1 Riparian Buffer Waivers
2 6 Waiver Provisions in (d)(2)(i-vi) The project is necessary to abate a substantial threat to public health or safety. Linear projects which may include pipelines, public roadways, rail lines or utility lines. Abandoned mine reclamation activities that are conducted under Department authorization or permit. Projects of a temporary nature where the site will be fully restored to its preexisting condition during the term of the permit under this chapter. Redevelopment projects which may include brownfields or use of other vacant land and property within a developed area for further construction or development. Projects for which compliance with subsection (a) and (b) is not appropriate or feasible due to site characteristics, or existing structures at the project site.
3 How does an applicant apply for a waiver? Part of the application for the project Cannot submit stand alone applications for waivers
4 Buffer Waiver Requests By Region
5 Waiver Request Must Contain Alternatives analysis Existing buffers will be protected All other aspects of Chapter 102 will be met
6 Department and Conservation District Presumption Presumed that the 150 foot buffer can be achieved To rebut the presumption that a practicable alternative does exist, the applicant shall demonstrate with reliable and convincing evidence and documentation that: The basic project purpose cannot be accomplished utilizing one or more other sites that would avoid, or result in less, adverse impact on the buffer A reduction in the proposed project s size, scope or density or an alternative project design or configuration that would avoid, or result in less severe, adverse impacts on a buffer would not accomplish the basic purpose of the project
7 Elements of the alternatives analysis On-site avoidance Environmental consistency
8 On-site avoidance The purpose of the on-site analysis is to identify opportunities to avoid the buffer impact altogether and minimize any impacts to the maximum extent possible when total avoidance is determined to not be practicable The applicant shall submit and the Department and conservation district shall take into consideration the following information in the evaluation of on-site avoidance and minimization: o The spatial requirements of the proposed project; o The location of any existing structural or natural features that may dictate the placement or configuration of the proposed project; o The purpose of the proposed project, and how the purpose relates to placement, configuration or density; o Sensitivity of the site design to buffers; o Efforts to reduce the scope of the proposed project; remove or accommodate site constraints including local zoning requirements, existing infrastructure, site access, or natural features; and otherwise avoid or minimize adverse impacts.
9 Environmental Consistency An alternative should be considered not practicable if it will have a significant adverse impact on other resources or environmental values: Special Concern Species and Resources Consideration of Local Comprehensive Plans and Zoning Ordinances Existing wetlands
10 What is the process for evaluating projects? Joint evaluation by DEP and the conservation district
11 Public Health and Safety Project must be certified by the Pennsylvania Emergency Management Agency (PEMA), the Federal Emergency Management Agency (FEMA), another emergency management entity, or Project must qualify as a High Hazard Dam according to the list maintained by the Bureau of Waterways Engineering, Dam Safety Division, or Project must have a justified reason for encroachment into the floodway (installation of a levee or other flood control structure), or Project must be necessary as a right of way for emergency vehicle access, or Project must be required to meet current transportation safety standards, or Project must meet requirements of HSCA (Act ), CERCLA U.S. Title 42, Chapter 103, Act 2 (Act ) for environmental cleanup activities, or Other projects not described but applicable to apply for a waiver under this section. Corroborating letter
12 Linear Projects Projects that include a decreased area for buffer installation due to physical site constraints, or Projects may contain leased areas that are not owned by permittee, or Projects that must maintain right of way (ROW) areas on adjacent lands, or Other projects not described but applicable to apply for a waiver under this section. A pre-survey must be done to document existing conditions, which should be replicated in replacement.
13 Abandoned Mine Drainage Projects where land necessary for AMD treatment system may preclude land available for buffers, or Projects where the degree of pre-existing site disturbance is high due to abandoned mining impacts, or Other projects not described but applicable to apply for a waiver under this section. Stormwater from area on the site or routed around the site should be treated with non-structural BMPs to the extent possible (up to 25%)
14 Temporary Projects Projects where the impact is temporary, or Other projects not described but applicable to apply for a waiver under this section. Should be a pre-survey and post-survey to make sure things are going back to pre-impact conditions (or better).
15 Redevelopment Projects Projects on lands that are vacant, eroding or impervious areas that are being reclaimed and put into use, or Other projects not described but applicable to apply for a waiver under this section.
