1 Project name Eco-Energy Retrofit, Grove Housing Association, Belfast Project summary The mid terrace solid wall house built in 1896, is located in North Belfast and owned by Grove HA. It is already relatively energy efficient having an RD SAP rating of 57 (band D) compared to the average in Northern Ireland of 50. There is currently no insulation under the floor slab so this will be replaced with one sitting on 200mm of phenolic insulation. This house is part of a terrace of mixed social and private dwellings, so external wall insulation can not be used. Internal wall insulation, Passivhaus windows and doors and good airtightness will secure the thermal envelope. To reduce PE demand, a condensing systems boiler, MVHR, LEDs and gas clothes drier will be installed, with a 1.72kWp PV array generating electricity on site. Project Description Projected build start date 01 May 2010 Projected date of occupation 01 Nov 2010 Project stage Under construction Project location Belfast, County Antrim, Northern Ireland Energy target Retrofit for the Future Build type Refurbishment Building sector Public Residential Page 1

2 Property type Mid Terrace Existing external wall construction Solid Brick Existing external wall additional information Unrendered Existing party wall construction Solid brick Floor area 89 m² Floor area calculation method PHPP Project team Organisation Project lead Client Architect Mechanical & electrical consultant(s) Energy consultant(s) Structural engineer Quantity surveyor Other consultant Contractor Eco-Energy (NI) Ltd Eco-Energy (NI) Ltd Grove Housing Association, North Belfast Hugh Green RIBA Eco-Energy (NI) Ltd Eco-Energy (NI) Ltd Brian Murray Ltd W.B.Evans & Co Alba Thermals Ltd (Thermal bridging & condensation analysis) Design strategies Planned occupancy Family of four. Two adults and two children. Space heating strategy Natural gas system boiler coupled to a 145 litre DHW hot water cylinder. No secondary heating. The MVHR (mechanical ventilation heat recovery) system will recover the heat contained in the stale exhaust air via a heat exchanger, pre-heating the incoming fresh air. Water heating strategy Fuel strategy Renewable energy generation strategy Passive solar strategy Space heating boiler as above, coupled to a 145 litre hot water cylinder. Main gas. Mains electricity kwp of roof mounted PV array. The rear south facing windows are small and shaded by adjoining houses and yard walls. PHPP predicts available solar gains of 2.8kWh/m2/year. Solar gain will be maximised in the retrofit by using Passivhaus windows with narrow frame widths to provide maxiumum glazed area. Page 2

3 Space cooling strategy Daylighting strategy Ventilation strategy Airtightness strategy Opening windows to provide passive cross ventilation will cool in the day and purge the house at night. This will allow the option of switching off MVHR in the summer, reducing primary energy (PE) demand. Internal solar blinds and external roll out solar shading will control the solar gain in the summer season if required. Daylighting factors currently pre retrofit, front room 1.8, dining room 1.2, kitchen 1.6. The window openings within the walls of the house are fixed dimentionally. The windows to the south facing rear of the house are surrounded by the high walls of an enclosed yard and adjoining houses. The glazed area of each retrofitted Passivhaus window will be maximised by the use of narrow frames widths increasing the glazing area from what it is currently, improving daylighting with a higher daylight factor. A mechanical ventilation and heat recovery (MVHR) system will be operating throughout the heating season. The MVHR summer bypass option will draw fresh outside air from the cooler shaded north side of house and supply it into the house in the summer. Alternatively, the MVHR can be turned off in the summer to reduce PE demand and the house cooled with cross ventilation by opening windows. Masonary walls parged down to the floor slab and between floor joists. Floors taped to the walls to create an airtight seal. Internal insulation plywood substructure cut to encompass floor/ceiling joists between floors with taped joints to provide an air tight seal. Airtight membrane/vapour barrier mounted inside roof structure, bonded to parged masonary walls. Services (pipes,cables, ducting, etc) penetrations through airtight barrier sealed with gaskets, tape or airtight sealant and windows sealed to wall/airtight membrane. Socket outlet/switch boxes. ceiling roses, etc, sealed for airtightness. Page 3

4 Strategy for minimising thermal bridges Modelling strategy Insulation strategy Other relevant retrofit strategies Thermal bridging analysis conducted on each potential thermal bridge using THERM software. Replacement floor slab on top phenolic insulation will have edge insulation to minimise the thermal bridge to the adjoining walls. Flanking insulation will be installed on the internal party walls to minimise thermal bridging and prevent condensation at the junction of the party wall and external wall. Aerocell and closed cell foam insulation inserted around the face and sides of window/door frames to minimise the thermal bridge with the masonary. Whole house modelling using PHPP. The PV output was calculated manually using a PV yield for Northern Ireland of 850kWh/year per kwp. The 8 module 1.720kWp array has a predicted annual yield of 1.720kWp x 850 = 1.462kWh. Combination of aerogel and phenolic internal insulation installed on the external walls to achieve a U-value of 0.15W/m2K. Replacement of existing concrete floor (which has no insulation) with a concrete slab over phenolic insulation to achieve a U value of 0.10 W/m2K. Edge insulation to minimise thermal bridging between floor slab and walls. Removal and replacement of existing attic bedroom ceiling to allow for the installation for a combination of different types of insulation to achieve a U-value of 0.10 W/m2K. Passivhaus windows with a U value of 0.8 will be installed. Due to health and safety issues, the extent of and the length of time required to complete this initial retrofit, the tenants will be accommodated in an alternative unnoccupied spare house within the existing HA stock. For any future small scale retrofit roll out, it envisaged a spare house will be available to keep alternative (hotel) accommodation costs low. To minimise traffic disruption in narrow terraced streets and reduce the transport carbon footprint, it is proposed that all the retrofit components are containerised offsite. The loaded10 foot (the width of a terraced house) container, can then be placed in the road directly outside the house. Page 4

