1 02732 SANITARY FORCE MAIN *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number *************************************************************************************************************** PART 1 GENERAL 1.1 SUMMARY A. Section Includes: A sanitary force main system including necessary accessories as shown on drawings and specified in this section from the new lift station to the point of connection shown. B. Related Sections: Excavating, Backfilling and Compaction for Utilities Sanitary Sewer System Lift Station Cast-In-Place Concrete. 1.2 REFERENCES A. American National Standards Institute, Inc. (ANSI) Standards, latest edition: 1. A21.10 Ductile-Iron Fittings, 3 inches through 38 inches for Water and Other Liquids. 2. A21.11 Neoprene-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings. 3. A21.51 Ductile-Iron Pipe, Centrifugally Cast in Metal Molds or Sand-Lined Molds, for Water or Other Liquids. B. American Society for Testing and Materials (ASTM), latest edition: 1. D Specifications for Polyethylene Plastics Molding and Extrusion Materials. C. American Water Work Association (AWWA) Standards: C Installation of Ductile Iron Pipe. D. Miami-Dade Water and Sewer Authority Department (WASA) Standards and Specifications. 1.3 SUBMITTALS A. Submit the following before starting work: 1. Pipe and Fittings. 2. Valves. 3. Test Reports. 4. Certificate of compliance for each shipment of materials by manufacturer of products. Project No. SPECIFICATION GUIDELINES

2 1.4 QUALITY ASSURANCE A. Manufacturer's certificate of compliance or certified analysis shall be required for each shipment of materials used. Perform tests according to ANSI A21.6 or A STORAGE A. Store materials on site, and keep clean and free of foreign materials. Any damaged items shall be replaced at no additional cost to M-DCPS. 1.6 PROJECT CONDITIONS A. Miami-Dade Water and Sewer Authority will perform the tapping into the existing force main. Include the cost of construction permit fees, cost of the tapping, including the tapping sleeve, valve and related materials, and any service line installation fees. PART 2 PRODUCTS 2.1 MATERIALS A. Ductile Iron Pipe: 1. ANSI Standard A21.51 and AWWA C151, working pressure not less than 150 pounds per square inch, Class Pipe shall be polyethylene lined. 3. Polyethylene Lining: American Polybond or U.S. Polylined complying with D1248. Lining shall be nominal thickness. B. Joints for Ductile Iron Pipe: 1. Mechanical joints shall comply with AWWA C Push-on joints shall comply with ANSI Standard Neoprene gaskets and lubricant shall comply with the applicable requirements of ANSI Standard A C. Fittings and Special Items for Ductile Iron Pipe: 1. Fittings and specials shall be suitable for 250 psi pressure rating. 2. Fittings shall be with mechanical or push-on joints. 3. Fittings and specials for use with push-on joint pipe shall comply with ANSI/AWWA C110 and A Fittings and specials shall be polyethylene lined. 5. Linings shall be nominal thickness, American Polybond or U.S. Polylined. D. Valves: 1. Gate and plug valves, designed for a working pressure of not less than 150 pounds per square inch. 2. Valve connections shall be as required for the piping in which they are installed. 3. Valves shall have a clear waterway equal to the full nominal diameter of the valve, and shall be opened by turning counter clockwise. Project No. SPECIFICATION GUIDELINES

3 4. Plug and check valves shall be cast iron body non-lubricated, eccentric type with resilient neoprene rubber faced plugs, similar and equal to those manufactured by DeZurik Corp. E. Valve boxes: 1. Cast iron construction. 2. Cast iron boxes shall be extension type with slide-type adjustment and with flared base. 3. The minimum thickness of metal shall be 3/16". 4. The boxes shall be such length as will be adapted, without full extension, to the depth of cover required over the pipe at the valve location. 5. Covers shall be marked "S". PART 3 EXECUTION 3.1 INSTALLATION A. The force main shall be installed according to requirements of authorities having jurisdiction and AWWA C600. B. Handling: 1. Pipe and accessories shall be handled to insure delivery to the trench in sound, undamaged condition. 2. Do not injure the pipe coating. 3. If the coating or lining of any pipe or fitting is damaged, the repair shall be made by the Contractor at his expense in a satisfactory manner. 4. No other pipe or material of any kind shall be place inside a pipe or fitting after the coating has been applied. 5. Pipe shall be carried into position. 6. Turning pipe will be allowed only on the ends of the pipe. 7. The interior of pipe and accessories shall be thoroughly cleaned of foreign matter before being lowered into the trench and shall be kept clean during laying operations by plugging or other acceptable method. 8. Before installation, the pipe shall be inspected for defects. Material found to be defective before or after laying shall be replaced with sound material without additional expense to M-DCPS. 9. Neoprene gaskets that are not to be installed immediately shall be stored in a cool and dark place. C. Cutting of pipe shall be done in a neat and accurate manner without damage to the pipe. Unless otherwise recommended by the manufacturer and authorized by the A/E, cutting shall be done with an accepted type mechanical cutter. Wheel cutters shall be used when practicable. D. Locating: 1. Where the location of the sewer pipe is not clearly defined in dimensions on the drawings, the sewer pipe shall not be laid closer horizontally than 10 feet from a water supply line except where the bottom of the water pipe will be at least 18 inches above the top of the sewer pipe. Project No. SPECIFICATION GUIDELINES

