1 Baltimore & Potomac Tunnel Project
2 MEETING AGENDA Project Background Review Purpose of Meeting Alternatives Carried Forward for Further Study Alternatives Evaluated & Screening Process Portal Renderings Ventilation Plants Alternatives Evaluation Matrix Next Steps
3 PROJECT BACKGROUND What is the B&P Tunnel Project? Engineering and environmental study (NEPA) to develop and evaluate alternatives to the existing Amtrak tunnel that connects the West Baltimore MARC and Baltimore Penn Stations Evaluation of alternatives designed to improve capacity, reliability and travel time for existing and projected passenger rail service on Amtrak s Northeast Corridor (NEC)
4 PROJECT TEAM Grantor/NEPA Lead Grantee Tunnel Owner Project Partner
5 B&P TUNNEL DESCRIPTION Constructed in 1873 Spans 1.4 miles and comprises three tunnels: John Street Tunnel Wilson Street Tunnel Gilmor Street Tunnel Located on Amtrak s Northeast Corridor (NEC) Used by Amtrak, MARC, and Norfolk Southern 143 passenger trains (21,600 passengers) per day 2 freight trains per day 5
6 ALTERNATIVES B&P TUNNEL LOCATION CONSIDERED 6
7 PROJECT PURPOSE The primary purpose of the project is to address the structural and operational deficiencies of the existing B&P Tunnel which: Is approaching the end of its useful life Does not provide enough capacity to support current and projected demands Is not suited for modern high-speed usage due to tight clearances and sharp curves, which limit train speeds through the tunnel to 30 mph
8 PROJECT PURPOSE (CONT D) The B&P Tunnel Project is intended to: Improve travel time Accommodate existing and projected travel demand for passenger rail services (regional and commuter) Eliminate impediments to existing and projected operations along the NEC Provide operational reliability Take into account the value of the existing tunnel as an important element of Baltimore's rail infrastructure 8
9 ALTERNATIVES ALTS. CARRIED FORWARD CONSIDERED 9
10 ALTERNATIVE REFINEMENT The project team has been refining the Alternatives carried forward for detailed study. During this time, the team has determined that: Four (4) tracks will be required to meet the project purpose and need Each track will be placed in an individual bore to help with traffic operations Options to the two build alternatives (3 and 11) can help to avoid and/or minimize impacts to operation 10
11 TRACK OPERATIONS Four tracks are needed through Baltimore to accommodate future high-frequency passenger train service on the Northeast Corridor (NEC). Four tracks located in four separate tunnel bores are proposed. Four tracks support train capacity requirements and operational flexibility for conflict-free operations. 11
12 ALTERNATIVE 1: NO BUILD Continued use of existing tunnel with necessary maintenance Used as a baseline to compare other alternatives against If Alternative 1 is not selected, the ultimate disposition or use of the existing tunnel will still need to be determined 12
13 ALTERNATIVE 2 Reconstruction and modernization of the existing B&P Tunnel in place: Would eliminate deteriorating conditions and result in a modernized 2-track tunnel Would include complete replacement of tunnel features Would require cut-and-cover construction for the full width of the street along the length of the existing alignment Would result in significant disruption of passenger service during construction 13
14 ALTERNATIVE 2 DETAILS Reconstruction of tunnel to modern design standards Increase horizontal tunnel clearance +/- 18 ft. Increase vertical tunnel clearance +/- 5 ft Cut-and-cover construction for full width of street along entire alignment All tracks along NEC would need to be closed during construction 14
15 OPTIONS TO ALTS 3 & 11 15
16 COMPARISON OF ALT 3 OPTIONS Alternative 3 Option 3A Wide arc north of existing B&P Tunnel Gradual curve improves train speeds relative to existing B&P Tunnel Passes beneath existing light rail station platform Would be bored beneath existing Metro rail tunnel, no modification needed No modifications needed to West Baltimore MARC Station Alternative 3 Option 3B Similar to Alternative 3A with south portal shifted further east Improves curvature over 3A and existing B&P Tunnel Passes beneath existing light rail platform Would be bored beneath existing Metro rail tunnel, no modifications needed Would improve curve at West Baltimore MARC Station Alternative 3 Option 3C Similar to Alternative 3A with south portal shifted further west Would improve curve at West Baltimore MARC Station 16
