Future Programmatic Date 09/04/2018 Sorted By District (Subject to Departmental Changes) Run Date 6/22/2018

Size: px
Start display at page:

Download "Future Programmatic Date 09/04/2018 Sorted By District (Subject to Departmental Changes) Run Date 6/22/2018"

Transcription

1 Future Programmatic 09/04/2018 Sorted By rict (Subject to Departmental Changes) Run 6/22/2018 Prgmtc 1 09/04/ D01/D02 ENV FY19 Task Order Environmental task order agreement for rict 1 and rict /04/ $2,000,000 MED IR Deck ReplacementMED under MED TR 121 (Paradise Rd) 3 09/04/ D03 CO Inspection rict 3 Wide Inspection FY /04/ $3,500,000 MED US Bridge Rehab. Deck/Convert to Semi integralmed L& R 4 09/04/ $2,000,000 TRU SR (Drainage) Drainage improvements (catch basin and storm sewer) to improve TRU SR 46 from SLM 1.05 (500 feet North of Prospect Street (SLM 0.94) to Gilbert Drive (SLM 1.57). Construct curbing on the East side of SR-46 from 500 feet North of Prospect Street (SLM 0.94)1.05 to Ohltow nohltown Road. Also included is resurfacin g the roadway within the Project Limits. 4 09/04/ $650,000 SUM SR Replacing SFN SUM over 4 09/04/ D4/D11 Const Insp/Admin FY19/ /04/ D4/D11 Const Insp/Admin FY19/ /04/ D05/D10 GES FY2019/FY /04/ D06 GENERAL ENGR FY19A 6 09/04/ D06 CON ENGR FY 20P Two year construction inspection/administration agreement for rict 4 Projects. Two year construction inspection/administration agreement for rict 4 Projects. Block Pid for General Engineering and Engineering Tasks for D5 and D10. General engineering consultant services for various projects in D6. Two year contract beginning in FY21. Bridge painting inspection services on various project in D6 for CY 2019 & 2010 Environmental Services on a task order basis (IDIQ) focused mainly on projects in ricts 1 and 2. The duration of the contract will be 24 months from the date of authorization to proceed. The maximum prime compensation shall not exceed $750,000. Bridge Deck Replacement 10/01/22 10/01/22 Consultant for construction inspection Bridge Design ODOT to complete Environmental ODOT to complete survey control and ROW Consultant to provide engineering services from PE (Stage 1 & 2) through FE (Final Tracings) including On-Going services during construction. RW Acq services are not included in this agreement. Consultant to provide engineering services from PE (Stage 1 & 2) through FE (Final Tracings) including On-Going services during construction. RW Acq services are not included in this agreement. Two Year Inspection Agreement to provide general and bridge inspection services rict 4-wide. Coating Inspection Services for D4 & D11. Estimated fee is $1.525M. Two Year Inspection Agreement to provide general and bridge inspection services rict 4-wide. Coating Inspection Services for D4 & D11. Estimated fee is $1.525M. Request for general engineering and construction engineering services in ricts 5 and 10. Consultant to provide general engineering services as requested by the rict. Duration 24 months from authorization to proceed. Total contract amount $500,000. Consultant to provide Paint Inspection Services on various projects as requested by rict 6. Contract duration 24 months. 04/01/23 04/01/23

2 Future Programmatic 09/04/2018 Sorted By rict (Subject to Departmental Changes) Run 6/22/2018 Prgmtc 6 09/04/ D06 CON ENGR FY 19G B 6 09/04/ $1,500,000 MAD over I /04/ $68,500,000 FRA IR (Proj 2E) General construction inspection services on various projects in D6 for CY 2019 & SFN / : Replace overlay w/ concrete overlay (some full depth expected), replace parapets, add vandal fencing Reconstruct and widen portions of IR 70 EB & WB between 4thSt and Miller St to include ramps from Fulton Ave to IR 70 EB and IR 70EB to Parsons Ave. Reconstruct Mooberry St from Parsons Ave to 18th St and Fulton St between Third St and Fourth St. Recons truct structures FRA , FRA R, and FRA L&R. Construct eight retaining walls. 6 09/04/ $3,500,000 FRA FRA L (IR 70 WB over SR 315 and ramps) replace deckfra r (IR 70 EB over SR 315 and ramps) repair structure 7 09/04/ $1,440,000 D07 Signs FY20 Project to replace deficient guide signs at various locations in Montgomery & Clark County. In addition, wrong way signs will be placed at various interchanges throughout the district. 7 09/04/ D07 Paint Inspection FY19/20 Task order to provide construction paint inspection services for SFY 2019/ /04/ $5,900,000 MOT SR Convert the I-75 interchange at SR 725 to a diverging diamond (DDI), upgrade the traffic signal at Byers Road and install sidewalk along SR /04/ D08 BI 2019/2020 (A) rict 8 consultant inspection contract of various fracture critical steel pier caps in the rict for calender year 2019 and /04/ D08 BI 2019/2020 (B) rict 8 consultant bridge inspection contract of various truss bridges in the rict for calender year 2019 and /04/ $3,152,000 HAM IR Replace the deck and paint the HAM bridge that carries the ramp from NB I-75 to WB I-275 over I-75. Consultant to provide project inspection on various projects within D6. Primary work types to include roadway, earthwork, aggregate and structures. Paint and engineering services will not be included in this contract. Consultant to prepare plans to repair twin structures over IR-70. Provide construction inspection services and schedule reviewfor project duration Consultant to provide staged design plans through pre-bid activities. Perform survey, develop plans through Stages 1, 2 and 3, Final Tracings, aid in Pre-bid and provide Ongoing Services During Inspection Task Order to perform bridge painting inspection on various projects within the district. Duration of 24 months, total contract amount of $500,000. Perform survey, IMS, develop plans for all stages of design, final tracings, aid in Pre Bid activities, and provide On Going Services during construction. Annual bridge inspections for various fracture critical steel pier caps for calendar years 2019 and Annual bridge inspection for various truss bridges in rict 8 for calendar years 2019 and Consultant to prepare complete construction plans. 07/01/20 07/01/20 03/28/19 04/08/19 01/01/20 01/02/20 04/01/20 04/01/20 01/01/23 01/01/23

