SPECIAL PROVISION Concrete Pavement

Size: px
Start display at page:

Download "SPECIAL PROVISION Concrete Pavement"

Transcription

1 1995 Metric CSJ s , etc. SPECIAL PROVISION Concrete Pavement For this project, Item 360, Concrete Pavement, of the Standard Specifications, is hereby amended with respect to the clauses cited below, and no other clauses or requirements of this Item are waived or changed hereby. Article Materials, Subarticle (1) Portland Cement Concrete. The first paragraph is (1) Portland Cement Concrete. Classification and mix design shall conform to Class P Portland cement concrete as defined in Item 421, Portland Cement Concrete, except for the following: The concrete mix shall be designed to meet a minimum flexural strength of 3585 kpa or a minimum compressive strength of 22 MPa at 7 days. Testing shall be in accordance with Test Method Tex-448-A, Flexural Strength of Concrete Using Simple Beam in Third Point Loading or Test Method Tex-418-A, Compressive Strength of Cylindrical Concrete Specimens. A 7- day flexural strength lower than 3585 kpa or a compressive strength lower than 22 MPa is also acceptable, provided the mix meets a minimum flexural strength of 4275 kpa at 28 days. The maximum water cement ratio shall not exceed Article Materials, Subarticle (3) Dowels for Expansion and Contraction Joints is (3) Dowels for Expansion and Contraction Joints. Dowels shall be smooth, straight dowels of the size and type shown on the plans and shall conform to the requirements of ASTM A615, Grade 400. The free end of dowels shall be smooth and free of burrs. When shown on the plans, corrosion protection shall be applied to dowels. Unless otherwise shown on the plans, the entire length of each dowel shall be coated with a hot applied asphalt cement or other de-bonding material approved by the Engineer. At the Contractor's option the dowel may be lightly coated with grease that has been approved by the Engineer. Cut-backs, emulsions or oils shall not be used for the coating. Dowels that have been epoxy coated for resistance to moisture shall also be coated with asphalt or grease as noted. Unless otherwise shown on the plans, 1 end of each coated dowel to be used in an expansion joint shall be encased in an approved cap having an inside diameter of 2 millimeters greater than the diameter of the dowel. The cap shall be of such strength, durability and design as to provide free movement of the dowels and shall be approved by the Engineer prior to use. The end of the cap shall be filled with a soft compressible material or shall be void in order to permit free movement of the dowel for a distance equivalent to 150% of the width of the joint used. The

2 dowel caps and dowels shall be held securely in place by ties as shown on the plans, or as approved by the Engineer. Article Materials is supplemented by the following subarticle: (7) Evaporation Retardant. A list of pretested and approved evaporation retardants will be maintained by the Construction Division, Materials and Pavements Section. The evaporation retardant shall be a commercially available monomolecular film compound certified by the producer to reduce surface moisture evaporation from the concrete when concrete operations are performed in direct sun, wind, high temperatures or low relative humidity. The evaporation retardant shall have no adverse effect on the cement hydration process or the concrete. Evaporation retardants shall be considered for addition to this list when the manufacturer of the evaporation retardant submits a written request certifying that the material to be furnished meet the requirements of this Item. Article Equipment, Subarticle (14) Texturing Equipment is voided and replaced by the following: (14) Texturing Equipment. Texturing equipment shall consist of the following: Carpet Drag. Carpet drag shall be mounted on a work bridge or a moveable support system capable of varying the area of carpet in contact with the pavement. The carpet drag shall be a single piece of carpet of sufficient length to span the full width of the pavement being placed and adjustable so as to have up to a 1.2-meter longitudinal length of carpet in contact with the concrete being placed. Where construction operations necessitate and with the approval of the Engineer, the length and width of the carpet may be varied to accommodate specific applications. The carpeting used shall be an artificial grass type having a molded polyethylene pile face with a blade length of 15 millimeters to 25 millimeters and a minimum mass of 2 kilograms per square meter. The backing shall be a strong, durable material not subject to rot, and shall be adequately bonded to the facing to withstand use as specified. The texturing equipment shall be operated independent from the spreading, finishing and curing equipment and from the curing operation. Hand operated equipment may be approved by the Engineer for use on small or irregular shaped areas, provided an equivalent texture is obtained. Article Quality of Concrete is Quality of Concrete. The quality of concrete shall be in accordance with Item 421, Portland Cement Concrete, and the additional requirements herein. Unless otherwise shown on the plans or permitted by the Engineer, the job control concrete strength shall be by 7-day strength tests in accordance with Test Method Tex-448-A, Flexural Strength of Concrete Using Simple Beam in Third Point Loading or Test Method Tex-418-A, Compressive Strength of Cylindrical Concrete Specimens. When shown on the plans or permitted by the Engineer, the 7-day job control strength tests shall be by Test Method Tex-421- A, Splitting Tensile Strength of Cylindrical Concrete Specimens. When job control is by flexural or compressive strength, the 7-day job control strength shall be 3585 kpa flexural or 22 MPa compressive or a lower value proven to meet a 28-day flexural strength of 4275 kpa as correlated in accordance with Test Method Tex-427-A, Correlating Concrete Strength Tests