17 ALTERNATIVE 3 OPTION A SOUTH PORTAL RENDERING 17
18 ALTERNATIVE 3 OPTION A SOUTH PORTAL RENDERING 18
19 ALTERNATIVE 3 OPTION A SOUTH PORTAL RENDERING CLOSE-UP 19
20 ALTERNATIVE 3 OPTION A SOUTH PORTAL RENDERING CLOSE-UP 20
21 ALTS. CARRIED FORWARD ALTERNATIVE 3 OPTION B SOUTH PORTAL RENDERING 21
22 ALTS. CARRIED FORWARD ALTERNATIVE 3 OPTION B SOUTH PORTAL RENDERING 22
23 ALTS. CARRIED FORWARD ALTERNATIVE 3 OPTION B SOUTH PORTAL RENDERING CLOSE UP 23
24 ALTS. CARRIED FORWARD ALTERNATIVE 3 OPTION B SOUTH PORTAL RENDERING CLOSE UP 24
25 ALTS. CARRIED FORWARD ALTERNATIVE 3 OPTION C SOUTH PORTAL RENDERING 25
26 ALTS. CARRIED FORWARD ALTERNATIVE 3 OPTION C SOUTH PORTAL RENDERING 26
27 ALTS. CARRIED FORWARD ALTERNATIVE 3 OPTION C SOUTH PORTAL RENDERING CLOSE UP 27
28 ALTS. CARRIED FORWARD ALTERNATIVE 3 OPTION C SOUTH PORTAL RENDERING CLOSE UP 28
29 ALTERNATIVES 3 & 11 NORTH PORTAL RENDERING 29
30 ALTERNATIVES 3 & 11 NORTH PORTAL RENDERING 30
VIBRATION TECHNICAL REPORT
B&P Tunnel Project Baltimore, Maryland VIBRATION TECHNICAL REPORT August 2015 U.S. Department of Transportation Federal Railroad Administration Maryland Department of Transportation This page intentionally
More informationNATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD
NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD September 18, 2013 District Department of Transportation Federal Railroad Administration AGENDA Vision History & Background Study Area Purpose & Need
More informationEnvironmental Impact Statement (EIS)/ Section 106 Public Meeting Proposed Alternatives. December 14, 2017
Environmental Impact Statement (EIS)/ Section 106 Public Meeting Proposed Alternatives December 14, 2017 Today s Agenda Project Overview Project Schedule Purpose and Need Concept Screening Process Level
More informationLONG BRIDGE - PRESENT & FUTURE: A MULTIMODAL ANALYSIS
LONG BRIDGE - PRESENT & FUTURE: A MULTIMODAL ANALYSIS Review of the Potomac River Crossing a Rail Resource for the Washington, DC Region and Beyond Presenter: Edward La Guardia P.E. Michael Baker International
More information2-2 ALTERNATIVES CONSIDERED AND ELIMINATED
Section 2: Alternatives Development and Evaluation 2-1 INTRODUCTION This section of the Scoping Information Packet describes the alternatives to be evaluated in the Environmental Impact Statement (EIS)
More informationLong Bridge Project. Environmental Impact Statement (EIS) Revised Purpose and Need
Environmental Impact Statement (EIS) Revised Purpose and Need June 23, 2017 1.0 What is the Proposed Action? The consists of potential improvements to the Long Bridge and related railroad infrastructure
More informationConceptual Design Report
Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE
More informationPublic Meeting. Draft Environmental Impact Statement (EIS) and Section 106 Consultation. Preferred Alternative Selection November 29, 2018
Public Meeting Draft Environmental Impact Statement (EIS) and Section 106 Consultation Preferred Alternative Selection November 29, 2018 Agenda Project Overview No Action Alternative and Action Alternatives
More informationTECHNICAL MEMORANDUM
TECHNICAL MEMORANDUM Basic High-Speed Train Tunnel Configuration TM 2.4.2 Prepared by: Signed document on file 29 June 2009 Jimmy Thompson Checked by: Signed document on file 15 July 2009_ Gary McClellan
More informationProject Purpose. Federal Railroad Administration
Project Purpose To preserve the current functionality of Amtrak s Northeast Corridor service and NJ TRANSIT s commuter rail service between New Jersey and Penn Station New York by repairing the deteriorating
More informationPresentation to the GBC Transportation Committee. September 14, Overview of the Howard Street Tunnel Double-Stack Clearance Project
Presentation to the GBC Transportation Committee September 14, 2016 Overview of the Howard Street Tunnel Double-Stack Clearance Project Howard Street Tunnel - Background o Completed in 1895 o 1.7 mile,
More informationLong Bridge Project. Environmental Impact Statement (EIS) Revised Purpose and Need
Environmental Impact Statement (EIS) Revised Purpose and Need November 9, 2017 1.0 What is the Proposed Action? The consists of potential improvements to the Long Bridge and related railroad infrastructure