3 Future Programmatic 09/04/2018 Sorted By rict (Subject to Departmental Changes) Run 6/22/2018 Prgmtc 8 09/04/ $3,916,000 PRE US Rehabilitate Bridge Pre which carries US 127 over I-70 by replacing the deck, raising the structure, and painting the structural steel /04/ D10 BR INSP Underwater FY /04/ $3,320,000 JEF SR 7 (20.59)(20.84) Two-year Bridge Inspection (Underwater) contract for ODOT Structures, FY Does not include Ohio River Bridges. Replace continuous concrete slab superstructure on bridge JEF Replace deck on existing continuous steel beams and convert abutments to semiintegral on bridge JEF /04/ $2,200,000 CUY SR Replace the deck of the Broadview Rd (SR-176) bridge over West Creek located south of Brookpark Rd (SR-17) in Parma. Overlay done in 2004 under PID /04/ $1,000,000 CUY SR Remove the existing structure over a culvert and replace with fill east of SR /04/ D12 FY CON INSP PAINT 12 09/04/ D12 FY CON INSP /04/ D12 FY CON INSP /04/ D12 FY CON INSP3 in Hunting Valley and Moreland Hills. rict 12 construction inspection contract during SFYs for construction bridge paint inspections. Consultant to prepare complete construction and right of way plans as well as some environmental. 24 month contract to provide underwater bridge inspections for approximately 29 bridges in rict 10. Consultant to perform Preliminary and Detailed Engineering for rehabilitation of two structures. Bridges included in this project are JEF (SFN ) carrying SR 7 over TR 382 and JEF (SFN ) carrying SR 7 over CR 7G/RampG. replace the deck of the Broadview Rd bridge over West Creek. remove the existing structure over an existing trail/culvert. rict 12 contract for bridge paint construction inspection services for calendar years Primary work will be for bridge paint coating inspections during construction, 4 coatings ins. Secondary as needed: 2 PI, 1 CE1, 1 CE2. No.1 Contract. rict 12 task order needed, 2 CE2's as needed, 5-7 project needed No.2 Contract. rict 12 task order needed, 2 CE2's as needed 5-7 project needed. No.3 Contract. rict 12 task order needed, 2 CE2's as needed 5-7 project

4 Future Programmatic 09/04/2018 Sorted By rict (Subject to Departmental Changes) Run 6/22/2018 Prgmtc PID Cost 12 09/04/ D12 FY CON INSP SOIL construction inspection task orders for soil and compaction testing 12 09/04/ $470,000 CUY SR Replace the Aurora Rd (SR-43) bridge over a branch of Tinkers Creek located east of SR-175 in Solon /04/ CUY BI 2019(A) 3-year major bridge inpsection contract for the following structures: - CUY R - CUY CUY CUY CUY /04/ CUY BI 2019(B) 3-year major bridge inpsection contract for the following structures:cuy L&R - 3 yearscuy C - 2 yearscuy years 12 09/04/ CUY BI 2019(C) 3-year major bridge inpsection contract for the following structures:cuy /04/ STW MCR Task Order CY /04/ STW Env Services FY /04/ STW Eco/Permits/Mitigation/ ESA 15.32CUY Task Order Consultant for Maintenance Condition Rating, CY 2019 and CY 2020 Statewide Task Order for OES and districts to use for environmental services including overall project management, Ecological/Permits, ESA, Noise & Air Quality Investigations, and Cultural Resources. The Office of Environmental Services will hold a statewide task order contract for districts to use for ecological, permits, mitigation, and ESA work. needed. rict 12 task contract for construction inspection services for Calendar Years Primary work: soil and compaction testing and provide assistance for the rict Test Lab. 4 soils, 1 asphalt, 1 concrete tech. Secondary: 2PI, 1CE1 1CE2. replace the SR-43 bridge over Tinkers Creek. A multi-year bridge inspection contract for major bridges in D year major bridge inspection contract for calendar years 2019, 2020,2021. CUY , CUY , CUY inspection for 2020 for CUY & CUY year major bridge inpsection contract for the following structures: CUY L&R - 3 years CUY C - 2 years CUY years 3-year major bridge inpsection contract for the following structures: CUY CUY Task order for the visual inspection and recording of deficiencies along 60% (30% spring/summer, 30% summer/fall) of the centerline roadway segments per county for the Maintenance Condition Rating (MCR). OES will hire a consultant to perform Environmental Services on a statewide task order basis. Maximum compensation shall not exceed $300, and completion is 24 months from authorization to proceed. OES is requesting to hire a consultant to perform Eco/Permits/Mitigation/ESA tasks. Maximum prime compensation will not exceed $500,000. Completion time will be 24 months from Authorization to Proceed /04/ US 33 Corridor Study US 33 Corridor Study This project will develop a 20-year long range corridor plan looking at US 33 from the Transportation Research Center (SR 347) to the City of Dublin (SR 161) /04/ STW Safety Project Design Task Order contract to design safety improvements identified through ODOT's Highway Safety Program. The maximum Task Order contract to design safety improvements identified through ODOT's Highway Safety Program. The maximum

