1 Ruling No Application No BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article of Regulation 403, as amended by O. Reg. 22/98, 102/98, 122/98, 152/99, 278/99, 593/99, 597/99, 205/00, 283/01 and 220/02 (the Ontario Building Code ). AND IN THE MATTER OF an application by Grace Sweatman, Christie Gardens, for the resolution of a dispute with Ann Borooah, Chief Building Official, City of Toronto, to determine whether the asinstalled vertical exhaust shafts serving a residential high rise building which extend three storeys in height, and which are constructed using paper-lined gypsum shaftboard liners, comply with the intent of Sentence (1) of the Ontario Building Code (OBC) or, in the alternative, whether these same shafts provide sufficiency of compliance with Sentence (2) of the OBC at 600 Melita Crescent, Toronto, Ontario. APPLICANT RESPONDENT PANEL PLACE Grace Sweatmam Christie Gardens Toronto, Ontario Ann Borooah Chief Building Official City of Toronto Len King, Vice-Chair Gary Burtch Donald Pratt Toronto, Ontario DATE OF HEARING December 4, 2003 DATE OF RULING December 4, 2003 APPEARANCES Randy Brown Randy Brown & Associates Willowdale, Ontario The Applicant Peter Kaczmarek Building Inspector City of Toronto Designate for the Respondent

2 -2- RULING 1. The Applicant Grace Sweatman, Christie Gardens, has received a building permit under the Building Code Act, S.O. 1992, c. 23, as amended, and is constructing an addition to an existing building referred to as Christie Gardens, 600 Melita Crescent, Toronto, Ontario. 2. Description of Construction The Applicant is constructing an addition to an existing building that contains a Group A, Division 2 assembly occupancy, Group B, Division 2 care and treatment occupancy, Group C residential occupancy, and Group F, Division 3 low hazard industrial occupancy. The structure is seven storeys in building height, with a three storey addition being constructed on top of the existing building. The building is approximately 4, 642 m 2 in building area and is comprised of non-combustible construction. The building is partially sprinklered and is equipped with both a fire alarm and standpipe and hose system. The construction at dispute pertains to the vertical exhaust shafts that have been used in the three storey addition. The subject exhaust shafts are constructed as extensions of brick-lined exhaust shafts serving the residential units in the existing seven storey building. The subject exhaust shafts are located within the new building envelope rising vertically to the roof and are finished with an enclosed exhaust fan. There are 24 shafts at issue. They range in size between 203 mm x 305 mm (8 in x 12 in) and 203 mm x 457 mm (8 in x 18 in). The various connector ducts supplying these exhaust shafts are 101 mm (4 in) in diameter. The subject exhaust shafts are constructed as 1 hr. fire separations in accordance with cul Design No. U 469, using paper-lined shaftboard liners. 3. Dispute The issue at dispute between the Applicant and Respondent pertains to whether the as-installed vertical exhaust shafts serving a residential high rise building which extend three storeys in height, and which are constructed using paper-lined gypsum shaftboard liners, comply with the intent of Sentence (1) of the Ontario Building Code (OBC) or, in the alternative, whether these same shafts provide sufficiency of compliance with Sentence (2) of the OBC. Sentence (1) of Article of the OBC outlines the various materials that are permitted to be used in the construction of ducts, duct connectors, associated fittings and plenums used in air duct systems. As per the requirements of Sentence (1), all ducts shall be constructed of steel, aluminum alloy, copper, clay, asbestos-cement or similar noncombustible material. Noncombustible is a defined term in the Code. Its meaning is found in Article ; Noncombustible means that a material meets the acceptance criteria of CAN4-S114, Standard Method for Determination of Non-Combustibility in Building Materials. It should be noted that Article of the Code provides a list of minor combustible components that are permitted to be found in a building that is required to be of non-combustible construction. Of particular importance to the issue at dispute is Clause (1)(b), which permits the use of tightly adhering paper covering not more than 1 mm (0.039 in) thick applied to noncombustible backing