More informationLONG BRIDGE CAPACITY NEEDS. Oscar J. Gonzalez Virginia Railway Express Project Manager Alexandria, VA
LONG BRIDGE CAPACITY NEEDS Oscar J. Gonzalez Virginia Railway Express Project Manager Alexandria, VA 1 TODAY S PRESENTATION VRE Overview Project Location and Partners Challenges and Opportunities Funding
More informationLong Bridge - Present & Future: A Multimodal Analysis
Long Bridge - Present & Future: A Multimodal Analysis Edward La Guardia P.E. American Public Transportation Association (APTA); American Railway Engineering and Maintenance-of- Way Association (AREMA);
More informationFOR IMMEDIATE RELEASE June 7, ATK Contact: Media Relations
FOR IMMEDIATE RELEASE June 7, 2010 ATK-10-080 Contact: Media Relations 202 906.3860 NATIONAL RAIL PLAN NEEDS TO RECOGNIZE THE VALUE OF AMTRAK S INTERCITY PASSENGER RAIL NETWORK Serves as foundation to
More informationSection IMPLEMENTATION PLAN. 7. Implementation Plan
Section 7 IMPLEMENTATION PLAN 7. Implementation Plan 7.0 Implementation Plan The Tier 1 DEIS has presented several improvements along the Chicago to St. Louis corridor to meet the purpose and need of the
More informationNortheast Rail Operations Study (NEROps)
I-95 Corridor Coalition Northeast Rail Operations Study (NEROps) Phase I Final Report Executive Summary June 2007 Northeast Rail Operations Study (NEROps) Phase I Final Report Executive Summary Prepared
More informationExecutive Summary. ES-1 Introduction. ES-2 Background
ES-1 Introduction The Federal Transit Administration (FTA) and the (CTDOT) are preparing a combined Environmental Assessment (EA), Section 4(f) Evaluation, and Environmental Impact Evaluation (EIE) to
More informationPositive Train Control (PTC) Amtrak s Northeast Corridor
Positive Train Control (PTC) on Amtrak s Northeast Corridor 12 July 2012, Session: Infrastructure 3 - Power Supply & Signaling Requirement for PTC The Rail Safety Improvement Act of 2008 requires that
More informationSection IMPLEMENTATION PLAN. 7. Implementation Plan
Section 7 IMPLEMENTATION PLAN 7. Implementation Plan 7.0 Implementation Plan The Tier 1 Final EIS has presented several improvements along the Chicago to St. Louis corridor to meet the purpose and need
More informationWELCOME TO THE LONG BRIDGE PROJECT
WELCOME TO THE LONG BRIDGE PROJECT Public Meeting Thursday, December 14, 2017 Open House Format: 4:00 p.m. to 7:00 p.m. Formal Presentations: 4:30 p.m. and 6:00 p.m. (same presentation at both times) Project
More informationMassachusetts Rail Plan. September 16, 2010
Massachusetts Rail Plan September 16, 2010 State Freight and Rail Plans State Rail Plan The plan describes state policy for freight and passenger rail transportation, including commuter rail Provides priorities
More informationLAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR
LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR July 12, 2002 A Paper Submitted for the AREMA Annual Conference by: Paul B. Satterly, P.E. HNTB CORPORATION 111 Monument Circle, Suite 1200 Indianapolis,
More informationAREAWIDE BRIDGE REPLACEMENT AND REHABILITATION
CECIL COUNTY 2018 TRANSPORTATION IMPROVEMENT PROGRAM AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION DESCRIPTION: On-going program to provide major upgrades to state owned bridges that are structurally
More informationSOUTHWEST LRT (METRO GREEN LINE EXTENSION)
8 Evaluation of Alternatives This chapter evaluates the effectiveness of the No Build Alternative and the Southwest Light Rail Transit (LRT) Project (the Project) based on the information contained in
More informationConnecting the Nation's Capital Transportation System
Connecting the Nation's Capital Transportation System 12th National Light Rail Conference November 2012 Greg Benz, Henry Kay Mike Madden, Monica Meade Overview New LRT systems can provide intermodal connectively
More informationProject Overview. A Collaborative Effort
Project Overview A Collaborative Effort DRPT and FRA are working closely with CSX, which owns and operates the corridor, as well as with passenger operators Amtrak and Virginia Railway Express (VRE), the
More informationEconomic Analysis Reports: Briefing. Transportation Finance Panel
Economic Analysis Reports: 1. I-84 Viaduct in Hartford 2. I-84/Rt8 Mixmaster in Waterbury 3. New Haven Rail Line Briefing for Transportation Finance Panel Nov 23, 2015 Economic analyses 1 & 2 1. I-84 Viaduct