4 2. Water lines shall in all cases cross above sewage force mains and shall be not less than 6 inches above the sewer main. 3. Sewer lines shall not be laid in the same trench with water lines, gas lines, fuel lines, or electric wiring. 4. Excavation and backfilling for trenches and manholes shall be as specified in Section Excavating, Backfilling, and Compacting for Utilities. E. Placing and Laying: 1. Pipe and accessories shall be carefully lowered into the trench by means of derrick, ropes, belt slings, or other authorized equipment. 2. Under no circumstances shall any of the water line materials be dropped or dumped into the trench. 3. Care shall be taken to avoid abrasions of the pipe coating. 4. Except where necessary in making connections with other lines, pipe shall be laid with the bells facing in the direction of laying. 5. The full length of each section of pipe shall rest solidly upon the pipe bed, with recesses excavated to accommodate bells, couplings and joints. 6. Pipe that has the grade or joint disturbed after laying shall be taken up and relaid. 7. Pipe shall not be laid in water or when trench conditions are unsuitable for the work. Water shall be kept out of the trench until jointing is completed. 8. When work is not in progress, open end of pipe, fittings, and valves shall be securely closed so that no trench water, earth, or other substance will enter the pipes or fittings. 9. Where any part of the coating or lining is damaged, the repair shall be made by the Contractor, at his expense, in a satisfactory manner. 10. Pipe ends left for future connections shall be valved, plugged, or capped and anchored. F. Jointing Ductile Iron Pipe: Push-on type joints or mechanical joints shall be installed according to AWWA C600, modified as necessary by the recommendations of the manufacturer to provide for special requirements of ductile iron pipe. G. Setting of Valves and Boxes: 1. Install where shown or specified, and set plumb. 2. Valve boxes shall be centered on the valves. 3. Boxes shall be installed over each outside valve unless otherwise shown. 4. Where feasible, valves shall be located outside the area of roads and parking. 5. Earth fill shall be carefully tamped around each valve box to a distance of 4 feet on all sides of the box, or to the undisturbed trench face if less than 4 feet. 6. A concrete ring shall be poured around the box top flush with the ground. H. Thrust Blocks: 1. Plugs, caps, tees, and bends deflecting 22-1/2 degrees or more, either vertically or horizontally, on sewer lines 6 inches in diameter or larger, shall be provided with thrust blocking, or metal tie rods and clamps or lugs. 2. Thrust blocking shall be concrete of a mix not leaner than 1 cement: 2-1/2 sand: 5 gravel and have a compressive strength of not less than 2000 psi after 28 days. 3. Blocking shall be placed between solid ground and the fitting to be anchored. 4. Unless otherwise indicated the base and thrust bearing sides of thrust blocks shall be poured directly against undisturbed earth. Project No. SPECIFICATION GUIDELINES

5 5. The sides of thrust blocks not subject to thrust may be poured against forms. 6. The area of bearing shall be as shown. 7. Blocking shall be placed to allow the fitting joints to be accessible for repair. I. Hydrostatic Tests: 1. Where any section of the force main is provided with concrete thrust blocking for fittings, the hydrostatic tests shall not be made until at least 5 days after installation of the concrete thrust blocking unless otherwise accepted. 2. Upon completion of the pipe installation for any section, the force main shall be thoroughly flushed. 3. The method proposed for disposal of waste water from hydrostatic tests, cleaning and flushing shall be submitted to the A/E before performing hydrostatic tests, to avoid causing a nuisance or property damage. 4. Pressure Test: a. After the pipe is laid, the joints completed, and the trench partially backfilled leaving the joints exposed for examination, the newly laid piping shall, unless otherwise specified, be subjected for 1 hour to a hydrostatic pressure test of 100 pounds per square inch. b. Exposed pipe, joints, fittings, and valves shall be carefully examined during the partially open trench test. c. Joints showing visible leakage shall be replaced or remade as necessary. d. Cracked or defective pipe, joints, fittings, or valves discovered by this pressure test shall be removed and replaced with sound material, and the test shall be repeated until the test results are satisfactory. e. All replacement and repair shall be without additional expense to M-DCPS. f. Tests shall be inspected and accepted by Miami-Dade Water and Sewer Authority Dept. 5. Time for Making Test: Except for joint material setting or where concrete reaction backing requires a 5 day delay, pipe lines or couplings may be subjected to hydrostatic pressure, inspected and tested for leakage any time after partial completion of backfill. Polyethylene lined pipe may be filled with water as recommended by the manufacturer before being subjected to the pressure test. 6. Leakage shall be defined as the quantity of water that must be supplied into the newly laid pipe, or any valved section thereof, to maintain the specified leakage test pressure after the air in the pipe line has been expelled and the pipe has been filled with water. 7. The maximum allowable leakage shall be determined by the following formula from the "AWWA Standard for Installation of Ductile Iron Water Mains", AWWA C600-85, L = ND times square root of P 3700 L = allowable leakage in gallons per hour. N = number of joints in the length of pipe line tested. D = nominal diameter of the pipe in inches. P = average test pressure during the leakage test in pounds per square inch gage. a. No pipe installation will be accepted if the leakage is greater than that determined by the above formula. Project No. SPECIFICATION GUIDELINES