3 -3- provided that the assembly has a flame-spread rating not more than 25. The as-installed exhaust shafts at dispute have been constructed using paper-lined gypsum shaftboard liners and have a flame-spread rating of 20. Sentence (2) is an exception to Sentence (1) of the Code in that it permits ducts, associated fittings, and plenums to contain combustible material provided that they comply with the stipulated clauses that are assigned therein. In Clause (2)(a), ducts, associated fittings, and plenums are permitted to contain combustible material provided they conform to the appropriate requirements for Class 1 duct materials in CAN/ULC-S110-M, Standard Methods of Test for Air Ducts. The Standard CAN/ULC-S110-M includes tests with respect to surface burning, flame penetration, corrosion, mould growth and humidity, temperature, puncture, static load, impact, erosion, tension, pressure, collapse, bending and leakage. In terms of fire safety, the standard permits combustible air ducts and connectors provided that they have a flame spread rating of not more than 25 and a smoke developed classification of no greater than 50. It should also be noted that the standard requires mould growth and humidity tests in situations where a duct carries air that contains excessive moisture or is exposed to moisture. The ducts must also have no appreciable loss of strength when wet and must be corrosion resistant. Also relevant to the case at dispute is Clause (2)(e), which limits the use of ducts containing combustible materials to vertical runs serving only two storeys in a non-combustible building. The purpose of this Code provision is to minimize the fire load and heat generation in the case of fire, as well as limit the spread of fire and production of combustion products, such as smoke, in air distribution systems. As previously mentioned, the subject exhaust shafts rise vertically through the three storey addition and, as such, are in contravention with the two-storey vertical run limit stipulated in Clause (2)(e) of the Code. The root of the issue at dispute, therefore, appears to be whether the exemption for combustible materials found in Clause (1)(b) of the OBC is intended to extend also to the requirement for noncombustible shafts found in Sentence (1). If so, there is no need to examine the as-installed exhaust shafts against the requirements found in Sentence (2). In other words, the exemption found there is not necessary and not applicable. If, however, the duct material is considered to be combustible, then Sentences (2) to (4) are applicable. Moreover, if the criteria set out in Sentences (2) to (4) are not met then the proposal will be assessed for its sufficiency of compliance with these Sentences. 4. Provisions of the Ontario Building Code Materials in Air Duct Systems (1) Except as provided in Sentences (2) to (4) and in Article , all ducts, duct connectors, associated fittings and plenums used in air duct systems shall be constructed of steel, aluminum alloy, copper, clay, asbestos-cement or similar noncombustible material. (2) Ducts, associated fittings and plenums are permitted to contain combustible material provided they (a) conform to the appropriate requirements for Class 1 duct materials in CAN/ULC-S110- M, "Standard Methods of Test for Air Ducts", (b) conform to Article in a building required to be of noncombustible construction, (c) conform to Subsection , (d) are not used in horizontal runs in a building required to be of noncombustible construction, (e) are not used in vertical runs serving more than 2 storeys in a building required to be of noncombustible construction, and (f) are not used in air duct systems in which the air temperature may exceed 120 C (248 F).

4 -4- (3) Duct sealants shall have a flame-spread rating of not more than 25 and a smoke developed classification of not more than 50. (4) Duct connectors that contain combustible materials and that are used between ducts and air outlet units shall (a) conform to the appropriate requirements for Class 1 air duct materials in CAN/ULC-S110-M, "Standard Methods of Test for Air Ducts", (b) be limited to 4 m (13 ft 1 in) in length, (c) be used only in horizontal runs, and (d) not penetrate required fire separations. (5) Materials in Sentences (1) to (4) which when used in a location where they may be subjected to excessive moisture shall have no appreciable loss of strength when wet and shall be corrosion-resistant. 5. Applicant s Position The Agent for the Applicant began by providing a brief overview of the building at dispute. He stated that the project involves a three storey addition on top of an existing seven story residential building. The Agent advised that the issue at dispute pertains to the construction of the exhaust shafts that serve the kitchens and bathrooms of both new and existing residential units. As described by the Agent, the shaft walls consist of one layer of e inch Type X gypsum wallboard on steel studs with 25 mm shaft liner panels. As per the Agent, this design is in accordance with cul Design No. U469, and achieves a 1 hour fire-resistance rating. The Agent submitted that while gypsum board has combustible properties, it is his belief that the asconstructed exhaust shafts comply with Sentence (1) of the OBC. He stated that since Clause (1)(b) of the Code specifically permits the use of tightly adhered paper on noncombustible backing provided the assembly has a flame spread rating of not more than 25, it is his opinion that the as-constructed exhaust shafts, with a flame spread rating of 20, meet the intent of noncombustibility inherent within Sentence (1). In this regard, the Agent submitted that since the as-installed exhaust shafts comply with Sentence (1), there is no need to assess them on the basis of their compliance with Sentences (2) to (4) of the Code. The Agent stated that he disagrees with the Respondent s position that the subject exhaust shafts are combustible since they are constructed using paper-lined gypsum, and as a result their construction is required to meet the provisions of Sentence (2) of the OBC. He noted that the Respondent is of the view that the subject shafts do not comply with Clause (a) or (e) of this provision, nor do they comply with the CAN/ULC-S110-M Standard Method of Test for Air Ducts or the two storey vertical rise limit respectively. In response, the Agent acknowledged that the shafts do rise three storeys, however, he reiterated his position that, in his view, the gypsum constructed shafts are an equivalent to the ducts specified in Sentence (1) of the Code. The Agent then stated that he also disputed the Respondent s concern regarding whether the subject exhaust shafts are prone to excessive moisture and will thereby experience mould and mildew growth. He indicated that while some condensation may occur, it his opinion that the shafts will not be subjected to excessive moisture. He argued that as the exhaust shafts serving the residential units are only marginally humidified and are located in interior walls, the dew point of the exhausted air will not be reached. Consequently, mould and mildew will not grow in the as-built shafts, existing and new. As support for this argument, the Agent referenced a letter from the project s mechanical engineer indicating that the conditions for condensation and thus potential mould and mildew growth would not occur in the subject building. The Agent continued by stating that Sentence (5) of the Code