5 Future Programmatic 09/04/2018 Sorted By rict (Subject to Departmental Changes) Run 6/22/2018 Prgmtc PID Cost compensation for each contract will be $750,000 over 24 months. We will select one consultant /04/ STW Safety Studies Task Order contract to complete safety studies for locations identified through ODOT's Highway Safety Program. The maximum compensation for each contract will be $300,000 over 24 months. We will select one consultants. compensation for each contract will be $750,000 over 24 months. We will select one consultant. Task Order contract safety studies identified through ODOT's Highway Safety Program. The maximum compensation for each contract will be $300,000 over 24 months. We will select one consultant.

Future Programmatic Beyond 01/06/2020 Sorted By District (Subject to Departmental Changes)

Future Programmatic Beyond 01/06/2020 Sorted By District (Subject to Departmental Changes) Sorted By rict (Subject to Departmental Changes) Future Prog Beyond Prompt By Run : 1/25/2019 1 09/08/20 101082 D01 UBI FY21 Use a consultant to perform underwater bridge inspections. Consultant to perform

More information

Future Programmatic Beyond 05/06/2019 Sorted By District (Subject to Departmental Changes)

Future Programmatic Beyond 05/06/2019 Sorted By District (Subject to Departmental Changes) Sorted By rict (Subject to Departmental Changes) Future Prog Beyond Prompt By Run : 10/5/2018 1 09/09/19 100972 D01 Const Insp FY20 / FY21 inspection contract in rict 1 for FY20 & FY21 24 month Inspection

More information

Creek) Bridge Replacement with environmental, survey, and bridge design. Geotechnical work will be performed by ODOT.

Creek) Bridge Replacement with environmental, survey, and bridge design. Geotechnical work will be performed by ODOT. 1 101193 HAN SR 698 4.73/5.76 Bridge replacement of two structures, each over Tiderishi Creek. Consultant services to include design, contract plan development, & possible RW plan development. ODOT will

More information

PUBLIC INFORMATION MEETING June 24, 2015

PUBLIC INFORMATION MEETING June 24, 2015 Gallows Road (RTE. 650) over Arlington Boulevard (RTE. 50) Fairfax County Bridge Rehabilitation, Preventive Maintenance and Pier Repairs Phase 1 - Project No. 0650-029-235; UPC 106956, Pier Repair Phase

More information

CUY-IR MNT FY2018 Tree Removal PRUNING/OR TREE/BRUSH REMOVAL

CUY-IR MNT FY2018 Tree Removal PRUNING/OR TREE/BRUSH REMOVAL Notices 181004 Late CUY-IR MNT FY2018 Tree Removal PRUNING/OR TREE/BRUSH REMOVAL FOR IMPROVING VARIOUS SECTIONS IN CUYAHOGA COUNTY, OF OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY REMOVING TREES

More information

ODOT DISTRICT CONSTRUCTION PROGRAM

ODOT DISTRICT CONSTRUCTION PROGRAM ODOT DISTRICT 5 2017 CONSTRUCTION PROGRAM SERVING COSHOCTON, FAIRFIELD, GUERNSEY, KNOX, LICKING, MUSKINGUM, AND PERRY COUNTIES. JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR SONJA R. SIMPSON,

More information

Highway Construction Program

Highway Construction Program Highway Construction Program Monthly Delivery Progress Report Watch List February 2017 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,

More information

PROJECT DESCRIPTION PIK-CR PID 95402

PROJECT DESCRIPTION PIK-CR PID 95402 PROJECT DESCRIPTION PIK-CR 85-0.91 PID 95402 It is proposed to rehabilitate the bridge over Sunfish Creek on CR 85 in Pike County, Ohio. The rehabilitation includes the replacement of the concrete deck,

More information

CLA /10.54, PID Project Description:

CLA /10.54, PID Project Description: Project Description: The proposed project will consist of widening IR 70 to three lanes from Enon Road (SLM 06.75) to the US 68 interchange ramps (SLM 10.55). IR 70 is a component of the Strategic Highway

More information

MEMORANDUM. Attachments:

MEMORANDUM. Attachments: MEMORANDUM To: Technical Advisory Committee, Board of Directors From: MVRPC Staff Date: November 8, 2017 Subject: SFY2018-SFY2021 Transportation Improvement Program (TIP) Amendment #4 Over the last few

More information

PUBLIC NOTICE MEDINA COUNTY HIGHWAY ENGINEER SHAW ROAD BRIDGE REPLACEMENT - DESIGN REQUEST FOR STATEMENT OF QUALIFICATIONS (RFQ)