6 b. Locate and repair all leaks until the leakage is reduced to the limits specified, but shall repair all known leaks regardless of the amount of leakage. J. Connection to Existing System: 1. All connections to existing mains of the Miami-Dade Water and Sewer Authority Department shall be made under the direction of the Authority. Valves separating the mains being installed from existing mains shall be operated by or under the direction of the Authority's representative. The cost of the work by the Authority in making the connection shall be paid by the Contractor. 2. A plug valve and a check valve shall be installed at the beginning of the force main after crossing the property line as indicated on the drawings. 3. In the event the proposed main is to be connected to a main which has one or more active services between the point of connection and the first existing line valve, a temporary plug or cap shall installed on the new main until the pressure tests are completed. Upon satisfactory completion, the cap or plug shall be removed from both mains and the connection made. The connection shall be made as swiftly as possible. The pipe line shall then be placed in service by the Authority personnel. 3.2 FIELD QUALITY CONTROL A. Cost of Test: Cost of tests will be at the Contractor's expense. 3.3 CLEANUP: A. Upon completion of the installation of the force main and appurtenances, all debris and surplus materials resulting from the work shall be removed. END OF SECTION Project No. SPECIFICATION GUIDELINES

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS

More information

1. B16.1 Cast Iron Pipe Flanges and Flanged Fittings, Class C 111 Rubber Gasket Joints for Ductile Iron Pressure Pipe and Fittings

1. B16.1 Cast Iron Pipe Flanges and Flanged Fittings, Class C 111 Rubber Gasket Joints for Ductile Iron Pressure Pipe and Fittings SECTION 33 34 00 SANITARY FORCE MAIN PART 1 GENERAL 1.1 SCOPE OF WORK A. This section specifies the requirements for furnishing and installing sanitary force main and appurtenances. The pipe shall be of

More information

SECTION WATER SYSTEMS

SECTION WATER SYSTEMS SECTION 02660 WATER SYSTEMS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. A complete underground domestic/fire water supply system, with all necessary accessories indicated on drawings or specified

More information

SECTION SANITARY SEWER SYSTEM

SECTION SANITARY SEWER SYSTEM SECTION 02731 SANITARY SEWER SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Sanitary sewer system including necessary accessories indicated on drawings and specified in this section. Contractor

More information

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems. NORTH MARIN WATER DISTRICT STANDARD SPECIFICATIONS SECTION 15056 DUCTILE-IRON PIPE AND FITTINGS PART 1 GENERAL 1.01 DESCRIPTION This section includes materials and installation of ductile-iron pipe and

More information

SECTION WATER DISTRIBUTION SYSTEM

SECTION WATER DISTRIBUTION SYSTEM Conditions of Use/ Responsibility of Data Montgomery County Public Schools Facilities Guide DIVISION 2 - SITE WORK These guideline specifications are to be used by the A/E as a base document in the development

More information

***************************************************************************************************************

*************************************************************************************************************** 02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************

More information

SECTION WATER DISTRIBUTION

SECTION WATER DISTRIBUTION SECTION 33 10 00 WATER DISTRIBUTION PART 1 GENERAL 1.01 SUMMARY 1.02 CODES A. Section Includes: 1. Underground water service piping, watermains and appurtenances. A. All work shall comply with the most

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 848 SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 848 SANITARY SEWERS ITEM NO. 848 SANITARY SEWERS 848.1 DESCRIPTION: This item shall govern the furnishing, installation and jointing of sanitary sewer pipe of the size and type specified by the project's plans and specifications.

More information

SECTION WASTEWATER FORCE MAINS

SECTION WASTEWATER FORCE MAINS SECTION 02732 WASTEWATER FORCE MAINS PART - GENERAL 1.01 GENERAL: A. This section includes the general requirements for design and installation of force main systems serving wastewater lift stations. B.

More information

TECHNICAL SPECIAL PROVISION FOR FINANCIAL PROJECT ID:

TECHNICAL SPECIAL PROVISION FOR FINANCIAL PROJECT ID: TECHNICAL SPECIAL PROVISION FOR 1001 WATER DISTRIBUTION SYSTEM FINANCIAL PROJECT ID: 200105-7-52-01 The official record of this Technical Special Provision is the electronic file signed and sealed under

More information

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. PART 1 - GENERAL 1.1 DESCRIPTION A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Section 01300 Record

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 813 WATER SERVICE FOR FIRELINES

San Antonio Water System Standard Specifications for Construction ITEM NO. 813 WATER SERVICE FOR FIRELINES ITEM NO. 813 WATER SERVICE FOR FIRELINES 813.1 DESCRIPTION: This item shall consist of water service for fire line installations in accordance with these specifications and as directed by the Engineer.