More informationLong Bridge Project. Environmental Impact Statement (EIS) Alternatives Development Report. June 19, 2018
Long Bridge Project Environmental Impact Statement (EIS) Alternatives Development Report June 19, 2018 Draft Alternatives Development Report Table of Contents 1.0 Introduction... 1 1.1. NEPA Requirements
More informationHAMPTON ROADS PASSENGER RAIL STUDY DATA COLLECTION PHASE 2A NORFOLK-RICHMOND CORRIDOR
Presentation To: Agenda Item #11 Hampton Roads Transportation Planning Organization Board HAMPTON ROADS PASSENGER RAIL STUDY DATA COLLECTION PHASE 2A NORFOLK-RICHMOND CORRIDOR Presentation By: March 21,
More informationTransbay Program Phase 2 Downtown Rail Extension (DTX) Tunnel Options Study Briefing
Transbay Program Phase 2 Downtown Rail Extension (DTX) Tunnel Options Study Briefing April 2018 Study Purpose and Goals Initiated to address concerns about impacts resulting from cut-and-cover construction
More informationPursuing an automated solution to a long standing challenge.
Pursuing an automated solution to a long standing challenge. Presented to: 2016 Louisiana Transportation Conference Presented by: Edward La Guardia P.E. Michael Baker International February, 2016 Automated
More informationThe Challenges of Improving High Speed Rail in Pennsylvania:
The Challenges of Improving High Speed Rail in Pennsylvania: The Keystone Corridor June 4, 2013 2013 Rail Conference Marilyn Jamison Senior Director Major Projects & Environmental Support Amtrak NEC Infrastructure
More informationActon Parking Committee. Presented by:
Presented to: Acton Parking Committee Presented by: The MBTA/HNTB Team MARCH 2009 Project Goals Improve Performance Increase Transit Reliability Decrease Travel Time Key Project Elements Engineering Work
More informationWelcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.
1 Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 2 During this public meeting, we will explain the 75 th Street Corridor Improvement
More informationEnvironmental Impact Statement for the Baltimore-Washington Superconducting Maglev (SCMAGLEV) Project, between Baltimore, Maryland and Washington, DC
This document is scheduled to be published in the Federal Register on 11/25/2016 and available online at https://federalregister.gov/d/2016-28285, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION
More informationRed and Purple Modernization (RPM)
Red and Purple Modernization (RPM) A Core Capacity Expansion Northwestern University Transportation Center October 13, 2016 Chicago Transit Authority Chicago Transit Authority Created in 1947 Serves Chicago
More informationHUDSON TUNNEL PROJECT
HUDSON TUNNEL PROJECT NORTH BERGEN COMMUNITY MEETING Lido Restaurant 2600 Tonnelle Avenue North Bergen, NJ January 30, 2018 6:00-8:00 PM Agenda Project Overview Construction Activities in North Bergen
More informationCapitol Corridor Vision Implementation Plan Vision for the Megaregion. CCJPA November 2017
Capitol Corridor Vision Implementation Plan Vision for the Megaregion CCJPA November 2017 1990 s: Prop 116/108 SR3T Ph 1 2006 Electrified, very frequent passenger rail service plateau Europe Asia 3 CCJPA
More information1.1 Environmental Assessment/Environmental Impact Evaluation for the New Haven, Hartford and Springfield High-Speed Intercity Rail Project
1.0 INTRODUCTION 1.1 Environmental Assessment/Environmental Impact Evaluation for the New Haven, Hartford and Springfield High-Speed Intercity Rail Project Connecticut is centrally located in a part of
More informationStandard Respecting Railway Clearances
Standard Respecting Railway Clearances May 14, 1992 TM Standard Respecting Railway Clearances Effective: May 14, 1992 CONTENTS 1. APPLICATION OF STANDARD 2. INTERPRETATION 3. STANDARD CLEARANCES 4. LESS
More informationNortheast Rail Operations Study (NEROps)
I-95 Corridor Coalition Northeast Rail Operations Study (NEROps) Phase I Final Report Executive Summary July 2007 Northeast Rail Operations Study (NEROps) Phase I Final Report Executive Summary Prepared
More informationMidtown Corridor Alternatives Analysis. Technical Advisory Committee Meeting November 15, 2012
Midtown Corridor Alternatives Analysis Technical Advisory Committee Meeting November 15, 2012 Today s Agenda Introductions Roles and Responsibilities Alternatives Analysis Process Overview Outreach Overview
More informationSandpoint Junction Connector