5 Other information (constraints or opportunities influencing project design or outcomes) 1) Standby killer electrical circuits installed in each room to enable appliances with a standby mode plugged into green socket outlets, to be switched off from one central switch. 2) A bath/shower drain water heat recovery/heat store system will pre-heat incoming mains water. This potential saving has not been entered into PHPP. The performance will be measured by installing heat meters on the inlet and outlet of the unit. Energy use Fuel use by type (kwh/yr) Fuel previous forecast measured Electri c Gas Oil LPG Wood Primary energy requirement & CO2 emissions Annual CO2 emissions (kg CO2/m².yr) Primary energy requirement (kwh/m².yr) previous forecast measured Renewable energy (kwh/yr) Renewables technology forecast measured PV's Energy consumed by generation Airtightness ( 50 Pascals ) Date of test Test result Pre-development airtightness 19 Apr Final airtightness 01 Jan Space heat demand Annual space heat demand ( kwh/m².yr ) Pre-development forecast measured Whole house energy calculation method PHPP Page 5

6 Other energy calculation method Predicted heating load Other energy target(s) 11 W/m² (demand) The project target is to achieve 3 litre house status, a term recognised in Europe depicting a house that consumes less than 3 litres oil equivalent/m2/year (30kWh/m2/year) for space heating. An aspirational target is to achieve 25kWh/m Building services Occupancy Space heating Hot water Ventilation Controls Cooking Lighting Appliances Renewables Strategy for minimising thermal bridges Building construction Storeys Volume Thermal fabric area Roof description Roof U-value Walls description Walls U-value Party walls description Party walls U-value Floor description Floor U-value Glazed doors description Glazed doors U-value Opaque doors description Opaque doors U-value Windows description Windows U-value Windows energy transmittance (G-value) Page 6

7 Windows light transmittance Rooflights description Rooflights light transmittance Rooflights U-value Page 7

8 Project images Page 8

9 Page 9

10 Page 10

11 Page 11

12 Page 12

13 Page 13

14 Page 14

Project Description. Projected build start date 12 Apr 2010 Projected date of occupation 28 Feb

Project Description. Projected build start date 12 Apr 2010 Projected date of occupation 28 Feb http://lowenergybuildings.org.uk Project name PassivHaus Retrofit - Octavia Housing Project summary PassivHaus retrofit of a three storey solid brick Victorian terraced house in a conservation area. Produce

More information

Project name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles

Project name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles http://lowenergybuildings.org.uk Project name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles Project Description Projected build start date

More information

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 31 May Aberdare, Rhondda Cynon Taff, Wales

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 31 May Aberdare, Rhondda Cynon Taff, Wales http://lowenergybuildings.org.uk Project name Self Heating Social Housing- the zero carbon retrofit Project summary The target for this project is to create the first UK PassivHaus retrofit using low/zero

More information

Project Description. Projected build start date 03 May 2010 Projected date of occupation 06 Aug

Project Description. Projected build start date 03 May 2010 Projected date of occupation 06 Aug http://lowenergybuildings.org.uk Project name Retrofit - Appledore, Ashford Project summary The key project approach is to develop a solution that uses complementary technologies and techniques, and primarily

More information

Project Description. Projected build start date 19 Apr 2010 Projected date of occupation 30 Sep

Project Description. Projected build start date 19 Apr 2010 Projected date of occupation 30 Sep http://lowenergybuildings.org.uk Project name LB Greenwich - How low can we go? Project summary Our project has sought to produce a retrofit solution which is practical to build, easy to run and maintain,

More information

Project name SOLAR HOUSE 80/50 Project summary

Project name SOLAR HOUSE 80/50 Project summary http://lowenergybuildings.org.uk Project name SOLAR HOUSE 80/50 Project summary Project Description Projected build start date 01 Mar 2010 Projected date of occupation 19 Jul 2010 Project stage Under construction

More information

Project Description. Projected build start date 15 Aug 2011 Projected date of occupation 19 Dec Existing external wall construction

Project Description. Projected build start date 15 Aug 2011 Projected date of occupation 19 Dec Existing external wall construction http://lowenergybuildings.org.uk Project name Redlands Project summary Deep retrofit of 1955 brick house in Devon based on EnerPHit standard. House had old gas boiler, double glazing, cavity wall insulation

More information

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 01 Aug Energy target.

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 01 Aug Energy target. http://lowenergybuildings.org.uk Project name Larch House, Ebbw Vale, Wales Project summary The Larch House, designed by bere:architects, is the UKs first zero carbon (code 6), low cost, Certified Passivhaus,

More information

Project Description. Projected build start date Projected date of occupation. Dungannon, County Tyrone, Northern Ireland

Project Description. Projected build start date Projected date of occupation. Dungannon, County Tyrone, Northern Ireland http://lowenergybuildings.org.uk Project name Lisnahull Project summary The terrace of 5 two storey houses have been developed as the first certified social housing project in Ireland for Oaklee Homes

More information

Project Description. Projected build start date 02 Aug 2010 Projected date of occupation 03 Dec Existing external wall construction

Project Description. Projected build start date 02 Aug 2010 Projected date of occupation 03 Dec Existing external wall construction http://lowenergybuildings.org.uk Project name Tower Hamlets - naturally ventilated Passivhaus Retrofit Project summary The property is a 3 bedroom mid terrace single family residence built in the 1960

More information

Project Description. Projected build start date 02 Aug 2010 Projected date of occupation 03 Dec

Project Description. Projected build start date 02 Aug 2010 Projected date of occupation 03 Dec http://lowenergybuildings.org.uk Project name Hounslow Council Passivhaus Retrofit - and the development of a decision making matrix Project summary The house is a 3-bedroom semi-detached single-family

More information

Project Description. Projected build start date Projected date of occupation. Existing external wall construction.