PUBLIC NOTICE MEDINA COUNTY HIGHWAY ENGINEER SHAW ROAD BRIDGE REPLACEMENT - DESIGN REQUEST FOR STATEMENT OF QUALIFICATIONS (RFQ) PUBLIC NOTICE MEDINA COUNTY HIGHWAY ENGINEER SHAW ROAD BRIDGE REPLACEMENT - DESIGN REQUEST FOR STATEMENT OF QUALIFICATIONS (RFQ) The Medina County Highway Engineer is soliciting statement of qualifications

More information

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures Cumberland Viaduct Rehabilitation Project Contract No. AL4095180R Presenter Bob Bofinger MDSHA Office of Structures Project Justification & Improvements Condition State The deck, superstructure and substructure

More information

State of Ohio. Department of Transportation ~ Innovative Contracting Manual

State of Ohio. Department of Transportation ~ Innovative Contracting Manual State of Ohio Department of Transportation ~ Innovative Contracting Manual 4/10/2006 Copies of this manual and reference materials may be obtained at: Ohio Department of Transportation Division of Construction

More information

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle

More information

Ohio Contractor Association Annual Work Forecast Program. John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director

Ohio Contractor Association Annual Work Forecast Program. John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director Ohio Contractor Association Annual Work Forecast Program John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director John R. Kasich, Ohio Governor Jerry Wray, ODOT Director ODOT S

More information

Any discussions or marketing activities related to this specific project.

Any discussions or marketing activities related to this specific project. 04-11-19 Posting Date South Sandusky Street Widening and Relocation PID No. Not Assigned City of Mount Vernon Response Due Date: 04-24-19 Communications Restrictions Please note the following policy concerning

More information

Ohio Department of Transportation - Prebid Questions

Ohio Department of Transportation - Prebid Questions Project No. 120625 Sale Date - 12/14/2012 ATB-76747 - IR-90-7.56, PART 1;ATB-90-13.60, PART 2 12/11/2012 8:03:55 AM Per Addendum 5 Item 184 was reduced drastically. With over 35,000 LF of new guardrail

More information

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN 2016 STRUCTURE INSPECTION APPRAISAL REPORT Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN by K. SMART ASSOCIATES LIMITED 8 McIntyre Drive Kitchener ON N2R 1H6 August 2016

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated May 4, 2018 FULTON COUNTY SR 0000(FMC) #109343 PROPOSAL:$21.36 PLANS:$9.02 12X18:$11.07 24X36:$159.90 X-SEC:$7.48 12X18:$9.18 24X36:$132.60 This project involves

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 6/2/2014 Project 140353 Addendum No. 1 PID No. 86675 MOT IR 75 11.75/11.80

More information

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units)

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units) 10/16/2014 Construction Cost Estimation Preparation Manual for Preliminary Design (English Units) July 2002 Prepared by Construction Cost Estimating Unit Program Support Services 10/16/2014 Table of Contents

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 Updated June 30, 2014 LUZERNE COUNTY SR 309(W02) #102354 PROPOSAL:$25.20 PLANS:$6.24 The description and location

More information

ENGINEERING DEPARTMENT UPDATE

ENGINEERING DEPARTMENT UPDATE To: Date: Public Works Committee Safety & Public Properties Committee Month ending July 31, 2018 RESIDENTIAL & COMMERCIAL REVIEWS AND PERMITTING A. Summary of Permits Type July Submitted 2018 YTD Submitted

More information

Northeast Bridge Preservation Partnership Meeting

Northeast Bridge Preservation Partnership Meeting Northeast Bridge Preservation Partnership Meeting Superstructure Preservation Strategies Aetna Viaduct Superstructure Repairs Route I-84 City of Hartford, CT State Project No. 63-648 David A. Cutler, P.E.

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 3 DBNUM: 15419 / UPC: 154190 This contract will bring projects into compliance with current ADA design requirements that could

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated June 27, 2016 BEAVER COUNTY SR 7446(LBB) #92912 PROPOSAL:$54.72 PLANS:$42.46 12X18:$52.11 24X36:$752.70 EXSTRUCT:$48.62 12X18:$59.67 24X36:$861.90 The description and location of the project is

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)

More information

WELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015

WELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015 WELCOME Public Meeting for I-35 / I-44 Interchange October 6, 2015 TEAM INTRODUCTIONS PURPOSE OF THIS MEETING is to present the alternative alignments for the I-35/I-44 and I-35/NE 63rd Street Interchanges

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 1 DBNUM: 15417 / UPC: 154170 This contract will bring projects into compliance with current ADA design requirements that could

More information

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure. Route 15/29 SBL Bridge Superstructure Replacement & Widening Existing Structure Scope Accelerated Procedure Staging (Superstructure) Preparatory Work (Substructure) NOVA District Questions EXISTING STRUCTURE

More information

Highway Construction Program

Highway Construction Program Highway Construction Program Monthly Delivery Progress Report Watch List October 2018 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,

More information

VDOT s Strategic Approach to Bridge Management and Maintenance

VDOT s Strategic Approach to Bridge Management and Maintenance ASCE Richmond Branch VDOT s Strategic Approach to Bridge Management and Maintenance Adam Matteo Assistant State Structure and Bridge Engineer Structure and Bridge Division October 13, 2015 Long Term Challenge

More information

Construction Cost Estimation Preparation Manual (Metric Units)

Construction Cost Estimation Preparation Manual (Metric Units) 07/25/2001 Construction Cost Estimation Preparation Manual (Metric Units) July 2001 Prepared by Cost Estimating Unit Program Support Services 07/25/2001 Table of Contents Section Page 1.0 Introduction

