1 TECHNICAL SPECIFICATION ITEM CONCRETE FORMWORK 1.0 GENERAL 1.1 DESCRIPTION This section defines requirements and limitations for design, construction, erection, and removal of concrete formwork for this project. 1.2 REFERENCE STANDARD American Concrete Institute; ACI 347, "Recommended Practice for Concrete Formwork." 2.0 PRODUCTS 2.1 MATERIALS a. Forms for As-Cast Finish (1) Rough Form Finish. Dressed or undressed lumber free of knots, splits, or other defects; plywood; metal; other approved material. (2) Smooth Form Finish. Plywood, tempered, concrete-form hardboard; dressed lumber faced with plywood; metal; plastic; other approved material. Do not use material with raised grain, torn surface, work edges, patches, dents, or other defects. b. Form Accessories (1) Use commercially manufactured ties, hangers, and other accessories for embedding in concrete. Use of wire which is not commercially fabricated as form accessories is not permitted. (2) Install form ties so that ends or end fasteners can be removed without causing spalling of concrete faces. (3) When formed concrete face will not be permanently exposed to view, form ties may be cut flush with formed surfaces. (4) When formed concrete face will be exposed to view and after ends or end fasteners of form ties have been removed, the embedded portion must be at least ¾-inch (¾") or twice the minimum dimension of the tie from formed concrete faces. c. Form Coating. Use commercial formulation of form oil or form-release agent having proven satisfactory performance. Coating must not bond with, stain, or adversely effect concrete surfaces. It must not impair subsequent treatment of concrete surfaces, including bonding agents and curing compounds

2 d. Chamfer Strips. Provide in corners of forms to produce beveled edges on permanently exposed surfaces. Size of chamfer is ¾-inch (¾") unless shown otherwise. Interior corners and edges of formed joints do not require beveling unless otherwise shown. 2.2 DESIGN OF FORMWORK Design formwork for loads, lateral pressure, and allowable stresses as described in the reference standard (ACI 347). Allow for design consideration, wind loads, allowable stresses, and other applicable requirements of controlling local building codes. a. Tolerances. (1) For concrete surfaces exposed to view, the maximum allowable deflection is 1/240 of the span between structural members. (2) When necessary to maintain specified tolerances, chamfer formwork to compensate for anticipated deflection during concrete hardening. (3) Design forms sufficiently tight to prevent loss of mortar. b. Earth Cuts For Forms. For beams under slabs on grade, use earth cuts for forms where beams are shown to have sloping sides and are integral with slab. Earth cuts may be used for sides of footings if sides of excavation are in stable condition to prevent caving or sloughing. c. Slip Forming. Not permitted. 3.0 EXECUTION 3.1 NOTIFICATION At least 24 hours prior to scheduled concrete placement, notify the Engineer that formwork may be inspected. Do not place concrete until forms have been inspected and approved. 3.2 PREPARATION a. Anchor, brace, and tie formwork to shores, members, or other supporting surfaces to prevent upward or lateral movement to any part of formwork system during concrete placement. Tighten forms to close joints and insure conformance to specified lines and shapes. Remove and rebuild forms that cannot be tightened properly. b. Arrange facing material in an orderly and symmetrical fashion. Keep the number of seams to a practical minimum. Support facing material adequately to prevent deflection in excess of specified tolerances. c. For flush surfaces exposed to view, overlap previously placed, hardened concrete with form sheeting by approximately one-inch (1"). Hold forms against hardened concrete to maintain true surfaces, preventing offsets or loss of mortar. d. Provide temporary openings at the base of column and wall forms and at other points required. The openings facilitate observation and cleaning immediately before concrete is placed. e. If runways are required for moving equipment, provide for support of runways with struts or legs resting directly on the formwork or structural member. Do not allow runways or supports to rest on reinforcing steel

3 3.3 ADJUSTMENTS a. Use wedges or jacks to provide positive adjustment of shores and struts. Wedges used for final adjustment of forms should be fastened in position after final inspection and before concrete placement. b. Securely brace forms against lateral deflections. Prepare to compensate for settling during concrete placement. c. For wall openings, construct wood forms that facilitate any necessary loosening to counteract swelling of forms. 3.4 TOLERANCES a. Construct formwork so that concrete surfaces will conform to tolerance limits as listed in the appropriate table at the end of this section. b. Establish sufficient control points and bench marks as references for tolerance checks. Maintain these references in undisturbed condition until final completion and acceptance of the project. 3.5 PREPARATION OF FORM SURFACES a. Before placing concrete, clean surfaces of forms and embedded materials. Remove accumulated mortar, grout, rust and other foreign matter. b. Coat forms for exposed or painted concrete surfaces with form oil or form-release agent before placing reinforcement. Cover form surfaces with coating material used in strict accordance with the manufacturer's printed instructions. Do not allow excess coating material to accumulate in forms or to contact hardened concrete against which fresh concrete will be placed. Remove coating material from reinforcement before placing concrete. c. Other than retained-in-place metal forms, forms for unexposed surfaces may be wet with water immediately before concrete placement in lieu of coating. One exception is that when a possibility of freezing temperatures exists, use of a coating is mandatory. 3.6 REMOVAL OF FORMS a. On vertical surfaces when repair of surfaces defects or finishing is required before concrete is aged, remove forms as soon as concrete has hardened sufficiently to resist damage from removal operations. b. Remove top forms on sloping surfaces of concrete as soon as concrete has attained sufficient stiffness to prevent sagging. Loosen wood forms for wall openings as soon as this can be accomplished without damage to concrete. Formwork for columns, walls, sides of beams, and other parts not supporting weight of concrete may be removed after 12 hours provided that concrete has hardened sufficiently to resist damage from removal operations. When shores and other vertical supports are arranged so that nonload-carrying, form-facing material may be removed without loosening or disturbing shores and supports, facing material may be removed at an earlier age. c. Keep in place all forms and shoring used to support weight of concrete until concrete has reached the minimum strength specified for removal of forms and shoring. In no case shall forms be removed in less than four (4) days

