1 Page 1 of 5 SECTION PARK NON-SEGREGATED BUS SPECIFICATION 1.0 SCOPE 1.1. This specification describes assemblies of 600V, 5Kv and 15Kv non-segregated bus duct, which will be installed indoors and outdoors The manufacturer shall have a minimum of 5 years field experience with the equipment proposed. 2.0 CODES and STANDARDS 2.1. All codes and standards referenced in this specification shall be those in effect at the time of Purchase Order award. Permission for deviation from this specification and referenced codes and standards will not be allowed American National Standards Institute, Inc. (ANSI) Institute of Electrical and Electronic Engineers (IEEE) National Electrical Manufacturers Association (NEMA) National Electrical Code (NEC) 2.2. It shall be the Seller s and/or Manufacture's responsibility to be, or to become, knowledgeable of the requirements of these Codes and Standards. Any changes or alterations to the equipment to make it meet the Codes and Standards requirements shall be at the expense of the Seller Whenever equipment, proposed by the Seller, cannot fully meet the requirements of this specification, such exceptions must be clearly stated by the Seller. No exceptions shall be allowed. 3.0 DETAILED TECHNICAL REQUIREMENTS 3.1. Basic Construction The bus duct shall be completely metal-enclosed and weatherproof with pitched roof for outdoor applications The bus conductor shall be made of C110 copper Kv and 15Kv Design: Except at bolted termination's the bus bar shall be insulated with flame retardant, epoxy insulation applied by Park fluidized bed system. All bolted joints; expansion joints; and bus connections, factory or field; shall be insulated with removable boots. Taping is acceptable at transformer and equipment terminations. Removable boots shall be designed to overlap permanent insulation on each conductor in the connection. The length of overlap on each conductor shall not be less than 2 inches at expansion joints, and not less than

2 Page 2 of 5 1/2 at other connections. The insulation rating of bus joint, connection, and termination insulation shall be not less than the voltage rating of the equipment V Design: Bare bus is acceptable, but painted black a. OPTION for 600V: Except at bolted termination's the bus bar shall be insulated with flame retardant, epoxy insulation applied by Park fluidized bed system. All bolted joints; expansion joints; and bus connections, factory or field; shall be insulated with removable boots. Taping is acceptable at transformer and equipment terminations. Removable boots shall be designed to overlap permanent insulation on each conductor in the connection. The length of overlap on each conductor shall not be less than 2 inches at expansion joints, and not less than 1/2 at other connections. The insulation rating of bus joint, connection, and termination insulation shall be not less than the voltage rating of the equipment All bus bar connections shall be bolted, accomplished by bolts passing through the bus bar conductor capable of being torqued and locked in place to provide and maintain full and uniform pressure under all operation conditions. All bolted joints shall have silver to silver or tin to tin contact surfaces with minimum contact resistance. Provisions shall be made for bus expansion, to prevent undesirable or destructive mechanical strains in the bus supports and connections. Expansion joints shall be furnished where required. (Torque requirements in FT-LBS shall be furnished by the manufacturer) The bus shall be installed with rigid, non-tracking, fire-resistant, and nonhydroscopic insulating supports capable of with standing the mechanical forces imposed by short-circuit currents equal to the momentary current. Park GPO-3 insulators shall be used. (Insulator Part# B1400, 600V Insert Part# B1401, 5Kv & 15Kv Insert Part# B1402 ) The enclosure shall be aluminum with stainless steel hardware. The enclosure and joints shall be designed and sized to meet all the requirements of an equipment grounding conductor in accordance with NEC. This requires bonding jumpers and/or a separate ground bus be furnished The bus duct shall include all necessary Park flexible connectors and hardware to connect the bus duct to the auxiliary transformer and to the switchgear. Insulated cable or hard bus connection is not acceptable A fire resistant divider or barrier shall be provided at all points where the bus duct extends through the building wall. The barrier shall have a minimum rating of (3) three hours Suitable accessories and fittings shall be furnished on the bus duct to accommodate buyers hangers and supports. Required support point shall be designated on the bus duct drawings It shall be the bus duct Seller s responsibility to match the bus duct connection flanges to switchgear and transformers. If necessary, dimensions and details of the connecting equipment flange connections will be supplied to Seller by Buyer Space heaters rated 240 volts ac, operating at 120 volts ac, shall be provided in all outdoor bus duct to prevent condensation. The space heaters shall be completely factory wired with no exposed wiring inside the bus housing. Heaters shall be thermostatically controlled. The space heaters shall be supplied from and external source by Buyer. The entire circuit shall be wired to an accessible terminal block providing for a single connection of the external power source. Space heaters shall be accessible from the outside of the bus duct. A drip shield will be provided over the space heater opening to prevent entry of water into the enclosure.

