ONTARIO BUILDING CODE CONCEPTS AND CODE ANALYSIS

Size: px
Start display at page:

Download "ONTARIO BUILDING CODE CONCEPTS AND CODE ANALYSIS"

Transcription

1 ONTARIO BUILDING CODE CONCEPTS AND CODE ANALYSIS Deborah Levine Farrow, Architect, OAA, FRAIC James Farrow, Architect, OAA, OAQ, FRAIC

2 Get the habit of analysis analysis will in time enable synthesis to become your habit of mind. Frank Lloyd Wright

3 Context: Codes Ontario Building Code 2012 National Building Code 2010

4 Context: Facts 1. OBC 2012 = Ontario Regulation 332/12 (January ) 2. OBC 2012 = a Regulation part of the Building Code Act OBC 2012 = Two (2) Volumes 4. OBC 2012 = OBC Volume Amendments + Errata Amendment 1: O. Reg. 151/13 Amendment 2: O. Reg. 360/13, O. Reg. 361/13, and O. Reg. 368/13 Amendment 3: O. Reg. 191/14 January 2015 Erratum issued January = Compendium Edition OBC = Official copies of the legislation

5 Context: What Is The Code? The Building Code: Technical requirements for construction (including renovation) and demolition of buildings, change of use of existing buildings where the change would result in an increase in hazard and the maintenance and operation of on-site sewage systems. The Code : a set of minimum provisions with respect to the safety of buildings public health, fire protection, accessibility and It is a building owner s responsibility for life safety of the occupants of a building. Architects advise building owner s of the Building Code Requirements which are the : minimum requirements of the applicable codes and standards.

6

7 Course Objective To describe the Structure of the Ontario Building Code; Understand how to navigate through the Code; Code Matrix building code compliance data. Sample Code Matrix - new building, using Part 3 of the Building Code; Review key components of the Building Code.

8 Ontario Building Code 2012 Structure The OBC 2012 is divided into Three Divisions, and subdivided into Parts: Division A: Compliance, Objectives and Functional Statements Division B: Acceptable Solutions Division C: Administrative Provisions

9 Ontario Building Code 2012 Structure Division A: Part 1: Compliance and General 1.1 Organization and application 1.2 Compliance 1.3 Interpretation 1.4 Defined Terms, symbols and abbreviations 1.5 Referenced Documents and Organizations

10 ONTARIO BUILDING CODE 2012 STRUCTURE 1.4 Defined Terms, symbols and abbreviations Division A: Part 1 Compliance and General 1.4 Defined Terms Symbols and Abbreviations

11 1.4 Definition: Building Italics throughout the OBC but missing from the (1) (c) (1) (a) advises to reference the Building Code Act 1992 (as amended 2014) Building Code Act (1) (a) lists structures designated in the building code as listed above in (d)

12 ONTARIO BUILDING CODE 2012 STRUCTURE Division A: Part 1 Compliance and General Section 1.2 Compliance Compliance with Division B 1. Compliance with Division B shall be achieved, (a) By complying with the applicable acceptable solutions in Division B, or (b) By using alternative solutions that will achieve the level of performance required by the applicable acceptable solutions in respect of the objectives and functional statements attributed to the applicable acceptable solutions in MMAH Supplementary Standard SA-1, Objectives and Functional Statements Attributed to the acceptable solutions.

13 ONTARIO BUILDING CODE 2012 STRUCTURE Division A: Part 2 : Objectives Division A: Part 3 : Functional Statements The 2012 Building Code is Ontario s second edition of the building code published in an objective-based format. Some of the objectives were developed jointly between the National Research Council (NRC) and the provinces. The objective-based format is intended to assist users of the code in the WHY behind code requirements. Intent statements although not available in a published format are intended to be available electronically (similar to Appendix A) - explaining the intent of the code item.

14 Objective Based Format: WHY? The objective-based format : Intended to Answer WHY????. I. Specific technical requirements identifies objectives and sub-objectives II. Each technical requirement has an acceptable solution in Division B and is linked to one or more of the objectives as well as functional statements III. OBC 2012-VOLUME 2 : Attribution tables : SA-1 (Supplementary Standard). IV. The objective based framework: a framework for evaluating alternative solutions against the performance achieved by the acceptable solutions set out in the Code. V. At least one functional statement is linked to each technical requirement that is an acceptable solution in Division B. SA-1 Attribution Table

15 Division A: Part 2 : Objectives

16 Division A: Part 3 : Functions

17 EXAMPLE: FUNCTIONAL AND OBJECTIVE STATEMENT F-03-OP1.2 F-03-OS Multiple Occupancy Requirements Separation of Major Occupancies Acceptable Solution: Division B (1) Except as provided by Sentences (2) and (5), major occupancies shall be separated from adjoining major occupancies by fire separations having fireresistance ratings conforming to Table Division A - Part 3 Functional Statement: F - 03 To retard the effects of fire on areas beyond its point of origin Division A-Part 2 Objective Statement: OP Category: Fire, Structural, Water and Sewage Protection of Buildings Fire Protection of the Building: An objective of this code is to limit the probability that, as a result of its design or construction, a building will be exposed to an unacceptable risk of damage due to fire caused by fire or explosion impacting areas beyond its point of origin

18 DIVISION B: ACCEPTABLE SOLUTIONS (PRESCRIPTIVE) Division B: Part 1: General Contains general requirements including reference to climatic data, and seismic design data (contained in MMAH-SB-1), depth of frost and referenced documents. Division B: Part 2 Reserved Division B: Part 3 : Fire Protection, Occupant Safety and Accessibility. Part 3 contains the requirements with respect to health and fire safety, which depend upon the use of a building and type of occupancy.

19 DIVISION B: ACCEPTABLE SOLUTIONS Division B: Part 4 : Structural Design 4.1 Structural Loads and Procedures 4.2 Foundations 4.3 Design Requirements for Structural Materials 4.4 Design Requirements for Special Structures

20 DIVISION B: ACCEPTABLE SOLUTIONS Division B: Part 5 : Environmental Separation 5.1 General 5.2 Loads and Procedures 5.3 Heat Transfer 5.4 Air Leakage 5.6 Vapour Diffusion 5.7 Surface Water 5.8 Moisture in the Ground 5.9 Sound Transmission 5.10 Standards

21 DIVISION B: ACCEPTABLE SOLUTIONS Division B: Part 6 : Heating, Ventilating and Air-Conditioning 6.1 General 6.2 Design and Installation 6.3 Chimneys and Venting Equipment

22 DIVISION B: ACCEPTABLE SOLUTIONS Division B: Part 7 : Plumbing 7.1 General 7.2 Materials and Equipment 7.3 Piping 7.4 Drainage Systems 7.5 Venting Systems 7.6 Potable Water Systems 7.7 Non-Potable Water Systems Division B: Part 8 : Sewage Systems Part 8 : Design, construction, operation and maintenance of various class of sewage systems located within properties.

23 DIVISION B: ACCEPTABLE SOLUTIONS Division B: Part 9 : Housing and Small Buildings Requirements for the construction of houses and small buildings up to 600m2 per floor and 3 storeys in height, and applies to occupancies other than assembly, care, or detention and industrial-high hazard.

24 DIVISION B: ACCEPTABLE SOLUTIONS Division B: Part 10 : Change of Use governs the requirements with respect to a change in major occupancy without any proposed construction to the building. Clothing Store Food Store Party Supply Store Clothing Store Restaurant Food Store Tenant A Tenant B Tenant C Tenant A Tenant D Tenant C Shopping Plaza A Shopping Plaza A

25 DIVISION B: ACCEPTABLE SOLUTIONS Division B: Part 11 : Renovation Flexibility to meet life safety requirements when renovating existing buildings, with or without changes in major occupancies of the buildings or parts of the buildings. Alternative methods of compliance are prescribed. Division B: Part 12 : Resource Conservation Part 12 regulates the mandatory and enabling energy efficiency requirements and insulation in residential and non-residential buildings.

26 DIVISION C: Administrative Provisions Division C: Part 1 : General Administrative provisions 1.1 Administration 1.2 Design and General Review 1.3 Permits and Inspections 1.4 Search Warrant 1.5 Designated Persons and Power 1.6 Prescribed Person 1.7 Enforcement-Act and Building Code Related to Sewage 1.8 Language 1.9 Fees 1.10 Sewage System Maintenance Inspection Programs.

27 DIVISION C: Administrative Provisions Division C: Part 2 : Alternative Solutions, Disputes, Rulings and Interpretations 2.1 Alternative Solutions 2.2 Building Code Commission 2.3 Building Material Evaluation 2.4 Rulings and Interpretations Website of Rulings of Building Code Commission Website of Rulings of Building Evaluation Commission

28 DIVISION C: Administrative Provisions Division C: Part 3 : Qualifications 3.1 Qualifications for Chief Building Officials and Inspectors 3.2 Qualifications for Designers 3.3 Qualifications: Persons Engaged: Sewage Systems 3.4 Qualifications for Registered Code Agencies 3.5 Classes of Registration and Categories of Qualifications 3.6 Insurance 3.7 Registered Code Agencies

29 DIVISION C: Administrative Provisions Division C: Part 4 : Transition, Amendments, Revocation and Commencement 4.1 Transition Rule 4.2 Amendments 4.3 Revocation 4.4 Commencement

30 Appendices: Administrative Provisions Appendix A: Explanatory Information Non-regulatory explanatory information to assist Code users in understanding the intent of the requirements contained in Division A, B, C Example: Appendix A-Volume 2: A Buildings divided by Firewalls This concept relates to the provisions directly regulated by this Code and does not apply to electrical service entrance and natural gas service requirements which are regulated by other documents.

31 Appendices: Administrative Provisions Appendix B: Imperial Conversion Appendix B contains Imperial conversion factors for metric values used in the Code. It is not a regulatory section of the 2012 Building Code.

32 Supplementary Standards : SA-1 SA-1: Objectives and Functional Statements Attributed to the Acceptable Solutions Article Division A of the OBC- the objective and functional statements that have been attributed to acceptable solutions provided in Division B of the Building Code. Objectives and Functional Statements The Objective Statements listed in SA-1 are those set out in Part 2 of Division A The Functional Statements listed in SA-1 are those set out in Part 3 of Division A

33 From Supplementary Standards SA-1

34 MMAH Supplementary Standards SB: Referenced in Division B Supplementary Standards: Division B: SB SB-1 Climatic and Seismic Data SB-2 Fire Performance Ratings SB-3 Fire and Sound Resistance of Building Assemblies SB-4 Measures for Fire Safety in High Buildings SB-5 Approved Sewage Treatment Units SB-6 Percolation Time and Soil Description SB-7 Guards for Housing and Small Building SB-8 Design, Construction and Installation of Anchorage Systems for Fixed Access Ladders SB-9 Requirements for Soil Gas Control SB-10 Energy Efficiency Requirements SB-11 Construction of Farm Buildings SB-12 Energy Efficiency for Housing SB-13 Glass in Guards

35 Supplementary Standards : SB-1, SB-2 SB-1: Climatic and Seismic Data SB-2: Fire Protection Ratings Division B-Part 1: (1) Application This part applies to all buildings covered in this Code Table Reference SB-1, SB-2

36 From Supplementary Standards SB-1

37 MMAH Supplementary Standards SC: Referenced in Division C Supplementary Standards: Division C: SC-1 Code of Conduct for Registered Code Agencies 1. Standards: A registered code agency shall at all times undertake its responsibilities in a professional manner, and in conformance with the provisions of the Building Code Act, 1992, the building code, and all applicable legislation.

38 Course Objective To describe the Structure of the Ontario Building Code; Understand how to navigate through the Code; Code Matrix building code compliance data. Sample Code Matrix - new building, using Part 3 of the Building Code; Review key components of the Building Code.