3 When job control is by splitting tensile strength, the 7-day job control strength shall be determined by correlating to the specified flexural strength. The correlation shall be determined in accordance with Test Method Tex-427-A, Correlating Concrete Strength Tests. When a job control test value is more than 10% below the required job control strength or when 3 consecutive strength values fall below the required job control strength, an investigation of the strength test procedure, the quality of materials, and batching operation shall be performed by the Contractor and Engineer to determine the likely cause or causes of the problem. Immediate remedial action shall be taken to correct the problem including redesign of the concrete mix when warranted. Article Placement of Reinforcing Steel and Joint Assemblies, Subarticle (3) Placing Reinforcement at Joints. The first sentence of the fourth paragraph is voided and replaced by the following: Tie bars inserted into plastic concrete must develop a pull-out resistance equal to a minimum of 3/4 of the required yield strength of the steel by using a tension test similar to ASTM E488 after the concrete has cured for 7 days. Article Concrete Mixing and Placing, Subarticle (3) Placing. The first paragraph and the Temperature-Time Requirements Table is (3) Placing. At time of placement, the concrete temperature shall not exceed 35 C. The temperature of the concrete will be measured at the time of discharge at the paving operation in accordance with Test Method Tex-422-A. Immediate corrective action shall be taken by the Contractor when the concrete at time of placement exceeds the specified 35 C or the Contractor shall stop production activities. The Contractor will be allowed to transport and place all concrete produced up to the time of being notified of the high concrete temperature. Concrete delivered in agitating trucks shall be discharged within 60 min. after batching. Concrete delivered in non-agitating equipment shall be discharged within 45 min. after batching. In hot weather or under conditions contributing to quick stiffening of the concrete, a time less than permitted above may be required by the Engineer. These time limitations may be extended if the Contractor can demonstrate to the satisfaction of the Engineer that such concrete can be properly placed, consolidated and finished without the use of additional water. Article Concrete Mixing and Placing, Subarticle (3) Placing. The fourth paragraph is Paving equipment and mixers shall not be located on completed pavement, except as herein provided. The paving equipment and mixer may be located and operated on completed pavement when the pavement meets the specified requirements for opening to all traffic in accordance with Subarticle (2) and provided suitable protection to the pavement is provided. Article Concrete Mixing and Placing, Subarticle (5) Cold Weather Precautions. The second paragraph is voided and replaced with the following:

4 It is the Contractor's responsibility to protect the concrete from freezing. When freezing weather is forecasted within a 72-hour period after placement, the Contractor shall submit to the Engineer for approval, proposed measures to protect the concrete. If approved, placement will be allowed, however, the Contractor shall be responsible for the quality and strength of the concrete under cold weather conditions and any concrete damaged by freezing shall be removed and replaced at the Contractor's expense. Article Spreading and Finishing, Subarticle (1) Machine Finishing. The seventh, eighth, and ninth paragraphs are Final finish shall consist of a carpet drag finish and shall be completed before the concrete has attained its initial set. The final finish shall be accomplished by drawing the specified carpet drag longitudinally along the pavement. The carpet shall be kept from getting plugged with grout. There shall not be excessive bleed water during the carpet drag. The texture achieved by the carpet drag shall be tested by the Contractor in accordance with ASTM E965-87, Test Method for Measuring Surface Macrotexture Depth Using a Sand Volumetric Technique. The Engineer will determine test locations, on average one test per 300 meters per lane. The texture depth shall have a minimum value of 1 millimeter. Limits of any failing individual test shall be determined by additional tests at 30-meter intervals before and after the failing test location. For the failing section, diamond grinding will be required to attain the necessary texture of 1 millimeter. All testing of the surface texture shall be completed no later than one day after pavement placement. Article Curing, Subarticle (3) Membrane Curing. The first paragraph is voided and replaced by the following: (3) Membrane Curing. After final finish and immediately after the free surface moisture has disappeared, the concrete surface shall be sprayed uniformly with a curing compound in accordance with Article After the initial curing compound has dried, the concrete surface shall be sprayed uniformly with a second application of curing compound in accordance with Article Should the membrane be damaged from any cause before the expiration of 72 hours after original application, the damaged portions shall be repaired immediately with additional compound. Article Protection of Pavement and Opening to Traffic, Subarticle (2) Opening Pavement to Traffic is voided and replaced with the following: (2) Opening Pavement to Traffic. The opening of the pavement to either vehicles of the Contractor or to all traffic shall in no manner relieve the Contractor from his responsibility for the work in accordance with Item 7, Legal Relations and Responsibilities to the Public. For those sections of pavement to be opened to traffic, all joints shall first be sealed, the pavement cleaned, stable material placed against the pavement edges, unless otherwise shown on the plans, and all other work performed as required for the safety of traffic

5 The pavement shall be closed to all traffic, including vehicles of the Contractor, until the concrete is as least 4 days old. After 4 days, the pavement may be opened for use by vehicles of the Contractor provided the gross weight (vehicle plus load) of such vehicles and/or equipment does not exceed 6350 kilograms. Where a detour is not readily available or economically feasible to use, an occasional crossing of the roadway with overweight equipment may be permitted for relocating equipment only, but not for hauling material. When an occasional crossing of overweight equipment is permitted, temporary matting or other methods may be required by the Engineer. After the concrete in any section of pavement is 7 days old, such section of pavement may be opened to all traffic as shown on the plans or directed by the Engineer. The pavement may also be opened to all traffic after the pavement has cured for a period of 4 curing days, and laboratory cured concrete specimens have attained either a flexural strength of 3100 kpa, a compressive strength of 19 MPa, or a splitting tensile strength of 2275 kpa. A curing day is defined as a calendar day when the temperature, taken in the shade, away from artificial heat, is above 10 C for at least 19 hours or if satisfactory provisions are made to maintain the surface temperature of the concrete above 4 C for the entire 24 hours. The required curing period shall begin when all concrete therein has attained initial set. Article Deficient Pavement Thickness, Subarticle (a) Coring. The first paragraph is (a) Depth Checks. The pavement will be tested for depth by direct measurement as approved by the Engineer after final strike off or by coring prior to final acceptance if significant surface deviation corrections were required. The direct measurement method shall be in accordance with Test Method Tex-423-A. Locations of depth tests will be selected by the Engineer. If the thickness of the pavement indicated by the direct measurement depth test is deficient by more than 5 millimeters from the plan thickness, the thickness will be verified by measurement of cores taken by the Contractor in accordance with Test Method Tex-424- A at the locations selected by the Engineer. Article Deficient Pavement Thickness, Subarticle (a) Coring. The fourth paragraph is A minimum of 2 direct measurement depth tests will be taken by the Department at locations selected by the Engineer or at random in each 300-meter unit. When no single direct measurement from any unit is deficient by more than 5 millimeters from the plan thickness, full payment will be made. When any direct measurement depth test is deficient by more than 5 millimeters, but not by more than 20 millimeters from the plan thickness, 3 cores will be taken from the unit and the average of the 3 cores determined. The cores from any 300-meter unit will be taken at intervals of not less than 45 meters. The cores from any 300-meter unit will be taken at locations such that the pavement in the unit will be well represented. If the average measurement of these 3 cores is not deficient more than 5 millimeters from the plan thickness, full payment will be made. If the average thickness of the 3 cores is deficient by more than five (5) millimeters but not more than 20 millimeters from the plan thickness, an adjusted unit price as provided in (b), Price Adjustments, will be paid for the unit represented by these cores