3 Page 3 of Finish The bus enclosure shall be farbricated from aluminum not less than 1/8 inch thick Bus hardware shall be stainless steel for outdoor applications and zinc plated for indoor applications The bus duct enclosures shall be cleaned, primed and finish-powder coated in accordance with Park standard practice The finish coat shall be ANSI No light gray Outdoor Bus Duct Supports Support spans shall be 12 feet or less Supports shall be galvanized steel Supports over 10 feet tall shall be (Park Prt#DBSJ20) constructed with 12 X12 X3/8 wall steel tubing. Supports under 10 feet tall shall be (Park Prt#DBSJ10) constructed with 6 X6 X3/8 wall steel tubing. Supports may vary with material and size depending on site conditions Structures shall be galvanized by the hot dip process in accordance with ASTM A-123 except that all shapes shall receive 3.0 oz. of zinc per square foot of surface area. Structures are to be galvanized both inside and out after all cutting, punching, welding and cleaning have been completed Finished galvanized surfaces must be uniform in color, appearance and texture and must be free of excessive roughness, pimples, lumpiness and runs Indoor Bus Supports 4.0. BUS RATINGS Indoor supports shall be (Park Prt# DBSJ111) constructed of galvanized steel and designed for hanging supports from building overhead steel. Support spans shall be 5 feet or less Bus Ratings a. Bus duct shall be furnished with the following voltage ratings: 1. Nominal voltage: 480V rms 2. Rated maximum voltage: 600V rms 1 minute withstand voltage: 2.2 kv rms 4. Rated impulse withstand voltage: 10 kv peak b. Bus duct shall be furnished with the following voltage ratings:

4 Page 4 of 5 1. Nominal voltage: 4.16 kv rms 2. Rated maximum voltage: 4.76 kv rms 1 minute withstand voltage: 19 kv rms 4. Rated impulse withstand voltage: 60 kv peak c. 1. Nominal voltage: 13.2 kv rms 2. Rated maximum voltage: 15 kv rms 1 minute withstand voltage: 36 kv rms 4. Rated impulse withstand voltage: 95 kv peak Bus duct shall be furnished with the following current and short circuit ratings: 1. Continuous rated current: 1,200 amps rms 1,600 amps rms 2,000 amps rms 2,500 amps rms 3,000 amps rms 3,200 amps rms 4,000 amps rms 4,500 amps rms 5,000 amps rms Other Sizes Available 2. Short-circuit withstand, Symmetrical: 25,000 amps or greater 5.0. ENGINEERING DATA REQUIREMENTS 5.1. All engineering data provided shall be for the equipment as specified and ordered. Engineering data, as listed below, shall be supplied to the Buyer Copies of factory standard tests shall be provided to Buyer All symbols used on drawings shall be in accordance with applicable ANSI standards Drawing Requirements Typical drawings are not acceptable unless they are revised to show only the equipment being furnished. Reproducible drawings for approval shall be supplied as follows: Outline and Arrangement Drawings, completely dimensioned, showing:

5 Page 5 of 5 a. Dimensional Plan and Elevation, front view, other elevation views if pertinent, and shipping sections. b. Bus duct arrangement. c. Cross sectional view of bus bar arrangement, support blocks, and the totally-enclosed housing arrangement. d. Bus termination details. e. Location of space heaters and space heater wiring diagram indicating wiring terminal locations. f. Conductor joint connection details. g. Grounding connections. h. Weight of busway per foot. I. Location, size and of bus duct supports. J. Identification of all terminals, terminal blocks and wires Installation, Operating, and Maintenance Instructions Installation, operating, storage and maintenance instructions shall cover all equipment furnished APPROVED MANUFACTURERS 6.1. Park Electric Company, Detroit, MI, David Shillingburg Jr INSPECTION AND TESTING 7.1. All standard factory tests shall be in full accordance with the latest applicable standards and the results shall be submitted to the Buyer Where any component has failed to pass any test, the Buyer shall be notified in writing of the nature of the failure and the corrective measures applied All equipment covered in this specification shall be subject to inspection and/or witnessed testing by the Buyer or his designated representative.

