1 OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO July 17, 2015 To: Users of the Bridge Design Manual From: Tim Keller, Administrator, Office of Structural Engineering By: Re: Sean Meddles, Assistant Administrator, Office of Structural Engineering 2015 Third Quarter Revisions Revisions have been made to the ODOT Bridge Design Manual, January These revisions shall be implemented on all Department projects that begin Stage 2 plan development date after July 17, Implementation of some or all of these revisions for projects further along the development process should be considered on a project-by-project basis. This package contains the revised pages. The revised pages have been designed to replace the corresponding pages in the book and are numbered accordingly. Revisions, additions, and deletions are marked in the revised pages by the use of one vertical line in the right margin. The header of the revised pages is dated accordingly. To keep your Manual correct and up-to-date, please replace the appropriate pages in the book with the pages in this package. To ensure proper printing, make sure your printer is set to print in the 2-sided mode. The January 2004 edition of the Bridge Design Manual may be downloaded at no cost using the following link: Attached is a brief description of each revision.

2 (THIS PAGE INTENTIONALLY LEFT BLANK)

3 Summary of Revisions to the January 2004 ODOT BDM BDM Section Affected Pages Revision Description Figure 320C The data for water elevations has been revised for consistency with FEMA terminology. The data for water elevations has been revised for consistency with FEMA terminology. For consistency with regulatory definitions, reference is provided to the USACE document defining OHWM. Our office is eliminating the use of Type D waterproofing for non-composite box beam bridges. The Type D is more labor intensive to install with little to no benefit compared to Type 3 waterproofing. Our office is eliminating the use of Type D waterproofing for non-composite box beam bridges. The Type D is more labor intensive to install with little to no benefit compared to Type 3 waterproofing. Our office is eliminating the use of Type D waterproofing for non-composite box beam bridges. The Type D is more labor intensive to install with little to no benefit compared to Type 3 waterproofing. The equation for the max height of the #4 supplemental haunch bar was corrected for a math error Figure through With the release of PSID-1-13, there has been confusion on locating construction joints for diaphragms and decks. These revisions help clarify the placement options for semi-integral diaphragms with regard to skew and phased construction. This figure has been updated to reflect the replacement of Item 448 with Item 441. Also, the dimensions for intermediate and surface courses has been clarified.

4 (THIS PAGE INTENTIONALLY LEFT BLANK)

5 SECTION 200 PRELIMINARY DESIGN July 2014 SECTION PRELIMINARY DESIGN 201 STRUCTURE TYPE STUDY GENERAL In conformance with Section 1400 of the ODOT Location and Design Manual, Volume Three, a Structure Type Study shall be included in the Preferred Alternative Verification Review Submission for a Major Project or in the Minor Project Preliminary Engineering Study Review Submission. The Structure Type Study is not required for projects classified as Minimal. The project site should be studied in detail and evaluated to determine the best structure alternative. A site visit should be made. In many cases, it can be readily determined whether a particular bridge or culvert should be chosen for a particular site. If a bridge is the most appropriate structure for a particular site, then the Structure Type Study needs to be performed to determine the appropriate bridge type STRUCTURE TYPE STUDY SUBMISSION REQUIREMENTS A Structure Type Study submission should include the following: A. Profile for each bridge alternative... Section B. Preliminary Structure Site Plan (for preferred bridge alternative)... Section C. Hydrology & Hydraulics (H&H) Report... Section D. Narrative of Bridge Alternatives... Section E. Cost Analysis... Section F. Foundation Recommendation... Section G. Preliminary Maintenance of Traffic Plan... Section The Structure Type Study shall be included in the review submission made directly to the District Office. A concurrent review submission shall be made to the Office of Structural Engineering if the proposed structure type contains non-standard bridge railing types, non-redundant designs, or fracture critical designs. The Office of Structural Engineering will forward review comments for these items to the responsible District Office. Additional structural related items that are required at this stage of the review process include: A. Retaining Wall Justification (L&D Section ) B. Noise Wall Justification (ODOT Policy # and Procedure # ) C. Pedestrian Overpass Justification (L&D Section ) 2-1

6 SECTION 200 PRELIMINARY DESIGN July PROFILE FOR EACH BRIDGE ALTERNATIVE The profile for each bridge alternative considered shall generally be drawn to a scale of 1 =20 and shall generally be taken along the proposed centerline of survey for the full length of the bridge. The profiles shall include: the existing and proposed profile grade lines; existing ground line; the crosssection of channel; an outline of the structure; highest known high water mark; normal water elevation; Ordinary High Water Mark (OHWM); flow line elevation (thalweg); design and 100 year water surface elevations (WSE); overtopping flood elevation and frequency; existing and proposed profile grade elevations at 25 ft increments; and minimum and required vertical and horizontal clearances. Note: normal water elevation is the water elevation in the stream which has not been affected by a recent heavy rain runoff and could be found in the stream most of the year. Refer to BDM Section for OHWM definition. Carry WSE in a FEMA Zone out to two decimal places PRELIMINARY STRUCTURE SITE PLAN The Site Plan scale generally should be 1 = 20 [1 to 200]. For some cases to get the entire bridge on one sheet a smaller scale may be provided, if all details can be clearly shown. For bridges where the 1 = 20 [1 to 200] scale is too small to clearly show the Site Plan details, a 1 = 10 [1 to 100] scale may be considered. The following general information should be shown on the Preliminary Structure Site Plan: A. The plan view should show the existing structures (use dashed lines); contours at 2 foot [0.5 meter] intervals showing the existing surface of the ground (for steep slopes contours at 5 foot [2.0 meter] or greater intervals may be used); existing utility lines and their disposition; proposed structure; proposed temporary bridge; proposed channel improvements; a north arrow; and other pertinent features concerning the existing topography and proposed work in an assembled form. In case of a highway grade separation or a highway-railway grade separation, the required minimum and actual minimum horizontal and vertical clearances and their locations shall be shown in the plan and profile views. For a bridge over a railway, the vertical clearance shall be measured from a point level with the top of the highest rail and 6 feet [2 meters] from the centerline of those tracks, or greater if specified by the individual railroad. Reference shall be made to Chapter 15, Section 1.2.6(a), AREMA Specifications for increased lateral clearances required when tracks are on a horizontal curve. B. A profile as described in Section The profile scale shall be the same as the plan view. C. Horizontal and vertical curve data. D. Size of drainage area. The elevation, discharge and stream velocity through the structure and the backwater elevation for the 100-year frequency base flood, the design year flood and if necessary the overtopping flood. Label discharge as FIS when taken from a FEMA Flood Insurance Study. The clearance from the lowest elevation of the bottom of the superstructure to the design year water surface elevation (freeboard) should be provided. 2-2

7 SECTION 200 PRELIMINARY DESIGN July BRIDGE AND WATERWAY PERMITS Impacts to bridges or waterways may require legal authorization in the form of permits or certifications issued by various regulatory agencies, including: A. U.S. Army Corps of Engineers... Section 404 and/or Section 10 Permit B. U.S. Coast Guard... Section 9 Bridge Permit C. Ohio EPA... Section 401 Water Quality Certification and/or Isolated Wetland Permit The jurisdictional limit of the U.S. Army Corps of Engineers (USACE) is termed the Waters of the United States and, as noted in ODOT CMS , includes: rivers, streams, lakes and wetlands. For rivers and streams, the jurisdiction begins below the Ordinary High Water Mark (OHWM). The OHWM is defined by the USACE Regulatory Letter No which is available at:

8 SECTION 200 PRELIMINARY DESIGN January 2015 The ODOT Office of Environmental Services Waterway Permits Unit (OES-WPU) assumes the responsibility for determining project eligibility for different types of waterway permits, such as, but not limited to, Nationwide Permits (NWP) or ODOT s Regional General Permit (RGP). The designer and project manager shall coordinate with the DEC and the OES-WPU throughout the permit determination process to ensure that the final waterway permit applications are indicative of the final project design. For more information refer to the Waterway Permits Manual available from the ODOT Office of Environmental Services. Special Provisions are the method ODOT uses to attach the waterway permits and certifications to the project construction plans. The waterway permits Special Provisions Package (SPP) is prepared by the Office of Environmental Services Waterway Permits Unit and may contain the following: A. All pertinent waterway permits, certifications and related conditions B. Drawings and/or mapping submitted with a permit application C. Specialized conditions associated with the waterway permits The designer and the project manager shall confirm that the bridge design plans meet the requirements in the project waterway SPP (e.g. Sections 404 and 401 conditions, and infrequently Sections 9 and 10) and shall ensure the project waterway SPP is submitted with the Final Plan Package TEMPORARY ACCESS FILLS A Temporary Access Fill (TAF) is a fill or structure that allows a contractor access to work on roads or bridges located within bodies of water. TAF s are work-type specific and are not required on every project. Examples of TAF s include: cofferdams; temporary structures for maintaining traffic; causeways and workpads; and demolition debris. The placement of all TAF s in Waters of the United States must be performed in accordance with the special provisions for waterway permits. A contractor s means and methods of construction will dictate the TAF required for a project. However, the Department must estimate the potential impacts to Waters of the United States during project development to ensure all permits are in-place during contract letting. Furthermore, it is incumbent upon the Department that these permits provide all bidding contractors the ability to construct the project without resulting in expensive delays, change orders or fines. To that end, the Department partnered with the Ohio Contractor s Association to develop the following guidance to estimate the size of TAF s: A. The TAF shall provide access to all piers located within the Ordinary High Water Mark (OHWM) of the waterway from at least one bank of the waterway. Access may be provided by construction staging of the TAF. When considering the constructability of staged TAF s, typical superstructure erection plans for lifting lengths of 50-ft or more require two cranes. Unless the access for member delivery is from an adjacent structure, the TAF must provide access to each end of the lift from one bank. In the case of staging, the permit application shall reflect the construction stage that impacts the largest area of the

9 SECTION 300 DETAIL DESIGN July 2015 wearing surface shall be composed as follows: 1. Two separate 1½ inch [38 mm] minimum lifts of Item 441 Asphalt Concrete Surface Course, Type 1, PG70-22M. The first lift shall be variable thickness to accommodate beam camber. The second lift shall be a uniform 1½ inch [38 mm] thickness. 2. Two applications of Item 407 Tack Coat - one prior to placement of the first lift of surface course and one prior to placement of the second lift of surface course. Refer to the ODOT Pavement Design Manual, Section 400 for application rates. C. 6 inches [155 mm] cast-in-place composite deck - defined as the minimum thickness of concrete slab for composite prestressed box beams. The top 1 inch [25 mm] shall be considered monolithic as defined above. Also see Section FUTURE WEARING SURFACE All bridges shall be designed for a future wearing surface (FWS) of 60 psf [2.87 kpa]. The future wearing surface is considered non-structural and shall not be used in design to increase the strength of the superstructure. The presence of a future wearing surface does not exclude the use of the 1 inch [25 mm] monolithic wearing surface as defined above CONCRETE DECK PROTECTION TYPES A. Epoxy Coated Reinforcing Steel - CMS B. Minimum concrete cover of 2½ inches [65 mm] C. Class QC2 Concrete D. Drip Strips E. CMS 512, Type 3 Waterproofing F. Asphaltic concrete wearing surface 3-11

10 SECTION 300 DETAIL DESIGN October WHEN TO USE All reinforcing steel shall be epoxy coated

11 SECTION 300 DETAIL DESIGN October 2007 (THIS PAGE INTENTIONALLY LEFT BLANK)

12 SECTION 300 DETAIL DESIGN July 2015 All cast-in-place concrete decks shall have minimum concrete top cover of 2½ inches [65 mm]. A drip strip may be used on decks with over the side drainage. Non-composite box beam bridges, with over the side drainage, shall have an asphalt concrete overlay. The overlay shall be placed over Type 3 Waterproofing, CMS 512. Minimum thickness of overlay is 3 inches [75 mm] - See Section SEALING OF CONCRETE SURFACES SUPERSTRUCTURE Specifications for sealing material are defined in CMS 512. Concrete surfaces shall be sealed with an approved concrete sealer as follows: (See Figures 310 & 311) A. Concrete slabs or concrete decks on steel superstructures with over-the-side drainage: The deck fascia and a 6 inch [150 mm] (minimum) width under the deck shall be sealed with either an epoxy-urethane or non-epoxy sealer. B. Concrete slabs, composite prestressed box beam superstructures or concrete decks on steel superstructures with sidewalks: The vertical face of curb; the top of the curb/sidewalk; the inside face, top and outside face of the parapet; the deck fascia; and a 6 inch [150 mm] (minimum) width under the deck shall be sealed with either an epoxy -urethane or non-epoxy sealer. C. Concrete slabs, composite prestressed box beam superstructures or concrete decks on steel superstructures with deflector parapets: The inside face, top and outside face of parapet; the deck fascia; and a 6 inch [150 mm] (minimum) width under the deck shall be sealed with either an epoxy-urethane, or non-epoxy sealer. D. Non-composite prestressed concrete box beam decks with over-the-side drainage: The fascia of the outside beams and a minimum 6 inch [150 mm] width under the beam shall be sealed with an epoxy-urethane or a non-epoxy sealer. E. Concrete decks on prestressed I-beam superstructures with over-the-side drainage: The deck fascia; the underside of the deck to the edge of the top flange; the exterior fascia of the beam; the underside of the bottom flange; and the inside face of the bottom flange shall 3-12

