1 SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE Keith Donington, P.E. October

2 Sibley Pond - Bridge Elevation 2

3 Bridge Open to Traffic November

4 Bridge Highlights General: Design-Build Project Bridge designed and constructed in 15 months Opened to traffic in November 2011 more than 10 months ahead of the owner set completion date of October 2012 First design of PCI s NEXT D (Northeast Extreme Double Tee Beam) with full depth integral deck NEXT D and NEXT F were new beam sections developed by PCI New England in response to FHWA s nationwide initiative for Accelerated Bridge Construction (ABC) NEXT D - 8 inch full depth integral deck slab NEXT F - 4 inch form deck w/cip topping NEXT D selected as faster to erect, less costly, improved durability, and perceived higher technical score for D/B 4

5 Bridge Facts Type of Bridge: Highway Bridge Stream/Pond Crossing Structure & Geometry: No. of Spans 10 spans arranged in two 5-span continuous units and a single expansion joint located in the center Continuity Spans continuous for LL and SDL Span Length 79-0 Overall Length C.L. to C.L. of end abutments Overall Width 36-0 curb to curb No. of Traffic Lanes 2 Alignment /Skew Tangent /0 skew Longitudinal Grade ± 1.0% with crown at center of bridge 5

6 Bridge Highlights Design & Construction: Designed to AASHTO LRFD Bridge Design Specifications for HL-93 loading for all limit states except for Strength I LL for Strength I Limit State is MaineDOT Modified Live Load consisting of the standard HL-93 Live Load with 25% increase in the design truck Bridge designed to 100-year design life per owner s project requirements 6

7 Sibley Pond - Site Plan 7

8 Design Parameters Substructure: Organic Silt Silty Sand / Silty Clay Silty/Gravely Sand Fine Sand Bedrock Subsurface Profile 8

9 Pile Driving Steel pipe piles for piers near the north abutment were driven from the old road during the first winter Remainder of the piles were driven by leapfrogging the pile driving crane from pier to pier, supported by temporary decking and temporary intermediate steel pile bents Pile Driving Operations 9

10 Intermediate Pier Bents Elevation of several pier bents Fixed pier bent 10

11 Design Parameters Superstructure: 11

12 Design Parameters Superstructure: 12

13 Design Parameters Longitudinal Joint detail: 13

14 PCI NEXT D Beam NEXT D Beam in casting bed NEXT D Beam with steel studs 14

15 PCI NEXT D Beam NEXT D Beam lifted from casting bed Completed NEXT D Beams 15

16 Beam Erection 4 79 beams/ span erected using a custom gantry crane PB designed the gantry transverse support beam system Gantry lifted the beams from the transporter vehicle parked on the old bridge deck Transporter removed, steel rail beams inserted Gantry rolled sideways across the new piers on Hillman Rollers. Beams lowered onto the bearings Less costly and quicker than 2 crane pick 4 beams erected in an eight-hour shift turnaround time of 2 days per span Beam Erection Operations 16

17 Existing Bridge Conditions 17

18 Deck View 18

19 PCI NEXT D Beam Innovations: - Ends of beams - no rebar or strand projections allowed to clear legs of gantry crane - For live load negative moment continuity over the piers, mechanical couplers were detailed to field splice the splice bars between adjacent beams - This layout required the precaster to align the deck rebars from adjacent beams to tight tolerances Couplers for (-) Moment continuity at intermediate diaphragms 19

20 PCI NEXT D Beam Innovations: - For positive moment continuity, a special detail was developed for the bottom reinforcement using a steel end plate with ASTM A706 weldable rebar - In shop, steel plate and rebar assemblies were cast into ends of NEXT D forms - In field, following removal of the gantry rail support system, hooked rebars were field welded to the steel plates Couplers for (+) Moment continuity at intermediate diaphragms 20

21 Durability 100yr Life Superstructure: NEXT D beams were selected by D/B team for best technical score as well as cost considerations NEXT D has integral deck which is both precast and prestressed Beams used a HP performance/self-consolidating concrete mix with 5.5 gals/cy calcium nitrite corrosion inhibitor (DCI) 8,000 psi was specified by design but 10,000 psi concrete was consistently achieved by the precaster CIP concrete construction was limited to only the curbs, longitudinal closure joints, and pier continuity diaphragms HPC was also specified for all field-placed concrete along with 5.5 gals/cy of DCI MMFX rebar specified in exposed bridge curbs and rail transition barriers Deck protection: HP machine hot applied deck waterproofing with 3 inch minimum asphalt overlay Only one expansion joint in 790 ft, located at high point, with semi-integral abutments at ends Substructure: Concrete filled steel pipe piles are protected with a shop applied fusion bonded epoxy coating system, extending from the top of the pile to 10 feet (3 meters) below the mud line 21