SECTION METAL-ENCLOSED BUS MEDIUM VOLTAGE

SECTION METAL-ENCLOSED BUS MEDIUM VOLTAGE METAL-ENCLOSED BUS MEDIUM VOLTAGE PART 1 GENERAL 1.01 1.02 1.03 1.04 1.05 SCOPE The Contractor shall furnish and install the equipment as specified herein and as shown on the contract drawings. The medium

More information

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466 BUSWAY LOW VOLTAGE (POW-R-WAY III) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein

More information

A. Section includes busway and fittings including plug-in units.

A. Section includes busway and fittings including plug-in units. SECTION 26 25 00 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes busway and fittings including plug-in units. 1.2 REFERENCES A. Institute of Electrical and Electronics Engineers:

More information

SECTION BUSWAYS

SECTION BUSWAYS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 25 11 BUSWAYS SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable to the section and

More information

31-SDMS-03 REV. 01 SPECIFICATIONS FOR

31-SDMS-03 REV. 01 SPECIFICATIONS FOR 31-SDMS-03 REV. 01 SPECIFICATIONS FOR LOW VOLTAGE CABINET FOR POLE MOUNTED TRANSFORMER This specification is property of SEC and subject to change or modification without any notice CONTENTS Clause Description

More information

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard PART 1 GENERAL 1.1 Scope A. The intent of this specification is to provide power control for the parallel operation of generator

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS. Use for Southeast projects only **************************************************************************

UNIFIED FACILITIES GUIDE SPECIFICATIONS. Use for Southeast projects only ************************************************************************** USACE / NAVFAC / AFCESA / NASA UFGS-26 13 00.00 25 (July 2006) ------------------------------- Preparing Activity: NAVFAC Superseding Southeast UFGS-S-16345N (March 2001) Use in lieu of UFGS-26 13 00.00

More information

SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES

SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES MANUALLY OPERATED / REMOTELY OPERATED DEAD FRONT PADMOUNTED SWITCHGEAR WITH VACUUM LOAD INTERRUPTING

More information

Point Eight Power, Inc. Switchgear Specification Low Voltage UL 1558 Metal-Enclosed Switchgear

Point Eight Power, Inc. Switchgear Specification Low Voltage UL 1558 Metal-Enclosed Switchgear Table of Content 1.0 General... 2 2.0 Scope... 2 3.0 Applicable Codes, Standards and Qualifications... 2 4.0 Service and Environmental Conditions... 3 5.0 Construction... 3 6.0 Front Breaker Compartment

More information

SECTION WIRE, CABLE AND BUSWAYS. A. This section specifies providing wire, cable and busways.

SECTION WIRE, CABLE AND BUSWAYS. A. This section specifies providing wire, cable and busways. SECTION 16120 WIRE, CABLE AND BUSWAYS PART 1 - GENERAL 1.01 DESCRIPTION: A. This section specifies providing wire, cable and busways. B. Definitions: 1. Cable: Cable having low smoke generating characteristics.

More information

SECTION to 5000 AMPERE PLUG-IN AND FEEDER BUSWAYS - SPECTRA. A. Low-Voltage Plug-in Busway to 5000 ampere, 600 VAC

SECTION to 5000 AMPERE PLUG-IN AND FEEDER BUSWAYS - SPECTRA. A. Low-Voltage Plug-in Busway to 5000 ampere, 600 VAC PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Low-Voltage Plug-in Busway - 225 to 5000 ampere, 600 VAC 1.02 RELATED

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION SECONDARY UNIT SUBSTATIONS

SECTION SECONDARY UNIT SUBSTATIONS SECTION 26 12 16 SECONDARY UNIT SUBSTATIONS PART 1 GENERAL 1.1 SUMMARY This section describes metal-clad, indoor or outdoor, secondary unit substations with integral primary fused disconnect switches,

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section. 1.2 SUMMARY A. This Section

More information

Customer Owned Meter Enclosures for Self-Contained Watthour Meters

Customer Owned Meter Enclosures for Self-Contained Watthour Meters Revision No. 4 Page 1 of 15 SPECIFICATION Page 2 of 15 RECORD OF SPECIFICATION APPROVALS: This Specification is approved for the inclusion of subject products on the Florida Meter Group s Approved Metering

More information

37-SDMS-01 REV. 03 SPECIFICATIONS FOR

37-SDMS-01 REV. 03 SPECIFICATIONS FOR 37-SDMS-01 REV. 03 SPECIFICATIONS FOR LOW VOLTAGE MOLDED CASE CIRCUIT BREAKERS FOR SERVICE CONNECTIONS This specification is property of SEC and subject to change or modification without any notice CLAUSE

