SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

Size: px
Start display at page:

Download "SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc."

Transcription

1 2004 Specifications CSJ , Etc. SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction of a grade separation between US 277 and the Union Pacific Railroad and reconstruction of the approaches to US 277 and BU 277 on the north side of Eagle Pass, Texas. This non-freeway facility consists of a four-lane, divided curb-and-gutter section with storm sewers and includes construction of one bridge over the Union Pacific Railroad. The project will be constructed primarily within existing right-of-way with several new parcels acquired along US 277. The work to be performed under this contract consists of right-of-way preparation, grading, outfall ditches, flexible base, continuously reinforced concrete pavement, asphaltic concrete pavement, storm sewers, bridge, bridge class culvert, signing and pavement markings, roadway illumination foundations and conduit, traffic signals, railroad crossing surfaces and warning devices, traffic control, landscaping piping, retaining walls, and Storm Water Pollution Prevention Plan (SW3P). B. Roadway. Preparing right-of-way (ROW) for this project will include all ROW. Removal of the existing roadway pavement will be paid for under the appropriate bid items. Buildings, slabs, trees, etc., not covered by bid items will be removed under preparing ROW. Grading for this project includes excavation in cut sections and the construction of embankment in fill sections. The proposed concrete paving section will consist of, 6- in. cement-treated base, 1-in. asphalt-stabilized base (bond breaker), and the following: 10-in. continuously reinforced concrete pavement along US 90A and 8-in. continuously reinforced concrete pavement along ramps, frontage roads, and intersecting streets. The temporary asphaltic concrete pavement section will consist of 9-in. asphalt stabilized base and 4-in. hot mix asphalt concrete surface pavement. The work includes ditch excavation within the TxDOT ROW, drainage easements and the ROW of the Union Pacific Railroad (UPRR). C. Storm Sewers. Trunk lines and laterals will consist of reinforced concrete pipes and boxes, ranging in size from 24 in. to 36 in. reinforced concrete pipe and 10 ft. x 5 ft. reinforced concrete box sections. The storm sewers will outfall to various locations along US 277. D. Structures. This project includes construction of one bridge over the Union Pacific Railroad and one bridge class culvert crossing

2 E. Signing. The signing portion of this project consists primarily of ground-mounted warning, regulatory, and guide signs to be furnished and installed. F. Illumination. Roadway illumination work consists of placing roadway illumination foundations, conduits, pull boxes, and trace wire. G. Traffic Signals. Traffic signals will be installed at US 277 and BU 277 intersection. The signalization work will consist of mast arm poles, signal heads, ground boxes, and VIVIDS. H. Traffic Control Plan. Construction of this project allows the Contractor to work in different locations concurrently or sequentially. The traffic control plan is divided into three phases. A more detailed description of the traffic control plan for this project will be found in the "Sequence of Work" section of this special provision. I. Employ erosion and sedimentation control practices on this project in areas where disturbed soil is present. These practices include placing silt fence, rock filter dams, rock bedding at construction exits, storm sewers, preserving natural resources, erosion control logs, and temporary seeding and permanent seeding. J. Utilities. Numerous pipelines will be adjusted or relocated by the owners. Please see special provision Important Information to Contractor for this information. K. Railroad Crossing Improvements. The existing warning devices will be relocated by Union Pacific Railroad forces at the existing at grade crossing. 2. Scope of Contract. A. General. The Contractor will not have exclusive use of the ROW. Cooperate in the use of ROW with the Texas Department of Transportation, City of Eagle Pass, the Union Pacific Railroad, various utility companies and districts and their contractors. B. Traveling Public. Consider the safety and convenience of the traveling public passing through this project as an important function of this contract. Maintain existing traffic, except as noted. Also, if emergency work or major accidents necessitate closing roadway lanes in or adjacent to sections occupied by the Contractor, the Engineer may direct the Contractor to cease operations and remove his/her workers, materials, and equipment from the roadway until such emergency work is completed or the accident is cleared. The plan sheets showing construction phasing show in detail such measures as are deemed necessary to handle traffic during construction of this project. If the Engineer requires traffic handling measures in addition to those shown in the plans, provide and perform these measures, as directed. This work is be paid for at the unit contract prices for the various bid items involved. C. Data on Existing Utilities. Utilities will be adjusted by their respective owners to clear construction proposed by this project except as noted elsewhere in the plans. Should a conflict occur with any utility, contact the respective utility company or owner as soon as it becomes apparent that the utility will interfere with the work

