1 ADDENDUM 1 BID , CHARLES POINT TRAIL CONSTRUCTION ISSUED 5/25/2018 Summary: Below, questions and answers from the May 17, 2018 Pre-Bid Meeting and Site Walk. All attachments referenced below are appended hereto. QUESTION 1 Who is responsible for detection of underground utilities? ANSWER The Contractor is responsible for requesting utility markout (NYS Codes Rule 753) extending onto public property. It is the Contractor s responsibility to notify the City and the property owner prior to any on-site activity. The Contractor is responsible for the cost of utility location. Please refer to General Conditions for additional detail. 2 During the site visit, comments were raised regarding the drainage and washout area at the southern end of the RESCO property and long-term effects related to the Trail. See Attachment 1 RESCO Utility Plans The existing downspout off of the nearby structure currently discharges onto the proposed asphalt walkway trail. The plans call for discharging water runoff over the newly-stabilized area. Over time, the washout may re-occur. In-field changes may be required to remedy this issue. See Attachment 1 - RESCO Utility Plans 3 How far do the boardwalk s concrete pillars extend? 4 What is the material for the peninsula trail section? Also refer to Construction Plan Drawings from Bid materials package. The plans do not call for removal. Rather, the plans call to cut down piers to 1 below proposed slab (see sheet C3 of Construction Document Plans). Full removal of the footings may cause stability issues. The plans call for stone screenings for the path, the same as the material proposed under the benches and trashcans.

2 5 Permanent fencing will be necessary near the southern storage area where it meets the boat storage area on parcel This will add another 270 linear feet of fencing to the 630 linear feet Storage area for material and equipment. See Attachment 2 Fencing See Attachment 3 Updated Bid Forms: Base Bid Sheet [C5]; Itemized Bid form [Bid Item #30. Regarding the storage areas, there are two locations for materials/equipment storage. The first is on City property at the Charles Point Park in the grassy area directly abutting the property line for parcel As indicated on the Construction Plan Drawings, the Civil set of drawings clearly indicates the locations of both the construction area (via a temporary easement already acquired between the City and the property owner) and the permanent easement area, or location of the proposed trail. There is to be no work outside of either the temporary or permanent easement areas. Further, the City will work with the selected Contractor to determine the most appropriate schedule. 7 Is the Contractor responsible for designing the signs? 8 Is a permit required for lane closures on John Walsh Boulevard? See Construction Document Plans, Civil Section No, the Contractor is responsible for the fabrication and installation of the signage. The City will provide the appropriate text, graphics, logos, etc. to the Contractor. See General Conditions, Front End documents. This project has been explained and discussed with Westchester County Department of Public Works (WC DPW). Further, the City has the necessary form related to work in this area. It is the Contractor s responsibility to completely and dully fill out and submit the information to the WC DPW and acquire all permits necessary for work, including lane closures. See General Conditions, Front End documents.

3

4

5

6

7

8

9 H DY 9. {\W0.8;\T1.44;MATCHLINE B-B} U UMH 9.5' APPROX. LOC. CATCH BASIN CURB INLET 9.6' APPROX. LOC. ELECTRIC BOX 9.5' GRAPHIC SCALE 1 inch=20 feet 9.4' BC:7.5' N/F CITY OF PEEKSKILL INDUSTRIAL DEVELOPMENT AGENCY DRAWING KEY TC:7. BC:7.5' 5 JOHN E. WALSH BLV'D 1 CHARLES POINT PARK 9.5' 6.7' BC:7.9' BM MAG NAIL TOP TIE WALL ELEV.=9.3 2 BC:7.9' SEWER MANHOLE RIM: 8.41' WHEELABRATOR 7.9' S TC:8.5' BC:8.0' 8.5' MARINA ' 8.1' ' 8.3' 7.2' 4 BERTOLINE 6.5' 6' 4.7' 7.2' BC:6.9' CATCH BASIN RIM: 6.79' 7.5' 6.5' BC:8.7' 5 LENTS COVE JOHN WALSH BOULEVARD SIGN (NO PARKING) LENTS COVE PARK BC:9.1' 7.1' 7.5' 5.2' 7.0' 8.1' BC:8.3' 4' NO. DATE REVISION DRAWN CHK'D REL'D BC:9.2' TC:9.4' \pxqj;{\fsimplex c0;this DOCUMENT WAS PREPARED FOR THE NEW YORK STATE DEPARTMENT OF STATE WITH FUNDS PROVIDED UNDER TITLE 11 OF THE ENVIRONMENTAL PROTECTION FUND.} LAYOUT PLAN 3 OF 5 12' {\W0.8;\T1.44;MATCHLINE C-C} 10.0' \pxqj;alterations BY ANY PERSON IN ANY WAY, OF ANY ITEM CONTAINED ON THIS DOCUMENT, UNLESS ACTING UNDER DIRECTION OF THE LICENSED ENGINEER WHOSE PROFESSIONAL SEAL IS AFFIXED HERETO, IS A VIOLATION OF TITLE VII, SECTION 69.5 (b) OF NEW YORK STATE LAW. DRAFT 11/27/2017 DAPHNE A. GALVIN NY PROFESSIONAL ENGINEER Lic. No Fifth Avenue, Suite 1001 New York, NY NY Certificate of Authorization No Tel.: Fax.: CHARLES POINT MULTI-USE WATERFRONT TRAIL SITUATED IN CITY OF PEEKSKILL, WESTCHESTER COUNTY, NEW YORK Date 08/31/2017 Scale:(H) 1" = 20' (V) N/A Drawn By BZ Designed Checked Released BZ DG DG Job No. Drawer Number Drawing Name: 03-C6-C10-SITE.dwg

