1 SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE Keith Donington, P.E. October
2 Sibley Pond - Bridge Elevation 2
3 Bridge Open to Traffic November
4 Bridge Highlights General: Design-Build Project Bridge designed and constructed in 15 months Opened to traffic in November 2011 more than 10 months ahead of the owner set completion date of October 2012 First design of PCI s NEXT D (Northeast Extreme Double Tee Beam) with full depth integral deck NEXT D and NEXT F were new beam sections developed by PCI New England in response to FHWA s nationwide initiative for Accelerated Bridge Construction (ABC) NEXT D - 8 inch full depth integral deck slab NEXT F - 4 inch form deck w/cip topping NEXT D selected as faster to erect, less costly, improved durability, and perceived higher technical score for D/B 4
5 Bridge Facts Type of Bridge: Highway Bridge Stream/Pond Crossing Structure & Geometry: No. of Spans 10 spans arranged in two 5-span continuous units and a single expansion joint located in the center Continuity Spans continuous for LL and SDL Span Length 79-0 Overall Length C.L. to C.L. of end abutments Overall Width 36-0 curb to curb No. of Traffic Lanes 2 Alignment /Skew Tangent /0 skew Longitudinal Grade ± 1.0% with crown at center of bridge 5
6 Bridge Highlights Design & Construction: Designed to AASHTO LRFD Bridge Design Specifications for HL-93 loading for all limit states except for Strength I LL for Strength I Limit State is MaineDOT Modified Live Load consisting of the standard HL-93 Live Load with 25% increase in the design truck Bridge designed to 100-year design life per owner s project requirements 6
7 Sibley Pond - Site Plan 7
8 Design Parameters Substructure: Organic Silt Silty Sand / Silty Clay Silty/Gravely Sand Fine Sand Bedrock Subsurface Profile 8
9 Pile Driving Steel pipe piles for piers near the north abutment were driven from the old road during the first winter Remainder of the piles were driven by leapfrogging the pile driving crane from pier to pier, supported by temporary decking and temporary intermediate steel pile bents Pile Driving Operations 9
10 Intermediate Pier Bents Elevation of several pier bents Fixed pier bent 10
11 Design Parameters Superstructure: 11
12 Design Parameters Superstructure: 12
13 Design Parameters Longitudinal Joint detail: 13
14 PCI NEXT D Beam NEXT D Beam in casting bed NEXT D Beam with steel studs 14
15 PCI NEXT D Beam NEXT D Beam lifted from casting bed Completed NEXT D Beams 15
16 Beam Erection 4 79 beams/ span erected using a custom gantry crane PB designed the gantry transverse support beam system Gantry lifted the beams from the transporter vehicle parked on the old bridge deck Transporter removed, steel rail beams inserted Gantry rolled sideways across the new piers on Hillman Rollers. Beams lowered onto the bearings Less costly and quicker than 2 crane pick 4 beams erected in an eight-hour shift turnaround time of 2 days per span Beam Erection Operations 16
17 Existing Bridge Conditions 17
18 Deck View 18
19 PCI NEXT D Beam Innovations: - Ends of beams - no rebar or strand projections allowed to clear legs of gantry crane - For live load negative moment continuity over the piers, mechanical couplers were detailed to field splice the splice bars between adjacent beams - This layout required the precaster to align the deck rebars from adjacent beams to tight tolerances Couplers for (-) Moment continuity at intermediate diaphragms 19
20 PCI NEXT D Beam Innovations: - For positive moment continuity, a special detail was developed for the bottom reinforcement using a steel end plate with ASTM A706 weldable rebar - In shop, steel plate and rebar assemblies were cast into ends of NEXT D forms - In field, following removal of the gantry rail support system, hooked rebars were field welded to the steel plates Couplers for (+) Moment continuity at intermediate diaphragms 20