Project Description. Projected build start date Projected date of occupation. Existing external wall construction. http://lowenergybuildings.org.uk Project name Admirals Hard Project summary FINALIST of the UK Passivhaus Awards 2015 - Situated on the Stonehouse peninsula, by the banks of the River Tamar, Number 3 Admirals

More information

Project Description. Projected build start date 18 Mar 2013 Projected date of occupation 11 Nov 2013

Project Description. Projected build start date 18 Mar 2013 Projected date of occupation 11 Nov 2013 http://lowenergybuildings.org.uk Project name Coventry Eco House Project summary A project vision for Coventry & Warwickshire FORCE Group to design and build two 3 bedroom detached houses for Orbit Homes

More information

Project Description. Projected build start date 23 May 2016 Projected date of occupation 27 Feb 2017

Project Description. Projected build start date 23 May 2016 Projected date of occupation 27 Feb 2017 http://lowenergybuildings.org.uk Project name Loudon Buildings, Godinton Estate Project summary Conversion of a modern concrete framed straw barn into low energy 4 bedroom house, approved under Class Q

More information

Project Description. Projected build start date Projected date of occupation 01 Jun Low Energy Buildings

Project Description. Projected build start date Projected date of occupation 01 Jun Low Energy Buildings http://lowenergybuildings.org.uk Project name Knights Place Project summary When the client, Exeter City Council, was offered a funding opportunity by the HCA to develop the first council housing in Exeter

More information

Project Description. Projected build start date 31 Jan 2009 Projected date of occupation 31 Aug

Project Description. Projected build start date 31 Jan 2009 Projected date of occupation 31 Aug http://lowenergybuildings.org.uk Project name The Curly House Project summary Initial project meetings first started in January of 2008, the clients owned a small cottage on the site which had been extended

More information

Project name Fulford Passivhaus, York Project summary New-build singe-family detached house for individual clients. Certified as Passivhaus Plus.

Project name Fulford Passivhaus, York Project summary New-build singe-family detached house for individual clients. Certified as Passivhaus Plus. http://lowenergybuildings.org.uk Project name Fulford Passivhaus, York Project summary New-build singe-family detached house for individual clients. Certified as Passivhaus Plus. Project Description Projected

More information

Project Description. Projected build start date 01 Feb 2010 Projected date of occupation 31 May Queenborough and Rushenden, Kent, England

Project Description. Projected build start date 01 Feb 2010 Projected date of occupation 31 May Queenborough and Rushenden, Kent, England http://lowenergybuildings.org.uk Project name Low Carbon Sheppey Project summary The project involves 2 houses in Queenborough and Rushenden on the Isle of Sheppey in Kent, one a mid terrace 1974 built

More information

Project Description. Projected build start date 01 Apr 2010 Projected date of occupation 31 Jan

Project Description. Projected build start date 01 Apr 2010 Projected date of occupation 31 Jan http://lowenergybuildings.org.uk Project name The Natural Refurbishment of 1960 Laing Easiform System; Housing Study of the application of natural Hemp Insulation and Fuel Cell Technolgy Project summary

More information

Project Description. Projected build start date 11 Feb 2013 Projected date of occupation 14 Nov

Project Description. Projected build start date 11 Feb 2013 Projected date of occupation 14 Nov http://lowenergybuildings.org.uk Project name Clapham Retrofit Project summary This 4-storey semi-detached Grade II listed Victorian townhouse has been eco retrofitted to a high standard of airtightness

More information

Project name Old Dover Road Project summary Whole house retrofit and formation of new habitable roof structure

Project name Old Dover Road Project summary Whole house retrofit and formation of new habitable roof structure http://lowenergybuildings.org.uk Project name Old Dover Road Project summary Whole house retrofit and formation of new habitable roof structure Project Description Projected build start date Projected

More information

http://lowenergybuildings.org.uk Project name Grove Cottage Project summary Extension & Refurbishment of Victorian Townhouse using Passivhaus methodology and CarbonLite guidance. Certified to the Passivhaus

More information

Project Description. Projected build start date 10 Sep 2012 Projected date of occupation 03 May

Project Description. Projected build start date 10 Sep 2012 Projected date of occupation 03 May http://lowenergybuildings.org.uk Project name Bristol Retrofit Project summary A full thermal retrofit of a mid-century, three-storey property built into a hill and located within a Conservation Area in

More information

Project Description. Projected build start date 05 Jul 2010 Projected date of occupation 25 Sep

Project Description. Projected build start date 05 Jul 2010 Projected date of occupation 25 Sep http://lowenergybuildings.org.uk Project name Bringing Wates homes into the Future Project summary Wates property structural and low energy refurbishment based on an optimised structural insulated render

More information

Project Description. Projected build start date 24 Dec 2004 Projected date of occupation. Energy target. Existing external wall construction