22 Acknowledgments Owner: Maine Department of Transportation, Augusta, ME Contractor: The Lane Construction Corp., Bangor, ME Engineer/Designer: Parsons Brinckerhoff, Inc., Manchester, NH/Boston MA Precaster: J.P. Carrara & Sons, Inc., Middlebury, VT PCINE 22

23 Questions? 23

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT PROJECT ROUTE 2, CANAAN/PITTSFIELD, MAINE

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT PROJECT ROUTE 2, CANAAN/PITTSFIELD, MAINE SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT PROJECT ROUTE 2, CANAAN/PITTSFIELD, MAINE G. Keith Donington, PE, Parsons Brinckerhoff, Manchester, NH Hany L. Riad, PhD, PE, Parsons Brinckerhoff, Boston, MA

More information

Northeast Extreme Tee (NEXT) Beam with Rochester VT Case Study

Northeast Extreme Tee (NEXT) Beam with Rochester VT Case Study ABC UTC Webinar 2-15-18 Northeast Extreme Tee (NEXT) Beam with Rochester VT Case Study Speakers: Rita Seraderian, PE., Executive Director Precast/Prestressed Concrete Institute Northeast Belmont, MA Rob

More information

1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY

1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY Detailing of ABC Bridges for Simplicity and Durability Michael P. Culmo, P.E. CME Associates, Inc. East Hartford, CT DETAILS This presentation contains many preferred details My favorite details will be

More information

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA ASHE NATIONAL PROJECT OF THE YEAR SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA For the PENNSYLVANIA DEPARTMENT OF TRANSPORTATION Engineering District 12-0 Submitted By: January 29, 2018 AMERICAN

More information

Applications of Ultra High Performance Concrete and Prefabricated Concrete Elements in Accelerated Bridge Construction

Applications of Ultra High Performance Concrete and Prefabricated Concrete Elements in Accelerated Bridge Construction Applications of Ultra High Performance Concrete and Prefabricated Concrete Elements in Accelerated Bridge Construction 2018 Virginia Concrete Conference March 2, 2018 Bardia Emami, PE Outline Projects

More information

Accelerated Bridge Construction in USA

Accelerated Bridge Construction in USA Accelerated Bridge Construction in USA Abstract Rush hour traffic is a common daily occurrence in the USA. Highway and bridge construction further aggravates the situation. The Federal Highway Administration

More information

LRFD Bridge Design Manual Changes

LRFD Bridge Design Manual Changes LRFD Bridge Design Manual Changes Dave Dahlberg Bridge Design Manual & Policy Engineer May 17, 2017 Bridge Office mndot.gov/bridge Overview 1) Concrete mix designations 2) Reinforcing bar development and

More information

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc. Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on

More information

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Washington State s Skagit River Bridge Emergency Slide Bijan Khaleghi

More information

ABC, FHWA SHRP2 R04: Project update, lessons learned. Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead

ABC, FHWA SHRP2 R04: Project update, lessons learned. Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead ABC, FHWA SHRP2 R04: Project update, lessons learned Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead January 11, 2015 Goals for ABC Enhanced Mobility Safety Reduced Costs***

More information

PHASING CONSIDERATIONS FOR BRIDGES

PHASING CONSIDERATIONS FOR BRIDGES PHASING CONSIDERATIONS FOR BRIDGES Christopher Miller, P.E. 6/11/18 Table of contents 1 What Not to Do 3 2 Span Arrangement 4-9 3 4 5 6 Superstructure Geometric Considerations Superstructure Structural

More information

ACCELERATED BRIDGE CONSTRUCTION IN TEXAS. Michael D. Hyzak, PE 1 Gregg A. Freeby, PE 2 Lloyd M. Wolf, PE 3 David P. Hohmann, PE 4 John M.

ACCELERATED BRIDGE CONSTRUCTION IN TEXAS. Michael D. Hyzak, PE 1 Gregg A. Freeby, PE 2 Lloyd M. Wolf, PE 3 David P. Hohmann, PE 4 John M. ACCELERATED BRIDGE CONSTRUCTION IN TEXAS Michael D. Hyzak, PE 1 Gregg A. Freeby, PE 2 Lloyd M. Wolf, PE 3 David P. Hohmann, PE 4 John M. Holt, PE 5 ABSTRACT The Texas Department of Transportation (TxDOT)

More information

DESIGN AND ANALYSIS OF PRECAST CONCRETE BRIDGES IN AREAS OF HIGH OR MODERATE SEISMICITY

DESIGN AND ANALYSIS OF PRECAST CONCRETE BRIDGES IN AREAS OF HIGH OR MODERATE SEISMICITY DESIGN AND ANALYSIS OF PRECAST CONCRETE BRIDGES IN AREAS OF HIGH OR MODERATE SEISMICITY ABSTRACT Jugesh Kapur, PE, SE 1 The seismic design and detailing of bridges made of precast prefabricated members

More information

Benefits of Ultra-High Performance Concrete for the Rehabilitation of the Pulaski Skyway