10 H DY BC:9.2' TC:9.4' 12' {\W0.8;\T1.44;MATCHLINE C-C} 10.0' 6' 2' 10.7' 12.4' 13.0' WOOD DOCK 6' 12' 13.0' N/F DDJT BERTOLINE ASSOCIATES, LLC 4.7' JOHN E. WALSH BLVD. 4' 0' GRAPHIC SCALE 1 inch=20 feet TC:11.6' 12.3' BC:11.4' 3.2' 0' INV. 18" CLAY PIPE ELEV.: 1.11' TC:11.5' DRAWING KEY 12.0' 2' TC:11.4' 1 CHARLES POINT PARK 11.2' 4' CATCH BASIN CURB INLET RIM: TC:11.7' BC:11.3' TC:11.9' 2 WHEELABRATOR TC:11.6' 11.7' BC:11.2' MARINA 3 INV. 18" CMP ELEV.: 7.61' BM SM. SPK. IN ROOT ELEV.=10.19' 4.0' 4' 4' 6' 8.2' 9.5' 9.3' 7.2' 11.9' BERTOLINE 0' 9.7' 10.7' 11.1' 11.4' DRAINAGE MANHOLE RIM: 10.70' 5 LENTS COVE JOHN WALSH BOULEVARD ' LENTS COVE PARK 7.5' 8.6' 9.0' 6.4' 4' 0' 2' 2.6' INV 24'' CMP ELEV.: 2.36' 11.6' 10.5' 10.9' 11.6' D 10.7' ELECTRIC BOX 7.6' TC:10.4' BC:9.9' 6.4' 5.7' 4.0' 3.6' 6' TC:9.0' ELECTRIC MANHOLE INV. 12" CIP ELEV.: 0.15' 2' 4. BC:9.0' TC:9.4' 5.0' 3.9' TC:8.3' BC:8.1' BC:8.5' POLE TC:7.3' BC:6. INV 1'CIP ELEV.: 0.71' 3.3' 7.2' ' 6.1' 5.5' 6.9' TC:6.7' BC:6.5' INV. 12'' CIP ELEV.: -0.29' INV 24'' CMP ELEV.: -0.16' 6.0' 6' TC:6.4' NO. DATE REVISION DRAWN CHK'D REL'D \pxqj;{\fsimplex c0;this DOCUMENT WAS PREPARED FOR THE NEW YORK STATE DEPARTMENT OF STATE WITH FUNDS PROVIDED UNDER TITLE 11 OF THE ENVIRONMENTAL PROTECTION FUND.} LAYOUT PLAN 4 OF 5 L E N T S C O V E \pxqj;alterations BY ANY PERSON IN ANY WAY, OF ANY ITEM CONTAINED ON THIS DOCUMENT, UNLESS ACTING UNDER DIRECTION OF THE LICENSED ENGINEER WHOSE PROFESSIONAL SEAL IS AFFIXED HERETO, IS A VIOLATION OF TITLE VII, SECTION 69.5 (b) OF NEW YORK STATE LAW. DRAFT 11/27/2017 DAPHNE A. GALVIN NY PROFESSIONAL ENGINEER Lic. No Fifth Avenue, Suite 1001 New York, NY NY Certificate of Authorization No Tel.: Fax.: CHARLES POINT MULTI-USE WATERFRONT TRAIL SITUATED IN CITY OF PEEKSKILL, WESTCHESTER COUNTY, NEW YORK Date 08/31/2017 Scale:(H) 1" = 20' (V) N/A Drawn By BZ Designed Checked Released BZ DG DG Job No. Drawer Number Drawing Name: 03-C6-C10-SITE.dwg

11 Bid Sheet Charles Point Multi-Use Waterfront Trail City of Peekskill, NY BID NO ITEMIZED PROPOSAL ITEM APPROXIMATE PAY ITEM UNIT BID PRICE AMOUNT BID NO. QUANTITIES UNIT DESCRIPTION DOLLARS CTS. DOLLARS CTS S.Y. FULL DEPTH ASPHALT PAVEMENT L.F. PAVEMENT MARKINGS L.F. CONCRETE CURB L.F. RECONSTRUCT CONCRETE GUTTER UN. CONCRETE WHEEL STOP L.F. GUIDERAIL L.F. HIGH CHAIN LINK FENCE WITH SCREENING L.F. HIGH CHAIN LINK FENCE COMPLETE THIS FORM USING BLACK INK ONLY C-4 (4 OF 17)

12 BID PROPOSAL FORM TOTAL BASE BID Items 1 through 56 Total Base Bid for all labor, equipment, materials and installation: Total $ Total (Price in words) ALTERNATE A: CHARLES POINT PARK RESTROOM Items A1-A18 Total Bid for all labor, equipment, materials and installation: Total $ Total (Price in words) ALTERNATE B: PENINSULA TRAIL with POLE-MOUNTED LIGHTING Items B1-B19 Total Bid for all labor, equipment, materials and installation: Total $ Total (Price in words) ALTERNATE C: PENINSULA TRAIL with BOLLARD LIGHTS Items C-C19 Total Bid for all labor, equipment, materials and installation: Total $ Total (Price in words) (Signature of partner or corporate officer) ATTEST: (Corporate Seal) (Secretary of Corporate Bidder) C-5

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION CITY OF ALBANY Public Works Department ADDENDUM #1 ST-13-04-2014, MAIN STREET REHABILITATION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and