More information

BALFOUR INTERCHANGE PHASE 1 CONSTRUCTION PRE-BID MEETING

BALFOUR INTERCHANGE PHASE 1 CONSTRUCTION PRE-BID MEETING BALFOUR INTERCHANGE PHASE 1 CONSTRUCTION PRE-BID MEETING WHO WE ARE The Contra Costa Transportation Authority (CCTA) is a public agency formed by Contra Costa County voters in 1988 to manage the county

More information

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No. Palm Beach County, Florida Palm Beach Metropolitan Planning Organization April 217 Project Study Area LIMITS: SR 9/I-95: from S of 45th Street to N of 45th Street 45th Street: From Village Boulevard to

More information

MEMORANDUM. Attachments:

MEMORANDUM. Attachments: MEMORANDUM To: Technical Advisory Committee, Board of Directors From: MVRPC Staff Date: January 9, 2019 Subject: SFY2018-SFY2021 Transportation Improvement Program (TIP) Amendment #13 Over the last few

More information

Alternatives for Willow Creek Flood Mitigation Study

Alternatives for Willow Creek Flood Mitigation Study Alternatives for Willow Creek Flood Mitigation Study Presented by: Anil Tangirala, PE, CFM, ENV SP ms consultants, inc. June 22, 2016 Presentation Overview Introduction Project Background Willow Creek

More information

VDOT s Experience with Reinforced Concrete and Metal Culverts

VDOT s Experience with Reinforced Concrete and Metal Culverts 2015 Virginia Concrete Conference VDOT s Experience with Reinforced Concrete and Metal Culverts Adam Matteo, P.E. - Assistant State Structure and Bridge Engineer - Maintenance Jeff Milton - Bridge Preservation

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION JUNE 5, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JUNE 5, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated on May 19, 2014 VENANGO COUNTY SR 308(DOI) #96906 PROPOSAL:$13.44 PLANS:$3.96 For the bituminous milling and resurfacing of various state routes throughout VENANGO COUNTY, Commonwealth of Pennsylvania,

More information

Bridge Asset Management City of Battle Creek Planning and Projects

Bridge Asset Management City of Battle Creek Planning and Projects Bridge Asset Management City of Battle Creek Planning and Projects Michigan Bridge Conference, March 20, 2013 Gregory B. Rickmar P.E., Public Works Department, City of Battle Creek Alan Halbeisen, P.E.

More information

Ohio Department of Transportation - Prebid Questions

Ohio Department of Transportation - Prebid Questions Ohio Department of Transportation - Prebid Questions Project No. 110510 Sale Date - 9/29/2011 CUY-22212 - SR-17-8.38 (BROOKPARK ROAD) 9/22/2011 10:38:17 AM Quanity of materials for asbestos abatement?

More information

General Info. Number: PROJECT NO

General Info. Number: PROJECT NO General Info Number: PROJECT NO. 43-16-04 Description: BRIDGE DECK REPLACEMENT AND REHABILITATION, RAKER-BARDEN ROAD (CR. 7-2) OVER OHIO TURNPIKE M.P. 41.9, DELTA-SANTEE ROAD (CR. 7) OVER OHIO TURNPIKE

More information

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25 General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO

More information

Dyckman Avenue over Black River: A Movable Bridge Rehabilitation. South Haven, Michigan

Dyckman Avenue over Black River: A Movable Bridge Rehabilitation. South Haven, Michigan Dyckman Avenue over Black River: A Movable Bridge Rehabilitation South Haven, Michigan 1 Summary of Presentation Project Location History Condition Assessment Funding Design Construction Acknowledgements

More information

IMPROVING I 81 IN MARYLAND

IMPROVING I 81 IN MARYLAND IMPROVING I 81 IN MARYLAND April 25, 2017 Stephen A. Bucy, P.E. Improving I 81 in Maryland Overview: Facts SHA s Comprehensive I 81 Strategy Current Phase 1 Widening Project Update Closing Improving I

More information

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated November 17, 2008 PHILADELPHIA COUNTY SR 30(ADA) PROPOSAL:$14.40 The description and location of the project is as follows: For the design and construction of ADA compliant concrete curb ramps

More information

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA 2008/09 $52.0 M 85% SELF-PERFORMED Widen 12 miles of Interstate 10 to six lanes including the reconstruction

More information

Ohio Department of Transportation

Ohio Department of Transportation Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 Ted Strickland, Governor Jolene M. Molitoris, Director THE DEPARTMENT UTILIZES BID EXPRESS (http://www.bidx.com)

More information

Clear Creek Road (PM 1.82 & 0.25) Bridge Replacement Projects. Public Meeting, Wednesday, November 20, 2013 Pleasant Valley Middle School

Clear Creek Road (PM 1.82 & 0.25) Bridge Replacement Projects. Public Meeting, Wednesday, November 20, 2013 Pleasant Valley Middle School Clear Creek Road (PM 1.82 & 0.25) Bridge Replacement Projects Public Meeting, Wednesday, November 20, 2013 Pleasant Valley Middle School Presented By: County of El Dorado Community Development Agency Transportation