Sandpoint Junction Connector BNSF Railway MAY 23, 2018 BNSF is a Leading Railroad A Berkshire Hathaway, Inc. company 32,500 route miles in 28 states and 3 Canadian provinces 42,000 employees Approximately
More informationWELCOME The Walk Bridge Project CTDOT Project No
1 WELCOME The Walk Bridge Project CTDOT Project No. 0301-0176 Walk Bridge Public Scoping/Public Information Meeting 1. Project description 2. Study process 3. Findings 4. Potential solutions 5. Next steps
More information2.0 Purpose. 3.0 Work Plan. Page 1 of 7
2.0 Purpose The purpose of this document is to present the findings of the field investigation and concept design study, as well as recommend appropriate track relocation and bridge modifications to provide
More informationSouthwest LRT Update Freight Rail Technical Issue #21 City of St. Louis Park Council Study Session
Southwest LRT Update Freight Rail Technical Issue #21 City of St. Louis Park Council Study Session Mark Fuhrmann Jim Alexander May 28, 2013 2 Today s Topics Project Overview and Timeline Freight Rail Update
More informationNorthern Virginia Region Draft Needs Summary
Needs Map: Need A A DEMAND The ability of communities around transit stations (particularly the areas within 1-2 miles of the stations and other travel hubs) to attract skilled workers and grow businesses
More informationPresented to : I 710 Project Committee June 30, 2011
Presented to : I 710 Project Committee June 30, 2011 Overview Metro s Public Private Partnership (PPP) program Traffic Effects of Tolling Trucks on I 710 Statutory Authority for Tolling Interstate Highways
More informationNORFOLK SOUTHERN RAILWAY COMPANY FILES: BR & BR
NORFOLK SOUTHERN RAILWAY COMPANY FILES: BR0013844 & BR0013846 CHARLESTON, CHARLESTON COUNTY, SOUTH CAROLINA CHARLESTON PORT ACCESS ROADWAY PROJECT (1) SITE - 1 - REPLACEMENT OF EXISTING US78/52 OVERHEAD
More informationExecutive Summary S.1 INTRODUCTION
Executive Summary S.1 INTRODUCTION The Federal Railroad Administration (FRA) and New Jersey Transit Corporation (NJ TRANSIT) as joint lead agencies are preparing an Environmental Impact Statement (EIS)
More informationMeeting Minutes. Lauren Schiszik. Jeffrey Abrams (Parsons), Johnette Davies, Amrita Hill, Steve Jurow (HNTB), William Prosser
Attendees: Meeting Minutes Maryland Historical Trust (MHT) Baltimore City Commission for Historical and Architectural Preservation (CHAP) Baltimore City Department of Planning (BCDP) Baltimore Heritage
More informationPeninsula Widening. Project Description. Overview of Project Status. Estimated Total Project Cost $4.7 - $7.3 Billion
Peninsula Widening SYSTEM: Interstate FROM: I-664 (Hampton Roads) TO: I-95 (Richmond) DESCRIPTION OF WORK: Provide for increased capacity, improve safety standards and minimize roadway geometric and structural
More informationWestside Purple Line Extension Section 1 Project Overview
Westside Purple Line Extension Section 1 Project Overview Westside Purple Line Extension (WPLE) Section 1 Project Purple Line Project Alignment The WPLE corridor traverses portions of three jurisdictions,
More informationUpgrading Rail Lines for Higher Speeds
Upgrading Rail Lines for Higher Speeds Railroad Infrastructure Diagnosis and Prognosis David E. Staplin, PE University of Nevada Las Vegas, October 16, 2018 Upgrading Rail Lines for Higher Speeds A Perspective
More informationChapter 2. Alternatives
Chapter 2. Alternatives This chapter presents an overview of the process used to develop the reasonable alternatives considered for the 75 th Street Corridor Improvement Project (CIP), presents details
More informationTwin Cities-Milwaukee-Chicago Intercity Passenger Rail Phase I Study Twin Cities- Milwaukee High Speed Rail to Chicago Corridor Study
Twin Cities-Milwaukee-Chicago Intercity Passenger Rail Phase I Study Twin Cities- Milwaukee High Speed Rail to Chicago Corridor Study Rail Modeling Update May 4, 2017 www.dot.state.mn.us/passengerrail/tc-mil-chi/
More informationNorth Carolina Railroad Company Engineering Department. Design and Construction Guidelines
North Carolina Railroad Company Engineering Department Design and Construction Guidelines January 2019 Version 2.0 PREFACE These Design and Construcion Guidelines are provided as information only to assist
More information1. Evaluation of route and service alternatives; 2. Tier 1 Environmental Impact Analysis; and 3. Service Development Plan.