4 3.7 REMOVAL STRENGTH a. Control Tests. Suitable strength control tests will be used as evidence that concrete has attained specified strength for removal of formwork or shoring supporting weight of concrete in beams, slabs, and other structural members. (1) Field Test. When field cured test cylinders reach the specified removal strength, formwork or shoring may be removed from the respective concrete placements. (2) Laboratory Test. When concrete has been cured as specified for cast-in-place concrete for the same time period required by laboratory cured cylinders to reach specified strength, the formwork or shoring may be removed from respective concrete placements. Determine the length of time that the concrete placement has been cured by totaling the number of days or fraction of days, not necessarily consecutive, during which the air temperature surrounding the concrete is above 50 F and the concrete has been damp or thoroughly sealed against evaporation and loss of moisture. b. Compressive Strengths. The minimum concrete compressive strengths for removal of all formwork not specifically covered under the previous paragraph on Removal of Forms shall be 75 percent (75%) of the specified minimum 28-day strength of the class of concrete involved. 3.8 SHORING a. When reshoring is permitted or required, plan operations in advance and secure approval of such operations. While reshoring is under way, keep live load off the new construction. Do not permit concrete in beam, slab, column or other structural member to be subjected to combined dead and construction loads in excess of loads permitted for developed concrete strength at the time of reshoring. b. Place reshores as soon as practicable after stripping operations are complete but in no case later than the end of the working day on which stripping occurs. Tighten reshores to carry the required loads without overstressing construction. Leave reshores in place until tests representative of concrete being supported have reached specified strength or strength specified for removal of reshores. c. Leave original supporting shores in place or reshore those floors supporting shoring under newly placed concrete. Reshoring system capacity must be sufficient to resist anticipated loads and in all cases have a capacity equal to at least ½ of the capacity of the shoring system above. Locate reshores directly under shore positions above unless other locations are permitted. d. Extend reshoring over a sufficient number of stories to distribute weight of newly placed concrete, forms and construction live loads in such a manner that design superimposed loads of floors supporting shores are not exceeded. 3.9 FORM REUSE Approval is required before reusing any forms. Do not reuse forms that are worn or damaged beyond repair. Thoroughly clean and recoat forms before reuse. For wood and plywood forms to be used for exposed smooth finish, sand or otherwise dress concrete contact surface to original condition or provide form liner facing material. For metal forms, straighten, remove dents and clean to return to original condition

5 TABLE 3A TOLERANCES FOR FORMED SURFACES CONCRETE IN BUILDINGS Variation Form Plumb or Specified Batter Variation in Lines and surfaces of columns, piers, walls, and arrises Exposed corner columns, control joint grooves, and other conspicuous lines For Any 10 Foot Length For Any 20 Foot Length or Any Bay Maximum For Entire Dimension ¼" -- 1" ¼" ¼" ½" Level or Specified Grade Slab soffits, ceilings, beam soffits, and in arrises (measured before removal of shores) exposed lintels, sills, parapets horizontal grooves and other conspicuous lines ¼" _" ¾" -- ¼" ½" Drawing Dimensions Position of linear building lines, columns, walls, and partitions Size and location of sleeves, floor openings and wall openings Cross section of columns, beams, slabs, and walls -- ½" 1" ±¼" ½" -¼" Footings* in plan " -½" Footing misplacement or eccentricity of direction error (the less of) % of width or 2" Footing thickness decrease % Footing thickness increase no limit Step rise in flight of stairs ±_" Step tread in flight of stairs ±¼" Consecutive step rise ± 1 / 16 " Consecutive step tread ±_" * Footing tolerances apply to concrete dimensions only, not to positioning of vertical reinforcing steel, dowels, or embedded items

6 TABLE 3B TOLERANCES FOR FORMED SURFACES CONCRETE IN BRIDGES, WHARVES AND SIMILAR STRUCTURES Variation Form Variation In Maximum Plumb or Specified Batter Level or Specified Grade Surfaces of Columns, Piers, and Walls Top Surfaces of Slabs, Curbs, & Railings Drawings Dimensions Cross Section of Columns, Caps, Beams and Similar Members * Same as footings for buildings - See Table 3A. Thickness of Deck Slabs ½" in 10_ 3 / 16 " in 10_ +½" -¼" Footing * +¼" -_"

