1 SECTION TRENCHING AND BACKFILLING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Earth excavation and backfilling for construction of pipe and appurtenances, and for required removals. B. Disposal of excavated materials including stripping and stockpiling topsoil, salvage of material for backfill and removal of excess or material removed and not suitable for re-use. C. Excavation of surface materials, including pavements, drainage facilities, culvert pipes and end-walls. D. Maintenance of excavations including sheeting, dewatering, bridging, and fencing. E. Construction of bedding and pipe zone backfill. F. Construction of trench backfill. G. Construction of embankments. H. Excavation and backfill of test pits. I. Protection of utilities and maintenance in service of all utilities; including those to be removed; until said removal commences after replacement facilities have been constructed and placed in service. J. Compaction. K. Restoration of surfaces, including topsoil, drainage culverts, and ditches. L. Protection of trenches and open excavations. 1.3 RELATED SECTIONS A. Section Earthwork (Broadscope). B. Section Environmental Protection and Erosion and Sediment Control. C. Section Sheeting and Shoring. D. Section Structural Excavation, Backfill, and Compaction (Building Area). E. Section Ductile Iron Pipe. F. Section Sanitary Utility Sewerage Piping

2 G. Section Corrugated Polyethylene Storm Drain Pipe. 1.4 DEFINITIONS A. Earth Excavation: The removal of all material not classified as rock. B. Hand Trench Excavation: Excavations performed manually exceeding one cubic yard in any one operation. Hand trench excavation may be required to protect trees, utilities, etc. or as specified, shown on the Contract Drawings or as directed by the Architect/Engineer. C. Gravel Backfilling: The placement or replacement of all soil material as specified, shown on the Contract Drawings or as directed by the Architect/Engineer. 1.5 QUALITY ASSURANCE A. Allowable Tolerances: 1. Alignment of Excavation: To permit construction of pipe, structures, and appurtenances to the tolerances specified under pertinent drawings and specifications. a. Trench bottom vertical alignment: Do not excavate less, or 2 inches more at any point below proposed pipes and other structures than dimension shown on the Contract Drawings. b. Trench sides horizontal alignment: Do not excavate less than dimension shown on the Contract Drawings. c. Line of neat pavement cut: Do not vary more than 12 inches in 50 feet, and not more than one inch in 10 feet from a straight horizontal line. 2. Bedding: Construct bedding with specified material as indicated to produce the minimum levels relative to the pipe as shown on the Contract Drawings. B. Requirements of Regulatory Agencies: 1. Comply with New York State Department of Labor Board of Standards and Appeals Part 23 of Title Comply with Subpart P, "Excavations, Trenching, and Shoring" of U.S. Department of Labor OSHA Regulations for Construction. 3. Comply with rules, regulations, laws concerning construction activity in roads of the applicable jurisdiction: a. New York State Department of Transportation. b. County of Albany. c. Town of Guilderland. 4. Comply with all other applicable regulations. 1.6 SUBMITTALS A. Samples: 1. Before using material for special trench backfill, pipe zone backfill, or bedding, submit samples from each typical source to the Architect/Engineer for testing and approval as follows: 2. Submit two samples of material from each source used for trench backfill or bedding if other than on-site sand. 3. Submit two samples of crushed stone from each source, as shown in the Contract Drawings or Specifications, or ordered by the Architect/Engineer. 4. Submit two samples of Structural Fill used for trench backfill, as shown in the Contract Drawing or as ordered by the Architect/Engineer

3 1.7 DELIVERY, STORAGE, AND HANDLING A. Load and haul away excavated material not suitable for other uses at the site. Use haul routes approved by the municipality having jurisdiction. Use temporary dust control to keep haul routes clean and free of dust. Provide dump at Contractor's expense, and obtain approval for its use from municipality having jurisdiction. B. Store and stockpile material suitable for backfilling within rights-of-way and easements, away from interference with traffic, and nearby residents. Use all stockpiled material as soon as practical. Do not allow material to erode or wash into trench, onto road or adjacent property. 1.8 SITE CONDITIONS A. Sequencing, Scheduling: Notify the Architect/Engineer three working days in advance of the need for manhole and pipeline layout. B. Notify: Capital Area Underground Utilities Location Service ( ) 72 hours prior to starting excavation, for location of gas, telephone, and electric lines. C. Notify: Other private and public utilities in the work area. 1.9 GEOTECHNICAL ENGINEERING STUDY (SOILS REPORT) A. The Owner employed by C.T. Male Associates, P.C. (Geotechnical Engineer) to investigate sub-surface soil conditions and make recommendations regarding sitework construction procedures. Perform all work in accordance with the recommendations and requirements therein. If conflicts exist between the Geotechnical Evaluation and the Contract Drawings and Specifications, the more stringent requirements shall apply. PART 2 - PRODUCTS 2.1 MATERIALS A. Bedding: 1. On-Site Sand: Material shall be clean, as approved by the Architect/Engineer, and shall be practically free from silt, clay, organic matter, frozen sections, or other deleterious matter. It shall not contain slag, cinders, ashes, rubbish, or other foreign material. B. Pipe Zone Backfill: 1. On-Site Sand: Material shall be clean, as approved by the Architect/Engineer, and shall be practically free from silt, clay, organic matter, frozen sections, or other deleterious matter. It shall not contain slag, cinders, ashes, rubbish, or other foreign material. C. Special Trench Backfill: 1. Crushed Stone or Crushed Gravel: As specified in Section 703, Subsection 703_02 - Coarse Aggregate of the New York State Department of Transportation Standard Specifications for Construction and Materials, dated May 1, 2008 and all addenda thereto; and being of the specific size called for by the Architect/Engineer. 2. Run-of-Bank Gravel or Sand:

4 a. Gravel shall be as specified in Section 667 Local Road Gravel Surface, Base, and Subbase Courses of the New York State Department of Transportation Standard Specifications for Construction and Materials, dated May 1, 2008 and all addenda thereto and being of the specific gradation called for; or a run of bank gravel of a gradation and from a source acceptable to the Architect/Engineer. b. Sand shall be as specified in Section 703, Subsection 703_01 - Fine Aggregate of the New York State Department of Transportation Standard Specifications for Construction and Materials, dated May 1, 2008 and all addenda thereto; or a run of bank sand acceptable to the Architect/Engineer. 3. Flowable Fill: As specified in paragraph 2.2.A of this section. D. Structural Fill: 1. Structural fill shall be as defined in the Geotechnical Evaluation. This material is an imported run-of-bank sand or sand and gravel which conforms to the limits of gradations listed below. Structural fill shall be used to backfill areas of utility removal. Imported Structural Fill Sieve Size Percent Finer by Weight 4-Inch 100 ¼ Inch 75 to 100 No to 95 No to 10 E. Embankment: 1. On-Site Sand: Material shall be clean, as approved by the Architect/Engineer, and shall be free of clay, organic matter, frozen material or other deleterious matter, including slag, cinders, ash or rubbish. 2. Structural Fill: As specified herein. 2.2 MIXES A. Flowable Fill: 1. Shall be a manufactured special trench backfill of the following proportions: a. Cement: 35 lb/cy. b. Aggregate (Sand and Gravel - 3/8 Maximum Size): 2,750 lb/cy. c. Water: 315 lb/cy. d. Air Entraining Agent: 20 lb/cy. 2. Shall be prepared by a ready mix supplier and delivered to the site premixed. 3. Shall be equal to the CLSM 0 Flowable Fill as manufactured by Clemente Latham Concrete Corp or equal. 4. Shall result in a backfill material which exceeds 95% relative optimum density upon installation. PART 3 - EXECUTION 3.1 INSPECTION A. Prior to all work, carefully inspect the site and verify that construction may properly commence

5 1. Before excavation verify: a. Work layout, horizontal and vertical, and conformance of layout with the Contract Drawings. b. Limits of construction. c. Surface drainage ditch and driveway culvert alignments, both vertical and horizontal. Also inspect culvert pipes and immediately report to the Architect/Engineer any condition which would prevent removal and reinstallation of culvert pipes to condition when found. d. Utility locations, including, but not limited to: aerial, pole-lines, buried, underground transmission, local service, and individual connections. e. Location, size and description of property to be replaced including, but not limited to: curbs, driveways, pavements, plantings, and lawn furnishings. f. Location of property markers, bench marks, USGS Monuments, settlement gauges, and ROW markers, within the Limits of Construction which may be moved by the Contractor's operations. 2. After excavation verify that pipe, structures, and appurtenances to be placed in trenches may be installed in accordance with pertinent drawings and specifications. 3. Before backfilling verify: a. Pipe, structures, and appurtenances have been installed in accordance with pertinent Contract Drawings and Specifications. b. Utilities are adequately continued, supported and maintained without damage. B. In the event of discrepancy or unsatisfactory condition, immediately notify the Architect/Engineer. 3.2 PREPARATION A. Notification: Before commencing excavation in any part of the job, notify the following: 1. The Architect/Engineer. 2. Adjacent and affected property occupants. 3. The Fire Department. 4. The Police Department. 5. All public and private utilities whose facilities are in the vicinity of the excavation. Notify UFPO 72 hours before excavating. B. Utility Protection and Changes: Where public and/or private utilities are encountered: 1. Maintain, support, and save from damage all public utilities. 2. Allow reasonable time and space for owners of private utilities to cooperate in maintaining their facilities. 3. Excavate test pits: a. As required by the Contract Drawings or as directed by the Architect/Engineer. b. In advance of construction to determine precise location of obstructions, utilities. C. Site Clearing and Surface Removal: Prior to excavation of trench: 1. Clear the work area. 2. Strip topsoil and stockpile for re-application. 3.3 PERFORMANCE A. Excavation: Perform all earth excavation for construction of pipe, appurtenances, structures, bedding, and backfill. Remove surface materials and drainage facilities: 1. Disposal of excavated material: a. Store material suitable for backfill. Protect from contamination