More information

METAL ENCLOSED BUS SOLUTIONS

METAL ENCLOSED BUS SOLUTIONS METAL ENCLOSED BUS SOLUTIONS ABOUT TECHNIBUS Technibus, Inc is a global leader in the supply of metal enclosed bus systems operating for more than 50 years. Our products include Isolated Phase, Non-Segregated,

More information

SECTION HEAT TRACING FOR PLUMBING PIPING

SECTION HEAT TRACING FOR PLUMBING PIPING SECTION 22 05 33 HEAT TRACING FOR PLUMBING PIPING PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph not

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-33 77 19.00 40 (August 2016) --------------------------------- Preparing Activity: NASA Superseding UFGS-33 77 19.00 40 (August 2013) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SECTION MOTOR CONTROL CENTER

SECTION MOTOR CONTROL CENTER SECTION 16445 MOTOR CONTROL CENTER PART 1 GENERAL 1.01 DESCRIPTION A. This section covers the contract item Motor Control Center (MCC). The contract item includes demolition and removal of existing MCC;

More information

33-SDMS-02 SPECIFICATIONS FOR

33-SDMS-02 SPECIFICATIONS FOR SPECIFICATIONS FOR MV AUTOMATIC LINE SECTIONLIZER UP TO 36 KV This specification is property of SEC and subject to change or modification without any notice TABLE OF CONTENTS SECTION T I T L E PAGE NO.

More information

A. The work consists of furnishing a Chiller Noise Reduction System as listed in the specifications.

A. The work consists of furnishing a Chiller Noise Reduction System as listed in the specifications. SECTION 32 31 14 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply

More information

SECTION HEAT TRACING FOR PLUMBING PIPING

SECTION HEAT TRACING FOR PLUMBING PIPING SECTION 22 05 33 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable in the section

More information

SECTION CHAIN-LINK FENCES AND GATES 02821/1

SECTION CHAIN-LINK FENCES AND GATES 02821/1 SECTION 02821 - CHAIN-LINK FENCES AND GATES 02821/1 PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Chain-Link Fences: 2. Gates: horizontal slide or swing. 3. Fences installed where

More information

30-SDMS-01 SPECIFICATIONS FOR LOAD BREAK SWITCH

30-SDMS-01 SPECIFICATIONS FOR LOAD BREAK SWITCH SPECIFICATIONS FOR LOAD BREAK SWITCH This specification is property of SEC and subject to change or modification without any notice TABLE OF CONTENTS 1.0 SCOPE 3 2.0 CROSS REFERENCES 3 3.0 APPLICABLE CODES

More information

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install Manual Transfer Switches (MTS) and

More information

SECTION GROUNDING

SECTION GROUNDING SECTION 16450 GROUNDING PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies general grounding and bonding requirements of electrical and telecommunication installations for personnel safety, equipment

More information

Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008

Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008 Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008 (Above 1000V and up to 38kV for Surface Mining) Key Components of Specification:

More information

SECTION ENCLOSED BUS ASSEMBLIES

SECTION ENCLOSED BUS ASSEMBLIES SECTION 262500 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS DAIMLERCHRYSLER MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS ISSUE DATE: 5/1/90 EFFECTIVE DATE: 2/4/92 REVIEW DATE:

More information

OVERHEAD SERVICES - SECONDARY

OVERHEAD SERVICES - SECONDARY OVERHEAD SERVICES - SECONDARY Contents - Overhead Services... O-1 General Requirements for Overhead Service... O-2 Names of Parts for Overhead Service... O-3 Service Attachment on an Unguyed Service Mast...

More information

Houston First Corporation Package 1 SECTION MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER

Houston First Corporation Package 1 SECTION MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER PART 1 - GENERAL 1.1 SUMMARY SECTION 26 13 16 MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER A. The scope of this section includes providing and assembling materials and equipment for the dead-front, medium voltage

More information

SECTION PART 1 GENERAL

SECTION PART 1 GENERAL SECTION 16060 GROUNDING AND BONDING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Grounding of electrical systems and equipment and basic requirements for ground for equipment, circuits, and systems.

More information

Details of technical leaflets/write-up on various pieces of equipment.