More information

SECTION STORM DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-place Concrete.

SECTION STORM DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-place Concrete. SECTION 02720 STORM DRAINAGE SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02221 - Excavating, Backfilling, and Compaction for Utilities. 2. 03300 - Cast-in-place Concrete. 1.02 REFERENCES

More information

1.1 SECTION INCLUDES.1 Materials and installation for water mains, hydrants, valves, valve boxes, and valve chambers, including service connections.

1.1 SECTION INCLUDES.1 Materials and installation for water mains, hydrants, valves, valve boxes, and valve chambers, including service connections. Issued 2005/06/01 Section 02511 Water Mains Page 1 of 10 PART 1 GENERAL 1.1 SECTION INCLUDES.1 Materials and installation for water mains, hydrants, valves, valve boxes, and valve chambers, including service

More information

SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE

SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE SECTION 02622 POLYVINYL CHLORIDE (PVC) PRESSURE PIPE PART 1 - GENERAL 1.1 SCOPE A. The work covered by this section includes furnishing all labor, equipment, and materials required to install and test

More information

SECTION WASTEWATER FORCE MAINS

SECTION WASTEWATER FORCE MAINS SECTION 02732 WASTEWATER FORCE MAINS PART 1 GENERAL 1.01 GENERAL: A. This section includes the general requirements for design and installation of force main systems serving wastewater lift stations. B.

More information

Wastewater Capital Projects Management Standard Construction Specification. 9.0 Pipe Testing, Inspection and Acceptance

Wastewater Capital Projects Management Standard Construction Specification. 9.0 Pipe Testing, Inspection and Acceptance CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 9.0 Pipe Testing, Inspection and Acceptance 9.1 General In addition to any other

More information

Exhibit A FOX CHAPEL AUTHORITY STANDARD SPECIFICATIONS FOR MATERIALS AND INSTALLATION OF WATER MAINS

Exhibit A FOX CHAPEL AUTHORITY STANDARD SPECIFICATIONS FOR MATERIALS AND INSTALLATION OF WATER MAINS Exhibit A FOX CHAPEL AUTHORITY STANDARD SPECIFICATIONS FOR MATERIALS AND INSTALLATION OF WATER MAINS Requests for extensions to Authority water mains shall be made in writing by the owner or owners of

More information

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE SECTION 02632 POLYVINYL CHLORIDE (PVC) WATERLINE PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required, and install polyvinyl chloride (PVC) waterline,

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 812 WATER MAIN INSTALLATION

San Antonio Water System Standard Specifications for Construction ITEM NO. 812 WATER MAIN INSTALLATION ITEM NO. 812 WATER MAIN INSTALLATION 812.1 DESCRIPTION: This item shall consist of water main installation in accordance with these specifications and as directed by the Engineer. 812.2 MATERIALS: The

More information

SECTION PIPE INSTALLATION

SECTION PIPE INSTALLATION SECTION 02232 PIPE INSTALLATION A. General The pipe shall be Ductile Iron pipe with Tyton push-on joints and cement lined as described and manufactured in accordance with ANSI/AWWA C151/A21.51. Gaskets

More information

VALLECITOS WATER DISTRICT SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE

VALLECITOS WATER DISTRICT SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE PART 1 - GENERAL 1.1 DESCRIPTION A. This section designates the requirements for the manufacture and installation of polyvinyl chloride, abbreviated PVC, pressure pipe. 1.2 RELATED WORK SPECIFIED ELSEWHERE

More information

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION POLYETHYLENE PRESSURE PIPE

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION POLYETHYLENE PRESSURE PIPE SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION 33 11 13.24 POLYETHYLENE PRESSURE PIPE PART 1 GENERAL... 2 1.1 Description... 2 1.2 Reference Specification... 2 1.3

More information

SECTION GRAVITY WASTEWATER LINES

SECTION GRAVITY WASTEWATER LINES SECTION GRAVITY WASTEWATER LINES 1. DESCRIPTION This specification shall govern all work required for furnishing, handling and installing gravity wastewater lines required to complete the project. 2. MATERIALS

More information

SECTION 2100 WATER MAIN

SECTION 2100 WATER MAIN SECTION 2100 WATER MAIN WATER MAIN PART 1 GENERAL 1.01 Section Summary A. This section includes product and installation requirements for water main pipe, gate valves, hydrants, fittings, and miscellaneous

More information

SECTION FACILITY SANITARY SEWERS

SECTION FACILITY SANITARY SEWERS SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION WATER UTILITIES

SECTION WATER UTILITIES SECTION 33 10 00 PART 1 - GENERAL 1.1 DESCRIPTION: Underground water distribution system complete, ready for operation, including all appurtenant structures, and connections to both new building service

More information

A. Gravity-Flow, Nonpressure, Drainage-Piping Pressure Rating: 10-foot head of water (30 kpa).

A. Gravity-Flow, Nonpressure, Drainage-Piping Pressure Rating: 10-foot head of water (30 kpa). SECTION 221313 - FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