21 Durability 100yr Life Superstructure: NEXT D beams were selected by D/B team for best technical score as well as cost considerations NEXT D has integral deck which is both precast and prestressed Beams used a HP performance/self-consolidating concrete mix with 5.5 gals/cy calcium nitrite corrosion inhibitor (DCI) 8,000 psi was specified by design but 10,000 psi concrete was consistently achieved by the precaster CIP concrete construction was limited to only the curbs, longitudinal closure joints, and pier continuity diaphragms HPC was also specified for all field-placed concrete along with 5.5 gals/cy of DCI MMFX rebar specified in exposed bridge curbs and rail transition barriers Deck protection: HP machine hot applied deck waterproofing with 3 inch minimum asphalt overlay Only one expansion joint in 790 ft, located at high point, with semi-integral abutments at ends Substructure: Concrete filled steel pipe piles are protected with a shop applied fusion bonded epoxy coating system, extending from the top of the pile to 10 feet (3 meters) below the mud line 21
22 Acknowledgments Owner: Maine Department of Transportation, Augusta, ME Contractor: The Lane Construction Corp., Bangor, ME Engineer/Designer: Parsons Brinckerhoff, Inc., Manchester, NH/Boston MA Precaster: J.P. Carrara & Sons, Inc., Middlebury, VT PCINE 22
23 Questions? 23
SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT PROJECT ROUTE 2, CANAAN/PITTSFIELD, MAINE
SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT PROJECT ROUTE 2, CANAAN/PITTSFIELD, MAINE G. Keith Donington, PE, Parsons Brinckerhoff, Manchester, NH Hany L. Riad, PhD, PE, Parsons Brinckerhoff, Boston, MA
More informationNortheast Extreme Tee (NEXT) Beam with Rochester VT Case Study
ABC UTC Webinar 2-15-18 Northeast Extreme Tee (NEXT) Beam with Rochester VT Case Study Speakers: Rita Seraderian, PE., Executive Director Precast/Prestressed Concrete Institute Northeast Belmont, MA Rob
More information1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY
Detailing of ABC Bridges for Simplicity and Durability Michael P. Culmo, P.E. CME Associates, Inc. East Hartford, CT DETAILS This presentation contains many preferred details My favorite details will be
More informationSR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA
ASHE NATIONAL PROJECT OF THE YEAR SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA For the PENNSYLVANIA DEPARTMENT OF TRANSPORTATION Engineering District 12-0 Submitted By: January 29, 2018 AMERICAN
More informationApplications of Ultra High Performance Concrete and Prefabricated Concrete Elements in Accelerated Bridge Construction
Applications of Ultra High Performance Concrete and Prefabricated Concrete Elements in Accelerated Bridge Construction 2018 Virginia Concrete Conference March 2, 2018 Bardia Emami, PE Outline Projects
More informationAccelerated Bridge Construction in USA
Accelerated Bridge Construction in USA Abstract Rush hour traffic is a common daily occurrence in the USA. Highway and bridge construction further aggravates the situation. The Federal Highway Administration
More informationLRFD Bridge Design Manual Changes
LRFD Bridge Design Manual Changes Dave Dahlberg Bridge Design Manual & Policy Engineer May 17, 2017 Bridge Office mndot.gov/bridge Overview 1) Concrete mix designations 2) Reinforcing bar development and
More informationDesign and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.
Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on
More informationAccelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents
Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Washington State s Skagit River Bridge Emergency Slide Bijan Khaleghi
More informationABC, FHWA SHRP2 R04: Project update, lessons learned. Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead
ABC, FHWA SHRP2 R04: Project update, lessons learned Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead January 11, 2015 Goals for ABC Enhanced Mobility Safety Reduced Costs***
More informationPHASING CONSIDERATIONS FOR BRIDGES
PHASING CONSIDERATIONS FOR BRIDGES Christopher Miller, P.E. 6/11/18 Table of contents 1 What Not to Do 3 2 Span Arrangement 4-9 3 4 5 6 Superstructure Geometric Considerations Superstructure Structural
More informationACCELERATED BRIDGE CONSTRUCTION IN TEXAS. Michael D. Hyzak, PE 1 Gregg A. Freeby, PE 2 Lloyd M. Wolf, PE 3 David P. Hohmann, PE 4 John M.