Details of technical leaflets/write-up on various pieces of equipment. Details of technical leaflets/write-up on various pieces of equipment. (1) Insulator Designs: The insulators are provided in one, two, three, or four insulator designs per location and spaced to provide

More information

GE EQUIPMENT CENTERS APPLICATION CONSIDERATIONS

GE EQUIPMENT CENTERS APPLICATION CONSIDERATIONS g GE Electrical Distribution and Control General Electric Company 41 Woodford Avenue, Plainville, CT 06062 860 747-7111 GE EQUIPMENT CENTERS APPLICATION CONSIDERATIONS Introduction For many years the petro/chemical

More information

SECTION SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V

SECTION SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the secondary unit substation(s) complete from the incoming line terminals

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 35 33.00 40 (August 2016) --------------------------------- Preparing Activity: NASA Superseding UFGS-26 35 33.00 40 (August 2013) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SECTION GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT

SECTION GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT SECTION 23 05 12 GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. Also delete

More information

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 1.1. REFERENCE STANDARDS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification

More information

UNDERGROUND SERVICES SECONDARY

UNDERGROUND SERVICES SECONDARY Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Medium Voltage Switchgear. Basis of Design.

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Medium Voltage Switchgear. Basis of Design. Basis of Design This section applies to the design and selection of medium voltage switchgear, primarily for use in substations. Design Criteria 13.8kV equipment shall be 15kV class, 4.16kV and 2.4kV equipment

More information

SECTION ENCLOSED BUS ASSEMBLIES

SECTION ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

Power Control Distribution Building (PCD) Technical Specification General Purpose (Non-Hazardous) Environment

Power Control Distribution Building (PCD) Technical Specification General Purpose (Non-Hazardous) Environment Power Control Distribution Building (PCD) Technical Specification PART I: GENERAL 1. Scope 1.1. The specification covers requirements applicable to the provision of power distribution centers (PCD) suitable

More information

a) Line and load compartments must be separated by a stable barrier.

a) Line and load compartments must be separated by a stable barrier. 1.00 GENERAL 1.01 The electric utility shall furnish and connect all meters, instrument transformers, test switches, and meter control wiring necessary to complete the meter installation. 1.02 The customer

More information

PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE SECTION SECTION

PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE SECTION SECTION PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE PART 1 GENERAL 1.01 SCOPE A. The Contractor shall furnish and install the primary unit substation(s) complete from the incoming line terminals to the

More information

1 29SEP03 ALL General update with miscellaneous changes in entire document.

1 29SEP03 ALL General update with miscellaneous changes in entire document. REVISION RECORD SECTION 16461 Dry-Type Transformers (600 V and Less) REV DATE PAGE PARA NO. DESCRIPTION APPROVED BY 28SEP01 ALL Initial issue. 1 29SEP03 ALL General update with miscellaneous changes in

More information

A. Access doors and frames are part of an access door and frame allowance.

A. Access doors and frames are part of an access door and frame allowance. SECTION 08 31 13 ACCESS DOORS AND FRAMES PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

UFGS (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UFGS (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 35 33.00 40 (August 2013) --------------------------------- Preparing Activity: NASA Superseding UFGS-26 35 33.00 40 (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SECTION INTEGRATED POWER ASSEMBLY (IPA)

SECTION INTEGRATED POWER ASSEMBLY (IPA) INTEGRATED POWER ASSEMBLY (IPA) PART 1 GENERAL 1.01 1.02 1.03 SCOPE The specification covers requirements applicable to the provision of Integrated Power Assembly (IPA). The IPA shall be environmentally

More information

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection

More information

Power Zone Center. Your solution for power distribution and control systems

Power Zone Center. Your solution for power distribution and control systems Power Zone Center Your solution for power distribution and control systems The Strength of One Powerful When you need to install a new power distribution center in your facility, you need it done in fastest

More information

N-SERIES: NTH2700 SPECIFICATIONS Tubular Composite Top Hung Sliding Door System

N-SERIES: NTH2700 SPECIFICATIONS Tubular Composite Top Hung Sliding Door System Version 5.22.13 N-SERIES: NTH2700 SPECIFICATIONS Tubular Composite Top Hung Sliding Door System OPTIONS ARE LISTED IN BOLD, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT CONSULT MANUFACTURER

More information

CONTENTS. B. System Design and Performance Requirements

CONTENTS. B. System Design and Performance Requirements 16060 Grounding and Bonding This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or

More information

DISTRIBUTION TRANSFORMER SPECIFICATION #

DISTRIBUTION TRANSFORMER SPECIFICATION # DISTRIBUTION TRANSFORMER SPECIFICATION #1212.03 15kV Single Phase Submersible Transformer Stainless Steel 12/2/2011 Page 1 of 8 1. SCOPE This specification covers single-phase submersible transformers