16 Projects where compliance is not feasible due to site characteristics or existing structures Projects where there is not enough physical area for a buffer, or Projects where there is not the proper alignment for a buffer, or Projects where soil conditions that cannot grow vegetation, or Projects where certain structures must be placed in the buffer area (e.g., sewage interceptor), or Projects where the applicant does not own intervening land between stream and buffer area, or Projects where there are specific site conditions that applicant wants to maintain (e.g., golf course, lake front property) for economic reasons, or Projects where existing infrastructure in phased projects forces the layout and buffer impacts Other projects not described but applicable to apply for a waiver under this section. A pre-survey must be done to document existing conditions, which should be replicated in replacement.
17 Questions JENNIFER ORR (717)
Riparian Buffer Requirements. Department of Environmental Protection Bureau of Watershed Management
102.14 - Riparian Buffer Requirements Department of Environmental Protection Bureau of Watershed Management 102.2 Scope and Purpose BMPs to protect, maintain, and restore water quality and existing designated
More informationHolly Swartz and Jason Shirey
Chapter 105 General Permits for Stream and Wetland Impacts DEP Ch. 105 CONTACTS FOR BERKS COUNTY: Holly Swartz and Jason Shirey What DEP Regulates Under Chapter 105 Waters of the Commonwealth, which includes
More informationDRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT
Goal 7.0. To optimize integrated stormwater management in order to reduce damage and impacts from sea level rise and flooding, promotes recharge to the Surficial Aquifer System (SAS), improve and protect
More informationCOMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION PERMIT GUIDELINES FOR PHASED NPDES STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY PERMITS, CHAPTER 102 EROSION AND SEDIMENT
More informationTOWN OF SMYRNA Water Quality Buffer Zone Policy
TOWN OF SMYRNA Water Quality Buffer Zone Policy Section I - Description A water quality buffer zone (a.k.a. a riparian zone) is a strip of undisturbed native (indigenous) vegetation, either original or
More informationStormwater Management Studies PDS Engineering Services Division ES Policy # 3-01
Stormwater Management Studies PDS Engineering Services Division Revised Date: 2/28/08 INTRODUCTION The City of Overland Park requires submission of a stormwater management study as part of the development
More informationPermit Section Ohio EPA Permit Change or Addition Model Ordinance Section to be Changed
Permit Section Ohio EPA Permit Change or Addition Model Ordinance Section to be Changed Ordinance Controlling Construction Site Soil Erosion, Sediment, and Other Wastes and Storm Water Runoff Part III.G.2:
More informationNew Castle County, DE. Floodplain Regulations
New Castle County, DE Floodplain Regulations John J. Gysling, PE CFM Department of Land Use New Castle County, DE February 26, 2009 Today s Presentation Floodplain Protection and Uses Terms and Definitions
More informationWill County Site Development Permit Submittal Checklist TAB 1 PROJECT OVERVIEW
Applicant: Reviewer: Permit No.: The following tables contain a checklist of the requirements before a review for a Site Development Permit submittal will be accepted. Not all requirements pertain to every
More informationSection 3. Plan Submittal/Review Requirements
Section 3. Plan Submittal/Review Requirements Each developer/owner subject to this ordinance shall submit to Boone County Public Works for review and approval a stormwater management plan as provided herein:
More informationSummary of 2017 NWPs NWP #3 NWP #5 NWP #7 NWP #12 NWP #13 NWP #14 NWP #15 NWP #18 NWP #19 NWP #21 NWP #23 NWP #25 NWP #27 NWP #29 NWP #30 NWP #31 NWP
Summary of 2017 NWPs NWP #3 NWP #5 NWP #7 NWP #12 NWP #13 NWP #14 NWP #15 NWP #18 NWP #19 NWP #21 NWP #23 NWP #25 NWP #27 NWP #29 NWP #30 NWP #31 NWP #33 NWP #36 NWP #37 NWP #39 NWP #42 NWP #45 NWP #46