Project Description. Projected build start date 24 Dec 2004 Projected date of occupation. Energy target. Existing external wall construction http://lowenergybuildings.org.uk Project name Withy Cottage Project summary Timber Frame & Straw Bale self build with thermal bridge free construction (other than door and window frames). Simple flat raft

More information

Project Description. Projected build start date 05 Apr 2010 Projected date of occupation. Low Energy Buildings

Project Description. Projected build start date 05 Apr 2010 Projected date of occupation.  Low Energy Buildings http://lowenergybuildings.org.uk Project name Development of an integrated Ground / Air / Solar Heat Pump for plug in retrofit Project summary The retrofit will be carried out to an occupied house owned

More information

Passivhaus Projects and Benefits

Passivhaus Projects and Benefits Passivhaus Projects and Benefits Andrew T. Arthur MPH CMCIEH Arthur Associates Passivhaus not Passive House Need to make distinction between: this and this Passivhaus Standard which was developed in Germany

More information

Single family semi-detached four-bedroom home in London, England

Single family semi-detached four-bedroom home in London, England Passivhaus Project Documentation Hiley Road Retrofit Passivhaus, London, UK Abstract Single family semi-detached four-bedroom home in London, England Building data Year of Construction 2016 0.076 Space

More information

Project name RetroPHit 04 - Steel Frame Bungalow Project summary A steel framed, brick clad bungalow built off a concrete raft foundation

Project name RetroPHit 04 - Steel Frame Bungalow Project summary A steel framed, brick clad bungalow built off a concrete raft foundation http://lowenergybuildings.org.uk Project name RetroPHit 04 - Steel Frame Bungalow Project summary A steel framed, brick clad bungalow built off a concrete raft foundation Project Description Projected

More information

Passivhaus Project Documentation Wrexham Passivhaus

Passivhaus Project Documentation Wrexham Passivhaus Passivhaus Project Documentation Wrexham Passivhaus Design/Architecture: Simmonds Mills Architects Structural ngineer: Bob Johnson Structural ngineers, Shrewsbury Building Services: Alan Clarke Passivhaus

More information

Passive House Object Documentation

Passive House Object Documentation Passive House Object Documentation Detached house with 4no. Bedrooms in Crawsfordsburn, Northern Ireland. Project Designer Mr Paul McAlister Paul McAlister Architects Ltd Year of construction 2012/2013

More information

Passive House: Overview

Passive House: Overview Passive House: Overview Wexford Local Development Maurice Falvey MosArt Passive House Academy 3,000 BC Increasing energy standards... Conventional energy standard (65kWh/m 2 /year for space heating) Low

More information

Passive House: Overview

Passive House: Overview Passive House: Overview Wexford Local Development Maurice Falvey MosArt Passive House Academy 3,000 BC Increasing energy standards... Conventional energy standard (65kWh/m 2 /year for space heating) Low

More information

LISNAHULL TERRACE, DUNGANNON IRELANDS FIRST CERTIFIED SOCIAL PASSIVE HOUSING SCHEME. Case Study

LISNAHULL TERRACE, DUNGANNON IRELANDS FIRST CERTIFIED SOCIAL PASSIVE HOUSING SCHEME. Case Study LISNAHULL TERRACE, DUNGANNON IRELANDS FIRST CERTIFIED SOCIAL PASSIVE HOUSING SCHEME Five houses recently constructed at Lisnahull Terrace, Dungannon are amongst the most energy efficient homes in Northern

More information

PassiveDesign.org. Passive Construction. Name:...

PassiveDesign.org. Passive Construction. Name:... PassiveDesign.org Passive Construction About: This handout contains the information from the Passive Construction topic pages on passivedesign.org. Name:... Passive Construction A Passivhaus is a super-insulated,

More information

BPE Case study of Pippin Close and Barnlea Close

BPE Case study of Pippin Close and Barnlea Close BPE Case study of Pippin Close and Barnlea Close Building Performance Evaluation conference 14 th July 2015 Woking Professor Rajat Gupta and Mariam Kapsali Low Carbon Building Group, Oxford Institute for

More information

14.8 kwh/(m²a) Project Documentation. 1 Abstract. R-951 Residence: Three Family Passive House Building. 1.1 Data of building. Year of construction

14.8 kwh/(m²a) Project Documentation. 1 Abstract. R-951 Residence: Three Family Passive House Building. 1.1 Data of building. Year of construction Project Documentation 1 Abstract R-951 Residence: Three Family Passive House Building 1.1 Data of building Year of construction U-value external wall/ U-Wert Außenwand 2013 0.112 W/(m²K) Space heating

More information

The Nottingham Ecohome. Part L1 (2002) in existing dwellings

The Nottingham Ecohome. Part L1 (2002) in existing dwellings The Nottingham Ecohome Part L1 (2002) in existing dwellings The Nottingham Ecohome is a refurbished Victorian house situated in West Bridgford, Nottingham, which incorporates a variety of eco-friendly

More information

Building Performance Evaluation

Building Performance Evaluation BUILDING PERFORMANCE EVALUATION CASE STUDY ONE BRIGHTON One Planet Living Zero carbon (renewable heat, on and off-site renewable electricity) Mechanical ventilation with heat recovery, communal heating,

More information

IFORE Retrofitting Works Outreau. Pre-retrofit Description

IFORE Retrofitting Works Outreau. Pre-retrofit Description IFORE Retrofitting Works Outreau Program : 2952 Address : Georges Braque Street Building year : 1979 Pre-retrofit Description 10 cm width concrete paving Floor Gable end walls Front wall Exterior render