6 Article Deficient Pavement Thickness, Subarticle (a) Coring. The sixth paragraph is When the measurement of any individual core is less than the specified thickness by more than 20 millimeters, the actual thickness of the pavement in this area will be determined by taking cores at 3-meter intervals parallel to the centerline in each direction from the deficient depth test until, in each direction, a core is taken which is not deficient by more than 20 millimeters. Exploratory cores for deficient thickness will not be used in averages for adjusted unit price. Exploratory cores are to be used only to determine the length of pavement in a unit that is to be left in place without pay and/or removed and replaced as provided in (a), Coring. Article Ride Quality is Ride Quality. Unless otherwise shown on the plans, ride quality will be required in accordance with Special Specification, Ride Quality for Pavement Surfaces. Article Measurement, Subarticle (3) Ride Quality is voided and replaced by the following: (3) Ride Quality. Ride Quality will be measured as described in Special Specification, Ride Quality for Pavement Surfaces. Article Payment. The second sentence of the first paragraph is voided and replaced by the following: This price shall be full compensation for furnishing, loading, unloading, storing, hauling and handling of all concrete ingredients, including all freight and royalty involved; for coring; for placing and adjusting forms, including supporting material or preparing track grade; for furnishing and installing all reinforcing steel; for furnishing all materials for sealing joints and placing longitudinal, expansion and weakened-plane joints, including all steel dowel caps and load transmission devices required; for mixing, placing, finishing, curing and sawing concrete; for cleaning and sealing concrete joints; and for all manipulations, labor, tools, equipment and incidentals necessary to complete work. Article Payment. The second paragraph is When Surface Test Type-B, as specified in Special Specification, Ride Quality for Pavement Surfaces, is used, a bonus or deduction for each kilometer section of each travel lane will be calculated in dollar and cents

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 350 MARCH 1998 CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE 350.01 SCOPE 350.02 REFERENCES 350.03 DEFINITIONS TABLE OF CONTENTS

More information

CITY OF SAN ANGELO ITEM 360 CONCRETE PAVEMENT

CITY OF SAN ANGELO ITEM 360 CONCRETE PAVEMENT ITEM 360 360.1. DESCRIPTION. CITY OF SAN ANGELO ITEM 360 This item shall govern for the construction of Portland Cement Concrete pavement with or without monolithic curbs on a prepared subgrade or sub-base

More information

B. Reinforcing. Materials shall be as specified in Section 2000 Concrete or as indicated on the plans.

B. Reinforcing. Materials shall be as specified in Section 2000 Concrete or as indicated on the plans. SECTION 1400 - CONCRETE PAVEMENT 1401 SCOPE. This section governs the furnishing of all labor, equipment, tools, and materials and the performance of all work necessary to construct concrete pavement.

More information

ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE

ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE AFTER NOVEMBER 1, 2008 ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE 231.1 Description. This item shall consist of a foundation for surface course or for other base courses and shall be composed

More information

SPECIAL SPECIFICATION 3157 Cold Processed - Recycled Paving Material (RPM) for Use as Aggregate Base Course

SPECIAL SPECIFICATION 3157 Cold Processed - Recycled Paving Material (RPM) for Use as Aggregate Base Course 1993 Specifications SPECIAL SPECIFICATION 3157 Cold Processed - Recycled Paving Material (RPM) for Use as Aggregate Base Course 1. Description. This Item, Cold Processed - Recycled Paving Material (RPM),

More information

ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE

ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE AFTER MAY 1, 2014 ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE 231.1 Description. This Item shall govern for surface courses or for other base courses composed of a mixture of crushed aggregate,

More information

ITEM 666 REFLECTORIZED PAVEMENT MARKINGS

ITEM 666 REFLECTORIZED PAVEMENT MARKINGS ITEM 666 REFLECTORIZED PAVEMENT MARKINGS 666.1. Description. This Item shall govern for furnishing and placing reflectorized pavement markings of the types, colors, shapes, sizes, widths, and thickness

More information

SECTION PORTLAND CEMENT CONCRETE PAVEMENT. All subsurface utilities must be inspected, tested, and accepted prior to any paving.

SECTION PORTLAND CEMENT CONCRETE PAVEMENT. All subsurface utilities must be inspected, tested, and accepted prior to any paving. SECTION PORTLAND CEMENT CONCRETE PAVEMENT 1. DESCRIPTION This specification shall govern for the construction of Portland cement concrete pavement on a prepared subgrade or base course, in accordance with

More information

SPECIAL SPECIFICATION 3402 Reflective Crack Relief Interlayer (RCRI)

SPECIAL SPECIFICATION 3402 Reflective Crack Relief Interlayer (RCRI) 1993 Specifications CSJ 0451-02-023, etc. SPECIAL SPECIFICATION 3402 Reflective Crack Relief Interlayer (RCRI) 1. Description. This Item shall govern for the materials and construction requirements for

More information

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) 275.1. Description. This Item shall govern for treating subgrade, new and/or existing base [with or without asphaltic concrete pavement (ACP)], or

More information

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 3 ITEM 530 CONCRETE CURB, GUTTER, CURB AND GUTTER SIDEWALKS AND DRIVEWAYS