More informationOrdinance No Lot Surface Drainage
Ordinance No. 35-2008 - Lot Surface Drainage The Township has adopted a new Lot Surface Drainage Ordinance which amends Chapter 170, Article IX, Subdivision and Site Plan Review by adding a new Section
More informationPost-Development Stormwater Runoff Performance Standards
Post-Development Stormwater Runoff Performance Standards December 9, 2014 Topics Why performance standards? What practices/requirements are in effect in other States? The Workgroup s preliminary and final
More informationWQMP AMENDMENT REVIEW CHECKLIST
State of New Jersey Highlands Water Protection and Planning Council 100 North Road (Route 513) Chester, New Jersey 07930-2322 (908) 879-6737 (908) 879-4205 (fax) www.highlands.state.nj.us WQMP AMENDMENT
More informationCHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management
CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management Online ECode Available on Cheltenham Township Website at: http://ecode360.com/14477578 For all regulated
More informationDEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT, CORPS OF ENGINEERS P.O. BOX NEW ORLEANS, LOUISIANA DEPARTMENT OF THE ARMY GENERAL PERMIT
REPLY TO ATTENTION OF Operations Division Regulatory Branch DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT, CORPS OF ENGINEERS P.O. BOX 60267 NEW ORLEANS, LOUISIANA 70160-0267 DEPARTMENT OF THE ARMY GENERAL
More informationWetlands. DuPage County Stormwater Ordinance Update- Wetlands and Buffers. Is a Stormwater Permit Required? 7/13/2012
DuPage County Stormwater Ordinance Update- Wetlands and Buffers PRESENTED BY: MARY BETH FALSEY WETLAND SPECIALIST Wetlands Section 15-18.A.1.a: If a Stormwater Administrator has the expertise, he/she can
More informationWatershed Management Ordinance
Watershed Management Ordinance Resilient Chicago September 30, 2014 Presented by: John Murray, P.E., CFM WMO Objective Establish uniform, minimum, and comprehensive countywide stormwater management regulations
More informationBMP 5.4.2: Protect /Conserve/Enhance Riparian Areas
BMP 5.4.2: Protect /Conserve/Enhance Riparian Areas The Executive Council of the Chesapeake Bay Program defines a Riparian Forest Buffer as "an area of trees, usually accompanied by shrubs and other vegetation,
More informationLANCASTER COUNTY Act 167 Frequently Asked Questions (FAQs)
LANCASTER COUNTY Act 167 Frequently Asked Questions (FAQs) DISCLAIMER: The questions and answers outlined in this document are intended to help municipalities comply with Act 167 and other state and federal
More informationChapter 105 Dam Safety and Waterway Management
Chapter 105 Dam Safety and Waterway Management An overview PA Department of Environmental Protection Bureau of Watershed Management Division of Waterways, Wetlands, & Stormwater Management Purpose The
More informationFlorida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator
Florida Department of Environmental Protection Bureau of Mining and Minerals Regulation Regulation of Mines Howard J. Hayes, Program Administrator April 2011 What is a mine? Nonphosphate mine: Subsections
More informationCHAPTER 7 WATER QUALITY BUFFER ZONE
Ordinance No. 3414 Entitled an Ordinance to amend the Municipal Code of the City of Morristown, Title 14, Chapter 2 Zoning Ordinance (Chapter 31, Water Quality Buffer Zone) by moving the entire Chapter
More informationPennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines
Pennsylvania Stormwater Best Management Practices Manual Chapter 3 Stormwater Management Principles and Recommended Control Guidelines 363-0300-002 / December 30, 2006 Chapter 3 Stormwater Management Principles
More informationSTORMWATER MANAGEMENT ORDINANCE CITY OF KENTWOOD, MICHIGAN ord. no eff. June 1, 1984
STORMWATER MANAGEMENT ORDINANCE CITY OF KENTWOOD, MICHIGAN ord. no. 9-84 eff. June 1, 1984 25.170. AN ORDINANCE TO PROVIDE FOR CONTROL, MAINTENANCE, AND REGULATIONOF STORMWATER IN THE CITY OF KENTWOOD.
