1 Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Project Proposal: Expansion of Cement Plant capacity from 1.5 to 2.20 MTPA of Clinker and 2.25 to 3.55 MTPA of Cement at Amilia Village, Maihar Tehsil, Satna District, Madhya Pradesh Project Proponent: M/s KJS Cement Pvt Limited NH-7, Rewa Road, Village: Amilia-Lakhwar, PO: Maihar, Dist: Satna August, 2016

2 Tehsil, Satna District, Madhya Pradesh of PRE-FEASIBILITY REPORT (PFR) Contents 1 Executive Summary 2 Introduction to the Project 3 Project Description 4 Site Analysis 5 Planning Brief 6 Proposed Infrastructure 7 R& R Action Plan 8 Environmental impacts and mitigation measures 9 Proposed schedule for approval and implementation 10 Analysis of proposal Rev 01 2

3 Tehsil, Satna District, Madhya Pradesh of 1.0 Executive Summary M/s KJS Cement Private Limited (KJS), a group company of Kamal Sponge, Steel & Power Ltd. has setup a Cement Plant of 1.5 MTPA clinker and 2.25 MTPA of Cement productions and a 27 MW captive power plant, based on state-of-the- art technology near Amilia Village, Maihar Taluka, Satna District, Madhya Pradesh. The present project refers to proposed cement plant expansion with a capacity of 1.5 to 2.2 MTPA of Clinker and 2.25 to 3.55 MTPA of Cement at the existing plant site with a project cost of Rs 320 Crores. 2.0 Introduction to the Project About Project Proponent Kamal Sponge, Steel & Power Ltd. is situated at 10 km from Satna has a significant Presence in Madhya Pradesh from the year 2000 onwards. It has its own iron ore mines in Orissa and Madhya Pradesh. It has Sponge Iron Plant of 300 TPD in Madhya Pradesh producing steel bars and angles, with its own captive thermal power plant of 12 MW capacity. Brief Description of Nature of the Proposed Project The proposed Cement plant expansion is based on process optimization of existing cement plant & installation of a new Cement grinding mill. All the units in the upstream and downstream of the kiln will be designed for a clinker production capacity of 7020 TPD on an average of 330 working days basis, the total annual output of clinker will be about 2.2 MTPA. A new cement grinding mill of capacity 170 TPH will be installed. Total cement production will be 3.55 MTPA. The major raw materials for the unit are limestone, coal, pet coke, iron ore/ bauxite, gypsum and fly ash. The storage will be in covered sheds for all the raw material. cement manufacturing involves raw material preparation, raw meal preparation, clinkerisation, cement grinding, blending, cement packing & storage. Already installed APCE such as bag houses, ESP & bag filters will be upgraded to maintain the emission norms of 30 mg/nm 3. Need for the Project The cement market has growth potential due to the central government liberalization policies and new schemes for housing, road projects. Cement demand growth is anticipated to be about 5-6% increase mainly through road projects, housing projects. Continuous demand for exports to China and other South-East Asian countries along with the increased requirement of the domestic sector have leaded all the cement industries in the country to plan for increased capacities. Demand Supply Gap Efforts by the Government to push infrastructure spending and give impetus to real estate projects would have a positive rub-off on demand, resulting a meaningful and gradual recovery in cement demand from onwards. Rev 01 3

4 Tehsil, Satna District, Madhya Pradesh of Source: CRISIL Customized Research Bulletin, Oct-Nov, 2014 Figure-1: Country s Cement Demand Growth Outlook The trend of future demand in different markets of the target region is given in Table- 1. The table clearly indicates that the cement demand in the target region is likely to reach around 90 MT. Table-1: Future demand in Target Region S. Cement Demand (MT) Market No FY14 FY15 FY16 1 Karnataka Maharashtra Andhra Pradesh & Telangana Goa Total Employment Generation The management of KJS Cement Pvt. Ltd. has proposed to give preference to local people for recruitment in semi-skilled and unskilled categories. About 514 persons are presently employed at the existing plant KJS provides employment to the local populace and also further labour of unskilled and semi-skilled categories will be taken from the nearby villages and towns. A total of about 100 persons would be given indirect employment during construction and installation of proposed expansion project. About 30 number of persons will be employed during operation phase of the proposed expansion project. 3.0 Project Description Outline of the Manufacturing & production process Cement Plant The cement plant will adopt Dry Process Technology for Cement manufacturing with Pre Heating and Pre Calciner Technology. The major steps in the manufacture of cement are given hereunder: Rev 01 4