More information

Engineers Ireland Cork Region CPD lecture series

Engineers Ireland Cork Region CPD lecture series Engineers Ireland Cork Region CPD lecture series NZEB and Emerging Legislation & SEAI s Deep Retrofit Pilot Programme Orla Coyle NZEB Programme Manager Conor Hanniffy Deep Retrofit Pilot Programme Manager

More information

LITTLEPITS PASSIVHAUS PLUS

LITTLEPITS PASSIVHAUS PLUS #UKPHC18 LITTLEPITS PASSIVHAUS PLUS with PH15 SYSTEM Jae Cotterell Chartered Architect & Certified Passivhaus Designer Director of Passivhaus Homes Ltd and Passivhaus Store Co-author of The Passivhaus

More information

Energy Efficiency Requirements 9.36

Energy Efficiency Requirements 9.36 The following information has been obtained from the HPO Illustrated Guide, Energy Efficiency Requirements for Houses in British Columbia, BCBC 9.36 & 9.32, Building Officials Association of British Columbia

More information

The BIG Energy Upgrade Energy Innovation for Retrofitting Deprived Community Housing in the UK

The BIG Energy Upgrade Energy Innovation for Retrofitting Deprived Community Housing in the UK The BIG Energy Upgrade Energy Innovation for Retrofitting Deprived Community Housing in the UK Dr. Hasim Altan Lecturer in Sustainable Environmental Design Director of BEAU Research Centre, School of Architecture

More information

Dienstleistung. Certification as "Quality Approved Passive House" Criteria for Residential-Use Passive Houses

Dienstleistung. Certification as Quality Approved Passive House Criteria for Residential-Use Passive Houses Passiv Haus Institut Passivhaus Dienstleistung GmbH Dr. Wolfgang Feist Rheinstr. 44/46 Rheinstr. 44/46 D-64283 Darmstadt D-64283 Darmstadt www.passiv.de www.passivhaus-info.de Certification as "Quality

More information

Building Better Buildings BPE Case Study Dungannon Passivhaus

Building Better Buildings BPE Case Study Dungannon Passivhaus Building Better Buildings BPE Case Study Dungannon Passivhaus Choice Housing Ireland Ltd Lisnahull Terrace, Dungannon Building Performance Evaluation The Performance Gap Lessons for industry Choice Housing

More information

Passiv Haus Institut. Certification as "Quality Approved Passive House" Criteria for Non-Residential Passive House Buildings

Passiv Haus Institut. Certification as Quality Approved Passive House Criteria for Non-Residential Passive House Buildings Passiv Haus Institut Dr. Wolfgang Feist Rheinstr. 44/46 D-64283 Darmstadt www.passiv.de Certification as "Quality Approved Passive House" Criteria for Non-Residential Passive House Buildings Passive Houses

More information

Welsh Future Homes. Developer: United Welsh Housing Association. Project Description. Architect: bere:architects. Location: Ebbw Vale, Wales

Welsh Future Homes. Developer: United Welsh Housing Association. Project Description. Architect: bere:architects. Location: Ebbw Vale, Wales Case Study 03 Welsh Future Homes Developer: United Welsh Housing Association Architect: bere:architects Location: Ebbw Vale, Wales Building Types: Residential Community Renewable & Low Carbon Technologies

More information

Passivhaus Introduction

Passivhaus Introduction Passivhaus Introduction INTEGRITY BUILDINGS LIMITED 0844 809 4588 jon@integritybuildings.co.uk www.integritybuildings.co.uk 2011 Integrity Buildings Ltd WHAT IS PASSIVHAUS Passivhaus was established in

More information

Retrofitting social housing. Presented by Denys Stephens Group Environment and Sustainability Manager Devon & Cornwall Housing

Retrofitting social housing. Presented by Denys Stephens Group Environment and Sustainability Manager Devon & Cornwall Housing Retrofitting social housing Presented by Denys Stephens Group Environment and Sustainability Manager Devon & Cornwall Housing HeatPod Project Penwith HA s Retrofit for the Future Project 2 bed end of terrace

More information

Passive Design Solutions. Passive House The Road to Net-Zero

Passive Design Solutions. Passive House The Road to Net-Zero Passive House The Road to Net-Zero Net-Zero into the Future Net-Zero defined as producing as much energy onsite as the building uses annually. Using net-metering with the grid, so grid is acting as 100%

More information

Passive House Project documentation

Passive House Project documentation Passive House Project documentation Architecture: CadViz: Building physics: ehaus, Cyril Vibert Building Services: ehaus, Cyril Vibert Craftsperson: ehaus A compact two level family home with 4 bedrooms

More information

Jon Chadwick Associated Architects. Scaling Up Passivhaus The Centre for Medicine, University of Leicester

Jon Chadwick Associated Architects. Scaling Up Passivhaus The Centre for Medicine, University of Leicester Jon Chadwick Associated Architects Scaling Up Passivhaus The Centre for Medicine, University of Leicester The Centre for Medicine, University of Leicester Overview of the Client Brief: Bring together the

More information

Primary School Retrofit Project

Primary School Retrofit Project Primary School Retrofit Project Final Design Proposal Ian Black DIT D12124703 Passiv Haus Design Criteria PHI ENERPHIT CRITERIA EnerPHit Certification based on the requirement for heating demand Heating

More information

OKO House by YOUMEHESHE architects

OKO House by YOUMEHESHE architects OKO House by YOUMEHESHE architects The OKO House The OKO House is a modular pre-fabricated design aimed initially at the European and North American housing market and to be developed for other global