5 -5- addresses the issue of excessive moisture and that this would not be a problem in the building at dispute and the shafts will not experience an appreciable loss in strength as a result. When questioned, the Agent advised that the Applicant was not made aware of the fact that the 24 subject air shafts were an issue until after the renovation was complete, which was in the summer of He also stated that he found the municipality s position to be surprising, because there is ample precedence of the use of the exhaust shafts at dispute and that their installation is quite common. In summary, the Agent submitted that while gypsum board has combustible properties, it is his belief that the subject exhaust shafts can be viewed as an equivalent to those required under Sentence (1) of the OBC, since Clause (1)(b) of the Code specifically permits the use of tightly adhered paper on noncombustible backing with a flame spread of less than 25. The Agent maintained that compliance has, in his opinion, been achieved with Sentence (1) and, therefore, the asinstalled exhaust shafts do not need to be assessed on the basis of their compliance with Sentences (2) to (4) of the Code. 6. Respondent s Position The Designate for the Respondent submitted that Sentences (1) and (2) of the OBC address materials acceptable for duct system construction and also provide for exceptions. He stated that it is the Respondent s position that the construction of the subject exhaust shafts do not comply with Sentence (1) as they are viewed as being of combustible construction. The Designate submitted that, in his opinion, drywall is not a realistic material when one is exhausting a kitchen or bathroom and he stated that one cannot say that gypsum board is classified in the OBC as a non-combustible material. In this regard, the subject exhaust shafts, in his view, do not comply with Sentence (1) of the Code and, as a result, he directed the Commission s attention to Sentence (2) of the Code. Sentence (2) of the Code, the Designate explained, permits the use of ducts that are constructed of combustible material provided that they comply with the specific clauses contained therein. He then specifically addressed Clause (2)(a) of the Code, which permits the use of ducts, associated fittings, and plenums, provided that they conform to the appropriate requirements for Class 1 duct materials in CAN/ULC-S110-M, Standard Method of Test for Air Ducts. The Designate submitted that this Clause was of particular importance to the issue at dispute, because he does not know whether the subject exhaust shafts would be able to pass the tests associated with CAN/ULC-S110-M, Standard Method of Test for Air Ducts. The Designate then raised the issue of allowable height limits and stated that Clause (2)(e) maintains that ducts constructed of combustible material shall not be used in vertical runs serving more than 2 storeys. He stated that the purpose of this particular Code provision is to prevent the growth of mould and mildew in the exhaust shaft. He advised that this issue was of particular importance to the City, because the building at dispute is a home for senior citizens who are extremely vulnerable and susceptible to potential health risks. In addition to this, he added that no information was submitted by the Applicant party to indicate that gypsum board has been tested to be resistant to moisture and would therefore make this material acceptable under Sentence (5) of the Code. In summary, the Designate maintained that gypsum board is not an acceptable material for duct system construction. He stated that the subject exhaust shafts do not provide sufficiency of compliance with Sentences (1) and (2) of the OBC and that both their materialistic properties and installation are an inappropriate application of the Code.

6 -6-7. Commission Ruling It is the decision of the Building Code Commission that the as in-stalled exhaust shafts extending three storeys in height, which are constructed using paper-lined gypsum shaftboard liners, do not comply with the intent of Sentence (1) of the Ontario Building Code at 600 Melita Crescent, Toronto, Ontario. It is also the decision of the Building Code Commission that these same shafts do not provide sufficiency of compliance with Sentence (2) of the Code at the subject building. 8. Reasons i) Sentence (1) states that except as provided in Sentences (2) to (4) and in Article , all ducts, duct connectors, associated fittings and plenums used in air duct systems shall be constructed of steel, aluminum alloy, copper, clay, asbestos-cement or similar non-combustible material. ii) iii) iv) Non-combustible, as defined, means that a material meets the acceptance criteria of CAN4-S114 Standard Method of Test for Determination in Building Materials. Appendix A (1)(b) of the Ontario Building Code states: [g]ypsum board of the typical thickness used in building construction and that is paper faced will not generally comply with the criteria in CAN4-S114-M, Standard Method of Test for Determination of Non- Combustibility in Building Materials, even though there are no combustible components in the core. Gypsum board has satisfactory properties for resisting the spread of fire and Clause (1)(b) has been included to specifically permit the use of paper faced gypsum board in a building of noncombustible construction. The exemption found in provision (1)(b), however, in the BCC s view, is intended for the general noncombustible construction requirements of Part 3. The OBC does not state that this exemption may be extended to a Part 6 mechanical system. Sentence (2) prohibits the use of combustible elements in a vertical shaft serving more than 2 storeys. The subject building at dispute is seven stories in height, with a three storey addition. v) There were no compensating measures provided by the Applicant party.

7 -7- Dated at Toronto this 4th day in the month of December in the year 2003 for application number Len King, Vice-Chair Gary Burtch Donald Pratt

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-11-866 Application No. 2002-06 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentences 3.1.5.5.(1),

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 05-18-1032 Application No. 2005-11 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF in Article 9.10.14.11.

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-28-883 Application No. 2002-25 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Clauses 3.2.2.67.(2)(c)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 05-08-1022 Application No. 2005-03 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF in Articles 9.10.14.1.

