1 November 2, 2015 Melissa A. Malcolm Library Director Lapeer District Library 201 Village West Dr S Lapeer, MI RE: Structural Conditions Assessment of Current Lapeer District Schools Administration Building 250 Second Street, Lapeer, Michigan Dear Ms. Melissa Malcolm; It was a pleasure meeting with you and Ms. Jan Watz at 250 Second Street, Lapeer, Michigan on October 7, Thank you for coordinating the access to the building. The district staff were very helpful in the information and access they provided me to complete the evaluation of the building, including sets of drawings of the building s design and additions. For the purposes of this report, the building stretches in the north-south direction; the main door we entered is on the west elevation. Digital photographs taken of the building during the survey are included with this report. The original building was designed in 1951; only the mechanical plans were available of this portion of the building; although they provided a lot of insight into the structural system of the building. The original building footprint is a rectangle with a thin western projection for offices and entry into the original school building. The building is primarily a single story building, with a raised roof area for the original multipurpose room (the current board room). The roof over the original building is a gabled roof structure with a flat portion at the center that is dropped below the high point of the gabled sides. There is no basement; there are minimal crawl spaces or utility tunnels. In 1964, a north addition and a small extension to the west were constructed. The west addition now serves as the board room and storage closet spaces. In 2007, when the district repurposed the school for administration offices, a large renovation of the building took place. However, minimal changes were made to the overall building structure; most of the changes were with window/door systems and mechanical systems. Below is a description of the conditions observed with potential explanations for the distresses. A list of recommendations is also provided at the end of the report, given with a general sense of priority to the recommendations. Overall, the building structure is in good condition with few areas of concern. The building, from a structural engineering standpoint, could be repurposed as a library, with consideration given for loadings of the floors over the tunnels and crawl spaces.

2 The conditions assessment is visual in nature; destructive access to the structure was not obtained (finishes were not removed to verify the structure). Dropped ceiling tiles were not removed as original ceiling finishes were observed in the original building where the ceiling tiles were not installed. Only the structural system were evaluated on site. Hazardous materials, mechanical, life safety systems are not reviewed as part of this scope of work. Observations: The original building is simplistic in design with classrooms on the east and west sides of the building and a corridor between. The corridor is a non-load bearing wall constructed of concrete masonry units (CMU). Thin, horizontal cracking was observed in the CMU in the small closets in nearly each of the original classrooms. These closets are now furnace or storage rooms for the office use. The horizontal cracks in these interior walls infer that the bottom of the wall has settled downward. This settlement may have occurred shortly after construction of the building or many years later. Some of the cracks have been infilled with a sealant (caulk). This sealant should be removed and all of the cracks should be repointed. If the cracks reform, we will know that the settlement is still active and can address the situation with appropriate measures. In the Men's and Women's Bathrooms in the original building there is a significant horizontal crack along the bottom of the tile walls that create the plumbing chase between the restrooms. These walls are most likely undermined from plumbing piping, water leaks, or insufficient structure. The cracks should be repointed, and the potential for mud jacking the slab may be worth more investigation. Again, if the cracks do not reform, the settlement is old, and no further work is required. In the plumbing chase, the wall construction was exposed to be the 4" clay tile observed on the bathroom walls with a nominal 4" CMU structural backup. The northern wall of the plumbing chase is a bearing wall. The wood rafters, spanning north-south, are lapped over this wall. The roof system of the original building is constructed with nominal 2x rafters that span north-south to either masonry bearing walls as observed in the plumbing chase, or beams that are spanning east-west, following the slope of the east and west sides of the roof. The beams are supported on the exterior walls and steel I columns on the interior. The 1964 addition roof structure is of open web steel joists spanning between the CMU bearing walls. Nearly all of the north wing walls are bearing walls. In the west wing, the storage closet and bathroom, ceiling tiles were exposed that may contain asbestos; a materials professional should be consulted on this. Water staining was observed in isolated areas on the ceiling tiles. Specifically, in the following rooms: Closet south of the Men's Room in the Original Building Center Corrridor, opposite of the East Entry Corridor Mail Room (Room just north of the East Entry Corridor) Lapeer School District Administration Building 250 Second Street Page 2 of 8 Structural Conditions Assessment Lapeer, Michigan November 2, 2015

3 Women's Room in the North Wing Conference Room in the North Wing (west interior room of the north side of the North Corridor) In the mechanical room, significant cracking and water staining was noted on the CMU walls, especially on the east and south walls of the room. There are vertical cracks in the south wall that align with the corners of the chimney on the other side of the wall. Cracking in the southern end of the eastern wall may be related to support of the masonry above the original opening to the crawl space on the opposite side of this wall. Storage items in this corner prevented a full evaluation, or even verification that the crawl space access was still present. Some cracking was observed in the current storage room, mainly where the 1964 western extension joins the original building. The joint between original and addition is cracked in both walls and floor. This is a typical condition where additions meet pre-existing structures. Relatively minimal cracking was observed in the 1964 addition walls in this area, especially in the western corners of this room. On the exterior, the brick veneer is in good condition mostly. There are small areas where mortar is missing or the brick is spalled. Most areas are near downspout locations. A steel plate has been installed at the base of the east wall at a downspout location. The brick is spalled at this location, full height of the wall. The steel plate may be a 'backsplash,' to protect the brick from further damage. The condition of the brick behind the plate is unknown. The brick in this area of this downspout will require replacement in the future. Several downspouts are discharging directly against the building. Vegetation was observed in the drainage system on the flat roof over the central corridor in the original building. The stone window sills are missing mortar in their joints; some have shifted; several have been replaced. Steel lintels over louver openings in the walls are beginning to corrode and rust jack the brick veneer. The lintels should be cleaned and painted; the mortar joints repointed. It is interesting to note that the brick has header courses every sixth course in both the original building and 1964 addition. The header courses, traditionally tie the individual wythes of brick masonry walls together by rotating the bricks in these header courses 90 degrees from the typical running bond. With a CMU structural backup, the header courses may be purely architectural detail as metal wall ties typically join the brick and CMU wythes together. Removal of the brick would be required to verify which condition was constructed. At the southeastern corner, the grade is sloping down toward the building here, and when combined with the overall slope of the grade, creates an area where rain and snow melt will pond. Vertical through brick cracking is occurring in the eastern "wing" of the southern wall. The brick is significantly spalling at the top of the wall. Two potential causes for these distresses are that the soils are being washed away from the water collecting in this area, or that the wing wall is insufficient to withstand the corner wind loads acting on this cantilevered wall portion of the wing. The vertical cracking may be a Lapeer School District Administration Building 250 Second Street Page 3 of 8 Structural Conditions Assessment Lapeer, Michigan November 2, 2015