More information

Proposed development of 74 no. residential units at Craddockstown Road, Cradockstown Demesne, Naas, Co. Kildare

Proposed development of 74 no. residential units at Craddockstown Road, Cradockstown Demesne, Naas, Co. Kildare Proposed development of 74 no. residential units at Craddockstown Road, Cradockstown Demesne, Naas, Co. Kildare Compliance Report on Part L, HC 12 Building Energy Rating Assignment incorporating Energy

More information

Minimum Energy Consumption 84% energy heating savings*

Minimum Energy Consumption 84% energy heating savings* 3 HOUSE DESIGNS OF 140m² A modern concept for energy efficiency ENERGY EFFICIENCY AND ENVIRONMENTAL QUALITY Minimum Energy Consumption 84% energy heating savings* * According to a home fulfilling thermal

More information

AM-55, AM-56) B U I L D I N G P A R T N E R S H I P S F O R E N E R G Y S E C U R I T Y

AM-55, AM-56) B U I L D I N G P A R T N E R S H I P S F O R E N E R G Y S E C U R I T Y Nearly zero-energy building and components of the DIRECTIVE on energy performance of buildings 2010/31/EU Albin Zsebik, PhD, CEM Improving university curricula in the areas of a) energy efficiency in the

More information

Design specifications for the Future Creating a masterpiece

Design specifications for the Future Creating a masterpiece PRES/42 Design specifications for the Future Creating a masterpiece Verney Ryan Beacon Pathway Inc Source: World Green Building Council Source: World Green Building Council as quoted by NZGBC Features

More information

Radian Group. Performance Standards. Date November Author Rachel Mitchell. Version Final (V2)

Radian Group. Performance Standards. Date November Author Rachel Mitchell. Version Final (V2) Radian Group Performance Standards Date November 2011 Author Rachel Mitchell Version Final (V2) Radian Building performance standards Contents Introduction... 3 Design considerations for Radian Housing...

More information

4.2.3 MINERGIE ORIGIN AND ORGANISATION

4.2.3 MINERGIE ORIGIN AND ORGANISATION As described earlier, the energy performance of a building is calculated and compared with the requirements for the chosen Minergie system. The calculations are then sent to a Minergie administrator who

More information

PassivTEN - Scottish Tenements and the Passivhaus Standard

PassivTEN - Scottish Tenements and the Passivhaus Standard PassivTEN - Scottish Tenements and the Passivhaus Standard Alan Benson Milnbank HA Matt Bridgestock John Gilbert Architects Tenements stats that influenced the study.. 23% of Scottish housing stock 35%

More information

PassiveDesign.org. Principles of Passive Design

PassiveDesign.org. Principles of Passive Design PassiveDesign.org Principles of Passive Design About: This handout contains the information from the Principles of Passive Design topic pages on passivedesign.org. Name:... Principles of Passive Design

More information

> Performance requirements: Part L UK vs Energiesprong vs Passivhaus.

> Performance requirements: Part L UK vs Energiesprong vs Passivhaus. > Performance requirements: Part L UK vs Energiesprong vs Passivhaus. Introduction The purpose of this paper is to highlight and compare the difference in performance requirements between UK Building Regulations

More information

PassivHaus/ EnerPHit Introduction. Maiia Guermanova behalf of

PassivHaus/ EnerPHit Introduction. Maiia Guermanova behalf of PassivHaus/ EnerPHit Introduction Maiia Guermanova behalf of Email: maiia.guermanova@sturgis.co.uk PassivHaus/ EnerPHit What is a PassivHaus/ Passive House? Passivhaus is not a brand name but a building

More information

Energy Statement. Gainsford Road. For Pocket Living. XCO2 energy. May 2016

Energy Statement. Gainsford Road. For Pocket Living. XCO2 energy. May 2016 For Pocket Living May 2016 XCO2 energy w: www.xco2energy.com :: e: mail@xco2energy.com t: +44 (0) 20 7700 1000 :: f: +44 (0) 20 7183 6620 17-18 Hayward s Place :: Clerkenwell :: London :: EC1R 0EQ Contents

More information

ECO-RETROFITTING VERY OLD DWELLINGS: CURRENT AND FUTURE ENERGY AND CARBON PERFORMANCE FOR TWO UK CITIES

ECO-RETROFITTING VERY OLD DWELLINGS: CURRENT AND FUTURE ENERGY AND CARBON PERFORMANCE FOR TWO UK CITIES ECO-RETROFITTING VERY OLD DWELLINGS: CURRENT AND FUTURE ENERGY AND CARBON PERFORMANCE FOR TWO UK CITIES HANIYEH MOHAMMADPOURKARBASI, STEVE SHARPLES School of Architecture, University of Liverpool, Liverpool,

More information

Passivhaus Documentation

Passivhaus Documentation Passivhaus Documentation Single family house, Denby Dale, West Yorkshire, UK (Passivhaus database 1779) 2.1 Bill Butcher, Project leader, Denby Dale Passivhaus, The Denby Dale Passivhaus project commenced

More information

kwh(m2a) U-Value Floor Primary Energy W/(m2K) Renewable 48 kwh/(m2a) U-Value Roof Generation of W/(m2K) renewable energy

kwh(m2a) U-Value Floor Primary Energy W/(m2K) Renewable 48 kwh/(m2a) U-Value Roof Generation of W/(m2K) renewable energy KOWHAI HOUSE, Dunedin, New Zealand 1 PHOTOGRAPHS OF THE FRONT VIEW OF THE BUILDING 1.1. BUILDING DATA Year of Construction 2017 Space Heating 15 U-Value Walls 0.147 W/(m2K) kwh(m2a) U-Value Floor Primary