39 Ontario Building Code 2012 Identification Building Code: Numbering System The Building Code uses a decimal numbering system has been used to identify particular requirements. Number Description 3 Part 3.6 Section Subsection Article (1) Sentence (1) (f) Clause (1) (f) (i) Sub-clause (1) (f) (i) (A) Sub-sub-clause

40 Ontario Building Code 2012 Measurement Building Code: Metric Conversions Metric System =Theofficial units of measurement in the Code. Sometimes imperial equivalence appears in brackets for convenience only. Part 9 - Housing and Small Buildings Part 7-Plumbing: Measurements converted to SI units where it is feasible, except for pipe sizes which are expressed in inches. Pipe Sizes = known in the trade in IMPERIAL

41 Ontario Building Code 2012 Wording Building Code: Wording: AND AND The word and found at the end of a second last clause of a sentence and with multiple clauses means that the requirements of every Clause apply to the sentence: Example: Article reads: (1) Except as provided in Sentence (6) and Articles and , a guard not less than mm high shall be provided, a) Around each roof to which access is provided for other than maintenance, b) At opening into smoke shafts referred to in Subsection that are less than mm above the floor, and c) At each raised floor, mezzanine, balcony, gallery, interior or exterior vehicular ramp, and at other locations where the difference in level is more than 600 mm.

42 Ontario Building Code 2012 Wording Building Code: Wording: OR OR The word or found at the end of a second last clause of a sentence and with multiple clauses means requirements of Sentence is satisfied by any Clause as applied individually : Example: Article Corridors reads: (11) A dead end public corridor is permitted in a business and personal services occupancy where, (a) The dead end corridor, (i) serves an occupant load of not more than 30 persons (ii) is not more than 9m long, and (iii) is provided with doors having self-closing devices, or b) There is a second and separate egress doorway from each room or suite not leading into a dead end corridor.

43 Ontario Building Code 2012 Wording Building Code: Wording: Rules The Code is structured into a number of Rules that apply without exception. Example: Self Storage Buildings (1) self-service storage buildings shall conform to the requirements of Section 3.10.

44 Ontario Building Code 2012 Wording Building Code: Wording: Rules and Exceptions The Code is structured into a number of Rules that apply without exception. Other times the Code considers a general Rule, and then Exceptions as they apply. Example: Automatic Sprinkler Systems (1) Except as permitted in Sentences (2), to (4) an automatic sprinkler system shall be designed, constructed, installed and tested in conformance with NFPA 13, Installation of Sprinkler Systems. (See Appendix A.) Reading sentences 2, 3, and/or 4 one determines that in particular cases one can design according to the direction provided in NFPA 13R, NFPA13D or if the design has fewer than 9 sprinklers then sentence 4 provides direction.

45 Ontario Building Code 2012 Application NEW BUILDING EXISTING BUILDING Reconstruction Renovation Alteration Extension Addition Change of Use

46 Ontario Building Code 2012 Application Renovations - can be repartitioning (office accommodation), interior work, or installing of new equipment. The Fire Code - a regulation made under the Fire Protection and Prevention Act, It is applicable to operations and maintenance. The Fire Code is a set of minimum requirements respecting fire safety within and around existing buildings and facilities. The owner is responsible for complying with the Fire Code, except where otherwise specified. The municipal fire department enforces the Fire Code.

47 Course Objective To describe the Structure of the Ontario Building Code; Understand how to navigate through the Code; Code Matrix building code compliance data. Sample Code Matrix - new building, using Part 3 of the Building Code; Review key components of the Building Code.

48 Building Code Analysis Building Code Matrix Sequential Approach Code Matrix- A tool used to record Code Compliance Data.

49 Building Code Analysis Reference Project Level 1 Level 2 Site Plan N

50 Building Code Analysis Building Code Matrix Reference Project: Step 1: Identifying the Scope of the Project Questions to Ask:

51 Reference Project : Occupancy Classification: Table Major Occupancy Classification (forming part of Sentences (1), (1) and (3) Group Division Description of Major Occupancies A 1 Assembly occupancies intended for the production and viewing of the performing arts A 2 Assembly occupancies not elsewhere classified in Group A A 3 Assembly occupancies of the arena type A 4 Assembly occupancies in which occupants are gathered in the open air B 1 Detention occupancies B 2 Care and treatment occupancies B 3 Care occupancies C -- Residential occupancies D Business and personal services occupancies E - Mercantile occupancies F 1 High hazard industrial occupancies F 2 Medium hazard industrial occupancies F 3 Low hazard industrial occupancies

52 Building Code: Occupancy Classification Sentence (1) Occupancies of the Same Classification Any building is deemed to be occupied by a single major occupancy not withstanding its use for more than one major occupancy, provided that all occupancies are classified as belonging to the same Group classification or, where the Group is divided into Divisions, as belonging to the same Division classification described in Table Definitions: Building: Building Code 2012 missing from definitions but 2010 NBC Building: Building means any structure used or intended for supporting or sheltering any use or occupancy. Major occupancy: means the principal occupancy for which a building or part of a building is used or intended to be used, and is deemed to include the subsidiary occupancies that are an integral part of the principal occupancy.

53 Building Code: Occupancy Classification Definitions: Assembly Occupancy: (A1, A2, A3 and A4): the occupancy or use of a building or part of a building by a gathering of persons for civic, political, travel, religious, social, education, recreational or similar purposes or for the consumption of food or drink. A- Division 2 Church A- Division 1 Theatre

54 Building Code: Occupancy Classification Definitions: Detention Occupancy: Group B, Division 1 (B1): an occupancy in which persons are under restraint or are incapable of self preservation because of security measures not under their control. Care and Treatment Occupancy: Group B, Division 2 (B2): an occupancy in which persons receive special care and treatment. Care Occupancy: Group B, Division 3 (B3) : an occupancy in which special care is provided by a facility, directly through its staff or indirectly through another provider, to residents of the facility, (a) who require special care because of cognitive or physical limitations and (b) who as a result of those limitations, would be incapable of evacuating the occupancy, if necessary, without the assistance of another person. B Division 2 Home for the Aged B Division 3 Group Homes - Developmental Disabilities B Division 1 Prisons

55 Building Code: Occupancy Classification Definitions: Residential Occupancy: Group C: an occupancy in which sleeping accommodation is provided to residents who are not harboured for the purpose of receiving special care or treatment and are not involuntarily detained.

56 Building Code: Occupancy Classification Definitions: Business and Personal Service Occupancy: Group D: the occupancy or use of a building or part of a building for the transaction of business or the provision of professional or personal services

57 Building Code: Occupancy Classification Definitions: Mercantile Occupancy: Group E: the occupancy or use of a building or part of a building for the display or selling of retail goods, wares or merchandise

58 Building Code: Occupancy Classification Definitions: Industrial Occupancy: Group F: the occupancies or use of a building or part of a building for the assembling, fabricating, manufacturing, processing, repairing or storing of goods and materials Group F Division 1: High Hazard Industrial Occupancy Group F Division 2: Medium Hazard Industrial Occupancy Group F Division 3: Low Hazard Industrial Occupancy

59 Building Code: Major Occupancy Major Occupancy versus Subsidiary Occupancy: The definition of major occupancies does not prevent subsidiary occupancies in the building. The dividing line between a major occupancy and a subsidiary occupancy is not always black and white. Article : In a building in which the aggregate area of a major occupancies in a particular Group or Division is not more than 10% of the floor area of the storey in which they are located, these major occupancies need not be considered as major occupancies for the purpose of this Subsection, provided they are not classified as Group F, Division 1 or 2 occupancies. Morris Thuemen Architects Inc. Subsidiary Occupancy-an integral part of the principal Occupancy Major Occupancy: Occupancy A2: - School.

60

61

62 Building Code: Major Occupancy Major Occupancy + Major Occupancy +Major Occupancy + = HAZARDS = risk of exposure to fire. Certain major occupancies are to be isolated from others by fire separations, to protect one occupancy from the danger created by the other. (TABLE ) Adjoining means above, beside or below. The plane of fire separation could be vertical or horizontal. Fire separations are intended to slow or prevent the spread of fire and smoke from where it begins in the building to another part, by applying principles of compartmentation. Article : certain occupancies do not require separations, but others in the building code discuss that they can t be in the same building with other occupancies Section 3.3: Tenancy, ownership has an influence on fire separations

63 BUILDING CODE: MAJOR OCCUPANCY

64 Building Code Analysis Building Code Matrix Reference Project: Step 2: Major Occupancy (s) Questions to Ask: Circulation Offices Circulation Laboratories Storage Plan

65 Building Code Analysis Building Code Matrix Reference Project: Step 3: Building Area Questions to Ask: ITEM 1 2 Project Description: New Addition Alteration Change of Use ONTARIO 2012 BUILDING CODE DATA MATRIX PARTS 3 OR 9 Major Occupancy(s): F3- INDUSTRIAL LOW HAZARD OCCUPANCY D BUSINESS AND PERSONAL SERVICES OCCUPANCY OBC Reference: References are to Division B unless noted [A] for Division A or [C] for Division C Part 11 Part 3 Part TO [A] [A] & (1) Building Area (m²): Existing: New: 5022 m² Total: 5022m² [A] [A] Circulation Offices Circulation Laboratories Storage FOOTPRINT Plan

66 Building Code Analysis Building Code Matrix ITEM Reference Project: Step 4: Gross Area Questions to Ask: ONTARIO 2012 BUILDING CODE DATA MATRIX PARTS 3 OR 9 OBC Reference: References are to Division B unless noted [A] for Division A or [C] for Division C Project Description: Part 11 Part 3 Part 9 1 New Addition Alteration Change of Use [A] & 11.1 TO [A] Major Occupancy(s): F3- INDUSTRIAL LOW HAZARD OCCUPANCY (1) D BUSINESS AND PERSONAL SERVICES OCCUPANCY 3 Building Area (m²): Existing: New: 5022 m² Total: 5022 m² [A] [A] 4 Gross Area (m²): Existing: New: 9331 m² Total: 9331 m² [A] [A] 1 Level 1 2 Level 2 Gross Building Area: Sum of 1+2 Plan

67 Building Code Analysis Building Code Matrix ITEM Reference Project: Step 5: Number of Storeys Questions to Ask: ONTARIO 2012 BUILDING CODE DATA MATRIX PARTS 3 OR 9 OBC Reference: References are to Division B unless noted [A] for Division A or [C] for Division C Project Description: Part 11 Part 3 Part 9 1 New Addition Alteration Change of Use [A] & 11.1 TO [A] Major Occupancy(s): F3- INDUSTRIAL LOW HAZARD OCCUPANCY D BUSINESS AND PERSONAL SERVICES OCCUPANCY (1) Building Area (m²): Existing: New: 5022 m² Total: 5022 m² [A] [A] 4 Gross Area (m²): Existing: New: 9331 m² Total: 9331 m² [A] [A] [A] & [A] 5 Number of Storeys: Above Grade: 2 Below Grade: & Level 2 Number of Storeys above grade Grade 1 Level I Grade Section

68 Building Code Analysis Building Code Matrix Reference Project: Step 6: Building Height Questions to Ask: ITEM ONTARIO 2012 BUILDING CODE DATA MATRIX PARTS 3 OR 9 OBC Reference: References are to Division B unless noted [A] for Division A or [C] for Division C Project Description: Part 11 Part 3 Part 9 1 New Addition Alteration Change of Use [A] & 11.1 TO [A] Major Occupancy(s): F3- INDUSTRIAL LOW HAZARD OCCUPANCY D BUSINESS AND PERSONAL SERVICES OCCUPANCY (1) Building Area (m²): Existing: New: 5022 m² Total: 5022 m² [A] [A] 4 Gross Area (m²): Existing: New: 9331 m² Total: 9331 m² [A] [A] 5 Number of Storeys: Above Grade: 2 Below Grade: [A] & [A] & Building Height (m): m Roof 2 Level 2 Building Height Grade 1 Level I Floor of the first storey Section

69 Building Code: Grade Grade: = the average level of proposed or finished ground adjoining a building at all exterior walls. NEED TO KNOW: Storey and Building Height Subsection Building Size and Construction Related to Occupancy Subsection Additional Requirements for High Rise Building

70 Building Code Analysis Building Code Matrix Reference Project: Step 7: Number of Streets ITEM ONTARIO 2012 BUILDING CODE DATA MATRIX PARTS 3 OR 9 OBC Reference: References are to Division B unless noted [A] for Division A or [C] for Division C Project Description: Part 11 Part 3 Part 9 1 New Addition Alteration Change of Use [A] & 11.1 TO [A] Major Occupancy(s): F3- INDUSTRIAL LOW HAZARD OCCUPANCY D BUSINESS AND PERSONAL SERVICES OCCUPANCY (1) Building Area (m²): Existing: New: 5022 m² Total: 5022 m² [A] [A] 4 Gross Area (m²): Existing: New: 9331 m² Total: 9331 m² [A] [A] 5 Number of Storeys: Above Grade: 2 Below Grade: [A] & Building Height (m): m Number of Streets/Access Routes: 1 STREET & [A] & Street Plan

71 Building Code: Streets Number of Streets = Provisions for Firefighting Subsection Provisions for Fire Fighting Article , , and = access into the building by firefighters Article to = Construction requirements Article Access Routes, requires buildings that exceed three storeys in building height or exceed 600m2 in building area, to be provided with an access route to the building face having a principal entrance and to each building face of unsprinklered floor areas that are required to have direct exterior firefighter access required by Article and

72 Building Code: Number of Streets Number of Streets = Provisions for Firefighting An access route as set out in Subsection = STREET 2 Streets + a building = not less than 50% of the building perimeter is located within 15 m of a street or streets 3 Streets + a building = not less than 75% of the building perimeter is located within 15m of a street or streets. The building perimeter that is required to face a street(s) is required by Sentence (1) to be located at least 3m but not more than 15m from the street (s).