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 3 ITEM 530 CONCRETE CURB, GUTTER, CURB AND GUTTER SIDEWALKS AND DRIVEWAYS AFTER FEBRUARY 1, 2010 ITEM 530 CONCRETE CURB, GUTTER, CURB AND GUTTER SIDEWALKS AND DRIVEWAYS 530.1 Description. This item shall govern for curb, gutter, combined curb and gutter, sidewalks and/or driveways,

More information

SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams

SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams 1993 Specifications CSJ 0162-01-080, etc. SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams 1. Description. This Item shall govern for the repair of impact damaged prestressed

More information

ITEM 260 LIME TREATMENT FOR MATERIALS USED AS SUBGRADE (ROAD MIXED)

ITEM 260 LIME TREATMENT FOR MATERIALS USED AS SUBGRADE (ROAD MIXED) ITEM 260 LIME TREATMENT FOR MATERIALS USED AS SUBGRADE (ROAD MIXED) 260.1. Description. This Item shall govern for treating the new or existing subgrade, the existing pavement structure or a combination

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR SUBGRADE STABILIZATION

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR SUBGRADE STABILIZATION 326-1(a-j) 99 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR SUBGRADE STABILIZATION These Special Provisions revise, amend and where in conflict, supersede applicable sections of the 1999

More information

SPECIAL SPECIFICATION 3032 Reflective Crack Relief Interlayer (RCRI)

SPECIAL SPECIFICATION 3032 Reflective Crack Relief Interlayer (RCRI) 2004 Specifications CSJ 0197-02-097 SPECIAL SPECIFICATION 3032 Reflective Crack Relief Interlayer (RCRI) 1. Description. Produce and place a Reflective Crack Relief Bituminous Interlayer (RCRI) in one

More information

SPECIAL SPECIFICATION 3017 Reflective Crack Relief Interlayer (RCRI)

SPECIAL SPECIFICATION 3017 Reflective Crack Relief Interlayer (RCRI) 2004 Specifications CSJ 0027-12-130 SPECIAL SPECIFICATION 3017 Reflective Crack Relief Interlayer (RCRI) 1. Description. Produce and place a Reflective Crack Relief Bituminous Interlayer (RCRI) in one

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

CITY OF SAN ANGELO ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

CITY OF SAN ANGELO ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) ITEM 275 CITY OF SAN ANGELO ITEM 275 275.1 DESCRIPTION. This Item shall govern for treating subgrade, new and/or existing base (with or without asphaltic concrete pavement (ACP)), or combinations as shown

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 13 14 CONCRETE PAVEMENT FOR VEHICULAR AREAS PART 1 GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for forming and placing reinforced concrete curbs and vehicular pavement

More information

SPECIAL PROVISION Portland Cement Concrete

SPECIAL PROVISION Portland Cement Concrete 1993 Specifications CSJ 0271-16-117 SPECIAL PROVISION 421---040 Portland Cement Concrete For this project, Item 421, Portland Cement Concrete, of the Standard Specifications, is hereby amended with respect

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 7 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION SECTION PORTLAND CEMENT CONCRETE PAVEMENT Page 266, subsection.01. Delete the (**) footnote

More information

SPECIAL SPECIFICATION. Item Micro-Surfacing (Polymer Modified)

SPECIAL SPECIFICATION. Item Micro-Surfacing (Polymer Modified) 1995 Metric SPECIAL SPECIFICATION Item 3004 Micro-Surfacing (Polymer Modified) 1. Description. This Item shall consist of a micro-surfacing system which shall be a mixture of cationic polymer modified

More information

2. Determine Random Numbers: Determine random numbers for testing locations using the Probing, Coring, Texture and MIT-SCAN T2 Report.

2. Determine Random Numbers: Determine random numbers for testing locations using the Probing, Coring, Texture and MIT-SCAN T2 Report. JOB GUIDE CONCRETE PAVING INSPECTION 1. Review Contract and Plans: Obtain plans and special provisions and study them in detail. Attend the pre-construction meeting. Attend the pre-paving meeting. 2. Determine

More information

ITEM 223 LIME-FLY ASH STABILIZED SUBGRADE Description. Mix and compact water, lime and fly ash (LFA), and subgrade in the roadway.

ITEM 223 LIME-FLY ASH STABILIZED SUBGRADE Description. Mix and compact water, lime and fly ash (LFA), and subgrade in the roadway. AFTER JUNE 1, 2015 ITEM 223 LIME-FLY ASH STABILIZED SUBGRADE 223.1 Description. Mix and compact water, lime and fly ash (LFA), and subgrade in the roadway. 223.2 Materials. Furnish uncontaminated materials

More information

A. Submittal Procedures: See Article 13 of the General Conditions.

A. Submittal Procedures: See Article 13 of the General Conditions. SECTION 321313 - CONCRETE PAVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Driveways. 2. Roadways. 3. Parking lots. 4. Curbs and gutters. 5. Walks. B. Proposed Substitutions: See Article 2,

More information

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section 02670-1 of 6 SECTION 02670 CURB, COMBINATION CURB AND GUTTER, AND 02670.01 GENERAL A. Description This work shall include, but not necessarily be limited to, the construction of concrete curb, concrete

More information

SPECIAL SPECIFICATION 6003 Reflectorized Pavement Markings with Retroreflective Requirements

SPECIAL SPECIFICATION 6003 Reflectorized Pavement Markings with Retroreflective Requirements 2004 Specifications CSJ's 0005-11-003 & 6120-02-001 SPECIAL SPECIFICATION 6003 Reflectorized Pavement Markings with Retroreflective Requirements 1. Description. Furnish and place reflectorized pavement

More information

Item 247 Flexible Base

Item 247 Flexible Base Item Flexible Base 1. DESCRIPTION 2. MATERIALS Construct a foundation course composed of flexible base. Furnish uncontaminated materials of uniform quality that meet the requirements of the and specifications.