More information

ELLIOTT WAY IMPROVEMENTS

ELLIOTT WAY IMPROVEMENTS OWNER: THE VILLAGE OF CROTON-ON-HUDSON CROTON-ON-HUDSON TOWN HALL 1 VAN WYCK STREET CROTON-ON-HUDSON, NY 1050 ACTING VILLAGE MANAGER: JANINE KING LOCATION MAP SITE * COMMISSIONER OF PUBLIC WORKS: MARCO

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION CITY OF ALBANY Public Works Department ADDENDUM # ST-6-02 CROCKER LANE RECONSTRUCTION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall

More information

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013 ADDENDUM NO. 1 for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA Posting Date: June 20, 2013 BIDDERS SHALL CONFORM TO THE FOLLOWING CHANGES AS A PART OF THE BID DOCUMENTS, WHICH SHALL BECOME

More information

SECTION CONSTRUCTION SERVICES

SECTION CONSTRUCTION SERVICES SECTION 01100 CONSTRUCTION SERVICES PART 1 GENERAL 1.01 - Section Includes A. Mobilization. B. Construction Surveys. C. Record Documents. 1.02 Description Of Work A. Mobilization: includes the preparatory

More information

OAK MARSH PHASE II FEASIBILITY REPORT CITY OF MANKATO MINNEOSTA. January 20, 2015 Project No

OAK MARSH PHASE II FEASIBILITY REPORT CITY OF MANKATO MINNEOSTA. January 20, 2015 Project No PHASE II FEASIBILITY REPORT CITY MINNEOSTA January 20, 20 Project No. 14 I. INTRODUCTION Oak Marsh Phase II is a residential development on a parcel of land located in the Southern portion of the City

More information

Request for Proposal Topographic/Property Line Survey

Request for Proposal Topographic/Property Line Survey Request for Proposal Topographic/Property Line Survey We are requesting a proposal for a survey for the playgrounds at Saxon Woods Park, a Westchester County Park, located in the City of White Plains and

More information

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project

More information

Replace BID SCHEDULE with attached revised BID SCHEDULE.

Replace BID SCHEDULE with attached revised BID SCHEDULE. CONTRACT ADDENDUM Project: 9 st Ave SE & 4 th Street SE Sidewalk Improvements Project No: 00 Addendum No: Date: 0 September 0 Addendum: Replace BID SCHEDULE with attached revised BID SCHEDULE. Section

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 2-1 Issue date: September 2012 1. General SITEWORK OVERVIEW This Directive outlines the Fund s requirements for the Consultant relative to the development, design and presentation of documents

More information

Request for Proposal Topographic/Property Line Survey

Request for Proposal Topographic/Property Line Survey Request for Proposal Topographic/Property Line Survey We are requesting a proposal for a survey for V.E. Macy Park, a Westchester County Park, located at Saw Mill River Road, Route 9A in Ardsley, New York

More information

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING

More information

Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California Tel

Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California Tel Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California 93030 Tel 805.385.8280 October 24, 2018 ADDENDUM NO. 2 Vineyard Avenue Street Resurfacing Project PW 16-12 SCHEDULED

More information

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1 DATE: May 18, 2016 TO: FROM: All Bidders/Proposers Willie Velez, CPPB Procurement Administrator City of Casselberry Purchasing Division SUBJECT: ITB-2016-0023, Oxford Road Complete Street Improvements

More information

Division 33. Utilities

Division 33. Utilities See Section 32 for requirements on Utility Plan Preparation. 33 10 00. Water Utilities 33 11 00. Water Utility Distribution Piping 1. All underground pipe material, 4 inch diameter and larger shall be

More information

ADDENDUM NO. 1 CITY OF SOUTH PORTLAND, MAINE WATERMAN DRIVE PARKING IMPROVEMENTS BID # August 21, 2014 PREPARED BY:

ADDENDUM NO. 1 CITY OF SOUTH PORTLAND, MAINE WATERMAN DRIVE PARKING IMPROVEMENTS BID # August 21, 2014 PREPARED BY: ADDENDUM NO. TO CITY OF SOUTH PORTLAND, MAINE WATERMAN DRIVE PARKING IMPROVEMENTS BID #04-5 August 2, 204 PREPARED BY: SEBAGO TECHNICS, INC. 75 John Roberts Road Suite A South Portland, ME 0406 3036 Addendum

More information

ADDENDUM 3 Contractor Questions Essex County Courthouse Square Drainage Improvements IFB Responses Issued March 30, 2016

ADDENDUM 3 Contractor Questions Essex County Courthouse Square Drainage Improvements IFB Responses Issued March 30, 2016 ADDENDUM 3 Contractor Questions IFB 2016-154-01 Responses Issued March 30, 2016 Sealed Bids are due no later than 3:00 PM, April 4, 2016 at the Essex County Purchasing Office, 202 S. Church Lane, Tappahannock,

More information

ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS. All Plan Holders and Prospective Bidders

ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS. All Plan Holders and Prospective Bidders ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS TO: All Plan Holders and Prospective Bidders TITLE: Hills of Cedar Creek East Phase 2 PROJECT NO: LOCATION: OWNER: EGA181011 Council Bluffs, IA. City

More information

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of

More information

November 29, CITY OF PLANT CITY Purchasing Division (813)

November 29, CITY OF PLANT CITY Purchasing Division (813) November 29, 2018 CITY OF PLANT CITY Purchasing Division (813) 659-4270 IFB 18-014UM-LG 12-inch Water Transmission Main-Franklin St., Hancock St. and Terrace Drive West ADDENDUM No. 3 *Bidders are required