3 3. Sequence of Work. A. General. The Traffic Control Plan (TCP) for this project is outlined and enumerated in the plans. The intent of the plans and specifications is to require the Contractor to follow the phases and steps as enumerated. However, should the Contractor develop and wish to pursue a different procedure, submit the plan for approval, provided the plan maintains traffic and meets the construction priorities established in this section. Obtain written approval for any revision to the TCP that will alter the existing traffic lanes in a phase and do not implement it without approval. B. Traffic Control Plan (TCP). The TCP is divided into 3 phases. The following is a general overview of the work involved in each phase. Refer to the TCP drawings for additional details. Phase I Proposed Sequence Of Cconstruction Install project limit, advanced warning signs, work zone regulatory and warning signs, and channelizing devices as indicated in the traffic control plans. Step 1: Replace the north half of the existing 3 6 x 4 box culverts located at Sta with 3 10 x 5 box culverts. Reduce US 277 to 2-way, 2-lane operation with all traffic shifted south of the roadway centerline during construction of proposed box culvert. Place low profile concrete traffic barrier and channelization devices as shown in the plans, and install temporary special shoring. Remove existing pavement, excavate and remove the existing culvert. Maintain continuity of drainage throughout culvert construction. Restore pavement prior to proceeding to Phase I Step 2. See Phase I Step 1 US 277 closure, and TxDOT Standard drawing TCP (2-4)-03 for traffic handling details. Step 2 Replace the south half of the existing 3 6 x 4 box culverts located at Sta with 3 10 x 5 box culverts. Move low profile concrete traffic barrier and channelization devices and shift US 277 traffic north of the roadway centerline maintaining two-way, two lane operation. Install temporary special shoring, remove existing pavement, excavate and remove the existing culvert. Maintain continuity of drainage throughout culvert construction. Restore pavement prior to proceeding to Phase I Step 3. See Phase I Step 2 US 277 closure, and TxDOT Standard drawing TCP (2-4)-03 for traffic handling details. Step 3 Construct Access Roads A, B, C, & D outside of existing US 277 traffic to the limits shown: Access Road A Sta to Sta Access Road B Sta to Sta Access Road C Sta to Sta Access Road D Sta to Sta Flowers Dr Sta to Sta

4 During construction of access roads, maintain existing driveways or construct temporary driveways at the locations shown or as directed by the engineer. Omit proposed concrete curb at the locations noted on the plans. When Access Road B construction is complete, install signing for the Barrera Street closure and begin reconstruction of Barrera Street and the intersection with Access road B. Once Barrera Street is closed, construction operations must proceed until the intersection is complete and reopened to traffic. Construct temporary pavement between access roads and existing US 277 at the locations shown on the Phase I Step 3 traffic control plans. See TxDOT Standard TCP (2-4)-03 for temporary lane closures for any work adjacent to existing US 277 requiring closure of the outside lane of traffic. Prior to start of Phase II construction sequence, remove the pedestrian signal, concrete curb and directional island and pave the northeast traffic island at the US 277 and BU 277 intersection. Place temporary pavement markings on access roads prior to opening for traffic. Note: Permanent construction during Phase I will not include the final 2-inch surface course. Phase II Proposed Sequence of Construction Step 1: Coordinate with Union Pacific Railroad forces for the construction of the railroad grade crossing advance warning devices and relocation of the gate arm for southbound US 277. Install temporary erosion control measures. Modify the existing traffic signals and cover the pedestrian heads at the intersection of BU 277 and US 277 and shift traffic. devices and low profile concrete barrier as indicated in the traffic control plans. Begin construction of eastbound US 277 main lanes from Sta to Sta including construction of the temporary and permanent retaining walls, roadway embankment, drainage system and pavement. Construct a temporary HMAC transition on the south half of the US 277 main lanes from Sta to Sta prior to Phase III. Maintain access to adjacent businesses and properties utilizing the proposed access roads and temporary intersections constructed in Phase I. Provide off-duty police officers for traffic control during the erection of beams over the proposed access roads and when directed by the engineer

5 Step 2: devices and low profile concrete barrier as indicated in the traffic control plans on BU 277 and US 277. Realign existing traffic signals at the intersection of BU 277 and US 277 and shift traffic. Reconstruct existing pavement on BU 277 and US 277 northbound from Sta to Sta Provide leave-outs as indicated on the plans or approved by the engineer to facilitate truck turning movements. Step 2a: Install static message boards to notify public of US 277 closure 2-weeks prior to closure. Install US 277 detour signing as indicated on sheet. Closure will begin at 9:00 pm on Friday and reconstruction of the existing pavement will continue non-stop until the intersection is complete and open to traffic. Provide off-duty police officers for traffic control during US 277 closure. Construct pavement leave-outs using fast track concrete pavement methods. When construction is completed, reopen US 277 to thru traffic. Step 3: devices and low profile concrete barrier as indicated in the traffic control plans on BU 277 and US 277. Realign existing traffic signals at the intersection of BU 277 and US 277 and shift traffic. Reconstruct existing pavement on BU 277 and US 277 Southbound from Sta to Sta Provide leave-outs as indicated on the plans or approved by the engineer to facilitate truck turning movements. Phase II construction shall be scheduled so that Steps 2, 2a and 3 will be constructed consecutively and that completion of Step 3 will be concurrent with the completion of Phase II Step 1. Note: permanent construction during Phase II will not include the final 2-inch surface course

6 Phase III Proposed Sequence of Construction Step 1: devices and move concrete traffic barrier as indicated in the traffic control plans on US 277. Realign existing traffic signals at the intersection of US 277 and BU 277. Maintain phase II Step 3 traffic patterns on BU 277/US 277. Relocate US 277 traffic to the southern half of the facility constructed in phase II and begin twoway traffic on US 277 eastbound mainlanes. Open Access roads A and US 277 and close Barrera Street and Access Road D. Begin construction of US 277 westbound main lanes including permanent retaining walls, roadway embankment, drainage system and pavement. Construct pavement leave-outs on BU 277/US 277. Once is complete, re-open BU 277/US 277 to traffic. Step 1a: Remove markings and channelizing devices, and concrete traffic barrier on BU 277/US 277 and install proposed markings to reflect final conditions. Realign existing traffic signals at the intersection of US 277 and BU 277. Maintain phase III Step 1 traffic patterns on US 277. Complete construction of US 277 westbound main lanes from Sta to Sta Step 2: Install permanent traffic signals at BU 277 and US 277 and install Phase III, Step 2 signing and striping to the limits shown. Open US 277 westbound main lanes from Sta to Sta and install channelizing devices to open Barrera Street and intersection of US 277 and BU 277. Complete remaining construction of Access roads A & B. Complete construction of US 277 westbound main lanes. Step 3: Place final 2 Type C HMAC surface course on access roads and US 277 main lanes. Final clean up