73 Building Code: Access Routes Provisions for Firefighting = Distances Article : distances between a fire route, fire department connections (FDC), building entrances, fire trucks and hydrants (2)

74 Building Code: Access Route: Fire Fighting (3) (4)

75 Building Code: Access Route: Fire Fighting

76 Building Code Analysis Building Code Matrix Reference Project: Step 7: Number of Streets 7 Number of Streets/Access Routes: 1 STREET & Street Plan

77 Building Code Analysis Building Code Matrix Reference Project: Step 8: Building Classification Questions to Ask: 2 Major Occupancy(s): F3- INDUSTRIAL LOW HAZARD OCCUPANCY D BUSINESS AND PERSONAL SERVICES OCCUPANCY (1) Building Classification: GROUP D UP TO 3 STOREYS SPRINKLERED OR GROUP F3 UP TO 4 STOREYS SPRINKLERED (MORE STRINGENT) ( ) ( ) Circulation Offices D Circulation Laboratories Storage F3 F3 Plan

78 Building Code Analysis Building Code Matrix Reference Project: Step 8: Building Classification Questions to Ask: 8 Building Classification: GROUP D UP TO 3 STOREYS SPRINKLERED OR GROUP F3 UP TO 4 STOREYS SPRINKLERED (MORE STRINGENT) ( ) ( ) Major Occupancies Number of facing Streets D F3 1 Street D Street F3 2 Plan Building Height 2 Storeys Section 1 Building Area 5022m2 Footprint: 5022m2

79 Building Code Analysis Building Code Matrix Reference Project: Step 8: Building Classification Questions to Ask: 8 Building Classification: GROUP D UP TO 3 STOREYS SPRINKLERED OR GROUP F3 UP TO 4 STOREYS SPRINKLERED (MORE STRINGENT) ( ) ( ) Article Multiple Major Occupancies evaluate the building as if it is entirely one of the Major occupancies- determine which Articles applies- then take the other major occupancy- determine Articles applies - TAKE THE MOST STRINGENT - construction requirements of the entire building. Table Table Major Occupancy Separations = additional requirement. D F3 Street 2 Section 1 Footprint: 5022m2 Plan

80 Building Code Analysis Building Code Matrix Reference Project: Step 8: Building Classification Questions to Ask: 8 Building Classification: GROUP D UP TO 3 STOREYS SPRINKLERED OR GROUP F3 UP TO 4 STOREYS SPRINKLERED (MORE STRINGENT) ( ) ( ) Major Occupancy Area (m2) Building Height Building Classification Construction Type D Combustible/ or noncombustible F Combustible/ or noncombustible D/F3 Major Occupancy Separations: Table No requirements Sprinkler Yes Yes Floor Rating Fire Separation: and 45 min-if combustible Fire Separation: and 45 min-if combustible material Mezzanine 45 min- or noncombustible 45 min- or noncombustible Rating of supporting members 45 min or noncombustible 45 min or noncombustible Building Classified as either D or F3 neither is more stringent- Selected F3.

81 Building Code Superimposed Major Occupancies Subsection FRR- D occupancy E 4 E 3 and D 2 = D 1 Section

82 Building Code Superimposed Major Occupancies Example: Subsection The building is sprinklered throughout 50m C 4 50m D 3 Plan D 2 = E 1 Section

83 Building Code Fire Wall Article Fire wall -atypeoffire separation of noncombustible construction that subdivides a building or separates adjoining buildings to resist the spread of fire and that has a fire-resistance rating as prescribed in this Code and the structural stability to remain intact under the fire conditions for the required fire-rated time. A firewall is a special type of fire separation, constructed to provide a fire-resistance rating of 2 to 4 hours. They are structurally stable for the rated time in a fire. Building Total 2 buildings Building A FIREWALL Building B

84 Building Code Fire Wall Subsection Firewalls - the Building Code defines materials, fire resistance rating, structural configurations, and requirements to extend above rooflines.

85 Building Code Analysis Building Code Matrix Reference Project: Step 9: Sprinkler System Questions to Ask: Subsection Building Size and Occupancy. 9 Sprinkler System: entire building selected components selected floor areas basement only in lieu of roof rating not required ( ) INDEX INDEX Sprinklers provides relief to building code requirements re: compartmentation of basements, or in lieu of roof ratings. Construction under Subsection related to rated components and combustible/con-combustible material construction relate to decision to sprinkler or not to sprinkler.

86 Building Code Analysis Building Code Matrix Reference Project: Step 10: Water Supply Adequate Questions to Ask: Is the water supply adequate? 12 Water Service/Supply is Adequate: yes no N/A Article Water Supply requires an adequate water supply for firefighting to be provided for every building. Reference the Appendix for discussions and calculations of adequate Sentence (2) If the perimeter of the building is considered to face the street (for Subsection 3.2.2) the required perimeter has to be within 90 m of the hydrant.

87 Building Code Water Supply Adequate Even though within a municipality, VERIFY the water supply

88 Building Code Analysis Building Code Matrix Reference Project: Step 11: Standpipe requirements Questions to Ask: Is the water supply adequate? Part 3 Part 9 10 Standpipe Required : yes no N/A Sentence (1) A standpipe system is required : If a building: is more than three storeys in building height More than 14 m high measured between grade and the ceiling of the top storey, or is more than 14 m high measured between grade and the ceiling of the top storey but has a building area exceeding the Area shown in Table for the applicable building height if the building is not sprinklered.

89 Building Code Standpipe Article has other requirements listed for requirements of standpipes. NFPA 14 Installation of Standpipe and Hose System Definition in NFPA 14 Standpipe : An arrangement of piping, valves, hose connections and allied equipment installed in a building or structure, with the hose connections located in such a manner that water can be discharged in streams through attached hose and nozzles, for the purposes of extinguishing a fire, thereby protecting a building or structure and its contents in addition to protecting the occupants. This is accomplished by means of connections to water supply systems or by means of pump tanks and other equipment necessary to provide an adequate supply of water to the hose connections (NFPA, 2003).

90 Building Code Standpipe Sentence (6) A fire department connection (FDC) is required to be provided for every standpipe system

91 Building Code Analysis Building Code Matrix Reference Project: Step 12: Fire Alarm and Detection System Questions to Ask: Fire Alarm - YES - could be 2 stage, or 1 stage Part 3 Part 9 11 Fire Alarm Required : yes Client Requirement: Campus Single Stage no Article Installation of Fire Alarm: a) A contained impeded egress zone b) More than 3 storeys, including storeys below the first the storey c) A total occupant contained use area d) load more than 300, other than in open air seating areas, e) An occupant load more than 150 above or below the first storey other than in open air seating areas, f) A school, college, or child care facility with an occupant load more than 40, g) A licensed beverage establishment or a restaurant, with an occupant load more than 150 h) A medium hazard industrial occupancy or a low hazard industrial occupancy with an occupant load more than 75 above the first storey, i) A residential occupancy with sleeping accommodation for more than 10 persons j) A high hazard industrial occupancy with an occupant load more than 25, k) An occupant load more than 300 below an open air seating area, l) An interconnected floor space required to conform to Articles to m) A care and treatment occupancy for more than 10 persons receiving care or treatment or n) A care occupancy for more than 10 persons receiving care.

92 Building Code Fire Alarm Sentence Single stage: upon the operation of any manual pull station or fire detector, cause an alarm signal to sound on all audible signal devices in the system for evacuation throughout the building. Two Stage: Causes an alert signal to sound upon the operation of any manual pull station or fire detector, and has a key to affect the manual pull stations and other additional requirements. When the device goes off immediate floor and above and below goes into evacuation mode and others into alert.

93 Building Code Analysis Building Code Matrix Reference Project: Step 13: Additional Requirements for High Buildings Questions to Ask: Verify Criteria Part 3 Part 9 13 High Building: yes no N/A A. Of Group A, D, E or F major occupancy classification that is more than, i. 36 m high, measured between grade and the floor level of the top storeys, or ii. 18 m high, measured between grade and the floor level of the top storey, and in which the cumulative or total occupant load on or above any storey above grade, other than the first storey, divide by 1.8 times the width in metres of all exit stairs at that storey exceeds 300, B. Contains a Group B major occupancy in which the floor level of the highest storey of that major occupancy is more than 18 m above grade, C. Contains a floor area or part of a floor area located above the third storey designed or intended as a Group B, Division 2 or 3 occupancy, and D. Containing a Group C major occupancy whose floor level is more than 18 m above grade

94 Building Code Additional Requirements for High Building Subsection Additional requirements for high rise buildings are described in Subsection 3.2.6, i.e. limits to smoke development, emergency operation of elevators, firefighting elevators, venting to aid firefighting, central alarm and control facility, voice communication system. A requirement of a sprinkler building design is to limit smoke movement, and to limit the danger to occupants and firefighters from exposure to smoke in a building fire. These are discussed in MMAH Standard SB-4 - Measures for Fire Safety in High Buildings. Include in the Code Matrix a line item documenting Measure i.e. Measure A - sprinklered building, Measure G - Pressurized building, Measure M balconies etc. the building considered for the design.

95 Building Code Analysis Building Code Matrix Reference Project: Step 14: Construction Restrictions Questions to Ask: Subsection Building Size and Occupancy. 14 Permitted: Actual: Client Input Combustible Non-Combustible Both Combustible Non-Combustible Both ( ) Group F Division 3, up to 4 Storeys, Sprinklered (2) The building referred to in Sentence (1) is permitted to be of combustible construction or noncombustible construction used singly or in combination and..

96 Building Code Analysis Building Code Matrix Reference Project: Step 15: Required Fire Resistance Ratings Questions to Ask: Subsection Building Size and Occupancy. 22 Required Fire Resistance Rating (FRR) Compartments and Fire Separations: Horizontal Assemblies FRR (hrs) Listed Design No. Or Description (SG-2) Floors 0 FIRE SEPARATION Roof N/A Mezzanine N/A Supporting Members FRR (hrs) Floors 0 Roof 0 Mezzanine 0 Listed Design No. Or Description (SG-2) Group F Division 3, up to 4 Storeys, Sprinklered (2) (a) floor assemblies shall be fire separations and, if of combustible construction shall have a fire resistance rating of 45 min, and (b) mezzanines shall have, if of combustible construction, a fire-resistance rating not less than 45min, and (c ) loadbearing walls, columns and arches supporting an assembly (i) required to have a fire-resistance rating, shall have a fire resistance rating not less than 45 min, or (ii) be of non combustible construction

97 Building Code Analysis Building Code Matrix Reference Project: Step 16: Hazardous Substances Questions to Ask: Subsection & Hazardous Substances: yes no & (4) The handling and storage of hazardous substances shall be in conformance with: a) The Fire Code, made under the Fire Protection and Prevention Act, 1997 or b) The National Fire Code of Canada, in the absence of regulations referred to in Clause (a). Typically to be considered in laboratories are flammable liquids, gases, and quantity of gases i.e. oxygen, and hydrogen. In a garage to be considered are Petroleum, lubricant and oil storage.