ACCELERATED BRIDGE CONSTRUCTION IN TEXAS Michael D. Hyzak, PE 1 Gregg A. Freeby, PE 2 Lloyd M. Wolf, PE 3 David P. Hohmann, PE 4 John M. Holt, PE 5 ABSTRACT The Texas Department of Transportation (TxDOT)
More informationDESIGN AND ANALYSIS OF PRECAST CONCRETE BRIDGES IN AREAS OF HIGH OR MODERATE SEISMICITY
DESIGN AND ANALYSIS OF PRECAST CONCRETE BRIDGES IN AREAS OF HIGH OR MODERATE SEISMICITY ABSTRACT Jugesh Kapur, PE, SE 1 The seismic design and detailing of bridges made of precast prefabricated members
More informationBenefits of Ultra-High Performance Concrete for the Rehabilitation of the Pulaski Skyway
Benefits of Ultra-High Performance Concrete for the Rehabilitation of the Pulaski Skyway Michael D. McDonagh, P.E., P.Eng., WSP Parsons Brinckerhoff Andrew J. Foden, Ph.D., P.E., WSP Parsons Brinckerhoff
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS
MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS SECTION 1 - MISCELLANEOUS STANDARDS 1.00.01 -.05 Table of Contents 1.11.01 Decimal Parts of a Foot and Inch 1.21.01 Factors
More informationLong Key Bridge, a spectacular example. Design Features and Prestressing Aspects of Long Key Bridge
Design Features and Prestressing Aspects of Long Key Bridge { i Thomas M. Gallaway* Principal Cutler-Gallaway Services, Inc. Consulting Engineers San Antonio, Texas Long Key Bridge, a spectacular example
More informationAPPENDIX G WHITTIER BRIDGE TYPE STUDY EVALUATION OF BRIDGE ALTERNATIVES
APPENDIX G WHITTIER BRIDGE TYPE STUDY EVALUATION OF BRIDGE ALTERNATIVES Massachusetts Department of Transportation Highway Division I-95 / Whittier Bridge Replacement Type Study Report 6. Evaluation of
More informationAccelerated Bridge Construction (ABC) National Status
Accelerated Bridge Construction (ABC) National Status by Mary Lou Ralls, P.E., Ralls Newman, LLC 88 th Annual Transportation Short Course Texas A&M University College Station, Texas Session: Construction
More informationSuperstructure Guidelines
Superstructure Guidelines The following are additional guidelines on using the following types of superstructure. Pre-stressed Concrete Beams To check beam size use the beam size chart. The chart was created
More informationWest Virginia s First ABC Deck Replacement Project Bill Manuel & Johann Aakre HNTB Corporation
West Virginia s First ABC Deck Replacement Project Bill Manuel & Johann Aakre 10.26.2016 HNTB Corporation Outline Overview of WV TPK Ghent NB Bridge Existing Conditions ABC Deck Replacement Alternatives
More informationHow Loads Are Distributed
LOAD DISTRIBUTION 1 LOAD DISTRIBUTION This section illustrate how load will transmit from the deck to the stringers. Determining the fraction of load carried by a loaded member and the remainder distributed
More informationDESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc.
DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc. Paper prepared for presentation at the Bridges in a Climate of Change
More informationCONNECTING PRECAST PRESTRESSED CONCRETE BRIDGE DECK PANELS WITH ULTRA HIGH PERFORMANCE CONCRETE
CONNECTING PRECAST PRESTRESSED CONCRETE BRIDGE DECK PANELS WITH ULTRA HIGH PERFORMANCE CONCRETE George Bornstedt, PE, Oregon Department of Transportation, La Grande, OR Craig Shike, PE, Oregon Department
More informationSteve Haines, P.E., Parsons, (303) , James Studer, Kiewit, (926) ,
PLACEMENT OF PRECAST PRESTRESSED CONCRETE GIRDER BRIDGE SPANS WITH SELF PROPELLED MODULAR TRANSPORTERS PIONEER CROSSING DESIGN/BUILD PROJECT, AMERICAN FORK, UT Steve Haines, P.E., Parsons, (303) 831-8100,
More informationPresented by: Taya Retterer BRG Webinar July 30, 2012
Presented by: Taya Retterer BRG Webinar July 30, 2012 PHASED CONSTRUCTION RECOMMENDATIONS FOR BRIDGES Will be posted to the TxDOT Website http://www.dot.state.tx.us/business/contractors_consultants/bridge/default.htm
More informationJULY 2014 LRFD BRIDGE DESIGN 5-1
JULY 014 LRFD BRIDGE DESIGN 5-1 5. CONCRETE STRUCTURES Reinforced and prestressed concrete are used extensively in bridge projects. In addition to general design guidance and information on detailing practices,
More informationWell Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.
Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Presentation Outline Project History Project Scope Construction Alternatives Plan
More informationSTANDARDIZED CONCRETE BRIDGES IN TEXAS. John Holt, PE, Texas Department of Transportation Ronald Medlock, PE, Texas Department of Transportation
STANDARDIZED CONCRETE BRIDGES IN TEXAS John Holt, PE, Texas Department of Transportation Ronald Medlock, PE, Texas Department of Transportation ABSTRACT Standardized concrete bridge plans are used extensively
More informationBrD Superstructure Tutorial
AASHTOWare BrD 6.8 BrD Superstructure Tutorial PS12 Prestressed Concrete I Beam Using BrD LRFD Engine BrD Superstructure Training PS12 - Prestressed Concrete I Beam Using BrD LRFD Engine 1'-9" 55'-6" Total
More informationPennDOT e-notification No. 13
PennDOT e-notification No. 13 Bureau of Project Delivery Bridge Design and Technology Division April 3, 2006 (Revised April 2016) Interim Revision to Bridge Standard Drawing(s) Drawing 86-353 PE (Change
More informationGet In, Get Out, Stay Out!
Get In, Get Out, Stay Out! FHWA Accelerated Bridge Construction Program By Gary Jakovich, P.E. Senior Bridge Engineer, FHWA Virginia Concrete Conference Richmond, VA March 6-7, 2007 Federal Highway Administration
More informationA New Precast Concrete Deck System for Accelerated Bridge Construction
A New Precast Concrete Deck System for Accelerated Bridge Construction George Morcous 1(&), Fouad Jaber 2, and Jason Volz 2 1 University of Nebraska-Lincoln, Omaha, NE, USA 2 Nebraska Department of Roads,
More informationRESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO
RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT October 1, 2017 to December 31, 2017 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,
More informationRESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO
RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT July 1, 2017 to September 30, 2017 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,
More informationOHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO
OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO 43216-0899 July 17, 2015 To: Users of the Bridge Design Manual From: Tim Keller, Administrator, Office of Structural
More informationLecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts...
Lecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts... LECTURE 13 May 17, 2005 May 17, 2005 1 Where we have been Basics Allowable Stress Ultimate Strength Shear Camber
More informationCHEF MENTEUR BRIDGE REPLACEMENT
CHEF MENTEUR BRIDGE REPLACEMENT Gumbo Engineers, Inc. Lucy Farrar, Travis Honore, Jeremy Vezina, Thomas Harrison PRELIMINARY DESIGN Fall 2016 Semester CE 4750 Professional Issues Mr. Miles Williams INTRODUCTION
More informationBijan Khaleghi, Ph, D. P.E., S.E.
0 Submission date: July, 0 Word count: 0 Author Name: Bijan Khaleghi Affiliations: Washington State D.O.T. Address: Linderson Way SW, Tumwater WA 0 INTEGRAL BENT CAP FOR CONTINUOUS PRECAST PRESTRESSED
More informationASCE STRUCTURAL ENGINEERING CONFERENCE. Ames Iowa
2014 HDR Architecture, 2014 HDR, Inc., all rights reserved. ASCE STRUCTURAL ENGINEERING CONFERENCE Ames Iowa WHAT DO YOU DO IF YOU HAVE MORE PROJECT THAN BUDGET? DESIGN BUILDER SELECTION METHOD Fixed Price
More informationEconomical Design / Case Studies
Economical Design / Case Studies Alabama Technology Transfer Center Workshop Michael Barker, PE University of Wyoming & SSSBA Bridge Technology Center Outline of Today s Presentation Competitiveness of
More informationSTRUCTURE AND BRIDGE DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Corrosion Resistant Reinforcing Steels (CRR) SPECIFIC SUBJECT: Plan Modifications
More informationBRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT)
SPECIAL PROVISION August 31, 2009 PROJECT # S-R399(42) PROJECT # S-R399(59) PIN # 6697/7236 SECTION 03253S BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) Add Section 03253S: PART
More informationBRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E.