4 result of wind loads acting on the cantilevered wall section, creating a negative bending situation that the brick cannot support, thus cracking as the tension stresses increase. With the assumed brick veneer on both sides of the 'wing' wall, the wall is a nominal 12 inches wide, leaving a mere 4 inches of structural backup. If the brick is built integral with the structural backup (assumed 4" CMU), if the brick is a structural element not just a veneer finish, the wind load resistance is much higher. It is recommended to repair the crack, improving the drainage and monitoring for recracking. If when the crack is repaired, the construction method of the wall can be verified, that knowledge can be applied to a proper final solution to prevent this crack from recurring. On the west elevation, south of the west wing of the building, there is a horizontal crack just above grade, just above the header course. This crack is unusual; potentially related to frost heave of the foundation below. The foundation system for the original building may be a poured concrete trench foundation. It is common for these foundations to have "mushrooming" or overflow at the top of the foundation pour. The mushroomed top create horizontal projections that the frost in the ground can act against, pushing the foundation up out of the ground. As the frost melts, the foundation may settle back down, creating the crack in the wall. The foundation in this area could be exposed on the exterior to verify this assumption. The crack should be repaired regardless to keep the structure weathertight. On the west elevation, there are four steel columns supporting the roof overhang. The columns are all rusting at the base of the columns. The columns should be cleaned with a wire brush, inspected for significant deterioration, repaired if needed, and repainted. The brick above this roof overhang on the south elevation of the west wing is missing mortar, spalling, potentially shifting. The distress seems to be on horizontal lines, separated by five courses of brick. The metal brick ties connecting the brick to the structural CMU wythe behind may be corroding and causing this distress. Removal of the bricks in this area to properly address this concern is recommended. Simple repointing and repair will only be a temporary fix if it is the corrosion of the metal ties causing the distress. Similar brick movements and distresses were observed in the upper courses of brick on the tall chimney stack. Up to 18 courses of the outer wythe of brick may require rebuilding on at least two sides of the chimney, if not all four. On the north addition, the CMU foundation wall is exposed at the window locations. With no brick veneer at the window locations, the exterior edge of the wall is inset of the exterior edge of the CMU foundation wall. At least one of these locations, the cores of the CMU are exposed; they are ungrouted and allowing moisture into the foundation wall system. It is surprising that no distresses were noted with this situation as of yet. The cores should be cleaned, grouted solid, and ideally capped to prevent water from entering the wall structure. Lapeer School District Administration Building 250 Second Street Page 4 of 8 Structural Conditions Assessment Lapeer, Michigan November 2, 2015

5 Analysis: The structural analysis of the system is limited to the first floor system, as that is the only area that would change loading criteria if the building is repurposed as a library. The roof and walls are still supporting the same wind and snow loads regardless of the use of the building. The structural concrete slab over the crawl space in the original building (below the east entry corridor mainly) is adequate for 100psf live load, based on its original and current use only. Building codes have traditionally required first floor corridors of schools to safely support 100psf live load (people, furniture, movable loads). If structural drawings showing the steel reinforcement sizes and spacings are located, a safe allowable live load of the concrete slab over the crawl space can be provided. The structural concrete slab over the utility tunnels in the north addition are adequate to safely support 100psf if constructed as shown on the design drawings. Stacks of books should be kept free of the perimeter of this addition, off of the utility tunnel slab. The remaining floor areas are concrete slabs on grade. The soil below the slabs is unknown (its stiffness); this is required to complete any sort of numerical analysis of the concrete slab. The thickness of the slab is also unknown; it is assumed to be a 4-inch thick slab on grade. Traditionally, for 100psf, a 4-inch concrete slab on grade is adequate. For a 150psf, as required for library loads in current codes, traditionally a 5-inch thick concrete slab on grade is recommended. Some settlement was observed in the building, mainly at unsupported (as per the mechanical drawings) masonry walls. The sustained weight of the masonry, combined with the insufficient support (the slabs should have been thickened below these walls) leads to the settlement observed. Even if the interior walls are a minimal 4-inch nominal masonry, the direct pressure on the slab and soil below the wall is greater than 150psf. Therefore, if the relatively minor settlement cracks observed in the closet walls are the greatest distress observed under the constant weight of the masonry wall, the existing concrete slab on grade should be sufficient to support safely the 150psf code required live load for library use. As discussed above, some of the masonry walls are bearing walls for the roof structure. In other areas, such as the main corridor walls in the original building, are non-bearing walls. However, a portion of these walls are providing lateral restraint from wind loading on the building. If the desire is to remove nearly all of the interior walls to create an open space, a structural engineer should be involved in the design process to ensure the lateral stability of the building is not compromised in this effort. Lapeer School District Administration Building 250 Second Street Page 5 of 8 Structural Conditions Assessment Lapeer, Michigan November 2, 2015