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-22-877 Application No. 2002-19 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentences 3.3.1.2.(3),

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 01-38-831 Application # 2001-47 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24 (1) of the Building Code Act, 1992. AND IN THE MATTER OF Sentence 3.3.1.17.(1) of Regulation 403, as amended

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-04-859 Application No. 2001-81 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentences 3.2.3.7.(7)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 03-40-938 Application No. 2003-40 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 3.1.5.1. of

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-21-876 Application No. 2002-17 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 3.2.2.24. and

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 09-06-1218 Application No. B-2009-04 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF with Article 3.1.9.1.

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-13-868 Application No. 2002-11 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Articles 3.2.2.9. and

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 05-07-1021 Application No. 2005-02 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 3.2.2.67.,

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-35-890 Application No. 2002-22 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Articles 3.4.3.6. and

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-05-860 Application No. 2001-82 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 4.1.10.8. of

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 07-42-1171 Application No. B-2007-37 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentence 3.4.6.5.(8)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 09-17-1229 Application No. 2009-10 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF with Article 9.19.1.1.

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-38-893 Application No. 2002-33 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Clause 3.3.4.4.(1)(a)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 03-07-905 Application No. 2002-51 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentence 3.2.2.35.(4)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 03-16-914 Application No. 2003-08 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentence 9.8.8.2.(4)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 08-06-1180 Application No. B- 2007-49 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 7.4.8.2.,

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 08-24-1198 Application No. 2008-21 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF with Sentence 9.19.1.1.(1)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 03-34-932 Application No. 2003-41 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentence 3.7.4.1.(3)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 01-22-815 Application # 2001-14 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24 (1) of the Building Code Act, 1992. AND IN THE MATTER OF Articles 3.3.1.8. and 3.4.3.6. of Regulation

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 07-39-1168 Application No. 2007-35 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Articles 9.10.12.3.

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 04-27-982 Application No. 2004-19 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentence 9.8.8.8.(2)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 08-12-1186 Application No. 2008-03 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentence 3.6.3.1.(2)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 04-32-987 Application No. 2004-24 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Clause 3.3.2.1.(1)(c)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 05-26-1040 Application No. 2005-17 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentence 4.1.1.3.(1)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 10-21-1257 Application No. B-2010-13 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF with Articles 9.8.8.3.

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 09-14-1226 Application No. B-2009-15 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF with Clause 9.25.2.2.(1)(g)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 03-27-925 Application No. 2003-14 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Articles 9.14.2.1.,

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 05-22-1036 Application No. 2005-18 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentence 9.8.8.5.(1)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 03-32-930 Application No. 2003-31 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Articles 5.1.4.2. and

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 10-35-1271 Application No. B-2010-26 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 4.3.4.3.

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 10-37-1273 Application No. B-2010-33 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Clauses 9.7.2.1.(1)(a)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling # 01-12-805 Application # 2000-83 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24 (1) of the Building Code Act, 1992. AND IN THE MATTER OF Articles 9.26.5.1. and 9.26.5.2. of Regulation

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION - 1 - Ruling No. 07-31-1160 Application No. 2007-15 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Articles 8.7.3.2.

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-19-874 Application No. 2002-16 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 11.3.1.1. of

More information

Chapter 4-16 SPECIAL DESIGN STANDARDS FOR TYPE V CONSTRUCTION

Chapter 4-16 SPECIAL DESIGN STANDARDS FOR TYPE V CONSTRUCTION Chapter 4-16 SPECIAL DESIGN STANDARDS FOR TYPE V CONSTRUCTION Sections: 4-16-01 PURPOSE 4-16-02 APPLICABLE AREA 4-16-03 CONSTRUCTION AND OCCUPANCY 4-16-04 UPPER BUILDING AREA, HEIGHT, NUMBER OF STORIES

More information

Introduction. This Part One will address; Type 1 Fire Resistive and Type 2 Noncombustible buildings.

Introduction. This Part One will address; Type 1 Fire Resistive and Type 2 Noncombustible buildings. Introduction This Part One will address; Type 1 Fire Resistive and Type 2 Noncombustible buildings. The future presentations, will cover; Type 3 Ordinary Type 4 Heavy Timber and Type 5 Wood Frame buildings.

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 00-54-786 Application No. 2000-66 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24 (1) of the Building Code Act, 1992. AND IN THE MATTER OF Articles 9.8.8.8., 4.1.10.1. and Sentence 9.8.2.1.(1)

More information

BC BUILDING CODE ERRATA

BC BUILDING CODE ERRATA BC BUILDING CODE ERRATA The following changes should be made to print and offline copies of the 2012 BC Codes. The 2012 BC Codes subscription products include these changes. Highlighted text is used in

More information

BUILDING CODE BULLETIN

BUILDING CODE BULLETIN BUILDING CODE BULLETIN September 2010 06-BCB-007 Page 1 of 5 VENTILATION AIR FOR DWELLING UNITS IN MULTI-UNIT RESIDENTIAL BUILDINGS DISCUSSION This STANDATA has been developed to cover alternative methods