13 SECTION 300 DETAIL DESIGN July 2015 When designing the deck reinforcement for a multiple span structure, unless a more precise method of analysis is performed, the composite structure shall be conservatively modeled as a continuous beam on a single support centered on the pier. Composite box beam structures with concrete parapets or sidewalks should not incorporate fit-up tolerances in the finished roadway width. To compensate for fit-up tolerances the composite deck and barrier and/or sidewalk should be designed to cantilever or overhang the boxbeam units by 2" [50 mm] to 8" [200 mm] each side with the fit-up being absorbed in the overhang. A mixture of 48" [1220 mm] and 36" [915 mm] boxbeam units may be necessary to meet this requirement. See Figure 320 for a sketch of the cross-section of the composite deck superstructure NON-COMPOSITE WEARING SURFACE Non-composite box beam bridges with asphalt overlays shall have Type 3 Waterproofing as specified in CMS 512 placed on the boxes before the 1½ inch minimum layers of CMS type 441 asphaltic concrete is applied. See section The Type 3 Waterproofing is preferred. Non-composite box beam bridges with asphalt overlays shall be limited to a 4 percent combined grade. Combined grades greater than 4 percent require a composite deck design. Combined grade includes both the longitudinal and transverse structure grades calculated as follows: Combined Grade (Cg) = ([deck slope] 2 + [transverse grade] 2 ) ½ CAMBER The topping thickness on prestressed box beam superstructures will vary along the length of the beams to account for beam camber and other vertical elevation adjustments. Proper determination of the topping thickness is crucial in order to properly establish beam seat elevations. As shown in Figure 320A, the topping thickness (Tx) at any point, x, along the length of a prestressed box beam superstructure shall be determined as: Tx = A + Bx + C + Dt,x - E Where: A = Design deck thickness Bx = Vertical grade adjustment C = Sacrificial haunch depth Dt,x = Beam camber adjustment at member age equal to Day t 3-41

14 SECTION 300 DETAIL DESIGN January 2014 E = Haunch adjustment a DESIGN DECK THICKNESS (A) The design deck thickness shall be in accordance with BDM Section or BDM Section b VERTICAL GRADE ADJUSTMENT (B x ) The Vertical Grade Adjustment accounts for any elevation differences between a non-linear profile grade and the linear grade connecting the centerline of beam supports. The value of the Vertical Grade Adjustment depends on many geometric factors such as vertical curvature, skew, cross-slope transitions, etc. Designers should attempt to minimize the vertical grade adjustment along the length of the bridge by setting the linear grade between the beam ends parallel to the tangent of the vertical grade at the midpoint of the beam span (see Figure 320A) c SACRIFICIAL HAUNCH DEPTH (C) The purpose of the Sacrificial Haunch Depth is to account for camber in excess of that calculated in the Beam Camber Adjustment above and account for the roadway cross-slope. For multiple span box beam bridges with design speeds exceeding 45 mph, the minimum thickness of the Sacrificial Haunch Depth (C) shall be 2-inches. For all other box beam bridges, the minimum thickness of Sacrificial Haunch Depth (C) shall be 0-in. Because box beams are set on sloping seats that approximate the cross-slope, the sacrificial haunch depth is typically constant. If, however, the cross slopes are different at the beam bearings as noted in BDM Section , the difference between the cross slope and the beam seat slope will be accommodated by the sacrificial haunch depth. The minimum thickness, C, will occur at the outside edge of the fascia beam on the low side of the cross slope d BEAM CAMBER ADJUSTMENT (D t,x ) As prestressed concrete beams age, beam camber will increase due to concrete creep under the constant loading from the prestressing force. Although designers cannot accurately predict the girder age when the deck is placed, general assumptions can be made to prevent camber growth from becoming an issue during construction. The design plans shall show two values for camber at midspan which the contractor can use to establish seat elevations according to C&MS and tolerance according to C&MS : camber at Day 0 (D0) and camber at Day 30 (D30). These values shall represent the midspan camber in the beams before application of dead load other than self-weight. To determine these camber values, Designers shall calculate the creep coefficient, ψ(t,ti), according to LRFD with humidity (H) equal to 70%; age of concrete at release (ti) equal to 0.75 days; and V/S and f ci according to the project requirements. To calculate the creep coefficient at Day 0 and Day 30, use a maturity of concrete (t) equal to 0 days and 30 days 3-42

15

16

17 SECTION 700 TYPICAL DETAIL NOTES July 2015 [71] INTERMEDIATE DIAPHRAGMS: Do not place the deck concrete until all intermediate diaphragms have been properly installed. If concrete diaphragms are used, complete the installation of the intermediate diaphragms at least 48 hours before deck placement begins. Concrete shall conform to C&MS 511 with a design strength of 4.5 ksi SEMI-INTEGRAL OR INTEGRAL ABUTMENT CONCRETE PLACEMENT FOR DIAPHRAGMS Hardened concrete end diaphragms restrain the movement and rotation of beam/girder ends that occur during deck placement. This restraint will increase stress in both the beam/girder and diaphragm. Factors that can contribute to detrimental stress increases include large structure skew and phased construction. When these factors exist, hardened diaphragms should be avoided during the deck placement. The following table provides guidelines for concrete diaphragm placement options. Description of Superstructure No phased construction, and Steel superstructures with skew < 30º, or I-beam superstructure with skew < 10º No phased construction, and Steel superstructures with skew 30º, or I-beam superstructure with skew 10º Phased construction with closure pour, and Steel superstructures with skew < 30º, or I-beam superstructure with skew < 10º Phased construction with closure pour, and Steel superstructures with skew 30º, or I-beam superstructure with skew 10º Phased construction without closure pour, and Steel superstructures with skew < 30º, or I-beam superstructure with skew < 10º Phased construction without closure pour, and Steel superstructures with skew 30º, or I-beam superstructure with skew 10º Note [71a] [71b] [71c] [71d] [71e] [71f] Designers should consider the absence of restraint at the diaphragm location and when calculating the unbraced length of beam/girder flanges. If necessary, temporary bracing details should be included in the plans. Temporary end bracing should be oriented perpendicular to beam/girder webs. 7-5

18 SECTION 700 TYPICAL DETAIL NOTES July 2015 Use the following notes as prescribed in the table above: [71a] ABUTMENT DIAPHRAGM CONCRETE: Place the diaphragm concrete encasing the structural member ends with the deck concrete or at least 48 hours before placement of the deck concrete. If placed separately, locate a horizontal construction joint in the diaphragm as shown on PSID-1-13, sheet 7 of 10 and place remaining diaphragm concrete with the deck. [71b] ABUTMENT DIAPHRAGM CONCRETE: Place the diaphragm concrete encasing the structural member ends after the deck placement in the adjacent span is complete. Procedures that place the abutment diaphragm with the deck concrete may be approved by the Engineer if the placement submittal can assure that the deck concrete in the adjacent span will be placed before concrete in the diaphragm has reached its initial set. NOTE TO DESIGNER: (Applies only to [71b]) Locate the deck construction joint parallel to the centerline of the abutment offset 1-ft from the face of the diaphragm toward the span. [71c] ABUTMENT DIAPHRAGM CONCRETE, PHASED CONSTRUCTION: Place the diaphragm concrete encasing the structural member ends of an individual phase with the deck concrete or at least 48 hours before placement of the deck concrete. If placed separately, locate a horizontal construction joint in the diaphragm as shown on PSID-1-13, sheet 7 of 10 and place remaining diaphragm concrete with the deck. Place closure pour concrete in the diaphragm and deck concurrently. NOTE TO DESIGNER: (Applies only to [71c]) If a closure pour is required in the deck per BDM Section , provide a closure pour in the diaphragm as well. Locate the closure pour in the diaphragm, as near as practical, to mid-bay and orient the vertical construction joints parallel to the centerline of the adjacent beam/girders. Provide 3-in chamfers at the acute corners. [71d] ABUTMENT DIAPHRAGM CONCRETE, PHASED CONSTRUCTION: Place the diaphragm concrete encasing the structural member ends of an individual phase after the deck placement in the adjacent span is complete. Procedures that place the abutment diaphragm with the deck concrete may be approved by the Engineer if the placement submittal can assure that the deck concrete in the adjacent span will be placed before concrete in the diaphragm has reached its initial set. Place closure pour concrete in the diaphragm and deck concurrently. NOTE TO DESIGNER: (Applies only to [71d]) If a closure pour is required in the deck per BDM Section , provide a closure pour in the diaphragm as well. Locate the closure pour in the diaphragm, as near as practical, to mid-bay and orient the vertical construction joints parallel to the centerline of the adjacent beam/girders. Locate the deck construction joint parallel to the centerline of the abutment offset 1-ft from the face of the diaphragm toward the span. Provide 3-in chamfers at the acute corners. 7-6