6 b. All surplus earth, rock and other unsuitable or unsatisfactory material shall be transported and placed on spoil areas specified in the Contract Drawings at the elevations and grades shown. If spoil areas are not shown, all spoil and surplus materials shall be disposed of at an off-site location approved by the Architect/Engineer. c. The Contractor shall furnish written approval from the owner of the spoil disposal site for such disposal. 2. Remove pavement to neat straight lines for pavement restoration when excavating through pavement to remain. Remove pavement to allow for a minimum of 6 inches of undisturbed base on each side of trench for pavement replacement. 3. Perform excavation in such manner and to such widths as will give ample room for installing the pipe, appurtenances and structures, and for sheeting, bracing, pumping, and draining. 4. Do not disturb bottom of excavation at structures requiring a cast-in-place concrete base. In case material is disturbed, carefully excavate to undisturbed level and fill with concrete at no additional cost to the Owner. 5. Unauthorized Excavation: Unauthorized excavations carried outside lines and grades shown on Contract Drawings shall be filled by Contractor at no additional cost to the Owner as follows: a. Below concrete cradle, concrete encasement or concrete foundation, fill unauthorized excavations with 3,000 psi concrete. b. Below specified bedding, fill unauthorized excavations with compacted bedding material. 6. Maintenance of Trench: a. Keep sides of excavation from slides, cave-ins. Use any method including, but not limited to: b. temporary sheeting, shoring, bracing, cribbing. c. Furnish and install sheeting and shoring to support the sides of all trenches and other excavations. Remove sheeting and shoring as excavation is filled up, except where the Architect/Engineer orders the sheeting left in place. d. Keep excavations free from water. Use any method including but not limited to gravity flow, pumping, sumps. Maintain excavation in a dry condition until backfill has been placed and compacted a minimum of 18 inches above top of pipe. In all cases, maintain dry trench at backfill level. 7. Schedule: a. Advance excavation operations ahead of pipe-laying to allow for circumstances such as rock, other utilities. b. Limit excavations ahead of pipe-laying a maximum of 200 feet, unless more is approved by the Architect/Engineer in writing. c. Confine excavation operations to reasonable limits to facilitate traffic movement and reduce inconvenience to property of the Owner. B. Bedding and Pipe Zone Backfill: 1. The trenches for pipelines shall have bottoms as shown on the Contract Drawings conforming to the required grades. All excavations for pipelines shall be made to the depths shown for pipe bedding. 2. If the bottom of trench becomes unsuitable for pipe laying, due to Contractor's operations, he shall provide extra excavation and backfill suitable to the conditions at the area and bedding specified, at no additional cost to the Owner. 3. If the bottom of the trench is soft and, in the opinion of the Architect/Engineer, cannot support the pipe or structure, additional trench depth shall be excavated as ordered by the Architect/Engineer, and refilled with specified crushed stone. 4. On-Site Sand: a. Inasmuch as the pipe will be bedded in on-site sand no excavation will be required below the bottom of the pipe other than shaping the existing material to receive the pipe bells or joints. Prior to the said shaping, a plate tamper shall be utilized to compact the subgrade of the pipe to 95% Modified Proctor Density

7 b. The placement and compaction of bedding material shall continue in 6-inch thick loose lifts on each side of the pipe up to the spring line of the pipe. Each loose lift shall be hand compacted to 95% Modified Proctor Density. c. Place Pipe Zone Backfill material in 6-inch thick loose lifts on each side of the pipe up to plane 12-inches above the top of the pipe. Hand compact each layer to 95% Modified Proctor Density. 5. Class A Concrete Cradle Bedding (If ordered by the Architect/Engineer): a. Place and compact 3,000 psi concrete in trench bottom. b. Settle the bottom of pipe into fresh concrete at correct line and grade. c. After construction of pipe, place and compact 3,000 psi concrete each side of the pipe as shown on the Drawings. d. Place Pipe Zone Backfill material in 6-inch thick loose lifts on each side of the pipe up to a plane 12 inches above the top of the pipe. Hand compact each layer to 95% Modified Proctor Density. 6. Class A Concrete Encasement (If ordered by the Architect/Engineer): a. Same requirements as for Concrete Cradle, except increase the concrete to cover the pipe a minimum of 6 inches and exclude the Pipe Zone Backfill, as shown on the Drawings. b. Place a layer of 15 lb. asphalt impregnated felt on the concrete before backfilling. 7. Bedding Compaction: a. Below pipe and structures: Compact to not less than 95% of Modified Proctor maximum density, at or below optimum moisture content in conformance with ASTM D b. Material shall be deposited evenly on both sides of the pipe in tamped layers not exceeding 6 inches in depth until at least three-fourths the depth of the pipe has been reached. For wide trenches tamping shall be done for a distance on each side of the pipe equal to at least the diameter of pipe. Any pipe that is damaged or moved out of alignment, regardless of cause, shall be replaced or realigned at the Contractor's expense. 8. Ditch Line Dikes: 9. Construct an impervious earth dike at trench bottom to keep free water from traveling downstream along pipe and eroding pipe bedding. a. Construct dike of clay or other impervious material. b. Construct one foot thick and from bottom of trench to top of pipe and at every manhole, and other places as directed by the Architect/Engineer. C. Trench Backfill: 1. Trench backfill shall be on-site sand or Structural Fill as specified, shown on the Drawings, or as directed by the Architect/Engineer. Material shall be placed and compacted as follows: a. Within 18-inches of subgrade elevation, on-site sand backfill shall be placed in 12-inch thick loose lifts and mechanically compacted to 95% Modified Proctor maximum density. b. Up to within 18-inches of subgrade elevation, on-site sand backfill shall be placed in 15- inch thick loose lifts and mechanically compacted to 95% Modified Proctor maximum density. c. Do not backfill against masonry walls or other structures until they have attained sufficient strength to safely resist the thrust of fill materials. d. Do not backfill with frozen materials. e. If settlement or washout occurs before Final Inspection, furnish, place, and compact additional material to resurface the low places as directed by the Architect/Engineer. f. Maintain dust control at all times. 2. Heavy equipment shall not be allowed to pass over the pipe until a fill of at least 2 foot depth has been placed over the pipe. In any case, movement of construction equipment and all other vehicles and loads over and adjacent to any pipe shall be done at the Contractor's risk. When determined by the Architect/Engineer, any pipe that is damaged or disturbed through any cause shall be replaced as directed by the Architect/Engineer, at the expense of the Contractor and at no cost to the Owner. 3. Methods of Compaction:

8 a. Hand Compaction: b. Tamping by hand with flat hand tampers. c. Mechanical Compaction: d. Compaction by means of vibratory or other mechanical tampers. 4. Backfilling and consolidation shall be by one of the following procedures, as directed by the Architect/Engineer, depending on the nature of the backfill material and the location of the trench. a. Cross-country conditions and lawns where reasonable subsequent trench settlement can be tolerated: 1) Backfill material shall be placed in 2-foot layers compacted to 90% Modified Proctor. The top layer shall be similarly compacted and mounded as required to allow for subsequent settlement. The surface shall be maintained prior to fine grading and seeding, and thereafter repaired as necessary for the duration of the maintenance period. D. Special Trench Backfill: 1. Crushed Stone or Crushed Gravel: Shall generally be required in extremely wet trench conditions primarily for Pipe Zone Backfill. 2. Run-of-Bank Gravel or Sand: Shall be required under highways and other paved areas as Pipe Zone Backfill and/or Special Trench Backfill when excavated material is unsatisfactory as directed by the Architect/Engineer: a. Trench backfill material in trench excavations ranging from 0 to 10 feet deep, measured from invert of pipe to finished grade, in non-paved areas as designated by the Architect/Engineer shall be placed and compacted in accordance with paragraph 3.3.C.4.a.1) herein. b. Trench excavations exceeding 10 feet deep over the invert of the pipe shall be placed and compacted in accordance with paragraph 3.3.C.4.b.1) herein. 3. Flowable Fill: Shall generally be required in County and State highway rights-of-way whenever paved areas are excavated by the open cut method. Flowable fill shall be used as directed by the Architect/Engineer. E. Test Pits: 1. Excavate test pits for location of utilities which may affect the location of proposed work, at times and locations as shown on the Contract Drawings, or as directed by the Architect/Engineer. 2. Size: 3 feet x 6 feet to the depth required, unless larger pit is ordered by the Architect/Engineer. 3. Prior to excavation, notify the Architect/Engineer, and affected utility owners. 4. Test pits shall include excavation, temporary sheeting, dewatering, backfill and temporary pavement. F. Utility Protection: 1. Support and protect from injury all existing utility lines and structures which are encountered, uncovered or hazarded by excavation operations, which do not, in the opinion of the Architect/Engineer, require to be changed in locations. If damaged or removed, restore to as good condition as when found at Contractor's expense. 2. Provide temporary channels of flow for all water courses, and restore to original condition at completion of backfilling. 3. Give written notice to owners of existing utilities or structures in time for them to cooperate in protecting their property. 4. Contractor shall hold the Architect/Engineer harmless against: a. Obstructions to flow of drains, ditches, or streams. b. Injury to electric, telephone lines, gas, and water lines. G. Maintenance of Utilities:

9 1. During the construction of this project all utilities shall be maintained in service except as necessary to construct the building. The portion of the existing Sanitary Sewer to be removed and properly disposed of shall be maintained in service until replacement facilities are connected and can themselves be placed in service. Replacement facilities shall be connected and the existing structures to which they connect can be modified without interruptions in service. Where the sewer line and appurtenances have been removed, excavations shall be backfilled with Structural Fill. H. Restoration of Surfaces: 1. After backfilling, restore surfaces and facilities to as good condition or better than they were found. 2. On paved surfaces disturbed by digging, place and compact subbase granular material to match the original pavement elevation immediately after backfilling is completed. 3. Immediately after backfilling, restore all other surfaces and facilities as follows: a. Where possible, mound additional fill or topsoil over trench line to provide for settlement. b. Replace drainage culverts and pipes, end sections, and walls, removed for excavation to their original position. Provide granular bedding and backfill suitable for each installation. Shape, trim and compact surface to receive pavement or surface treatment of similar or like kind and quality as that which was removed. c. Shape, trim and compact ditches, water courses, swales to original cross-section and profile. Place topsoil, seed and maintain until intended vegetation has been reestablished. Where water velocities produce a scouring or erosion in ditches, provide jute mesh or riprap to stabilize as directed by the Architect/Engineer. d. Grade, trim, compact lawns and open areas. Spread topsoil on disturbed areas and seed. Furnish make-up topsoil if sufficient material has not been adequately stockpiled. I. Maintenance of Roadways and Sidewalks: 1. Conduct construction operations so as to leave open and free passage at sidewalks, cross walks, and carriageways. 2. Maintain hydrants, fire/police alarm boxes, mail boxes, accessible for use. 3. Provide temporary bridge(s) of adequate design and construction where open trench crosses walkways, roadways, or driveways. a. Provide hand railing for bridges used for walks. b. Maintain temporary bridges in a safe, neat condition, suitably lighted at night. J. Temporary Wire Fence: 1. Where trenches and open excavations are left unattended during non-working hours or days, furnish and maintain temporary for: a. Excavations having sides steeper than one vertical to one horizontal. b. Excavations deeper than 5 feet. 2. A temporary wire fence shall not be required where temporary sheeting is extended a minimum of 3 feet above ground surface, and no void exists between sheeting and side of excavation. Provide signs in accordance with 4.a and 5.b below. 3. Provisions for this fencing are in addition to provisions the Contractor would normally make to safeguard his work operations and in no way diminish his obligations in this respect. 4. Materials: a. Signs: "DANGER - KEEP OUT" message. Size: b. 16" x 24". 5" black letters on orange background. c. Posts: Steel angle, wood or barricades, suitable to provide adequate support. 5. Construction Details: a. Construct temporary fence to completely surround all excavations as required. b. Mount "DANGER - KEEP OUT" signs at intervals not exceeding 50 feet along fence line