BRIDGE DESIGN MANUAL UPDATES Jamie F. Farris, P.E. October 2015 Table of Contents 1 BDM Chapter 2 Limit States and Loads 2 BDM Chapter 3 Superstructure Design 3 BDM Chapter 4 Substructure Design 4 Questions
More informationAGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.
Route 15/29 SBL Bridge Superstructure Replacement & Widening Existing Structure Scope Accelerated Procedure Staging (Superstructure) Preparatory Work (Substructure) NOVA District Questions EXISTING STRUCTURE
More informationMinistry of Forests & Range
Ministry of Forests & Range DRAWING SCHEDULE DRAWING No. / MODEL TYPE STD-EC-040-01 STD-EC-040-02 STD-EC-040-03 STD-EC-040-04 STD-EC-040-05 STD-EC-040-06 STD-EC-040-07 STD-EC-040-08 DESCRIPTION REV. DATE
More informationCE 435/535, Fall 2003 Preliminary Design Example 1 / 6
CE 435/535, Fall 2003 Preliminary Design Example 1 / 6 Perform a preliminary design for a bridge on a state highway over a large creek in rural Alabama. Produce a construction layout drawing showing profile
More informationABC Techniques for Rapid Bridge Replacement. Bala Sivakumar HNTB Corporation. Purdue Road School 2017
ABC Techniques for Rapid Bridge Replacement Bala Sivakumar 03.08.2017 HNTB Corporation Purdue Road School 2017 Outline Introduction to ABC ABC Technologies Precast Decks SHRP2 ABC Toolkit Implementing
More informationNCHRP Project Michael Culmo, PE CME Associates, Inc.
NCHRP Project 12-102 Michael Culmo, PE CME Associates, Inc. Acknowledgements NCHRP: Waseem Dekelbab Project Panel Ahmad Abu-Hawash Iowa DOT Norman P. Marzano Jr. Rhode Island DOT Carmen Swanwick Utah DOT
More information14. Structural Concrete
14. Structural Concrete 14.1. Materials 14.2. Reinforcement 14.3. Structural Concrete Design 14.4. Prestressed Concrete Girders Section 5 of the LRFD Specifications presents unified design requirements
More informationSpecification Changes and Their Effect on Plans. Bridge Construction Issues. BRG VTC April, 2010
Specification Changes and Their Effect on Plans Bridge Construction Issues BRG VTC April, 2010 Brian D. Merrill, P.E. BRG Construction & Maintenance Branch Also: Common Plan Review Items Revised Specifications
More informationJFK Airport Light Rail Transit System
JFK Airport Light Rail Transit System Author: Co-Author: Company: José M. Rodriguez, P.E., Senior Project Director D. Brice Urquhart, P.E., Project Manager Figg Bridge Engineers, Inc. Address: 424 N. Calhoun
More informationSPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit
2004 Specifications CSJ: 0028-09-111 SPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit 1. Description. Construct cast-in-place segmental concrete box girder superstructure according to the plans,
More informationSHRP 2 - R04 Innovative Bridge Designs for Rapid Renewal
SHRP 2 - R04 Innovative Bridge Designs for Rapid Renewal FEHRL Long Life Bridges SQUARE (Brussels) Thursday June 10, 2010 Objective RAPID RENEWAL Bridge Systems WHAT IS THE BIG IDEA? Manufactured Bridges
More informationPROPOSED BEAM STABILITY SUBMITTAL REQUIREMENTS March 3, 2017
PROPOSED BEAM STABILITY SUBMITTAL REQUIREMENTS March 3, 2017 Virginia J. Epperly, PE Complex Structures Engineer Structure & Bridge Division Andrew M. Zickler, PE ABC Support & Complex Str. Program Manager
More informationGuidelines for Checking Final Design Bridge Plans
MNDOT BRIDGE OFFICE Guidelines for Checking Final Design Bridge Plans Edited by the MnDOT Bridge Office ES ESS Committee February 2018 Disclaimer: This document is meant to be used as a checklist for the
More informationNew Development in Accelerated Bridge Design and Construction in WA
Delivery of Accelerated Bridge Construction WSDOT Workshop Wednesday April 1st, 2015 New Development in Accelerated Bridge Design and Construction in WA Washington State Department of Transportation Bridge
More informationRESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO
RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT October 1, 2016 to December 31, 2016 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,
More informationFEBRUARY 2019 LRFD BRIDGE DESIGN 5-1
FEBRUARY 2019 LRFD BRIDGE DESIGN 5-1 5. CONCRETE STRUCTURES Reinforced and prestressed concrete are used extensively in bridge projects. In addition to general design guidance and information on detailing
More informationJOINTS TABLE OF CONTENTS CHAPTER 14
TABLE OF CONTENTS CHAPTER 14 FILE NO. TITLE DATE TABLE OF CONTENTS, INTRODUCTION 14.TOC-1 Table of Contents Chapter 14... 03May2018 14.00-1 Introduction Chapter 14... 03May2018 GENERAL INFORMATION 14.01-1
More informationPrestressed Concrete Girder Continuity Connection
Report No: Title: Developing Organization: Precast/Prestressed Concrete Institute Technical Committee Phone - 888-700-5670 Email contact@pcine.org Website- www.pcine.org Report Date: Revision Date: Status
More informationSTRUCTURES INSPECTION CERTIFICATION TRAINING COURSE
STRUCTURES INSPECTION CERTIFICATION TRAINING COURSE Code Pre/Route AFE Function Part 0 1000 7116 1174 N Hadley Eisenbeisz Bridge Construction Engineer Rick Brandner Mitchell Area Darrell utter Assistant
More informationPARTIAL-DEPTH PRECAST DECK PANEL DESIGN AND CONSTRUCTION IN TEXAS
PARTIAL-DEPTH PRECAST DECK PANEL DESIGN AND CONSTRUCTION IN TEXAS Gregg Freeby, P.E., Leon Flournoy, P.E. & Sara Watts, E.I.T TxDOT Bridge Division Prefabricated Elements TxDOT s primary technique for
More informationCorrosion Resistant Reinforcing Steel (CRR)
Corrosion Resistant Reinforcing Steel (CRR) Virginia DOT Workshop Charlottesville, VA Prasad Nallapaneni, VDOT Assistant State Structure & Bridge Engineer October 4, 2017 Presentation Outline IIM S&B 81
More informationGUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410
GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 Note to user: These guide specifications are provided by Mid- States Concrete Products as a service to you; they are NOT specific
More information3.0 TEMPORARY DETOUR BRIDGES
3.0 TEMPORARY DETOUR BRIDGES Table of Contents 3.1 General...1 3.2 STORAGE SITES:...2 3.3 BID ITEMS:...2 3.4 INDEX OF PLAN SHEETS with H-Pile:...3 3.5 INVENTORY SHEET FOR DETOUR BRIDGES WITH H-PILE:...4
More informationRoute 360 Inverted T-beams. Carin Roberts-Wollmann Virginia Tech Tommy Cousins Clemson University Fatmir Menkulasi Louisiana Tech
Route 360 Inverted T-beams Carin Roberts-Wollmann Virginia Tech Tommy Cousins Clemson University Fatmir Menkulasi Louisiana Tech Background Outline Scope and Objectives Development and Testing Topping
More informationRt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening
Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening March 5, 2009 Nicholas J. Roper NOVA District Bridge Engineer Robert F. Price Resident Administrator of Loudoun/ Prince William Construction
More informationShort Span Steel Bridges
Short Span Steel Bridges MINK 2015 Michael Barker, PE University of Wyoming & SSSBA Bridge Technology Center Outline of Today s Presentation SSSBA & espan140 Design Competitiveness of Steel Bridges Economics
More informationEGCE 406: Bridge Design
EGCE 406: Bridge Design Design of Slab for Praveen Chompreda Mahidol University First Semester, 2006 Bridge Superstructure Outline Components of bridge Superstructure Types Materials Design of RC Deck
More informationModeling and Design of Bridge Super Structure and Sub Structure
Topic 3 Day 2 Modeling and Design of Bridge Super Structure and Sub Structure Naveed Anwar 1. Over view of Bridge Design Process and Bridge Types 2. Advances and recent trends in Modeling and Analysis
More informationThe FHWA Long-Term Bridge Performance Program
The FHWA Long-Term Bridge Performance Program by John M. Hooks, J. M. Hooks & Associates An ever-growing volume of cars and trucks move people and goods on modern bridges spanning highways and topographical
More informationThe Pennsylvania Rapid Bridge Replacement Project