More information

SECTION OUTLET, PULL, AND JUNCTION BOXES

SECTION OUTLET, PULL, AND JUNCTION BOXES SECTION 16131 OUTLET, PULL, AND JUNCTION BOXES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16112 - Raceways and Conduits. 1.02 SYSTEM DESCRIPTION A. Performance Requirements:

More information

Power Control Distribution Building (PCD) Technical Specification Corrosive Environment

Power Control Distribution Building (PCD) Technical Specification Corrosive Environment PART I - GENERAL 1. SCOPE 1.1. The specification covers requirements applicable to the provision of power distribution centers (PCD) suitable for installation in highly corrosive environments. The PCD

More information

Standard of Practice - Campus Electrical Distribution System

Standard of Practice - Campus Electrical Distribution System A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all

More information

SECTION ROOF ACCESSORIES

SECTION ROOF ACCESSORIES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 72 00 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable

More information

OPERATING PROCEDURE NO. 310

OPERATING PROCEDURE NO. 310 OPERATING PROCEDURE NO. 310 Related Operating Procedures: 310A; 310B; 310C; 310D SUBJECT: Conditions of Service Issued: February 10, 2014 Revised: March 28, 2016 OBJECTIVE: To establish the rules, regulations

More information

56-SDMS-01 REV. 01 SPECIFICATIONS FOR

56-SDMS-01 REV. 01 SPECIFICATIONS FOR 56-SDMS-01 REV. 01 SPECIFICATIONS FOR 13.8KV UNIT SUBSTATIONS This specification is property of SEC and subject to change or modification without any notice CONTENTS PAGE No. 1.0 SCOPE 3 2.0 CROSS REFERENCES

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 48-05 Van Dam Street Long Island City, NY 11101 ELECTRIC METER SHOP DEPARTMENT METER ENGINEERING SPECIFICATION MES-350 REVISION 3 June 2016 EFFECTIVE DATE

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Customer Owned Meter Enclosures for Self-Contained Watthour Meters

Customer Owned Meter Enclosures for Self-Contained Watthour Meters Spec. No. 1.0 Revision No. 8 Date 11/2/2015 Page 1 of 16 SPECIFICATION Page 2 of 16 RECORD OF SPECIFICATION APPROVALS: This Specification is approved for the inclusion of subject products on the Meter

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 GROUNDING AND BONDING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features DESIGN CRITERIA FOR STANDARD CONSTRUCTION: These standard design elements of the P.E.I. Power Equipment Center are utilized to meet the following design criteria per ASCE 7-05 as adopted by the IBC (International

More information

SPECIFICATION FOR SIMPLEX SWITCHBOARDS

SPECIFICATION FOR SIMPLEX SWITCHBOARDS SPECIFICATION FOR SIMPLEX SWITCHBOARDS 1.0 SCOPE This specification presents general guidelines, design criteria, and construction requirements for AZZ ENCLOSURE SYSTEMS SIMPLEX PANELS for providing control

More information

SECTION DECORATIVE METAL RAILINGS

SECTION DECORATIVE METAL RAILINGS SECTION 05 73 00 DECORATIVE METAL RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Vertical Stainless Steel Cable Railing System. B. Horizontal Stainless Steel Cable Railing System. 1.2 RELATED SECTIONS

More information

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1 INDEX Page SECTION 1.0: SCOPE 1 1.1 Toronto Hydro Requirements 1 1.2 Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1 SECTION 3.0: DEFINITIONS AND THE INTERNATIONAL SYSTEM OF UNITS 1 3.1 Definitions

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL).

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL). 16450 GROUNDING ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 05 26 An optional keynote to the

More information

42-SDMS-02 SPECIFICATIONS FOR FIBERGLASS REINFORCED LOW VOLTAGE SERVICE CABINET FOR 800A BULK CUSTOMERS

42-SDMS-02 SPECIFICATIONS FOR FIBERGLASS REINFORCED LOW VOLTAGE SERVICE CABINET FOR 800A BULK CUSTOMERS SPECIFICATIONS FOR FIBERGLASS REINFORCED LOW VOLTAGE SERVICE CABINET FOR 800A BULK CUSTOMERS This specification is property of SEC and subject to change or modification without any notice C O N T E N T

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR BRIDGE NAVIGATION LIGHTING

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR BRIDGE NAVIGATION LIGHTING 809-1(a-e) 09 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR BRIDGE NAVIGATION LIGHTING These special provisions amend and where in conflict, supersede applicable sections of the 2009 Standard

More information

OVERHEAD SERVICES - RESIDENTIAL & GENERAL SERVICE. See Chapter 3, Section 3.01 for more information about point of entrance (POE).