5 Tehsil, Satna District, Madhya Pradesh of Clinker Section The main steps involved in the process are: Limestone Crushing Limestone Storage Raw Mill Feeding Raw Mill Grinding Homogenizing and Storage Blending Silo Cyclone pre-heater Kiln Cooler Coal Grinding Clinker Storage Cement Manufacturing The main steps In the Process of the cement Manufacturing are Cement Grinding Cement Blending Cement Storage and Packing 4.0 Site Analysis As the proposed project refers to expansion of the existing cement plant, no alternative sites have been considered. The efficient functioning of the plant depends on the availability of the basic requirements. Apart from this, the suitability/compliance of the site with respect to the guidelines of the Ministry of Environment and Forests and location of the deposit has been evaluated. The reasons for selection of the existing cement plant site at Amilia are given below: Availability of land and water Compliance of the site with the sitting guidelines of MoEF&CC Proximity of the captive limestone deposit. Availability of road to facilitate and transportation of the plant equipment, raw material and product. Availability of labour force during construction and operation phase. Accessibility of the site from environmental aspects. No national park or wild life sanctuary exists within 10 km of the plant. The salient features of the proposed project site are given in Table-2. Rev 01 5

6 Tehsil, Satna District, Madhya Pradesh of Table-2: Salient Features of Project Site District & State Satna District, Madhya Pradesh Tehsil Maihar Tehsil Village Amilia Village Land Availability 91 ha Nature of the Area Plain Topo-sheet No 63 D/ 15 and 63 D/ 16 Coordinates General Climatic Conditions Maximum Temperature 47 C Minimum Temperature 1 C Annual Rainfall Wind Pattern during study period Elevation above mean sea level Road Connectivity Rail Connectivity Airport Water bodies Archaeological/ Historically Important Site Eco-Sensitive Places Sanctuaries / National Parks Important Religious & Tourist Places 5.0 Planning Brief Salient features of the project Latitude: 24 14'50.96" N & 24 15'27.70" N Longitudes: 80 47'28.99" E & 80 48'09.66"E 1,100 mm Predominantly from North West and North East during Post-Monsoon Season 335 to 340 m above MSL NH km N Maihar-Umariya SH -3 KM. West Maihar 3 km, W Jabalpur- 155 km Tamas river km E Seranji Nallah -1.6 km NE Lilji Nallah-6.3 km N Ghusra Nallah-3.5 km WNW Gadha Nallah-6.2 km NE Pathna Nallah-6.6 km N None within 10 km radius of the site None within 10 km radius of the site None within 10 km radius of the site Sharda Temple -8.5 km W The salient features of the project are given in Table-4. Table-4: Salient Features of the Project S. No Item Description 1 Capacity 1.5 to 2.2 MTPA of Clinker and 2.25 to 3.55 MTPA of Cement 2 Land requirement 91 ha 3 Water requirement 2900 m 3 /day (Existing + Proposed) 4 Power requirement 39 MW (Existing + Proposed) 5 Limestone Requirement 3.2 MTPA (Existing + Proposed) 6 Primary fuel 0.6 MTPA (Existing + Proposed) 7 Auxiliary fuel Furnace oil, High Speed Diesel 8 Project cost Rs 320 Crores 9 EMP cost Capital Cost: Rs 600 Lakhs Recurring Cost: Rs 70 Lakhs Rev 01 6

7 Tehsil, Satna District, Madhya Pradesh of 6.0 Proposed Infrastructure Raw Material Requirement The major raw material requirement for proposed plant will be limestone, bauxite, iron ore, gypsum, slag, fly ash and coal. The details of raw materials requirement, the source and mode of transportation are provided in Table-5. Raw Material Table-5: Raw Materials and Source Additional Total Existing Proposed Proposed Source (MTPA) (MTPA) (MTPA) Mode of transport Limestone captive mines road Iron ore/ private mines in Bauxite Katni, Shahdol area road South Eastern Coal Coalfields & nearby petroleum refineries. Rail/Road Mineral Gypsum from mines in Gypsum Nagpur/Bikaner districts road Nearby thermal Fly ash power plant Bulkers Source: KJS Project Report Infrastructure Requirement Water: The existing water requirement is 2400 m 3 /day for cement plant and CPP. The additional water requirement of 500 m 3 /day for the proposed expansion project will be obtained from the rainwater harvested in the captive mine pits, located adjacent to the plant area. Power: The total power requirement for the proposed cement plant expansion of 39 MW will be met from existing 27 MW CPP and MPSEB grid. Land: Existing plant complex covers an area of 91 ha. About 30 ha of land has been developed into greenbelt. 7.0 R& R Action Plan As the plant is existing and it is an expansion project without any additional area acquisition, no Rehabilitation & Resettlement (R&R) issues are involved. Rev 01 7