19 SECTION 700 TYPICAL DETAIL NOTES July 2015 [71e] ABUTMENT DIAPHRAGM CONCRETE, PHASED CONSTRUCTION: Place the diaphragm concrete encasing the structural member ends of an individual phase with the deck concrete. NOTE TO DESIGNER: (Applies only to [71e]) Do not use this note where a deck closure pour is required per BDM Section [71f] ABUTMENT DIAPHRAGM CONCRETE, PHASED CONSTRUCTION: Place the diaphragm concrete encasing the structural member ends of an individual phase after the deck placement in the adjacent span is complete. Procedures that place the abutment diaphragm with the deck concrete may be approved by the Engineer if the placement submittal can assure that the deck concrete in the adjacent span will be placed before concrete in the diaphragm has reached its initial set. NOTE TO DESIGNER: (Applies only to [71f]) Do not use this note where a deck closure pour is required per BDM Section Locate the deck construction joint parallel to the centerline of the abutment offset 1-ft from the face of the diaphragm toward the span CONCRETE DECK SLAB DEPTH AND PAY QUANTITIES For all steel beam and girder bridges with a concrete deck, provide the following note that describes how the quantity of deck concrete was calculated. [72] DECK SLAB CONCRETE QUANTITY: The estimated quantity of deck slab concrete is based on the constant deck slab thickness, as shown, plus the quantity of concrete that forms each beam/girder haunch. The estimate assumes a constant haunch thickness of inches [mm] and a constant haunch width outside the edge of each beam/girder flange of 9 inches [230 mm]. Deviate from this haunch thickness as necessary to place the deck surface at the finished grade. The allowable tolerance for the haunch width outside the edge of each beam/girder flange is ± 3 inches [75 mm]. The haunch thickness was measured at the centerline of the beam/girder, from the surface of the deck to the bottom of the top flange minus the deck slab thickness. The area of all embedded steel plates has been deducted from the haunch quantity in accordance with NOTE TO DESIGNER: The note above applies to new structures with beams/girders placed parallel to the profile grade line. A constant depth haunch may not be practical for existing structures or new structures whose beams/girders are not placed parallel to the profile grade line. In these special cases, the note shall be modified to fit the exact conditions. [73] Note retired see appendix 7-6.1

20 SECTION 700 TYPICAL DETAIL NOTES July 2015 [THIS PAGE INTENTIONALLY LEFT BLANK] 7-6.2

21 STRUCTURAL STEEL DEFLECTION & CAMBER TABLE DEFLECTION AND CAMBER SPAN NUMBER (1) Point (2) Bearing Pt 1/4 Pt Pt (3) Mid Span Pt (3) 1/4 Pt Splice Pt Bearing Pt Deflection due to weight of steel Deflection due to remaining deadload (4) Adjustment required for vertical curve Adjustment required for horizontal curve Adjustment required for heat curving (5) Required Shop Camber (1) Table is only an example. For multiple span structures include each span and the bearing points in a single table. (2) Define distance and position (3) Additional points required in a span if the distance between bearing points, 1/4 points, mid span and/or splice points exceeds 30 feet. If the distance does exceed 30 feet locate the additional point midway between standard points. (4) Do not include a separate wearing surface that is not installed during the project (5) For horizontally curved girders the designer is responsible for establishing the required additional camber to be included in the girder per AASHTO Include these values. Figure 701

22

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO 43216-0899 July 20, 2018 To: Users of the Bridge Design Manual From: Tim Keller, Administrator, Office of Structural

More information

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO 43216-0899 January 20, 2012 To: Users of the Bridge Design Manual From: Tim Keller, Administrator, Office of Structural

More information

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO 43216-0899 July 18, 2014 To: Users of the Bridge Design Manual From: Tim Keller, Administrator, Office of Structural

More information

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO 43216-0899 July 15, 2016 To: Users of the Bridge Design Manual From: Tim Keller, Administrator, Office of Structural

More information

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO 43216-0899 October 21, 2011 To: Users of the Bridge Design Manual From: Tim Keller, Administrator, Office of Structural

More information

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO 43216-0899 July 21, 2017 To: Users of the Bridge Design Manual From: Tim Keller, Administrator, Office of Structural

More information

Parapet/railing terminal walls shall be located on the superstructure.

Parapet/railing terminal walls shall be located on the superstructure. GENERAL INFORMATION: This section of the chapter establishes the practices and requirements necessary for the design and detailing of deck slab extensions at abutments. For general requirements and guidelines

More information

SPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit

SPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit 2004 Specifications CSJ: 0028-09-111 SPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit 1. Description. Construct cast-in-place segmental concrete box girder superstructure according to the plans,

More information

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction Chapter 1 Bridge Design Manual General Design Information Section 1.02 Selection and Geometry Introduction Selection or Rehabilitation Report This section of the design manual provides guidance on the

More information

PREFACE. The Office of Structural Engineering offers a web page, the Manual and revisions at:

PREFACE. The Office of Structural Engineering offers a web page, the Manual and revisions at: PREFACE To reflect the findings in research, new products or changes in design concepts, revised portions of the manual, will be issued to maintain a current Bridge Design Manual. The agency or its representative

More information

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO 43216-0899 July 18, 2008 To: Users of the Bridge Design Manual From: Tim Keller, Administrator, Office of Structural

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS

MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS SECTION 1 - MISCELLANEOUS STANDARDS 1.00.01 -.05 Table of Contents 1.11.01 Decimal Parts of a Foot and Inch 1.21.01 Factors

More information

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA PURPOSE AND SCOPE These criteria modify and supplement the applicable sections of the AREMA Manual of Recommended Practice in connection

More information

Presented by: Taya Retterer BRG Webinar July 30, 2012

Presented by: Taya Retterer BRG Webinar July 30, 2012 Presented by: Taya Retterer BRG Webinar July 30, 2012 PHASED CONSTRUCTION RECOMMENDATIONS FOR BRIDGES Will be posted to the TxDOT Website http://www.dot.state.tx.us/business/contractors_consultants/bridge/default.htm

More information

PHASING CONSIDERATIONS FOR BRIDGES

PHASING CONSIDERATIONS FOR BRIDGES PHASING CONSIDERATIONS FOR BRIDGES Christopher Miller, P.E. 6/11/18 Table of contents 1 What Not to Do 3 2 Span Arrangement 4-9 3 4 5 6 Superstructure Geometric Considerations Superstructure Structural