10 c. Provide posts or adequate supports for fencing at intervals not in excess of 10 feet. Stretch and fasten wire fabric at top, middle, and bottom of each support. END OF SECTION

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related

More information

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1 1.01 GENERAL A. The Contractor shall perform all excavation, backfilling, grubbing and grading required for construction and installation of pipelines, structures and appurtenances. Excavation shall include

More information

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing. SECTION 02221 TRENCHING, BACKFILLING AND COMPACTION PART 1 GENERAL 1.01 WORK INCLUDED A. Excavation for piped utility material. B. Provide necessary sheeting, shoring and bracing. C. Prepare trench bottom

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

SECTION EXCAVATION AND FILL

SECTION EXCAVATION AND FILL SECTION 02315 EXCAVATION AND FILL PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, equipment, and incidentals necessary to perform excavation, backfill, grading, and slope protection required to

More information

SECTION 10 - TRENCHING AND BACKFILLING

SECTION 10 - TRENCHING AND BACKFILLING SECTION 10 - TRENCHING AND BACKFILLING 10.1 General A. Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 10.1.1 Related requirements

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL

CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL 13.01 GENERAL The work included in this section shall consist of furnishing all materials and equipment and performing all labor

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES AFTER MARCH 1, 2012 ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES 430.1 Description. This item shall govern for all excavation required for the construction of sewers, sewer structures, pipe culverts,

More information

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill. SECTION 312000- EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Special Conditions, apply to this Section. 1.2 SUMMARY This Section

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 02222 - EXCAVATION, BACKFILL, AND COMPACTION FOR UTILITIES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Excavating trenches for the installation of utilities and stormwater detention facilities. B.

More information

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation.

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation. SECTION 312333 TRENCHING AND BACKFILLING PART 1 - GENERAL 1.1 SUMMARY A. Excavate trenches for new electric and telephone conduits, gas lines, and their appurtenances from at least 5 feet outside the building

More information

Construction Specification for General Excavation

Construction Specification for General Excavation Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03

More information

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations. Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet

More information

SECTION 1 GENERAL NOTES

SECTION 1 GENERAL NOTES ISSUE DATE NOVEMBER 1st, 2011 SECTION 1 Page List Page Number Page Title COVER COVER GN-01 PAGE 1 GN-02 PAGE 2 GN-03 PAGE 3 GN-04 PAGE 4 GN-05 PAGE 5 GN-06 PAGE 6 GN-07 PAGE 7 : 1. (CCU) STANDARD SPECIFICATIONS

More information

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014 1 0 1 0 1 0 1 SECTION 1. TRENCHING BASED ON DFD MASTER SPECIFICATION DATED // P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all work, materials, labor, equipment,

More information

SECTION GENERAL EXCAVATION

SECTION GENERAL EXCAVATION 02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,

More information

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards... SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES 1 1 1 0 1 0 1 0 1 SECTION 1. STRUCTURAL EXCAVATION FOR STRUCTURES BASED ON DFD MASTER SPECIFICATION DATED /1/1 P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all

More information

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving. SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.

More information

STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION TRENCHING AND BACKFILL

STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION TRENCHING AND BACKFILL STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION 31 23 33 TRENCHING AND BACKFILL PART 1 GENERAL... 3 1.1 Description... 3 A. Excavation for Utilities Includes... 3 B. Suitable Fill Material...

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain

More information

SECTION EARTHWORK. B. Removal of subsoil and excavating all classes of material encountered.

SECTION EARTHWORK. B. Removal of subsoil and excavating all classes of material encountered. SECTION 02200 PART 1 GENERAL 1.1 SECTION INCLUDES A. Subsoil and aggregate materials. B. Removal of subsoil and excavating all classes of material encountered. C. Handling, storage, transportation and

More information

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES SECTION 02215 EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES PART 1 - GENERAL 1.1 DESCRIPTION: This section includes materials, testing, and installation of earthwork for excavations, fills, and

More information

EXCAVATION AND BACKF1LL

EXCAVATION AND BACKF1LL S E C T I O N 2 3 1 5 EXCAVATION AND BACKF1LL PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: Excavation, trenching, complete and continual dewatering of excavation, sheeting, bracing and shoring of

More information

SECTION EMBANKMENT

SECTION EMBANKMENT 02260-1 of 8 SECTION 02260 EMBANKMENT 02260.01 GENERAL A. Description 1. Embankment shall be formed of suitable material obtained from General, Structure, Borrow, Trench, and other excavations included

More information

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

SECTION EARTHWORK

SECTION EARTHWORK SECTION 02200 EARTHWORK PART 1 - GENERAL 1.01 WORK INVOLVED A. Provide all labor, materials and equipment as required for all excavation, grading, providing borrow materials, hauling, placing and compacting