8 Tehsil, Satna District, Madhya Pradesh of 8.0 Environmental impacts and mitigation measures Air The emissions generated from Cement Plant process are Particulate Matter (PM), Oxides of Nitrogen (NO 2 ) and Sulphur dioxide (SO 2 ). High efficiency ESP have been installed for cooler, bag house for raw mill and kiln, bag house for coal mill and cement mill to control the PM emissions to less than 30 mg/nm 3. These APCE will be further upgraded to take additional load. Fugitive emission shall be controlled by covered storage facilities for raw material & product. Installation of bag filters and water sprinkling shall be carried out at the material transfer points. Water No industrial waste water will be generated from cement manufacturing process. There is already a Sewage treatment plant of capacity 850 KLD. This STP is having sufficient capacity to treat additional domestic waste water generated after capacity enhancement. Sludge will be used as manure for green belt development within the plant premises. Solid Waste/ Hazardous waste No solid waste is generated in cement manufacturing process. Dust collected from air pollution control equipment is recycled in process. Generated used oil will be sold to authorized recyclers. Noise During operational phase noise will be generated from compressors, motors, blowers, grinding mills, crushing units etc. in the cement plant. Noise will be controlled by providing silencers, acoustic enclosures and providing sound barriers wherever feasible, Ear plugs/ muffs will be provided to persons working in high noise zone. Socioeconomic The major positive impact on the socio economic environment of the surrounding area of the project site will be increase in the work opportunity. There would be more employment opportunities generated due to the proposed project both during the construction phase and operation phase. In Addition to this industrial and economic development of the area will also take place No major impact is anticipated on socio economic environment. It is anticipated that the impacts on parameters of human interest could be mitigated by proper implementation of the control measures indicated in the Environmental Management Plan for the proposed project. An amount of about Rs 2.46 Crores has been indicated as CSR budget which as stated by the proponent is indicative only and the detailed budget will be prepared once detailed need based assessment in the study area during is carried out. Rev 01 8

9 Tehsil, Satna District, Madhya Pradesh of Green belt development Green belt development within the premises will reduce noise levels and dust levels by acting as a barrier between the outside environment of the premises and the inside environment of the premises. To make the green belt effective for this purpose, it is essential to select proper plant species rich in foliage and design the green belt spacing that results in lowering the sheltering effect. They will act like a sieve by separating the suspended particles of the air by offering physical obstruction. In the development of green belts multipurpose plant species should be selected. This will satisfy the ecological requirement of species diversity. The total area being developed as green belt is 33%, i.e., 30 ha. The details regarding the tree are based on the guidelines for developing green belts by the CPCB. The green cover proved beneficial in many ways, such as retention of soil moisture, prevention of soil erosion, recharge of ground water and moderation of the micro-climate of the area. This will help in reducing adverse effect of pollution in general. Environment monitoring plan The main attributes for which monitoring shall be carried out are: Ambient air Quality Stack Emission Wastewater Quality Noise Level Hazardous Waste Online monitoring of Ambient & stack air quality. Health Checkup for workers Regular monitoring of all above parameters shall be carried out as per the guidelines prescribed by the statutory body. 9.0 Proposed schedule and cost Estimates Time Schedule The ground works of the proposed cement plant expansion will be commenced after seeking all necessary clearances from the governing bodies. Installation and implementation of the expansion project would take around 12 months time period after getting Consent for Establishment from the MPPCB. Estimated Project Cost The proposed project cost is estimated as Rs 320 Crores, which includes Rs 170 Crores for installation of new ball mill and Rs 150 Crores for railway siding for raw materials handling and cement transportation. All other units of the existing cement plant will be optimized to meet proposed additional production capacity. The project is economically viable, involving innovative technology and is sustainable in terms of investing financial resources into the project. Rev 01 9

10 Tehsil, Satna District, Madhya Pradesh of 10.0 Analysis of Proposal By considering the proposed project and by evaluating all the possible environment impacts of the project, it can be concluded that project activities during construction and operation phase of this proposed expansion project by. will not have any significant negative impact on environment if the Environment Management Plan and Disaster Management Plan are strictly followed. More over this project will have a positive impact on the socio economy of this region as source of employment. Rev 01 10

11 capacity of 1.5 to 2.20 MTPA of Clinker and 2.25 to 3.55 MTPA of Cement at Amilia Village, Maihar Tehsil, Satna District, Madhya Pradesh of Figure 1: Index Map Rev 00 11

12 capacity of 1.5 to 2.20 MTPA of Clinker and 2.25 to 3.55 MTPA of Cement at Amilia Village, Maihar Tehsil, Satna District, Madhya Pradesh of Figure 2: Study Area Map Rev 00 12

13 capacity of 1.5 to 2.20 MTPA of Clinker and 2.25 to 3.55 MTPA of Cement at Amilia Village, Maihar Tehsil, Satna District, Madhya Pradesh of Figure 3: Google Map Rev 00 13