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK DIVISION 03 CONCRETE SPECIFICATION 031000: FORMS AND FORMWORK PART 1.0 GENERAL 1.1 DESCRIPTION The work of this specification includes furnishing of all labor, materials, equipment and incidentals to install,

More information

SECTION CONCRETE FORMWORK PART 1 GENERAL 1.01 RELATED DOCUMENTS

SECTION CONCRETE FORMWORK PART 1 GENERAL 1.01 RELATED DOCUMENTS SECTION 031000 - CONCRETE FORMWORK PART 1 GENERAL 1.01 RELATED DOCUMENTS 1.02 SCOPE A. Drawings and general provisions of the Contract, including General and Special Conditions and Division 01 Specification

More information

CONCRETE FORMWORK. .2 CSA , Supplement No.1 to CAN/CSA , Engineering Design in Wood. .4 CSA O151, Canadian Softwood Plywood.

CONCRETE FORMWORK. .2 CSA , Supplement No.1 to CAN/CSA , Engineering Design in Wood. .4 CSA O151, Canadian Softwood Plywood. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 03100-1 PART 1 GENERAL 1.1 Related Work.1 All Division 1 Specification Sections.2 Section 02233 Granular Base.3 Section 02311 Site Grading.4 Section 03200

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCESA / NASA UFGS-03 11 13.00 10 (August 2010) --------------------------------- Preparing Activity: USACE Superseding UFGS-03 11 13.00 10 (May 2009)) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

***************************************************************************************************************

*************************************************************************************************************** 03100 CONCRETE FORMWORK *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 11 00 ***************************************************************************************************************

More information

SECTION CONCRETE FORMWORK

SECTION CONCRETE FORMWORK SECTION 03100 CONCRETE FORMWORK PART 1 GENERAL 1.1 REFERENCES A. The following is a list of standards which may be referenced in this section: 1. American Concrete Institute (ACI): a. 117, Standard Specifications

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

SECTION CONCRETE FORMWORK AND ACCESSORIES

SECTION CONCRETE FORMWORK AND ACCESSORIES SECTION 03100 CONCRETE FORMWORK AND ACCESSORIES Part 1 GENERAL 1.01 SUMMARY A. Furnish equipment, materials, and labor required for construction and removal of forms for the containment of concrete to

More information

Division 03 Concrete Section includes various guidelines for general concrete use, curing, forming, reinforcing, finishing and concrete accessories.

Division 03 Concrete Section includes various guidelines for general concrete use, curing, forming, reinforcing, finishing and concrete accessories. Section includes various guidelines for general concrete use, curing, forming, reinforcing, finishing and concrete accessories. This design guideline is written to the designer of record (DOR). This guideline

More information

ITEM NO. 307 CONCRETE STRUCTURES

ITEM NO. 307 CONCRETE STRUCTURES ITEM NO. 307 CONCRETE STRUCTURES This item shall govern the construction of box culverts, headwalls, wingwalls, bridges, box transitions, approach slabs, retaining walls, inlets, storm sewer structures,

More information

Division 03 - Concrete Section New Westminister Multi-Use Civic Facility & Office Building Project No Page 1

Division 03 - Concrete Section New Westminister Multi-Use Civic Facility & Office Building Project No Page 1 Project No. 210022 Page 1 PART 1 GENERAL 1.7 Documents.1 The General Conditions of the Canadian Standard Construction Document CCDC-2, together with all amendments and supplements and Division 1 General

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 307 CONCRETE STRUCTURES

San Antonio Water System Standard Specifications for Construction ITEM NO. 307 CONCRETE STRUCTURES ITEM NO. 307 CONCRETE STRUCTURES 307.1 DESCRIPTION: This item shall govern the construction of box culverts, headwalls, wingwalls, bridges, box transitions, approach slabs, retaining walls, inlets, storm

More information

SECTION CONCRETE FORMWORK

SECTION CONCRETE FORMWORK PART 1 GENERAL 1.1 SECTION INCLUDES 1.2 FORMWORK FOR CONCRETE A. Related accessories 1.3 REFERENCES SECTION 03 11 00 CONCRETE FORMWORK A. ACI 301 - Specifications for Structural Concrete Buildings B. ACI

More information

SECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents.

SECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents. SECTION 06110 WOOD FRAMING PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents. B. Products Installed But Not Supplied

More information

STRUCTURAL PRECAST CONCRETE

STRUCTURAL PRECAST CONCRETE SECTION 03410 STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Provide labor, materials, necessary equipment, services and included, but not limited to, related work to complete the structural

More information

.1 Formwork for cast-in-place concrete with shoring, bracing, and anchorage.