6 Recommendations: As stated above, the building, structurally, can support the library floor loadings. The following recommendations are given to ensure the building is maintained. The distresses as noted create a baseline from which they can be monitored for further movement. At minimum, these distresses should be reviewed on an annual basis until they are repaired properly. The greatest concern is the exterior masonry. However, most of this is general repair of a 50+ year old building. The recommendations provided below are schematic in nature; further review, research, analysis and/or design may be required. They are provided as at a minimal, practical, and ideal level, with the later levels building upon the previous. Minimal Repair: 1) Verify the assumed 4-inch thickness of the concrete slab on grades. If the thickness is less than 4-inches, consult with a professional structural engineer before proceeding with any further design of the building as a library. 2) Monitor the thin, horizontal cracking was observed in the CMU in the small closets in nearly each of the original classrooms. 3) Tuckpoint the significant horizontal crack along the bottom of the tile walls that create the plumbing chase between the Men's and Women's Bathrooms in the original building. 4) Determine source of water staining was observed in isolated areas on the ceiling tiles; verify it is old staining or repair as required. 5) Remove storage items in the southeast corner of the mechanical room to verify the crawl space access was still present. Verify the condition of the opening, and the underside of the concrete slab in the crawl space. 6) Monitor the minimal cracking observed in the 1964 addition walls, especially in the western corners of the storage room (old kitchen). 7) Maintain and direct water away from the building with the gutter and downspout systems. 8) Repoint the brick masonry where mortar is missing or cracked to keep the building weathertight. 9) Repair the crack on the east end of the south wall, improve the grading in this area, and monitoring for recracking. a. If when the crack is repaired, the construction method of the wall can be verified, that knowledge can be applied to a proper final solution to prevent this crack from recurring. 10) On the west elevation, south of the west wing of the building, tuckpoint the crack to keep the structure weathertight. 11) On the west elevation, clean, re-inspect, reinforce if required, and repaint the four steel columns supporting the roof overhang. 12) Remove a select area of the brick above the western roof overhang on the south elevation of the west wing to verify wall construction detailing and to properly address the distress. Lapeer School District Administration Building 250 Second Street Page 6 of 8 Structural Conditions Assessment Lapeer, Michigan November 2, 2015

7 13) Up to 18 courses of the outer wythe of brick may require rebuilding on at least two sides of the chimney, if not all four. 14) On the north addition, at the exposed CMU at the window locations; the cores should be cleaned and grouted solid. Practical Repair: 15) Repoint the thin, horizontal cracking observed in the CMU in the small closets in nearly each of the original classrooms. Remove the caulk in isolated areas and re-create the mortar bond between the CMU courses. 16) Investigate further the potential for underpinning or mud jacking the concrete slab in the Men's and Women's Bathrooms in the original building in the areas that are supporting the interior masonry walls. 17) Consult a materials professional on original ceiling tiles that were exposed that may contain asbestos. 18) Repoint the vertical cracks in the south wall of the Mechanical Room that align with the corners of the chimney on the other side of the wall. 19) Repoint the cracks in the east wall of the Mechanical Room. 20) Repoint, reset or repair the stone window sills as required at each location to make the walls weathertight. 21) Clean and repaint the exposed steel lintels over louver openings in the walls. Ideal Repair: 22) Remove the steel plate that may be a 'backsplash' to protect the brick from further damage from the downspout. Inspect and repair the brick masonry as required. 23) Removal of the brick veneer is required to verify if the wythes of masonry were built with header courses or metal ties. Corrosion of the metal ties may be a cause of cracking in the masonry. 24) Expose the foundation on the west elevation, south of the west wing of the building to verify if frost heave is a cause of the horizontal crack in this area. 25) On the north addition, at the exposed CMU at the window locations; cap and/or flash the cores to prevent water from entering the wall structure. 26) If structural drawings showing the steel reinforcement sizes and spacings are located, a safe allowable live load of the concrete slab over the crawl space can be provided. 27) Keep stacks of books free of the perimeter of the North Addition, off of the utility tunnel slabs, unless these slabs are reinforced to achieve the 150psf safe allowable live load capacity. 28) If the desire is to remove nearly all of the interior walls to create an open space, a structural engineer should be involved in the design process to ensure the lateral stability of the building is not compromised in this effort. Lapeer School District Administration Building 250 Second Street Page 7 of 8 Structural Conditions Assessment Lapeer, Michigan November 2, 2015

8 Thank you for the opportunity to assist on this project. Please let me know if you have any questions or concerns. I wish you the best of luck in your decision to repurpose this building or build new. Respectfully, Cheryl Early, P.E. Associate Engineer Enclosure cc: Ms. Janet Watz, Board Chair, Lapeer District Library (via ) Lapeer School District Administration Building 250 Second Street Page 8 of 8 Structural Conditions Assessment Lapeer, Michigan November 2, 2015

9

10

11

12

13

14

15

16

17

18

19

20

21

22

STRUCTURAL ASSESSMENT OBSERVATION REPORT

STRUCTURAL ASSESSMENT OBSERVATION REPORT Consulting Engineers THORSON BAKER & Associates, Inc. 3030 West Streetsboro Road (330) 659-6688 phone Richfield, Ohio 44286 (330) 659-6675 fax www.thorsonbaker.com STRUCTURAL ASSESSMENT OBSERVATION REPORT

More information

KORA_Req._for_Eng._Studies_on_Stouffer_Apts. KU Reference No

KORA_Req._for_Eng._Studies_on_Stouffer_Apts. KU Reference No 000130 1 PURPOSE: Professional Engineering Consultants, P.A. (PEC) was engaged by University of Kansas Design & Construction Management to perform an assessment of Stouffer Place Apartment Building 20

More information

U.S. EDITION RESIDENTIAL CONSTRUCTION DETAILS SAMPLE. A visual guide to construction detailing. Emma Walshaw

U.S. EDITION RESIDENTIAL CONSTRUCTION DETAILS SAMPLE. A visual guide to construction detailing. Emma Walshaw RESIDENTIAL CONSTRUCTION DETAILS U.S. EDITION A visual guide to construction detailing Emma Walshaw Contents INTRODUCTION 4 PRINCIPLES OF CONSTRUCTION DETAILING 6 FOUNDATIONS 9 PRINCIPLES OF FOUNDATION

More information

Framing Methods Structural Components

Framing Methods Structural Components Framing Methods Structural Components Balloon Framing *Balloon framing or Eastern framing the exterior studs run from the top of the foundation to the top of the highest level. Benefits of this type of

More information

Stone and Masonry Veneer

Stone and Masonry Veneer Stone and Masonry Veneer R703.7 Stone and masonry veneer, general. Stone and masonry veneer shall be installed in accordance with this chapter, Table R703.4 and Figure R703.7. These veneers installed over

More information

ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA Tel: Fax:

ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA Tel: Fax: ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA 02144 Tel: 617.628.1700 Fax: 617.628.1711 March 3, 2016 Mr. Jeff Hoover, Principal Tappe Architects, 6 Edgerly Place

More information

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage The following list of code requirements is intended to assist you in complying with the Code of Public

More information

Structural Inspection

Structural Inspection General: Background: An inspection and structural analysis have been performed for the purpose of evaluating the buildings structural systems and components. A full set of structural drawings was utilized

More information

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012 Existing Site Aerial Building Developmental History 1981 1966 1939 1977 1978 1955 1966 Exterior Roof: Most of existing roof has multi ply built up roofing. Some areas have gravel ballast, others have cap

More information

Excellence in Experts, Efficiency and Service

Excellence in Experts, Efficiency and Service Excellence in Experts, Efficiency and Service February 12, 2009 Insurance Company P.O. Box 1209 Horse Canyon, California 92808 RE: Insured: Mr. and Mrs. Insured 1669 Wild Horse Ranch Tobiano Paint, California

More information

Eidem Farm Brooklyn Park, MN

Eidem Farm Brooklyn Park, MN Eidem Farm Brooklyn Park, MN East Farm House Structural Condition Assessment Prepared By 1 0 0 P O R T L A N D A V E N U E S O U T H, S U I T E 1 0 0 M I N N E A P O L I S, M I N N E S O T A 5 5 4 0 1

More information

Subject: Amphitheater School District Reroofing Projects Amphi High School, Building 900 Roof Evaluation SCI Project Number:

Subject: Amphitheater School District Reroofing Projects Amphi High School, Building 900 Roof Evaluation SCI Project Number: 27 June 2016 Mr. Shane Chism, AIA Breckenridge Group 4625 E. Fort Lowell Road Tucson, Arizona 85712 Subject: Amphitheater School District Reroofing Projects Amphi High School, Building 900 Roof Evaluation

More information

Connaught. Facility Audit report for: Connaught Regina, SK. Report Created: Page 1 of 20

Connaught. Facility Audit report for: Connaught Regina, SK. Report Created: Page 1 of 20 Connaught Facility Audit report for: Connaught Regina, SK Report Created: 2012-04-02 Page 1 of 20 Facility Details Facility Connaught Address: Location: Regina, SK Facility Zone: 8 Grade Configuration:

More information

Groundwater Seepage. Causes of Basement Seepage and Leaks Hydrostatic Pressure

Groundwater Seepage. Causes of Basement Seepage and Leaks Hydrostatic Pressure Groundwater Seepage The following guide can be used by you and your crews when assessing seepage at a property. Bear in mind that this guide is not all-inclusive, and should be used in a supplementary

More information

October 26, 2017 Ref.: Newfoundland & Labrador English School District 95 Elizabeth Avenue St. John s, NL A1B 1R6

October 26, 2017 Ref.: Newfoundland & Labrador English School District 95 Elizabeth Avenue St. John s, NL A1B 1R6 October 26, 2017 Ref.: 351-1 Newfoundland & Labrador English School District 95 Elizabeth Avenue St. John s, NL A1B 1R6 Attention: Mr. Jim Sinnott Director of Facilities & Custodial Management Dear Sir:

More information

East Lyme Middle School EAST LYME MIDDLE SCHOOL

East Lyme Middle School EAST LYME MIDDLE SCHOOL Description: N EAST LYME MIDDLE SCHOOL The school consists of a multi story building with lower, main and upper level floors. The typical floor framing for the main and upper levels is wide flange steel

More information

Masonry Study. Club House and Jr. Club House Pequot Yacht Club Southport, Connecticut 03-44

Masonry Study. Club House and Jr. Club House Pequot Yacht Club Southport, Connecticut 03-44 Club House and Jr. Club House Southport, Connecticut 03-44 669 Harbor Road Southport, Connecticut 06890 Architect: Martin A. Benassi, AIA Architect Two Broadway Hamden, CT 06518 Date: Table of Contents

More information

Technical Notes 11B - Guide Specifications for Brick Masonry, Part 3 Rev [Feb. 1972] (Reissued Sept. 1988) INTRODUCTION

Technical Notes 11B - Guide Specifications for Brick Masonry, Part 3 Rev [Feb. 1972] (Reissued Sept. 1988) INTRODUCTION Technical Notes 11B - Guide Specifications for Brick Masonry, Part 3 Rev [Feb. 1972] (Reissued Sept. 1988) INTRODUCTION This Technical Notes contains the guide specifications in CSI format for Part III

More information

DISTRESS PHENOMENA OFTEN MISTAKEN FOR FOUNDATION MOVEMENT

DISTRESS PHENOMENA OFTEN MISTAKEN FOR FOUNDATION MOVEMENT Issued for Website Publishing Foundation Performance Association Structural Committee Page 1 of 5 PHENOMENA OFTEN MISTAKEN FOR FOUNDATION MOVEMENT by The Structural Committee of The Foundation Performance

More information

WALL SYSTEMS ( Ref: The Building Illustrated, Ching, Francis DK )

WALL SYSTEMS ( Ref: The Building Illustrated, Ching, Francis DK ) WALL SYSTEMS ( Ref: The Building Illustrated, Ching, Francis DK ) 1.0 Comparative wall systems Wood stud walls * walls are normally 2x4, but may be 2x6. * studs are spaced 16. * studs carry vertical loads.

More information

BOWIE LEARNING CENTER

BOWIE LEARNING CENTER BOWIE LEARNING CENTER Bowie Learning Center BUILDING DATA BOWIE LEARNING CENTER 900 North Elm St., Weatherford, TX 76086 Year Built 1936 No. of Buildings No. of Portables 0 Approx. Total Square Footage

More information

County of Santa Barbara, California Facility Condition Assessment Total: $238,124. Appendix 1 Probable Cost Estimates Detail

County of Santa Barbara, California Facility Condition Assessment Total: $238,124. Appendix 1 Probable Cost Estimates Detail Project No.:P03000.001 Building Number: P03000-Lompoc County Offices Grounds Project Description: Mill and Overlay with some Partial Depth Patching Background: The site comprises asphalt pavement for the

More information

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs November 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements....................................

