 721 B721-2 - - OPSS 721 721-2.1 GENERAL Steel Beam Guide Rail (SBGR) is a semi-rigid barrier system which restrains and redirects vehicles by a combination of beam bending (W-shaped steel section), tension,

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

CONSTRUCTION AND MATERIALS SPECIFICATIONS MANUAL. REVISION # 7 October 2017 NOTICE OF REVISION

CONSTRUCTION AND MATERIALS SPECIFICATIONS MANUAL. REVISION # 7 October 2017 NOTICE OF REVISION City of Hamilton Public Works Department 77 James Street North, Suite 320 Hamilton, ON L8R 2K3 CONSTRUCTION AND MATERIALS SPECIFICATIONS MANUAL Email Contact Information: REVISION # 7 October 2017 NOTICE

More information

CONSTRUCTION SPECIFICATION FOR RUBBLIZING CONCRETE PAVEMENT AND CONCRETE BASE

CONSTRUCTION SPECIFICATION FOR RUBBLIZING CONCRETE PAVEMENT AND CONCRETE BASE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 361 NOVEMBER 2011 CONSTRUCTION SPECIFICATION FOR RUBBLIZING CONCRETE PAVEMENT AND CONCRETE BASE TABLE OF CONTENTS 361.01 SCOPE 361.02 REFERENCES 361.03

More information

CONSTRUCTION SPECIFICATION FOR KEYHOLE EXCAVATION AND PERMANENT REINSTATEMENT OF KEYHOLE CORES TABLE OF CONTENTS

CONSTRUCTION SPECIFICATION FOR KEYHOLE EXCAVATION AND PERMANENT REINSTATEMENT OF KEYHOLE CORES TABLE OF CONTENTS CITY OF TORONTO TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS TS 4.70 November 2007 CONSTRUCTION SPECIFICATION FOR KEYHOLE EXCAVATION AND PERMANENT REINSTATEMENT OF KEYHOLE CORES TABLE OF

More information

CONSTRUCTION SPECIFICATION FOR IN-PLACE FULL DEPTH RECLAMATION OF BITUMINOUS PAVEMENT AND UNDERLYING GRANULAR

CONSTRUCTION SPECIFICATION FOR IN-PLACE FULL DEPTH RECLAMATION OF BITUMINOUS PAVEMENT AND UNDERLYING GRANULAR ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 330 NOVEMBER 2011 CONSTRUCTION SPECIFICATION FOR IN-PLACE FULL DEPTH RECLAMATION OF BITUMINOUS PAVEMENT AND UNDERLYING GRANULAR TABLE OF CONTENTS 330.01

More information

CHAPTER 3 SCOPE SUMMARY

CHAPTER 3 SCOPE SUMMARY CHAPTER 3 SCOPE SUMMARY GENERAL The SDDOT is an active member of AASHTO to share common national design standards for the state highway system. The AASHTO Task Force on Geometric Design has completed the

More information

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 355 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS TABLE OF CONTENTS 355.01 SCOPE 355.02 REFERENCES

More information

B441 - WATERMAINS - OPSS GENERAL

B441 - WATERMAINS - OPSS GENERAL B441 - - OPSS 441 441.1 GENERAL Watermains are a component of a water supply network. Watermains are a system of engineered hydraulic components designed for the conveyance of water from storage to consumption.

More information

CONSTRUCTION SPECIFICATION FOR HOT MIX ASPHALT - END RESULT

CONSTRUCTION SPECIFICATION FOR HOT MIX ASPHALT - END RESULT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 313 November 2016 CONSTRUCTION SPECIFICATION FOR HOT MIX ASPHALT - END RESULT TABLE OF CONTENTS 313.01 SCOPE 313.02 REFERENCES 313.03 DEFINITIONS

More information

Special Provision No. 103F03 June 2017

Special Provision No. 103F03 June 2017 AMENDMENT TO OPSS 313, NOVEMBER 2016 Special Provision No. 103F03 June 2017 OPSS 313, November 2016, Construction Specification for Hot Mix Asphalt - End Result, is deleted in its entirety and replaced

More information

BASE CONSTRUCTION MATERIALS A Aggregate

BASE CONSTRUCTION MATERIALS A Aggregate BASE CONSTRUCTION 2211 AGGREGATE BASE 2211.1 DESCRIPTION This work consists of placing aggregate base. 2211.2 MATERIALS A Aggregate... 3138 Provide the class of aggregate as required by the contract. 2211.3

More information

Supeseded. by T-01/15 PAVEMENT STRUCTURE DESIGN GUIDELINES. Technical Circular T-01/04. Geotechnical, Materials and Pavement Engineering

Supeseded. by T-01/15 PAVEMENT STRUCTURE DESIGN GUIDELINES. Technical Circular T-01/04. Geotechnical, Materials and Pavement Engineering MINISTRY OF TRANSPORTATION Geotechnical, Materials, & Pavement Engineering PAVEMENT STRUCTURE DESIGN GUIDELINES Technical Circular T-01/04 Geotechnical, Materials and Pavement Engineering February, 2004

More information

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN P401: ITEM 254 - PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN P402: ITEM 254 - PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, AS PER PLAN P403: ITEM 304 - AGGREGATE BASE, AS PER PLAN P404: DELETED P405:

More information

Allen & Sherriff Architects, Inc Yonge Street, S202, Richmond Hill, Ontario L4C 5K9 Tel: Fax: File Ref.