98 Building Code Analysis Building Code Matrix Reference Project: Step 17: Mezzanine(s) Area (m2) Questions to Ask: Are there mezzanines- how many, and total m2 17 Mezzanine(s) Area (m2): N/A (3) -(8) Mezzanine: means an intermediate floor assembly between the floor and ceiling of any room or storey and includes an interior balcony.

99 Building Code Analysis Building Code Matrix Reference Project: Step 18: Occupancy Questions to Ask: Subsection how many persons 18 Occupant Load Based On: m²/person design of building Level Occupancy Type Occupancy Area Per Load (Number of (m²) Person Persons) Area (m²) Level 0 Level Level 2 Total Occupant Load persons Definition: Occupancy: means the use or intended use of a building or part of a building for the shelter or support of persons, animals or property. Occupant load: means the number of persons for which a building or part of a building is designed.

100 Building Code Occupancy Subsection Occupant Load Determination (1) The occupant load of a floor area or part of a floor area, or a building or part of a building not having a floor area, shall be based on, (c) The number of persons, (i) for which the area is designed, or (ii) determined from Table for occupancies other than described in Clause a, and b. (2) If a floor area or part of it has been designed for an occupant load other than that determined from Table , a permanent sign indicating that occupant load shall be posted in a conspicuous location.

101 Building Code Occupancy Occupancy Load: Based on occupancy load a building may: Require a fire alarm and detection system Compliance with high building additional requirements Occupant load is used to determine: Use of panic/fire exit hardware on doors Number of egress doorways from a room/suite Number of exits from a floor area Width of corridors, various types Number of plumbing fixtures Need for emergency lighting Exit signage Direction of Door Swing

102 Building Code Analysis Building Code Matrix Reference Project: Step 18: Occupancy 18 Occupant Load Based On: m²/person design of building Level 1 Level 2

103 Building Code Occupancy Level 1 Level 2 Business and Personal Services uses offices 9.3m2 per person Industrial uses manufacturing or process rooms 4.6m2 per person Industrial uses storage 28.0 m2 per person Other uses Kitchen offices 9.3 m2 per person Other uses cleaning 4.6m2 per person Table Occupant Load

104 Building Code Analysis Building Code Matrix Reference Project: Step 18: Occupancy (based on m2/person- Option 1) CALCULATION OF OCCUPANT LOAD: Step 1 - Calculate the floor area, per occupancy: Step 2 - Determine the use - determine the use of all floor areas within the building. Definition: Floor area means the space on any storey of a building between exterior walls and required firewalls including the space occupied by interior walls and partitions, but not including exits, vertical service spaces and their enclosing assemblies. Step 3 Using Table calculate the persons / m2 per space If a floor area or part of it has been designed for an occupant load other than that determined from Table a permanent sign indicating that occupant load shall be posted in a conspicuous location.

105 Building Code Occupancy Level 1 Level 2 Business and Personal Services uses offices Industrial uses manufacturing or process rooms Industrial uses storage Other uses Kitchen offices Other uses cleaning Table Occupant Load - by design-intended use

106 Building Code Analysis Building Code Matrix Reference Project: Step 18: Occupancy (based on design-option2) CALCULATION OF OCCUPANT LOAD: If a floor area or part of it has been designed for an occupant load other than that determined from Table a permanent sign indicating that occupant load shall be posted in a conspicuous location.

107 Building Code Exit Capacity Defined Terms: Exit : that part of a means of egress, including doorways that leads from the floor area it serves., to a separate building, an open public thoroughfare, or an exterior open space protected from fire exposure from the building and having access to an open public thoroughfare. Access to Exit: means part of a means of egress within a floor area that provides access to an exit serving the floor area. Means of Egress: includes exits and access to exits and means a continuous path of travel provided for the escape of persons from any point in a building or contained open spaces to a separate building, an open public thoroughfare, or an exterior open space protected from fire exposure from the building and having access to an open public thoroughfare. EXIT Stair ACCESS TO EXIT Street Stair Path to public thoroughfare (street) EXIT Floor Plan

108 Building Code Number and Locations of Exits Subsection Number and Location of Exits Typically a floor area has at least 2 exits. Sentence (2) permits a single exit from a floor area under certain conditions: The building is not more than 2 storeys in building height The total occupant load served by the exit does not exceed 60 persons and In a floor area that is not sprinklered, the floor area and the travel distance are not more than the values in Table A or In a floor area that is sprinklered: -the travel distance is not more than 25m and the floor area is not more than the value in Table B

109 Building Code Number and Locations of Exits Subsection Number and Location of Exits Article directs a minimum safe separation distance between exits in a floor area. The least distance allowable between the two exits. Articles and Travel Distance Travel distance is the distance measured along the path of travel to an exit from any point within a floor area. It is measured along the line of pedestrian movement. Is it an open floor plate Is there a public corridor Is the floor plate divided by a fire separation subdividing the floor area

110 Building Code Distance between Exits Subsection Distance Between Exits

111 Building Code Travel Distance-Location of Exits Use/ Occ. More than One Exit Required from a Floor Area Max. Travel Distant to at least 1 Exit. [ ] Not sprinklered Sprinklered Floor Area One Exit from a Floor Area Permitted (Two Storeys or Less) (Occupant Load 60) [ ] Not Sprinklered Maximum travel distance Maximum Area (m 2 ) Sprinklered Floor Area Maximum Area (m 2 ) (travel distance 25 m) A-FS 45 m 45 m 15 m 150 m m 2 A-1 30 m 45 m 15 m 150 m m 2 A-2 30 m 45 m 15 m 150 m m 2 A-3 30 m 45 m 15 m 150 m m 2 Legend-Maximum Travel Distance in Metres - TD = Travel Distance is 60 m for an open air storage garage A-FS assembly occupancy with fixed seats complying reference Sentences (15) and (16) ** - Building is sprinklered 9m p-c Public Corridor 9m wide reference (3) or provide exits spaced at 60 m along building perimeter except F-1 - Not permitted A-4 30 m 45 m 15 m 150 m m 2 B-1 30 m 45 m 100 m 2 B-2 30 m 45 m 100 m 2 B-3 30 m 45 m 100 m 2 C 30 m 45 m 15 m 100 m m 2 D 40 m 45 m 25 m 200 m m 2 E 30 m 45 m 15 m 150 m m 2 F-1 25 m 25 m F-2 30 m 45 m 10 m 150 m m 2 F-3 30 m* 45 m* 15 m 200 m m 2 9m p-c 30 m 105 m**

112 Building Code Travel Distance Where a room or suite is served by an exterior passageway or by a corridor separated from the remainder of the floor area by a fire separation, the travel distance can be measured from the egress door of the room or suite to the nearest exit. Where travel distance is permitted to be measured from the room or suite egress door to an exit, additional travel distance within the room or suite is regulated by Article for rooms or suites with one egress doorway and Article for rooms or suites having more than one egress doorway At least one door at every principal entrance from ground level should be designed as an exit for the purposes of Section 3.4 (Article ) for additional distance within the room (2) Exit Public Corridor or Exterior Passageway Exit

113 Building Code Travel Distance SKETCH A

114 Building Code Exit Width Article Width and Height of Exits-Article Exits include corridor, passageway stair ramp or doorway. Width of exits are determined mainly by Occupant Load of the floor area. The minimum required width of exits: minimum prescribed by the building code or the width necessary to accommodate the occupant load. Examples : Occupant load: 175 persons What is the width required for : low slope exit stair width ( (b) ) 175 x 8.0mm/persons = 1400mm (reference table) Or conversely: 915 mm door/ 6.1mm/person = 150 persons (reference table)

115 Building Code Exit Width Minimum widths of exits serving floor areas based on occupant load as described in Sentences (1), (2) and (3) Exit Component - A,D,E, and F Occupancies A, C, D, E, F (not including A-4) mm per person x occupant load Capacity factor (mm/person) Doorway, passageway, corridor, ramp with slope not more than 1:8 6.1 Stair with steps whose rise is not more than 180 mm and whose run is not less than 280 mm (low slope) Ramp with slope exceeding 1:8 Stair with steps whose rise exceeds 180 mm or whose run is less than 280 mm Exit Components: B1, B2, B3 mm per person x occupancy Capacity factor (mm/person) Aggregated exits 18.4 Exit Components: A-4 mm per person x occupancy Capacity factor (mm/person) Aisles, stairs (other than exit stairs) 1.8 Ramps and passageways in dormitories and exits 1.8 Exit stairs 2.4

116 Building Code Exit Width Subsection Width & Height of Exits Minimum widths of an exits described in Sentence (7) Type Application Minimum Width (mm) Serving patients or residents sleeping rooms 1050 Doorways Not serving patients or residents sleeping rooms 790 Corridors & passageways All circumstances 1100 Stairs & ramps Ramps not serving patients or residents sleeping rooms 1100 Stairs not serving patients or residents sleeping rooms that serve more than 2 storeys above the lowest exit level or more than one storey below the lowest exit level Serving patients or residential sleeping rooms 1650 Stairs Not serving patients or residents sleeping rooms that serve not more than two storeys above the lowest exit level or not more than one storey below the lowest exit level. 900

117 Building Code Headroom Clearance Article indicates minimum headroom for location of exits: Minimum Headroom Location in Exit 2030 Doorway 1980 Door closer 2050 Stairways and landings 2100 Other locations

118 Building Code Analysis Building Code Matrix Reference Project: Step 19: Fire Separations-Compartments Exits are separated from the adjacent floor areas by a fire separation. The walls of the exit shaft have a fire-resistance rating not less than required for the floor assemblies through which it passes, but not less than 45 minutes.

119 Building Code Fire Separations Level 1

120 Building Code Fire Separations Level 2 Section

121 Building Code Exit Signage Subsection Exit Signage Exit signs: to identify the location of exits In smaller buildings and single entrance ways - it is assumed that building occupants know the location of the door that leads out. New to the OBC is the Green pictogram and white graphic symbol - the running man / or figure.

122 Building Code Types of Exit Facilities Subsection Types of Exit Facilities Articles to : requirements for exit stairs, ramps guards handrails doors and hardware including dimensions of landings, maximum vertical rise of stair flights and required landings, handrails, guards, ramp slope, treads and risers, curved stairs, horizontal exits, doors, direction of door swing, self-closing devices, sliding doors, revolving doors, door release hardware, emergency access to floor areas, and floor numbering (11) Not less than 50 mm ( (3) a 30mm-43mm

123 Building Code Type of Exit Facilities Subsection Types of Exit Facilities Articles to : Doors, Direction of Doors, Self-Closing Devices Article Door swing- a door serving an exit facility is normally required to swing on a vertical axis in the direction of travel to the exit. Article Generally, where occupancies are of less than 60 persons a door does not need to swing in the direction of travel, or access to exit (this does not apply to high hazard occupancies). Single residential occupancies have to have a door that swings on an access, but not in the direction of travel. Article , Generally doors acting as closures within a wall with a fire separation has to be self-closing and self-latching.