More information

STRUCTURAL ISSUES IN RESIDENTIAL CONSTRUCTION. Presented by: Susan L. Lasecki P.E., S.E.

STRUCTURAL ISSUES IN RESIDENTIAL CONSTRUCTION. Presented by: Susan L. Lasecki P.E., S.E. STRUCTURAL ISSUES IN RESIDENTIAL CONSTRUCTION Presented by: Susan L. Lasecki P.E., S.E. Presentation Outline Gravity Design Load Paths from Roof to Foundation Roof Framing Floor Framing Wall Framing Lateral

More information

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST This list is provided as a guide to help you understand the information that must be contained on the construction drawings. This list is not all-inclusive of all building codes but is used as a general

More information

DISTRESS PHENOMENA OFTEN MISTAKENLY ATTRIBUTED TO FOUNDATION MOVEMENT

DISTRESS PHENOMENA OFTEN MISTAKENLY ATTRIBUTED TO FOUNDATION MOVEMENT Issued for Website Publishing Foundation Performance Association Structural Committee Page 1 of 5 PHENOMENA OFTEN MISTAKENLY ATTRIBUTED TO FOUNDATION MOVEMENT by The Structural Committee of The Foundation

More information

UCC Permit Application Procedures

UCC Permit Application Procedures How do I apply for a permit? UCC Permit Application Procedures 1. Please complete the CodeMaster Pan Review Application 2. Please provide the scope of work description and/or construction documents/plans.

More information

BUILDING CODES Presented by CORUM ENGINEERING

BUILDING CODES Presented by CORUM ENGINEERING BUILDING CODES Presented by CORUM ENGINEERING AGENDA I. The Basics of Foundations A. Footer Designs B. Foundation Walls 1. Non-Backfilled Walls 2. Backfilled Walls (Retaining Walls) C. Slabs vs. Crawl

More information

component was performing its intended function; installation and condition were appropriate for age and use.

component was performing its intended function; installation and condition were appropriate for age and use. April 23, 2012 Dear Home Seller, On April 6, 2012, Cities Inspection Service, Inc. completed a home inspection of the property located at 123 Oak Drive, Somewhere, Minnesota for you. Doug Hastings did

More information

Administrative Changes

Administrative Changes Revised 11/29/06 Knox County Residential Building Codes Significant Changes From The 1995 CABO One And Two Family Dwelling Code To The 2006 International Residential Code All one and two family dwellings

More information

Sparks Engineering, Inc. S T R U C T U R A L E V A L U A T I O N, D E S I G N A N D T E S T I N G

Sparks Engineering, Inc. S T R U C T U R A L E V A L U A T I O N, D E S I G N A N D T E S T I N G Sparks Engineering, Inc. S T R U C T U R A L E V A L U A T I O N, D E S I G N A N D T E S T I N G February 29, 2008 Ms. Leslie Wolfenden Save Austin's Cemeteries PO Box 41814 Austin, TX 78704 (512) 917-1666

More information

Rockland Library Assessment Executive Summary

Rockland Library Assessment Executive Summary Rockland Library Assessment Executive Summary performed for City of Rockland, Maine 270 Pleasant Street Rockland, ME 04841 February 2, 2016 Civil & Structural Engineering 132 Brentwood Street Portland,

More information

Table 3. Detailed Comparison of Structural Provisions of IRC 2000 and 1997 NEHRP (Continued)

Table 3. Detailed Comparison of Structural Provisions of IRC 2000 and 1997 NEHRP (Continued) 2000 IRC 1997 NEHRP Section Provision Section Provision Comments CHAPTER 3 BUILDING PLANNING R301 DESIGN CRITERIA R301.2.2 Seismic Provisions R301.2.2.1 Determination of Seismic Design Category R301.2.2.1.1

More information

Moonlight Architecture, Inc. Architecture Interior Design Site Planning

Moonlight Architecture, Inc. Architecture Interior Design Site Planning Moonlight Architecture, Inc. Architecture Interior Design Site Planning 22 May 2018 18057 Mr. Michael J. Petit de Mange, County Administrator Kent County Levy Court 555 Bay Road Dover, DE 19901 RE: Facilities

More information

New Home Warranty Handbook

New Home Warranty Handbook New Home Warranty Handbook Cabinets CB 1 Warping of doors and drawer faces should not exceed ¼ inch. Warping is measured from the face of the frame to the point of maximum warpage, with the door or drawer

More information

Tier 1 Assessment Linderman Gymnasium Polson, MT

Tier 1 Assessment Linderman Gymnasium Polson, MT Tier 1 Assessment Linderman Gymnasium Polson, MT June 15, 2018 Prepared by: 128 W. ALDER ST SUITE a MISSOULA, MT 59802 (406) 274-7671 June 15, 2018 Mr. Paul Bishop Paradigm v.2.0 125 ½ W. Main Street RE:

More information

STRUCTURAL CONDITION ASSESSMENT

STRUCTURAL CONDITION ASSESSMENT STRUCTURAL CONDITION ASSESSMENT ALLEN JAY ROCK GYM 1201 FAIRFIELD ROAD HIGH POINT, NC Prepared for: Prepared by: Guilford County Schools 617 West Market Street Greensboro, NC Adrian S. Durham, PE, SE,

More information

Project Findings: Appendix 2

Project Findings: Appendix 2 NSF Final Report CMMI-1034874 Project Findings: Appendix 2 Selected Damage Photos of Engineered Buildings PART 2. Teleco Office Tower Civil Engineering and Engineering Mechanics Department University of

More information

Unit 4 Brick Masonry. Part Ⅰ Illustrated Words and Concepts. Figure 4-1 Basic Vocabulary of Bricklaying

Unit 4 Brick Masonry. Part Ⅰ Illustrated Words and Concepts. Figure 4-1 Basic Vocabulary of Bricklaying Part ⅠIllustrated Words and Concepts Figure 4-1 Basic Vocabulary of Bricklaying Figure 4-2 The Procedure for Building Brick Walls Figure 4-3 A Reinforced Brick Load bearing Wall Part ⅡPassages Passage