Rail Rail plays a significant role in transportation planning, especially when considering economic development, safety, freight, and intermodal connectivity. Jackson has two rail lines serving the area,
More informationIndirect and Cumulative Effects
Indirect and Cumulative Effects 19.1 INTRODUCTION This chapter discusses potential indirect and cumulative effects of the Modified Design, in comparison to the 2004 FEIS Design. The White House Council
More informationTrackway Guidelines for Streetcar and Light Rail Circulator Systems Infrastructure 12th National Light Rail Conference
Trackway Guidelines for Streetcar and Light Rail Circulator Systems Infrastructure 12th National Light Rail Conference Sustaining the Metropolis: LRT & Streetcars for Super Cities Session: Growing Streetcar
More informationSanta Clara Valley Transportation Authority Board of Directors. General Manager, Nuria I. Fernandez
8.1.C Date: Current Meeting: Board Meeting: December 6, 2017 December 7, 2017 December 7, 2017 BOARD MEMORANDUM TO: Santa Clara Valley Transportation Authority Board of Directors THROUGH: General Manager,
More informationOhio & Lake Erie Regional Rail - The Ohio Hub. Executive Summary
Ohio & Lake Erie Regional Rail - The Ohio Hub Improving the capacity and efficiency of the railroad system will help ensure that the regional economy continues to be served by an effective transportation
More informationAnn Arbor Station Environmental Review. Public Information Meetings April 2, 2014
Ann Arbor Station Environmental Review Public Information Meetings April 2, 2014 Welcome Eli Cooper, AICP Transportation Program Manager City of Ann Arbor ecooper@a2gov.org 734-794-6430 x.43710 Robert
More information4 Evaluation of Alternatives
4 Evaluation of Alternatives The alternatives have undergone an evaluation on numerous topics related to transportation function, implementation, cost, and financing/revenue. For each topic, the performance
More informationUsing Hybrid LiDAR for Positive Train Control (PTC) Systems
Merrick s High Density Mapping System mounted on a helicopter collecting PTC information Using Hybrid LiDAR for Positive Train Control (PTC) Systems On May 12, 2015 an Amtrak Train from Washington D.C
More informationConnectivity along Amtrak s NEC. Emmanuel S. Bruce Horowitz
Connectivity along Amtrak s NEC Emmanuel S. Bruce Horowitz Creative Passenger Rail Transportation Economics Overview Overview of Amtrak s NEC Illustrated description of key intermodal connections at major
More information2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement
2 Purpose and Need 2.1 Study Area Interstate 81 (I-81) is relied upon for local and regional travel and interstate travel in the eastern United States. It extends 855 miles from Tennessee to New York at
More informationNEW JERSEY DEPARTMENT OF TRANSPORTATION. New Jersey Statewide Strategic Freight Rail Plan
NEW JERSEY DEPARTMENT OF TRANSPORTATION New Jersey Statewide Strategic Freight Rail Plan OVER-ARCHING PROJECT PURPOSE In short, the plan is intended to: Identify Issues That Constrain Freight Rail Operations
More informationDescription of Phase 2 Modified Design
Description of Phase Modified Design. INTRODUCTION This chapter provides an overview of the preliminary engineering design for Phase of the Second Avenue Subway that was evaluated in the Final Environmental
More informationPRIIA Section 305 Executive Committee 10/20/2010. Version 3
Requirements Document Diesel Locomotive Version 3 Introduction The Next-Generation Equipment Committee (NGEC) was established under the provisions of section 305 of the Passenger Rail Investment and Improvement
More informationVRE AT WORK PREPARING VIRGINIA RAILROADING FOR ITS NEXT QUARTER CENTURY
VRE AT WORK PREPARING VIRGINIA RAILROADING FOR ITS NEXT QUARTER CENTURY T. R. ( Tom ) Hickey Chief Development Officer April 4, 2017 1 1 TONIGHT S PRESENTATION Introduction Safety Briefing VRE Overview
More informationNEW JERSEY STATE RAIL PLAN NJ TRANSIT New Jersey Department of Transportation
NJ TRANSIT New Jersey Department of Transportation NJ TRANSIT AND NJDOT TEAM Developing State Rail Plan NJ TRANSIT contract Over the next six months Most planning information already exists Data must be
More informationStandards Respecting Railway Clearances. May 14, 1992 (TC E-05)
Standards Respecting Railway Clearances May 14, 1992 (TC E-05) STANDARD RESPECTING RAILWAY CLEARANCES 1. APPLICATION OF STANDARD 1.1 This Standard shall apply on all tracks owned or operated on by a railway