.1 Formwork for cast-in-place concrete with shoring, bracing, and anchorage. 03 10 00 CONCRETE FORMING AND ACCESSORIES Page 1 of 4 1 General 1.1 SECTION INCLUDES.1 Formwork for cast-in-place concrete with shoring, bracing, and anchorage..2 Form accessories..3 Form stripping. 1.2

More information

***************************************************************************************************************

*************************************************************************************************************** 03410 STRUCTURAL PRECAST CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 41 00 ***************************************************************************************************************

More information

1.02 RELATED WORK: Refer to the following sections for related work:

1.02 RELATED WORK: Refer to the following sections for related work: SECTION 4200 - CONCRETE STRUCTURES PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of header curb, retaining walls, energy dissipation structures for drainage channels, reinforced concrete

More information

1. Cast-in place structural concrete including footers, foundations, and other non-slab applications. 2. Formwork 3. Reinforcement

1. Cast-in place structural concrete including footers, foundations, and other non-slab applications. 2. Formwork 3. Reinforcement SECTION 03 31 00 - CAST-IN-PLACE STRUCTURAL CONCRETE PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Cast-in place structural concrete including footers, foundations, and other non-slab applications.

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 052100 - STEEL JOISTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections

More information

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1 16 May 2014 Page 1 PART 1 GENERAL 1.1 DESCRIPTION This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories

More information

SECTION ARCHITECTURAL PRECAST CONCRETE. A. American Society for Testing and Materials (ASTM):

SECTION ARCHITECTURAL PRECAST CONCRETE. A. American Society for Testing and Materials (ASTM): SECTION 03450 ARCHITECTURAL PRECAST CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03100 - Concrete Formwork 2. 03200 - Concrete Reinforcement 3. 03300 - Cast-in-Place Concrete 4. 03600 -

More information

DIVISION 03 CONCRETE. Number CONCRETE

DIVISION 03 CONCRETE. Number CONCRETE 03 00 00 CONCRETE 03 10 00 CONCRETE FORMING AND ACCESSORIES 03 11 00 Concrete Forming 03 11 13 Structural Cast-in-Place Concrete Forming 03 11 16 Architectural Cast-in-Place Concrete Forming 03 15 00 Concrete

More information

Concrete Framing Systems - Walls and Columns

Concrete Framing Systems - Walls and Columns Concrete Framing Systems - Walls and Columns Casting a Concrete Wall Wall Footing Reinforcing Wall Forms Pouring Concrete Finishing the Concrete Controlling Cracking Insulating Concrete Forms (ICF) Tilt-Up

More information

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4 City of Columbia Engineering Regulations PART 25: SPECIFICATIONS FOR ALTITUDE VALVE VAULT Table of Contents Paragraph Description Page No. 25.1 General 25-1 25.2 Materials 25-1 25.3 Concrete Masonry Work

More information

SECTION NON-STRUCTURAL METAL FRAMING

SECTION NON-STRUCTURAL METAL FRAMING SECTION 09 22 16 PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories

More information

Elevated Slab Sequence

Elevated Slab Sequence Elevated Slab Sequence The following group of photos shows the sequence for installa4on of a one- way elevated slab. (Slab & Beam with Reinforcing & Post- Tensioning) Columns Placed & Form Support (Scaffolding)

More information

SECTION WOOD FRAMING. A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents.

SECTION WOOD FRAMING. A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents. SECTION 06 1100 WOOD FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents. B. Products Installed But

More information

PRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS

PRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS PRODUCTION SPECIFICATIONS SECTION 03135 INSULATED CONCRETE FORMS PART 1 GENERAL 1.1 SECTION INCLUDES A. Insulated panel permanent concrete form system for: 1. Exterior structural wall panels. 2. Interior

More information

PRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS

PRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS PRODUCTION SPECIFICATIONS SECTION 03135 INSULATED CONCRETE FORMS PART 1 GENERAL 1.1 SECTION INCLUDES A. Insulated panel permanent concrete form system for: 1. Exterior structural wall panels. 2. Interior

More information

1. Cast-in-place concrete is specified in Section

1. Cast-in-place concrete is specified in Section SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record

More information

Technical Notes 11B - Guide Specifications for Brick Masonry, Part 3 Rev [Feb. 1972] (Reissued Sept. 1988) INTRODUCTION

Technical Notes 11B - Guide Specifications for Brick Masonry, Part 3 Rev [Feb. 1972] (Reissued Sept. 1988) INTRODUCTION Technical Notes 11B - Guide Specifications for Brick Masonry, Part 3 Rev [Feb. 1972] (Reissued Sept. 1988) INTRODUCTION This Technical Notes contains the guide specifications in CSI format for Part III

More information

CONCRETE FORMWORK CHECKLIST AT SITE

CONCRETE FORMWORK CHECKLIST AT SITE CONCRETE FORMWORK CHECKLIST AT SITE Concrete formwork is a temporary supporting structure for concrete when it is placed at the construction site to keep the concrete in position and shape till it gets

More information

Polycrete Big Block Standard Specification

Polycrete Big Block Standard Specification Polycrete Big Block Standard Specification SECTION 03 11 19 INSULATED CONCRETE FORMING 10/13 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent

More information

***************************************************************************************************************

*************************************************************************************************************** 03450 ARCHITECTURAL PRECAST CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 45 13 ***************************************************************************************************************