CHINO VALLEY FIRE DISTRICT FIRE PROTECTION STANDARD

CHINO VALLEY FIRE DISTRICT FIRE PROTECTION STANDARD CHINO VALLEY FIRE DISTRICT FIRE PROTECTION STANDARD SPECIFICATIONS Establishing Minimum Standards for as Related To Fire Protection STANDARD # 103 REVISED 04/01/19 PAGES 7 SCOPE: These specifications shall

More information

SECTION PIPE & PIPE FITTINGS PART 1 GENERAL

SECTION PIPE & PIPE FITTINGS PART 1 GENERAL SECTION 02610 PIPE & PIPE FITTINGS PART 1 GENERAL 1.01 DESCRIPTION A. This Section includes the material and bedding requirements for all pipe and pipe fittings for underground pressure and non-pressure

More information

CONSTRUCTION OF WATER SYSTEMS 1.0 PIPING

CONSTRUCTION OF WATER SYSTEMS 1.0 PIPING CONSTRUCTION OF WATER SYSTEMS 1.0 PIPING 1.1 HANDLING Pipe, fittings and accessories shall be handled with care and shall not be dropped or bumped against pipe or appurtenances already or against any other

More information

ARTICLE 26 UTILITY LINE INSTALLATION REQUIREMENTS

ARTICLE 26 UTILITY LINE INSTALLATION REQUIREMENTS UTILITY LINE INSTALLATION REQUIREMENTS Index 26.01 JACK AND BORE OPERATIONS 26.02 PRESSURE PIPE RESTRAINT 26.03 PRESSURE CONNECTION BACK TO TABLE OF CONTENTS Section 26.01 JACK AND BORE OPERATIONS 26.01.01

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 PRECAST CONCRETE PIPE 10.1.1 General This section covers material requirements,

More information

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections. SANITARY SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sanitary Sewer Gravity Mains B. Sanitary Sewer Force Mains C. Sanitary Sewer Services 1.02 DESCRIPTION OF WORK A. Construct sanitary sewer gravity

More information

SECTION STORM SEWER COLLECTION SYSTEM

SECTION STORM SEWER COLLECTION SYSTEM SECTION 02722 STORM SEWER COLLECTION SYSTEM PART 1 GENERAL 1.01 SUMMARY A. This section addresses the installation of storm sewer collection mains and includes the acceptable products, materials, and construction

More information

DETAILED WATER MAIN SPECIFICATONS INDEX. Sec. No. Items Page Nos.

DETAILED WATER MAIN SPECIFICATONS INDEX. Sec. No. Items Page Nos. INDEX Sec. No. Items Page Nos. 1. Ductile Iron Pipe............... DWM 2 thru DWM 5 2. Reinforced Concrete Water Main............... DWM 5 thru DWM 6 3. Hydrants............... DWM 7 4. Gate Valves and

More information

CITY OF FARGO SPECIFICATIONS SEWER AND WATER SERVICE CONNECTIONS

CITY OF FARGO SPECIFICATIONS SEWER AND WATER SERVICE CONNECTIONS SEWER AND WATER SERVICE CONNECTIONS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of the furnishing of all labor, material,

More information

TABLE OF CONTENTS

TABLE OF CONTENTS DIVISION 33: SEWER AND SEPTIC SYSTEMS 33 3633 UTILITY SEPTIC TANK DRAINAGE FIELD TABLE OF CONTENTS 33 0000-1 SECTION 33 3633-- UTILITY SEPTIC TANK DRAINAGE FIELD PART 1 - GENERAL 1.1 SUMMARY A. Includes

More information

SECTION SANITARY SEWER SYSTEM

SECTION SANITARY SEWER SYSTEM SECTION 02530 SANITARY SEWER SYSTEM PART 1 - GENERAL 1.1 SUMMARY A. Section includes sanitary sewer system piping for collection of wastewater. B. Related Sections include but are not limited to: 1. Division

More information

WATER TRANSMISSION AND DISTRIBUTION LINES

WATER TRANSMISSION AND DISTRIBUTION LINES SECTION 2300 WATER TRANSMISSION AND DISTRIBUTION LINES 1.00 GENERAL 1.01 Scope. Work under this Section shall include furnishing all materials, labor, equipment and miscellaneous items necessary to install,

More information

DIVISION 2 SITE WORK SECTION SYSTEM WATER LINES

DIVISION 2 SITE WORK SECTION SYSTEM WATER LINES DIVISION 2 SITE WORK SECTION 02667 SYSTEM WATER LINES PART 1 GENERAL 1.01 SUMMARY A. Section includes: 1. Pipe and fittings for water lines including, HDPE sludge mains. 2. Gate valves and appurtenances.