1 The rebuilding of 558 structurally deficient bridges in the Commonwealth of Pennsylvania over a 3+ year span April 2017 Charles Zugell The Plenary Walsh Keystone Partners believe engaging local community
More informationSTRUCTURE SELECTION REPORT
STRUCTURE SELECTION REPORT Prepared for: City & County of Denver 201 West Colfax Avenue Denver, CO 80202 Prepared by: Felsburg Holt & Ullevig 6300 South Syracuse Way Suite 600 Centennial, CO 80111 June
More informationPresenter: Contributing Authors: Guy C. Nelson PE, SE TEG Engineering, LLC Structural Engineer
Presenter: Guy C. Nelson PE, SE TEG Engineering, LLC Structural Engineer Contributing Authors: Bill Hazelton St. Clair County Road Commission Director of Engineering Dewayne Rogers St. Clair County Road
More informationHALLS RIVER BRIDGE REPLACEMENT
HALLS RIVER BRIDGE REPLACEMENT FDOT District 7 Structures Design Office Cristina Kay Suarez Mamunur Siddiqui, P.E. David Pelham Structures Designer Structures Design Engineer - SEOR Senior Structures Designer
More informationBridge Design Guide. Bridge Division
Bridge Design Guide Bridge Division August 2018 Chapter 1 About this Guide Contents: Section 1 Introduction... 1-2 Bridge Design Guide 1-1 TxDOT August 2018 Chapter 1 About this Guide Section 1 Introduction
More informationDesign and Rating of Steel Bridges
2014 Bentley Systems, Incorporated Parametric and Integrated Bridge Design LEAP Bridge Steel Steve Willoughby Design and Rating of Steel Bridges 2 WWW.BENTLEY.COM 2014 Bentley Systems, Incorporated 1 Discussion
More informationPROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012
PROJECT UPDATE Rendering View from the City of Chesapeake Elizabeth River Boat Landing and Park looking across the Elizabeth River at Portsmouth CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA The new 5,375
More informationStructural - Engineering Review Checklist
Structural - Engineering Review Checklist Project: List Corridor Criteria ID Review Priority (H,M,L) TOPICS S-_-## Structural Design Codes, Manuals and Specifications 6.1.0 REFERENCES DESIRED Criteria
More informationIronton Russell Bridge Project
Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014
More informationAREMA 2008 Annual Conference. LOW PROFILE RAILROAD BRIDGE Steve K. Jacobsen, PE NNW, Inc. Rochester, Minnesota
AREMA 2008 Annual Conference LOW PROFILE RAILROAD BRIDGE Steve K. Jacobsen, PE NNW, Inc. Rochester, Minnesota 55904 507-281-5188 Steve K. Jacobsen, PE 2 LOW PROFILE RAILROAD BRIDGE Steve K. Jacobsen, PE
More informationAPPENDIX B ABC STRUCTURES DESIGN GUIDE
APPENDIX B ABC STRUCTURES DESIGN GUIDE The Cohos Evamy Partners TABLE OF CONTENTS Page No. DISCLAIMER... I 1. STRUCTURAL DESIGN GUIDELINES... 1 2. GENERAL REQUIREMENTS (FIGURE B.2, STEP 1)... 1 3. GENERAL
More informationCONCRETE SPLICED GIRDERS IN TEXAS. Nicholas Nemec, P.E. TxDOT-BRG
CONCRETE SPLICED GIRDERS IN TEXAS Nicholas Nemec, P.E. TxDOT-BRG October 15, 2014 What is a Concrete Spliced Girder? 2 What is a Concrete Spliced Girder? What it is NOT : Continuous For Live Load 3 What
More informationApplication of Ultra High Performance Concrete in Expediting the Replacement and Rehabilitation of Highway Bridges
Application of Ultra High Performance Concrete in Expediting the Replacement and Rehabilitation of Highway Bridges Abstract M. Ataur Rahman, P.Eng., Ph.D. and Tyler McQuaker, P.Eng. Ministry of Transportation
More informationJohn James Audubon Bridge
John James Audubon Bridge Cable-Stayed Main Span Over the Mississippi River Johns Hopkins University Whiting School of Engineering September 10, 2008 The Project Scheduled Time to Complete Estimated Number
More informationAASHTOWare BrD 6.8. BrR and BrD Tutorial. PS7-3 Stem PS Bridge Example
AASHTOWare BrD 6.8 BrR and BrD Tutorial PS7-3 Stem PS Bridge Example BrR and BrD Training PS7 3 Stem PS Bridge Example From the Bridge Explorer create a new bridge and enter the following description data.