More informationYuba County IRWMP 2015 UPDATE APPENDIX 10-1 General Plan Relation to IRWMP
APPENDIX 10-1 General Plan Relation to IRWMP 1 of 13 Community Development Element Goal CD11: Quality of Life and Local Advantages Provide a high quality of life and take advantage of the County s economic
More informationNew Jersey Statewide Stormwater, Flood Hazard and Wetlands Programs
New Jersey Statewide Stormwater, Flood Hazard and Wetlands Programs Authorities Federal Clean Water Act NJ Water Pollution Control Act NJ Stormwater Management Act Soil Erosion and Sediment Control Act
More informationTHE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL INTRODUCED BY ALLOWAY, BARTOLOTTA, RESCHENTHALER, WHITE AND STEFANO, JUNE 23, 2017 AN ACT
PRIOR PRINTER'S NOS., PRINTER'S NO. 1 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL No. Session of 1 INTRODUCED BY ALLOWAY, BARTOLOTTA, RESCHENTHALER, WHITE AND STEFANO, JUNE, 1 AS AMENDED ON THIRD
More informationChapter 3 Dispersion BMPs
Chapter 3 Dispersion BMPs 3.1 BMP L611 Concentrated Flow Dispersion 3.1.1 Purpose and Definition Dispersion of concentrated flows from driveways or other pavement through a vegetated pervious area attenuates
More informationSOLAR ENERGY FARMS AND SOLAR ENERGY SYSTEMS
Chapter XI SOLAR ENERGY FARMS AND SOLAR ENERGY SYSTEMS 1. Purpose Rev. 06-07-17; Ord. 752 A. The purpose of this Chapter is to maintain the City s attractiveness, protect the safety of the people, and
More informationRegulation of Mines In South Florida
Florida Department of Environmental Protection Bureau of Mining and Minerals Regulation Regulation of Mines In South Florida Howard J. Hayes, Program Administrator February 8, 2011 What is a mine? Nonphosphate
More informationFranklin County Communique to the Planning Board
Franklin County Communique to the Planning Board PETITIONER(S): Name of Petitioner: Carolina Solar Energy II, LLC Address: 400 W. Main St. Suite 503 City/State/Zip: Durham, NC 27701 LOCATION: REQUEST FOR
More informationCook County Watershed Management Ordinance. Public Review Draft June 24, 2013
Cook County Watershed Management Ordinance Public Review Draft June 24, 2013 [This page is intentionally blank.] Table of Contents Article 1 Article 2 Article 3 Article 4 Article 5 Article 6 Article 7
More informationVIRGINIA POLLUTION ABATEMENT APPLICATION FORM D MUNICIPAL EFFLUENT AND BIOSOLIDS
VIRGINIA POLLUTION ABATEMENT APPLICATION FORM D MUNICIPAL EFFLUENT AND BIOSOLIDS PART D-II LAND APPLICATION OF BIOSOLIDS All of the information provided in this application will become part of the Biosolids
More informationIncorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan
Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan Pennsylvania State Section American Water Resources Association Fall 2011
More informationInformation Paper Flood Recovery and Repair Activities in the Galveston District, U.S. Army Corps of Engineers
U.S. Army Corps Of Engineers Galveston District Information Paper Flood Recovery and Repair Activities in the Galveston District, U.S. Army Corps of Engineers U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT
More informationRiparian Setback- What is that and what should I be doing? October 25th, 2016 Presented by: Anil Tangirala, PE, CFM, ENV SP
Riparian Setback- What is that and what should I be doing? October 25th, 2016 Presented by: Anil Tangirala, PE, CFM, ENV SP Agenda Introduction Stream and Riparian Impacts Ohio EPA Stormwater General Permit
More informationChapter 102 Construction Stormwater Program Updates VUSP Pennsylvania Stormwater Management Symposium
Chapter 102 Construction Stormwater Program Updates 2017 VUSP Pennsylvania Stormwater Management Symposium Agenda Central Office Changes Permits (proposed changes) PA Best Management Practices Manual Act
More informationYork County STORMWATER LUNCH & LEARN
York County STORMWATER LUNCH & LEARN TOPICS Points of Exposure SWPPP's NOT's Construction Sequence Permanent BMP's Basin Details Major and Minor Modifications Construction Buffers Stabilization Questions
More informationLAKE COUNTY STORMWATER MANAGEMENT COMMISSION GENERAL PERMIT NUMBER 3 AUTHORIZING MINOR MAINTENANCE DREDGING ACTIVITIES