More information

2002 Advanced Building Products, Inc., P.O. Box 98, Springvale, Maine TEL: ; FAX: ; WEBSITE:

2002 Advanced Building Products, Inc., P.O. Box 98, Springvale, Maine TEL: ; FAX: ; WEBSITE: SECTION 07651 FLEXIBLE COPPER SHEET FLASHINGS Advanced Building Products, Inc. manufacturer many types of flexible copper sheet flashings. Due to their ductility, high tensile strength, and resistance

More information

DIVISION 04 MASONRY. Section Title Number MASONRY Maintenance of Masonry Masonry Mortaring Masonry Accessories

DIVISION 04 MASONRY. Section Title Number MASONRY Maintenance of Masonry Masonry Mortaring Masonry Accessories 04 00 00 MASONRY 04 01 00 Maintenance of Masonry 04 01 20 Maintenance of Masonry 04 05 13 Masonry Mortaring 04 05 23 Masonry Accessories 04 20 00 UNIT MASONRY 04 21 00 Clay Unit and Brick Veneer 04 22

More information

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu INSTALLATION INSTRUCTIONS Note: The following installation instructions are based off of ASTM E 1643 (Standard Practice for Installation of Water Vapor Retarders Used in Contact with Earth or Granular

More information

TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following: PART 1 GENERAL 1.01 SUMMARY SECTION 03460 TILT-UP PRECAST CONCRETE SANDWICH PANELS A. Work includes, but is not limited to, the following: 1. Architectural precast concrete sandwich wall panels. 2. Integral

More information

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items: ITEM 431 PNEUMATICALLY PLACED CONCRETE 431.1. Description. This Item shall govern for furnishing and placing of "Pneumatically Placed Concrete" for encasement of designated structural steel members, the

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 808 REINFORCED CONCRETE VAULTS

San Antonio Water System Standard Specifications for Construction ITEM NO. 808 REINFORCED CONCRETE VAULTS San Antonio Water System Standard Specifications for Construction ITEM NO. 808 REINFORCED CONCRETE VAULTS 808.1 DESCRIPTION: Reinforced concrete vaults shall be cast-in-place and shall include reinforcing

More information

SECTION PORTLAND CEMENT CONCRETE

SECTION PORTLAND CEMENT CONCRETE PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including the supplemental documents as indicated in the Site Work General Provisions, apply to work of this

More information

CONCRETE WORK CONCRETE WORK. Underground Electric Distribution Standards I. SCOPE APPLICABLE STANDARDS

CONCRETE WORK CONCRETE WORK. Underground Electric Distribution Standards I. SCOPE APPLICABLE STANDARDS Underground Electric Distribution Standards I. SCOPE This section includes the standards for concrete, reinforcing steel, formwork, concrete placement, curing, and construction joints. Concrete work for

More information

DIVISION 03 CONCRETE CONCRETE REINFORCING Reinforcing Steel Welded Wire Fabric Reinforcing Fibrous Reinforcing

DIVISION 03 CONCRETE CONCRETE REINFORCING Reinforcing Steel Welded Wire Fabric Reinforcing Fibrous Reinforcing 03 00 00 CONCRETE 03 10 00 CONCRETE FORMING AND ACCESSORIES 03 11 00 Concrete Forming 03 11 13 Structural Cast in Place Concrete Forming 03 11 16 Architectural Cast in Place Concrete Forming 03 15 00 Concrete

More information

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones.

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones. ITEM 432 RIPRAP 432.1. Description. This Item shall govern for the furnishing and placing of riprap of the type and details shown on the plans and in accordance with this Item. 432.2. General. Riprap furnished

More information

Shoring and Reshoring Fundamentals

Shoring and Reshoring Fundamentals Shoring and Reshoring Fundamentals by Mary Bordner Tanck, PE SHORING AND RESHORING FUNDAMENTALS Because it has such a significant impact on schedule and material movements, it is important for everyone

More information

SECTION CONCRETE PAVING

SECTION CONCRETE PAVING SECTION 32 13 13 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for providing portland cement concrete work and all other incidental concrete improvements for the project

More information

MANUFACTURER S SPECIFICATIONS Section LIME CONCRETE. A. This section describes the requirements for floors and slabs on grade.

MANUFACTURER S SPECIFICATIONS Section LIME CONCRETE. A. This section describes the requirements for floors and slabs on grade. MANUFACTURER S SPECIFICATIONS Section 03330 LIME CONCRETE ST. ASTIER NATURAL HYDRAULIC LIME CONCRETE PART 1 GENERAL 1.01 General A. This section describes the requirements for floors and slabs on grade.

More information

1 Exam Prep Prov Module: Vertical Formwork Questions and Answers

1 Exam Prep Prov Module: Vertical Formwork Questions and Answers 1 Exam Prep Prov Module: 27308-14 Vertical Formwork Questions and Answers 1. The amount of formwork needed for a job can be influenced by. A. The size of the forming crew B. The project budget C. Materials

More information

SECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

SECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following: PART 1 GENERAL 1.01 SUMMARY SECTION 03460 TILT-UP PRECAST CONCRETE SANDWICH PANELS A. Work includes, but is not limited to, the following: 1. Architectural precast concrete sandwich wall panels. 2. Integral

More information

SECTION UNIT MASONRY

SECTION UNIT MASONRY SECTION 04200 UNIT MASONRY PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, and equipment and perform functions required in the installation and maintenance of the work covered by this Section.