More information

Item 247 Flexible Base

Item 247 Flexible Base Item Flexible Base 1. DESCRIPTION 2. MATERIALS Construct a foundation course composed of flexible base. Furnish uncontaminated materials of uniform quality that meet the requirements of the and specifications.

More information

SPECIAL PROVISION Portland Cement Concrete

SPECIAL PROVISION Portland Cement Concrete 1995 Metric SPECIAL PROVISION 421---028 Portland Cement Concrete For this project, Item 421, Portland Cement Concrete, of the Standard Specifications, is hereby amended with respect to the clauses cited

More information

PCC Pavement Rideability

PCC Pavement Rideability Supplemental Technical Specification for PCC Pavement Rideability SCDOT Designation: SC-M-502 (04/16) 1. SCOPE 1.1. The Resident Construction Engineer (RCE) will evaluate Portland cement concrete (PCC)

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ITEM 00223 LIME-FLYASH OR FLYASH STABILIZED SUBGRADE 223.1 Description. This item shall consist of treating the subgrade by the pulverizing, addition of lime flyash and/or flyash,

More information

SPECIAL PROVISION TO SPECIAL SPECIFICATION Quality Control/Quality Assurance of Hot Mix Asphalt

SPECIAL PROVISION TO SPECIAL SPECIFICATION Quality Control/Quality Assurance of Hot Mix Asphalt 1993 Specifications CSJ 0018-05-062 SPECIAL PROVISION TO SPECIAL SPECIFICATION 3146--035 Quality Control/Quality Assurance of Hot Mix Asphalt For this project, Special Specification Item 3146, Quality

More information

Special Specification 6148 Inverted Profile Pavement Marking (Audible)

Special Specification 6148 Inverted Profile Pavement Marking (Audible) Special Specification Inverted Profile Pavement Marking (Audible) 1. DESCRIPTION 2. MATERIALS Furnish and install an Inverted Profile Pavement Marking (Audible) that is hot applied to the pavement surface.

More information

Cement Modified Recycled Base

Cement Modified Recycled Base Supplemental Technical Specification for Cement Modified Recycled Base SCDOT Designation: SC-M-306 (01/18) 1.0 DESCRIPTION 1.1 This section contains specifications for the materials, equipment, construction,

More information

SPECIAL SPECIFICATION 6110 Reflectorized Pavement Markings with Retroreflective Requirements

SPECIAL SPECIFICATION 6110 Reflectorized Pavement Markings with Retroreflective Requirements 2004 Specifications SPECIAL SPECIFICATION 6110 Reflectorized Pavement Markings with Retroreflective Requirements 1. Description. Furnish and place reflectorized pavement markings of the types, colors,

More information

2003 SPECIFICATIONS SECTION 501 DIVISION 500 RIGID PAVEMENT

2003 SPECIFICATIONS SECTION 501 DIVISION 500 RIGID PAVEMENT 2003 SPECIFICATIONS SECTION 501 DIVISION 500 RIGID PAVEMENT SECTION 501 PORTLAND CEMENT CONCRETE PAVEMENT 501.01 GENERAL. This item consists of constructing a concrete pavement (with or without reinforcement)

More information

SECTION CONCRETE PAVING PART 1 - GENERAL 1.1 REFERENCES

SECTION CONCRETE PAVING PART 1 - GENERAL 1.1 REFERENCES SECTION 321313 - CONCRETE PAVING PART 1 - GENERAL 1.1 REFERENCES A. Specifications governing civil site construction include the following list and shall be observed in the order listed below. If conflicting

More information

9 Concrete Pavement Patching

9 Concrete Pavement Patching 9 Concrete Pavement Patching Materials Concrete Mix Design Concrete Mix Criteria Trial Batch Demonstration of CMD Acceptance Removal of Concrete Partial Depth Patches Full Depth Patched Placement of Patching

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt

More information

< ~ -n~rtz, Concrete Engineer Office of Materials

< ~ -n~rtz, Concrete Engineer Office of Materials Minnesota Department of Transportation MEMO Office of Materials Mailstop 645 1400 Gervais Avenue Maplewood, MN 55109 'stribution 57, 612, 618, 650 ~ < ~ -n~rtz, Concrete Engineer Office of Materials Implementation

More information

CUT, RE SECTION VI. (Sub-section 290) Cut, Removal, and Replacement of Paved Surfaces. 1. Description Bituminous Pavements thru 290-2

CUT, RE SECTION VI. (Sub-section 290) Cut, Removal, and Replacement of Paved Surfaces. 1. Description Bituminous Pavements thru 290-2 CUT, RE SECTION VI (Sub-section 290) Cut, Removal, and Replacement of Paved Surfaces Article Page 1. Description 290-1 2. Bituminous Pavements 290-1 thru 290-2 3. Concrete Pavements 290-3 thru 290-4 4.

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

City of Regina Standard Construction Specification SECTION 2350 PLACEMENT OF ASPHALTIC CONCRETE SURFACE 1.0 GENERAL. 1.1 Scope

City of Regina Standard Construction Specification SECTION 2350 PLACEMENT OF ASPHALTIC CONCRETE SURFACE 1.0 GENERAL. 1.1 Scope 1.0 GENERAL 1.1 Scope 2.0 PRODUCTS 1.1.1 The work shall consist of placing asphaltic concrete to a compacted thickness conforming to the lines, grades, and cross-sections as shown on the plan or as designated

More information

Cement Stabilized Aggregate Base

Cement Stabilized Aggregate Base Supplemental Technical Specification for June 2, 2008 Cement Stabilized Aggregate Base SCDOT Designation: SC-M-308 (06/08) 1. SCOPE 1.1. Cement Stabilized Aggregate Base (CSAB) consists of aggregate, Portland

More information

CRD-C Standard Test Method for Comparing Concretes on the Basis of the Bond Developed with Reinforced Steel