Benefits of Ultra-High Performance Concrete for the Rehabilitation of the Pulaski Skyway Benefits of Ultra-High Performance Concrete for the Rehabilitation of the Pulaski Skyway Michael D. McDonagh, P.E., P.Eng., WSP Parsons Brinckerhoff Andrew J. Foden, Ph.D., P.E., WSP Parsons Brinckerhoff

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS

MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS SECTION 1 - MISCELLANEOUS STANDARDS 1.00.01 -.05 Table of Contents 1.11.01 Decimal Parts of a Foot and Inch 1.21.01 Factors

More information

Long Key Bridge, a spectacular example. Design Features and Prestressing Aspects of Long Key Bridge

Long Key Bridge, a spectacular example. Design Features and Prestressing Aspects of Long Key Bridge Design Features and Prestressing Aspects of Long Key Bridge { i Thomas M. Gallaway* Principal Cutler-Gallaway Services, Inc. Consulting Engineers San Antonio, Texas Long Key Bridge, a spectacular example

More information

APPENDIX G WHITTIER BRIDGE TYPE STUDY EVALUATION OF BRIDGE ALTERNATIVES

APPENDIX G WHITTIER BRIDGE TYPE STUDY EVALUATION OF BRIDGE ALTERNATIVES APPENDIX G WHITTIER BRIDGE TYPE STUDY EVALUATION OF BRIDGE ALTERNATIVES Massachusetts Department of Transportation Highway Division I-95 / Whittier Bridge Replacement Type Study Report 6. Evaluation of

More information

Accelerated Bridge Construction (ABC) National Status

Accelerated Bridge Construction (ABC) National Status Accelerated Bridge Construction (ABC) National Status by Mary Lou Ralls, P.E., Ralls Newman, LLC 88 th Annual Transportation Short Course Texas A&M University College Station, Texas Session: Construction

More information

Superstructure Guidelines

Superstructure Guidelines Superstructure Guidelines The following are additional guidelines on using the following types of superstructure. Pre-stressed Concrete Beams To check beam size use the beam size chart. The chart was created

More information

West Virginia s First ABC Deck Replacement Project Bill Manuel & Johann Aakre HNTB Corporation

West Virginia s First ABC Deck Replacement Project Bill Manuel & Johann Aakre HNTB Corporation West Virginia s First ABC Deck Replacement Project Bill Manuel & Johann Aakre 10.26.2016 HNTB Corporation Outline Overview of WV TPK Ghent NB Bridge Existing Conditions ABC Deck Replacement Alternatives

More information

How Loads Are Distributed

How Loads Are Distributed LOAD DISTRIBUTION 1 LOAD DISTRIBUTION This section illustrate how load will transmit from the deck to the stringers. Determining the fraction of load carried by a loaded member and the remainder distributed

More information

DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc.

DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc. DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc. Paper prepared for presentation at the Bridges in a Climate of Change

More information

CONNECTING PRECAST PRESTRESSED CONCRETE BRIDGE DECK PANELS WITH ULTRA HIGH PERFORMANCE CONCRETE

CONNECTING PRECAST PRESTRESSED CONCRETE BRIDGE DECK PANELS WITH ULTRA HIGH PERFORMANCE CONCRETE CONNECTING PRECAST PRESTRESSED CONCRETE BRIDGE DECK PANELS WITH ULTRA HIGH PERFORMANCE CONCRETE George Bornstedt, PE, Oregon Department of Transportation, La Grande, OR Craig Shike, PE, Oregon Department

More information

Steve Haines, P.E., Parsons, (303) , James Studer, Kiewit, (926) ,

Steve Haines, P.E., Parsons, (303) , James Studer, Kiewit, (926) , PLACEMENT OF PRECAST PRESTRESSED CONCRETE GIRDER BRIDGE SPANS WITH SELF PROPELLED MODULAR TRANSPORTERS PIONEER CROSSING DESIGN/BUILD PROJECT, AMERICAN FORK, UT Steve Haines, P.E., Parsons, (303) 831-8100,

More information

Presented by: Taya Retterer BRG Webinar July 30, 2012

Presented by: Taya Retterer BRG Webinar July 30, 2012 Presented by: Taya Retterer BRG Webinar July 30, 2012 PHASED CONSTRUCTION RECOMMENDATIONS FOR BRIDGES Will be posted to the TxDOT Website http://www.dot.state.tx.us/business/contractors_consultants/bridge/default.htm

More information

JULY 2014 LRFD BRIDGE DESIGN 5-1

JULY 2014 LRFD BRIDGE DESIGN 5-1 JULY 014 LRFD BRIDGE DESIGN 5-1 5. CONCRETE STRUCTURES Reinforced and prestressed concrete are used extensively in bridge projects. In addition to general design guidance and information on detailing practices,

More information

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Presentation Outline Project History Project Scope Construction Alternatives Plan