More information

Bidder Name: ITEMIZED BID: The bidder should complete the following section in accordance with Sec 102.7. The bidder proposes to furnish all labor, materials, equipment, services, etc. required for the

More information

ADDENDUM TO THE CONTRACT. for the. Switzer Creek Subdivision Contract No. E ADDENDUM NO.: FOUR CURRENT DEADLINE FOR BIDS: September 23, 2015

ADDENDUM TO THE CONTRACT. for the. Switzer Creek Subdivision Contract No. E ADDENDUM NO.: FOUR CURRENT DEADLINE FOR BIDS: September 23, 2015 ADDENDUM TO THE CONTRACT for the ENGINEERING DEPARTMENT Switzer Creek Subdivision Contract No. E16-046 ADDENDUM NO.: FOUR CURRENT DEADLINE FOR BIDS: September 23, 2015 PREVIOUS ADDENDA: THREE ISSUED BY:

More information

City of Berkley, Michigan Harvard Road Reconstruction & Water Main Replacement Project FREQUENTLY ASKED QUESTIONS (FAQ)

City of Berkley, Michigan Harvard Road Reconstruction & Water Main Replacement Project FREQUENTLY ASKED QUESTIONS (FAQ) FREQUENTLY ASKED S (FAQ) The purpose of this document is to provide detailed information about the Harvard Road Reconstruction & Water Main Replacement Project. This project will directly affect residents

More information

CONSTRUCTION PLANS FOR ENTERPRISE RENTAL CAR

CONSTRUCTION PLANS FOR ENTERPRISE RENTAL CAR CONSTRUCTION PLANS FOR VICINITY MAP (NOT TO SCALE) DEVELOPER/OWNER: CHRISTOPHER SLOVAN ENTERPRISE HOLDINGS, INC. 284 MALLORY STATION RD, SUITE 120 FRANKLIN, TN 37067 PH: 615-309-9621 DAVIDSON CO., TENNESSSEE

More information

ENCROACHMENT/EXCAVATION PERMIT APPLICATION

ENCROACHMENT/EXCAVATION PERMIT APPLICATION PERMIT / PROJECT INFORMATION: PARCEL INFO: APPLICANT S INFO: Public Works/Engineering 595 SILVER LACE BLVD, FERNLEY, NV 89408 (775)-784-9910 ENCROACHMENT/EXCAVATION PERMIT APPLICATION PERMIT APPLICATIONS,

More information

Eastern Sewershed Package IV Project Solicitation Number: CO Job No.: ADDENDUM 1 April 20, 2018

Eastern Sewershed Package IV Project Solicitation Number: CO Job No.: ADDENDUM 1 April 20, 2018 Eastern Sewershed Package IV Project Solicitation Number: CO-00149 Job No.: 17-4527 ADDENDUM 1 April 20, 2018 To Bidder of Record: This addendum, applicable to work referenced above, is an amendment to

More information

Department of Transportation Mitchell Region Office

Department of Transportation Mitchell Region Office Connecting South Dakota and the Nation Department of Transportation Mitchell Region Office PO Box 1206 Mitchell, SD 57301-7206 605/995-8129 FAX: 605/995-8135 September 28, 2018 TO: Interested Bidders (pdf

More information

Stormwater Management The District exercises regulatory authority for Stormwater Management in the City of Edina.

Stormwater Management The District exercises regulatory authority for Stormwater Management in the City of Edina. Permit Application No.: 7-56 Rules: Erosion Control, Stormwater Management Applicant: Edina Public Schools Received:0/7/207 Project: South View Middle School Addition and Bus Parking Complete: /27/207

More information

November 2, 2018 CITY OF BERKELEY FY 2018 MEASURE M STREET REHABILITATION SPECIFICATION NO C (Re-Issued) ADDENDUM NO. 1

November 2, 2018 CITY OF BERKELEY FY 2018 MEASURE M STREET REHABILITATION SPECIFICATION NO C (Re-Issued) ADDENDUM NO. 1 Department of Public Works Engineering Division November 2, 2018 CITY OF BERKELEY FY 2018 MEASURE M STREET REHABILITATION ADDENDUM NO. 1 Dear Bidder: The following amendments are hereby made to the subject

More information

APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) RFP QUESTIONS AND ANSWERS-REVISION 2

APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) RFP QUESTIONS AND ANSWERS-REVISION 2 Project: APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) PROJECT: 0029-005-130, C501, B645 RFP QUESTIONS AND ANSWERS-REVISION 2 Date: 12/04/09 Approaches and Bridge over Tye River (Rte. 29 NBL) Subject:

More information

The Contract Documents for the referenced project are hereby amended in the following particulars only, with all other conditions remaining unchanged.

The Contract Documents for the referenced project are hereby amended in the following particulars only, with all other conditions remaining unchanged. 1700 East Iron Ave. Salina, KS 67401 785-827-0433 phone 785-827-5949 fax 6 March 2018 Arizona California Colorado Kansas Louisiana Missouri Nebraska New Mexico Texas Utah ADDENDUM NO. 2 RE: City of Kingman,

More information

ADDENDUM # 3 DATE: February 16, 2018

ADDENDUM # 3 DATE: February 16, 2018 ADDENDUM # 3 DATE: February 16, 2018 REFERENCE: Invitation for Bid No.: S-LB-18607 IFB Issue Date: January 25, 2018 Title: Stonewall Middle School Addition and Renovations Architect/Engineer: Architecture

More information

ADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF

ADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF ADDENDUM #1 MARCH 10, 2016 CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project "Central Winds