More information

PIC PID Const Project Pre Bid Meeting. April 25, 2013

PIC PID Const Project Pre Bid Meeting. April 25, 2013 PIC-674-4.21 PID 83958 Const Project 466314 Pre Bid Meeting April 25, 2013 1 Project Goals Complete Replacement of PIC-674-0430 structure Improve deficient sight distance by reconstructing vertical curves

More information

Procedure No: (SP) Effective: August 28, 2002 Responsible Office: Division of Finance and Forecasting INFRASTRUCTURE CAPITALIZATION PROCEDURE

Procedure No: (SP) Effective: August 28, 2002 Responsible Office: Division of Finance and Forecasting INFRASTRUCTURE CAPITALIZATION PROCEDURE Approved : Procedure No: 210-003(SP) Effective: August 28, 2002 Responsible Office: Division of Finance and Forecasting Julie Ray, Deputy Director Division of Finance and Forecasting INFRASTRUCTURE CAPITALIZATION

More information

SCHUYLKILL COUNTY SR 125(JFR) # PROPOSAL:$20.76 PLANS 8.5X11:$1.20

SCHUYLKILL COUNTY SR 125(JFR) # PROPOSAL:$20.76 PLANS 8.5X11:$1.20 SCHUYLKILL COUNTY SR 125(JFR) #111844 PROPOSAL:$20.76 PLANS 8.5X11:$1.20 The emergency project consists of rock protection and underpinning of the piers to prevent future scouring and other miscellaneous

More information

ANSWERS TO QUESTIONS RECEIVED THROUGH 11:00 A.M. ON JANUARY 4, 2019:

ANSWERS TO QUESTIONS RECEIVED THROUGH 11:00 A.M. ON JANUARY 4, 2019: ADDENDUM NO. PROJECT NO. 3-9-07 PAGE 2 ANSWERS TO QUESTIONS RECEIVED THROUGH :00 A.M. ON JANUARY, 209: Q# Plan sheet 2 has a note MAINTENANCE OF TRAFFIC (LOCAL ROADS) which relates to bid item 22 and calls

More information

Engineering & Capital Improvements. Shore Acres Civic Association August 21 st, 2017

Engineering & Capital Improvements. Shore Acres Civic Association August 21 st, 2017 Engineering & Capital Improvements Shore Acres Civic Association August 21 st, 2017 40 th Avenue N Bridge 34 th Avenue NE Storm Drainage Improvements Resiliency Planning Continued Maintenance 40 th Avenue

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four DISTRICT FOUR PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Four. In fiscal years 2014 and 2015, current Turnpike projects total over $127

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 1, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 1, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) As of February14, 2018 SNYDER COUNTY SR 2007(012) #93607 PROPOSAL:$16.56 PLANS:$4.40 12X18:$5.40 24X36:$78.00 The description and location of the project are as follows: The work is the furnishing and

More information

Oklahoma Department of Transportation Environmental Programs Division Office Fax

Oklahoma Department of Transportation Environmental Programs Division Office Fax Oklahoma Department of Transportation Environmental Programs Division Office 521-3050 Fax 522-5193 Documented Categorical Exclusion (DCE) for I-40: Pavement Reconstruction and Added Lanes from the Douglas

More information

Texas Department of Transportation Book 2 Technical Provisions. Grand Parkway Project. Attachment 2-2. Work Breakdown Structure Requirements

Texas Department of Transportation Book 2 Technical Provisions. Grand Parkway Project. Attachment 2-2. Work Breakdown Structure Requirements Texas Department of Transportation Book 2 Technical Provisions Grand Parkway Project Work Breakdown Structure Requirements Table 1 represents the minimum levels of the WBS that all schedule information

More information

b. Include an evaluation of maintenance of traffic for ramps, local roads and cross streets.

b. Include an evaluation of maintenance of traffic for ramps, local roads and cross streets. 630-5 Maintenance of Traffic Alternative Analysis As noted in Section 630-1, Section 1400 of the L&D Manual indicates that a Maintenance of Traffic Alternative Analysis will be performed. This analysis

More information

PennDOT District 11 Bridge Asset Management. Louis J. Ruzzi, P.E. District 11-0 (Pittsburgh Area) Bridge Engineer

PennDOT District 11 Bridge Asset Management. Louis J. Ruzzi, P.E. District 11-0 (Pittsburgh Area) Bridge Engineer PennDOT District 11 Bridge Asset Management Louis J. Ruzzi, P.E. District 11-0 (Pittsburgh Area) Bridge Engineer Talking Points History of the PennDOT District 11-0 Bridge Program Bridge events and fiscal

More information

Annual Listing of projects with Obligated Federal Funding. Under federal law, TMACOG is responsible for producing an annual listing of federal

Annual Listing of projects with Obligated Federal Funding. Under federal law, TMACOG is responsible for producing an annual listing of federal Annual Listing of projects with Federal Funding Under federal law, TMACOG is responsible for producing an annual listing of federal funds that are obligated in the previous fiscal year. In fiscal year

More information

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016 Rt. 29 Solutions Project Delivery Advisory Panel February 18, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Feb

More information

extent feasible. Per the and low constructability,

extent feasible. Per the and low constructability, RELEVANT PUBLIC PROJECTS AND REFERENCES TranTech is proud of its accomplishments in structural engineering. Our staff members have provided design servicess to numerous public agencies on very successful

More information

Clinton Street Bridge over the Maumee River. ODOT Project DEF December 2, 2014 Stakeholder s Meeting