More information

STANDARDIZED CONCRETE BRIDGES IN TEXAS. John Holt, PE, Texas Department of Transportation Ronald Medlock, PE, Texas Department of Transportation

STANDARDIZED CONCRETE BRIDGES IN TEXAS. John Holt, PE, Texas Department of Transportation Ronald Medlock, PE, Texas Department of Transportation STANDARDIZED CONCRETE BRIDGES IN TEXAS John Holt, PE, Texas Department of Transportation Ronald Medlock, PE, Texas Department of Transportation ABSTRACT Standardized concrete bridge plans are used extensively

More information

BrD Superstructure Tutorial

BrD Superstructure Tutorial AASHTOWare BrD 6.8 BrD Superstructure Tutorial PS12 Prestressed Concrete I Beam Using BrD LRFD Engine BrD Superstructure Training PS12 - Prestressed Concrete I Beam Using BrD LRFD Engine 1'-9" 55'-6" Total

More information

PennDOT e-notification No. 13

PennDOT e-notification No. 13 PennDOT e-notification No. 13 Bureau of Project Delivery Bridge Design and Technology Division April 3, 2006 (Revised April 2016) Interim Revision to Bridge Standard Drawing(s) Drawing 86-353 PE (Change

More information

Get In, Get Out, Stay Out!

Get In, Get Out, Stay Out! Get In, Get Out, Stay Out! FHWA Accelerated Bridge Construction Program By Gary Jakovich, P.E. Senior Bridge Engineer, FHWA Virginia Concrete Conference Richmond, VA March 6-7, 2007 Federal Highway Administration

More information

A New Precast Concrete Deck System for Accelerated Bridge Construction

A New Precast Concrete Deck System for Accelerated Bridge Construction A New Precast Concrete Deck System for Accelerated Bridge Construction George Morcous 1(&), Fouad Jaber 2, and Jason Volz 2 1 University of Nebraska-Lincoln, Omaha, NE, USA 2 Nebraska Department of Roads,

More information

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT October 1, 2017 to December 31, 2017 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,

More information

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT July 1, 2017 to September 30, 2017 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,

More information

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO 43216-0899 July 17, 2015 To: Users of the Bridge Design Manual From: Tim Keller, Administrator, Office of Structural

More information

Lecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts...

Lecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts... Lecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts... LECTURE 13 May 17, 2005 May 17, 2005 1 Where we have been Basics Allowable Stress Ultimate Strength Shear Camber

More information

CHEF MENTEUR BRIDGE REPLACEMENT

CHEF MENTEUR BRIDGE REPLACEMENT CHEF MENTEUR BRIDGE REPLACEMENT Gumbo Engineers, Inc. Lucy Farrar, Travis Honore, Jeremy Vezina, Thomas Harrison PRELIMINARY DESIGN Fall 2016 Semester CE 4750 Professional Issues Mr. Miles Williams INTRODUCTION

More information

Bijan Khaleghi, Ph, D. P.E., S.E.

Bijan Khaleghi, Ph, D. P.E., S.E. 0 Submission date: July, 0 Word count: 0 Author Name: Bijan Khaleghi Affiliations: Washington State D.O.T. Address: Linderson Way SW, Tumwater WA 0 INTEGRAL BENT CAP FOR CONTINUOUS PRECAST PRESTRESSED

More information

ASCE STRUCTURAL ENGINEERING CONFERENCE. Ames Iowa

ASCE STRUCTURAL ENGINEERING CONFERENCE. Ames Iowa 2014 HDR Architecture, 2014 HDR, Inc., all rights reserved. ASCE STRUCTURAL ENGINEERING CONFERENCE Ames Iowa WHAT DO YOU DO IF YOU HAVE MORE PROJECT THAN BUDGET? DESIGN BUILDER SELECTION METHOD Fixed Price

More information

Economical Design / Case Studies

Economical Design / Case Studies Economical Design / Case Studies Alabama Technology Transfer Center Workshop Michael Barker, PE University of Wyoming & SSSBA Bridge Technology Center Outline of Today s Presentation Competitiveness of

More information

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Corrosion Resistant Reinforcing Steels (CRR) SPECIFIC SUBJECT: Plan Modifications

More information

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT)

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) SPECIAL PROVISION August 31, 2009 PROJECT # S-R399(42) PROJECT # S-R399(59) PIN # 6697/7236 SECTION 03253S BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) Add Section 03253S: PART

More information

BRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E.

BRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E. BRIDGE DESIGN MANUAL UPDATES Jamie F. Farris, P.E. October 2015 Table of Contents 1 BDM Chapter 2 Limit States and Loads 2 BDM Chapter 3 Superstructure Design 3 BDM Chapter 4 Substructure Design 4 Questions

More information

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure. Route 15/29 SBL Bridge Superstructure Replacement & Widening Existing Structure Scope Accelerated Procedure Staging (Superstructure) Preparatory Work (Substructure) NOVA District Questions EXISTING STRUCTURE

More information

Ministry of Forests & Range

Ministry of Forests & Range Ministry of Forests & Range DRAWING SCHEDULE DRAWING No. / MODEL TYPE STD-EC-040-01 STD-EC-040-02 STD-EC-040-03 STD-EC-040-04 STD-EC-040-05 STD-EC-040-06 STD-EC-040-07 STD-EC-040-08 DESCRIPTION REV. DATE

More information

CE 435/535, Fall 2003 Preliminary Design Example 1 / 6

CE 435/535, Fall 2003 Preliminary Design Example 1 / 6 CE 435/535, Fall 2003 Preliminary Design Example 1 / 6 Perform a preliminary design for a bridge on a state highway over a large creek in rural Alabama. Produce a construction layout drawing showing profile

More information

ABC Techniques for Rapid Bridge Replacement. Bala Sivakumar HNTB Corporation. Purdue Road School 2017

ABC Techniques for Rapid Bridge Replacement. Bala Sivakumar HNTB Corporation. Purdue Road School 2017 ABC Techniques for Rapid Bridge Replacement Bala Sivakumar 03.08.2017 HNTB Corporation Purdue Road School 2017 Outline Introduction to ABC ABC Technologies Precast Decks SHRP2 ABC Toolkit Implementing

More information

NCHRP Project Michael Culmo, PE CME Associates, Inc.

NCHRP Project Michael Culmo, PE CME Associates, Inc. NCHRP Project 12-102 Michael Culmo, PE CME Associates, Inc. Acknowledgements NCHRP: Waseem Dekelbab Project Panel Ahmad Abu-Hawash Iowa DOT Norman P. Marzano Jr. Rhode Island DOT Carmen Swanwick Utah DOT

More information

14. Structural Concrete

14. Structural Concrete 14. Structural Concrete 14.1. Materials 14.2. Reinforcement 14.3. Structural Concrete Design 14.4. Prestressed Concrete Girders Section 5 of the LRFD Specifications presents unified design requirements

More information

Specification Changes and Their Effect on Plans. Bridge Construction Issues. BRG VTC April, 2010

Specification Changes and Their Effect on Plans. Bridge Construction Issues. BRG VTC April, 2010 Specification Changes and Their Effect on Plans Bridge Construction Issues BRG VTC April, 2010 Brian D. Merrill, P.E. BRG Construction & Maintenance Branch Also: Common Plan Review Items Revised Specifications

More information

JFK Airport Light Rail Transit System

JFK Airport Light Rail Transit System JFK Airport Light Rail Transit System Author: Co-Author: Company: José M. Rodriguez, P.E., Senior Project Director D. Brice Urquhart, P.E., Project Manager Figg Bridge Engineers, Inc. Address: 424 N. Calhoun

More information

SPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit

SPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit 2004 Specifications CSJ: 0028-09-111 SPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit 1. Description. Construct cast-in-place segmental concrete box girder superstructure according to the plans,

More information

SHRP 2 - R04 Innovative Bridge Designs for Rapid Renewal

SHRP 2 - R04 Innovative Bridge Designs for Rapid Renewal SHRP 2 - R04 Innovative Bridge Designs for Rapid Renewal FEHRL Long Life Bridges SQUARE (Brussels) Thursday June 10, 2010 Objective RAPID RENEWAL Bridge Systems WHAT IS THE BIG IDEA? Manufactured Bridges

More information

PROPOSED BEAM STABILITY SUBMITTAL REQUIREMENTS March 3, 2017

PROPOSED BEAM STABILITY SUBMITTAL REQUIREMENTS March 3, 2017 PROPOSED BEAM STABILITY SUBMITTAL REQUIREMENTS March 3, 2017 Virginia J. Epperly, PE Complex Structures Engineer Structure & Bridge Division Andrew M. Zickler, PE ABC Support & Complex Str. Program Manager

More information

Guidelines for Checking Final Design Bridge Plans

Guidelines for Checking Final Design Bridge Plans MNDOT BRIDGE OFFICE Guidelines for Checking Final Design Bridge Plans Edited by the MnDOT Bridge Office ES ESS Committee February 2018 Disclaimer: This document is meant to be used as a checklist for the

More information

New Development in Accelerated Bridge Design and Construction in WA

New Development in Accelerated Bridge Design and Construction in WA Delivery of Accelerated Bridge Construction WSDOT Workshop Wednesday April 1st, 2015 New Development in Accelerated Bridge Design and Construction in WA Washington State Department of Transportation Bridge

More information

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT October 1, 2016 to December 31, 2016 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,

More information

FEBRUARY 2019 LRFD BRIDGE DESIGN 5-1

FEBRUARY 2019 LRFD BRIDGE DESIGN 5-1 FEBRUARY 2019 LRFD BRIDGE DESIGN 5-1 5. CONCRETE STRUCTURES Reinforced and prestressed concrete are used extensively in bridge projects. In addition to general design guidance and information on detailing