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

ENGINEERING MEMORANDUM

ENGINEERING MEMORANDUM ENGINEERING MEMORANDUM April 10, 2017 TO: FROM: City Council Mike Payne, City Engineer SUBJECT: Consideration and action to award contract for Bid Schedule C - 2017: C2017-12 Landfill Paving Improvements

More information

CONTRACT ADDENDUM # 1

CONTRACT ADDENDUM # 1 date: January 5, 09 project: Bear River Bleachers CONTRACT ADDENDUM # by: Design West Architects subject: Revisions The Work shall be carried out in accordance with the following supplemental instructions

More information

CITY OF LONGWOOD. Fostering citizen trust and cultivating a prosperous community ADDENDUM II. June 6, 2016

CITY OF LONGWOOD. Fostering citizen trust and cultivating a prosperous community ADDENDUM II. June 6, 2016 CITY OF LONGWOOD Fostering citizen trust and cultivating a prosperous community ADDENDUM II June 6, 2016 To: Prospective Bidders & All Others Concerned From: Greg Kirby, Purchasing Manager Subject: IFB

More information

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number) EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY

More information

Town of Scarborough, Maine

Town of Scarborough, Maine Town of Scarborough, Maine Notification of Planning Board Site Visit May 16 th, 2016 beginning at 4:30 pm. The Planning Board will conduct a site visit on May 16 th, 2016. At 4:30pm the Board will begin

More information

to provide timely and accurate information, we make no 385 S. Goliad Street

to provide timely and accurate information, we make no 385 S. Goliad Street 701 Feet 0 50 100 200 300 677 400 660 SP2015-012 ADVANCE AUTO PARTS SITE PLAT - LOCATION MAP = AG 661 JUSTIN RD 651 1405 1200 1411 C S GOLIAD ST 1415 1410 MF-14 1810 1815 PD-39 1000 GR 1920 1902 W YELLOW

More information

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : 012777.00 PROJECTS ------------------------------ STP-1277(700)S COUNTY : ANDROSCOGGIN CONTRACT ID : 012777.00 MAINE

More information

General Rules and Regulations

General Rules and Regulations General Rules and Regulations City of Hamilton, Ohio Sanitary Sewer Collection and Treatment Revised December 23, 2016 Page 1 of 13 To Our Customers, Sanitary Sewer Collection and Treatment Department

More information

TRACTOR ROAD IMPROVEMENTS HIGHLANDS COUNTY

TRACTOR ROAD IMPROVEMENTS HIGHLANDS COUNTY HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS (HCBCC) PURCHASING DEPARTMENT DATE: 3/08/16 ITB NO. 16-012 ADDENDUM No. 1 Project.: TRACTOR ROAD IMPROVEMENTS HIGHLANDS COUNTY Owner: Highlands County BCC

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH)

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH) City of St. Catharines Standard Drawings SEPTEMBER 2018 Revised September 6, 2018 TES-ENG (SH) Roads Dwg No. Revision Standard Sidewalk Detail 110-2001 2 Monolithic Curb-Faced Sidewalk 110-2002 3 Sidewalk

More information

EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02

EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02 EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02 Date: April 22, 2009 To: Prospective Bidders/Plan Holders From: Abraham Campos, PE on behalf of City of El

More information

GENERAL NOTES AND CONDITIONS STORM SEWER 1. ALL EARTHWORK, GRADING AND PAVING SHALL BE PERFORMED IN ACCORDANCE WITH STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION IN ILLINOIS, STATE OF ILLINOIS

More information

TENDER WELLCOX ACCESS ROAD ADDENDUM 1

TENDER WELLCOX ACCESS ROAD ADDENDUM 1 TENDER 2336-2019 WELLCOX ACCESS ROAD ADDENDUM 1 This addendum shall be read in conjunction with and considered as an integral part of the Tender Contract 2336-2019. Revisions supersede the information

More information

4TH STREET SEWER EXTENSION TO MBR PLANT BID SOLICITATION NO

4TH STREET SEWER EXTENSION TO MBR PLANT BID SOLICITATION NO ADDENDUM NO. 2 March 12, 2019 Engineer: Owner: Parametrix The Tulalip Tribes 1019 39th Avenue SE 8802 27th Avenue NE Suite 100 Tulalip, WA 98271-9694 Puyallup, Washington 98374 4TH STREET SEWER EXTENSION

More information

ADDENDUM NO. 1 FOR ROADWAY RECONSTRUCTION RFP # June 7, 2016

ADDENDUM NO. 1 FOR ROADWAY RECONSTRUCTION RFP # June 7, 2016 ADDENDUM NO. 1 FOR ROADWAY RECONSTRUCTION RFP #2017-01 NOTICE TO PROSPECTIVE BIDDERS June 7, 2016 Prospective bidders are hereby informed of the following corrections, additions, deletions, and/or modifications

More information

ADDENDUM NO. 2 PUBLIC WORKS CONSTRUCTION PROJECT NO

ADDENDUM NO. 2 PUBLIC WORKS CONSTRUCTION PROJECT NO ADDENDUM NO. 2 LANCASTER BOULEVARD AND 15 th STREET WEST ROUNDABOUT This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans,

More information

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of a Partnership consisting of an Individual doing business as. TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction

More information

study for 2018 include:

study for 2018 include: MEMORANDUM TO: Mayor and City Council gk FROM: Shawn Sanders irector of Public Works DATE: March 15, 2018 RE: Feasibility Study for the 2018 Street Improvement Project Project No. 2018-02 INTRODUCTION

More information

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION ADDENDUM NO. 1 PROJECT NO ANSWERS TO QUESTIONS RECEIVED THROUGH 12:00 PM ON DECEMBER 29, 2015