7 Upon completion of the work and before final acceptance and final payment, the contractor shall clear and remove from the project site all surplus and discarded materials, trash, and debris leaving the project site in a neat and orderly condition

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 2004 Specifications CSJ: 0932-01-076 SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 1.0 Description of Project 1.1. General. This project provides for the widening of

More information

SPECIAL SPECIFICATION Description of Project, Scope of Contract, and Sequence of Work

SPECIAL SPECIFICATION Description of Project, Scope of Contract, and Sequence of Work 2004 Specifications CSJ: 0050-06-081 SPECIAL SPECIFICATION 000--2733 Description of Project, Scope of Contract, and Sequence of Work 1. Description of Project. General. This project involves widening of

More information

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING

More information

Texas Department of Transportation Book 2 Technical Provisions. Grand Parkway Project. Attachment 2-2. Work Breakdown Structure Requirements

Texas Department of Transportation Book 2 Technical Provisions. Grand Parkway Project. Attachment 2-2. Work Breakdown Structure Requirements Texas Department of Transportation Book 2 Technical Provisions Grand Parkway Project Work Breakdown Structure Requirements Table 1 represents the minimum levels of the WBS that all schedule information

More information

COUNTY OF SUTTER ENCROACHMENT PERMIT

COUNTY OF SUTTER ENCROACHMENT PERMIT COUNTY OF SUTTER ENCROACHMENT PERMIT PERMIT No. Development Services Dept. Engineering Division 1130 Civic Center Blvd Yuba City, CA 95993 (530) 822-7400 Hours: 8 AM - 5 PM Upon completion, submit application

More information

SECTION MAINTENANCE OF EXISTING CONDITIONS

SECTION MAINTENANCE OF EXISTING CONDITIONS SECTION 02 01 00 MAINTENANCE OF EXISTING CONDITIONS PART 1 GENERAL 1.1 GENERAL A. The CONTRACTOR shall protect all existing utilities and improvements not designated for removal and shall restore damaged

More information

SECTION TRAFFIC REGULATIONS

SECTION TRAFFIC REGULATIONS PART 1 GENERAL 1.1 DESCRIPTION A. Traffic Control permits, notifications, mobilization, temporary signs, barriers, lights, flagging personnel, striping, markings, and demobilization and removal. 1.2 RELATED

More information

THE ANTICIPATED SEQUENCE OF EVENTS ARE AS FOLLOWS, BUT THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS

THE ANTICIPATED SEQUENCE OF EVENTS ARE AS FOLLOWS, BUT THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS GENERAL PLAN NOTES PERMANENT SIGNS PROJECT SCOPE THIS PROJECT INCLUDES REMOVAL OF PORTIONS OF CONCRETE CURB & GUTTER AND HMA SURFACE; INSTALLATION OF SANITARY AND STORM SEWER AND UNDERDRAIN; EXCAVATION

More information

GRAYSON COUNTY POLICY, PROCEDURES AND SPECIFICATIONS OF GRAYSON COUNTY, TEXAS FOR THE INSTALLATION OF DRIVEWAY

GRAYSON COUNTY POLICY, PROCEDURES AND SPECIFICATIONS OF GRAYSON COUNTY, TEXAS FOR THE INSTALLATION OF DRIVEWAY GRAYSON COUNTY POLICY, PROCEDURES AND SPECIFICATIONS OF GRAYSON COUNTY, TEXAS FOR THE INSTALLATION OF DRIVEWAY CULVERTS, ROAD BORES, USE OF HEAVY EQUIPMENT AND UTILITY LINES WITHIN GRAYSON COUNTY ROAD

More information

SECTION PROTECTION AND RESTORATION OF EXISTING FACILITIES

SECTION PROTECTION AND RESTORATION OF EXISTING FACILITIES PART 1 - GENERAL 1.1 GENERAL A. The CONTRACTOR shall protect all existing utilities and improvements not designated for removal and shall restore damaged or temporarily relocated utilities and improvements

More information

Constructability Guidelines

Constructability Guidelines Constructability Guidelines The Constructability Guidelines offer a list of items that should be considered by Constructability function personnel during the Concept Development Phase through the Final

More information

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices. SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section

More information

Review of Plans and Specs from a Constructability Perspective

Review of Plans and Specs from a Constructability Perspective Review of Plans and Specs from a Constructability Perspective The Executive Regional Manager and the Project Manager, with approval of the Director of Project Management, may request the Constructability

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

To: Plan Holder Project: O Neill Ranch Well and Treatment Plant Project

To: Plan Holder Project: O Neill Ranch Well and Treatment Plant Project 5180 SOQUEL DR. SOQUEL, CA 95073 PO Box 1550 CAPITOLA, CA 95010 TEL 831-475-8500 FAX 831-475-4291 BOARD OF DIRECTORS To: Plan Holder Project: O Neill Ranch Well and Treatment Plant Project Dr. THOMAS LAHUE