CRD-C Standard Test Method for Comparing Concretes on the Basis of the Bond Developed with Reinforced Steel Standard Test Method for Comparing Concretes on the Basis of the Bond Developed with Reinforced Steel 1. Scope 1.1 This test method covers comparison of concretes on the basis of the bond developed with

More information

ITEM 342 PLANT MIX SEAL

ITEM 342 PLANT MIX SEAL ITEM 342 PLANT MIX SEAL 342.1. Description. This Item shall govern for the construction of a wearing surface composed of a compacted mixture of aggregate and asphalt cement mixed hot in a mixing plant,

More information

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course. SECTION 02750 RIGID PAVEMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Portland Cement Concrete (PCC) pavement. B. Related Sections: 1.2 REFERENCES 1. Section 02315 Excavation. 2. Section 02721

More information

Special Provision No. 335S03 April 2015

Special Provision No. 335S03 April 2015 COLD IN-PLACE RECYCLED EXPANDED ASPHALT MIX Item No. Special Provision No. 335S03 April 2015 Amendment to OPSS 335, November 2009 OPSS 335, November 2009, Construction Specification for Cold In-Place Recycling

More information

507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING

507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING 507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL 489 DELETE: SECTION 507 SLURRY SEAL in its entirety. INSERT: The following. SECTION 507 SLURRY SEAL AND MICRO-SURFACING

More information

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1993 SPECIFICATIONS CSJ 581-1-95 SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1. DESCRIPTION. This Item shall govern for the furnishing and installation of all materials and equipment for

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE ROAD BASE

CONSTRUCTION SPECIFICATION FOR CONCRETE ROAD BASE CITY OF TORONTO STANDARD CONSTRUCTION SPECIFICATIONS FOR ROADS TS 3.40 November 2009 CONSTRUCTION SPECIFICATION FOR CONCRETE ROAD BASE INDEX TS 3.40.01 SCOPE... 3 TS 3.40.02 REFERENCES... 3 TS 3.40.03

More information

SPECIAL SPECIFICATION 8625 All-Weather Traffic Markings

SPECIAL SPECIFICATION 8625 All-Weather Traffic Markings 2004 Specifications CSJ 6203-45-001, 6225-40-001 & 0045-02-031 SPECIAL SPECIFICATION 8625 All-Weather Traffic Markings 1. Description. This work will consist of furnishing and installing a wet reflective

More information

ITEM NO. 307 CONCRETE STRUCTURES

ITEM NO. 307 CONCRETE STRUCTURES ITEM NO. 307 CONCRETE STRUCTURES This item shall govern the construction of box culverts, headwalls, wingwalls, bridges, box transitions, approach slabs, retaining walls, inlets, storm sewer structures,

More information

.1 Concrete mix shall be in accordance with the following:.1 The average of all tests shall exceed 25 MPa.

.1 Concrete mix shall be in accordance with the following:.1 The average of all tests shall exceed 25 MPa. Page 1 1.0 CONCRETE 1.1 CONCRETE MIX.1 Concrete mix shall be in accordance with the following: Minimum 28 Day Strength 25 MPa* Designated Aggregate Size.maximum 25 mm (1 inch) Slump. 25-75 mm (1-3 inches)

More information

Special Specification 3005 Scrub Seal Treatment

Special Specification 3005 Scrub Seal Treatment Special Specification 3005 Scrub Seal Treatment 1. DESCRIPTION 2. MATERIALS 3. EQUIPMENT Construct a surface treatment consisting of 1 or more applications of a single layer of asphalt emulsion that is

More information

City of Estevan. Construction Specifications

City of Estevan. Construction Specifications City of Estevan Construction Specifications 1.0 GENERAL This section governs the requirements for the supply and placement of Asphaltic Concrete pavement. 2.0 MATERIALS 2.1 Aggregate Shall consist of hard,

More information

JOB SPECIFIC BELLEVUE AVENUE NEWPORT, RHODE ISLAND PORTLAND CEMENT CONCRETE PAVEMENT

JOB SPECIFIC BELLEVUE AVENUE NEWPORT, RHODE ISLAND PORTLAND CEMENT CONCRETE PAVEMENT PORTLAND CEMENT CONCRETE PAVEMENT This Specification consists of furnishing and placing full-panel replacement of Portland Cement Concrete Pavement on Bellevue Avenue. Portland Cement Concrete Pavement

More information

Warm Mix Asphalt (WMA) Guide Specification for Highway Construction

Warm Mix Asphalt (WMA) Guide Specification for Highway Construction Warm Mix Asphalt (WMA) Guide Specification for Highway Construction Division 400 - Asphalt Pavements and Surface Treatments SECTION 4XX - WARM MIX ASPHALT (WMA) PAVEMENT Warm mix asphalt (WMA) is the generic

More information

MATERIAL SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS

MATERIAL SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1821 APRIL 2004 MATERIAL SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS TABLE OF CONTENTS 1821.01 SCOPE 1821.02 REFERENCES

More information

ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING

ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING AFTER NOVEMBER 1, 2008 ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING 252.1 Description. This work shall consist of a stabilized base course composed of a mixture of the existing bituminous

More information

Section 506 SLURRY SEAL Description. Prepare the surface and apply a properly proportioned slurry seal mixture.

Section 506 SLURRY SEAL Description. Prepare the surface and apply a properly proportioned slurry seal mixture. 506.01 Section 506 SLURRY SEAL 506.01 Description. Prepare the surface and apply a properly proportioned slurry seal mixture. 506.02 Materials. Furnish a slurry seal mixture consisting of a blend of asphalt

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE PART 1 - GENERAL 1.01 RELATED DOCUMENTS SECTION 03300 - A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 requirements are applicable to

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section CEMENT STABILIZED BASE COURSE. 1. Foundation course of cement stabilized crushed stone.