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION ADDENDUM NO. 1 PROJECT NO ANSWERS TO QUESTIONS RECEIVED THROUGH 12:00 PM ON DECEMBER 29, 2015 OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION ADDENDUM NO. 1 PROJECT NO. 43-16-05 ANSWERS TO QUESTIONS RECEIVED THROUGH 12:00 PM ON DECEMBER 29, 2015 Q#1 Can Asbury Road (MP 197.8) & State Route 700 (MP

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

CHARLES COUNTY GOVERNMENT ITB NO NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) TEMI DRIVE CONSTRUCTION

CHARLES COUNTY GOVERNMENT ITB NO NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) TEMI DRIVE CONSTRUCTION CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 October 7, 2014 ITB NO. 15-10 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

More information

ADDENDUM NO. 1 Page 1 of 7

ADDENDUM NO. 1 Page 1 of 7 ADDENDUM NO. 1 Page 1 of 7 INVITATION TO BIDDERS Solicitation No. CO-00109 Sealed bids are requested by the San Antonio Water System for the construction of approximately 5,014 linear feet of chain link

More information

Port KC RFP NORTHLAND PARK BUILDING V

Port KC RFP NORTHLAND PARK BUILDING V Port KC RFP NORTHLAND PARK BUILDING V 1. The RFP refers to landscaping plans. However, it does not appear that the landscaping plans were issued with the rest of the RFP. Will these be issued with an addendum?

More information

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE CITY OF BRECKSVILLE,

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE CITY OF BRECKSVILLE, CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE FOR THE CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS RQ# 41677 BIDS DUE ON: May 1, 2018, at 2:00 p.m. ADDENDUM NUMBER 1, April 25, 2018, Page

More information

CIRCLE K SUB-CONTRACTOR BID FORM

CIRCLE K SUB-CONTRACTOR BID FORM CIRCLE K SUB-CONTRACTOR BID FORM Store No: 3308 Address: 8985 Will Clayton Pkwy Date: Bid Due September 17, 2014 Sub Contractor: Trade CONSTRUCTION TAX Construction Tax EXCAVATION / DIRT WORK Cut / Fill

More information

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements This checklist is to be completed and submitted with all Subdivision Applications. The Town reserves

More information

QUESTIONS & ANSWERS ITB HELEN MCCALL PARK IMPROVEMENTS

QUESTIONS & ANSWERS ITB HELEN MCCALL PARK IMPROVEMENTS QUESTIONS & ANSWERS ITB 017-030 HELEN MCCALL PARK IMPROVEMENTS QUESTION: Site Lighting. The prints show that the existing site lighting structures are to be relocated on site. Is this the only site lighting

More information

Addendum No. 1 Issue Date: March 29, 2016

Addendum No. 1 Issue Date: March 29, 2016 Addendum No. 1 Issue Date: Project: Bonson and Short Street Reconstruction Contract: #1-16 Owner: City of Platteville, Wisconsin Engineer: Delta 3 Engineering, Inc. Daniel J. Dreessens, P.E. 875 South

More information

RE: Addendum No CR2297 (Cooks Bayou) Bridge Replacement. Please accept this as Addendum No. 4 for the above referenced project.

RE: Addendum No CR2297 (Cooks Bayou) Bridge Replacement. Please accept this as Addendum No. 4 for the above referenced project. Purchasing Department 40 est 11 th Street, Suite 200 Panama City, FL 32401 Telephone: (0) 24-20 Fax: (0) 24-26 Board of County Commissioners March 29, 201 Prospective Bidders RE: Addendum No. 4 1-16 CR229

More information

ADDENDUM #3 ( CORRECTED FINAL) TO BID # BID NUMBER: ISSUE DATE: Thursday, April 05, 2018

ADDENDUM #3 ( CORRECTED FINAL) TO BID # BID NUMBER: ISSUE DATE: Thursday, April 05, 2018 Georgetown County, South Carolina 129 Screven Street, Suite 239, Georgetown, SC 29440-3641 Post Office Drawer 421270, Georgetown, SC 29442-4200 (843) 545-3083 Fax (843) 545-3500 E-Mail purch@gtcounty.org

More information

IMPROVEMENT PLANS FOR CITY OF RIO VISTA CONDITIONAL USE PERMIT NO

IMPROVEMENT PLANS FOR CITY OF RIO VISTA CONDITIONAL USE PERMIT NO IMPROVEMENT PLANS FOR CITY OF RIO VISTA CONDITIONAL USE PERMIT NO. 2016-002 AND LIFORNIA 94571 REVISIONS VICINITY MAP No. Description NTS CONTACTS SHEET INDEX SHEET NO. SITE MAP 1"=50' COVER SHEET R MLP

More information

ADDENDUM NO. 1 TO THE INVITATION TO BID - ITB # RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN

ADDENDUM NO. 1 TO THE INVITATION TO BID - ITB # RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN ADDENDUM NO. 1 TO THE INVITATION TO BID - ITB #4320 2014 RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN The following changes, additions, and/or deletions shall be made to the Bid Documents

More information

2018 Utility & Street Reconstruction

2018 Utility & Street Reconstruction 2018 Utility & Street Reconstruction Public Hearing On Proposed Special Assessments/Hookup Fees for Installation and Construction of Public Improvements Introduction of the Village technical staff Laura

More information

ADDENDUM #1 BL Construction of Club Drive Park: Phase II

ADDENDUM #1 BL Construction of Club Drive Park: Phase II October 25, 2017 ADDENDUM #1 BL094-17 Construction of Club Drive Park: Phase II 1389 Peachtree Street, NE Suite 200 Atlanta, GA 30309 Phone: 404.873.6730 www.tsw-design.com Principals: William Tunnell