More information

City of Berkley, Michigan Harvard Road Reconstruction & Water Main Replacement Project FREQUENTLY ASKED QUESTIONS (FAQ)

City of Berkley, Michigan Harvard Road Reconstruction & Water Main Replacement Project FREQUENTLY ASKED QUESTIONS (FAQ) FREQUENTLY ASKED S (FAQ) The purpose of this document is to provide detailed information about the Harvard Road Reconstruction & Water Main Replacement Project. This project will directly affect residents

More information

Exposition Light Rail Transit Project

Exposition Light Rail Transit Project Exposition Light Rail Transit Project Downtown & Mid-Corridor Project Status Update Meeting Holman United Methodist Church Thursday, July 23, 2009 Phase 1 Project Description 8.6 mile corridor from Downtown

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION CITY OF ALBANY Public Works Department ADDENDUM # ST-6-02 CROCKER LANE RECONSTRUCTION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall

More information

, US 87, Howard County. Contractor Questions and TxDOT Responses

, US 87, Howard County. Contractor Questions and TxDOT Responses 125 EAST 11TH STREET, AUSTIN, TEXAS 78701-2483 512.463.8588 WWW.TXDOT.GOV 0908-12-022, US 87, Howard County Contractor Questions and TxDOT Responses Questions and responses from the mandatory pre-bid meeting

More information

Rte. 66/29 Interchange Reconstruction Project: ,C505 Grade Separation of Two Crossings Norfolk Southern Railway Right of Way and Track

Rte. 66/29 Interchange Reconstruction Project: ,C505 Grade Separation of Two Crossings Norfolk Southern Railway Right of Way and Track Rte. 66/29 Interchange Reconstruction Project: 0066-076-113,C505 Grade Separation of Two Crossings Norfolk Southern Railway Right of Way and Track Mileposts B-8.1 thru B-8.8 DOT 714-363S, 714-364Y Gainesville,

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 11/03/2014

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 11/03/2014 NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 11/03/2014 Control Project Highway County 0237-07-012, ETC. STP 2015(294), ETC. FM 133, ETC. DIMMIT, ETC. Ladies/Gentlemen: Attached please find an addendum

More information

SANBORN COUNTY

SANBORN COUNTY Sheet 1 of 12 SPECIFICATIONS ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 110E0500 Remove Pipe Culvert 134 Ft 110E1010 Remove Asphalt Concrete Pavement 178

More information

It is the CONTRACTORS RESPONSIBILITY to use OSHA approved shoring

It is the CONTRACTORS RESPONSIBILITY to use OSHA approved shoring PERMIT# EXCAVATION/RIGHT OF WAY PERMIT ATE: NOTE: No permit shall be issued \vithout CURRENT Montana Contractors License, Insurance and Bonding on file with the Public Works epartment. It is the CONTRACTORS

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

ADVERTISEMENT SET DECEMBER 2013

ADVERTISEMENT SET DECEMBER 2013 Sheet List Table GREELEY CANAL #2 WCR 21 PROJECT AREA N SH-392 ADVERTISEMENT SET DECEMBER 2013 LINE DESCRIPTION PROPOSED LINE POWER / COMMUNICATIONS EXISTING LINE LINE DESCRIPTION PROPOSED LINE BOUNDARY

More information

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 492 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES TABLE OF

More information

CHAPTER 3 EXCAVATIONS

CHAPTER 3 EXCAVATIONS 7-3-1 7-3-1 CHAPTER 3 EXCAVATIONS SECTION: 7-3-1: Permit Requirements 7-3-2: Bond Required 7-3-3: Subject and Excluded Excavations 7-3-4: Standards 7-3-5: Protection of Public 7-3-6: Relocation and Protection

More information

SECTION PAYMENT PROCEDURES

SECTION PAYMENT PROCEDURES SECTION 01 29 00 PAYMENT PROCEDURES PART 1 GENERAL 1.01 SECTION INCLUDES A. For each BID item, the WORK will be measured and paid for on either a unit price basis or on a lump sum basis. The quantities

More information

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

TABLE OF DRAWINGS. Pierce County Public Works & Utilities Section A Concrete and Asphalt Concrete Pavement and Roadway Sections PC.A1.1 Arterial with Cement Concrete Traffic Curb and Gutter and Sidewalk, Closed Drainage 05/10/2018 PC.A1.2 Arterial with Cement

More information

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/ CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA 34695 PHONE: 727/724-1555 FAX: 727/724-1566 RIGHT-OF-WAY / EASEMENT USE PERMIT DATE SUBMITTED: EXPIRATION DATE: Submit the following to the

More information

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project RES. NO. PROPOSAL FOR THE COMPLETION OF 2015-28 TO THE SATISFACTION OF THE BUTLER COUNTY COMMISSIONERS AND THE COUNTY ENGINEER: SAID WORK CONSISTING OF TYLERSVILLE ROAD IMPROVEMENTS, PHASE I TO THE COUNTY

More information

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

TABLE OF DRAWINGS. Pierce County Public Works & Utilities Section A Concrete and Asphalt Concrete Pavement and Roadway Sections PC.A1.1 Arterial with Cement Concrete Traffic Curb and Gutter and Sidewalk, Closed Drainage 04/01/2019 PC.A1.2 Arterial with Cement

More information

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of a Partnership consisting of an Individual doing business as. TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION CITY OF ALBANY Public Works Department ADDENDUM #1 ST-13-04-2014, MAIN STREET REHABILITATION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and

More information

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED?????