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section CEMENT STABILIZED BASE COURSE. 1. Foundation course of cement stabilized crushed stone. PART 1 GENERAL 1.01 SUMMARY A. This section includes: Section 02712 1. Foundation course of cement stabilized crushed stone. 2. Foundation course of cement stabilized bank run gravel. 1.02 MEASUREMENT

More information

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis.

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis. PART 1 GENERAL 1.01 SUMMARY A. This Section includes the following: Section 02775 1. Reinforced concrete sidewalks. 2. Wheelchair Ramps. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment for concrete

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 307 CONCRETE STRUCTURES

San Antonio Water System Standard Specifications for Construction ITEM NO. 307 CONCRETE STRUCTURES ITEM NO. 307 CONCRETE STRUCTURES 307.1 DESCRIPTION: This item shall govern the construction of box culverts, headwalls, wingwalls, bridges, box transitions, approach slabs, retaining walls, inlets, storm

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ITEM 00252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING 252.1 Description. This work shall consist of a stabilized base course composed of a mixture of the existing bituminous

More information

SECTION MISCELLANEOUS CAST-IN-PLACE CONCRETE

SECTION MISCELLANEOUS CAST-IN-PLACE CONCRETE SECTION 033053- MISCELLANEOUS CAST-IN-PLACE CONCRETE PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS 219-1.1 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION This item consists of a base course composed of crushed recycled concrete aggregate, crushed to meet a particular gradation,

More information

1995 Metric CSJ SPECIAL SPECIFICATION ITEM Fly Ash Treatment of Materials

1995 Metric CSJ SPECIAL SPECIFICATION ITEM Fly Ash Treatment of Materials 1995 Metric CSJ 0637-02-010 SPECIAL SPECIFICATION ITEM 2015 Fly Ash Treatment of Materials 1. Description. This Item applies to fly ash (FA) treatment of embankment, subgrade or reworked base material

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL January 2000 Page 1 of 10 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 APPROVALS PART 2 PRODUCTS 2.01 CEMENT 2.02 WATER The General Conditions of the Contract,

More information

Construction Specification 62 Grouted Rock Riprap

Construction Specification 62 Grouted Rock Riprap Construction Specification 62 Grouted Rock Riprap 1. Scope The work consists of furnishing, transporting, and the installation of grouted rock riprap revetments and blankets, including filter or bedding

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3 CITY OF TORONTO TS 3.65 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS 3.65.01 SCOPE...3 TS 3.65.02 TS 3.65.03 REFERENCES...3

More information

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items: ITEM 431 PNEUMATICALLY PLACED CONCRETE 431.1. Description. This Item shall govern for furnishing and placing of "Pneumatically Placed Concrete" for encasement of designated structural steel members, the

More information

LAPEER COUNTY ROAD COMMISSION ANNUAL BID SLURRY SEAL SURFACE SPECIFICATIONS

LAPEER COUNTY ROAD COMMISSION ANNUAL BID SLURRY SEAL SURFACE SPECIFICATIONS 2009-17 LAPEER COUNTY ROAD COMMISSION ANNUAL BID SLURRY SEAL SURFACE SPECIFICATIONS DESCRIPTION The Slurry Seal Surface shall consist of a mixture of emulsified asphalt, mineral aggregate and water, properly

More information

CONSTRUCTION SPECIFICATION FOR SLURRY SEAL

CONSTRUCTION SPECIFICATION FOR SLURRY SEAL ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 337 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR SLURRY SEAL TABLE OF CONTENTS 337.01 SCOPE 337.02 REFERENCES 337.03 DEFINITIONS 337.04 DESIGN AND SUBMISSION

More information

Section 409 of the Standard Specifications is hereby deleted and replaced with the following: DESCRIPTION

Section 409 of the Standard Specifications is hereby deleted and replaced with the following: DESCRIPTION Sample Project Special Provision: 409cas 08-11-2016 (Re-issued 07-03-17 with City of Montrose Edits) 1 Section 409 of the Standard Specifications is hereby deleted and replaced with the following: DESCRIPTION

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990 90P-270 Sheet 1 of 5 SECTION PAVEMENT PATCHING Page 591, Section. Delete the Section and replace with

More information

ITEM 247 FLEXIBLE BASE

ITEM 247 FLEXIBLE BASE ITEM 247 FLEXIBLE BASE 247.1. Description. This Item shall govern for the delivery, stockpiling and/or the construction of foundation or base courses as herein specified and in conformity with the typical

More information

SPECIAL SPECIFICATION 2093 LIME/CEMENT STABALIZED SUBGRADE

SPECIAL SPECIFICATION 2093 LIME/CEMENT STABALIZED SUBGRADE 2004 Specifications CSJ 0902-48-838 SPECIAL SPECIFICATION 2093 LIME/CEMENT STABALIZED SUBGRADE This item shall consist of treating the subgrade by scarifying, adding lime slurry, initial mixing and curing,

More information

SECTION CONCRETE PAVING FOR PEDESTRIAN AREAS. A. This Section includes exterior cement concrete pavement for the following:

SECTION CONCRETE PAVING FOR PEDESTRIAN AREAS. A. This Section includes exterior cement concrete pavement for the following: SECTION 321313 CONCRETE PAVING FOR PEDESTRIAN AREAS PART 1 GENERAL 1.1 SUMMARY A. This Section includes exterior cement concrete pavement for the following: 1. Walkways. 2. Courtyards. 3. Plazas. 4. Pedestrian

More information

SPECIAL SPECIFICATION 4492 Tie Back Anchors

SPECIAL SPECIFICATION 4492 Tie Back Anchors 2004 Specifications CSJ 0504-02-022 SPECI SPECIFICATION 4492 Tie Back Anchors 1. Description. This Item shall govern for the installation of tie-back anchors in place, with grouting as required in accordance

More information

6 The Paving Operation

6 The Paving Operation 6 The Paving Operation Condition of Grade Dowel Bars and Assemblies Plant Technician Mixing Concrete Weather Restrictions Placing Concrete Placing Reinforcing Steel Strike Off, Consolidation, and Finishing

More information

Section 506. SLURRY SEAL

Section 506. SLURRY SEAL 506.02 Section 506. SLURRY SEAL 506.01. Description. This work consists of providing traffic control, preparing the surface, and applying a slurry seal mixture. 506.02. Materials. Provide material in accordance

More information

SECTION 315 ASPHALT CONCRETE PAVEMENT. Materials shall be furnished by the Contractor in accordance with Section 200.