More information

Proposed Modifications to the LRFD Design of U-Beam Bearings

Proposed Modifications to the LRFD Design of U-Beam Bearings Proposed Modifications to the LRFD Design of U-Beam Bearings Charles D. Newhouse, Scott A. Bole, W. R. Burkett, Phillip T. Nash, Mostafa El-Shami Performed in Cooperation with the Texas Department of Transportation

More information

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT)

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) SPECIAL PROVISION August 31, 2009 PROJECT # S-R399(42) PROJECT # S-R399(59) PIN # 6697/7236 SECTION 03253S BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) Add Section 03253S: PART

More information

How Loads Are Distributed

How Loads Are Distributed LOAD DISTRIBUTION 1 LOAD DISTRIBUTION This section illustrate how load will transmit from the deck to the stringers. Determining the fraction of load carried by a loaded member and the remainder distributed

More information

AREMA 2008 Annual Conference. LOW PROFILE RAILROAD BRIDGE Steve K. Jacobsen, PE NNW, Inc. Rochester, Minnesota

AREMA 2008 Annual Conference. LOW PROFILE RAILROAD BRIDGE Steve K. Jacobsen, PE NNW, Inc. Rochester, Minnesota AREMA 2008 Annual Conference LOW PROFILE RAILROAD BRIDGE Steve K. Jacobsen, PE NNW, Inc. Rochester, Minnesota 55904 507-281-5188 Steve K. Jacobsen, PE 2 LOW PROFILE RAILROAD BRIDGE Steve K. Jacobsen, PE

More information

PENNDOT e-notification

PENNDOT e-notification PENNDOT e-notification Bureau of Design Engineering Computing Management Division BRADD No. 029 December 5, 2011 Release of Version 3.1.6.0 PennDOT's Bridge Automated Design and Drafting Software (BRADD)

More information

3/21/2012. Dave Conkel State Aid Bridge Engineer. Brian Homan State Aid Bridge Plans Engineer

3/21/2012. Dave Conkel State Aid Bridge Engineer. Brian Homan State Aid Bridge Plans Engineer 3/21/2012 Dave Conkel State Aid Bridge Engineer Brian Homan State Aid Bridge Plans Engineer 1 3/21/2012 Check Q100, V100 and drainage area versus up and down stream bridges. Check proposed channel bottom

More information

Highway Bridge Structure Components

Highway Bridge Structure Components Highway Bridge Structure Components Basic Bridge Components 1 Deck and 2 Stringer 3 Bearing 4 Pedestal 5 Footing 6 Piles 7 Underpass 8 Embakment 9 Live Loading Basic Bridge Components 1-Deck & wearing

More information

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE Keith Donington, P.E. October 2012 1 Sibley Pond - Bridge Elevation 2 Bridge Open to Traffic November 2011 3 Bridge Highlights

More information

BRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E.

BRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E. BRIDGE DESIGN MANUAL UPDATES Jamie F. Farris, P.E. October 2015 Table of Contents 1 BDM Chapter 2 Limit States and Loads 2 BDM Chapter 3 Superstructure Design 3 BDM Chapter 4 Substructure Design 4 Questions

More information

SPECIAL PROVISIONS WATERWAY PERMITS CONDITIONS PID: Date: 3/8/18 C-R-S: UNI-TR

SPECIAL PROVISIONS WATERWAY PERMITS CONDITIONS PID: Date: 3/8/18 C-R-S: UNI-TR SPECIAL PROVISIONS WATERWAY PERMITS CONDITIONS C-R-S: UNI-TR 0308-00.57 PID: 99910 Date: 3/8/18 Special Provisions: UNI-TR 0308-00.57, PID 99910 Page 2 of 7 1. Waterway Permits Time Restrictions: USACE

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

LRFD Bridge Design Manual Changes

LRFD Bridge Design Manual Changes LRFD Bridge Design Manual Changes Dave Dahlberg Bridge Design Manual & Policy Engineer May 17, 2017 Bridge Office mndot.gov/bridge Overview 1) Concrete mix designations 2) Reinforcing bar development and

More information

Guidelines for Checking Final Design Bridge Plans

Guidelines for Checking Final Design Bridge Plans MNDOT BRIDGE OFFICE Guidelines for Checking Final Design Bridge Plans Edited by the MnDOT Bridge Office ES ESS Committee February 2018 Disclaimer: This document is meant to be used as a checklist for the

More information

Baseline Document Change Announcement

Baseline Document Change Announcement New Jersey Department of Transportation 1035 Parkway Avenue, PO Box 600, Trenton, New Jersey 08625-0600 Baseline Document Change Announcement Revisions to NJDOT Design Manual for Bridges and Structures,

More information

Section G1. Design of Cast-In-Place Box Conduits

Section G1. Design of Cast-In-Place Box Conduits G1-1 Economy of Design 1. Height to Width Ratio Section G1 Design of Cast-In-Place Box Conduits Careful economic studies should be made to determine the greatest economy of the entire storm drain. As an

More information

JULY 2016 LRFD BRIDGE DESIGN 11-1

JULY 2016 LRFD BRIDGE DESIGN 11-1 JULY 016 LRFD BRIDGE DESIGN 11-1 11. ABUTMENTS, PIERS, AND WALLS This section contains guidance for the design and detailing of abutments, piers, retaining walls, and noise walls. Abutments and piers are

More information

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc. Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on

More information

DESIGN AND ANALYSIS OF PRECAST CONCRETE BRIDGES IN AREAS OF HIGH OR MODERATE SEISMICITY

DESIGN AND ANALYSIS OF PRECAST CONCRETE BRIDGES IN AREAS OF HIGH OR MODERATE SEISMICITY DESIGN AND ANALYSIS OF PRECAST CONCRETE BRIDGES IN AREAS OF HIGH OR MODERATE SEISMICITY ABSTRACT Jugesh Kapur, PE, SE 1 The seismic design and detailing of bridges made of precast prefabricated members

More information

Superstructure Guidelines

Superstructure Guidelines Superstructure Guidelines The following are additional guidelines on using the following types of superstructure. Pre-stressed Concrete Beams To check beam size use the beam size chart. The chart was created

More information

JOINTS TABLE OF CONTENTS CHAPTER 14

JOINTS TABLE OF CONTENTS CHAPTER 14 TABLE OF CONTENTS CHAPTER 14 FILE NO. TITLE DATE TABLE OF CONTENTS, INTRODUCTION 14.TOC-1 Table of Contents Chapter 14... 03May2018 14.00-1 Introduction Chapter 14... 03May2018 GENERAL INFORMATION 14.01-1

More information

Bridge articulation No. 1.04

Bridge articulation No. 1.04 Bridge articulation Scope This Guidance Note gives advice on the selection of the articulation arrangements, the choice of bearing types and dispositions of bearings, for bridges where relative movement

More information

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section 02670-1 of 6 SECTION 02670 CURB, COMBINATION CURB AND GUTTER, AND 02670.01 GENERAL A. Description This work shall include, but not necessarily be limited to, the construction of concrete curb, concrete

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2 MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2 OFS:MJF 1 of 10 APPR:JAB:POJ:09-29-18 FHWA:APPR:10-01-18 a. Description. This work consists of