More information

D3.9_Overall Refurbishment Plan DRAFT CS03. Hotel Restaurant Valcanover

D3.9_Overall Refurbishment Plan DRAFT CS03. Hotel Restaurant Valcanover D3.9_Overall Refurbishment Plan DRAFT CS03 Hotel Restaurant Valcanover INTELLIGENT ENERGY EUROPE II Energy efficiency and renewable energy in buildings IEE/12/070 EuroPHit [Improving the energy performance

More information

Related party disclosure: Technical Information Benchmark. 82 m² 249 kwh/m² per year 53 kg/m² per year

Related party disclosure: Technical Information Benchmark. 82 m² 249 kwh/m² per year 53 kg/m² per year Energy Performance Certificate Northern Ireland 13 Oaktree Drive ANTRIM BT41 1DA Date of assessment: Date of certificate: Reference number: Accreditation scheme: Assessor's name: Assessor's accreditation

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate Northern Ireland 16 Bonds Street LONDONDERRY BT47 6ED Energy Efficiency Rating Date of assessment: 15 January 01 Date of certificate: 4 January 01 Reference number: 959-1064-0339-687-4984

More information

Energy efficiency and the Code for Sustainable Homes

Energy efficiency and the Code for Sustainable Homes CE290 Energy efficiency and the Code for Sustainable Homes Level 3 Also available: Energy efficiency guidance for level 4 Energy efficiency guidance for levels 5 and 6 Contents 1. Introduction 3 1.1 The

More information

Energy-Efficient Passive House using thermal mass to achieve high thermal comfort

Energy-Efficient Passive House using thermal mass to achieve high thermal comfort Energy-Efficient Passive House using thermal mass to achieve high thermal comfort Loa Andersson Managing Director RLI Byggdata AB rli@termodeck.com Alexander Engström Technical Director RLI Byggdata AB

More information

Building Sustainability Why Passive House?

Building Sustainability Why Passive House? Building Sustainability Why Passive House? Paul McAlister RIBA Northern Ireland s First Certified Passive House Designer Agenda Timeline to Carbon Zero Features of a Passive House How it works Benefits

More information

Generation Homes Low Carbon Retrofit

Generation Homes Low Carbon Retrofit case studies Generation Homes Low Carbon Retrofit Project Summary Radian provides around 16,000 affordable homes across the south of England. The Highfield Road retrofit project is being managed by Radian

More information

2014 British Columbia Building Code Changes

2014 British Columbia Building Code Changes 2014 British Columbia Building Code Changes A City of Prince George interpretation of the 2014 Building Code Changes for 9.32 & 9.36 The following changes reflect the most notable revisions and staff interpretations.

More information

2000 Antwerp, terraced house

2000 Antwerp, terraced house 2000 Antwerp, terraced house 1. INTRODUCTION PROJECT SUMMARY - First phase energy renovation: 1999 - Second phase energy renovation: 2007 SPECIAL FEATURES - Two phased energy renovation - The owners stayed

More information

WP5.5: Product concepts for high efficiency step by step retrofits

WP5.5: Product concepts for high efficiency step by step retrofits WP5.5: Product concepts for high efficiency step by step retrofits Final presentation Product development 1. Aim of Product development 2. Summary of demand - what exists and what is needed 3. Meetings

More information

Contact Details: Phone Fax . Work Description: New Building Extensions Refurbishment Change of Use. Yes No Method:

Contact Details: Phone Fax  . Work Description: New Building Extensions Refurbishment Change of Use. Yes No Method: BCA Section J- Energy Efficiency Deemed- to- Satisfy Provisions Assessment Sheet 1. Project Overview Client Name: Address: Contact Person: Contact Details: Phone Fax Email Project: Work Description: New

More information

A 92 plus B C D E F 21-38

A 92 plus B C D E F 21-38 Energy Performance Certificate Northern Ireland 21, Cypress Drive Date of assessment: 19 November 2010 COLERAINE Date of certificate: 09 January 2011 BT52 2AF Reference number: 9893-3716-6629-3190-3903

More information

Energy Efficiency Rating

Energy Efficiency Rating Energy Performance Certificate Northern Ireland 1a Primrose Street BANGOR BT20 3AZ Date of assessment: 28 April 2016 Date of certificate: 28 April 2016 Reference number: 9866-0734-6860-1908-8922 Type of

More information

BUILDING REGULATIONS PART L 2011 PROVISIONS & COSTS (STANDARD 3-BED SEMI-D, CIRCA 120 SQM)

BUILDING REGULATIONS PART L 2011 PROVISIONS & COSTS (STANDARD 3-BED SEMI-D, CIRCA 120 SQM) BUILDING REGULATIONS PART L 2011 PROVISIONS & COSTS (STANDARD 3-BED SEMI-D, CIRCA 120 SQM) NOV 2012 OVERALL PRIMARY ENERGY, CO 2 & RENEWABLES TGD L 2005-2013 2005 2007/8 2011 2013? CO 2 % 100% 69% 46%

More information

Extra 6. Sustainability. The Sigma Home. December 2009

Extra 6. Sustainability. The Sigma Home. December 2009 6 December 2009 The Sigma Home As the house-building industry makes progress in the transition towards the zero carbon homes of the future, some useful postoccupancy research has recently been published