More informationVDOT and DRPT MPO and PDC Winter Meeting Amy Inman Planning & Mobility Programs Administrator Virginia Department of Rail and Public Transportation
VDOT and DRPT MPO and PDC Winter Meeting Amy Inman Planning & Mobility Programs Administrator Virginia Department of Rail and Public Transportation www.drpt.virginia.gov 1 DRPT Customers 54 Transit Systems
More informationNew England Railroads The Next Generation. New England Railroad Club Presentation to UMass Amherst November 29, 2018
New England Railroads The Next Generation New England Railroad Club Presentation to UMass Amherst November 29, 2018 Introduction What we are going to cover: New England Railroad Club and Railroading Megaregions
More informationAtlantic Street Bridge Project CTDOT Project Nos (Phase 1) & (Phase 2)
Atlantic Street Bridge Project CTDOT Project Nos. 135-326 (Phase 1) & 135-301 (Phase 2) Reconstruction of Atlantic Street & Metro-North RR Bridge Replacement City of Stamford www.atlanticstreetbridge.com
More informationAppendix A: Project Planning and Development A-1 White Paper on Transit and the Tappan Zee Hudson River Crossing Project
Appendix A: Project Planning and Development A-1 White Paper on Transit and the Tappan Zee Hudson River Crossing Project Purpose of White Paper White Paper on Transit and the Tappan Zee Hudson River Crossing
More informationWELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015
WELCOME Public Meeting for I-35 / I-44 Interchange October 6, 2015 TEAM INTRODUCTIONS PURPOSE OF THIS MEETING is to present the alternative alignments for the I-35/I-44 and I-35/NE 63rd Street Interchanges
More informationAGENDA ITEM #8: HAMPTON ROADS PASSENGER RAIL STUDY HIGH SPEED RAIL SERVICE ALTERNATIVES ANALYSIS: PHASE 2B DRAFT SCOPE OF WORK
AGENDA ITEM #8: HAMPTON ROADS PASSENGER RAIL STUDY HIGH SPEED RAIL SERVICE ALTERNATIVES ANALYSIS: PHASE 2B SCOPE OF WORK SUBJECT: The draft scope of work for the next phase of the Hampton Roads Passenger
More informationSURFACE TRANSPORTATION BOARD. APTA Legal Affairs Conference STB s Passenger Rail Responsibilities. February 24, 2014
SURFACE TRANSPORTATION BOARD APTA Legal Affairs Conference STB s Passenger Rail Responsibilities February 24, 2014 Jamie Rennert Chief, Passenger Rail Operations 1 What is the STB? Bipartisan board established
More informationSECTION 4(f) EVALUATION ALASKA RAILROAD MOODY TUNNEL REMOVAL FEDERAL TRANSIT ADMINISTRATION U.S. Department of Transportation
SECTION 4(f) EVALUATION ALASKA RAILROAD MOODY TUNNEL REMOVAL FEDERAL TRANSIT ADMINISTRATION U.S. Department of Transportation INTRODUCTION This has been prepared in compliance with the requirements of
More informationAnn Arbor, Michigan. May 22, Amtrak s Accessible Boarding Technologies (ABT) Program. Setback Level Boarding Platform
Ann Arbor, Michigan May 22, 2015 Amtrak s Accessible Boarding Technologies (ABT) Program Setback Level Boarding Platform Prototype Test Hardware Deployment AMTRAK ACCESSIBLE BOARDING TECHNOLOGIES PROGRAM
More informationNewark Regional Transportation Center TIGER II Planning Grant Application
Newark Regional Transportation Center TIGER II Planning Grant Application Submitted by the Wilmington Area Planning Council in partnership with the State of Delaware, New Castle County, the City of Newark,
More informationRailway Alignment Design and Geometry
Railway Alignment Design and Geometry Pasi Lautala, Michigan Tech University Tyler Dick, HDR, Inc. Topics Horizontal and Vertical geometry Clearances Turnout design Structures and loading 1 REES Module
More informationEnvironmental Analysis, Chapter 4 Consequences, and Mitigation
Environmental Analysis, Chapter 4 4.11 Energy Resources This section summarizes the energy resources in the project area, usage associated with construction and operation of the proposed Regional Connector
More informationBetween existing Interstate 70 in St. Louis, MO to west of the IL 203 Interchange on existing I-55/70 in Madison, IL
American Association of State Highway and Transportation Officials An Application from the State Highway or Transportation Department of Illinois for: Elimination of a U.S. (Interstate) Route Establishment
More informationFundamentals and Selected Technical Issues High Speed and Heavy Axle Railroad Engineering
Fundamentals and Selected Technical Issues High Speed and Heavy Axle Railroad Engineering Dr. Allan M Zarembski, PE Professor Director of the Railroad Engineering and Safety Program University of Delaware
More informationCurrent I-5 roadway overpasses need elevation lift, some overpasses need replacing anyway because of problems.
