1 VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment
2 VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment rotary drill hydro-mill backhoe Clamshell + Kelly bar
3 VERTICAL BARRIERS SLURRY TRENCH BARRIERS: Problems due to improper construction A strict Construction Quality Assurance CQA and Construction Quality Control CQC are necessary to avoid problems =>
4 VERTICAL BARRIERS SLURRY WALLS: SOIL-BENTONITE Bentonite % for different soils range = 2-5%
5 VERTICAL BARRIERS SLURRY WALLS: SOIL-BENTONITE Typical construction site B-W slurry + soil: Slump = cm g = g/cm 3
6 VERTICAL BARRIERS SLURRY WALLS: SOIL-BENTONITE Excavation and backfilling Soil-bent mix is placed so that it flows down a shallow slope, not free dropped
7 VERTICAL BARRIERS SLURRY WALLS: SOIL-BENTONITE CQA and CQC Sampling before (and after) placement of the slurry to measure: - unit weight (mud balance): > 1.03 g/cm 3 - viscosity (Marsh funnel): < 40 seconds - filter loss (filter press): < 25 ml in 30 at 100 psi Inspection of trench geometry: - width, depth, key penetration, - verticality, continuity, bottom cleaning Sampling and testing of the backfill to measure: - unit weight, slump, composition, k, Careful handling of contaminated materials (slurry, backfill) preventing exposure of workers and other receptors.
8 VERTICAL BARRIERS SLURRY WALLS: SOIL-BENTONITE CQA and CQC UNIT WEIGHT (mud balance) spirit-level fulcrum movable weight scale
9 VERTICAL BARRIERS SLURRY WALLS: SOIL-BENTONITE CQA and CQC VISCOSITY (Marsh funnel)
10 VERTICAL BARRIERS SLURRY WALLS: SOIL-BENTONITE CQA and CQC FILTER LOSS: amount of fluid passed through a permeable membrane in a given time under a given pressure before after controlled pressure slurry sample cake paper filter filtrate
11 VERTICAL BARRIERS SLURRY WALLS: SOIL-BENTONITE CQA and CQC FILTER PRESS API filter press
12 VERTICAL BARRIERS SLURRY WALLS: SOIL-BENTONITE main issues Risk of non homogeneous treatment k = 10-7 cm/s Need of space on site for soil-bentonite mixing Chemical compatibility
13 VERTICAL BARRIERS SLURRY WALLS: SOIL-BENTONITE chemical compatibility
14 GROUTED BARRIERS They are formed by injection of a GROUT into the soil. They are in general more expensive and more permeable than slurry walls => rarely used, mainly for artificial bottom liner Risk of non-uniform treatment Risk of hydro-fracturing (pressures too high) jet grouting method permeation method vibrating beam method injection from a hole into the pores and fissures of soil or rock The holes are spaced to have overlapping of the injection Injection by a special driven beam into the space created when the beam is removed
15 GROUTED BARRIERS The choice of the GROUT depends on: soil hydraulic conductivity soil grain size soil and groundwater chemistry type of pollutant (chemical compatibility) rate of groundwater flow A detailed site characterization is fundamental Chemical grouts: chemical base + catalyst + solvent (water) low viscosity => fine soils Particulate grouts: cement and/or bentonite + water more viscous => coarse soils A combination of them can be used, too.
16 GROUTED BARRIERS Guide for the choice of the GROUT
17 GROUTED BARRIERS Guide for the choice of the GROUT
18 GROUTED BARRIERS Guide for the choice of the GROUT
19 GROUTED BARRIERS: PERMEATION GROUTING Point Injection method: a grout casing is driven to full depth injection through the end of casing after withdrawing => a column of injected soil is created primary and secondary injection to have continuity AFTER SETTING OF THE PRIMARY k > 10-6 cm/s Injection pressure = ~ 20 kpa/m of depth ~ m
20 GROUTED BARRIERS: PERMEATION GROUTING Tube-a-manchette method: a sleeve pipe with small holes (1/30 cm) is placed in a grout hole The small holes are covered by manchettes (rubber sleeves = one way valves) that are opened under the pressure of the grout regrouting can be done if k> k required also changing the grout primary and secondary injection to have continuity PERMEATING INJECTIONS: column dimensions and continuity of treatment are difficult to control
21 GROUTED BARRIERS: VIBRATING BEAM METHOD Driving of a H-beam with a vibratory hammer The beam is modified to allow injection of grout (typically a CB mixture) through nozzles at the base of the beam while withdrawn Max thickness: cm Continuity is an issue K > 10-6 cm/s Shallow depths (m) steel beam markers of driving depth grout supply pipe final barrier profile (plan view) injection nozzle
22 GROUTED BARRIERS: JET GROUTING drilling beginning of jetting Revolving and drawing up of jetting rod completion with secondary jetting - soil erosion and brake-up - mixing of the soil+grout - part of the soil+grout (spoil) flows up around the drill rod jetting rod monitor