More information

NEWS LETTER MARCH 27, 2009

NEWS LETTER MARCH 27, 2009 PLANNING, BUILDING & DEVELOPMENT SERVICES DEPARTMENT 580-1 Street S.E. Medicine Hat, Alberta T1A 8E6 Telephone: 529-8374 FAX 502-8038 1 NEWS LETTER MARCH 27, 2009 GENERAL As you are probably aware there

More information

June 7, 2012 PARTIES INTERESTED IN HVAC DUCT ENCLOSURE ASSEMBLIES

June 7, 2012 PARTIES INTERESTED IN HVAC DUCT ENCLOSURE ASSEMBLIES June 7, 2012 TO: PARTIES INTERESTED IN HVAC DUCT ENCLOSURE ASSEMBLIES SUBJECT: Revisions to the Acceptance Criteria for Metallic HVAC Duct Enclosure Assemblies, Subject AC179-0612-R1 (MB/CA) Dear Colleague:

More information

Common Firestop Issues in Wood Framed Commercial Construction

Common Firestop Issues in Wood Framed Commercial Construction Common Firestop Issues in Wood Framed Commercial Construction October 2014 At the July 24, 2014 Metro KC ICC Fire and Life Safety Training all day seminar, there were multiple questions pertaining to issues

More information

BC BUILDING CODE ERRATA

BC BUILDING CODE ERRATA BC BUILDING CODE ERRATA The following changes should be made to print and offline copies of the 2012 BC Codes. The 2012 BC Codes subscription products include these changes. Highlighted text is used in

More information

Originally Issued: 08/03/2017 Revised: 02/01/2019 Valid Through: 08/31/2019

Originally Issued: 08/03/2017 Revised: 02/01/2019 Valid Through: 08/31/2019 ACCELLA POLYURETHANE SYSTEMS, LLC. 100 Enterprise Drive Cartersville, GA 30120 Phone: (770) 607-0755 www.accellapolyurethane.com BAYSEAL CC X AND BAYSEAL CC XP SPRAY-APPLIED POLYURETHANE FOAM PLASTIC INSULATION

More information

BMEC AUTHORIZATION: Camino Modular Floor System: SC Series

BMEC AUTHORIZATION: Camino Modular Floor System: SC Series 777 Bay Street, 16 th Floor Toronto, Ontario, M5G 2E5 777, rue Bay, 16 e etage Toronto, Ontario, M5G 2E5 T: F: W: 416 585 4234 416 585 7455 www.ontario.ca/buildingcode/ T: TC: W: 416 585 4234 416 585 7455

More information

CHIMNEYS AND FIREPLACES

CHIMNEYS AND FIREPLACES CHAPTER 10 CHIMNEYS AND FIREPLACES SECTION R1001 MASONRY FIREPLACES R1001.1 General. Masonry fireplaces shall be constructed in accordance with this section and the applicable provisions of Chapters 3

More information

EXETER TOWNSHIP HOOD AND DUCT SYSTEMS FOR COMMERCIAL KITCHENS

EXETER TOWNSHIP HOOD AND DUCT SYSTEMS FOR COMMERCIAL KITCHENS HOOD AND DUCT SYSTEMS FOR COMMERCIAL KITCHENS POLICY STATEMENT This policy applies to NEW Hood and Duct systems. The Authority Having Jurisdiction will not waive major criteria in the applicable standards

More information

2018 British Columbia Building Code Public Review of Proposed Changes

2018 British Columbia Building Code Public Review of Proposed Changes 2018 British Columbia Building Code Public Review of Proposed Changes PROPOSED CHANGE: Asbestos CHANGE NUMBER: 2018-BCBC-03-Asbestos CODE REFERENCE: 2015 National Building Code Division B Various Articles

More information

COUNCIL ORDER No

COUNCIL ORDER No SAFETY CODES COUNCIL #1000, 10665 Jasper Avenue N.W., Edmonton, Alberta, Canada, T5J 389 Tel: 780-413-0099 I 1-888-413-0099 Fax: 780-424-5134 I 1-888-424-5134 www.safetycodes.ab.ca COUNCIL ORDER No. 0015437

More information

Module 8: Ontario Building Code Fire and Spatial Separations

Module 8: Ontario Building Code Fire and Spatial Separations Ontario Building Code (OBC) 1. Fire Separations 2. Fire Resistance Ratings By Classification 3. Fire Resistance Ratings By Adjacent Use 4. Fire Resistance Ratings By Specific Space 5. Fire Resistance Ratings

More information

2012 & 2015 International Building Code. Section Section Section 713.4

2012 & 2015 International Building Code. Section Section Section 713.4 Pei Evaluation Service is an accredited ISO Standard 17065 Product Certifier, accredited by the IAS. This Assembly Evaluation Report represents a product that Pei ES has Evaluated and has an Assembly Evaluation

More information

2012 & 2015 International Building Code. Section Section Section Section Section Section 713.4

2012 & 2015 International Building Code. Section Section Section Section Section Section 713.4 Pei Evaluation Service is an accredited ISO Standard 17065 Product Certifier, accredited by the IAS. This Assembly Evaluation Report represents a product that Pei ES has Evaluated and has an Assembly Evaluation