Clinton Street Bridge over the Maumee River. ODOT Project DEF December 2, 2014 Stakeholder s Meeting Clinton Street Bridge over the Maumee River ODOT Project DEF-15-14.77 December 2, 2014 Stakeholder s Meeting Purpose of Stakeholder Meeting Discuss the project and why it s happening Describe the process

More information

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate any information received as a result of the public information meeting. The comment sheet in this brochure is provided to assist in making your

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 57, Bridge over Branch Lopatcong Creek DBNUM: 16345 / UPC: 163450 Problem Statement submitted by BMS for Tier 1 Screening. It is recommended for

More information

HUNT STREET BRIDGE. Site Number HUNT STREET, SIMCOE. 0.2 km North of Highway 3

HUNT STREET BRIDGE. Site Number HUNT STREET, SIMCOE. 0.2 km North of Highway 3 NORFOLK COUNTY HUNT STREET BRIDGE Site Number 983502 HUNT STREET, SIMCOE 0.2 km North of Highway 3 Ontario Structure Inspection Manual - Inspection Form Site Number: 983502 Inventory Data: Structure Name

More information

MnDOT State Aid Bridge Office 2014 Calendar Year - - Bridge Cost Report

MnDOT State Aid Bridge Office 2014 Calendar Year - - Bridge Cost Report MnDOT State Aid Bridge Office General Notes The CY 2014 Bridge Cost Report reflects the unit cost ($ per square foot of bridge area) of all of the bridges let in CY 2014. Pre-cast concrete box culverts

More information

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION Sheet 1 of 8 VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: State of Good Repair Bridge Project Selection and Eligible Work

More information

SHRP2 SOLUTONS. Innovative Bridge Designs for Rapid Renewal. Peer-to-Peer Exchange Workshop Atlanta, GA November 2015

SHRP2 SOLUTONS. Innovative Bridge Designs for Rapid Renewal. Peer-to-Peer Exchange Workshop Atlanta, GA November 2015 SHRP2 SOLUTONS Innovative Bridge Designs for Rapid Renewal Peer-to-Peer Exchange Workshop Atlanta, GA November 2015 VIJAYKUMAR THAKER, PE HARDEV DAVÉ INTRODUCTION VIJAYKUMAR THAKER, PE EXECUTIVE MANAGER

More information

The State of Ohio Bridges

The State of Ohio Bridges Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director ABCD NEOH Chapter The State of Ohio Bridges Tim Keller, P.E. Administrator ODOT Office of Structural Engineering Agenda 1.

More information

WILL ROGERS TURNPIKE

WILL ROGERS TURNPIKE INDEX OF SHEETS SHEET No. DESCRIPTION PAVEMENT REHABILITATION Mile 298.2 to 302.4, Length 4.11 Miles CONTRACT NO. WR-MC-113B OTTAWA COUNTY LOCATION MAP BEGIN PROJECT WR-MC-113B MILE NO. 298.2 PREPARED

More information

Revision 1 Dated October 2, UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE:

Revision 1 Dated October 2, UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE: Revision 1 Dated October 2, 2014 1.3.2 UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE: PEYTON DRIVE WIDENING - PHASE 3 AND ENGLISH CHANNEL IMPROVEMENTS Project No s. S12012 & 800360

More information

MSE Walls Problems and Solutions

MSE Walls Problems and Solutions MSE Walls Problems and Solutions Peter Narsavage, P.E. Foundation Engineering Coordinator Ohio Department of Transportation Office of Structural Engineering ODOT Geotechnical Workshop April 11, 2006 Problems

More information

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810 STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS 3 East Pulteney Square Bath, New York 14810 County Route 22 over Canisteo River Bridge Replacement Project BIN 3333290 D035511 PIN 6755.06 ADDENDUM #1 October

More information

Rapid City, SD HDR Project No RE: Replacement of Existing I-190 Twin Bridges at I-190/Silver Street Interchange, Rapid City, SD

Rapid City, SD HDR Project No RE: Replacement of Existing I-190 Twin Bridges at I-190/Silver Street Interchange, Rapid City, SD To: Steve Gramm, SDDOT Memo From: HDR Project: SDDOT I-190 Silver Street Interchange Study Rapid City, SD HDR Project No. 000000000137390 Date: December 27, 2011 RE: Replacement of Existing I-190 Twin

More information

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000) General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER

More information

Feasibility Assessment Study

Feasibility Assessment Study August 19, 2010 Feasibility Assessment Study Historic Sites Council Meeting Today s Agenda Historic Overview Project Overview Barrier Issues Concrete Parapet Recommendations Steel Parapet Recommendations

More information

REHABILITATION PACKAGE 4-a

REHABILITATION PACKAGE 4-a 4-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 4-a Rehab option 4-a is a rehabilitation package whereby all spans of the existing steel truss structure would be rehabilitated and strengthened.