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? 102.10 Minimum Rate of Wage Scale Typo. Several paragraphs were repeated. 105.5 Inspection of Work Clarified that the contractor

More information

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project

More information

CITY OF SOUTH LAKE TAHOE APPLICATION FOR ENCROACHMENT, EXCAVATION and GRADING WITHIN THE CITY RIGHT OF WAY

CITY OF SOUTH LAKE TAHOE APPLICATION FOR ENCROACHMENT, EXCAVATION and GRADING WITHIN THE CITY RIGHT OF WAY CITY OF SOUTH LAKE TAHOE APPLICATION FOR ENCROACHMENT, EXCAVATION and GRADING WITHIN THE CITY RIGHT OF WAY The Right-of-Way Encroachment, Excavation & Grading Permit issued by the Public Works Department

More information

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253) Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Foreword This manual contains

More information

NOTICE TO BIDDERS ADDENDUM NO. 3. Dated: March 25, 2019 SAP

NOTICE TO BIDDERS ADDENDUM NO. 3. Dated: March 25, 2019 SAP Public Works Department Donald J. Theisen, P.E. Director NOTICE TO BIDDERS Wayne H. Sandberg, P.E. Deputy Director/County Engineer Type of Work: ADDENDUM NO. 3 Dated: March 25, 209 SAP 082-68-022 Removing

More information

CITY OF ROCKLIN STANDARD DRAWINGS

CITY OF ROCKLIN STANDARD DRAWINGS CITY OF ROCKLIN STANDARD DRAWINGS November 2016 Table of Contents Page # Section 1 Section 2 Section 3 General Notes and Review Boxes 01-01 Signature Blocks... 1 01-02 General Notes (Sheet 1 of 8)... 2

More information

E. CONSTRUCTION PROCEDURES

E. CONSTRUCTION PROCEDURES E. CONSTRUCTION PROCEDURES The Project facilities would be constructed in accordance with established electric utility practices, best management practices, final engineering plans, CL&P s specifications

More information

Riverside County Transportation Commission RFP Number TP ATTACHMENT 4-1 WORK BREAKDOWN STRUCTURE

Riverside County Transportation Commission RFP Number TP ATTACHMENT 4-1 WORK BREAKDOWN STRUCTURE TP ATTACHMENT 4-1 WORK BREAKDOWN STRUCTURE TP Attachment 4-1 Work Breakdown Structure Page 1 The following Work Breakdown Structure (WBS) must be the basis for organizing all Work under the Contract Documents

More information

Riverside County Transportation Commission RFP Number TP ATTACHMENT 4-1 WORK BREAKDOWN STRUCTURE

Riverside County Transportation Commission RFP Number TP ATTACHMENT 4-1 WORK BREAKDOWN STRUCTURE TP ATTACHMENT 4-1 WORK BREAKDOWN STRUCTURE TP Attachment 4-1 Work Breakdown Structure Page 1 The following Work Breakdown Structure (WBS) must be the basis for organizing all Work under the Contract Documents

More information

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253) Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Comment Form Date: To: From:

More information

5/25/2017. Lumpkin Detention Basin Houston, Texas By Brian Whitney, P.E., CFM Victor Rendon. Lumpkin Basin. Lumpkin Road Overall Description

5/25/2017. Lumpkin Detention Basin Houston, Texas By Brian Whitney, P.E., CFM Victor Rendon. Lumpkin Basin. Lumpkin Road Overall Description Lumpkin Detention Basin Houston, Texas By Brian Whitney, P.E., CFM Victor Rendon TEXAS FLOODPLAIN MANAGEMENT ASSOCIATION April 27, 2017 PROJECT LOCATION PROJECT VICINITY MAP Lumpkin Road Overall Description

More information

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report BRIDGE DISTRICT Phase 1 Infrastructure Improvement Project (for work completed thru November 2011) Cover Photo: Joint Utility Trench installation along Fifth Street just north of Bridge Street. Page 1

More information

HERNANDO COUNTY BOARD OF COUNTY COMMISSIONERS DEPARTMENT OF PUBLIC WORKS ENGINEERING SERVICES

HERNANDO COUNTY BOARD OF COUNTY COMMISSIONERS DEPARTMENT OF PUBLIC WORKS ENGINEERING SERVICES F:\ENGR\bob\PIX\hccolorsea2.gif HERNANDO COUNTY BOARD OF COUNTY COMMISSIONERS DEPARTMENT OF PUBLIC WORKS UTILITY COMPANIES UTILITY COMPANY CONTACT PERSON CONTACT INFO HERNANDO COUNTY UTILITIES Brad Smith

More information

Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011

Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011 Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011 General Provisions and Specifications - These provisions and specifications shall

More information

1.00 LS $150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150,000.

1.00 LS $150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150,000. LAS VEGAS PAVING CORP. CONTRI CONSTRUCTION COMPANY AGGREGATE INDUSTRIES-SWR, INC. TAB CONTRACTORS, INC. ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT

More information

CHECK THE LOWER RIGHT CORNER OF EACH DETAIL FOR THE LATEST REVISION.