SECTION 315 ASPHALT CONCRETE PAVEMENT. Materials shall be furnished by the Contractor in accordance with Section 200. SECTION 315 ASPHALT CONCRETE PAVEMENT I. GENERAL 1.1. DESCRIPTION OF WORK The Contractor shall furnish all labor, supervision, material (except as herein provided), tools, equipment, supplies, and services;

More information

SECTION 20 INDEX PAVING FABRIC 1. SCOPE OF WORK MATERIAL REQUIREMENTS CONSTRUCTION AND INSTALLATION REQUIREMENTS...

SECTION 20 INDEX PAVING FABRIC 1. SCOPE OF WORK MATERIAL REQUIREMENTS CONSTRUCTION AND INSTALLATION REQUIREMENTS... SECTION 20 INDEX PAVING FABRIC 1. SCOPE OF WORK... 20-2 2. MATERIAL REQUIREMENTS... 20-2 3. CONSTRUCTION AND INSTALLATION REQUIREMENTS... 20-2 4. METHOD OF MEASUREMENT... 20-5 20-1 SECTION 20 PAVING FABRIC

More information

7. Refer to Paragraph 3.08 for unit price adjustments.

7. Refer to Paragraph 3.08 for unit price adjustments. Section 02741 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Surface course of compacted mixture of coarse and fine aggregates and asphaltic binder. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment

More information

Section ASPHALTIC CONCRETE PAVEMENT

Section ASPHALTIC CONCRETE PAVEMENT PART 1 GENERAL 1.01 SUMMARY Section 02741 This Section includes surface courses of compacted mixture of coarse and fine aggregates and asphaltic material. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1.

More information

SURFACINGS AND PAVEMENTS SECTION 37: BITUMINOUS SEALS 37-2 SLURRY SEAL

SURFACINGS AND PAVEMENTS SECTION 37: BITUMINOUS SEALS 37-2 SLURRY SEAL SURFACINGS AND PAVEMENTS SECTION 37: BITUMINOUS SEALS 37-2 SLURRY SEAL 37-2.01 DESCRIPTION This work shall consist of mixing asphaltic emulsion, aggregate, set-control additives and water and spreading

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

729 - MULTI-LAYER POLYMER CONCRETE OVERLAY SECTION 729 MULTI-LAYER POLYMER CONCRETE OVERLAY

729 - MULTI-LAYER POLYMER CONCRETE OVERLAY SECTION 729 MULTI-LAYER POLYMER CONCRETE OVERLAY SECTION 729 MULTI-LAYER POLYMER CONCRETE OVERLAY 729.1 DESCRIPTION Prepare the surface of the reinforced concrete bridge deck and construct a multi-layer polymer concrete overlay (overlay) as shown on

More information

KU Design Guidelines APPENDIX II PERMEABLE BITUMINOUS PAVEMENT

KU Design Guidelines APPENDIX II PERMEABLE BITUMINOUS PAVEMENT PERMEABLE BITUMINOUS PAVEMENT PART 1: GENERAL 1.01. RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including Special Requirements General Conditions and Division 1 Specifications Sections,

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA. STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA April 18, 2008 888.01 General 888.02 Materials 888.03 Concrete Proportioning 888.04

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA. STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA April 15, 2011 888.01 General 888.02 Materials 888.03 Concrete Proportioning 888.04

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LATEX MODIFIED EMULSION TREATMENT (MICRO-SURFACING)

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LATEX MODIFIED EMULSION TREATMENT (MICRO-SURFACING) S312EM2-1110 VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LATEX MODIFIED EMULSION TREATMENT (MICRO-SURFACING) August 10, 2010 I. DESCRIPTION This work shall include furnishing and placing

More information

SPECIFICATION 1035 M

SPECIFICATION 1035 M MAY 1984 SPECIFICATION 1035 M SPECIFICATIONS FOR UNDERWATER CONCRETE 1035. 1. DESCRIPTION The work will consist of the mixing of concrete in accordance with the "Specifications for Reinforced Concrete",

More information

SPECIAL SPECIFICATION 4401 Prestressed Ground Anchors

SPECIAL SPECIFICATION 4401 Prestressed Ground Anchors 2004 Specifications CSJ 0581-02-121 & 0200-11-100 SPECI SPECIFICATION 4401 Prestressed Ground Anchors 1. Description. Install post-tensioned permanent ground anchors in place, with grouting as required

More information

Construction Specification for Concrete Bus Pad

Construction Specification for Concrete Bus Pad Engineering & Construction Services Division Standard Specifications for Road Works TS 3.41 June 2017 for Concrete Bus Pad Table of Contents SCOPE... 3 REFERENCES... 3 DEFINITIONS... 3 DESIGN AND SUBMISSION

More information

SPECIAL PROVISIONS TO ITEM P-304 CEMENT TREATED BASE COURSE

SPECIAL PROVISIONS TO ITEM P-304 CEMENT TREATED BASE COURSE SPECIAL PROVISIONS TO ITEM P-304 CEMENT TREATED BASE COURSE The work under this item shall conform to the requirements of Item P-304 of the FAA standards for Specifying Construction of Airports which have

More information

Construction Specification for Tack Coat

Construction Specification for Tack Coat Engineering and Construction Services Division Standard Specifications for Road Works TS 3.20 April 2014 for Table of Contents TS 3.20.01 SCOPE... 2 TS 3.20.02 REFERENCES... 2 TS 3.20.03 DEFINITIONS Not

More information