I. INTRODUCTION This document is created under the authorities granted to the Lake County Stormwater Management Commission (LCSMC) with respect to the Lake County Watershed Development Ordinance (WDO)
More informationGeneral Order #4473/76 was specific to oil and gas well sites, gathering and flow lines. The order contained the following statement and resolution:
OIL AND GAS DEVELOPMENT IN THE AGRICULTURAL LAND RESERVE (ALR): THE NON-FARM USE OF AGRICULTURAL LAND AN HISTORICAL OVERVIEW OF THE AGRICULTURAL LAND COMMISSION S POSITION REGARDING OIL AND GAS ACTIVITIES
More informationWater and Watersheds. Data Maps Action
Water and Watersheds Data Maps Action What is the Wildlife Action Plan? Restore rare wildlife and habitats. Keep common species common. 2015 Revision: Partners in Conservation Science 2015 Revision Data
More informationSTORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW
SUBCHAPTER 8 STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW 7:45-8.1 Purpose and scope of review Except for those projects expressly exempted by this chapter or waived by the Commission, the Commission
More information16.1 Significant and Unavoidable Impacts
Chapter 16 NEPA requires an EIS and CEQA requires an EIR to evaluate a number of other types of environmental impacts in addition to those already addressed in the resource chapters. The analysis required
More informationGood morning, Chairman Yaw, Chairman Yudichak, Chairman Vulakovich, Chairman Costa,
Testimony of Patrick McDonnell, Secretary Pennsylvania Department of Environmental Protection Joint Hearing on Flooding and Emergency Response Senate Environmental Resources & Energy and Veterans Affairs
More informationNew Jersey Highlands Council RMP Update/Map Adjustment Review Municipal Petition for Plan Conformance SUMMARY OF FINDINGS RMP UPDATES/MAP ADJUSTMENTS
New Jersey Highlands Council RMP Update/Map Adjustment Review Municipal Petition for Plan Conformance SUMMARY OF FINDINGS RMP UPDATES/MAP ADJUSTMENTS Please be advised that RMP Updates pertain to factual
More informationStormwater Management Permit Application LESS Than One Acre. Public Works Department st Ave East Kalispell, Montana (406)
Public Works Department 201 1 st Ave East Kalispell, Montana 59901 (406) 758-7720 Note: This permit is separate from any permits required by the Montana Department of Environmental Quality. A State Stormwater
More informationIOWA ADMINISTRATIVE CODE SUMMARY
IOWA ADMINISTRATIVE CODE SUMMARY To explain and define details of legislation, departments in the executive branch of Iowa government adopt and publish rules. After prescribed public review and comments,
More informationCOMMUNITY FACILITIES ELEMENT
[COMPREHENSIVE PLAN] 2025 EXHIBIT C COMMUNITY FACILITIES ELEMENT INTRODUCTION Chapter 163 of the Florida Statutes (F.S.) and Rule 9J-5 of the Florida Administrative Code (F.A.C.) provide the statutory
More informationMemo. To: From: cc: For further assistance please contact Ben Ruzowicz, GSWCC Technical Specialist at (706)
Memo To: From: cc: Local Issuing Authorities, Design Professionals, Plan Reviewers and Other Interested Parties The Georgia Soil and Water Conservation Commission and the Georgia Environmental Protection
More informationRULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES ENVIRONMENTAL PROTECTION DIVISION CHAPTER EROSION AND SEDIMENTATION CONTROL TABLE OF CONTENTS
RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES ENVIRONMENTAL PROTECTION DIVISION CHAPTER 391-3-7 EROSION AND SEDIMENTATION CONTROL TABLE OF CONTENTS 391-3-7.01 Definitions. 391-3-7.02 (Repealed) 391-3-7.03
More informationNassau County 2030 Comprehensive Plan. Conservation Element (CS) Goals, Objectives and Policies. Goal
(CS) Goal Conserve, protect and enhance the natural resources that are important to the economy, health, and quality of life of County residents, ensuring that adequate resources are available for future
More informationReclamation Project or Water Pollution Abatement Project under the Environmental Good Samaritan Act Application
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION Reclamation Project or Water Pollution Abatement Project under the Environmental Good Samaritan Act
More informationAMENDMENTS TO BAYFIELD COUNTY ZONING ORDINANCE. Lake Superior Shoreland Lot Development Requirements.