14 Pre-Feasibility Report for prior Environment Clearance for the Proposed Cement Plant Expansion with a capacity of 1.5 to 2.20 MTPA of Clinker and 2.25 to 3.55 MTPA of Cement at Amilia Village, Maihar Tehsil, Satna District, Madhya Pradesh of M/s KJS Cement Pvt Ltd Annexure-2: List of Survey Nos Rev 00 14

15 Pre-Feasibility Report for prior Environment Clearance for the Proposed Cement Plant Expansion with a capacity of 1.5 to 2.20 MTPA of Clinker and 2.25 to 3.55 MTPA of Cement at Amilia Village, Maihar Tehsil, Satna District, Madhya Pradesh of M/s KJS Cement Pvt Ltd Rev 00 15

16 Pre-Feasibility Report for prior Environment Clearance for the Proposed Cement Plant Expansion with a capacity of 1.5 to 2.20 MTPA of Clinker and 2.25 to 3.55 MTPA of Cement at Amilia Village, Maihar Tehsil, Satna District, Madhya Pradesh of M/s KJS Cement Pvt Ltd Rev 00 16

17 capacity of 1.5 to 2.20 MTPA of Clinker and 2.25 to 3.55 MTPA of Cement at Amilia Village, Maihar Tehsil, Satna District, Madhya Pradesh of Figure 4: Plant Layout Map Rev 00 17

Executive Summary in English

Executive Summary in English for Proposed Cement Plant with a capacity of Clinker 3 MTPA, Cement 7 MTPA (0.70 MTPA OPC, 3.50 MTPA PSC & 2.80 MTPA PPC) at Bhimnagar village, Sedam taluka, Gulbarga district, Karnataka in English Project

More information

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement

More information

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) 1) Executive Summary Project Name of Company / Mine Owner Location Village Taluka District State Girgita Limestone Mine M/s KJS

More information

1. EXECUTIVE SUMMARY

1. EXECUTIVE SUMMARY 1. EXECUTIVE SUMMARY 1.1 Introduction This feasibility report presents a brief summary of the proposed Greenfield integrated cement Project in villages: Hardua Ken, Puraina, Sotipura, Devra, Madaiyan,

More information

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2 THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II

More information

Environment protection measures / technology

Environment protection measures / technology Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,

More information

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola 0 1.0 INTRODUCTION M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola Village, Kotma Tehsil, Annupur District, Madhya Pradesh. 10.29 Acres of land is envisaged for

More information

Environment Consultant:

Environment Consultant: MODERNIZATION CUM EXPANSION OF INDUCTION FURNACE PRODUCTION(2,05,000 TPA TO 6,00,000 TPA) AND ROLLING MILL PRODUCTION (3, 69,000 TPA TO 6,00,000 TPA) at Sy. No. 158 (part) 159 (part), 166 170, village

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

COMPLIANCE STATUS REPORT

COMPLIANCE STATUS REPORT COMPLIANCE STATUS REPORT Sona Alloys Pvt. Ltd. Additional Director (IA) Ministry of Environment & Forests, Paryavaran Bhavan, CGO Complex, Lodhi Road, New Delhi 11003 Date: 08.02.2014 Sub: Compliance Status

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

PRE-FEASIBILITY REPORT OF M/s ILC IRON & STEEL PVT.LTD

PRE-FEASIBILITY REPORT OF M/s ILC IRON & STEEL PVT.LTD PRE-FEASIBILITY REPORT OF M/s ILC IRON & STEEL PVT.LTD 1. Introduction of the project M/s ILC Iron &Steel Pvt.Ltd is incorporated by a team of directors namely Sri K. Somasekhar and Sri K. Chandrasekhar.

More information

J-11011/45/2009- IA II (I)

J-11011/45/2009- IA II (I) SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm

More information

Calcom Cement India Limited

Calcom Cement India Limited Calcom Cement India Limited (Subsidiary of DALMIA BHARAT CEMENT LIMITED) 2 No. Pipalpukhuri, Lanka, Dist. Nagaon, Assam 782446 Ref: MOEF, New Delhi Environment Clearance F. No. J-1101/312/2006-IA.II (I)

More information

Dheeru Powergen Private Limited.

Dheeru Powergen Private Limited. Executive Summary Of The Proposed 2 x 300 MW Dhanras Thermal Power Station At Dhanras Village Katgora Taluk, Korba District, Chhattisgarh. Implemented By Dheeru Powergen Private Limited. Submitted to CHHATTISGARH

More information

- 1 S. NO. PARTICULARS DETAILS

- 1 S. NO. PARTICULARS DETAILS 1.0 INTRODUCTION EXECUTIVE SUMMARY M/s. Lafarge India Private Ltd. (LIPL) is a subsidiary of French building materials major Lafarge. Lafarge entered in the Indian market in 1999 with acquisition of cement

More information

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server. Environmental Clearance Point Wise Half Yearly Compliance Report (October 2014 to March 2015) Cement Plant - EC No: F.No. J-11011/450/2007-IA II(I) Dated: 24 th March 2008 A. SPECIFIC CONDITIONS : S.NO.