More information

JOINTS TABLE OF CONTENTS CHAPTER 14

JOINTS TABLE OF CONTENTS CHAPTER 14 TABLE OF CONTENTS CHAPTER 14 FILE NO. TITLE DATE TABLE OF CONTENTS, INTRODUCTION 14.TOC-1 Table of Contents Chapter 14... 03May2018 14.00-1 Introduction Chapter 14... 03May2018 GENERAL INFORMATION 14.01-1

More information

Prestressed Concrete Girder Continuity Connection

Prestressed Concrete Girder Continuity Connection Report No: Title: Developing Organization: Precast/Prestressed Concrete Institute Technical Committee Phone - 888-700-5670 Email contact@pcine.org Website- www.pcine.org Report Date: Revision Date: Status

More information

STRUCTURES INSPECTION CERTIFICATION TRAINING COURSE

STRUCTURES INSPECTION CERTIFICATION TRAINING COURSE STRUCTURES INSPECTION CERTIFICATION TRAINING COURSE Code Pre/Route AFE Function Part 0 1000 7116 1174 N Hadley Eisenbeisz Bridge Construction Engineer Rick Brandner Mitchell Area Darrell utter Assistant

More information

PARTIAL-DEPTH PRECAST DECK PANEL DESIGN AND CONSTRUCTION IN TEXAS

PARTIAL-DEPTH PRECAST DECK PANEL DESIGN AND CONSTRUCTION IN TEXAS PARTIAL-DEPTH PRECAST DECK PANEL DESIGN AND CONSTRUCTION IN TEXAS Gregg Freeby, P.E., Leon Flournoy, P.E. & Sara Watts, E.I.T TxDOT Bridge Division Prefabricated Elements TxDOT s primary technique for

More information

Corrosion Resistant Reinforcing Steel (CRR)

Corrosion Resistant Reinforcing Steel (CRR) Corrosion Resistant Reinforcing Steel (CRR) Virginia DOT Workshop Charlottesville, VA Prasad Nallapaneni, VDOT Assistant State Structure & Bridge Engineer October 4, 2017 Presentation Outline IIM S&B 81

More information

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 Note to user: These guide specifications are provided by Mid- States Concrete Products as a service to you; they are NOT specific

More information

3.0 TEMPORARY DETOUR BRIDGES

3.0 TEMPORARY DETOUR BRIDGES 3.0 TEMPORARY DETOUR BRIDGES Table of Contents 3.1 General...1 3.2 STORAGE SITES:...2 3.3 BID ITEMS:...2 3.4 INDEX OF PLAN SHEETS with H-Pile:...3 3.5 INVENTORY SHEET FOR DETOUR BRIDGES WITH H-PILE:...4

More information

Route 360 Inverted T-beams. Carin Roberts-Wollmann Virginia Tech Tommy Cousins Clemson University Fatmir Menkulasi Louisiana Tech

Route 360 Inverted T-beams. Carin Roberts-Wollmann Virginia Tech Tommy Cousins Clemson University Fatmir Menkulasi Louisiana Tech Route 360 Inverted T-beams Carin Roberts-Wollmann Virginia Tech Tommy Cousins Clemson University Fatmir Menkulasi Louisiana Tech Background Outline Scope and Objectives Development and Testing Topping

More information

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening March 5, 2009 Nicholas J. Roper NOVA District Bridge Engineer Robert F. Price Resident Administrator of Loudoun/ Prince William Construction

More information

Short Span Steel Bridges

Short Span Steel Bridges Short Span Steel Bridges MINK 2015 Michael Barker, PE University of Wyoming & SSSBA Bridge Technology Center Outline of Today s Presentation SSSBA & espan140 Design Competitiveness of Steel Bridges Economics

More information

EGCE 406: Bridge Design

EGCE 406: Bridge Design EGCE 406: Bridge Design Design of Slab for Praveen Chompreda Mahidol University First Semester, 2006 Bridge Superstructure Outline Components of bridge Superstructure Types Materials Design of RC Deck

More information

Modeling and Design of Bridge Super Structure and Sub Structure

Modeling and Design of Bridge Super Structure and Sub Structure Topic 3 Day 2 Modeling and Design of Bridge Super Structure and Sub Structure Naveed Anwar 1. Over view of Bridge Design Process and Bridge Types 2. Advances and recent trends in Modeling and Analysis

More information

The FHWA Long-Term Bridge Performance Program

The FHWA Long-Term Bridge Performance Program The FHWA Long-Term Bridge Performance Program by John M. Hooks, J. M. Hooks & Associates An ever-growing volume of cars and trucks move people and goods on modern bridges spanning highways and topographical