OVERHEAD SERVICES - RESIDENTIAL & GENERAL SERVICE. See Chapter 3, Section 3.01 for more information about point of entrance (POE). 6.01 GENERAL OVERHEAD SERVICES - RESIDENTIAL & GENERAL SERVICE See Chapter 3, Section 3.01 for more information about point of entrance (POE). In all cases, the customer installs, owns, and maintains the

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

WHITE PAPER The Criticality of Proactive Maintenance on Isolated Phase Bus Duct Systems

WHITE PAPER The Criticality of Proactive Maintenance on Isolated Phase Bus Duct Systems WHITE PAPER The Criticality of Proactive Maintenance on Isolated Phase Bus Duct Systems Introduction Isolated Phase Bus Duct (IPBD) is the main conduit for power distribution in a power generation facility.

More information

SECTION SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION

SECTION SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION SECTION 16-372 SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION 1. GENERAL SPECIFICATIONS The work of this Section includes furnishing all labor, equipment, materials (unless specifically identified as Owner-furnished)

More information

Flat Bank SERIES 05FB AND 07FB. Options CONSTRUCTION FEATURES EQUIPMENT OPTIONS PRODUCT DATA CLEAN-LINE TM SERIES 05FB/07FB PD-CLFB-03A JANUARY 2003

Flat Bank SERIES 05FB AND 07FB. Options CONSTRUCTION FEATURES EQUIPMENT OPTIONS PRODUCT DATA CLEAN-LINE TM SERIES 05FB/07FB PD-CLFB-03A JANUARY 2003 PRODUCT SERIES 05FB/07FB PD-CLFB-03A FILTRATION EQUIPMENT SERIES 05FB AND 07FB 2" AND 4" FLAT BANK FILTER HOUSINGS Flat Bank CONSTRUCTION FEATURES 16 GAUGE ALUMINIZED STEEL FACTORY ASSEMBLED (2) HINGED

More information

MATERIAL SPECIFICATION FOR LUMINAIRE RAISING AND LOWERING EQUIPMENT

MATERIAL SPECIFICATION FOR LUMINAIRE RAISING AND LOWERING EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 2476 JANUARY 1990 MATERIAL SPECIFICATION FOR LUMINAIRE RAISING AND LOWERING EQUIPMENT 2476.01 SCOPE 2476.02 REFERENCES 2476.05 MATERIALS TABLE OF CONTENTS

More information

Product Guide Specification

Product Guide Specification ACCESS CABLE TRAYS, Inc 1073 79 th St. S St. Petersburg, FL 33707 PH. 727 341 1111 FX. 727 344 8680 EMAIL. information@accesscabletrays.com Product Guide Specification ********************************************************************************************************************

More information

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

B. Provide liquid-filled secondary substation transformers as indicated on drawings.

B. Provide liquid-filled secondary substation transformers as indicated on drawings. SECTION 26 12 13 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 26 05 00. B. Provide liquid-filled secondary substation transformers as indicated on drawings. 1.02 RELATED

More information

SECTION MISCELLANEOUS METALS

SECTION MISCELLANEOUS METALS PART 1 GENERAL 1.1 WORK OF THIS SECTION A. Contractor shall provide all labor, materials, equipment and incidentals as shown, specified and required to furnish and install all miscellaneous metal fabrications

More information

LOW-VOLTAGE SERVICE ENTRANCE SWITCHBOARDS SECTION D

LOW-VOLTAGE SERVICE ENTRANCE SWITCHBOARDS SECTION D SECTION 16428D (26 24 13.01) LOW VOLTAGE SWITCHBOARDS TYPE POW-R-LINE C 600 VAC MAXIMUM PART 1 GENERAL 1.01 SCOPE A. The contractor shall furnish and install where indicated on the drawings a dead front

More information

N-SERIES: NTH3500 SPECIFICATIONS Hollow Metal Sliding Door System

N-SERIES: NTH3500 SPECIFICATIONS Hollow Metal Sliding Door System Version 5.22.13 N-SERIES: NTH3500 SPECIFICATIONS Hollow Metal Sliding Door System OPTIONS ARE LISTED IN BOLD, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT CONSULT MANUFACTURER FOR ADDITONAL

More information

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein.