More information

Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings

Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings Michelle Kam-Biron, PE, SE, SECB Senior Director, Education American Wood Council Copyright This presentation is protected

More information

Originally Issued: 11/06/2017 Valid Through: 11/30/2018

Originally Issued: 11/06/2017 Valid Through: 11/30/2018 ACCELLA POLYURETHANE SYSTEMS, LLC. SEALTITE CC+ SPRAY-APPLIED POLYURETHANE FOAM PLASTIC INSULATION CSI Section: 07 21 00 Thermal Insulation 1.0 RECOGNITION insulations described in this report have been

More information

780 CMR: 9 th Edition Massachusetts State Building Code. Presented to: BSA Codes Committee. DATE: January 20, 2016

780 CMR: 9 th Edition Massachusetts State Building Code. Presented to: BSA Codes Committee. DATE: January 20, 2016 780 CMR: 9 th Edition Massachusetts State Building Code Presented to: BSA Codes Committee DATE: January 20, 2016 This course is registered with AIA CES for continuing professional education. Credit(s)

More information

Supplementary Standard SB-12. Energy Efficiency For Housing

Supplementary Standard SB-12. Energy Efficiency For Housing OBC Excerpt: SB 12 Ministry of Municipal Affairs and Housing Building and Development Branch 2006 Building Code - Supplementary Standards Supplementary Standard SB-12 Energy Efficiency For Housing November

More information

Date of Authorization June 29, 2006 BMEC Authorization Authorization Report - Camino Modular Floor System: SC Series

Date of Authorization June 29, 2006 BMEC Authorization Authorization Report - Camino Modular Floor System: SC Series Building Materials Evaluation Commission 777 Bay Street, 2 nd Floor Toronto, Ontario, M5G 2E5 Tel: 416 585-4234 / Fax: 416 585-7531 www.obc.mah.gov.on.ca Date of Authorization June 29, 2006 BMEC Authorization

More information

2006 INTERNATIONAL MECHANICAL CODE

2006 INTERNATIONAL MECHANICAL CODE DOCUMENTATION 006 INTERNATIONAL MECHANICAL CODE Code Change No: M6-07/08 Original Proposal Table 308.6, 307..3, 506.3.., 507.4, 507.5, [F] 53.3. (IFC 909.3.; IBC [F] 90.3.), Table 603.4, 803.8, Table 803.9(),

More information

BUILDING DIVISION 120 Malabar Road, S.E., Palm Bay, FL Phone: (321) Fax: (321)

BUILDING DIVISION 120 Malabar Road, S.E., Palm Bay, FL Phone: (321) Fax: (321) BUILDING DIVISION 120 Malabar Road, S.E., Palm Bay, FL 32907 Phone: (321) 953-8924 Fax: (321) 953-8925 CUSTOMER SERVICE INFORMATION ON COMMERCIAL PLAN REVIEW REQUIRED DOCUMENTS MUST BE SUBMITTED AT TIME

More information

WOOD USE IN NONCOMBUSTIBLE BUILDINGS

WOOD USE IN NONCOMBUSTIBLE BUILDINGS INTRODUCTION The National Building Code of Canada (NBCC) 1 requires that some buildings be of noncombustible construction under its prescriptive requirements. Its use in certain types of buildings such

More information

Date of Authorization June 29, 2006 BMEC Authorization Authorization Report - Camino Modular Floor System: WC Series

Date of Authorization June 29, 2006 BMEC Authorization Authorization Report - Camino Modular Floor System: WC Series Building Materials Evaluation Commission 777 Bay Street, 2 nd Floor Toronto, Ontario, M5G 2E5 Tel: 416 585-4234 / Fax: 416 585-7531 www.obc.mah.gov.on.ca Date of Authorization June 29, 2006 BMEC Authorization

More information

2009 International Building Code Errata (Portions of text and tables not shown are unaffected by the errata)

2009 International Building Code Errata (Portions of text and tables not shown are unaffected by the errata) TWELFTH PRINTING (Updated December 6, 2016) Note for 706.5.1: This is an erratum in the 8 th, 9 th, 10 th and 11 th printing only. The reference is correct in other editions. 706.5.1 Exterior walls. Where

More information

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II Fire Inspection and Code Enforcement, 7 th Edition Chapter 6 Building Construction: Components Today we will Discuss fire walls, party walls, fire partitions, and curtain walls Discuss roof types and coverings

More information

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION CHAPTER 26 PLASTIC SECTION BC 2601 GENERAL 2601.1 Scope. These provisions shall govern the materials, design, application, construction and installation of foam plastic, foam plastic insulation, plastic

More information

Document Reference Number - CL4 CL4FIRE

Document Reference Number - CL4 CL4FIRE Fire Protection Gypsum Chase Construction and Wrap Alternatives for Commercial Kitchen Exhaust Ductwork and 1 or 2-Hour Fire-Rated Ventilation Air Ductwork in Canada Document Reference Number - CL4 - Nov