124 Building Code Health Requirements Section 3.7 prescriptive requirements for the height, and area of rooms, window areas, protection of windows in apartment buildings, ventilation, plumbing facilities, health care facility systems and food premises. Subsection Plumbing Facilities Articles to Steps to determine the amount of water closets and lavatories required for a building, tenant or occupancy: calculate occupant load in accordance with Subsection Occupant Load use the applicable article in Subsection Plumbing Fixtures to determine the required number of water closets for each sex calculate number of lavatories Sentence (5) Group D Occupancy - 14m2 per person

125 Building Code Health Requirements

126 Building Code Analysis Building Code Matrix Reference Project: Step 20: Plumbing Fixtures Option 1: Occupancy m2 Option 2: Occupancy by design

127 Building Code Spatial Separations and Exposure Protection Subsection SPATIAL SEPARATION AND EXPOSURE PROTECTION - Fires spread = close proximity to one another Minimum fire-resistance rating and protection = control of fire Limits on combustibility of construction = control of fire Defined Terms Exposed building face: that part of the exterior wall of a building that faces one direction and is located between ground level and level and the ceiling of its top storey, or where a building is divided into fire compartments, the exterior wall of a fire compartment that faces one direction (Sentences: (1) and (2)) Limiting Distance is the distance from an exposing building face to a property line, the centre line of a street, lane or public thoroughfare, or to an imaginary line between two buildings of fire compartments on the same property, measured at right angles to the exposed building face.

128 Building Code Spatial Separations and Exposure Protection

129 Building Code Spatial Separations and Exposure Protection Unprotected opening: as applied to an exposed building face is a doorway, window or opening other than one equipped with a closure having the required fire-protection rating, or any part of a wall forming part of the exposed building face that has a fire-resistance rating less than that required for the exposed building face. Spatial Separation: Depends on Occupancy Classification Limiting Distance Sprinkler Protection Size of Exposed Building Face Two calculations required: Depending on the % of unprotected openings, the cladding of the building material of the exposed building face is determined Allowable unprotected openings.

130 Building Code Spatial Separations and Exposure Protection

131 Building Code Analysis Building Code Matrix Reference Project: Step 21: Spatial Separation Site Plan

132 Building Code Exposed Building Face

133 Building Code Analysis Building Code Matrix Reference Project: Step 22: Energy Efficient Design Sample of Energy Model Software which can be used:

134 Building Code Lighting and Emergency Power Subsection LIGHTING AND EMERGENCY POWER Article Minimum Lighting Requirements: require adequate illumination levels under normal power conditions to occupied areas to ensure safety of operation and for egress. Article Recessed Lighting Fixtures: Insulated ceilings require specific recessed lighting fixtures designed for insulated ceilings. Article Emergency Lighting: lists areas that are required to be provided with emergency lighting and the minimum required illumination levels.

135 Building Code Lighting and Emergency Power Article Emergency lighting - average illumination level of 10 lx: Exits, principal routes providing access to exit in open floor areas and in service rooms, corridors used by the public, corridors serving patients or residents sleeping rooms in a Group B, Division 2 or Division 3 occupancy, corridors servicing classrooms, underground walkways, public corridors, floor areas or parts where in public may congregate in: Group A, Division 1 occupancies or Group A, Division 2 or 3 occupancies having an occupant load of 60 persons or more, floor areas or parts in daycare centres where persons are cared for, food preparation areas in commercial kitchens, aisles internal corridors and principal routes providing access to exit in a floor area that is not subdivided into rooms, or that is subdivided into rooms in Group D, E, and F occupancies (i.e. main passageways that lead to exits), service spaces that are located within floor level that is not considered a storey in determining building height and within a means of egress from a shelf or rack storage system.

136 Building Code Lighting and Emergency Power (4) (k): Emergency lighting required at doorways that are equipped with electromagnetic locking devices Article : Emergency Power for lighting, requires the following minimum duration of emergency power for the emergency lighting listed Article (listed above) : o 2 hr. for high buildings (Subsection part of Additional Requirements for High Buildings) o 1 hr. for Group B major occupancies that are not within the scope of Subsection Additional Requirements for High Buildings and 30 min for other buildings.

137 Building Code Analysis Building Code Matrix Reference Project: Step 23: Barrier Free Design (b) Appendix Section 3.8: Barrier Free Design INTENT: Facilities can be approached, entered and used by persons with physical or sensory disabilities one of the Barrier free entrance shall be the principal entrance Barrier-free path of travel from the entrances is required to be provided throughout the entrance storey and within all normally occupied floor areas served by a passenger elevator, escalator, inclined moving walk or other platform equipped passenger elevating device.

138 Building Code Barrier Free Design Sentence (2) - Interior and exterior walking surfaces within a barrier-free path of travel: Have no openings that will permit the passage of a sphere more than 13 mm in diameter, have any elongated openings oriented approximately perpendicular to the direction of travel, be stable, firm and slip-resistant, be beveled slopes of 1 in 2 for changes in level not more than 13mm. be provided with sloped floors or ramps at changes in level more than 13 mm.

139 Building Code Barrier Free Design Sentence (1) Except as required in Sentence (4) and except as permitted in Subsection 3.8.3, (section discusses doorways, ramps etc,) every barrier-free path of travel shall provide an unobstructed width of at least 1100m for the passage of wheelchairs. Sentence (4) - Every barrier-free path of travel less than 1600m in width shall be provided with an unobstructed space not less than 1800mm in width and 1800mm in length located not more than 30m apart. (revised Jan 2015)

140 Building Code Barrier Free Design Controls: Article : Controls intend to be operated by the occupant are to be mounted at a maximum height of 1200mm above the floor. (thermostat or a manual pull station. Doors and Doorways: Sentence (1) The 2012 Building Code introduces a clear width of 860 mm Barrier Free Path of Travel Clear width is defined as the width of the doorway measured with the door in the open position. Appendix A: (1) Illustrated Code Series-Barrier-Free Requirements

141 Building Code Barrier Free Design Sentence (10) In a Barrier Free Path of Travel: Space in a doorway for a wheelchair/scooter to approach the door is considered. 300 mm when the door swings away, and 600mm when the door swings towards the vehicle. (unless equipped with a power door operator) Appendix: A (10)

142 Building Code Barrier Free Design Sentence (11) Vestibules in barrier free path of travels are so positioned to allow sufficient space for barrier free. The minimum length is 1500mm plus the width of the door that swings into the vestibule. (revision to OBC) Appendix: A (11)

143 Building Code Barrier Free Design Section 3.8. Barrier Free Design : Includes: entrances, paths of travel; controls; washroom requirements, universal toilet room requirements, showers/bathtubs, shelves, counters for public telephones, and drinking fountains. Depending on client group they may be additional Client Group Barrier Free requirements. Various municipalities in Ontario have additional requirements. The federal government for example uses NBC 2010, and the technical standard CAN/CSA- B (even though 2012 is printed). In 2005, the Ontario Government took a step towards building a more accessible province when it passed Accessibility for Ontarians With Disability Act (AODA). It calls for the development of standards for accessibility in five key areas of daily living: Customer Service, Information and Communications, Employment, Transportation and the Built Environment.

144 Building Code Barrier Free Design As of January 2012 the AODA Act, legally requires all organizations both public and private, that provide goods and services either directly to the public or to other organizations in Ontario (3 rd parties) and that have one or more employees to provide accessible customer service to persons of all levels. Ontario Building Code has been amended to include enhancements to accessibility in buildings. As of January 1, 2015, new construction and renovations are subject to updated accessibility requirements.

145 PT. 3 Practice Tip OAA Building Code Data Matrix Regulation 27 of the Architects Act requires that architects must when submitting an application of a building permit include, with the information that is submitted, building code compliance data. In practice: communication of code related data when applying for a building permit is a systematic approach : A Building code Matrix. Although there is no direction in the Code as to how to do this, the practice tip attempts to provide information on a suggested procedure. 1. A code matrix has become the practice. 2. Locate the information in a conspicuous place on the drawings. 3. The OAA provides a sample matrix. Generally this is expanded so that the matrix becomes useful through out the life of the project. We use it as a record of decisions made with respect to the Building Code 4. Adjust the code matrix for each project, and Record the Code version being used, i.e to 2012-including the reference numbers 5. An adaptation of the matrix, can be made for other applicable codes, i.e. the National Building Code.

146 OAA Website: Practice Tips PT 3 PT. 3 Practice Tip OAA Building Code Data Matrix

147 PT. 4 Practice Tip OAA Workbook Framework

148 PT. 4 Practice Tip OAA Workbook Framework

149 PT. 4 Practice Tip OAA Workbook Framework PT. 4 provides workbook frameworks in excel format, providing worksheets assessing key components of a Building Code analysis. Note the worksheets relate to the OBC 2006, and require updating to the 2012 building Code.

150 Practice of Architecture Building Code and the Architects Act Practice of Architecture - Design of a building and General Review - Building Code and Architects Act The Architects Act 11.(1) to (5) defines who may engage in practice of architecture The Ontario Building Code 2012 does not contain such a definition. The Building Code Act does define the requirements of the Role of the Designer. The Ontario Building Code 2012 does in Division C Part 1 General discuss requirements for General Review

151 Exerpt from The Architects Act - elaw Who may engage in practice of architecture 11. (1) No person shall engage in the practice of architecture or hold himself, herself or itself out as engaging in the practice of architecture unless, (a) the person is licensed under this Act; (b) the person is the holder of a certificate of practice or the person is doing so as a member of a partnership that holds a certificate of practice; or (c) the person is the holder of a temporary licence under this Act. R.S.O. 1990, c. A.26, s. 11 (1); 2010, c. 16, Sched. 2, s. 1 (4). Who may provide service to public (2) No person shall provide to a member of the public a service that is part of the practice of architecture except under and in accordance with a certificate of practice or a temporary licence. R.S.O. 1990, c. A.26, s. 11 (2). Exception (3) Subsections (1) and (2) do not apply to, (a) the preparation or provision of a design for the construction, enlargement or alteration of a building, (i) that is not more than three storeys and not more than 600 square metres in gross area as constructed, enlarged or altered, and (ii) that is used or intended for one or more of residential occupancy, business occupancy, personal services occupancy, mercantile occupancy or industrial occupancy; (b) the preparation or provision of a design for the construction, enlargement or alteration of a building that is not more than three storeys and that is used or intended for residential occupancy and, (i) that contains one dwelling unit or two attached dwelling units each of which is constructed directly on grade, or (ii) that is not more than 600 square metres in building area as constructed, enlarged or altered and contains three or more attached dwelling units, each of which is constructed directly on grade, with no dwelling unit constructed above another dwelling unit; (c) the preparation or provision of a design for the construction, enlargement or alteration of a building used directly in the extraction, processing or storage of ore from a mine; (d) the preparation or provision, under the personal supervision and direction of a member of the Association or the holder of a temporary licence, of a design for the construction, enlargement or alteration of a building;

152 (e) the preparation or provision of a design for interior space for a building, including finishes, fixed or loose furnishings, equipment, fixtures and partitioning of space, and related exterior elements such as signs, finishes and glazed openings used for display purposes, that does not affect or is not likely to affect, (i) the structural integrity, (ii) a fire safety system or fire separation, (iii) a main entrance or public corridor on a floor, (iv) an exit to a public thoroughfare or to the exterior, (v) the construction or location of an exterior wall, or (vi) the usable floor space through the addition of a mezzanine, infill or other similar element, of the building; (f) the preparation or provision of a design for alterations within a dwelling unit that will not affect or are not likely to affect fire separations, firewalls, the strength or safety of the building or the safety of persons in the building; (g) the doing of an act that is within the practice of architecture but that is exempt from the application of this Act when performed or provided by a member of a class of persons prescribed by the regulations for the purpose of the exemption, if the act is done by a person who is a member of the class. R.S.O. 1990, c. A.26, s. 11 (3). Idem (4) The following rules govern the relationship between architects and professional engineers, and subsections (1) and (2) do not apply to prevent a professional engineer from preparing or providing a design for and carrying out the general review of the construction, enlargement or alteration of a building in accordance with these rules: 1. Only an architect may prepare or provide a design for the construction, enlargement or alteration of a building, i. used or intended for residential occupancy, ii. that exceeds 600 square metres in gross area, and iii. that does not exceed three storeys, and carry out the general review of the construction, enlargement or alteration of the building but an architect who prepares or provides such a design may engage a professional engineer to provide services within the practice of professional engineering in connection with the design and the professional engineer may provide the services.