CHECK THE LOWER RIGHT CORNER OF EACH DETAIL FOR THE LATEST REVISION. Standard Drawings Index NOTE: The specifications for materials and workmanship shall conform to the latest edition or the "Standard Specifications for Public Works Construction" published by the North

More information

M&M CARGO PARKING LOT REHABILITATION 5103 MAHER AVENUE LAREDO, TEXAS MAYOR PRO-TEMPORE, DISTRICT II DISTRICT VIII COUNCIL MEMBER

M&M CARGO PARKING LOT REHABILITATION 5103 MAHER AVENUE LAREDO, TEXAS MAYOR PRO-TEMPORE, DISTRICT II DISTRICT VIII COUNCIL MEMBER LAREDO INTERNATIONAL AIRPORT M&M CARGO PARKING LOT REHABILITATION 5103 MAHER AVENUE LAREDO, TEXAS 78041 CITY OF LAREDO, TEXAS HONORABLE RAUL G. SALINAS, MAYOR ESTEBAN RANGEL MAYOR PRO-TEMPORE, DISTRICT

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 02210 - Site Grading C O N T E N T S PART 1 - GENERAL... 1 1.01 REQUIREMENT... 1 1.02 STRUCTURE PROTECTION... 2 1.03 JOB CONDITIONS... 3 PART 2 - PRODUCTS...

More information

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS 12.1 The subdivider shall construct and install the improvements in accordance with the County's Standards for Construction Plans and Specifications

More information

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

Please ensure receipt of this Addendum is acknowledged on page 1 of the Form of Tender.

Please ensure receipt of this Addendum is acknowledged on page 1 of the Form of Tender. No. 1 Project: 47th Ave Road Reconstruction Owner: District of Chetwynd Date: March 5, 2019 Ref. No.: 1320.0095.01 This Addendum is issued prior to Tender Closing Date, in accordance with the Tender Documents

More information

SECTION TRAFFIC CONTROL. A. The following is a list of standards which may be referenced in this section:

SECTION TRAFFIC CONTROL. A. The following is a list of standards which may be referenced in this section: SECTION 01 55 26 TRAFFIC CONTROL PART 1 GENERAL 1.01 SECTION INCLUDES A. Section covers requirements for traffic control during construction of the PROJECT. 1.02 REFERENCES A. The following is a list of

More information

CITY OF MILTON CONSTRUCTION NOTES

CITY OF MILTON CONSTRUCTION NOTES CITY OF MILTON CONSTRUCTION NOTES 1. Driveways shall be constructed of concrete and sloped per Georgia Highway standard 9031-J. Curb shall not be broken from gutter. Curb and gutter to be removed to existing

More information

Construction Specification for General Excavation

Construction Specification for General Excavation Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03

More information

QUANTITIES MOBILIZATION PAVT, REM EROSION CONTROL, INLET PROTECTION, FABRIC DROP 12 EA AGGREGATE BASE AGGREGATE BASE, CONDITIONING SHOULDER, CL II

QUANTITIES MOBILIZATION PAVT, REM EROSION CONTROL, INLET PROTECTION, FABRIC DROP 12 EA AGGREGATE BASE AGGREGATE BASE, CONDITIONING SHOULDER, CL II 7/12/18 GENERAL NOTES SPECIFICATIONS: ALL WORK AND MATERIALS, UNLESS OTHERWISE STATED IN THESE PLANS, SHALL BE IN ACCORDANCE WITH THE MICHIGAN DEPARTMENT OF TRANSPORTATION (MDOT) 2012 STANDARD SPECIFICATIONS

More information

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017 VT 14 East Montpelier Bridge Project Informational Meeting February 22, 2017 Welcome & Introductions VTrans Mark Sargent, Project Manager Wayne Symonds, Structures Program Manager Chris Barker, Resident

More information

STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION TRENCHING AND BACKFILL

STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION TRENCHING AND BACKFILL STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION 31 23 33 TRENCHING AND BACKFILL PART 1 GENERAL... 3 1.1 Description... 3 A. Excavation for Utilities Includes... 3 B. Suitable Fill Material...

More information

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES AFTER MARCH 1, 2012 ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES 430.1 Description. This item shall govern for all excavation required for the construction of sewers, sewer structures, pipe culverts,

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 2-1 Issue date: September 2012 1. General SITEWORK OVERVIEW This Directive outlines the Fund s requirements for the Consultant relative to the development, design and presentation of documents

More information

PERMITTING AND CONSTRUCTION MANUAL

PERMITTING AND CONSTRUCTION MANUAL PUBLIC RIGHT-OF-WAY CONTENTS PERMITTING AND CONSTRUCTION MANUAL 1. INTRODUCTION 2. PUBLIC SERVICE PROVIDER REGISTRATION 3. CONSTRUCTION PERMITTING PROCEDURE 3.1 Permitting Process 3.2 Permit Application

More information

CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES

CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE LATEST EDITION OF THE STANDARD PLANS OF THE CITY OF LA QUINTA, THE LATEST EDITION OF THE STANDARD SPECIFICATIONS