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

Mangalam Cement Ltd.(Unit I)

Mangalam Cement Ltd.(Unit I) Mangalam Cement Ltd.(Unit I) Name of the Project :- Expansion of cement Project Code :- grinding capacity from 1.3 MTPA to 1.7 MTPA Clearance Letter No. : - F NO. J - 11011 /119 /2012 - IA II (I), dtd

More information

Mars Power & Steel Ltd.

Mars Power & Steel Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Mars Power & Steel Ltd. Village : Baihamura Tehsil : Ghargoda District : Raigarh Submitted to: Page 1 CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Executive

More information

Mangalam Cement Ltd. (Unit-II) Stack No.

Mangalam Cement Ltd. (Unit-II) Stack No. Mangalam Cement Ltd. (Unit-II) Name of the Project :- Expansion of cement grinding capacity from 1.7 MTPA to 2.3 MTPA Project Code :- Clearance Letter No. : - F NO. J - 11011 /110 /2012 - IA II (I), dtd

More information

Mangalam Cement Ltd.

Mangalam Cement Ltd. Mangalam Cement Ltd. Name of the Project :- New Cement Plant Unit - III and 17.5 mw CPP-II Project Code :- Raj- 80-600 - 2008 Clearance Letter No. :-F NO. J - 11011 / 30/2006 - IA II (I), dtd 17/07/2007

More information

EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.)

EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.) EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.) 1. PROJECT DESCRIPTION: Ambuja Cement Eastern Ltd. (ACEL) has the cement

More information

SUMMARY. for New Standalone Cement Grinding Unit. proposed at

SUMMARY. for New Standalone Cement Grinding Unit. proposed at SUMMARY of ENVIRONMENT IMPACT ASSESSMENT REPORT for New Standalone Cement Grinding Unit ( 2 x 1.0 million tons per annum) proposed at Gaithulapalem, Tallapalem & Narasapuram Villages, Kasimkota Mandal,

More information

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2 THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II

More information

EXECUTIVE SUMMARY. M/s. RELIANCE CEMENT COMPANY PRIVATE LIMITED. EIA Consultant:

EXECUTIVE SUMMARY. M/s. RELIANCE CEMENT COMPANY PRIVATE LIMITED. EIA Consultant: ENVIRONMENTAL IMPACT ASSESSMENT FOR EXPANSION OF INTEGRATED CEMENT PLANT FROM 3.6 TO 7.2 MTPA CLINKER AND 5.0 TO 10.0 MTPA CEMENT BY INSTALLATION OF LINE-II AT VILLAGES BHARAULI AND ITAHARA, TEHSIL MAIHAR,

More information

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka) J.K. Cement Works, Village- Muddapur, Taluka- Mudhol, Distt.- Bagalkot, Karnataka MoEF Letter No. F.No. J-11011/263/2009-IA II (I) dated 21-06-2010 Name of Project: J.K. Cement Works (Unit: J.K. Cement

More information

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013 Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013 Ref.: Environmental Clearance no. J-11011/754/2007-IA II

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2017 March 2018 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

Accord Energy Corporation India Pvt. Ltd.

Accord Energy Corporation India Pvt. Ltd. Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

Scanned by CamScanner

Scanned by CamScanner Scanned by CamScanner ENVIRONMENT STATEMENT (FORM V) Udaipur Cement Works Limited Daroli Limestone Mine-1 YEAR 2017-18 Udaipur Cement Works Limited SHRIPATINAGAR, P.O. CFA: DABOK, DISTRICT UDAIPUR (RAJASTHAN)-313021

More information

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013. STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY & 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007-IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA

More information

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PLOT No. F-1,2,3,8,9,10, ADDL. MIDC, PHASE II, AND GUT NO. 46 & 63, VILLAGE DAREGAON, TEHSIL: JALNA DIST: JALNA, MAHARASHTRA 2014-15 1. Executive

More information

Shri Girija Alloy & Power (I) Pvt. Ltd.

Shri Girija Alloy & Power (I) Pvt. Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Shri Girija Alloy & Power (I) Expansion of Ferro Alloys unit at Submitted to ANDHRA PRADESH POLLUTION CONTROL BOARD 0 1.0 PROJECT DESCRIPTION Shri Girija

More information

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017 A. SPECIFIC CONDITIONS Sl. No. i ii Condition Continuous stack monitoring facilities for all stacks and adequate air pollution control systems e.g. electrostatic precipitators (ESP) to clinker cooler and

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2017 - Sept 2017 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

INSPIRE INDUSTRIES PVT. LTD.