More information

The Pennsylvania Rapid Bridge Replacement Project

The Pennsylvania Rapid Bridge Replacement Project 1 The rebuilding of 558 structurally deficient bridges in the Commonwealth of Pennsylvania over a 3+ year span April 2017 Charles Zugell The Plenary Walsh Keystone Partners believe engaging local community

More information

STRUCTURE SELECTION REPORT

STRUCTURE SELECTION REPORT STRUCTURE SELECTION REPORT Prepared for: City & County of Denver 201 West Colfax Avenue Denver, CO 80202 Prepared by: Felsburg Holt & Ullevig 6300 South Syracuse Way Suite 600 Centennial, CO 80111 June

More information

Presenter: Contributing Authors: Guy C. Nelson PE, SE TEG Engineering, LLC Structural Engineer

Presenter: Contributing Authors: Guy C. Nelson PE, SE TEG Engineering, LLC Structural Engineer Presenter: Guy C. Nelson PE, SE TEG Engineering, LLC Structural Engineer Contributing Authors: Bill Hazelton St. Clair County Road Commission Director of Engineering Dewayne Rogers St. Clair County Road

More information

HALLS RIVER BRIDGE REPLACEMENT

HALLS RIVER BRIDGE REPLACEMENT HALLS RIVER BRIDGE REPLACEMENT FDOT District 7 Structures Design Office Cristina Kay Suarez Mamunur Siddiqui, P.E. David Pelham Structures Designer Structures Design Engineer - SEOR Senior Structures Designer

More information

Bridge Design Guide. Bridge Division

Bridge Design Guide. Bridge Division Bridge Design Guide Bridge Division August 2018 Chapter 1 About this Guide Contents: Section 1 Introduction... 1-2 Bridge Design Guide 1-1 TxDOT August 2018 Chapter 1 About this Guide Section 1 Introduction

More information

Design and Rating of Steel Bridges

Design and Rating of Steel Bridges 2014 Bentley Systems, Incorporated Parametric and Integrated Bridge Design LEAP Bridge Steel Steve Willoughby Design and Rating of Steel Bridges 2 WWW.BENTLEY.COM 2014 Bentley Systems, Incorporated 1 Discussion

More information

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012 PROJECT UPDATE Rendering View from the City of Chesapeake Elizabeth River Boat Landing and Park looking across the Elizabeth River at Portsmouth CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA The new 5,375

More information

Structural - Engineering Review Checklist

Structural - Engineering Review Checklist Structural - Engineering Review Checklist Project: List Corridor Criteria ID Review Priority (H,M,L) TOPICS S-_-## Structural Design Codes, Manuals and Specifications 6.1.0 REFERENCES DESIRED Criteria

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014

More information

AREMA 2008 Annual Conference. LOW PROFILE RAILROAD BRIDGE Steve K. Jacobsen, PE NNW, Inc. Rochester, Minnesota

AREMA 2008 Annual Conference. LOW PROFILE RAILROAD BRIDGE Steve K. Jacobsen, PE NNW, Inc. Rochester, Minnesota AREMA 2008 Annual Conference LOW PROFILE RAILROAD BRIDGE Steve K. Jacobsen, PE NNW, Inc. Rochester, Minnesota 55904 507-281-5188 Steve K. Jacobsen, PE 2 LOW PROFILE RAILROAD BRIDGE Steve K. Jacobsen, PE

More information

APPENDIX B ABC STRUCTURES DESIGN GUIDE

APPENDIX B ABC STRUCTURES DESIGN GUIDE APPENDIX B ABC STRUCTURES DESIGN GUIDE The Cohos Evamy Partners TABLE OF CONTENTS Page No. DISCLAIMER... I 1. STRUCTURAL DESIGN GUIDELINES... 1 2. GENERAL REQUIREMENTS (FIGURE B.2, STEP 1)... 1 3. GENERAL

More information

CONCRETE SPLICED GIRDERS IN TEXAS. Nicholas Nemec, P.E. TxDOT-BRG

CONCRETE SPLICED GIRDERS IN TEXAS. Nicholas Nemec, P.E. TxDOT-BRG CONCRETE SPLICED GIRDERS IN TEXAS Nicholas Nemec, P.E. TxDOT-BRG October 15, 2014 What is a Concrete Spliced Girder? 2 What is a Concrete Spliced Girder? What it is NOT : Continuous For Live Load 3 What

More information

Application of Ultra High Performance Concrete in Expediting the Replacement and Rehabilitation of Highway Bridges

Application of Ultra High Performance Concrete in Expediting the Replacement and Rehabilitation of Highway Bridges Application of Ultra High Performance Concrete in Expediting the Replacement and Rehabilitation of Highway Bridges Abstract M. Ataur Rahman, P.Eng., Ph.D. and Tyler McQuaker, P.Eng. Ministry of Transportation

More information

John James Audubon Bridge

John James Audubon Bridge John James Audubon Bridge Cable-Stayed Main Span Over the Mississippi River Johns Hopkins University Whiting School of Engineering September 10, 2008 The Project Scheduled Time to Complete Estimated Number

More information

AASHTOWare BrD 6.8. BrR and BrD Tutorial. PS7-3 Stem PS Bridge Example

AASHTOWare BrD 6.8. BrR and BrD Tutorial. PS7-3 Stem PS Bridge Example AASHTOWare BrD 6.8 BrR and BrD Tutorial PS7-3 Stem PS Bridge Example BrR and BrD Training PS7 3 Stem PS Bridge Example From the Bridge Explorer create a new bridge and enter the following description data.