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018 G2 Gordon + Gordon Architecture. LLC Dr. Edward Livingston Trudeau Building 118 Main Street, Saranac Lake, NY Building Systems Report June 24, 2018 Harry Gordon, FAIA 164 Otter Slide Road Saranac Lake

More information

Masonry Veneer - Chapter 6. Masonry Veneer Anchored Veneer

Masonry Veneer - Chapter 6. Masonry Veneer Anchored Veneer Masonry Veneer - Chapter 6 Chapter 6 covers anchored and adhered veneer. Following are prescriptive requirements for areas with wind 110 mph Vertical support of masonry veneer Support: Noncombustible structural

More information

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE - 268-5161 Residential Accessory Structures This information has been compiled for the benefit of any person

More information

Fundamentals of Building Construction: Materials and Methods

Fundamentals of Building Construction: Materials and Methods Fundamentals of Building Construction: Materials and Methods Allen, Edward ISBN-13: 9780470074688 Table of Contents Preface. Chapter 1: Making Buildings. Learning to Build. Sustainability. The Work of

More information

International Code Council

International Code Council International Code Council ICC 400-2012 edition Standard on the Design and Construction of Log Structures Public Comments Draft #1 The ICC Standard Development Committee on Log Structures (IS-LOG committee)

More information

Building Excellence IV Capital Levy Projects Under Construction

Building Excellence IV Capital Levy Projects Under Construction Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee Hill Elementary

More information

Attachment to Application for HAWP 7306 Maple Avenue Section 1- Written Description of the Project

Attachment to Application for HAWP 7306 Maple Avenue Section 1- Written Description of the Project Attachment to Application for HAWP 7306 Maple Avenue Section 1- Written Description of the Project 1a. Description of existing structure(s) and environmental setting, including their historical features

More information

BRICK CONSTRUCTION DETAILS

BRICK CONSTRUCTION DETAILS BRICK CONSTRUCTION DETAILS MAGNIFY DESIGN IMPACT WITH BRICK CONSTRUCTION Nothing tops the strength, stability and timelessness of brick construction. And no one tops Endicott for brick manufacturing.

More information

Commercial Flashing Details

Commercial Flashing Details This technical note illustrates many of the most common flashing details for commercial buildings. The purpose for flashing is to direct moisture to the exterior and in so doing, prevent moisture from

More information

EASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923

EASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923 INITIAL YEAR BUILT 1923 BUILDING AREA 288,800 SF CURRENT PROGRAM CAPACITY 1,425 ENROLLMENT 2008 565 WARD 6 PROPOSED PROGRAM CAPACITY 1,100 Site Plan EASTERN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

CTP STITCH-TIE AGAIN! Quick and easy way to re-anchor existing veneers to back-up structures.

CTP STITCH-TIE AGAIN! Quick and easy way to re-anchor existing veneers to back-up structures. Helical Wall Tie System for Stabilizing Veneers and Structural Repair AGAIN! ANOTHER CTP SOLUTION! CTP STITCH-TIE Quick and easy way to re-anchor existing veneers to back-up structures. Brick to Concrete

More information

Plan Check No. Checked by: An Appointment Is Required for Verification

Plan Check No. Checked by: An Appointment Is Required for Verification SUPPLEMENTAL CORRECTION SHEET UNREINFORCED MASONRY (URM) RETROFIT ( 2002 LABC ) Plan Check No. Checked by: Permit Appl. # An Appointment Is Required for Verification Job Address: For appt. call: APPLICATION

More information

BUILDING A NEW HOME. Construction Permit Tips For Home Owners

BUILDING A NEW HOME. Construction Permit Tips For Home Owners BUILDING A NEW HOME Construction Permit Tips For Home Owners This publication provides guidelines for constructing a detached singlefamily home. The code requirements herein are not all inclusive and should

More information

City of Washburn Building Assessment

City of Washburn Building Assessment City of Washburn Building Assessment Structural Assessment Report 204 W. Bayfield St. September 30, 2016 KOA No. 162078.01 Prepared For: City of Washburn 119 Washington Ave. Washburn, WI 54891 Prepared

More information

City of Republic Community Development Girder and Header Spans for Exterior Walls

City of Republic Community Development Girder and Header Spans for Exterior Walls City of Republic Community Development Girder and Header Spans for Exterior Walls Revision Date: January 2017 2012 IRC Table R502.5(1) Girder Spans a and Header Spans a for Exterior Bearing Walls (Maximum

More information

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI BCA Report Porfolio Development Size Construction TCHC - All Op Units Scattered Units (CHU 20),005 Sq.Ft. 925 Floor Above Grade 2 Divisional Units Page of 43 Description This dwelling unit is a detached

More information

2012 Code Update Training

2012 Code Update Training 2012 Code Update Training VIRGINIA RESIDENTIAL CODE Jack A. Proctor Virginia Building Code Academy Department of Housing and Community Development R202 Definitions BASEMENT R202 Definitions Story Above

More information

Masonry movement joints

Masonry movement joints Masonry movement joints are one of the most misunderstood and underappreciated technical issues in the masonry industry. The lack of properly located, detailed, specified, and installed masonry movement

More information

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE:

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE: IRC CODE UPDATES TO: RESIDENTIAL BUILDING CONTRACTORS FROM: GARY STABER, BUILDING OFFICIAL SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE: 6/1/2003 INTERNATIONAL RESIDENTIAL CODE (IRC) APPLICABILITY:

More information

CHIMNEYS AND FIREPLACES

CHIMNEYS AND FIREPLACES CHAPTER 10 CHIMNEYS AND FIREPLACES SECTION R1001 MASONRY FIREPLACES R1001.1 General. Masonry fireplaces shall be constructed in accordance with this section and the applicable provisions of Chapters 3

More information

Mondol Fabrics Ltd. Nayapara,kasimpur, Gazipur ( N, E0) 8th March 2014

Mondol Fabrics Ltd. Nayapara,kasimpur, Gazipur ( N, E0) 8th March 2014 Mondol Fabrics Ltd Nayapara,kasimpur, Gazipur (23.990028N, 90.317336E0) 8th March 2014 1 2 Observations 3 Column Stresses in Toilet Area North of Building Cursory calculations indicate that column size

More information

No structural deficiencies were observed to the west exterior elevation.