More information

Division 03 - Concrete Section New Westminister Multi-Use Civic Facility & Office Building Project No Page 1

Division 03 - Concrete Section New Westminister Multi-Use Civic Facility & Office Building Project No Page 1 Project No. 210022 Page 1 PART 1 GENERAL 1.1 Documents.1 The General Conditions of the Canadian Standard Construction Document CCDC-2, together with all amendments and supplements and Division 1 General

More information

SECTION STRUCTURAL PRECAST HOLLOW CORE SLABS

SECTION STRUCTURAL PRECAST HOLLOW CORE SLABS PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish all labor, materials, equipment and incidentals to provide a complete structural precast hollow core slab system as shown on the Contract

More information

SECTION MISCELLANEOUS CAST-IN-PLACE CONCRETE

SECTION MISCELLANEOUS CAST-IN-PLACE CONCRETE SECTION 033053- MISCELLANEOUS CAST-IN-PLACE CONCRETE PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete

More information

DIVISION 03 CONCRETE. Section Title Number CONCRETE

DIVISION 03 CONCRETE. Section Title Number CONCRETE 03 00 00 CONCRETE ***ALL CONCRETE HARDSCAPE & RELATED SITE CONCRETE MUST ALSO ADHERE TO THE 2015 LANDSCAPE MASTER PLAN AS WELL AS THE DIVISION 3 TECHNICAL STANDARDS. THE LANDSCAPE MASTER PLAN CAN BE FOUND

More information

PRECAST CONCRETE PRODUCTS

PRECAST CONCRETE PRODUCTS R LEADERS IN THE INDUSTRY TM CONCRETE PRODUCTS SILLS THRESHOLDS PARKING BUMPERS U - LINTELS SCUPPERS February 2012 COMPANY HISTORY Cast-Crete was founded in Tampa Bay, Florida in 1955 as a producer of

More information

Preassembled steel stairs with concrete-filled treads.

Preassembled steel stairs with concrete-filled treads. SECTION 055113 - PART 1 - GENERAL 1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this

More information

SECTION TILT-UP PRECAST CONCRETE. A. Work includes, but is not limited to, the following:

SECTION TILT-UP PRECAST CONCRETE. A. Work includes, but is not limited to, the following: SECTION 03470 TILT-UP PRECAST CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Work includes, but is not limited to, the following: 1. Precast wall panels. 2. Forms and casting beds. 3. Concrete. 4. Reinforcing

More information

SECTION 415 REINFORCING FOR CONCRETE

SECTION 415 REINFORCING FOR CONCRETE SECTION 415 REINFORCING FOR CONCRETE Module 5 August 2018 Release 10, Module 5 1 Release 10, August 2018 5-1 415 1 Description Furnish and place steel and fiber reinforced polymer (FRP) reinforcing of

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE McClellan Blakemore Architects New Warehouse Facility for SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete formwork. B. Floors and slabs on grade. C. Concrete floor

More information

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2) Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction

More information

SECTION CONCRETE FORMWORK

SECTION CONCRETE FORMWORK SECTION 03 11 00 CONCRETE FORMWORK PART 1 - GENERAL 1.01 SECTION INCLUDES A. Work specified in this Section consists of designing, furnishing materials for, fabricating, erecting and removing formwork

More information

SECTION GYPSUM BOARD & SHEATHING SYSTEMS

SECTION GYPSUM BOARD & SHEATHING SYSTEMS PART 1!GENERAL! 1.01! SECTION INCLUDES SECTION 09260 GYPSUM BOARD & SHEATHING SYSTEMS! Metal stud wall framing. Metal channel ceiling framing.! Gypsum board.! Sheathing.! Taped and sanded joint treatment.!

More information

Section REINFORCING STEEL

Section REINFORCING STEEL Section 03210 PART 1 GENERAL 1.01 SUMMARY This Section includes the furnishing and subsequent placing of reinforcing steel, deformed and smooth, chairs, ties, splicing devices, and other reinforcing accessory

More information

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS AFTER FEBRUARY 1, 2011 ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS 481.1 Description. This specification shall govern for the construction of monolithic, reinforced concrete box sewers of the size,

More information

Safety Documents > Safety Manual > Scaffolds

Safety Documents > Safety Manual > Scaffolds Safety Documents > Safety Manual > Scaffolds D. Scaffolds 1. General Requirements for All Scaffolds a. Scaffolds shall be furnished and erected in accordance with this standard for persons engaged in work

More information

Stone and Masonry Veneer

Stone and Masonry Veneer Stone and Masonry Veneer R703.7 Stone and masonry veneer, general. Stone and masonry veneer shall be installed in accordance with this chapter, Table R703.4 and Figure R703.7. These veneers installed over