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

SECTION EARTHWORK

SECTION EARTHWORK SECTION 310000 PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and perform all excavation, backfill, fill and grading required to complete the work

More information

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS. SECTION 1100 GRADING 1101 SCOPE. This section covers the performance of all work required for grading the project in coordination with all previous work performed at the locations shown on the contract

More information

SECTION TRENCHING, BACKFILL AND COMPACTION

SECTION TRENCHING, BACKFILL AND COMPACTION SECTION 312333 TRENCHING, BACKFILL AND COMPACTION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes 1. Native Backfill Material 2. Crushed Stone Bedding 3. Select Backfill Material 4. Shoring and Bracing

More information

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS CS-2-01. GENERAL: Trench excavation shall conform with the City Standard Specifications. In general a trench is defined as an excavation in which

More information

TRENCH EXCAVATION AND BACKFILL

TRENCH EXCAVATION AND BACKFILL TRENCH EXCAVATION AND BACKFILL PART 1 - GENERAL 1.01 SECTION INCLUDES A. Trench Excavation for Pipe Systems B. Trench Foundation Stabilization C. Pipe Bedding and Backfill 1.02 DESCRIPTION OF WORK A. Excavate

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01

More information

SECTION EXCAVATION, TRENCHING AND BACKFILL

SECTION EXCAVATION, TRENCHING AND BACKFILL SECTION 02315 EXCAVATION, TRENCHING AND BACKFILL PART 1 - GENERAL 1.01 SUMMARY A. Section includes: 1. Excavation, trenching, and backfill necessary for the construction of the facilities as indicated

More information

SECTION EXCAVATION, BACKFILLING AND COMPACTING

SECTION EXCAVATION, BACKFILLING AND COMPACTING PART 1 GENERAL 1.01 SCOPE Work of this Section shall include all labor, materials, equipment, plant and incidentals required to complete all excavation, backfilling and compacting as indicated on the Drawings

More information

The developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines.

The developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines. SECTION 15.0 PIPE TRENCHES 15.01 Clearing and Grubbing The developer/contractor shall be responsible for the clearing and grubbing of the entire right-of-way. See Sections 13.01 and 14.01. Clearing and

More information

DIVISION 31 SITE WORK SECTION TRENCHING AND BACKFILLING FOR UTILITIES

DIVISION 31 SITE WORK SECTION TRENCHING AND BACKFILLING FOR UTILITIES DIVISION 31 SITE WORK PART 1 GENERAL 1.01 SECTION INCLUDES A. Excavating trenches for utilities. B. Backfilling and compaction of utility trenches. C. Excavation, backfill and compaction for manholes and

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

SECTION 02215BP TRENCHING AND BACKFILLING

SECTION 02215BP TRENCHING AND BACKFILLING SECTION 02215BP TRENCHING AND BACKFILLING This page is intentionally left blank. Fluor-B&W Portsmouth, LLC (FBP) SITE PREPARATION INFRASTRUCTURE PHASE 1 SPECIFICATION COVER SHEET Client: U.S. Department

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION EXCAVATION AND BACKFILL, GENERAL

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION EXCAVATION AND BACKFILL, GENERAL SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION 31 23 00 EXCAVATION AND BACKFILL, GENERAL PART 1 GENERAL... 2 1.1 Description... 2 1.2 Submittals... 2 1.3 Reference

More information

SECTION 18 - EARTHWORK TABLE OF CONTENTS

SECTION 18 - EARTHWORK TABLE OF CONTENTS SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL... 18.1 18-2 ROADWAY EXCAVATION... 18.1 18-2.01 General... 18.1 18-2.02 Unsuitable Roadway Excavation and Backfill... 18.1 18-2.03 Surplus

More information

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The Work of this Section shall be all labour, materials, equipment and supervision necessary

More information

SECTION 32 EXCAVATION, BACKFILL, COMPACTION AND GRADING

SECTION 32 EXCAVATION, BACKFILL, COMPACTION AND GRADING 32.1 GENERAL SECTION 32 EXCAVATION, BACKFILL, COMPACTION AND GRADING This Section covers excavation, backfill, fill and grading associated with utility trench and structural construction. All such WORK

More information

SECTION 10.0 PIPE TRENCHES Excavation and Preparation of Trench

SECTION 10.0 PIPE TRENCHES Excavation and Preparation of Trench SECTION 10.0 PIPE TRENCHES 10.01 Excavation and Preparation of Trench The trench shall be excavated to the proper depth to permit installation of the pipe along the lines and grades shown on the Plans.