AMENDMENTS TO BAYFIELD COUNTY ZONING ORDINANCE Sec. 13-1-34 is created to read as follows: Sec. 13-1-34 Lake Superior Shoreland Lot Development Requirements. Introduction. Much of Bayfield County s Lake
More informationKANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR CLASS I & II GRADING AND DRAINAGE/STOMRWATER PERMIT APPLICATION
KANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR CLASS I & II GRADING AND DRAINAGE/STOMRWATER PERMIT APPLICATION Michael J. Van Mill, AICP Planning Director 189 East Court Street Kankakee, IL 60901
More informationNassau County 2030 Comprehensive Plan. Conservation Element (CS) Goals, Objectives and Policies. Goal
(CS) Goal Conserve, and protect and enhance the natural resources that are important to the economy, health, and quality of life of County residents, ensuring that adequate resources are available for
More informationProject: Developer/Designer: Reviewer:
City of Charlottesville, Virginia Engineering Plan Review Checklist (Site Plans, Site Plan Amendments, and Major Subdivisions) 610 East Market Street, Charlottesville, VA 22902 Telephone 434-970-3182;
More informationSections:
DIVISION 15: NATURAL RESOURCES REGULATIONS CHAPTER 9-1500 NATURAL RESOURCES REGULATIONS: INTENT AND ORGANIZATION 9-1500.1 Title and Intent. 9-1500.2 Organization. 9-1500.1 TFlZE AND INTENT. Division 15
More informationCHAPTER 20.8 SURFACE MINING AND LAND RECLAMATION REGULATIONS
CHAPTER 20.8 SURFACE MINING AND LAND RECLAMATION REGULATIONS 20.8.10 PURPOSE AND INTENT... 8-2 20.8.20 INCORPORATION OF SMARA AND STATE REGULATIONS... 8-2 20.8.30 APPLICABILITY...8-2 20.8.40 CONTENTS OF
More informationThe City of Lake Forest Stormwater Management Policy Approved by City Council on March 7, 2016
The City of Lake Forest Stormwater Management Policy Approved by City Council on March 7, 2016 I. Purpose The purpose of this policy is to address home and property drainage issues relating to stormwater
More informationLOWNDES COUNTY BOARD OF COMMISSIONERS
LOWNDES COUNTY BOARD OF COMMISSIONERS RODNEY N. CASEY, CHAIRMAN J. EDGAR ROBERTS, DISTRICT 1 RICHARD C. LEE, DISTRICT 2 G. ROBERT CARTER, DISTRICT 3 ENGINEERING DIVISION 325 West Savannah Avenue P. O.
More informationpennsylvania DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Active and Abandoned Mine Operations
pennsylvania DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Active and Abandoned Mine Operations Abandoned Mine Reclamation Contract No. OSM 30(2791)102.1 Bureau of Abandoned Mine Reclamation 286 Industrial
More informationStormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)
Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Allen County Stormwater Plan Submittal Checklist The following items must be provided when applying for an Allen County Stormwater
More informationPLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: February 7, 2013
PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: February 7, 2013 NAME LOCATION MAWSS Shelton Beach Road East side of Shelton Beach Road Extension, 2/10± mile North of Moffett Road CITY
More informationIII.C.5. Conformance with Creeks Ordinance, BMC (Updated: May 21, 2007)
Land Use Planning, 2120 Milvia Street, Berkeley, CA 94704 Tel: 510.981.7410 TDD: 510.981.7474 Fax: 510.981.7420 Email: Planning@ci.berkeley.ca.us III.C.5. Conformance with Creeks Ordinance, BMC 17.08 (Updated:
More informationSPECIAL WATER RESOURCE PROTECTION AREA REQUIREMENTS (DRAFT FOR COMMENT)
SPECIAL WATER RESOURCE PROTECTION AREA REQUIREMENTS (DRAFT FOR COMMENT) Introduction The Stormwater Management Rules establish a Special Water Resource Protection Area (SWRPA) which is defined as the area
More informationSection 1 Non-Conforming Structures and Uses Allowed to Continue. 12
CHAPTER 3 NONCONFORMITIES Section 1 Non-Conforming Structures and Uses Allowed to Continue. 12 Section 2 Discontinuance 12 Section 3 Change of Use... 12 Section 4 Residential Alterations 12 Section 5 Restoration..
More informationResponses to Comments from State Agencies
Summary of Comment Letters Received from State Agencies This section provides responses to comments received on the draft environmental document from state agencies. Comment Code Agency S-1 California
More informationEnvironmental Protection in the Development of the Marcellus Shale
Environmental Protection in the Development of the Marcellus Shale Areas of Environmental Protection Water sources Site development Wetland and waterway protection Water quality protection Dams and impoundments
More informationSTAFF REPORT CHELAN COUNTY PUD DAROGA DOMESTIC WATER SYSTEM
STAFF REPORT CHELAN COUNTY PUD DAROGA DOMESTIC WATER SYSTEM TO: Douglas County Hearing Examiner FROM: Douglas County Land Services Staff RE: Chelan County PUD, SCUP-12-01 DATE: July 5, 2012 I. GENERAL
More informationLuzerne County Act 167 Phase II
Executive Summary Luzerne County Act 167 Phase II Stormwater Management Plan 613 Baltimore Drive, Suite 300 Wilkes-Barre, PA 18702 Voice: 570.821.1999 Fax: 570.821.1990 www.borton-lawson.com 3893 Adler
More informationAppendix E : Guidelines for Riparian Buffer Areas
Appendix E : Guidelines for Riparian Buffer Areas This document should be read in conjunction with the CRCA Planning Policy. 1.0 PURPOSE The purpose of this document is to summarize the recommendations
More informationCHAPTER 725. Solar Farms.