More information

1.02 RELATED WORK: Refer to the following sections for related work:

1.02 RELATED WORK: Refer to the following sections for related work: SECTION 5100 - SANITARY SEWER MAIN PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of sanitary sewer mains and services. Topics include permits and fees, record drawings, pipe materials,

More information

City of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT TEL: (860) FAX: (860)

City of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT TEL: (860) FAX: (860) City of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT 06457 TEL: (860) 638-3500 FAX: (860) 343-8091 GENERAL REQUIREMENTS WATER MAIN AND SERVICE INSTALLATION JANUARY 2017 WATER MAINS:

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 812 WATER MAIN INSTALLATION

San Antonio Water System Standard Specifications for Construction ITEM NO. 812 WATER MAIN INSTALLATION ITEM NO. 812 WATER MAIN INSTALLATION 812.1 DESCRIPTION: This item shall consist of water main installation in accordance with these specifications and as directed by the Inspector. 812.2 SUBMITTALS: Contractor

More information

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction. General: 1. Construct utilities in accordance to TWA approved plans and shop drawings. Any deviation from the approved plans shall be approved by the DEVELOPER S ENGINEER and TWA 2. A preconstruction meeting

More information

SECTION C10 CLEANING AND CEMENT LINING GENERAL

SECTION C10 CLEANING AND CEMENT LINING GENERAL SECTION C10 CLEANING AND CEMENT LINING GENERAL The work under this section consists of the cleaning and cement mortar lining of existing cast iron water mains in place within the limits specified on the

More information

DIVISION II TECHNICAL SPECIFICATIONS SECTION S-003 SANITARY SEWER FORCE MAIN SYSTEM

DIVISION II TECHNICAL SPECIFICATIONS SECTION S-003 SANITARY SEWER FORCE MAIN SYSTEM DIVISION II TECHNICAL SPECIFICATIONS SECTION S-003 SANITARY SEWER FORCE MAIN SYSTEM TABLE OF CONTENTS: I. DESCRIPTION:... 2 II. COORDINATION:... 2 III. CONSTRUCTION LAYOUT:... 3 IV. MATERIALS:... 3 V.

More information

SECTION WASTE WATER DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-Place Concrete.

SECTION WASTE WATER DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-Place Concrete. SECTION 02735 WASTE WATER DRAINAGE SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02221 - Excavating, Backfilling, and Compaction for Utilities. 2. 03300 - Cast-in-Place Concrete. 1.02 REFERENCES

More information

***************************************************************************************************************

*************************************************************************************************************** 02735 WASTE WATER DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 22 14 00 ***************************************************************************************************************

More information

CITY OF WARRENVILLE STANDARD SPECIFICATIONS WATER MAIN, SANITARY SEWER AND STORM SEWER

CITY OF WARRENVILLE STANDARD SPECIFICATIONS WATER MAIN, SANITARY SEWER AND STORM SEWER CITY OF WARRENVILLE STANDARD SPECIFICATIONS WATER MAIN, SANITARY SEWER AND STORM SEWER WATER MAIN 1. All open cut water main shall be polyvinyl chloride plastic (PVC) pressure pipe per AWWA specification

More information

SECTION FIRE HYDRANTS

SECTION FIRE HYDRANTS SECTION 02080 FIRE HYDRANTS PART 1 - GENERAL 1.01 DESCRIPTION A. Work Specified The work specified shall include all labor, material, equipment, tools, services and incidentals necessary to furnish and

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 221313 - FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION SANITARY SEWERAGE PART 1 GENERAL 1.01 RELATED DOCUMENTS

SECTION SANITARY SEWERAGE PART 1 GENERAL 1.01 RELATED DOCUMENTS SECTION 02530 - SANITARY SEWERAGE PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

SECTION SANITARY UTILITY SEWERAGE PIPING

SECTION SANITARY UTILITY SEWERAGE PIPING SECTION 33 31 00 SANITARY UTILITY SEWERAGE PIPING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Sanitary sewer pipe and fittings. 2. Underground pipe markers. 3. Connection to existing manholes. 4.

More information

SECTION VII WATER. Concrete anchor and thrust blocks shall be provided at all discontinuities in accordance with Standard Details G-7.1 and G-7.2.

SECTION VII WATER. Concrete anchor and thrust blocks shall be provided at all discontinuities in accordance with Standard Details G-7.1 and G-7.2. SECTION VII WATER VII-1. DESIGN GUIDELINES Water pipelines and appurtenant structures within the jurisdiction of the City of Paso Robles shall be constructed in accordance with plans prepared by a Professional

More information

SUPPLEMENTAL SPECIFICATIONS TO STANDARD SPECIFICATIONS FOR WATER MAIN AND SERVICE LINE INSTALLATION NO. 2611

SUPPLEMENTAL SPECIFICATIONS TO STANDARD SPECIFICATIONS FOR WATER MAIN AND SERVICE LINE INSTALLATION NO. 2611 Revised October 10, 2014 SUPPLEMENTAL SPECIFICATIONS TO STANDARD SPECIFICATIONS FOR WATER MAIN AND SERVICE LINE INSTALLATION NO. 2611 Water Main and Service Line Installation shall be in accordance with

More information

1 Revised: 2019 Edition

1 Revised: 2019 Edition STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with

More information

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY Section Includes: 1. Pipe and fittings. 2. Drain Basin. 3. De-chlorination tablet feeder. 4. Non-pressure transition couplings.