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2 MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2 OFS:MJF 1 of 10 APPR:JAB:POJ:07-07-17 FHWA:APPR:07-11-17 a. Description. This work consists of

More information

STANDARDIZED CONCRETE BRIDGES IN TEXAS. John Holt, PE, Texas Department of Transportation Ronald Medlock, PE, Texas Department of Transportation

STANDARDIZED CONCRETE BRIDGES IN TEXAS. John Holt, PE, Texas Department of Transportation Ronald Medlock, PE, Texas Department of Transportation STANDARDIZED CONCRETE BRIDGES IN TEXAS John Holt, PE, Texas Department of Transportation Ronald Medlock, PE, Texas Department of Transportation ABSTRACT Standardized concrete bridge plans are used extensively

More information

ACHD Bridge and Culvert Policy DRAFT

ACHD Bridge and Culvert Policy DRAFT ACHD Bridge and Culvert Policy DRAFT Standard Drawings and additional construction details are contained in the separate ACHD Bridge Design Guide and are hereto made part of this policy by reference. DEFINITIONS

More information

Structural - Engineering Review Checklist

Structural - Engineering Review Checklist Structural - Engineering Review Checklist Project: List Corridor Criteria ID Review Priority (H,M,L) TOPICS S-_-## Structural Design Codes, Manuals and Specifications 6.1.0 REFERENCES DESIRED Criteria

More information

Designer Supplement: AS-2-15 Approach Slab Installation January 16, 2015

Designer Supplement: AS-2-15 Approach Slab Installation January 16, 2015 1 Overview: The purpose of Standard Bridge Drawing, AS-2-15, is to address details of approach slabs not previously addressed in the AS-1-81 Standard Bridge Drawing. Specifically, the drawing was initiated

More information

KANSAS. Crossover. The Kansas Department of Transportation finds a new solution for stream crossings.

KANSAS. Crossover. The Kansas Department of Transportation finds a new solution for stream crossings. The Kansas Department of Transportation finds a new solution for stream crossings. KANSAS Crossover BY TIM LEAF, P.E., AND SCOTT UHL, P.E. JUST WEST OF TOPEKA, KAN., where Highway K-4 crosses Blacksmith

More information

Potential Solutions- Background: Current Designs. Potential Solutions. Goals for Design What are we concerned about?

Potential Solutions- Background: Current Designs. Potential Solutions. Goals for Design What are we concerned about? Potential Solutions Potential Solutions- Background: Current Designs Goals for Design What are we concerned about? Primary Goal: Get the deck on successfully Stability during deck pour Girder plumbness

More information

Table of Contents. July

Table of Contents. July Table of Contents 36.1 General... 3 36.1.1 Bridge or Culvert... 3 36.1.2 Box Culvert Size Restrictions... 4 36.1.3 Stage Construction for Box Culverts... 4 36.2 Dead Loads and Earth Pressure... 5 36.3

More information

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK DIVISION 03 CONCRETE SPECIFICATION 031000: FORMS AND FORMWORK PART 1.0 GENERAL 1.1 DESCRIPTION The work of this specification includes furnishing of all labor, materials, equipment and incidentals to install,

More information

Review of Plans and Specs from a Constructability Perspective

Review of Plans and Specs from a Constructability Perspective Review of Plans and Specs from a Constructability Perspective The Executive Regional Manager and the Project Manager, with approval of the Director of Project Management, may request the Constructability

More information

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 1. Description This work shall consist of the design, manufacture and construction of a T-WALL structure

More information

CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS

CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS APRIL 2011 APRIL 2011 Page 1 Chapter Table of Contents 12.1 Policy... 12-3 12.1.1 Table 1... 12-3

More information

Ministry of Forests & Range

Ministry of Forests & Range Ministry of Forests & Range DRAWING SCHEDULE DRAWING No. / MODEL TYPE STD-EC-040-01 STD-EC-040-02 STD-EC-040-03 STD-EC-040-04 STD-EC-040-05 STD-EC-040-06 STD-EC-040-07 STD-EC-040-08 DESCRIPTION REV. DATE

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 1

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 1 MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 1 OFS:MJF 1 of 10 APPR:JAB:POJ:09-29-18 FHWA:APPR:10-01-18 a. Description. This work consists of

More information

Bridge and Culvert Design Standards

Bridge and Culvert Design Standards 3004 ROADWAY DESIGN STANDARDS 3004.1 Roadway Design Roadway planning and design for the public road system shall conform to the following guidelines and referenced specifications. Use the most current

More information

Chapter 4 Bridge Program Drawings

Chapter 4 Bridge Program Drawings Chapter 4 Bridge Program Drawings Section 4.10-Bridge Railing Introduction Steel bridge railing and concrete bridge barrier rail are installed along the edge of the bridge roadway to keep errant vehicles

More information

Chapter 11 PRELIMINARY DESIGN NDOT STRUCTURES MANUAL

Chapter 11 PRELIMINARY DESIGN NDOT STRUCTURES MANUAL Chapter 11 PRELIMINARY DESIGN NDOT STRUCTURES MANUAL September 2008 Table of Contents Section Page 11.1 INTRODUCTION... 11-1 11.1.1 Objectives of Preliminary Design... 11-1 11.1.2 Chapter Presentation...

More information

SECTION PORTLAND CEMENT CONCRETE

SECTION PORTLAND CEMENT CONCRETE PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including the supplemental documents as indicated in the Site Work General Provisions, apply to work of this

More information

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project

More information

ODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS

ODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS B401: DELETED B402: DELETED B403: DELETED B404: STRUCTURE/CULVERT IDENTIFICATION SIGNS B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS B406: ITEM 514 - FIELD PAINTING, MISC.; REPAIR PAINTING

More information

AUGUST 2016 LRFD BRIDGE DESIGN 3-1

AUGUST 2016 LRFD BRIDGE DESIGN 3-1 AUGUST 2016 LRFD BRIDGE DESIGN 3-1 3. LOADS AND LOAD FACTORS The loads section of the AASHTO LRFD Specifications is greatly expanded over that found in the Standard Specifications. This section will present

More information

BrD Superstructure Tutorial

BrD Superstructure Tutorial AASHTOWare BrD 6.8 BrD Superstructure Tutorial PS12 Prestressed Concrete I Beam Using BrD LRFD Engine BrD Superstructure Training PS12 - Prestressed Concrete I Beam Using BrD LRFD Engine 1'-9" 55'-6" Total

More information

ESTABLISHING A SOLID FOUNDATION FOR NEW BRIDGE CONSTRUCTION REPLACEMENT OF BRIDGE OVER THE SOUTH CANADIAN RIVER NEAR PURCELL, OKLAHOMA

ESTABLISHING A SOLID FOUNDATION FOR NEW BRIDGE CONSTRUCTION REPLACEMENT OF BRIDGE OVER THE SOUTH CANADIAN RIVER NEAR PURCELL, OKLAHOMA ESTABLISHING A SOLID FOUNDATION FOR NEW BRIDGE CONSTRUCTION REPLACEMENT OF BRIDGE 412.1 OVER THE SOUTH CANADIAN RIVER NEAR PURCELL, OKLAHOMA BURLINGTON NORTHERN AND SANTA FE RAILWAY By: John W. Hronek