CHAPTER 725 Solar Farms. The following provisions shall apply to all solar farms in Carroll County, IL. A Solar Farm is defined as a power station using photovoltaic modules and inverters for utility electricity
More informationKRISTOPHER J. KRZYSTON, CEI, CEM
PERMITTING IN NEW JERSEY KRISTOPHER J. KRZYSTON, CEI, CEM Kristopher J. Krzyston Rutgers graduate 1994 B.S. Environmental Planning Certificate in G.I.S. Assistant Division Manager Environmental Science
More informationMunicipal Stormwater Management Planning
Municipal Stormwater Management Planning Christopher C. Obropta, Ph.D., P.E. Water Resources Extension Specialist with Rutgers Cooperative Extension Assistant Professor with Department of Environmental
More informationBMP 5.6.1: Minimize Total Disturbed Area - Grading
BMP 5.6.1: Minimize Total Disturbed Area - Grading Without changing the building program, you can reduce site grading, removal of existing vegetation (clearing and grubbing) and total soil disturbance.
More information1006 UTILITIES, STREET LIGHTS, WATER SUPPLY, SEWAGE DISPOSAL, SURFACE WATER MANAGEMENT, AND EROSION CONTROL
1006 UTILITIES, STREET LIGHTS, WATER SUPPLY, SEWAGE DISPOSAL, SURFACE WATER MANAGEMENT, AND EROSION CONTROL 1006.01 GENERAL STANDARDS A. The location, design, installation, and maintenance of all utility
More informationPoly Met Mining, Inc. Antidegradation Review - Preliminary Determination for 401 Certification
Poly Met Mining, Inc. Antidegradation Review - Preliminary Determination for 401 Certification Summary Poly Met Mining, Inc. (PolyMet) submitted an application for a Clean Water Act Section 401 Water Quality
More informationChapter 9.39 Temporary Uses and Structures
Chapter 9.39 Temporary Uses and Structures Sections: 9.39.010- Purpose and Intent 9.39.020- Applicability 9.39.030- Exempt Temporary Structures and Uses 9.39.040- Structures and Uses Allowed with Temporary
More informationInfrastructure Element
Infrastructure Element 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 INFRASTRUCTURE ELEMENT GOAL 1: To provide for environmentally
More informationSection 2: Site Restorations and PCSM s Office of Oil and Gas Management Oil and Gas Industry Training Summer 2012
Section 2: Site Restorations and PCSM s Office of Oil and Gas Management Oil and Gas Industry Training Summer 2012 Site Restoration Regulations Act 13-3216(a) The Oil and Gas Act 25 Pa. Code 78.65 Oil
More informationSection 2: Site Restorations and PCSM s Office of Oil and Gas Management Oil and Gas Industry Training Summer 2012
Site Restoration Regulations Section 2: Site Restorations and PCSM s Office of Oil and Gas Management Oil and Gas Industry Training Summer 2012 Act 13-3216(a) The Oil and Gas Act 25 Pa. Code 78.65 Oil
More informationModel Riparian Buffer Ordinance.