Allen & Sherriff Architects, Inc Yonge Street, S202, Richmond Hill, Ontario L4C 5K9 Tel: Fax: File Ref. Allen & Sherriff Architects, Inc. 10350 Yonge Street, S202, Richmond Hill, Ontario L4C 5K9 Tel: 905-884-1117 Fax: 905-884-4970 File Ref. 4166 Tender No.: T18-21 St. Theresa C.S. Child Care Expansion Durham

More information

ASPHALT MIX DESIGNER

ASPHALT MIX DESIGNER ASPHALT MIX DESIGNER EFFECT OF MIX DESIGN ON PERFORMANCE AND CONSTRUCTION OF HMA Module 8 Module 8 1, July 2005 8-1 QUALITY Meets or Exceeds the Expectations or Needs of the Customer Module 8 2, July 2005

More information

CONSTRUCTION SPECIFICATION FOR MICROSURFACING

CONSTRUCTION SPECIFICATION FOR MICROSURFACING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 336 NOVEMBER 2000 CONSTRUCTION SPECIFICATION FOR MICROSURFACING TABLE OF CONTENTS 336.01 SCOPE 336.02 REFERENCES 336.03 DEFINITIONS - Not Used 336.04

More information

DESIGN BULLETIN #77/2013 AMENDMENTS TO PAVEMENT DESIGN MANUAL. Re: Updated Requirements for Agency Practice, Design Inputs and Design Report Contents

DESIGN BULLETIN #77/2013 AMENDMENTS TO PAVEMENT DESIGN MANUAL. Re: Updated Requirements for Agency Practice, Design Inputs and Design Report Contents DESIGN BULLETIN #77/2013 AMENDMENTS TO PAVEMENT DESIGN MANUAL Re: Updated Requirements for Agency Practice, Design Inputs and Design Report Contents Introduction This design bulletin provides a number

More information

MATERIAL SPECIFICATION FOR PERFORMANCE GRADED ASPHALT CEMENT

MATERIAL SPECIFICATION FOR PERFORMANCE GRADED ASPHALT CEMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1101 NOVEMBER 2002 MATERIAL SPECIFICATION FOR PERFORMANCE GRADED ASPHALT CEMENT 1101.01 SCOPE 1101.02 REFERENCES 1101.03 DEFINITIONS TABLE OF CONTENTS

More information

SECTION ASPHALT PAVING AND SURFACING

SECTION ASPHALT PAVING AND SURFACING SECTION 02500 ASPHALT PAVING AND SURFACING PART 1 - GENERAL 1.01 WORK INCLUDED A. Traffic control as required to divert vehicular and pedestrian traffic around construction. B. Spreading and compacting

More information

B701 WATERMAINS- OPSS 701

B701 WATERMAINS- OPSS 701 B701 - OPSS 701 701.1 GENERAL Watermains are a component of a water supply network. Watermains are a system of engineered hydraulic components designed for the conveyance of water from storage to consumption.

More information

Annexure PSTS31.1 Heavy Duty Dense Graded Asphalt

Annexure PSTS31.1 Heavy Duty Dense Graded Asphalt Annexure PSTS31.1 Heavy Duty Dense Graded Asphalt Specific Contract Requirements Contract Number Note: Clause references within brackets in this Annexure refer to Clauses in the parent Technical Specification

More information

B STEEL BEAM GUIDE RAIL - OPSS.PROV 721

B STEEL BEAM GUIDE RAIL - OPSS.PROV 721 B721-2 - - OPSS.PROV 721 721-2.1 GENERAL Steel beam guide rail (SBGR) is a semi-rigid barrier system which restrains and redirects vehicles by a combination of beam bending (W-shaped steel section), tension,

More information

EXCELLENCE IN CONCRETE PAVEMENT AWARDS NOMINATION FORM

EXCELLENCE IN CONCRETE PAVEMENT AWARDS NOMINATION FORM EXCELLENCE IN CONCRETE PAVEMENT AWARDS NOMINATION FORM Completed forms are due in the NCPA office no later than Tuesday, October 23, 2018 for projects substantially complete in 2018. (Please feel free

More information

THE REGIONAL MUNICIPALITY OF NIAGARA

THE REGIONAL MUNICIPALITY OF NIAGARA THE REGIONAL MUNICIPALITY OF NIAGARA 2017-T-107 Contract RN 17-07 Reconstruction of Regional Road 89 Between Burleigh Hill Drive and Tremont Drive In the City of St. Catharines ADDENDUM NO. 2 I DIRECTIVE

More information