More information

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING Section Number Title 301 GENERAL 302 MATERIALS SPECIFICATIONS 303 CLEARING

More information

SECTION EXCAVATION AND FILL

SECTION EXCAVATION AND FILL SECTION 312300 EXCAVATION AND FILL PART 1 - GENERAL 1.1 SUMMARY A. Excavate, backfill, compact, and grade the site to the elevations shown on the Drawings, as specified herein, and as needed to meet the

More information

SECTION TRENCI-JING PART 1 GENERAL

SECTION TRENCI-JING PART 1 GENERAL S SECTION 3123 17 TRENCI-JING PART 1 GENERAL 1.1 STIPULATIONS A. The Specification Sections "General Conditions of Contract", "Special Conditions" and "Division 01 - General Requirements" form a part of

More information

SECTION 14 EMBANKMENT

SECTION 14 EMBANKMENT SECTION 14 EMBANKMENT 14.1 DESCRIPTION A. General: This work consists of constructing roadway embankments, including preparation of the areas upon which embankments are to be placed; the construction of

More information

City of Thomasville Water, Sewer & Natural Gas Specifications SECTION TRENCH EXCAVATION AND BACKFILL

City of Thomasville Water, Sewer & Natural Gas Specifications SECTION TRENCH EXCAVATION AND BACKFILL SECTION 02225 TRENCH EXCAVATION AND BACKFILL PART 1 GENERAL 1.01 SCOPE A. The work under this Section consists of furnishing all labor, equipment and materials and performing all operations in connection

More information

SECTION STRUCTURE EXCAVATION AND EARTHWORK

SECTION STRUCTURE EXCAVATION AND EARTHWORK SECTION 02200 STRUCTURE EXCAVATION AND EARTHWORK PART 1 GENERAL 1.1 SECTION INCLUDES A. Pavement Removal B. Stripping Topsoil C. Rock Excavation D. Excavation E. Subgrade Preparation F. Filling 1.2 REFERENCES

More information

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis. PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and

More information

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements. SECTION 31 20 00 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating soil and other material for surface improvements. B. Excavating soil and other material for drainage basins. C. Placing fill. D. Compaction

More information

A. Excavation consists of the removal of material encountered to subgrade elevations and the reuse or disposal of materials removed.

A. Excavation consists of the removal of material encountered to subgrade elevations and the reuse or disposal of materials removed. SECTION 02200 EARTHWORK PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

SECTION 18 - EARTHWORK TABLE OF CONTENTS

SECTION 18 - EARTHWORK TABLE OF CONTENTS SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL...18.1 18-2 ROADWAY EXCAVATION...18.1 18-2.01 General...18.1 18-2.02 Unsuitable Roadway Excavation and Backfill...18.1 18-2.03 Surplus

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

SECTION ASPHALT CONCRETE

SECTION ASPHALT CONCRETE SECTION 02740 ASPHALT CONCRETE PART 1. GENERAL 1.01 SECTION INCLUDES A. Work includes but is not limited to the following: 1.02 RELATED SECTIONS 1. Provide all material, labor, and equipment to prepare

More information

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING

More information

SPECIAL SPECIFICATION 4425 Thermoplastic Pipe

SPECIAL SPECIFICATION 4425 Thermoplastic Pipe 2004 Specifications CSJ 0264-07-028 SPECIAL SPECIFICATION 4425 Thermoplastic Pipe 1. Description. Furnish and install thermoplastic pipe for constructing thermoplastic pipe culverts or thermoplastic storm

More information

SANBORN COUNTY

SANBORN COUNTY Sheet 1 of 12 SPECIFICATIONS ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 110E0500 Remove Pipe Culvert 134 Ft 110E1010 Remove Asphalt Concrete Pavement 178

More information

SECTION TRENCH EXCAVATION, BACKFILL, AND COMPACTION. 1. Maintenance of traffic; Sections O1410 through

SECTION TRENCH EXCAVATION, BACKFILL, AND COMPACTION. 1. Maintenance of traffic; Sections O1410 through 02250-1 of 18 SECTION 02250 TRENCH EXCAVATION, BACKFILL, AND COMPACTION 02250.01 GENERAL A. Description Trench excavation, backfill, and compaction shall include, but not necessarily be limited to, the

More information

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

SECTION IV. PIPELINE EXCAVATION AND BACKFILL SECTION IV. PIPELINE EXCAVATION AND BACKFILL A. Description of Work B. Surface Types C. Backfill D. Surface Restoration A. DESCRIPTION OF WORK 1. Extent: Excavation of trenches for pipelines shall include

More information

SPECIAL SPECIFICATION 4653 Polypropylene Pipe

SPECIAL SPECIFICATION 4653 Polypropylene Pipe 2004 Specifications CSJ 2158-01-013, Etc. SPECIAL SPECIFICATION 4653 Polypropylene Pipe 1. Description. Furnish and install polypropylene pipe for constructing polypropylene pipe culverts or polypropylene

More information

PUBLIC WORKS DEPARTMENT GENERAL NOTES

PUBLIC WORKS DEPARTMENT GENERAL NOTES PUBLIC WORKS DEPARTMENT GENERAL NOTES 1. All construction shall be in strict accordance with the standards of the City of Southlake and governed by the North Central Texas Council of Government's Standard

More information

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS STANDARD SPECIFICATIONS SECTION 02950 PAVEMENT REQUIREMENTS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for removing, replacing and providing new paving for roads, driveways, parking

More information

CITY OF KANSAS CITY, MISSOURI

CITY OF KANSAS CITY, MISSOURI KCMO Supplement April 2000 Document No. 000079 CITY OF KANSAS CITY, MISSOURI SUPPLEMENT TO APWA STANDARD SPECIFICATIONS AND DESIGN CRITERIA SECTION 2600 This is the Kansas City, Missouri Supplement to

More information

SECTION TRENCH EXCAVATION AND BACKFILL

SECTION TRENCH EXCAVATION AND BACKFILL SECTION 02221 - TRENCH EXCAVATION AND BACKFILL CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Sections... 2 1.03 Reference Standards... 2 1.04 Quality Assurance... 2 1.05 Measurement

More information

TRENCH EXCAVATION AND BACKFILL

TRENCH EXCAVATION AND BACKFILL SUDAS Standard Specifications Division 3 - Trench and Trenchless Construction Section 300 - Trench Excavation and Backfill TRENCH EXCAVATION AND BACKFILL PART - GENERAL.0 SECTION INCLUDES A. Trench Excavation

More information

SECTION STORM DRAIN

SECTION STORM DRAIN PART 1 - GENERAL 1-01 SECTION INCLUDED A. Furnishing and installing storm drainage facilities, including pipe, cleanout, manhole structures and inlet structures. 1-02 RELATED SECTIONS A. Division 00 Contract

More information

Section SITE CLEARING. B. Description of Work: 1. The extent of site clearing is shown on the drawings.