More information

EXCAVATION PERMIT CHECKLIST

EXCAVATION PERMIT CHECKLIST EXCAVATION PERMIT CHECKLIST Complete These Forms ST. LOUIS COUNTY/MUNICIPAL ZONING APPROVAL FOR PERMIT APPLICATION EXCAVATION PERMIT APPLICATION Present These Documents Drawing showing location of excavation

More information

Project # Brown County PCN i40h Replace Section Line Road Culvert

Project # Brown County PCN i40h Replace Section Line Road Culvert Project # 010-151 PCN i40h Replace Section Line Road Culvert R 64 W FREDERICK POP. 199 R 63 W R 62 W R 61 W 6 5 4 3 6 5 4 3 1 Dry 402 AVE 102 ST 387 AVE 12 388 AVE 390 AVE 7 8 9 10 11 12 391 AVE 393 AVE

More information

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013 ADDENDUM NO. 1 for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA Posting Date: June 20, 2013 BIDDERS SHALL CONFORM TO THE FOLLOWING CHANGES AS A PART OF THE BID DOCUMENTS, WHICH SHALL BECOME

More information

BID FORM. Alt. Bid: Additional extension of proposed taxiway from STA: to TW F/G intersection, approximately 1,095 feet.

BID FORM. Alt. Bid: Additional extension of proposed taxiway from STA: to TW F/G intersection, approximately 1,095 feet. BID FORM TxDOT CSJ 1812CONRO Project Description: TW Extension, Lighting and Signage Improvements Base Bid: The project consists of the extension of existing 50 TW approximately 2,640 feet. The proposed

More information

PUBLIC WORKS DEPARTMENT GENERAL NOTES

PUBLIC WORKS DEPARTMENT GENERAL NOTES PUBLIC WORKS DEPARTMENT GENERAL NOTES 1. All construction shall be in strict accordance with the standards of the City of Southlake and governed by the North Central Texas Council of Government's Standard

More information

T a b l e o f C o n t e n t s

T a b l e o f C o n t e n t s C i t y o f G l a d s t o n e P u b l i c W o r k s D e s i g n S t a n d a r d s T a b l e o f C o n t e n t s SECTION THREE SANITARY SEWER REQUIREMENTS... 1 3.0000 SANITARY SEWERS... 1 3.0010 General

More information

November 29, CITY OF PLANT CITY Purchasing Division (813)

November 29, CITY OF PLANT CITY Purchasing Division (813) November 29, 2018 CITY OF PLANT CITY Purchasing Division (813) 659-4270 IFB 18-014UM-LG 12-inch Water Transmission Main-Franklin St., Hancock St. and Terrace Drive West ADDENDUM No. 3 *Bidders are required

More information

RESTORATION SPECIFICATION

RESTORATION SPECIFICATION In proposed subdivision roadways where other utilities are present, the design plans should illustrate all possible utility line conflicts (crossings). During design and construction, care shall be utilized

More information

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA 2008/09 $52.0 M 85% SELF-PERFORMED Widen 12 miles of Interstate 10 to six lanes including the reconstruction

More information

SPECIAL SPECIFICATION. Water and Sewer System and Appurtenances

SPECIAL SPECIFICATION. Water and Sewer System and Appurtenances 2004 Specifications CSJ 2250-01-021, etc SPECIAL SPECIFICATION 5243 Water and Sewer System and Appurtenances 1. Description. This Item governs for the furnishing of all equipment, labor and materials to

More information

CITY OF TACOMA Department of Public Utilities Tacoma Power

CITY OF TACOMA Department of Public Utilities Tacoma Power CITY OF TACOMA Department of Public Utilities Tacoma Power ADDENDUM NO. 1 DATE: August 4, 2017 REVISIONS TO: Request for Bids Specification No. PG17-0130F TPU Eductor Waste Decant Facility NOTICE TO ALL

More information

ATTACHMENT 50-1: PERFORMANCE AND MEASUREMENT TABLE

ATTACHMENT 50-1: PERFORMANCE AND MEASUREMENT TABLE 1) PAVEMENT 1.1 Ride quality All roadways have a smooth surface course (including bridge deck approaches, covers, gratings, frames and boxes). 24 hours 28 days 6 months a. Measurement of International

More information

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form 2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form Project Information (\aen i vake.. F;) N0.3-7114117 Project Name Section 1 - Grading and Erosion Control BMPs Quantity Units Price Earthwork

More information

The following requirements shall supplement the Standard Specifications:

The following requirements shall supplement the Standard Specifications: Page 1 of 5 DESIGN STANDARDS FOR: GENERAL CONSTRUCTION REQUIREMENTS This design narrative contains general requirements that must be followed by contractors/developers. This section includes a general

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 10/31/2018

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 10/31/2018 NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 10/31/2018 Control 6331-53-001 Project BPM - 633153001 Highway US0067 County TITUS Ladies/Gentlemen: Attached please find an addendum on the above captioned

More information

YES, we received Addendum No. 1

YES, we received Addendum No. 1 TRANSMITTAL SHEET Date sent: Friday, April 6, 2018 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering Number of pages including this page: 36 CONFIRMATION

More information

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS***

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS*** 00005B *** *** BOLD ITALICIZED Item is bound within this specification manual. Regular non-italicized Item is not bound within this specification manual, however item is part of the contract. Contents

More information

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 507 JULY 1991 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES 507.01 SCOPE 507.02 REFERENCES 507.03 Not Used 507.04 Not Used

More information

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION MAINTENANCE OF TRAFFIC NOTES 431606 - MOT Notes - Addendum 1.dwg; 10/22/15-3:25pm MAINTENANCE OF TRAFFIC MAINTENANCE OF TRAFFIC SEQUENCE: THESE PLANS ARE BASED ON THE FOLLOWING SUGGESTED SEQUENCE OF CONSTRUCTION.