More information

CONSTRUCTION OF WATER SYSTEMS 1.0 PIPING

CONSTRUCTION OF WATER SYSTEMS 1.0 PIPING CONSTRUCTION OF WATER SYSTEMS 1.0 PIPING 1.1 HANDLING Pipe, fittings and accessories shall be handled with care and shall not be dropped or bumped against pipe or appurtenances already or against any other

More information

SECTION FACILITY SANITARY SEWERS

SECTION FACILITY SANITARY SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Gravity-flow, non-pressure sanitary sewerage outside the building, with the following components: 1.02 DEFINITIONS 1. Cleanouts. 2. Precast concrete manholes.

More information

SECTION TAPPING SLEEVES AND VALVES

SECTION TAPPING SLEEVES AND VALVES SECTION 33 12 16.17 TAPPING SLEEVES AND VALVES PART 1: GENERAL 1.01 SCOPE Furnish, install and test all tapping sleeves, tapping valves, and tapping saddles as shown on the Drawings. 1.02 RELATED WORK

More information

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS SECTION 02670 UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of containment

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle

More information

A. This Section includes sanitary waste and vent piping inside the building and to locations indicated.

A. This Section includes sanitary waste and vent piping inside the building and to locations indicated. SECTION 221316 SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS Section SECTION 39 - MANHOLES TABLE OF CONTENTS Page 39-1 GENERAL... 39.1 39-2 CONCRETE MANHOLES... 39.1 39-2.01 NOT USED... 39.1 39-2.02 Concrete Storm Drain Manholes... 39.1 39-3 SADDLE SEWER MANHOLES...

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

All definitions are defined according to ANSI/AWWA C b. Flanged Joint: The flanged and bolted joint as described in ANSI/AWWA C110/A21.10.

All definitions are defined according to ANSI/AWWA C b. Flanged Joint: The flanged and bolted joint as described in ANSI/AWWA C110/A21.10. 21-02 SAN ANTONIO WATER SYSTEM SPECIFICATIONS FOR RESILIENT-SEATED GATE AND TAPPING VALVES FOR WATER SUPPLY SERVICE ANSI/AWWA C509-01 3 IN., 4 IN., 6 IN., 8 IN., 10 IN., 12 IN., 16 IN., & 20 IN. Revised

More information

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections. SANITARY SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sanitary Sewer Gravity Mains B. Sanitary Sewer Force Mains C. Sanitary Sewer Services 1.02 DESCRIPTION OF WORK A. Construct sanitary sewer gravity

More information

SECTION PIPING AND ACCESSORIES - GENERAL PROVISIONS

SECTION PIPING AND ACCESSORIES - GENERAL PROVISIONS SECTION 33 11 00 PIPING AND ACCESSORIES - GENERAL PROVISIONS PART 1: GENERAL 1.01 DRAWINGS Dimensions shown on Drawings are approximate only. Verify all piping geometry in the field and to ensure proper

More information

SECTION SEWER PIPE

SECTION SEWER PIPE SECTION 02530 SEWER PIPE PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: Furnish and install all piping as shown on the Drawings, described in the Specifications and as required for a complete and operable

More information

SECTION SANITARY SEWERS

SECTION SANITARY SEWERS SECTION 02730 SANITARY SEWERS PART 1 GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of sanitary sewers and appurtenances. E. Backfill

More information

PIPE AND FITTINGS. Submit product information sheet for joint restraint system to be used.

PIPE AND FITTINGS. Submit product information sheet for joint restraint system to be used. PIPE AND FITTINGS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Pipe B. Fittings C. Special Fittings D. Pipeline Accessories 1.02 DESCRIPTION OF WORK Construct water mains and building service pipes. 1.03

More information

All definitions are defined according to ANSI/AWWA C

All definitions are defined according to ANSI/AWWA C SAN ANTONIO WATER SYSTEM SPECIFICATIONS FOR REDUCED-WALL, RESILIENT-SEATED GATE AND TAPPING VALVES FOR WATER SUPPLY SERVICE 4 IN. THROUGH 48 IN. ANSI/AWWA C515-01 July 2017 1. SCOPE This product specification

More information

DUCTILE IRON PIPE AND FITTINGS

DUCTILE IRON PIPE AND FITTINGS Section 02501 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Ductile iron pipe and fittings for water lines, wastewater force mains, gravity sanitary sewers, and storm sewers. 1.02 MEASUREMENT AND PAYMENT

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section DUCTILE IRON PIPE AND FITTINGS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section DUCTILE IRON PIPE AND FITTINGS Section 02501 PART 1 GENERAL 1.01 SUMMARY This Section includes ductile iron pipe and fittings for water lines, wastewater force mains, gravity sanitary sewers, and storm sewers. 1.02 MEASUREMENT AND PAYMENT

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 02630 - STORM DRAINAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

UBC OKANAGAN UBC Technical Guidelines Section Edition Water Utilities Page 1 of 11

UBC OKANAGAN UBC Technical Guidelines Section Edition Water Utilities Page 1 of 11 Page 1 of 11 1.0 GENERAL 1.1 This Section refers to those portions of work related to supply and installation of geothermal mains, valves and valve boxes, fittings, service connections and related appurtenances.