More information

Nearly Zero Energy Buildings (NZEB) Seán Armstrong, Housing/Building Standards Section, DHPCLG

Nearly Zero Energy Buildings (NZEB) Seán Armstrong, Housing/Building Standards Section, DHPCLG Nearly Zero Energy Buildings (NZEB) Seán Armstrong, Housing/Building Standards Section, DHPCLG Outline Current Part L Requirements Implementing the Energy Performance of Buildings Directive and NZEB Dwellings

More information

Building Control. A Guide to Compliance When Designing Domestic Extensions

Building Control. A Guide to Compliance When Designing Domestic Extensions Building Control Technical Guidance Leaflet No. 18 Approved Document L1B 2010 Conservation of Fuel and Power This leaflet is one of a series produced by the Hertfordshire Building Control Technical Forum

More information

A 92 plus B C D E F G 1-20

A 92 plus B C D E F G 1-20 Energy Performance Certificate Northern Ireland 118 Duncairn Gardens BELFAST BT15 2GL Date of assessment: 17 June 2010 Date of certificate: 18 June 2010 Reference number: 9239-9077-0236-6760-4920 Type

More information

Built examples and project certification. Zeno Bastian, Passive House Institute

Built examples and project certification. Zeno Bastian, Passive House Institute Built examples and project certification Zeno Bastian, Passive House Institute Passive House Standard for Retrofits? Photo Passive House Institute Shape Graphic Passive House Institute Thermal Bridges

More information

BPE Case Study - Lyndhurst Crescent, Swindon

BPE Case Study - Lyndhurst Crescent, Swindon Professor Rajat Gupta Oxford Institute for Sustainable Development, Oxford Brookes University rgupta@brookes.ac.uk BPE Case Study - Lyndhurst Crescent, Swindon Building Better Buildings Conference, Bristol

More information

Performance based testing versus Energy ratings

Performance based testing versus Energy ratings Performance based testing versus Energy ratings Ecological footprint of a house 72.5 10.2 18.8 Construction & Maintenance Natural Gas Electricity Grant, Milne, Wackernagel 2005. The Ecological Footprint

More information

Module 15. Country Specific Legislation

Module 15. Country Specific Legislation Module 15 Country Specific Legislation Module 15 Country Specific Legislation On completion of this module learners will be able to: List the main pieces of legislation and standards which affect the energy

More information

lighthouse Martin Rose Sheppard Robson

lighthouse Martin Rose Sheppard Robson lighthouse Martin Rose Sheppard Robson the past KINGSPAN TEK Service Integrated Insulated Structure Current System Proposed System LINTON Off-site 2005 Innovation Park BRE Garston Watford The way we

More information

2 x BPE studies of Passivhaus domestic projects

2 x BPE studies of Passivhaus domestic projects bere:architects 73 The Poets MuseRoad London 54A Newington N5 2SH Green T London +44(0)20 N16 7359 9PX 4503 www.bere.co.uk T +44 (0)20 7241 1064 www.bere.co.uk Building Better Buildings / UCL / Technology

More information

Project Documentation for Application for Passivhaus Designer 7 Convent Lane, Emsworth, UK

Project Documentation for Application for Passivhaus Designer 7 Convent Lane, Emsworth, UK Project Documentation for Application for Passivhaus Designer 7 Convent Lane, Emsworth, UK Photograph of building from entrance Building Data Year of Construction 2015 U Value external wall 0.081 W/m 2

More information

PHPP Report. Beattie Passive Inchkeith Drive

PHPP Report. Beattie Passive Inchkeith Drive PHPP Report Beattie Passive Inchkeith Drive 1. Introduction Passive House is the world-leading building standard in energy-efficient construction. It is comfortable, affordable and ecological at the same

More information

Date of assessment: 14 June 2015 Date of certificate: 14 June 2015 Reference number:

Date of assessment: 14 June 2015 Date of certificate: 14 June 2015 Reference number: Energy Performance Certificate Northern Ireland 139, Shandon Park BELFAST BT5 6NZ Date of assessment: 14 June 2015 Date of certificate: 14 June 2015 Reference number: 9085-0636-6120-6934-0992 Type of assessment:

More information

Healthy Buildings 2017 Europe July 2-5, 2017, Lublin, Poland

Healthy Buildings 2017 Europe July 2-5, 2017, Lublin, Poland Healthy Buildings 217 Europe July 2-5, 217, Lublin, Poland Paper ID 89 ISBN: 978-83-7947-232-1 THERMAL RETROFIT OF A RESIDENTIAL BUILDING IN ROMANIA TO REACH LOW-CONSUMPTION ENERGY TARGETS Andrei DAMIAN

More information

NEARLY ZERO ENERGY BUILDING RETROFIT SAP Dr Luisa Brotas

NEARLY ZERO ENERGY BUILDING RETROFIT SAP Dr Luisa Brotas NEARLY ZERO ENERGY BUILDING RETROFIT SAP 2012 Dr Luisa Brotas 4-8 July 2016 SAP EDITION 2012 SAP is the Government sstandard Assessment Procedure for Energy Rating of Dwellings. Assesses the energy performance

More information

Energy Performance Certificate

Energy Performance Certificate Energy Performance Certificate Northern Ireland 2, Magheraboy Hollow, PORTRUSH, BT56 8GQ Energy Efficiency Rating Date of assessment: Date of certificate: Reference number: Accreditation scheme: Assessor

More information