More information

ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO CONTRACT DOCUMENTS

ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO CONTRACT DOCUMENTS General Description: Date Prepared: November 1, 2017 (253) 604-6600 KHouse@Parametrix.com Bid Number: J2017-30 ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO

More information

LIST OF STANDARD DRAWINGS H2-2 - SERIES 2: Grading

LIST OF STANDARD DRAWINGS H2-2 - SERIES 2: Grading LIST OF STANDARD DRAWINGS H- - SERIES : Grading 00.0 Undivided Highway - Earth Grading Sections Earth Grading - Undivided Rural Earth/Shale Grading - Undivided Rural 9 04 7 00.00 Earth/Shale Grading -

More information

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2 MERCED COUNTY BID LIST CAMPUS PARKWAY SEGMENT 2 CONTRACT 2017191 The bidder must provide unit prices for each bid item listed below, based on the specified unit of measure. The unit price for each item

More information

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS COMPLETE THROUGH REVISION #18 April 2009 CITY STANDARD DETAILS REVISIONS Revision No. Revision Date Effective Date 2 August

More information

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Electrical Work. NOV Embankments Over Swamps and Compressible Soils GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

2018 Utility & Street Reconstruction

2018 Utility & Street Reconstruction 2018 Utility & Street Reconstruction Public Hearing On Proposed Special Assessments/Hookup Fees for Installation and Construction of Public Improvements Introduction of the Village technical staff Laura

More information

Table Related Arlington County Standards, Specification and Policies

Table Related Arlington County Standards, Specification and Policies 2.1 GENERAL 2.1.1 DESCRIPTION SITE WORK V02000 2.1 GENERAL 2.1.1 Description This standard identifies minimum requirements that shall be met for all site work in the design and construction of elements

More information

Construction Specifications for work in a Dakota County Right of way

Construction Specifications for work in a Dakota County Right of way Construction Specifications for work in a Dakota County Right of way County / Public Right of Way 1. The area on, below, or above a public roadway, highway, street, trail, bicycle lane, public sidewalk,

More information

ANSWERS TO QUESTIONS RECEIVED THROUGH 11:00 A.M. ON JANUARY 4, 2019:

ANSWERS TO QUESTIONS RECEIVED THROUGH 11:00 A.M. ON JANUARY 4, 2019: ADDENDUM NO. PROJECT NO. 3-9-07 PAGE 2 ANSWERS TO QUESTIONS RECEIVED THROUGH :00 A.M. ON JANUARY, 209: Q# Plan sheet 2 has a note MAINTENANCE OF TRAFFIC (LOCAL ROADS) which relates to bid item 22 and calls

More information

ADDENDUM NUMBER TWO. A. SECTION ADVERTISEMENT FOR BIDS 1. REVISE Sealed Bid Date/Time/Location paragraph to read as follows:

ADDENDUM NUMBER TWO. A. SECTION ADVERTISEMENT FOR BIDS 1. REVISE Sealed Bid Date/Time/Location paragraph to read as follows: DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS SECTION 00 91 11.02 ADDENDUM NUMBER TWO June 22, 2016 TO: PLANHOLDERS SUBJECT: PCT TRUCK STAGING PROJECT PROJECT NO. 091606 CONTRACT NO. 070287 This

More information

ROADWAY DESIGN AND CONSTRUCTION STANDARDS

ROADWAY DESIGN AND CONSTRUCTION STANDARDS ROADWAY DESIGN AND CONSTRUCTION STANDARDS Adopted: 1990 Amended: 1994 2003 2011 2013 ROADWAY DESIGN AND CONSTRUCTION STANDARDS ORIGINALLY ADOPTED IN 1990 Resolution No. R-990-046 OFFICIALLY AMENDED IN

More information

Cuyahoga County Department of Public Works Cuyahoga County Engineer's Sample Maintenance of Traffic Notes TABLE OF CONTENTS

Cuyahoga County Department of Public Works Cuyahoga County Engineer's Sample Maintenance of Traffic Notes TABLE OF CONTENTS Cuyahoga County Department of Public Works Cuyahoga County Engineer's Sample Maintenance of Traffic Notes TABLE OF CONTENTS NAME PAGE PLAN ENDORSEMENT NOTES (11/04/2013; CUY-M01) 3 ITEM 614 - MAINTAINING

More information

CONSTRUCTION PLANS FOR ENTERPRISE RENTAL CAR

CONSTRUCTION PLANS FOR ENTERPRISE RENTAL CAR CONSTRUCTION PLANS FOR VICINITY MAP (NOT TO SCALE) DEVELOPER/OWNER: CHRISTOPHER SLOVAN ENTERPRISE HOLDINGS, INC. 284 MALLORY STATION RD, SUITE 120 FRANKLIN, TN 37067 PH: 615-309-9621 DAVIDSON CO., TENNESSSEE

More information

DOCUMENT ADDENDA AND MODIFICATIONS

DOCUMENT ADDENDA AND MODIFICATIONS DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications

More information