153 2. An architect or a professional engineer may prepare or provide a design for the construction, enlargement or alteration of a building, i. that exceeds 600 square metres in gross area or three storeys, and ii. that is used or intended for, A. industrial occupancy, or B. mixed occupancy consisting of industrial occupancy and one or more other occupancies, where none of the other occupancies exceeds 600 square metres of the gross area,but only a professional engineer may provide services within the practice of professional engineering in connection with the design. 3. Subject to rules 4 and 5, an architect shall provide services that are within the practice of architecture and a professional engineer shall provide services that are within the practice of professional engineering related to the construction, enlargement or alteration of a building used or intended for, i. assembly occupancy, ii. institutional occupancy, iii. business occupancy or personal services occupancy that exceeds 600 square metres in gross area or three storeys, iv. mercantile occupancy that exceeds 600 square metres in gross area or three storeys, v. residential occupancy that exceeds three storeys, vi. mixed occupancy consisting of industrial occupancy and one or more other occupancies, where one of the other occupancies exceeds 600 square metres in gross area, vii. mixed occupancy consisting of a combination of, A. assembly occupancy and any other occupancy, except industrial occupancy, B. institutional occupancy and any other occupancy, except industrial occupancy, C. one or more of, 1. business occupancy, 2. personal services occupancy, or 3. mercantile occupancy, and any other occupancy, except assembly occupancy, institutional occupancy or industrial occupancy,

154 where the building as constructed, enlarged or altered exceeds 600 square metres in gross area or three storeys, D. residential occupancy that exceeds three storeys and any other occupancy, where the building as constructed, enlarged or altered exceeds 600 square metres in gross area, or viii. any other occupancy where the building as constructed, enlarged or altered exceeds 600 square metres in gross area or three storeys, but a professional engineer may provide a design for the industrial occupancy of a mixed occupancy described in subparagraph vi. 4. An architect may perfom1 or provide services that are within the practice of professional engineering in preparing or providing a design for and carrying out the general review of the construction, enlargement or alteration of a building described in rule 2 or 3 where to do so does not constitute a substantial part of the services within the practice of professional engineering related to the construction, enlargement or alteration of the building and is necessary, i. for the construction, enlargement or alteration of the building and is incidental to other services provided as part of the practice of architecture by the architect in respect of the construction, enlargement or alteration of the building, or ii. for co-ordination purposes. 5. A professional engineer may perform or provide services that are within the practice of architecture in preparing or providing a design for and carrying out the general review of the construction, enlargement or alteration of a building described in rule 1 or 3 where to do so does not constitute a substantial part of the services within the practice of architecture related to the construction, enlargement or alteration of the building and is necessary, i. for the construction, enlargement or alteration of the building and is incidental to other services provided as part of the practice of professional engineering by the professional engineer in respect of the construction, enlargement or alteration of the building, or ii. for co-ordination purposes. 6. Only an architect may carry out or provide the general review of the construction, enlargement or alteration of a building, i. that is constructed, enlarged or altered in accordance with a design prepared or provided by an architect, or

155 ii. in relation to services that are provided by an architect in connection with the design in accordance with which the building is constructed, enlarged or altered. 7. Only a professional engineer may carry out or provide the general review of the construction, enlargement or alteration of a building, i. that is constructed, enlarged or altered in accordance with a design prepared or provided by a professional engineer, or ii. in relation to services that are provided by a professional engineer in connection with the design in accordance with which the building is constructed, enlarged or altered. 8. An architect or a professional engineer may act as prime consultant for the construction, enlargement or alteration of a building. 9. A reference in these rules to the provision of a design or services by a professional engineer applies equally to a holder of a certificate of authorization issued under the Professional Engineers Act. R.S.O. 1990, c.a.26,s. 11 (4). Idem (5) Subsections (1) and (2) do not apply to prevent a person from, (a) evaluating, advising on or reporting on the construction, enlargement or alteration of a building that does not or is not intended to take the place of evaluating, advising or reporting required to be done by an architect; or (b) carrying out a general review of the construction, enlargement or alteration of a building that does not or is not intended to take the place of a general review required to be done by an architect. R.S.O. 1990, c. A.26, s. 11 (5).

156 Building Code Division C: Administrative Provisions Article : The construction, including for greater certainty, enlargement or alteration, of every building or part of it described in Table shall be reviewed by an architect, or a professional engineer or both as set out in the table.

157 Sentence (3) states: The architect, professional engineer or both who have been retained to undertake the general review of the construction of a building, shall forward copies of written reports arising out of the general review to the chief building official or registered code agency as the case may be. PT.5-General Review-Building Code (BC) and Non-Code Related Matters Version 1.0 ( ) provides further information, and Practice related procedures. The Practice Tips do require updating to reference the Building Code 2012.

158 PT-5 Practice Tip - OAA - General Review

159 Think simple" as my old master used to say meaning reduce the whole of its parts into the simplest terms, getting back to first principles. Frank Lloyd Wright

4/24/2015. Context: Codes ONTARIO BUILDING CODE CONCEPTS AND CODE ANALYSIS

4/24/2015. Context: Codes ONTARIO BUILDING CODE CONCEPTS AND CODE ANALYSIS ONTARIO BUILDING CODE CONCEPTS AND CODE ANALYSIS Deborah Levine Farrow, Architect, OAA, FRAIC James Farrow, Architect, OAA, OAQ, FRAIC Get the habit of analysis analysis will in time enable synthesis to

More information

HOUSING CONVERSION Guidelines for the conversion of a house to commercial use.

HOUSING CONVERSION Guidelines for the conversion of a house to commercial use. PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT HOUSING CONVERSION Guidelines for the conversion of a house to commercial use. HAIR 105 January 2017 contents General Information 3 Zoning Information 4 Building

More information

&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and &

&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and & &01 GENERAL To be developed. All of the exceptions have to be coordinated. &02 SPECIAL USE AND OCCUPANCY &02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections &02.1.1 and &02.1.2.

More information

2015 IBC Exit Systems

2015 IBC Exit Systems Objectives 2015 IBC Exit Systems Based on the 2015 International Building Code Upon completion, participants will be better able to: Determine those means of egress components that are defined as exits

More information

BUILDING CODE VARIANCE

BUILDING CODE VARIANCE BUILDING CODE VARIANCE April 2009 06-BCV-011-R1 Page 1 of 8 DISCUSSION MULTI-LEVEL STORAGE RACKING SYSTEMS The Alberta Building Code 2006 contains no specific requirements for multi-level storage racking

More information

(Statute, Rule, FBC, Industry) FBC 406.3, see also FBC No provisions in FBC or FS

(Statute, Rule, FBC, Industry) FBC 406.3, see also FBC No provisions in FBC or FS Florida Specific Amendment Code Reference NFPA 101 Open Parking Structure. A parking structure that, at each parking level, has wall openings open to the atmosphere, for an area of not less than 1.4 ft2

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-38-893 Application No. 2002-33 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Clause 3.3.4.4.(1)(a)

More information

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) Code Requirements for Existing Buildings R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS) was established in 1945 and currently

More information

PRESCRIPTIVE COMPLIANCE METHOD

PRESCRIPTIVE COMPLIANCE METHOD CHAPTER PRESCRIPTIVE COMPLIANCE METHOD 3 SECTION 301 GENERAL 301.2 Building materials. Building materials shall comply with the requirements of this section. 301.2.1 Existing materials. Materials already

More information

The Building Codes A.R.E. Building Design and Construction Exam Prep

The Building Codes A.R.E. Building Design and Construction Exam Prep Know Thy Codes! The Building Codes Building Codes The Code of Hammurabi 4000bc Developed 19 th and 20 th c. Codes define what you can and can t do Allowable area and height based on degree of danger Fire

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-35-890 Application No. 2002-22 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Articles 3.4.3.6. and

More information

STATEMENT OF DESIGN (for Part 3 Buildings) Ont. Reg. 332/12

STATEMENT OF DESIGN (for Part 3 Buildings) Ont. Reg. 332/12 Building Standards STATEMENT OF DESIGN (for Part 3 Buildings) Ont. Reg. 332/12 Building Standards Department 2141 Major Mackenzie Drive Vaughan, Ontario L6A 1T1 Permit Application No.: Property Address

More information

2012 IBC Exit Systems

2012 IBC Exit Systems Accreditation Based on the 2012 International Building Code The International Code Council has been accredited as an Authorized Provider by the International Association for Continuing Education and Training

More information

The Uniform Building and Accessibility Standards Regulations

The Uniform Building and Accessibility Standards Regulations UNIFORM BUILDING AND 1 The Uniform Building and Accessibility Standards Regulations being Chapter U-1.2 Reg 5 (effective April 10, 1992) as amended by Saskatchewan Regulations 102/92, 81/93, 35/94, 23/98

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-22-877 Application No. 2002-19 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentences 3.3.1.2.(3),

More information

INTERNATIONAL CODE INTERPRETATIONS

INTERNATIONAL CODE INTERPRETATIONS 2012 INTERNATIONAL CODE INTERPRETATIONS PREFACE The 2012 International Codes promulgated by the International Code Council (ICC ) comprise a comprehensive set of model regulations for the construction

More information

Comparison of the life safety elements of the 1997 UBC and the IBC 2000.

Comparison of the life safety elements of the 1997 UBC and the IBC 2000. Comparison of the life safety elements of the 1997 UBC and the IBC 2000. Introduction The Building Performance Research Institute s mission is primarily one of education on building safety and performance.

More information

E?? , , , , , , , , , , , , Table ,

E?? , , , , , , , , , , , , Table , CTC to BCAC Unenclosed Exits 2015 Group A Code Change Cycle Copyright 2014 International Code Council, Inc. IBC 10-31 E?? 15 202, 1005.3.2, 1009.3, 1009.4, 1019.3, 1029.6, 1029.6.3, 1029.7, 1029.8, 1029.8.1,

More information

General Building Information

General Building Information Software Module s Description Page 1 General Building Information BUILDING AREA AND HEIGHT - This module designed to determine the height and area of buildings on the basis of occupancy group classification

More information

BUILDING CODE VARIANCE

BUILDING CODE VARIANCE BUILDING CODE VARIANCE December 2017 14-BCV-015 Page 1 of 6 MULTI-LEVEL STORAGE RACKING SYSTEMS PURPOSE The purpose of this variance is to allow for an alternative solution for multi-level storage racking

More information

Report of project list/proposed changes for Dec. 5 and 6, 2017 BCAC face-to-face committee meeting and

Report of project list/proposed changes for Dec. 5 and 6, 2017 BCAC face-to-face committee meeting and BCAC MOE Work Group Summary with Files Revised 11-20-2017 with meeting notes Report of project list/proposed changes for Dec. 5 and 6, 2017 BCAC face-to-face committee meeting ITEM Topic SECTION Notes

More information

2015 IBC Accessible Means of Egress

2015 IBC Accessible Means of Egress 2015 IBC Accessible Means of Egress Based on the 2015 International Building Code Description Upon completion, the participant will be able to apply the accessible means of egress provisions of Section

More information

International Code INTERPRETATIONS

International Code INTERPRETATIONS 2015 International Code INTERPRETATIONS 2015 International Code Interpretations First Printing: June 2016 ISBN#978-1-60983-666.5 Copyright 2016 by International Code Council ALL RIGHTS RESERVED. This 2015

More information

EGRESS AZMIR SULTANA NICOLAS MIMU SAKUMA EDWIN VEGA CHAMORRO

EGRESS AZMIR SULTANA NICOLAS MIMU SAKUMA EDWIN VEGA CHAMORRO EGRESS AZMIR SULTANA NICOLAS CHAMORRO MIMU SAKUMA EDWIN VEGA DEFINITIONS NC ACCESSIBLE MEANS OF EGRESS. A continuous and unobstructed way of egress travel from any accessible point in a building or facility

More information

PERMIT APPLICATION CHECKLIST Municipal Address, Phone & Fax NONRESIDENTIAL

PERMIT APPLICATION CHECKLIST Municipal Address, Phone & Fax NONRESIDENTIAL PERMIT APPLICATION CHECKLIST Municipal Address, Phone & Fax NONRESIDENTIAL Permit Application #: Date: mm/dd/yy Project Address Applicant s Name NOTE TO PERMIT APPLICANTS: All permit applications must

More information

IBC MEANS OF EGRESS. Code Change No: E5-07/08. Original Proposal

IBC MEANS OF EGRESS. Code Change No: E5-07/08. Original Proposal DOCUMENTATION IBC MEANS OF EGRESS Code Change No: E5-07/08 Sections: 1002.1 (IFC [B] 1002.1) Proponent: Gerard Hathaway, New York State Department of State Building Codes Division, representing himself

More information

Applying the Building Code During Design

Applying the Building Code During Design Applying the Building Code During Design A Step-By-Step Process AIA Learning Units The Salt Lake City CSI Chapter is a Registered Provider with The American Institute of Architects Continuing Education

More information

Schedule A. a representative appointed from among persons nominated by the Nova Scotia Accessibility Advisory Board.