More information

BUILDING CODE VARIANCE

BUILDING CODE VARIANCE BUILDING CODE VARIANCE April 2009 06-BCV-011-R1 Page 1 of 8 DISCUSSION MULTI-LEVEL STORAGE RACKING SYSTEMS The Alberta Building Code 2006 contains no specific requirements for multi-level storage racking

More information

ICC INTERNATIONAL, MECHANICAL CODE 2012 edition

ICC INTERNATIONAL, MECHANICAL CODE 2012 edition City of Elmhurst AMENDMENTS to the ICC INTERNATIONAL, MECHANICAL CODE 2012 edition GENERAL AMENDMENTS Table of Contents 1. Applicability 2. Conflicts 3. General Amendments 4. Energy Efficiency SPECIFIC

More information

6-Storey Residential Buildings Combustible Construction. A Regulator s Perspective City of Richmond, BC Canada

6-Storey Residential Buildings Combustible Construction. A Regulator s Perspective City of Richmond, BC Canada 6-Storey Residential Buildings Combustible Construction A Regulator s Perspective City of Richmond, BC Canada Our first...learning curve Remy mid-rise Project 5388 Cambie Street, Richmond BC It s Allowed

More information

FIRE ENDURANCE RATINGS CLAY BRICK MASONRY

FIRE ENDURANCE RATINGS CLAY BRICK MASONRY FIRE ENDURANCE RATINGS OF CLAY BRICK MASONRY Prepared for: Western States Clay Products Association Submitted by: Jeffrey L. Elder Technical Committee Chair Western States Clay Products Association 386

More information

Date of Authorization February 23, 2012 BMEC Authorization Number BMEC Application A BMEC Expiration Date February 23, 2017

Date of Authorization February 23, 2012 BMEC Authorization Number BMEC Application A BMEC Expiration Date February 23, 2017 777 Bay Street, 2 nd Floor 777, rue Bay, 2 e etage Toronto, Ontario, M5G 2E5 Toronto, Ontario, M5G 2E5 T: 416 585 4234 T: 416 585 4234 F: 416 585 7531 TC: 416 585 7531 W: www.ontario.ca/buildingcode/ W:

More information

ICC-ES Evaluation Report Reissued May 1, 2010 This report is subject to re-examination in two years.

ICC-ES Evaluation Report Reissued May 1, 2010 This report is subject to re-examination in two years. ICC-ES Evaluation Report ESR-1255 Reissued May 1, 2010 This report is subject to re-examination in two years. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council

More information

Supplementary Standard SB-12. Energy Efficiency For Housing

Supplementary Standard SB-12. Energy Efficiency For Housing Ministry of Municipal Affairs and Housing Building and Development Branch 2006 Building Code - Supplementary Standards Supplementary Standard SB-12 Energy Efficiency For Housing January 1, 2012 update

More information

Deer Ridge Consulting, Inc.

Deer Ridge Consulting, Inc. Deer Ridge Consulting, Inc. Code Compliance Research Report 505 Deer Ridge Lane Ararat, VA 24053 Office: 276-755-9162 Fax: 866-441-1054 www.deer-ridge-consulting.com Subject: NCFI 12-008 Spray Polyurethane

More information

Date of Authorization September 25, 2003 BMEC Authorization BMEC #

Date of Authorization September 25, 2003 BMEC Authorization BMEC # Building Materials Evaluation Commission 777 Bay Street, 16 nd Floor Toronto, Ontario, M5G2E5 Tel: 416: 585. 4234 / Fax: 416. 585. 7455 www.ontario.ca/buildingcode Date of Authorization September 25, 2003

More information

County of Yolo Development Services Building Inspection Division

County of Yolo Development Services Building Inspection Division County of Yolo Development Services Building Inspection Division 292 W. Beamer Street Woodland, CA. 95695 www.yolocounty.org (530) 666-8775 Mechanical Plan Review Comments Plan Review No. Owners Name Job

More information

ROXUL SAFE Applications Guide

ROXUL SAFE Applications Guide FIRE-FIRST APPLICATIONS ROXUL SAFE Applications Guide TM Fire blocks, firestops, and rated assemblies 3 Introduction 4 ROCKWOOL Solutions for Fire Separation and Firestopping 6 Project The Ritz-Carlton

More information

PROPOSED CHANGE TO THE 2012 BUILDING CODE O. REG. 332/12 AS AMENDED

PROPOSED CHANGE TO THE 2012 BUILDING CODE O. REG. 332/12 AS AMENDED Ministry of Municipal Affairs PROPOSED CHANGE TO THE 2012 BUILDING CODE O. REG. 332/12 AS AMENDED CHANGE NUMBER: SOURCE: B-05-10-03 Ontario-mNBC CODE REFERENCE: Division B / 5.10.3. DESCRIPTION OF THE

More information

NATIONAL BUILDING CODE OF CANADA 1985

NATIONAL BUILDING CODE OF CANADA 1985 NATIONAL BUILDING CODE OF CANADA 1985 FIRST REVISIONS Issued by the Associate Committee on the National Building Code National Research Council of Canada Ottawa January 1986 Revisions to the National Building