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein. 16470 PANELBOARDS ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 24 16 An optional keynote to

More information

SECTION FACILITY LIGHTNING PROTECTION

SECTION FACILITY LIGHTNING PROTECTION PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 41 00 FACILITY LIGHTNING PROTECTION SPEC WRITER NOTE: Delete between //----//if not applicable to project. Also delete any other item or paragraph not applicable

More information

Outdoor + Switchgear, Walk-in Equipment Buildings Low & Medium Voltage NEMA 3R

Outdoor + Switchgear, Walk-in Equipment Buildings Low & Medium Voltage NEMA 3R Outdoor + Switchgear, Walk-in Equipment Buildings Low & Medium Voltage NEMA 3R Product Brochure www.apt-power.com 433 N. 36 th Street PROVIDING A COMPREHENSIVE Lafayette, IN 47905 www.apt-power.com 433

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes requirements for an electrical grounding system, including electrodes, grounding rods, connectors, insulators, equipment grounding and

More information

Equipment Specifications Low Voltage. Active Harmonic Filter

Equipment Specifications Low Voltage. Active Harmonic Filter Equipment Specifications Low Voltage Active Harmonic Filter 1.0 General Description This section contains the design standards, general equipment type and configuration, components, product description,

More information

*** Supercedes: BECO E and COM , , & ***

*** Supercedes: BECO E and COM , , & *** 7/27/09 Page 1 of 9 R5 *** Supercedes: BECO E2.9-27.4 and COM 1-0696, 2-0196, & 5-0385 *** 1.0 Scope #2 AWG to 1000 KCMIL CONCENTRIC NEUTRAL JACKETED CABLES RATED 5-35 kv These Specifications cover single

More information

SECTION OVERHEAD CONDUCTOR RAIL

SECTION OVERHEAD CONDUCTOR RAIL SECTION 34 23 06 OVERHEAD CONDUCTOR RAIL PART 1 - GENERAL 1.1 DESCRIPTION This Section describes and specifies the performance requirements to design, furnish, install, test, and place into satisfactory

More information

MATERIAL SPECIFICATION FOR HIGH PRESSURE SODIUM LUMINAIRES FOR UNDERPASS LIGHTING

MATERIAL SPECIFICATION FOR HIGH PRESSURE SODIUM LUMINAIRES FOR UNDERPASS LIGHTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 2434 November 2016 MATERIAL SPECIFICATION FOR HIGH PRESSURE SODIUM LUMINAIRES FOR UNDERPASS LIGHTING TABLE OF CONTENTS 2434.01 SCOPE 2434.02 REFERENCES

More information

Arc Resistant Switchgear & Integrated Factory Assembled Buildings

Arc Resistant Switchgear & Integrated Factory Assembled Buildings Arc Resistant Switchgear & Integrated Factory Assembled Buildings Factory Assembled Factory Pre-commissioned Fully Tested Arc Resistant Designs Proven Long Distance Transport Capability Five Days for Site

More information

STANDARD SPECIFICATION FOR SIGNAL CABLE. A. This Specification provides for single and multi-conductor insulated and jacketed cable for

STANDARD SPECIFICATION FOR SIGNAL CABLE. A. This Specification provides for single and multi-conductor insulated and jacketed cable for STANDARD SPECIFICATION FOR SIGNAL CABLE 1.01 SCOPE A. This Specification provides for single and multi-conductor insulated and jacketed cable for installation in direct contact with the earth, in ducts,

More information

DMS CONDUIT EFFECTIVE DATE: APRIL

DMS CONDUIT EFFECTIVE DATE: APRIL DMS - 11030 EFFECTIVE DATE: APRIL 2014 11030.1. Description. This Specification governs the materials, composition, quality, sampling, and testing of electrical conduit. 11030.2. Units of Measurements.

More information

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less)

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less) SECTION 260523 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less) PART 1 - GENERAL 1.1 SUMMARY A. Related Documents: 1. Drawings and general provisions of the Subcontract apply

More information

SECTION LOW-VOLTAGE TRANSFORMERS

SECTION LOW-VOLTAGE TRANSFORMERS PART 1 GENERAL 1.1 DESCRIPTION SECTION 26 22 00 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between // // if not applicable to project. Also, delete any other item or paragraph not

More information

A. This Section includes steel cable trays and accessories.

A. This Section includes steel cable trays and accessories. SECTION 26 05 36 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

A. Basket Cable Tray: A fabricated structure consisting of wire mesh bottom and side rails.

A. Basket Cable Tray: A fabricated structure consisting of wire mesh bottom and side rails. SECTION 27 11 00 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection

More information