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 1413 FACILITY STORM DRAINAGE PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

ITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe.

ITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe. AFTER MARCH 1, 2012 ITEM 460 REINFORCED CONCRETE PIPE 460.1 Description. This Item shall govern for the furnishing of reinforced concrete pipe. 460.2 Materials. A. Except as modified herein, materials,

More information

ARTICLE VI. STANDARD SPECIFICATIONS for SANITARY SEWER MAIN CONSTRUCTION. VI.6 Removal, Restoration, and Maintenance of Surface

ARTICLE VI. STANDARD SPECIFICATIONS for SANITARY SEWER MAIN CONSTRUCTION. VI.6 Removal, Restoration, and Maintenance of Surface ARTICLE VI STANDARD SPECIFICATIONS for SANITARY SEWER MAIN CONSTRUCTION VI.1 General VI.2 Materials and Equipment VI.3 Installation of Sanitary Sewer Mains VI.4 Laying of Pipe VI.5 Backfilling VI.6 Removal,

More information

CITY OF FARGO SPECIFICATION SANITARY SEWER

CITY OF FARGO SPECIFICATION SANITARY SEWER SECTION 1200 SECTION 1200 CITY OF FARGO SPECIFICATION SANITARY SEWER PART 1 DESCRIPTION OF WORK (revised March, 2007) The work to be done under these Specifications and the accompanying drawings consist

More information

REGIONAL CONSTRUCTION STANDARDS

REGIONAL CONSTRUCTION STANDARDS REGIONAL CONSTRUCTION STANDARDS SIXTH EDITION Publication Update 6.5 (Full Committee Approved Proposed Revision 6.5 Storm Sewer Joint Wrap - Section 302 As Publication Update 6.5) March 27, 2018 Copyright

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS SECTION 02620 PART 1 GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required to install High Density Polyethylene (HDPE) pressure pipe, fittings, and appurtenances

More information

ITEM NO. 824 SERVICE SUPPLY LINES (WATER)

ITEM NO. 824 SERVICE SUPPLY LINES (WATER) ITEM NO. 824 SERVICE SUPPLY LINES (WATER) 824.1 DESCRIPTION: This item shall consist of water service supply lines installation and adjustment installed in accordance with these specifications and as directed

More information

A. Gravity-Flow, Nonpressure, Drainage-Piping Pressure Rating: 10-foot head of water.

A. Gravity-Flow, Nonpressure, Drainage-Piping Pressure Rating: 10-foot head of water. SECTION 22 1313 - FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

LATHAM WATER DISTRICT

LATHAM WATER DISTRICT LATHAM WATER DISTRICT TOWN OF COLONIE STANDARD SPECIFICATIONS FOR WATER DISTRIBUTION SYSTEMS ADOPTED JUNE 24, 1993 REVISED FEBRUARY 29, 1996 LATHAM WATER DISTRICT 347 OLD NISKAYUNA ROAD LATHAM, NEW YORK

More information

CHAPTER 6 - SANITARY SEWER

CHAPTER 6 - SANITARY SEWER CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings

More information

CHAPTER 3 - PRESSURE IRRIGATION

CHAPTER 3 - PRESSURE IRRIGATION CHAPTER 3 - PRESSURE IRRIGATION 3.1 GENERAL This division covers furnishing and installing pressure pipe as shown on the Drawings or established in the field, and all flushing, testing, repairing, as required

More information

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Multi-Institutional Academic Health Science & Research Center Evansville, IN SECTION 221113 - FACILITY WATER DISTRIBUTION PIPING PART 1 - GENERAL 1.1 QUALITY ASSURANCE A. Work Description 1. This Work shall consist of furnishing materials and installing the Water Distribution System

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 824 SERVICE SUPPLY LINES (WATER)

San Antonio Water System Standard Specifications for Construction ITEM NO. 824 SERVICE SUPPLY LINES (WATER) San Antonio Water System Standard Specifications for Construction ITEM NO. 824 SERVICE SUPPLY LINES (WATER) 824.1 DESCRIPTION: This item shall consist of water service supply lines adjustment and installation

More information

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. SECTION 33 05 13 MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. B. Related Sections: 1. Section 03 20 00 - Concrete

More information

SECTION VITRIFIED CLAY PIPE SEWERS

SECTION VITRIFIED CLAY PIPE SEWERS SECTION 02724 VITRIFIED CLAY PIPE SEWERS PART 1 - GENERAL 1.1 SCOPE The work included in this section includes furnishing all labor, equipment, and materials required to install, test, and inspect vitrified

More information

CHAPTER 4 - CULINARY WATER

CHAPTER 4 - CULINARY WATER CHAPTER 4 - CULINARY WATER 4.1 GENERAL This Division covers furnishing and installing pressure pipe to the lines and grades shown on the drawings and/or established in the field, and all flushing, testing,

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

SECTION STORM DRAINAGE

SECTION STORM DRAINAGE SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation

More information