More information

Ontario Building Code

Ontario Building Code Ontario Building Code An Architect s Guide May 23, 2018 Mike Seiling, CET, CBCO Chief Building Official, City of Kitchener Past President, Ontario Building Officials Association 1 TODAY S AGENDA The legislation

More information

2018 IBC Chapter 6 Types of Construction

2018 IBC Chapter 6 Types of Construction Study Session 3 2018 IBC Chapter 6 Types of Construction OBJECTIVE: REFERENCE: KEY POINTS: To gain an understanding of how a building is classified as a specific type of construction, based on the construction

More information

Village of Glen Ellyn Basement Remodeling Project Guidelines

Village of Glen Ellyn Basement Remodeling Project Guidelines Village of Glen Ellyn Basement Remodeling Project Guidelines Existing unfinished basement space is often remodeled to create more habitable (living, sleeping, eating, dining) space in a home. Building

More information

July 23, 2010 PARTIES INTERESTED IN REFLECTIVE FOIL INSULATION

July 23, 2010 PARTIES INTERESTED IN REFLECTIVE FOIL INSULATION July 23, 2010 TO: SUBJECT: PARTIES INTERESTED IN REFLECTIVE FOIL INSULATION Revisions to the Acceptance Criteria for Reflective Foil Insulation, Subject AC02-0610-R1 (LS/RB) Dear Madam or Sir: In June

More information

Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings. John Buddy Showalter, PE VP, Technology Transfer American Wood Council

Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings. John Buddy Showalter, PE VP, Technology Transfer American Wood Council Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings John Buddy Showalter, PE VP, Technology Transfer American Wood Council Copyright This presentation is protected by US and International

More information

Chapter 4 Test. Directions: Write the correct letter on the blank before each question.

Chapter 4 Test. Directions: Write the correct letter on the blank before each question. Chapter 4 Test Name: Date: Directions: Write the correct letter on the blank before each question. Objective 1: Describe the impact of fire on common building materials. 1. Which of the following is the

More information

CHIMNEYS AND FIREPLACES

CHIMNEYS AND FIREPLACES SECTION R1001 MASONRY FIREPLACES R1001.1 General. Masonry fireplaces shall be constructed in accordance with this section and the applicable provisions of Chapters 3 and 4. R1001.2 Footings and foundations.

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 08-05-1179 Application No. B-2007-48 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 6.2.1.4.

More information

Code Change No: FS43-06/07

Code Change No: FS43-06/07 CODE CHANGES RESOURCE COLLECTION INTERNATIONAL MECHANICAL CODE PART III IBC MEANS OF EGRESS Approved as Submitted Committee Reason: The revised language in Sections 1021.3 and 1022.2. would provide consistency

More information

HOUSING CONVERSION Guidelines for the conversion of a house to commercial use.

HOUSING CONVERSION Guidelines for the conversion of a house to commercial use. PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT HOUSING CONVERSION Guidelines for the conversion of a house to commercial use. HAIR 105 January 2017 contents General Information 3 Zoning Information 4 Building

More information

Interior FRT Wood. References of Previous Model Building Codes

Interior FRT Wood. References of Previous Model Building Codes Interior FRT Wood References of Previous Model Building Codes Table of Contents SBBCI Standard Building Code 1 ICBO Uniform Building Code 3 BOCA National Building Code 5 10-SBBCI STANDARD BUILDING CODE

More information

ESR-2894 Reissued April 2014 This report is subject to renewal April 1, 2016.

ESR-2894 Reissued April 2014 This report is subject to renewal April 1, 2016. ICC-ES Evaluation Report ESR-894 Reissued April 04 This report is subject to renewal April, 0. www.icc-es.org (800) 4-87 () 99-04 A Subsidiary of the International Code Council DIVISION: 07 00 00 THERMAL

More information

G59 12: Final Decision AMPC1

G59 12: Final Decision AMPC1 G59 : Final Decision AMPC 0, 406.3, 406.3., 406.3., 406.3.3, 406.3.4 Add new definition as follows: Proposed Change as Submitted PRIVATE GARAGE. A building or portion of a building in which motor vehicles

More information

Ontario s 2012 Building Code Division B, Part 7 Ontario Regulation 332/12

Ontario s 2012 Building Code Division B, Part 7 Ontario Regulation 332/12 Ontario s 2012 Building Code Division B, Part 7 Ontario Regulation 332/12 Notice: This e-learning module is intended for general information purposes only. It only highlights certain provisions of the

More information

A. This Section includes duct and plenum insulation; accessories and attachments; and sealing compounds.

A. This Section includes duct and plenum insulation; accessories and attachments; and sealing compounds. SECTION 230713 DUCT INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Regulations of Connecticut State Agencies

Regulations of Connecticut State Agencies This document was prepared by the Connecticut State Library and is provided for the convenience of the reader. This is not the official version of the regulations. The official regulations are published

More information

CTC MEETING #25 CHILD WINDOW SAFETY REPORT

CTC MEETING #25 CHILD WINDOW SAFETY REPORT CTC MEETING #25 CHILD WINDOW SAFETY REPORT The Child Window Safety SG has not met following the 2012 Final Action Hearing. Group B activities did not necessitate SG meetings as the activity will be limited

More information