This Presentation will show the general Salem area and the Salem Hills Oregon part. The Salem Hills are west of Turner, and the grades would be to much for the CHSR to go over the surface. The Cascadia
More informationAppendix D. Public Comments Submitted and Project Team Response
B&P Tunnel Project Scoping Report Appendix D: Public Comments Submitted and Project Team Response Comment Form Template Table of Public Comments Submitted Comment Letter from Norfolk Southern Corporation
More informationU.S. Department of Transportation Federal Transit Administration and Metropolitan Atlanta Rapid Transit Authority
ATLANTA BELTLINE CITY OF ATLANTA, FULTON COUNTY, GA TIER 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT/ SECTION 4(F) EVALUATION U.S. Department of Transportation Federal Transit Administration and Metropolitan
More informationHampton Roads Passenger Rail Study Data Collection
Presentation To Hampton Roads Transportation Planning Organization: Passenger Rail Task Force Hampton Roads Passenger Rail Study Data Collection Phase 2A Presentation By July 31, 2012 Transportation Economics
More informationTier 1 Environmental Impact Statement for the Chicago, Illinois, to Detroit-Pontiac,
This document is scheduled to be published in the Federal Register on 08/31/2012 and available online at http://federalregister.gov/a/2012-21587, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION
More informationFollo Line Facts THE NORWEGIAN NATIONAL RAIL ADMINISTRATION
THE NORWEGIAN NATIONAL RAIL ADMINISTRATION Follo Line Facts The Follo line is a new double track from the capital of Oslo to the suburban town of Ski. Combined with the existing Østfold line, the Follo
More informationUS 27 MULTIMODAL CORRIDOR TREASURE COAST REGIONAL PLANNING COUNCIL SOUTH FLORIDA REGIONAL PLANNING COUNCIL
US 27 MULTIMODAL CORRIDOR TREASURE COAST REGIONAL PLANNING COUNCIL SOUTH FLORIDA REGIONAL PLANNING COUNCIL JOINT MEETING OCTOBER 12, 2018 Future Corridors Auburndale Winter Haven ILC (CSX Rwy) Tampa Airport
More informationRaritan River Bridge Replacement. Public Information Session September 2016
Raritan River Bridge Replacement Public Information Session September 2016 Welcome AT THIS MEETING YOU CAN: Learn about the Raritan River Bridge Replacement Project Understand how the project will be evaluated
More informationStatement by Wick Moorman President and Chief Executive Officer, Amtrak April 28, 2017 New Jersey Legislature Joint Hearing
Statement by Wick Moorman President and Chief Executive Officer, Amtrak April 28, 2017 New Jersey Legislature Joint Hearing Chairman Gordon, Chairman McKeon, members of the Senate and the Assembly, and
More informationC. ENVIRONMENTAL RESOURCES OF INTEREST
Chapter 18: Indirect and Cumulative Effects A. INTRODUCTION The Council on Environmental Quality (CEQ) s regulations implementing the procedural provisions of the National Environmental Policy Act (NEPA),
More informationThe HNTB Companies Infrastructure Solutions
Rail and Transit The HNTB Companies Infrastructure Solutions EXPERTS IN RAIL AND TRANSIT SOLUTIONS HNTB is the trusted adviser and provider of innovative rail and transit solutions to the nation s largest
More information2004 FEASIBILITY STUDY UPDATE
Austin-San Antonio Intermunicipal Commuter Rail District 2004 FEASIBILITY STUDY UPDATE December 2004 EXECUTIVE SUMMARY INTRODUCTION Almost 3 million people in Central Texas, living and working between
More information