INSPIRE INDUSTRIES PVT. LTD. For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory

More information

SUBMITTED TO M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

SUBMITTED TO M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.) JAYPEE REWA PLANT (A Unit of Jaiprakash Associates Limited) JAYPEE NAGAR REWA (M.P.) 2012 2013 SUBMITTED TO M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Rewa Plant (A unit of Jaiprakash Associates

More information

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION Page 1 of 8 Environmental Statement for Clinker Grinding Unit of M/s Bihar Cement Plant (A Unit of Shree Cement Ltd.), situated at Jasoia Mor, BIADA, Industrial Growth Centre, Aurangabad, Tehsil & Dist.

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2015 to March 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015. STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY& 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007- IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA

More information

PRE FEASIBILITY REPORT. For EXPANSION OF CEMENT PLANT. With

PRE FEASIBILITY REPORT. For EXPANSION OF CEMENT PLANT. With PRE FEASIBILITY REPORT For EXPANSION OF CEMENT PLANT With INCREASE OF PRODUCTION CLINKER: 0.66 to 3.00 MTPA CEMENT: 0.95 to 2.50 MTPA INSTALLATION OF WASTE HEAT RECOVERY BOILER: 15 MW By SAGAR CEMENTS

More information

Cement Grinding Plant, Madhukunda P.O. Sunuri Dist. - Purulia West Bengal

Cement Grinding Plant, Madhukunda P.O. Sunuri Dist. - Purulia West Bengal ENVIIRONMENTAL AUDIIT STATEMENT M//s.. ACC LIIMIITED Damodhar Cement Works Cement Grinding Plant, Madhukunda P.O. Sunuri 723 121 Dist. - Purulia West Bengal FOR THE YEAR 2015-2016 1 L I S T O F C O N T

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT PREPARED FOR SHIV SHANTHI CEMENT PRIVATE LIMITED Sy. Nos. 92, 93 & 94, Tatiguda Village, Garividi Mandal, Vizianagaram District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified

More information

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I DATA SHEET 01 Project type : Cement Date: 24.11.2015 02

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2016 Sept. 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

M/s Deccan Cements Limited, Bhavanipuram,Janaphad, Palakeedu, Suryapet. Telangana MoEF No: J-11011/572/2007-IA II(I) Dated

M/s Deccan Cements Limited, Bhavanipuram,Janaphad, Palakeedu, Suryapet. Telangana MoEF No: J-11011/572/2007-IA II(I) Dated 1 Status of Environmental Clearances received from MOEF vide MoEF No.J- 1101/572/2007-IA II(I) dated 27.12.2007- Cement Plant and CPP, April - 2017. i) Compliance report is enclosed herewith for all the

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

REPORT ON ENVIRONMENTAL IMPACTS & ENVIRONMENT MANAGEMENT PLAN

REPORT ON ENVIRONMENTAL IMPACTS & ENVIRONMENT MANAGEMENT PLAN REPORT ON ENVIRONMENTAL IMPACTS & ENVIRONMENT MANAGEMENT PLAN FOR INCREMENTAL INCREASE IN PRODUCTION CAPACITY DUE TO PROCESS OPTIMIZATION FROM 359 KTPA to 371 KTPA AUGMENTATION IN ALUMINIUM METAL PRODUCTION

More information

The below is a detailed evaluation of the EIA report, based on a community request from Ekta Parishad, a local NGO in Chhattisgarh.

The below is a detailed evaluation of the EIA report, based on a community request from Ekta Parishad, a local NGO in Chhattisgarh. EIA Review of Nalwa integrated steel plant (NSPL) Background Nalwa integrated steel plant (0.198 MTPA sponge iron), located near village Taraimal, Raigarh district, Chhattisgarh proposes to expand its

More information

Telefax: 011: Dated:10 th May, 2013

Telefax: 011: Dated:10 th May, 2013 F. No. J-11011/41/2011-IA-II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail:vp.upadhyay@nic.in Telefax: 011:

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to Sept. 2015 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx COMPLIANCE STATUS OF ENVIRONMENT CLEARANCE EC letter no. J-11011/79/2007-IA II (I) Dated 16.04.2009 A. Specific Conditions : SN Condition Compliance 1. Continuous stack monitoring facilities to monitor

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

My Home Industries Private Limited Srinagar, Mellacheruvu (V & M) , Suryapet Dist., Telangana State

My Home Industries Private Limited Srinagar, Mellacheruvu (V & M) , Suryapet Dist., Telangana State HALF YEARLY EC COMPLIANCE REPORT (APR 17-SEP 17) (Clinker 2.48 to 2.78 MTPA and Cement 3.30 to 3.90 MTPA) EC: Letter No. F. No. J-11011/1014/2007- IA II (I) dated 11 th June, 2008 S. No. Condition Compliance