More information

Addendum No. 1 Page 1 of 2

Addendum No. 1 Page 1 of 2 Addendum No. 1 Page 1 of 2 DATE: March 14, 2016 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Bidders SUBJECT: Addendum No. 1 PROJECT NAME: Parking Lot S7 Improvements JJC PROJECT

More information

extrudesection 00301 BID FORM PROJECT IDENTIFICATION: CONSTRUCTION OF PROPOSED DRAINAGE IMPROVEMENTS THIS BID IS SUBMITTED TO: THE CITY OF FREDERICKSBURG, TEXAS, herein after referred to as OWNER. 1. Enter

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2017.02 Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5 The following changes are made to the Proposal, Specifications and Plans: SPECIFICATIONS:

More information

Section 403. DRAINAGE STRUCTURES

Section 403. DRAINAGE STRUCTURES 403.01 Section 403. DRAINAGE STRUCTURES 403.01. Description. This work consists of adjusting, constructing, or temporarily lowering drainage structures and cleaning existing drainage structures and leads

More information

PUBLIC WORKS/ENGINEERING DEPARTMENT

PUBLIC WORKS/ENGINEERING DEPARTMENT PUBLIC WORKS/ENGINEERING DEPARTMENT ADDENDUM NO. 1 April 9, 016 TOWN OF MORAGA 016 Full Depth Reclamation Project CIP No. 08-106 TO: Prospective Bidders and Interested Parties This Addendum shall be considered

More information

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES CITY OF SANTA MONICA Department of Public Works Civil Engineering Division 1685 Main, Room 116 Santa Monica, CA 90401 Tel: (310) 458-2240 or (310) 458-8737 EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

10:00 AM, Wednesday, April 8, 2015

10:00 AM, Wednesday, April 8, 2015 NOTICE OF MANDATORY PRE-BID CONFERENCE WILL BE HELD AT 10:00 AM, Wednesday, April 8, 2015 IN ROOM 16, CITY HALL BUILDING, 101 NORTH MAIN STREET WINSTON-SALEM, NORTH CAROLINA The purpose of this conference

More information

Naperville Public Library. Parking Lot Work Naper Blvd. Library & 95 th St. Library

Naperville Public Library. Parking Lot Work Naper Blvd. Library & 95 th St. Library Naperville Public Library Request for Pricing Parking Lot Work Naper Blvd. Library & 95 th St. Library Submission Date/Time: May 31, 2018, at 10:00 a.m. CST Place: Nichols Library-Board Room 200 West Jefferson

More information

S1.0 FLOATING DOCK PLANS AND DETAILS S2.0 FLOATING DOCK SECTIONS AND DETAILS. Drawing C1.0 - Revised and attached Replace in entirety

S1.0 FLOATING DOCK PLANS AND DETAILS S2.0 FLOATING DOCK SECTIONS AND DETAILS. Drawing C1.0 - Revised and attached Replace in entirety ` CHARLES LADNER & ASSOCIATES, INC. CONSULTING CIVIL AND STRUCTURAL ENGINEERS Telephone 5393 BIG LAKE ROAD Facsimile (337) 478--2222 LAKE CHARLES, LOUISIANA 70601 (337) 478-2150 November 27, 2017 ATTENTION

More information

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

ENGINEERING REVIEW CHECKLIST City of Mount Clemens (To be completed by the Developer s & Submitted with ing Plans) DATE: PROJECT NAME: Site Plan Approved: Date DESIGN ENGINEERING COMPANY: ing Company Contact Information: Name: Phone: Email: Owner Contact

More information

A new Proposal Form is being issued with this Addendum, the following is an explanation of the changes, disregard originally issued form.

A new Proposal Form is being issued with this Addendum, the following is an explanation of the changes, disregard originally issued form. Courtyards Phase ADDENDUM NO. 1 May 2, 2016 PROJECT: Courtyards at the Oaks Phase 2 Paving & Incidental Drainage Improvements BID DATE: Tuesday, May 3, 2016, at 2:00 PM City Hall, City of Derby 611 Mulberry

More information

Task Order Authorization

Task Order Authorization Task Order Authorization Task Order Number: 6 Task Order Name: 2017 Small Drainage Program Hourly Rate: See attached Exhibit B Budget Not To Exceed: $79,795.00 This Task Order pertains to the On-Call Agreement

More information

LOT GRADING GUIDELINES FOR COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, MEDIUM AND HIGH DENSITY RESIDENTIAL PROPERTIES

LOT GRADING GUIDELINES FOR COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, MEDIUM AND HIGH DENSITY RESIDENTIAL PROPERTIES LOT GRADING GUIDELINES FOR COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, MEDIUM AND HIGH DENSITY RESIDENTIAL PROPERTIES Contents COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, MEDIUM AND HIGH DENSITY... 1 RESIDENTIAL

More information

Table Related Arlington County Standards, Specification and Policies

Table Related Arlington County Standards, Specification and Policies 2.1 GENERAL 2.1.1 DESCRIPTION SITE WORK V02000 2.1 GENERAL 2.1.1 Description This standard identifies minimum requirements that shall be met for all site work in the design and construction of elements