No structural deficiencies were observed to the west exterior elevation. August 9, 2016 Ms. Jennifer Spencer, AIA, NCARB Gary W. Anderson Architects 200 Prairie Street, Suite 201 Rockford, IL 61107 Subject: Structural Observations 227 North Wyman Street Rockford, IL Dear Ms.

More information

Foundation/Site Work Code Requirements

Foundation/Site Work Code Requirements Q: What is a Foundation Only permit and why did I receive one when I filed for a full Building Permit? All Building Permits for new construction and additions are reviewed for zoning compliance. This review

More information

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings Building Safety Department 400-2 nd Street South St. Cloud, MN 56301 (320) 255-7239 A building permit is required for any accessory

More information

HARLEY CLARKE MANSION Condition Assessment

HARLEY CLARKE MANSION Condition Assessment HARLEY CLARKE MANSION Condition Assessment 2603 Sheridan Road Evanston, Illinois 60201 Final Report August 24, 2016 WJE No. 2016.5003 Prepared for: Ms. Lisa DiChiera Landmarks Illinois 30 North Michigan

More information

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3 MEMORANDUM To: Ashley Rosenthal Payne, Indianapolis Historic Preservation Commission Adrienne Schmetzer, Indiana Housing and Community Development Authority Architecture Preservation Interior Design Landscape

More information

VILLAGE OF ORLAND PARK, ILLINOIS ADDENDUM NO. 1 REBID # STELLWAGEN FARMHOUSE RESTORATION: PHASE 1 EXTERIOR FOUNDATION

VILLAGE OF ORLAND PARK, ILLINOIS ADDENDUM NO. 1 REBID # STELLWAGEN FARMHOUSE RESTORATION: PHASE 1 EXTERIOR FOUNDATION VILLAGE OF ORLAND PARK, ILLINOIS ADDENDUM NO. 1 REBID #15-019 STELLWAGEN FARMHOUSE RESTORATION: PHASE 1 EXTERIOR FOUNDATION Date: Wednesday, April 13, 2016 To: From: RE: All Potential Bidders Village of

More information

Weatherproofing Masonry For Northern Climates

Weatherproofing Masonry For Northern Climates The enduring strength, beauty and performance of a brick wall assembly is critically dependant on three components: design, workmanship and materials. If even one of these factors has not been diligently

More information

MADELEY RANCH ELEMENTARY SCHOOL

MADELEY RANCH ELEMENTARY SCHOOL MADELEY RANCH ELEMENTARY SCHOOL CAMPUS DATA MADELEY RANCH ELEMENTARY SCHOOL 3500 Madeley Ranch Road, Montgomery TX 77356 Year Built 2009 Approx. Total Square Footage Grades Served 94,750 Pre-K - 4 th

More information

DAVIS ELEMENTARY SCHOOL

DAVIS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1943 BUILDING AREA 71,100 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 227 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan DAVIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-

More information

INTERNATIONAL BUILDING CODE

INTERNATIONAL BUILDING CODE INTERNATIONAL BUILDING CODE MODEL BUILDING CONDITIONS ASSESSMENT The Reid and Hughes building is a four-story, four-bay, brick building, constructed in 1869 with a later addition known as the Williams

More information

CHIMNEYS AND FIREPLACES

CHIMNEYS AND FIREPLACES SECTION R1001 MASONRY FIREPLACES R1001.1 General. Masonry fireplaces shall be constructed in accordance with this section and the applicable provisions of Chapters 3 and 4. R1001.2 Footings and foundations.

More information

General Requirements for Mobile Homes

General Requirements for Mobile Homes Mobile homes shall conform in all respects to the CAN/CSA-Z240 MH Series of Standards and shall be complete structurally with the entire plumbing, electrical, and heating services installed. Prior to moving

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

STRUCTURAL BUILDING CONDITION SURVEY

STRUCTURAL BUILDING CONDITION SURVEY STRUCTURAL BUILDING CONDITION SURVEY Our Project No. 140565 Prepared For: Mayfair Hotel Development Corporation Date: 3 December 2014; Revised: 15 December 2014 15 December 2014 Mayfair Hotel Development

More information

Building Division Informational Handout

Building Division Informational Handout CITY OF SAN JOSÉ, CALIFORNIA Building Division Informational Handout Conventional Light Frame Construction Design Provisions 2007 CBC Handout No. 2-21 Published: 1/1/08 Page 1 of 3 This document summarizes

More information

Introduction. LLB wishes to thank the Trustees, Director and Building Committee of the Gleason Public Library for their assistance and guidance.

Introduction. LLB wishes to thank the Trustees, Director and Building Committee of the Gleason Public Library for their assistance and guidance. 1 E x e c u t i v e s u m m a r y Introduction Architect Lerner Ladds + Bartels and engineers Simpson Gumpertz & Heger were selected to provide services to investigate and determine the causes of deterioration

More information

assembly an open space between the roof and ceiling of a building attic balloon frame a joist constructed of steel with bars in the verticle web space

assembly an open space between the roof and ceiling of a building attic balloon frame a joist constructed of steel with bars in the verticle web space assembly two or more interconnected structural components combined to meet a specific function or design requirement attic an open space between the roof and ceiling of a building balloon frame a type

More information

CONSTRUCTION IMPORTANT TERMS AND FACTS CHAPTER 15

CONSTRUCTION IMPORTANT TERMS AND FACTS CHAPTER 15 CONSTRUCTION IMPORTANT TERMS AND FACTS CHAPTER 15 Copyright 2004 CONSTRUCTION The following are twenty key construction components and basic facts that are to be considered high priority. Please refer

More information

Carpentry/Carpenter CIP Task Grid

Carpentry/Carpenter CIP Task Grid Secondary Task List 100 SAFETY/OCCUPATIONAL ORIENTATION 101 Identify and follow all basic safety practices and procedures. 102 Identify and follow all lab safety practices and procedures. 103 Identify

More information

The Inspection Process. Waxhaw N.C.