Schedule A. a representative appointed from among persons nominated by the Nova Scotia Accessibility Advisory Board. Schedule A Amendment to the Nova Scotia Building Code Regulations made by the Minister of Municipal Affairs under Section 4 of Chapter 46 of the Revised Statutes of Nova Scotia, 1989, the Building Code

More information

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3%

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3% CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE EXAM ID: I6 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 3 % 0101. Project Administration 3% Verify that plans,

More information

2015 IBC Special Building Types and Features IBC Special Building Types and Features. Copyright 2016 International Code Council 1

2015 IBC Special Building Types and Features IBC Special Building Types and Features. Copyright 2016 International Code Council 1 Description 2015 IBC Special Building Types and Features Based on the 2015 International Building Code (IBC ) This course provides an overview of selected 2015 IBC Chapter 4 provisions and the application

More information

AN ORDINANCE AMENDING TITLE 10 (BUILDING REGULATIONS)

AN ORDINANCE AMENDING TITLE 10 (BUILDING REGULATIONS) 1 AN ORDINANCE AMENDING TITLE 10 (BUILDING REGULATIONS) (BUILDING REGULATIONS FOR THE CONSTRUCTION OF INDUSTRIAL, STORAGE, BUSINESS, INSTITUTIONAL, AND PUBLIC BUILDINGS AND RESIDENCES) OF THE GENEVA CITY

More information

The Uniform Building and Accessibility Standards Regulations

The Uniform Building and Accessibility Standards Regulations UNIFORM BUILDING AND 1 The Uniform Building and Accessibility Standards Regulations being Chapter U-1.2 Reg 5 (effective April 10, 1992) as amended by Saskatchewan Regulations 102/92, 81/93, 35/94, 23/98

More information

The Building Code for Rookies

The Building Code for Rookies The Building Code for Rookies Or Basic Steps for Using the 7 Ohio Building Code Chapters - Or All the building code stuff you forgot to ask about in college and probably didn t have time for anyway AIA

More information

Module 8: Ontario Building Code Fire and Spatial Separations

Module 8: Ontario Building Code Fire and Spatial Separations Ontario Building Code (OBC) 1. Fire Separations 2. Fire Resistance Ratings By Classification 3. Fire Resistance Ratings By Adjacent Use 4. Fire Resistance Ratings By Specific Space 5. Fire Resistance Ratings

More information

Fire Safety Design Report

Fire Safety Design Report Fire Safety Design Report Extension to Existing Church 25 Mana Avenue Titahi Bay Reference Revision Date Comment 15166R01-11 th April 2016 - Extension to Existing Church, 25 Mana Avenue, Titahi Bay Page

More information

Residential Fire Sprinklers & On-site Sewage Systems: A Consultation on Proposed Changes to Ontario s Building Code. February 15 to May 1, 2008

Residential Fire Sprinklers & On-site Sewage Systems: A Consultation on Proposed Changes to Ontario s Building Code. February 15 to May 1, 2008 Ministry of Municipal Affairs and Housing Residential Fire Sprinklers & On-site Sewage Systems: A Consultation on Proposed Changes to Ontario s Building Code February 15 to May 1, 2008 An electronic copy

More information

Project Address Applicant: (Please Print) Plan review Engineer: Phone: Date

Project Address Applicant: (Please Print) Plan review Engineer: Phone: Date BUILDING AND SAFETY Tenant Improvement Checklist Project Address Applicant: (Please Print) Plan review Engineer: Phone: Date APPLICATION The following items will be required at the permit counter before

More information

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012 2012 Ontario Building Code Requirements for New Construction Bradford West Gwillimbury Building Division March 5, 2012 1 Ontario Building Code changes Applicable to permits applied for after December 31,

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 05-07-1021 Application No. 2005-02 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 3.2.2.67.,

More information

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) Code Requirements for Existing Buildings R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS) was established in 1945 and currently

More information

Municipal Code of Chicago CHAPTER EXIT REQUIREMENTS

Municipal Code of Chicago CHAPTER EXIT REQUIREMENTS Municipal Code of Chicago CHAPTER 13-160 EXIT REQUIREMENTS 13-160-010 General provisions. 13-160-020 Definitions. 13-160-030 Exit types - Requirements. 13-160-040 Exit types - Above or below grade. 13-160-050

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-13-868 Application No. 2002-11 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Articles 3.2.2.9. and

More information

Building Standards Department. Guide to Building Permits Understanding the Different Building Permit Types and their Submission Requirements

Building Standards Department. Guide to Building Permits Understanding the Different Building Permit Types and their Submission Requirements Guide to Building Permits Understanding the Different Building Permit Types and their Submission Requirements Building Standards March 2018 CONTENTS BUILDING PERMIT APPLICATIONS... 2 GENERAL INFORMATION...

More information

CHAPTER 34 EXISTING BUILDINGS

CHAPTER 34 EXISTING BUILDINGS CHAPTER 34 EXISTING BUILDINGS SECTION 3401 GENERAL 3401.1 Scope. Provisions of this chapter shall govern the application of this code to existing buildings. Exception: Buildings and structures located

More information

Reference Guide: Mid-Rise Wood Construction in the Ontario Building Code Report by Morrison Hershfield (January 2015)

Reference Guide: Mid-Rise Wood Construction in the Ontario Building Code Report by Morrison Hershfield (January 2015) 2015 Reference Guide: Mid-Rise Wood Construction in the Ontario Building Code Report by Morrison Hershfield (January 2015) Ontario Wood WORKS! 60 Commerce Court P.O. Box 5001 Office W113 North Bay, ON

More information

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) 2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:

More information

SUMMARY OF FIRE SPRINKLER REQUIREMENTS FOR ALTERATIONS TO EXISTING BUILDINGS 2015 I-Codes

SUMMARY OF FIRE SPRINKLER REQUIREMENTS FOR ALTERATIONS TO EXISTING BUILDINGS 2015 I-Codes SUMMARY OF FIRE SPRINKLER REQUIREMENTS FOR ALTERATIONS TO EXISTING BUILDINGS 2015 I-Codes SCOPE: The City of Lawrence requirements for application of current code provisions. This shall apply to alterations

More information

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) 2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:

More information

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS November 2018 Contents 1. Introduction... 1 2. Ontario Building Code and Second Dwelling Units... 1 3. How Do I Make My Secondary Dwelling Unit

More information

SPARTANBURG COUNTY BUILDING CODES DEPARTMENT

SPARTANBURG COUNTY BUILDING CODES DEPARTMENT SPARTANBURG COUNTY BUILDING CODES DEPARTMENT PLAN REVIEW CHECK LIST REQUIREMENTS FOR COMMERCIAL BUILDING PERMITS Plan Review Coordinator Kris Brannon 864-596-3180 366 N. Church St Room 500 Spartanburg,

More information

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION OFFICIAL USE ONLY Date: Permit #: Received by: For Staff Use Only: OFD ELEC Planning SITE LOCATION Site Address: Tax Parcel Number: TYPE OF WORK Building

More information

Bulletin BLD May 24, 2013 (Updated September 26, 2017) SECONDARY SUITES

Bulletin BLD May 24, 2013 (Updated September 26, 2017) SECONDARY SUITES Bulletin 2013-003-BLD May 24, 2013 (Updated September 26, 2017) SECONDARY SUITES The intent of this Bulletin is to advise homeowners, designers, and builders of the City s requirements regarding the development

More information

October 31, Attn: Architects, professional engineers. Design of hazardous areas

October 31, Attn: Architects, professional engineers. Design of hazardous areas B u i l d i n g S e r v i c e s N O T I C E October 31, 2016 Attn: Architects, professional engineers Re: Design of hazardous areas The design of hazardous areas requirements in the Building Code apply

More information

2014 Alberta Building Code Classifications of Buildings and the Types of Occupancies Allowed within Buildings

2014 Alberta Building Code Classifications of Buildings and the Types of Occupancies Allowed within Buildings 2014 Alberta Building Code Classifications of Buildings and the Types of Occupancies Allowed within Buildings Classification of Buildings Buildings are classified (e.g. Group D, E, A, B, F, etc.) by the

More information

Company Overview. Significant Code Changes Massachusetts State Building Code 9 th Edition (2015 International Code)

Company Overview. Significant Code Changes Massachusetts State Building Code 9 th Edition (2015 International Code) Significant Code Changes Massachusetts State Building Code 9 th Edition (2015 International Code) Company Overview R.W. Sullivan Engineering (RWS) was established in 1945 and currently has 95 employees.

More information

WON-DOOR CORPORATION Won-Door FireGuard Applications

WON-DOOR CORPORATION Won-Door FireGuard Applications WON-DOOR CORPORATION Won-Door FireGuard Applications A Code Analysis WON-DOOR CORPORATION Won-Door FireGuard Applications A Code Analysis THE INTERNATIONAL BUILDING CODE is widely recognized in the United

More information

E2-09/ (IFC [B] )

E2-09/ (IFC [B] ) Code Technology Committee 2010 Final Action Agenda The following are code changes and public comments to be considered at the 2010 Dallas Final Action Hearings that are related to the CTC Area of Study

More information

How to Prepare Your LSE Report

How to Prepare Your LSE Report LSE Rule Category Required Documentation Information Comments / Applicable Code Sections/ 10.1 Building Height Provide the Building height in Feet Provide the number of stories above grade Helpful Hints

More information

Building Permits A Guide for Homeowners

Building Permits A Guide for Homeowners Building Permits A Guide for Homeowners Why Bother With a Building Permit? Building Permits provide the means for Building Officials to ensure the health, safety and welfare of building occupants. The

More information

A minimum of 25% of any money spent upgrading areas of primary function shall be devoted to ADA upgrades. Existing non-compliant areas include:

A minimum of 25% of any money spent upgrading areas of primary function shall be devoted to ADA upgrades. Existing non-compliant areas include: October 23, 2012 PIX THEATER BUILDING CODE ANALYSIS 461 N 1 st St Woodburn, OR 97071 Executive Summary Since the most recent use in the building was a furniture store, the existing legal occupancy classification

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 01-38-831 Application # 2001-47 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24 (1) of the Building Code Act, 1992. AND IN THE MATTER OF Sentence 3.3.1.17.(1) of Regulation 403, as amended

More information

SFS Form: 4 PROJECT NAME ADDRESS FIRE SAFETY ENGINEERING DESIGN REPORT. Date. 1.0 Introduction

SFS Form: 4 PROJECT NAME ADDRESS FIRE SAFETY ENGINEERING DESIGN REPORT. Date. 1.0 Introduction PROJECT NAME ADDRESS FIRE SAFETY ENGINEERING DESIGN REPORT Date 1.0 Introduction 1.01 This report describes the fire safety requirements and the provisions for this project. This fire safety report has

More information

EFFECTIVE USE OF THE IBC/CBC

EFFECTIVE USE OF THE IBC/CBC Distilling the code review process down to a methodical, sequential list of considerations is generally problematic. In many cases, related provisions from various chapters of the code must be considered

More information

CHAPTER 4 SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY DRAFT. FLORIDA BUILDING CODE BUILDING, 5th EDITION (2014) 4.1