Section SITE CLEARING. B. Description of Work: 1. The extent of site clearing is shown on the drawings. Section 02110 SITE CLEARING 1.00 General: A. Related Documents: The general provisions of the Contract including General and Supplementary Conditions and General Requirements, apply to the work specified

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

SECTION MAINTENANCE OF EXISTING CONDITIONS

SECTION MAINTENANCE OF EXISTING CONDITIONS SECTION 02 01 00 MAINTENANCE OF EXISTING CONDITIONS PART 1 GENERAL 1.1 GENERAL A. The CONTRACTOR shall protect all existing utilities and improvements not designated for removal and shall restore damaged

More information

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS 12.1 The subdivider shall construct and install the improvements in accordance with the County's Standards for Construction Plans and Specifications

More information

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 401 NOVEMBER 2015 (Formerly OPSS 401, November 2013) CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 401.01

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 31 23 00 Trenching, Backfilling, and Compaction of Utilities 1. General A. The Contractor shall furnish all labor, materials, tools, equipment, and perform all

More information

Chapter 7 GENERAL CONSTRUCTION SPECIFICATIONS FOR CONVEYANCE SYSTEMS

Chapter 7 GENERAL CONSTRUCTION SPECIFICATIONS FOR CONVEYANCE SYSTEMS Chapter 7 GENERAL CONSTRUCTION SPECIFICATIONS FOR CONVEYANCE SYSTEMS 7.01 General Provisions 7.01.1 Scheduling 7.01.2 Preservation, Restoration, and Cleanup 7.01.3 Interferences and Obstructions 7.01.4

More information

SECTION HORIZONTAL DIRECTIONAL DRILLING

SECTION HORIZONTAL DIRECTIONAL DRILLING SECTION 330532- HORIZONTAL DIRECTIONAL DRILLING PART 1 - GENERAL 1.1 DESCRIPTION A. Furnish all labor, materials, tools, and equipment required to install pipes below the outer perimeter prison fence using

More information

Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form. McKee and Associates Architecture and Interior Design Addendum No. ONE Date: 2.27.19 Project: New Home Side Bleachers at Verbena High School Football Stadium for the Chilton County Board of Education Clanton,

More information

SECTION GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS

SECTION GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS SECTION 2100 - GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS The City of Lee s Summit hereby adopts Section 2100 of the Kansas City Metropolitan Chapter of APWA Construction

More information

SECTION FILL AND BACKFILL

SECTION FILL AND BACKFILL PART 1 GENERAL 1.1 SECTION INCLUDES A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building. B. Backfilling

More information

A. Work of this Section is affected by unit prices for earth moving specified in Section "Unit Prices."

A. Work of this Section is affected by unit prices for earth moving specified in Section Unit Prices. SECTION 312000 EARTH MOVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION EARTH MOVING

SECTION EARTH MOVING SECTION 312000 -EARTH MOVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Section,

More information

SECTION EROSION CONTROLS

SECTION EROSION CONTROLS SECTION 31 25 13 EROSION CONTROLS PART 1 GENERAL 1.1 SUMMARY A. Section Includes installing, maintaining and removing: 1. Silt Fence. 2. Temporary Construction Entrances. 3. Diversion Channels. 4. Sediment

More information

SECTION RIPRAP, BOULDERS, AND BEDDING

SECTION RIPRAP, BOULDERS, AND BEDDING SECTION 31 37 00 RIPRAP, BOULDERS, AND BEDDING PART 1 GENERAL 1.01 SECTION INCLUDES A. The WORK includes excavation, grading, and installation of riprap, boulders, soil riprap, void-filled riprap, and

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 804 EXCAVATION, TRENCHING AND BACKFILL

San Antonio Water System Standard Specifications for Construction ITEM NO. 804 EXCAVATION, TRENCHING AND BACKFILL ITEM NO. 804 EXCAVATION, TRENCHING AND BACKFILL 804.1 DESCRIPTION: This section shall govern the excavation, trenching, and backfilling for water, sanitary sewer, and recycled water construction, unless

More information

SECTION WASTE WATER DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-Place Concrete.

SECTION WASTE WATER DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-Place Concrete. SECTION 02735 WASTE WATER DRAINAGE SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02221 - Excavating, Backfilling, and Compaction for Utilities. 2. 03300 - Cast-in-Place Concrete. 1.02 REFERENCES

More information

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES Chapter 4 - SANITARY SEWER Chapter 5 - STORM SEWER Chapter 6 - EXCAVATION, TRENCING, BACKFILLING, AND BEDDING Chapter 11 - CONCRETE CURBS, CURB

More information