More information

SECTION METAL STAIRS

SECTION METAL STAIRS SECTION 05 51 00 METAL STAIRS PART 1 GENERAL 1.1 SUMMARY A. Section includes steel stair frame of structural sections, with closed risers; pan to receive concrete fill stair treads and landings; integral

More information

SECTION METAL STAIRS

SECTION METAL STAIRS SECTION 05510 METAL STAIRS PART 1 GENERAL 1.01 SECTION INCLUDES A. Stairs with concrete treads. B. Stairs with metal treads. C. Structural steel stair framing and supports. D. Handrails and guards. 1.02

More information

CONCRETE TECHNOLOGY CORPORATION

CONCRETE TECHNOLOGY CORPORATION PRECAST, PRESTRESSED HOLLOW CORE SLABS DESIGN CRITERIA & SPAN-LOAD CHARTS Introduction 2 Design Criteria for Development of the Span-Load Charts 2 Related Publications 3 Manufacturing Tolerances 4 8" Bare

More information

PART 1 GENERAL RELATED SECTIONS A. Section 03200: Concrete Reinforcement. B. Section 03300: Cast-In-Place Concrete.

PART 1 GENERAL RELATED SECTIONS A. Section 03200: Concrete Reinforcement. B. Section 03300: Cast-In-Place Concrete. 10.7 CSI TECHNICAL SPECIFICATIONS This document is arranged in agreement with the recommended section and page format developed by CSI (Construction Specifications Institute). All versions of this document

More information

1.02 STANDARD REFERENCES: The following standard specifications shall apply to the Work of this Section as indicated:

1.02 STANDARD REFERENCES: The following standard specifications shall apply to the Work of this Section as indicated: SECTION 04220 CONCRETE UNIT MASONRY PART 1 - GENERAL 1.01 SCOPE: A. The CONTRACTOR shall furnish all labor, materials and equipment necessary for the masonry construction as shown on the drawings or as

More information

Table 3. Detailed Comparison of Structural Provisions of IRC 2000 and 1997 NEHRP (Continued)

Table 3. Detailed Comparison of Structural Provisions of IRC 2000 and 1997 NEHRP (Continued) 2000 IRC 1997 NEHRP Section Provision Section Provision Comments CHAPTER 3 BUILDING PLANNING R301 DESIGN CRITERIA R301.2.2 Seismic Provisions R301.2.2.1 Determination of Seismic Design Category R301.2.2.1.1

More information

This section applies to the design and installation of cast-in-place concrete, shotcrete, precast concrete, and post-tensioned concrete.

This section applies to the design and installation of cast-in-place concrete, shotcrete, precast concrete, and post-tensioned concrete. Basis of Design This section applies to the design and installation of cast-in-place concrete, shotcrete, precast concrete, and post-tensioned concrete. Design Criteria Use most recent version of the International

More information

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 Note to user: These guide specifications are provided by Mid- States Concrete Products as a service to you; they are NOT specific

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 321610 - CURBING PART 1 - GENERAL 1.1 DESCRIPTION A. This Section specifies requirements for furnishing and installing all types of curbing including the following: granite curb, concrete and bituminous

More information

SECTION PRECAST CONCRETE COVER SYSTEM

SECTION PRECAST CONCRETE COVER SYSTEM SECTION 13500 PRECAST CONCRETE COVER SYSTEM PART 1 GENERAL 1.1 SYSTEM DESCRIPTION A. Design Criteria: 1. Precast manufacturer shall be responsible for structural design of individual precast components,

More information

CONCRETE WALKS AND CURBS SECTION CONCRETE WALKS AND CURBS PART 1 - GENERAL

CONCRETE WALKS AND CURBS SECTION CONCRETE WALKS AND CURBS PART 1 - GENERAL 13686.00 CONCRETE WALKS AND CURBS 033015-1 1.1 RELATED DOCUMENTS: SECTION 033015 CONCRETE WALKS AND CURBS PART 1 - GENERAL A. Drawings and general provisions of Contract, including General and Supplementary

More information

Project Address: Name of Person Completing Form:

Project Address: Name of Person Completing Form: Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties

More information

Temporary Structures. Form Materials and Accessories ATCE--II. Advanced Topics in Civil Engineering Form Materials and Accessories ATCE-II

Temporary Structures. Form Materials and Accessories ATCE--II. Advanced Topics in Civil Engineering Form Materials and Accessories ATCE-II Temporary Structures Form Materials and Accessories Practically all formwork jobs require some lumber. Local supplier will advise what material and sizes are in stock or promptly obtainable, and the designer

More information

SECTION ARCHITECTURAL CONCRETE

SECTION ARCHITECTURAL CONCRETE SECTION 033300 PART 1 - GENERAL 1.1 SUMMARY Section includes cast-in-place architectural concrete including form facings, reinforcement accessories, concrete materials, concrete mixture design, placement

More information

SPECIFICATION FOR PRECAST/ COMPOSITE CONCRETE FLOORS/ ROOF DECKS SECTION E60

SPECIFICATION FOR PRECAST/ COMPOSITE CONCRETE FLOORS/ ROOF DECKS SECTION E60 SPECIFICATION FOR SECTION E60 A 2007-09-26 S.W. Revision Date Issue Authorised By Approved for Issue SW Date 24.09.07 clarkebond Page 1 of 6 To be read with Preliminaries/ General Conditions. GENERAL 10

More information

REINFORCED CONCRETE MASONRY SECTION

REINFORCED CONCRETE MASONRY SECTION SECTION 04 22 02 - REINFORCED CONCRETE MASONRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification

More information

DIVISION 04 MASONRY CAST STONE. A. Design Considerations. 1. Cast stone shall comply with ASTM C1364, Standard Specification for Cast Stone.