More information

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening March 5, 2009 Nicholas J. Roper NOVA District Bridge Engineer Robert F. Price Resident Administrator of Loudoun/ Prince William Construction

More information

Prestress Superstructure Tutorial

Prestress Superstructure Tutorial AASHTOWare BrDR 6.8.2 Prestress Superstructure Tutorial PS14 Prestressed Concrete I Beam Example PS14 - Prestressed Concrete I Beam Example This example details the data input of a prestressed concrete

More information

AASHTOWare BrDR D FEM Analysis Tutorial. Curved Steel Multi-Span 3D Example

AASHTOWare BrDR D FEM Analysis Tutorial. Curved Steel Multi-Span 3D Example AASHTOWare BrDR 6.8.2 3D FEM Analysis Tutorial Curved Steel Multi-Span 3D Example 3DFEM4 Curved Steel I Beam Using BrDR LRFD Engine This example details the data input of a curved composite steel plate

More information

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK The professional services to be provided by the Consultant under this Agreement shall be as necessary to complete the required analyses, layouts,

More information

Horizontal Ellipse. Contact LSBC for additional sizes. Buried Ellipse for Pedestrian Traffic. Elliptical Stream Crossing

Horizontal Ellipse. Contact LSBC for additional sizes. Buried Ellipse for Pedestrian Traffic. Elliptical Stream Crossing Horizontal Ellipse By eliminating the need for concrete footings this shape can often provide the lowest overall installed cost of any long span structure. If a natural stream bottom is desired the invert

More information

2016 ACEC/PA ANNUAL MEETING

2016 ACEC/PA ANNUAL MEETING 2016 ACEC/PA ANNUAL MEETING z I-49 North, Segment K (I-220 to Martin Luther King Drive) Interchange Project Durk Krone, P.E., TRC Engineers Inc., Baton Rouge, La 1 I-49 North Segment K Project 2 AGENDA

More information

Chapter 1. General Design Information. Section 1.03 Loads and Load Factors. Introduction. Load Modifying Factors

Chapter 1. General Design Information. Section 1.03 Loads and Load Factors. Introduction. Load Modifying Factors Chapter 1 Bridge Design Manual General Design Information Section 1.03 Loads and Load Factors Introduction This section defines the loads and load factors to be used in structural analysis and design.

More information

CONSTRUCTION SPECIFICATION FOR STRUCTURE REHABILITATION - CONCRETE REMOVAL

CONSTRUCTION SPECIFICATION FOR STRUCTURE REHABILITATION - CONCRETE REMOVAL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 928 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR STRUCTURE REHABILITATION - CONCRETE REMOVAL TABLE OF CONTENTS 928.01 SCOPE 928.02 REFERENCES 928.03

More information

The content for this class has been provided by the following PB employees: With assistance from: Martine Klein, P.E. Narration by Greg Metzger, PB

The content for this class has been provided by the following PB employees: With assistance from: Martine Klein, P.E. Narration by Greg Metzger, PB 1 The content for this class has been provided by the following PB employees: With assistance from: Martine Klein, P.E. Narration by Greg Metzger, PB University If you have any questions about the content

More information

MINNESOTA HISTORIC PROPERTY RECORD PART I. PROPERTY IDENTIFICATION AND GENERAL INFORMATION

MINNESOTA HISTORIC PROPERTY RECORD PART I. PROPERTY IDENTIFICATION AND GENERAL INFORMATION MINNESOTA HISTORIC PROPERTY RECORD PART I. PROPERTY IDENTIFICATION AND GENERAL INFORMATION Common Name: Camp Ripley Bridge Bridge Number: 4969 Identification Number: Location: Feature Carried: TH 115 Feature

More information

Bijan Khaleghi, Ph, D. P.E., S.E.

Bijan Khaleghi, Ph, D. P.E., S.E. 0 Submission date: July, 0 Word count: 0 Author Name: Bijan Khaleghi Affiliations: Washington State D.O.T. Address: Linderson Way SW, Tumwater WA 0 INTEGRAL BENT CAP FOR CONTINUOUS PRECAST PRESTRESSED

More information

SECTION PLATE CONNECTED WOOD TRUSSES

SECTION PLATE CONNECTED WOOD TRUSSES SECTION 06173 PLATE CONNECTED WOOD TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Shop fabricated wood trusses for roof and floor framing. 2. Bridging, bracing, and anchorage. B. Related Sections:

More information

January 2015 v 2.0. (Revised April 2016)

January 2015 v 2.0. (Revised April 2016) v 2.0 (Revised April 2016) Page intentionally left blank. Contents Chapter 2 Bridge Selection 2.1 General 2.1-1 2.1.1 General 2.1-1 2.1.2 Bridge Terms 2.1-1 2.2 Guidelines for Bridge Site Visits 2.2-1

More information

Critical Structures Construction Issues

Critical Structures Construction Issues Critical Structures Construction Issues FLORIDA DEPARTMENT OF TRANSPORTATION STATE CONSTRUCTION OFFICE Specification 1-3: Definitions Contractor s Engineer of Record Specialty Engineer CLASS OF CONTRACTOR

More information

NOVEMBER 2017 LRFD BRIDGE DESIGN 14-1

NOVEMBER 2017 LRFD BRIDGE DESIGN 14-1 NOVEMBER 2017 LRFD BRIDGE DESIGN 14-1 14. JOINTS AND BEARINGS Expansion joints and bearings provide mechanisms to accommodate movements of bridges without generating excessive internal forces. This section

More information

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA ASHE NATIONAL PROJECT OF THE YEAR SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA For the PENNSYLVANIA DEPARTMENT OF TRANSPORTATION Engineering District 12-0 Submitted By: January 29, 2018 AMERICAN

More information

Bridge Construction. Nick Haltvick North Region Bridge Construction Engineer May 17, Bridge Office mndot.gov/bridge/construction.

Bridge Construction. Nick Haltvick North Region Bridge Construction Engineer May 17, Bridge Office mndot.gov/bridge/construction. Bridge Construction Nick Haltvick North Region Bridge Construction Engineer May 17, 2017 Bridge Office mndot.gov/bridge/construction.html Topics Bridge Construction Unit Special Provisions Update Bridge

More information

UPRR criteria for sizing waterway openings under bridges and through culverts are as follows:

UPRR criteria for sizing waterway openings under bridges and through culverts are as follows: UNION PACIFIC RAILROAD SCOPE OF HYDROLOGIC/HYDRAULIC DESIGN ENGINEERING AND PERMITTING SERVICES FOR SIZING WATERWAY OPENINGS AT NEW AND REPLACEMENT STRICTURES These flood passage criteria were developed

More information

TRANSVERSE SECTION TABLE OF CONTENTS CHAPTER 9

TRANSVERSE SECTION TABLE OF CONTENTS CHAPTER 9 TABLE OF ONTENTS HAPTER FILE TITLE DATE TABLE OF ONTENTS AND INTRODUTION 0.TO- Table of ontents - hapter... 2Sep20 0.00- Introduction - hapter... 0Jul202 PLAN 0.0- General Information... 2Sep20 SAMPLE