More informationBids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)
General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER
More informationMIDAS Civil 2016 v2.1 Release Webinar. PSC Composite Design Check / Load rating
2016 v2.1 Release Webinar PSC Composite Design Check / Load rating What is Composite Girder Module? Wizard-modeling - Steel Composite Bridge - PSC Composite Bridge Report Generation for Design & Load Rating
More informationACHD Bridge and Culvert Policy DRAFT
ACHD Bridge and Culvert Policy DRAFT Standard Drawings and additional construction details are contained in the separate ACHD Bridge Design Guide and are hereto made part of this policy by reference. DEFINITIONS
More informationProposed Modifications to the LRFD Design of U-Beam Bearings
Proposed Modifications to the LRFD Design of U-Beam Bearings Charles D. Newhouse, Scott A. Bole, W. R. Burkett, Phillip T. Nash, Mostafa El-Shami Performed in Cooperation with the Texas Department of Transportation
More informationPENNDOT e-notification
PENNDOT e-notification Bureau of Design Engineering Computing Management Division BRADD No. 029 December 5, 2011 Release of Version 3.1.6.0 PennDOT's Bridge Automated Design and Drafting Software (BRADD)
More informationJohn James Audubon Bridge. Introduction
John James Audubon Bridge Introduction The Project Why build the bridge? The bridge--proposed to be the longest cable-stayed bridge in America--will replace an existing ferry between the communities of
More informationB R I D G E O F F I C E
LRFD Bridge Design Manual BRIDGE OFFICE MANUAL 5-392 MINNESOTA DEPARTMENT OF TRANSPORTATION Bridge Office LRFD Bridge Design Manual MnDOT BRIDGE OFFICE LRFD Bridge Design Manual Minnesota Department of
More informationB R I D G E O F F I C E
LRFD Bridge Design Manual BRIDGE OFFICE MANUAL 5-392 MINNESOTA DEPARTMENT OF TRANSPORTATION Bridge Office LRFD Bridge Design Manual MnDOT BRIDGE OFFICE LRFD Bridge Design Manual Minnesota Department of
More informationSection 708. PRESTRESSED CONCRETE
708.02 Section 708. PRESTRESSED CONCRETE 708.01. Description. This work consists of manufacturing and erecting prestressed concrete. 708.02. Materials. Provide materials in accordance with the following:
More informationBridge and Culvert Design Standards
3004 ROADWAY DESIGN STANDARDS 3004.1 Roadway Design Roadway planning and design for the public road system shall conform to the following guidelines and referenced specifications. Use the most current
More informationBRIDGE STANDARD PLANS AND SPECIAL DETAILS ADAM LANCASTER, P.E. FEB. 27, 2018
BRIDGE STANDARD PLANS AND SPECIAL DETAILS ADAM LANCASTER, P.E. FEB. 27, 2018 NEW PUBLICATIONS 2016 LOUISIANA STANDARD SPECIFICATIONS FOR ROADS AND BRIDGES M.A.S.H. HIGHWAY GUARD RAIL STANDARD PLANS GUARD
More informationBoeing North Bridge: Lessons Learned in Accelerated Bridge Construction
Boeing North Bridge: Lessons Learned in Accelerated Bridge Construction Gregory A. Banks, Myles Parrish, Charles W. Spry WSDOT ABC Workshop April 2015 Project Overview Location Located in Renton, WA PROJECT
More informationSECTION 415 REINFORCING FOR CONCRETE
SECTION 415 REINFORCING FOR CONCRETE Module 5 August 2018 Release 10, Module 5 1 Release 10, August 2018 5-1 415 1 Description Furnish and place steel and fiber reinforced polymer (FRP) reinforcing of