More information

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Bridge Project/Plan Authorization and Approval Authority SPECIFIC SUBJECT:

More information

Chapter 4 Bridge Program Drawings

Chapter 4 Bridge Program Drawings Chapter 4 Bridge Program Drawings Section 4.10-Bridge Railing Introduction Steel bridge railing and concrete bridge barrier rail are installed along the edge of the bridge roadway to keep errant vehicles

More information

For Public Input Period

For Public Input Period 20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,

More information

Information for File # RJH

Information for File # RJH Information for File #2011-01629-RJH Applicant: Matthew Ternes Corps Contact: Ryan Huber, U. S. Army Corps of Engineers, 211 North Broadway, Suite 221, Green Bay, Wisconsin 54303; ryan.j.huber@usace.army.mil;

More information

Get Involved Design Public Hearing

Get Involved Design Public Hearing Get Involved Design Public Hearing VDOT representatives will review and evaluate Mail comments to Mr. Vicente Valeza at the address John G. Lewis Memorial Bridge any information received as a result of

More information

Engineering District 5-0

Engineering District 5-0 Engineering District 5-0 Executive Staff Michael W. Rebert, PE District Executive Christopher Kufro, PE Assistant District Executive (Design) Alfred A. Picca, PE Assistant District Executive (Construction)

More information

JOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018

JOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018 JOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018 On Maintenance of Traffic Details Sheet No. 46 there is a note that states I-49 Stage Construction is to be Completed Prior to Beginning Work on Hwy.

More information

TABLE OF CONTENTS. Background of Existing Facility 3. Proposed Work 4

TABLE OF CONTENTS. Background of Existing Facility 3. Proposed Work 4 TABLE OF CONTENTS SECTION PAGE Background of Existing Facility 3 Proposed Work 4 Objective of this Report 4 Required Data 4 Pavement Design Procedure 5 Other Data Requirements 7 Pavement Structures 8 Pavement

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION STR 6947 MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY INSPECTION REPORT Facility Latitude / Longitude MDOT Structure ID Structure Condition 9 MILE ROAD 43.5362 / -84.4294 56200055000B010 Fair Condition(6)

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 1, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 1, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated November 15, 2016 BEAVER COUNTY SR 588(B18) #91922 PROPOSAL:$22.80 PLANS:$18.04 12X18:$22.14 24X36:$319.80 X-SEC:$3.52 12X18:$4.32 24X36:$62.40 The description and location of the project is as

More information

Year Pre Total County Debt (Bonds & BANS) Mitigation Fees

Year Pre Total County Debt (Bonds & BANS) Mitigation Fees CR 9 (Bradt Hollow Road) Over Fox Creek Bridge Replacement Project Replacement of a 156 ft. long x 32ft. wide, 3 span pre stressed concrete box beam bridge over Fox Creek in the Town of Berne. The bridge

More information

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016 Rehabilitation of West Main Street Culvert and Shirley Street Bridge Town of Ayer November 22, 2016 Agenda Outline Introductions Project Goals and Objectives Existing Conditions Review Design Considerations

More information

Ohio Department of Transportation - Prebid Questions

Ohio Department of Transportation - Prebid Questions Project No. 110467 Sale Date - 8/25/2011 HAM-83469 - CR-CR 239-9.49 (WINTON/ S. GILMORE ROAD) 8/22/2011 9:56:54 AM Pole E on plan page 323 shows that 2" anchor bolts should be used for this pole. However,

More information

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening March 5, 2009 Nicholas J. Roper NOVA District Bridge Engineer Robert F. Price Resident Administrator of Loudoun/ Prince William Construction

More information

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. April 21, 2016

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. April 21, 2016 STATE OF OHIO DEPARTMENT OF TRANSPORTATION COLUMBUS, OHIO PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING April 21, 2016 This pamphlet is issued solely for the purpose of circulating advance information

More information

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Corrosion Resistant Reinforcing Steels (CRR) SPECIFIC SUBJECT: Plan Modifications

More information

Transportation Subcommittee Meeting July 18, 2014

Transportation Subcommittee Meeting July 18, 2014 Transportation Subcommittee Meeting July 18, 2014 Action Requested Recommend for Planning and Programming Committee approval in August 2014 and placement on the Board of Directors agenda for October 2014.

More information

Request for Proposals No ; Various On-call Professional Design and Engineering Services Addendum No. 1 Page 2

Request for Proposals No ; Various On-call Professional Design and Engineering Services Addendum No. 1 Page 2 Addendum Number 1 Request for Proposals No. 17-001 Various On-call Professional Design and Engineering Services To all prospective firms under specifications for Request for Proposals (RFP) No. 17-001,

More information

HOAN BRIDGE REHABILITATION

HOAN BRIDGE REHABILITATION 5/11/2013 HOAN BRIDGE REHABILITATION Presentation Overview Project Overview History Project Background In-Depth Inspection Structural Design Elements WSPE Discovery Conference 2013 PROJECT OVERVIEW Project

More information

SR 600 (US 92) Concrete Slab Replacement Reconstruction Project with Precast Pre-Stressed. Florida Department of Transportation District Five

SR 600 (US 92) Concrete Slab Replacement Reconstruction Project with Precast Pre-Stressed. Florida Department of Transportation District Five SR 600 (US 92) Concrete Slab Replacement Reconstruction Project with Precast Pre-Stressed Florida Department of Transportation District Five Project Overview Location SR 600 / US 92, Volusia County FPN:

More information

BRIDGE INSPECTION REPORT

BRIDGE INSPECTION REPORT NC DEPARTMENT OF TRANSPORTATION ATTENTION DIVISION OF HIGHWAYS BRIDGE MANAGEMENT UNIT BRIDGE INSPECTION REPORT INSPECTION TYPE: Routine Inspection COUNTY IREDELL BRIDGE NUMBER 480596 INSPECTION CYCLE 2

More information