Model Riparian Buffer Ordinance. This is a sample riparian buffer ordinance written as an amendment to an existing zoning ordinance. This ordinance complies with the state minimum standards for river corridor
More informationCITY OF SPRING HILL Water Quality Buffer Zone Policy (Adopted April 22, 2008)
Section I - Description CITY OF SPRING HILL Water Quality Buffer Zone Policy (Adopted April 22, 2008) A water quality buffer zone (a.k.a. a riparian zone) is a strip of undisturbed native (indigenous)
More informationiswm TM Criteria Manual City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June Chapter 1
City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June 2010... Chapter 1 i CITY OF AZLE iswm CRITERIA MANUAL FOR SITE DEVELOPMENT AND CONSTRUCTION Incorporating the Regional NCTCOG Integrated
More informationNo Adverse Impact Floodplain Management
No Adverse Impact Floodplain Management June 6, 2013 Beth Lucas, Senior Planner Broome County Planning No Adverse Impact Developed by Association of State Floodplain Managers Purposes: Address the shortcomings
More informationSECTION ENVIRONMENTAL SUB-INDEX TREE PROTECTION PRESERVATION AND HARVESTING
SECTION 10.00 ENVIRONMENTAL SUB-INDEX 10.00 ENVIRONMENTAL 10.01 GENERAL 10.02 TREE PROTECTION PRESERVATION AND HARVESTING A. Tree Protection Fencing B. Temporary Silt/Tree Protection Fencing C. Boardwalk
More informationSCOPE. UNIFIED STORMWATER ORDINANCE Flood Damage Prevention Stormwater Pollution Control Unified Development Code Others DESIGN CRITERIA MANUAL
UNIFIED STORMWATER ORDINANCE Flood Damage Prevention Stormwater Pollution Control Unified Development Code Others DESIGN CRITERIA MANUAL Water Utilities Transportation Stormwater Parks Fire SCOPE Subdivision
More informationTable of Contents. List of Tables. 11. Advantages and Disadvantages
Table of Contents 11. Advantages and Disadvantages... 11-1 page List of Tables... 11-1 11. Advantages and Disadvantages The overall advantages and disadvantages of the DMNP are articulated, summarized
More informationIDEM Wetlands and Streams Regulatory Overview. An overview of IDEM permitting for work in Waters of the State
IDEM Wetlands and Streams Regulatory Overview An overview of IDEM permitting for work in Waters of the State Who Has Jurisdiction? Adjacent wetland: USACE & IDEM Stream > 1 sq. mile drainage: IDNR, USACE
More informationS e c t i o n S u b d i vision
S e c t i o n 2. 6 - S u b d i vision Subdivision is a process of defining and redefining land parcel boundaries and can provide a framework for future land use and development. Integrated, well planned
More informationiswm TM Criteria Manual City Date here December 2009 Revised 1/2015 Revised 1/14/15
City Date here December 2009 December 2009 i Revised 1/14/15 Overview of the iswm Program The iswm Program for Construction and Development is a cooperative initiative that assists municipalities and counties
More informationCHAPTER SURFACE MINING AND RECLAMATION PLAN REGULATIONS
CHAPTER 19.66 SURFACE MINING AND RECLAMATION PLAN REGULATIONS Section: 19.66.010 PURPOSE AND INTENT 19.66.020 INCORPORATION OF SMARA AND STATE REGULATIONS 19.66.030 APPLICABILITY 19.66.040 EXEMPTIONS 19.66.050
More informationCOON CREEK WATERSHED DISTRICT PERMIT REVIEW
16-054 Woodland Creek Wetland Banking Restoration Project, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 11 FILE NUMBER: 16-054 ITEM: Woodland Creek
More informationQuintillion Subsea Project Applicant Proposed Mitigation Statement
1. Avoidance of impacts to waters of the U.S., including wetlands: Please describe how, in your project planning process, you avoided impacts to waters of the U.S., including wetlands, to the maximum extent
More informationCELEBRATING 80 YEARS MEMORANDUM. We have been asked to review SB 411, which proposes to amend the Environmental
CELEBRATING 80 YEARS MEMORANDUM From: Jordan B. Yeager and Lauren M. Williams Curtin & Heefner LLP Date: Re: Preliminary Review of SB 411 We have been asked to review SB 411, which proposes to amend the
More informationPhase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)
Permit Application No.: 17-181 Rules: Erosion Control, Wetland Protection, and Waterbody Crossings & Structures Applicant: Hennepin County Received: 4/27/17 Project: CSAH 112 Phase II Complete: 9/5/17
More informationSOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II
SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II DESIGN REQUIREMENTS FOR STORMWATER TREATMENT AND MANAGEMENT SYSTEMS WATER QUALITY AND WATER QUANTITY
More informationRegional Master Plan Consistency Report 1/8/2010
of 47 11:31 AM Regional Master Plan Consistency Report Prepared by State of New Jersey Highlands Water Protection and Planning Council 100 North Road (Route 513), Chester, NJ 07930 Telephone: (908) 879-6737
More information