DIVISION 04 MASONRY CAST STONE. A. Design Considerations. 1. Cast stone shall comply with ASTM C1364, Standard Specification for Cast Stone. DIVISION 04 MASONRY 04720 CAST STONE A. Design Considerations 1. Cast stone shall comply with ASTM C1364, Standard Specification for Cast Stone. 2. Care must be taken in the design of individual units

More information

SECTION STRUCTURAL CONCRETE

SECTION STRUCTURAL CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. Provision and installation of formwork, reinforcing steel, and cast-in-place concrete detailed and described on the drawings and hereinafter specified. B. Provision

More information

HARVEY MUDD COLLEGE TEACHING AND LEARNING CENTER SECTION Page 1 of 6 VOIDED CONCRETE SLAB

HARVEY MUDD COLLEGE TEACHING AND LEARNING CENTER SECTION Page 1 of 6 VOIDED CONCRETE SLAB 030111 Page 1 of 6 PART 1 - GENERAL 1.1 SUMMARY A. This Section specifies: 1. Voided concrete floor and roof slab system consisting of structural reinforced concrete containing hollow (bubbles) spherical

More information

1. Manufacturer certified according to NRMCA's "Certification of Ready Mixed Concrete Production Facilities."

1. Manufacturer certified according to NRMCA's Certification of Ready Mixed Concrete Production Facilities. SECTION 033000- CAST-IN-PLACE CONCRETE PART 1- GENERAL 1.1 SUMMARY This Section specifies cast-in place concrete, including formwork, reinforcement, concrete materials, mixture design, placement procedures,

More information

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course. SECTION 02750 RIGID PAVEMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Portland Cement Concrete (PCC) pavement. B. Related Sections: 1.2 REFERENCES 1. Section 02315 Excavation. 2. Section 02721

More information

Tolerances for Concrete Construction. Tolerances for Concrete Construction. Tolerance 6/16/2015

Tolerances for Concrete Construction. Tolerances for Concrete Construction. Tolerance 6/16/2015 Tolerances for Concrete Construction Thomas J Downs P.E., FACI President Forensic Experts Minneapolis, MN What is it? Tolerances for Concrete Construction When did we start this anyway? Who said we needed

More information

6.0 Forms and Falsework

6.0 Forms and Falsework 6.0 Forms and Falsework Table of Contents 6.0 TEMPORARY STRUCTURES...1 6.0.1 General...1 6.0.1.1 Purpose...1 6.0.1.2 The Inspector s Role...2 6.0.1.3 Description...2 6.0.1.4 Specifications...4 6.0.2 Materials...4

More information

JONES AIRWAY, LLC CLEVELAND REGIONAL JETPORT SECTION STRUCTURAL STEEL

JONES AIRWAY, LLC CLEVELAND REGIONAL JETPORT SECTION STRUCTURAL STEEL CLEVELAND REGIONAL JETPORT 05 1200-1 PART 1 - GENERAL SECTION 05 1200 STRUCTURAL STEEL 1.1 RELATED SPECIFICATION SECTIONS: A. Bolting of wood to steel, steel anchors for work of other trades, concrete

More information

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage The following list of code requirements is intended to assist you in complying with the Code of Public

More information

SECTION 1 TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-3 ABBREVIATIONS Common Usage.

SECTION 1 TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-3 ABBREVIATIONS Common Usage. SECTION 1 TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-3 ABBREVIATIONS. 1-3.2 Common Usage. Abbreviations Word or Words PAV.Pressure Aging Vessel PCC..Portland Cement Concrete PE.Polyethylene

More information

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site Installing DELTABEAM Installation of DELTABEAM These DELTABEAM installation instructions are intended to complement the project s erection plan. Peikko s technical support can help with the erection plan

More information

SECTION PLATE CONNECTED WOOD TRUSSES

SECTION PLATE CONNECTED WOOD TRUSSES SECTION 06173 PLATE CONNECTED WOOD TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Shop fabricated wood trusses for roof and floor framing. 2. Bridging, bracing, and anchorage. B. Related Sections:

More information

SECTION US Patent 8,857,130 B1 CAST-IN-PLACE CONCRETE WITH ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) EARLY MC APPLICATION

SECTION US Patent 8,857,130 B1 CAST-IN-PLACE CONCRETE WITH ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) EARLY MC APPLICATION ARDEX GUIDE SPECIFICATION ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) Cast-In-Place Concrete to Receive the ARDEX Concrete Management Systems including ARDEX Self-Leveling Underlayments SECTION 03 30 00

More information

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011. DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:

More information