More information

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

RESIDENTIAL CONSTRUCTION New Dwellings and Additions How to Obtain a Building Permit For RESIDENTIAL CONSTRUCTION New Dwellings and Additions MIAMI COUNTY, KANSAS CODE SERVICES DEPARTMENT 201 South Pearl Street, Suite 201 Paola, Kansas 66071-1777 Phone:

More information

CONCRETE TECHNOLOGY CORPORATION

CONCRETE TECHNOLOGY CORPORATION PRECAST, PRESTRESSED HOLLOW CORE SLABS DESIGN CRITERIA & SPAN-LOAD CHARTS Introduction 2 Design Criteria for Development of the Span-Load Charts 2 Related Publications 3 Manufacturing Tolerances 4 8" Bare

More information

MODULAR STEEL SUPERSTRUCTURES FOR ACCELERATED BRIDGE CONSTRUCTION - IOWA DOT CASE STUDIES

MODULAR STEEL SUPERSTRUCTURES FOR ACCELERATED BRIDGE CONSTRUCTION - IOWA DOT CASE STUDIES MODULAR STEEL SUPERSTRUCTURES FOR ACCELERATED BRIDGE CONSTRUCTION - IOWA DOT CASE STUDIES NORM McDONALD CURTIS CARTER AHMAD ABU-HAWASH BIOGRAPHY Norm McDonald is the director of the Office of Bridges and

More information

Steve Haines, P.E., Parsons, (303) , James Studer, Kiewit, (926) ,

Steve Haines, P.E., Parsons, (303) , James Studer, Kiewit, (926) , PLACEMENT OF PRECAST PRESTRESSED CONCRETE GIRDER BRIDGE SPANS WITH SELF PROPELLED MODULAR TRANSPORTERS PIONEER CROSSING DESIGN/BUILD PROJECT, AMERICAN FORK, UT Steve Haines, P.E., Parsons, (303) 831-8100,

More information

DESIGN MANUAL. For. Tollway Transportation Structures and Facilities. January 2008 ILLINOIS STATE TOLL HIGHWAY AUTHORITY

DESIGN MANUAL. For. Tollway Transportation Structures and Facilities. January 2008 ILLINOIS STATE TOLL HIGHWAY AUTHORITY DESIGN MANUAL For Tollway Transportation Structures and Facilities January 2008 ILLINOIS STATE TOLL HIGHWAY AUTHORITY The Design Manual for Tollway Transportation Structures dated January 2008 replaces

More information

ODOT Design & Construction Requirements for MSE Walls

ODOT Design & Construction Requirements for MSE Walls ODOT Design & Construction Requirements for MSE Walls Peter Narsavage, P.E. Foundation Engineering Coordinator Ohio Department of Transportation Office of Structural Engineering 2006 Ohio Transportation

More information

STRUCTURAL CONCRETE - LIGHTWEIGHT

STRUCTURAL CONCRETE - LIGHTWEIGHT SPECIAL PROVISION May 27, 2010 Add Section 03312: PROJECT #MP-I15-6(178)245 PIN #7037 SECTION 03312S STRUCTURAL CONCRETE - LIGHTWEIGHT PART 1 GENERAL 1.1 SECTION INCLUDES A. Materials and procedures for

More information

CURVED STEEL I GIRDER BRIDGES RAMP GH OVER THE ERIE CANAL INTRODUCTION BEHAVIOR OF CURVED BRIDGES DIFFERENCES FROM STRAIGHT BRIDGES

CURVED STEEL I GIRDER BRIDGES RAMP GH OVER THE ERIE CANAL INTRODUCTION BEHAVIOR OF CURVED BRIDGES DIFFERENCES FROM STRAIGHT BRIDGES DIFFERENCES FROM STRAIGHT BRIDGES Torsion effects Flange lateral bending Global stability CURVED STEEL I GIRDER BRIDGES RAMP GH OVER THE ERIE CANAL Constructability concerns INTRODUCTION COMPARISON WITH

More information

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION MANUAL OF THE STRUCTURE AND BRIDGE DIVISION PRESTRESSED CONCRETE ADJACENT MEMBER STANDARDS VIRGINIA DEPARTMENT OF TRANSPORTATION VDOT GOVERNANCE DOCUMENT VDOT Manual of the Structure and Bridge Division:

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 052100 - STEEL JOISTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections

More information

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: VDOT Modifications to the AASHTO LRFD Bridge Design Specifications, 8 th

More information

SPECIAL SPECIFICATION 4385 Railroad Bridge Construction

SPECIAL SPECIFICATION 4385 Railroad Bridge Construction 2004 Specifications CSJ 0912-71-622 SPECIAL SPECIFICATION 4385 Railroad Bridge Construction 1. Description. Construct Railroad bridges following the recommendations in the applicable Chapters of the current

More information

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF TRANSPORTATION BUREAU OF DESIGN

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF TRANSPORTATION BUREAU OF DESIGN GENERAL NOTES DESIGN TABLE NOTES INDEX OF SHEETS 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE NOTED. U.S. CUSTOMARY UNITS IN ( ) PARENTHESIS.. ALL "DESIGN" METRIC UNITS INDICATED ARE SOFT CONVERTED

More information

High Bridge Re-Deck Project

High Bridge Re-Deck Project High Bridge Re-Deck Project MnDOT Contract No. 1000532 Presented to: Minnesota Department of Transportation Bridge Repair Recommendations - September 22, 2016 Bridge Overview 11 Total Spans, 2755-0 Long

More information

Analysis of a Severely Skewed Prestressed Concrete Beam Bridge

Analysis of a Severely Skewed Prestressed Concrete Beam Bridge Analysis of a Severely Skewed Prestressed Concrete Beam Bridge Gary L. Gardner, Jr., P.E. Bridge Technical Service Manager ms consultants, inc. August 19 th, 2015 MIDAS Special Elite Engineers Webinar

More information

Bridge Design Guide. Bridge Division

Bridge Design Guide. Bridge Division Bridge Design Guide Bridge Division August 2018 Chapter 1 About this Guide Contents: Section 1 Introduction... 1-2 Bridge Design Guide 1-1 TxDOT August 2018 Chapter 1 About this Guide Section 1 Introduction

More information

Copyright 2015 American Institute of Steel Construction. All rights reserved.

Copyright 2015 American Institute of Steel Construction. All rights reserved. Notice: Copyright 2015 American Institute of Steel Construction. All rights reserved. This presentation is provided solely for informational purposes and does not constitute conveyance of any intellectual

More information

Mn/DOT BRIDGE INSPECTION REPORT

Mn/DOT BRIDGE INSPECTION REPORT 08/13/2007 Page 1 of 5 County: City: Township: WINONA DRESBACH Section: 33 Township: 105N Range: 04W Span Type: NBI Deck: 5 Super: 6 Sub: 6 Chan: 8 Culv: N Location: Route: Control Section: AT MINN/WISC

More information

14. Structural Concrete

14. Structural Concrete 14. Structural Concrete 14.1. Materials 14.2. Reinforcement 14.3. Structural Concrete Design 14.4. Prestressed Concrete Girders Section 5 of the LRFD Specifications presents unified design requirements

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 11/21/2014 Project 140560 Addendum No. 2 PID No. 82972 HAM IR 275

More information