More information

JAYPEE NIGRIE SUPER THERMAL POWER PLANT

JAYPEE NIGRIE SUPER THERMAL POWER PLANT JAYPEE NIGRIE SUPER THERMAL POWER PLANT (A Division of M/s Jaiprakash Power Ventures Limited) Village: Nigrie, Tehsil: Sarai District: Singrauli 2015 2016 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL

More information

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division) To, M/s. Madras Cement Ltd. V Floor 98-A, Dr. Radhakrishnan Road Mylapore Chennai 600 004 Tamilnadu F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

More information

Cement Manufacturing Company Ltd. Page 1

Cement Manufacturing Company Ltd. Page 1 Six Monthly Compliance status of Environment Clearance for Cement Plant (2400 TPD) at Village Lumshnong, Meghalaya July to December 2013 Ref.: Environmental Clearance no. SEIAA/Project-6/2008/23 dtd. 16.03.10.

More information

Environmental statement for the financial year ending the 31 st March 2012

Environmental statement for the financial year ending the 31 st March 2012 FORM V (See rule 14) Environmental statement for the financial ending the 31 st March 2012 1. Name and address of the Owner/Occupier of the Industry, operation of the process. PART A 2. Industry category

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of 0.66 MTPA CEMENT GRINDING UNIT At BHUPDEOPUR VILLAGE, KHARSIA TAHSIL, RAIGARH DISTRICT, CHHATTISGARH STATE. By M/s. CALCAR PRODUCTS PVT., LTD Prepared By B.S. ENVI-TECH

More information

Rapid Environmental Impact Assessment Study for the Proposed Cement Plant at Majhgawan, District Sidhi, Madhya Pradesh

Rapid Environmental Impact Assessment Study for the Proposed Cement Plant at Majhgawan, District Sidhi, Madhya Pradesh 1.0 Project Description 1.1 Background Jaiprakash Associates Limited (JAL) formerly known as Jaypee Cement Limited is the well diversified conglomerate of Jaypee Group. Its cement division has 3 modern,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

Executive Summary for R-EIA Report for 60

Executive Summary for R-EIA Report for 60 Executive Summary 1. INTRODUCTION Maihar Cement is a unit of M/s Century Textiles and Industries Ltd. located at Sarla Nagar near Maihar in district Satna (M.P). Maihar Cement Unit has come into operation

More information

Your letter ref. no. J-11011/131/2005-IA.II (I) dated A. SPECIFIC CONDITIONS

Your letter ref. no. J-11011/131/2005-IA.II (I) dated A. SPECIFIC CONDITIONS The status of Environmental Clearance accorded by Ministry of Environment and Forests, I.A. Division, New Delhi to M/s HINDALCO INDUSTRIES LIMITED, CHOTAMURI, Jharkhand for expansion of Alumina Refinery

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) HINAUTI LIMESTONE MINE Mine Lease area 378.261 ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement

More information

HALF YEARLY COMPLIANCE REPORT 14 15) ENVIRONMENTAL CLEARANCE (CLINKER 2.48 MTPA TO 2.78 MTPA AND CEMENT 3.30 MTPA TO 3.90 MTPA)

HALF YEARLY COMPLIANCE REPORT 14 15) ENVIRONMENTAL CLEARANCE (CLINKER 2.48 MTPA TO 2.78 MTPA AND CEMENT 3.30 MTPA TO 3.90 MTPA) HALF YEARLY COMPLIANCE REPORT (Oct 14 Mar 15) ENVIRONMENTAL CLEARANCE (CLINKER 2.48 MTPA TO 2.78 MTPA AND CEMENT 3.30 MTPA TO 3.90 MTPA) Letter No. F. No. J-11011/1180/2007- IA II (I) dated 11 th June,

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies M/s Maithan Steel and Power Ltd. is located at: At/PO- Bonra, PS- Neturia in Purulia district of WB with latitude:23 0 37 53.85 Nand longitude 86 0 50 08.10

More information

M/s. SHREE SHYAMJEE METALLICS

M/s. SHREE SHYAMJEE METALLICS PRE-FEASIBILITY REPORT FOR PRPOSED UNIT OF Manufacturing Of Manganese Dioxide, Manganese Oxide, Ferro Alloy Unit (By Thermite Process) And Manganese /Iron Ore Beneficiation From ROM At Survey No. 165 &

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR PROPOSED EXPANSION OF CEMENT PLANT FROM 1.0 MTPA TO 1.15 MTPA OF M/S KALYANPUR CEMENTS LTD. & INSTALLTION OF 15 MW CAPTIVE THERMAL POWER PLANT OF M/S SONE OJAS LTD. (A WHOLLY

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

The study area covers 10 km radius around the existing coal washery premises. The environmental setting of the expansion plant site is as follows:

The study area covers 10 km radius around the existing coal washery premises. The environmental setting of the expansion plant site is as follows: 1.0 EXECUTIVE SUMMARY 1.1 Introduction M/s Mahavir Benefication Pvt. Ltd. (MBPL) proposes expansion of its coal washery from 1.0 MTPA to 5.0 MTPA capacity at Dhiroul Village, Anuppur District, Madhya Pradesh

More information

STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA

STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA OPERATING GUIDELINES FOR PROCESSING OF CONSENT TO ESTABLISH APPLICATION FOR ESTABLISHMENT OF COAL WASHERIES IN THE STATE OF ORISSA STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY Star Cement Ltd. (formerly Cement Manufacturing Company Ltd.), has an existing Cement Plant having Clinker/Cement production capacity of 0.792 MTPA as per EC

More information

EXECUTIVE SUMMARY. (Approved Consultant)

EXECUTIVE SUMMARY. (Approved Consultant) ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED CAPTIVE RESIN PLANT OF 100000 TPA PRODUCTION CAPACITY AT ROUTHUSURAMALA VILLAGE, THOTTAMBEDU MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY

More information

Date: 20 th April, 2018

Date: 20 th April, 2018 Date: 20 th April, 2018 To, The Director & Member Secretary (Industry-1) Ministry of Environment, Forest & Climate Change, Govt. of India, Indira Paryavaran Bhawan, Ali Ganj, Jor Bagh Road, New Delhi 110

More information

EXECUTIVE SUMMARY 1. INTRODUCTION

EXECUTIVE SUMMARY 1. INTRODUCTION EXECUTIVE SUMMARY 1. INTRODUCTION M/s. Indsil Energy & Electro Chemical Ltd plant is situated in Urla Industrial Estate, Raipur, Chhattisgarh. The company is manufacturing Ferro Alloys. Due to massive

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

My Home Industries Private Limited Srinagar, Mellacheruvu (V & M) , Suryapet Dist., Telangana State

My Home Industries Private Limited Srinagar, Mellacheruvu (V & M) , Suryapet Dist., Telangana State HALF YEARLY EC COMPLIANCE REPORT (OCT 16-MAR 17) (Clinker 2.48 to 2.78 MTPA and Cement 3.30 to 3.90 MTPA) EC: Letter No. F. No. J-11011/1014/2007- IA II (I) dated 11 th June, 2008 S. No. Condition Compliance

More information

EXECUTIVE SUMMARY. Beldara, Girgita, Amilia Khurd, Village to to

EXECUTIVE SUMMARY. Beldara, Girgita, Amilia Khurd, Village to to EXECUTIVE SUMMARY INTRODUCTION M/s KJS Cement Limited, a group company of Kamal Sponge, Steel & Power Ltd. intends to mine out limestone from their Amilia Lime stone mine in village Amilia, Tehsil Maihar,

More information

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Chandu Cattle Feeds 10 KLPD Ethanol & 50 TPD Cattle Feed Unit Plot no. 31 & 30 B of Sy. No. 432/2 P, APIIC Industrial park, Kakuturu village, Venkatachalam

More information

Simran Industries Pvt. Ltd.

Simran Industries Pvt. Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Patharra Village Bemetara Tehsil Durg District Chhattisgarh Submitted to: CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Raipur, Chhattisgarh 1.0 INTRODUCTION

More information

Application of Low and Non Waste Technology in the production process;

Application of Low and Non Waste Technology in the production process; 9.0 ENVIRONMENT MANAGEMENT PLAN (EMP) 9.1 INTRODUCTION Environment Management Plan is required for ensuring sustainable development. It should not affect the surrounding environment adversely. The management

More information

CHAPTER-10 SUMMARY AND CONCLUSION

CHAPTER-10 SUMMARY AND CONCLUSION CHAPTER-10 SUMMARY AND CONCLUSION 10.1 INTRODUCTION M/s. Shree Warad Alloys (P) Ltd., Nagpur a private limited company having its registered office at Plot No. C-1, Sharvari Apartments, 8/B, Trimurty Nagar,

More information

Capacity as per EC Dt commissioned 1 Sponge Iron 2.0 MTPA 1.0 MTPA 0.4 MTPA 0.6 MTPA 2 Captive Power Plant Co-generation Power Plant (WHRB)

Capacity as per EC Dt commissioned 1 Sponge Iron 2.0 MTPA 1.0 MTPA 0.4 MTPA 0.6 MTPA 2 Captive Power Plant Co-generation Power Plant (WHRB) Brief Note Prakash Industries Limited (PIL) is existing Integrated Steel Plant located at Hathneora, Champa Villages, Janjgir-Champa District, Chhattisgarh. Existing plant has obtained Environment Clearance