The Inspection Process. Waxhaw N.C. The Inspection Process In Waxhaw N.C. This information is provided by the Waxhaw Enforcement Division to assist you in the progression of your project. Nothing in this document should be considered "Code"

More information

KEYSTONE PACIFIC PROPERTY MANAGEMENT, INC. Monarch Hills Condominium Association Dana Point, CA. Annual Maintenance Review.

KEYSTONE PACIFIC PROPERTY MANAGEMENT, INC. Monarch Hills Condominium Association Dana Point, CA. Annual Maintenance Review. KEYSTONE PACIFIC PROPERTY MANAGEMENT, INC. Monarch Hills Condominium Association Dana Point, CA January 19, 2016 LJP Project # 15-3149 TABLE OF CONTENTS 1. Assignment... 3 2. Summary of Existing Conditions...

More information

Residential Building Inspections

Residential Building Inspections Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved

More information

R CODE CHANGE PROPOSAL FORM (See instructions on page 2)

R CODE CHANGE PROPOSAL FORM (See instructions on page 2) CODE CHANGE PROPOSAL FORM (See instructions on page 2) Code: IRC 12/13 Sections 301.2.2.2.1 Proponent: Charles S. Bajnai, Chesterfield County, VA, ICC Building Code Action Committee 1. Delete as shown

More information

BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS

BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS Please note: This construction plan component list is to be used as a guide to assist you with your project. There may be elements unique to your project not

More information

1.0 Structural Systems

1.0 Structural Systems 1.0 Structural Systems 1.1 Code and Loading Requirements While all new construction will be in compliance with the 2006 International Building Code, existing portions of the building that are to remain

More information

November 30, University of Virginia Facilities Management Engineering & Design Division P.O. Box Charlottesville, VA

November 30, University of Virginia Facilities Management Engineering & Design Division P.O. Box Charlottesville, VA University of Virginia Facilities Management Engineering & Design Division P.O. Box 400726 Charlottesville, VA 22904-4726 Attention: Reference: William Blodgett, AIA Project Manager University of Virginia

More information

City of Hughson Building Safety Division 7018 Pine Street Hughson, CA (209)

City of Hughson Building Safety Division 7018 Pine Street Hughson, CA (209) City of Hughson Building Safety Division 7018 Pine Street Hughson, CA 95326 (209) 883-4054 RESIDENTIAL ATTACHED PATIO COVERS Patio covers are one story roofed structures not more than 12 feet above grade,

More information

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3%

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3% CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE EXAM ID: I6 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 3 % 0101. Project Administration 3% Verify that plans,

More information

New Raised Courtyard Terrace Pavers and Retaining Walls. Line of Steps Above. New Wood Framed Stair

New Raised Courtyard Terrace Pavers and Retaining Walls. Line of Steps Above. New Wood Framed Stair Building Program Wall Construction to Remain Religious Education New Wall Construction New Furring on Wall Construction, See Partition Types, Community Room New Galvanized Steel Window Well Patch Wall

More information

Residential Deck Guide

Residential Deck Guide Residential Deck Guide The text and illustrations included in this guide represent opinions of the Borough of Mechanicsburg Codes and Zoning Department. This guide is for educational and information purposes

More information

Pre-schematic Considerations. Who. What. Where

Pre-schematic Considerations. Who. What. Where Who What Where Who, What & Where Who are the users? Church School Manufacturers Researchers Who, What & Where What is the purpose? Fellowship Teaching Manufacturing Production Who, What & Where Location,

More information

05/16/2016 1:36:13 PM

05/16/2016 1:36:13 PM 1223 Mineral Spring Avenue North Providence, RI 02904 STRUCTURAL EXISTING CONDITIONS REPORT Prepared for: Jonathan Levi Architects 266 Beacon Street Boston, Massachusetts, 02116 May 16, 2016Draft WESTPORT,

More information

Table Air Barrier and Insulation Inspection Component Criteria

Table Air Barrier and Insulation Inspection Component Criteria Table 40.4. Air Barrier and Insulation Inspection Component Criteria NUMBER COMPONENT CRITERIA Air barrier and thermal barrier Exterior thermal envelope insulation for framed walls is installed in substantial

More information

ThermaSteel Corporation ASSEMBLY MANUAL

ThermaSteel Corporation ASSEMBLY MANUAL ThermaSteel Corporation ASSEMBLY MANUAL TABLE OF CONTENTS 1- INTRODUCTION 1.1 THERMASTEEL TM WALL PANELS 1.2 Drawing and Element Numbers 2- ASSEMBLY 2.1 Sequence of Assembly 2.2 Preparation of Foundation

More information

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1% CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE EXAM ID: I1 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 6% 0101. Project Administration 1% Verify that

More information

Residential Building Plans

Residential Building Plans Residential Building Plans 1. Building Site Plan indicating: a. Location of Proposed and Existing Buildings b. Location of Property Lines c. Building Setback Dimensions d. Location and Depth of Building

More information

10/23/2011. Plan Examination. Plan ExaminationPurpose. Catch problems in advance of construction.

10/23/2011. Plan Examination. Plan ExaminationPurpose. Catch problems in advance of construction. Plan Examination 1 Plan ExaminationPurpose 2 Catch problems in advance of construction. 3 1 Discovery of problems in the field results in higher cost. 4 Can a good plan review eliminate all problems in

More information

Horse Farm, Livestock Office, and Horticulture Shed Cost Evaluation Report, Revised to address comments

Horse Farm, Livestock Office, and Horticulture Shed Cost Evaluation Report, Revised to address comments November 4, 2014 Heidi Hubble Facilities and Services MSC 3545 New Mexico State University P.O. Box 30001 Las Cruces, NM 88003 Re: Horse Farm, Livestock Office, and Horticulture Shed Cost Evaluation Report,

More information

Attachment A. USG Minimum Design and Construction Requirements for Wood Framed Structures

Attachment A. USG Minimum Design and Construction Requirements for Wood Framed Structures Attachment A USG Minimum Design and Construction Requirements for Wood Framed Structures 1. General Design Criteria 1.1. Per Adopted Georgia State Minimum Standard Building Code 1.2. Minimum Live Loads

More information