More information

LOT GRADING GUIDELINES FOR LOW DENSITY RESIDENTIAL PROPERTIES

LOT GRADING GUIDELINES FOR LOW DENSITY RESIDENTIAL PROPERTIES LOT GRADING GUIDELINES FOR LOW DENSITY RESIDENTIAL PROPERTIES Contents LOT GRADING GUIDELINES... 3 LOW DENSITY RESIDENTIAL PROPERTIES... 3 Introduction... 3 Definitions:... 3 Purpose... 3 LOT GRADING APPROVAL

More information

Pier C North Damaged Pile Repairs. Pre-Bid Meeting April 24, :00 AM. Agenda Items

Pier C North Damaged Pile Repairs. Pre-Bid Meeting April 24, :00 AM. Agenda Items Pier C North Damaged Pile Repairs Pre-Bid Meeting April 24, 2012 10:00 AM Agenda Items 1. SCOPE: Repair of 71 damaged piles. The piles are 16 and 18 square precast concrete piles that were installed around

More information

HORIZON MEADOWS MINOR DEVELOPMENT PERMIT AMENDMENT LOT 1, BLOCK 3 OF HORIZON MEADOWS SUBDIVISION FILING NO. 1

HORIZON MEADOWS MINOR DEVELOPMENT PERMIT AMENDMENT LOT 1, BLOCK 3 OF HORIZON MEADOWS SUBDIVISION FILING NO. 1 HORIZON MEADOWS MINOR DEVELOPMENT PERMIT AMENDMENT LOT 1, BLOCK 3 OF HORIZON MEADOWS SUBDIVISION FILING NO. 1 MDP 201-033A SAWCUT ASPHALT 5' NORTH OF EXIST. CURB OWLINE 31' SAWCUT ASPHALT 2' NORTH OF EXIST.

More information

Case Recommendation: Approve the request for a Special Exception for property known as West 100 with the following conditions:

Case Recommendation: Approve the request for a Special Exception for property known as West 100 with the following conditions: Case 1856 Applicant: Owners: Pat Chisholm Warren Street LLC (Todd M. Wade) Request: Special Exception to permit residential use for West 100 Location: 100-108 Oxford Square Boulevard Zoning: (NB) General

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $13,984,117.36 Reed & Reed, Inc. - Woolwich, ME $14,883,139.00 Page 1 of 11 CPM Constructors Freeport, ME 201.11 Clearing AC 2.00 10000.00

More information

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows. 403.01 Section 403. DRAINAGE STRUCTURES 403.01 Description. Adjust, construct, or temporarily lower drainage structures. Clean existing drainage structures and leads as directed by the Engineer. Drainage

More information

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO. 3690 NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Commissioners Kitsap County 614 Division Street Port

More information

CUSTOM HOMES, ADDITIONS TAYLOR BUILDING & COMMERCIAL DESIGNS 63 KENSINGTON ROAD, SAN ANSELMO, CALIFORNIA SPIRIT LIVING GROUP APN

CUSTOM HOMES, ADDITIONS TAYLOR BUILDING & COMMERCIAL DESIGNS 63 KENSINGTON ROAD, SAN ANSELMO, CALIFORNIA SPIRIT LIVING GROUP APN SPIRIT LIVING GROUP 63 KENSINGTON ROAD, SAN ANSELMO, CALIFORNIA 100 HELENS LANE MILL VALLEY, CA 94941 415 388 9585 F 415 388 0412 CPD ENGINEERS / SURVEYORS / PLANNERS 1646 N CALIFORNIA BLVD SUITE 400 WALNUT

More information

ADDENDUM #1 AUGUST 25, INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF

ADDENDUM #1 AUGUST 25, INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF ADDENDUM #1 AUGUST 25, 2016 INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 10/30/2014 Project 140485 Addendum No. 7 PID No. 77254 LUC IR 75

More information

BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR

BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR Miscellaneous Concrete Repairs 2014 3600-3900 Blocks of Potomac Avenue and Town Hall, 2014 To: The Honorable Mayor and Town Council Town of Highland Park

More information

YES, we received Addendum No. 1

YES, we received Addendum No. 1 TRANSMITTAL SHEET Date sent: Friday, April 6, 2018 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering Number of pages including this page: 36 CONFIRMATION

More information

Department of Transportation Pierre Region Office 104 S. Garfield Bldg. A Pierre, South Dakota / FAX: 605/

Department of Transportation Pierre Region Office 104 S. Garfield Bldg. A Pierre, South Dakota / FAX: 605/ Connecting South Dakota and the Nation Department of Transportation Pierre Region Office 104 S. Garfield Bldg. A Pierre, South Dakota 57501-5405 605/773-3464 FAX: 605/773-6215 May 6, 2011 RE: 0009-391

More information

CITY OF HILSHIRE VILLAGE SWIMMING POOL PLAN SUBMITTAL CHECK LIST ADDRESS: DATE:

CITY OF HILSHIRE VILLAGE SWIMMING POOL PLAN SUBMITTAL CHECK LIST ADDRESS: DATE: CITY OF HILSHIRE VILLAGE SWIMMING POOL PLAN SUBMITTAL CHECK LIST "THE FOLLOWING CHECKLIST IS ONLY A SUMMARY THAT IS PROVIDED FOR THE APPLICANT'S BENEFIT; HOWEVER, FULFILLING THE REQUIREMENTS OF THIS SUMMARY

More information

FDOT REF. ITEM DESCRIPTION

FDOT REF. ITEM DESCRIPTION EXHIBIT B NAPLES BASIN V Stormwater Improvements BID TABULATION SUMMARY OF PAY ITEMS FDOT REF. ITEM DESCRIPTION Est. Quant. Cost 0 Mobilization LS 02 2 Maintenance of Traffic LS 3 Preconstruction Audio/Video

More information