CHAPTER 4 SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY DRAFT. FLORIDA BUILDING CODE BUILDING, 5th EDITION (2014) 4.1 CHAPTER 4 SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY SECTION 401 SCOPE 401.1 Detailed use and occupancy requirements. In addition to the occupancy and construction requirements in this code,

More information

LEAD DESIGN PROFESSIONAL:

LEAD DESIGN PROFESSIONAL: 2009 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:

More information

Ontario Building Code

Ontario Building Code Ontario Building Code An Architect s Guide May 23, 2018 Mike Seiling, CET, CBCO Chief Building Official, City of Kitchener Past President, Ontario Building Officials Association 1 TODAY S AGENDA The legislation

More information

City of Des Moines. Permit and Development Center 602 Robert D Ray Drive Des Moines, IA Phone: Fax:

City of Des Moines. Permit and Development Center 602 Robert D Ray Drive Des Moines, IA Phone: Fax: City of Des Moines Permit and Development Center 602 Robert D Ray Drive Des Moines, IA 50309 Phone: 515-283-4200 Fax: 515-283-4270 This Code Analysis Form must be completed and returned with the Building

More information

Building Codes and Ordinances ARC 227

Building Codes and Ordinances ARC 227 Building Codes and Ordinances ARC 227 Week 6 Fire Resistive Construction 03.02.10 Instructor: Rick Staub, AIA Email: staub@pointonearchitects.com Phone: 860-434-7707 Fire Resistive Construction Passive

More information

SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY

SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY CHAPTER 4 SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY SECTION 401 SCOPE 401.1 Detailed use and occupancy requirements. In addition to the occupancy and construction requirements in this code,

More information

PB-26 PROFESSIONAL INVOLVEMENT ON BUILDING PROJECTS

PB-26 PROFESSIONAL INVOLVEMENT ON BUILDING PROJECTS PB-26 PROFESSIONAL INVOLVEMENT ON BUILDING PROJECTS INTRODUCTION The Alberta Association of Architects 1 (AAA) is regularly asked about when an architect or licensed interior designer is legally required

More information

LIQUEFIED PETROLEUM GASES

LIQUEFIED PETROLEUM GASES CHAPTER 38 LIQUEFIED PETROLEUM GASES SECTION 3801 GENERAL 3801.1 Scope. Storage, handling and transportation of LP-gas and the installation of LP-gas equipment pertinent to systems for such uses shall

More information

ORDINANCE NO BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF MANHATTAN, KANSAS: Section Adoption of the International Building Code.

ORDINANCE NO BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF MANHATTAN, KANSAS: Section Adoption of the International Building Code. ORDINANCE NO. 7222 AN ORDINANCE AMENDING CHAPTER 8 OF THE CODE OF ORDINANCES, REGULATING BUILDINGS WITHIN THE CORPORATE LIMITS OF THE CITY OF MANHATTAN, KANSAS; INCORPORATING BY REFERENCE THE INTERNATIONAL

More information

EXIT ACCESS RAMP. An interior ramp that is not a required interior exit ramp.

EXIT ACCESS RAMP. An interior ramp that is not a required interior exit ramp. Coordination with language throughout code 10/05/2011 Stair vs. stairway Repetitive language with stairways and ramps Including ramps when applicable The locations for stair, stairway and ramp as used

More information

FIRE RATING AND FIRE PERFORMANCE

FIRE RATING AND FIRE PERFORMANCE FIRE RATING AND FIRE PERFORMANCE FOR WOOD BUILDINGS St. John s, NL February 3, 2015 Introductions Fire Ratings Background Where are They Needed How are they Achieved Fire Performance AGENDA Historical

More information

Work Group Item Stairways serving an occupant load of less than 50 shall have a width of not less than 36 inches (914 mm).

Work Group Item Stairways serving an occupant load of less than 50 shall have a width of not less than 36 inches (914 mm). IBC-12/13 1009.1, 1009.4, 1009.7.2, 1009.7.4, 1009.8, 1009.10, 1009.15 (IFC [B] 1009.1, 1009.4, 1009.7.2, 1009.7.4, 1009.8, 1009.10, 1009.15) Proponent: S. Bajnai, Chesterfield County, VA, ICC Building

More information

Schedule B to By-law

Schedule B to By-law Schedule B to By-law 33-2009 Part A Fees Payable for Permits (Effective January 1, 2018) Floor Area Calculation Floor area shall: a) be calculated by measuring to the outer face of exterior walls and to

More information

CODE ANALYSIS REPORT SECOND FLOOR

CODE ANALYSIS REPORT SECOND FLOOR CODE ANALYSIS REPORT SECOND FLOOR 384 DWIGHT STREET HOLYOKE, MA Prepared by Dietz & Company Architects, Inc. 17 Hampden Street Springfield, MA March 2014 INTRODUCTION The following report is a preliminary

More information

ONTARIO REGULATION 350/06 BUILDING CODE

ONTARIO REGULATION 350/06 BUILDING CODE ONTARIO REGULATION 350/06 BUILDING CODE Consolidation Period: From August 12, 2010 http://www.e-laws.gov.on.ca/html/regs/english/elaws_regs_060350_e.htm Section 9.36. Cottages 9.36.1. Scope 9.36.1.1. Application

More information

JC Code & Construction Consultants, Inc. Advanced 2010 FBC Update Ch. 1 to 16

JC Code & Construction Consultants, Inc. Advanced 2010 FBC Update Ch. 1 to 16 JC Code & Construction Consultants, Inc. Advanced 2010 FBC Update Ch. 1 to 16 Welcome! This course is designed to provide an overview of the most significant changes to the 2010 edition of the Florida

More information

CALIFORNIA BUILDING CODE MATRIX ADOPTION TABLE CHAPTER 10 MEANS OF EGRESS

CALIFORNIA BUILDING CODE MATRIX ADOPTION TABLE CHAPTER 10 MEANS OF EGRESS CALIFORNIA BUILDING CODE MATRIX ADOPTION TABLE CHAPTER 10 MEANS OF EGRESS (Matrix Adoption Tables are non-regulatory, intended only as an aid to the user. See Chapter 1 for state agency authority and building

More information

Fees and Permit requirements are regulated by the Township s Building By-law

Fees and Permit requirements are regulated by the Township s Building By-law Frequently Asked Questions This is a guide only and is intended to help you, the homeowner/builder, to better understand the steps to follow in obtaining a Building Permit; it is not a substitute for the

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-28-883 Application No. 2002-25 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Clauses 3.2.2.67.(2)(c)

More information

Approved Items IBC-Means of Egress

Approved Items IBC-Means of Egress Important Changes to the 2018 IBC for R-2 (Apartments) Green - Favorable Action for Multifamily Construction Red - Unfavorable Action for Multifamily Construction Yellow - Item of interest to Multifamily

More information

Tiny Houses NBC Code Change Request

Tiny Houses NBC Code Change Request Tiny Houses NBC Code Change Request Document: 2015 National Building Code (NBC) -10 code change recommendations- To be submitted the week of March 13, 2017 Author, Adaire Chown Tiny Houses NBC Code Change

More information

Annotated Accessibility Changes to the 2012 Ontario Building Code, as Amended by Ontario Regulation 368/13

Annotated Accessibility Changes to the 2012 Ontario Building Code, as Amended by Ontario Regulation 368/13 Annotated Accessibility Changes to the 2012 Ontario Building Code, as Amended by Ontario Regulation 368/13 RED indicates new text. O. Reg. 368/13 comes into force on 1 January, 2015 DIVISION A PART 1 COMPLIANCE,

More information

COUNCIL ORDER No

COUNCIL ORDER No SAFETY CODES COUNCIL #1000, 10665 Jasper Avenue N.W., Edmonton, Alberta, Canada, T5J 389 Tel: 780-413-0099 I 1-888-413-0099 Fax: 780-424-5134 I 1-888-424-5134 www.safetycodes.ab.ca COUNCIL ORDER No. 0015437

More information

Minnesota Healthcare Engineers Association, Fall Conference. Bob Dehler, P.E. Engineering Program Manager September 14, 2017

Minnesota Healthcare Engineers Association, Fall Conference. Bob Dehler, P.E. Engineering Program Manager September 14, 2017 Minnesota Healthcare Engineers Association, Fall Conference Bob Dehler, P.E. Engineering Program Manager September 14, 2017 Categories of Rehabilitation Work in Healthcare Facilities Bob Dehler, P.E. robert.dehler@state.mn.us

More information

PRESCRIPTIVE COMPLIANCE METHOD

PRESCRIPTIVE COMPLIANCE METHOD CHAPTER 3 PRESCRIPTIVE COMPLIANCE METHOD [B] SECTION 301 GENERAL 301.1 Scope. The provisions of this chapter shall control the alteration, repair, addition and change of occupancy of existing structures,

More information

Certified Professional Program

Certified Professional Program Municipal Insert 1. Introduction: 1.1. General 1.2. City of Surrey Building By law 1.3. Certified Professional Program 1.4. Role of Certified Professional 1.5. Expected Duties of Certified Professional

More information

2015 International Fire Code

2015 International Fire Code 1001, 1001.1, 1001.2, 1002, [BE] 1002.1, 1003, [BE] 1003.1, [BE] 1003.2, [BE] 1003.3, [BE] 1003.3.1, [BE] 1003.3.2, [BE] 1003.3.3, [BE] 1003.3.4, [BE] 1003.4, [BE] 1003.5, [BE] 1003.6, [BE] 1003.7, 1004,

More information

Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION

Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Division of Design, 35 th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242 Phone: (518)

More information

780 CMR CHAPTER 34 EXISTING BUILDINGS STRUCTURES

780 CMR CHAPTER 34 EXISTING BUILDINGS STRUCTURES 780 CMR CHAPTER 34 EXISTING BUILDINGS STRUCTURES SECTION 3401 GENERAL 3401.1 Scope. Chapter 34 of the International Building Code 2009 is deleted in its entirety. The provisions of the International Existing

More information

TOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION

TOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION TOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION Town of Hague Building Inspector: Dale Wagner Home #: 306-225-2265 Cell #: 306-241-4741 Fill all part of the permit application including the date and signature.

More information

Section Topic Pages. Section 4 Design for horizontal escape Section 5 Design for vertical escape Section 6 General provisions 83-94

Section Topic Pages. Section 4 Design for horizontal escape Section 5 Design for vertical escape Section 6 General provisions 83-94 Auditing simple premises Module: Means of escape Support Note Extracts: Approved Document B (Fire safety), Volume 2 Section Topic Pages Section 4 Design for horizontal escape 48-65 Section 5 Design for

More information

Change of Coordinating Registered Professional (CRP) or Registered Professional (RP)

Change of Coordinating Registered Professional (CRP) or Registered Professional (RP) January, 2019 BUILDING DIVISION Change of Coordinating Registered Professional (CRP) or Registered Professional (RP) General Information In the event that there is a change of the Coordinating Registered

More information

5/15/2013. Approved Course Title 2010 Existing Building Code Chapters Florida Building Code, Existing Building. Chapters

5/15/2013. Approved Course Title 2010 Existing Building Code Chapters Florida Building Code, Existing Building. Chapters 2010 Florida Building Code, Existing Building A Code for Existing Buildings Approved Course Title 2010 Existing Building Code Chapters 10-14 Chapters 10-14 Module Objectives Chapter 1 Administration Chapter

More information

Advanced Studies of the International Building Code. Presented by Steve Thomas, Colorado Code Consulting, LLC

Advanced Studies of the International Building Code. Presented by Steve Thomas, Colorado Code Consulting, LLC Advanced Studies of the International Building Code Presented by Steve Thomas, Colorado Code Consulting, LLC Advanced Studies of the International Building Code Instructor Steve Thomas, CBO President,

More information

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist This checklist is a convenient reference to the 2012 Michigan Building Code. The checklist

More information

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW 27 September 2007 prepared by: J. CHRIS EVANS ARCHITECT 3220 E. Terra Alta Blvd. No. 9 Tucson, Arizona 85716 520.319.8835 evansarch@hotmail.com

More information