More information

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000) General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER

More information

MIDAS Civil 2016 v2.1 Release Webinar. PSC Composite Design Check / Load rating

MIDAS Civil 2016 v2.1 Release Webinar. PSC Composite Design Check / Load rating 2016 v2.1 Release Webinar PSC Composite Design Check / Load rating What is Composite Girder Module? Wizard-modeling - Steel Composite Bridge - PSC Composite Bridge Report Generation for Design & Load Rating

More information

ACHD Bridge and Culvert Policy DRAFT

ACHD Bridge and Culvert Policy DRAFT ACHD Bridge and Culvert Policy DRAFT Standard Drawings and additional construction details are contained in the separate ACHD Bridge Design Guide and are hereto made part of this policy by reference. DEFINITIONS

More information

Proposed Modifications to the LRFD Design of U-Beam Bearings

Proposed Modifications to the LRFD Design of U-Beam Bearings Proposed Modifications to the LRFD Design of U-Beam Bearings Charles D. Newhouse, Scott A. Bole, W. R. Burkett, Phillip T. Nash, Mostafa El-Shami Performed in Cooperation with the Texas Department of Transportation

More information

PENNDOT e-notification

PENNDOT e-notification PENNDOT e-notification Bureau of Design Engineering Computing Management Division BRADD No. 029 December 5, 2011 Release of Version 3.1.6.0 PennDOT's Bridge Automated Design and Drafting Software (BRADD)

More information

John James Audubon Bridge. Introduction

John James Audubon Bridge. Introduction John James Audubon Bridge Introduction The Project Why build the bridge? The bridge--proposed to be the longest cable-stayed bridge in America--will replace an existing ferry between the communities of

More information

B R I D G E O F F I C E

B R I D G E O F F I C E LRFD Bridge Design Manual BRIDGE OFFICE MANUAL 5-392 MINNESOTA DEPARTMENT OF TRANSPORTATION Bridge Office LRFD Bridge Design Manual MnDOT BRIDGE OFFICE LRFD Bridge Design Manual Minnesota Department of

More information

B R I D G E O F F I C E

B R I D G E O F F I C E LRFD Bridge Design Manual BRIDGE OFFICE MANUAL 5-392 MINNESOTA DEPARTMENT OF TRANSPORTATION Bridge Office LRFD Bridge Design Manual MnDOT BRIDGE OFFICE LRFD Bridge Design Manual Minnesota Department of

More information

Section 708. PRESTRESSED CONCRETE

Section 708. PRESTRESSED CONCRETE 708.02 Section 708. PRESTRESSED CONCRETE 708.01. Description. This work consists of manufacturing and erecting prestressed concrete. 708.02. Materials. Provide materials in accordance with the following:

More information

Bridge and Culvert Design Standards

Bridge and Culvert Design Standards 3004 ROADWAY DESIGN STANDARDS 3004.1 Roadway Design Roadway planning and design for the public road system shall conform to the following guidelines and referenced specifications. Use the most current

More information

BRIDGE STANDARD PLANS AND SPECIAL DETAILS ADAM LANCASTER, P.E. FEB. 27, 2018

BRIDGE STANDARD PLANS AND SPECIAL DETAILS ADAM LANCASTER, P.E. FEB. 27, 2018 BRIDGE STANDARD PLANS AND SPECIAL DETAILS ADAM LANCASTER, P.E. FEB. 27, 2018 NEW PUBLICATIONS 2016 LOUISIANA STANDARD SPECIFICATIONS FOR ROADS AND BRIDGES M.A.S.H. HIGHWAY GUARD RAIL STANDARD PLANS GUARD

More information

Boeing North Bridge: Lessons Learned in Accelerated Bridge Construction

Boeing North Bridge: Lessons Learned in Accelerated Bridge Construction Boeing North Bridge: Lessons Learned in Accelerated Bridge Construction Gregory A. Banks, Myles Parrish, Charles W. Spry WSDOT ABC Workshop April 2015 Project Overview Location Located in Renton, WA PROJECT

More information

SECTION 415 REINFORCING FOR CONCRETE

SECTION 415 REINFORCING FOR CONCRETE SECTION 415 REINFORCING FOR CONCRETE Module 5 August 2018 Release 10, Module 5 1 Release 10, August 2018 5-1 415 1 Description Furnish and place steel and fiber reinforced polymer (FRP) reinforcing of

More information