23 GROUTED BARRIERS: JET GROUTING secant columns lamellar jet-grouting Revolving and drawing up of jetting rod Drawing up of jetting rod without revolving
24 GROUTED BARRIERS: JET GROUTING SYSTEMS SINGLE ROD (single fluid) CCP (Chemical Churning Pile): injection of GROUT DOUBLE ROD (double fluid) Jumbo-JSP (Jumbo Jet Special Grout): injection of GROUT + AIR TRIPLE ROD (triple fluid) KAJIMA injection of AIR + WATER to erode and break-up soil injection of GROUT
25 GROUTED BARRIERS: JET GROUTING APPLICATIONS LOW PERMEABILITY BARRIERS IMPROVE BEARING CAPACITY OF SOILS REDUCE SETTLEMENTS SLOPE AND EXCAVATION STABILIZATION
26 GROUTED BARRIERS: JET GROUTING FEASIBILITY any kind of soil, - except compact clays (Cu> 400 kpa), un-necessary! - excellent in gravels maximum depth: m usual depth: 5-30 m
27 GROUTED BARRIERS: JET GROUTING Feasibility of different injection methods Clay Silt Sand Gravel Cobbles Get-grouting Resins Silicates LV Silicates HV Fine cement CB mixtures mortars HV, LV = high, low Viscosity = too expensive Grain size (mm)
28 GROUTED BARRIERS: JET GROUTING MONOFLUID, CCP grout grout spoil injection nozzles grouted soil Column diameter: Inclination : cm (less with groundwater) from the vertical
29 GROUTED BARRIERS: JET GROUTING BIFLUID air spoil grout compressed air grout grout injection + annular injection of air grouted soil Column diameter: cm (groundwater poorly influent) Columns: vertical (max 10 )
30 GROUTED BARRIERS: JET GROUTING TRIFLUID grout water compressed air air water grout grout injection spoil water injection + annular injection of air grouted soil Column diameter: cm (groundwater poorly influent) Columns: vertical (max 10 )
31 GROUTED BARRIERS: JET GROUTING Parameters of the different systems
32 GROUTED BARRIERS: JET GROUTING COLUMN DIAMETER (m) Method Clays/silts Silty sands Gravels/sandy gravels Mono-fluid Bi-fluid Tri-fluid
33 GROUTED BARRIERS: JET GROUTING GROUTS: WATER-CEMENT, WC WATER-CEMENT-BENTONITE, CB WC Composition: System: mono-fluid bi-fluid tri-fluid W/C: Amount of mixture injected (spoil included) System: mono-fluid bi-fluid tri-fluid m³/m of column: ~ 0.2 up to 1 up to 1.5 Cement amount (spoil included) System : mono-fluid tri-fluid kg/m of column : coarse soil coarse soil fine soil fine soil
34 GROUTED BARRIERS: JET GROUTING Drilling distance, I Horizontal barrier: Vertical barrier: I/D = 0.71 I = D 2 S 2 D = column diameter, S = required barrier thickness Thickness of an horizontal (bottom) barrier: - The same of bottom liner of hazardous waste landfills - uplift verification needed
35 GROUTED BARRIERS: JET GROUTING CONSTRUCTION AND CONTROLS PILOT- TEST- (2-10 columns) Previous investigation : Soil stratigraphy Soil permeability After construction: - Check column diameter by excavation - Drilling into and out of columns => sampling for lab measures: - compressive strength - permeability
36 GROUTED BARRIERS: JET GROUTING CONTROLS DURING CONSTRUCTION - Revolving and drawing up velocity - Fluids pressure - Fluids flow rate - Spoil - Grout composition - Verticality of drilling
37 GROUTED BARRIERS: JET GROUTING Versatile technology (soils, depths, equipment) Risk of non-uniform diaphragm Quite large volume of spoil (to be cleaned or disposed) => high costs k = cm/s Useful for: - Site with difficult access or limited height - Artificial bottom barriers
38 BOTTOM BARRIER by JET GROUTING Jet grouting provides the best bottom barrier as: - Good control of grout column dimensions - good control on continuity of treatment - effective in any kind of soil - possibility to use cement grouts which has high chemical resistance (injection of grouts are possible only in coarse soils) The jetting is stopped to form short columns or disks beneath the contaminated soil
39 MIXED IN PLACE BARRIERS In situ mixing of soil and slurry Slurry = water+ bentonite or CB mixture Special equipment with generally three auger mixing hollow shafts, Simultaneous soil injection and mixing Partial overlapping => vertical barrier k dependent on the type of soil Risk of un-homogeneous k values K > 10-7 cm/s Bottom part cannot be inspected
40 STEEL SHEET PILE BARRIERS Constructed by driving interlocked sheet piles into the ground using single or double acting impact or vibratory pile drivers Thin barrier Suitable in loose soils, not in dense soil or bedrock Max depth = 30 m Issues: - Leakage through the interlocks (possible use of special GM joint) - compatibility with acids and salts - rapid placement => suitable for short term measures (emergency)
Compaction and Jet Grouting
Compaction and Jet Grouting Alan Ringen, PE Senior Vice President Breakthroughs in Tunneling Short Course August 16, 2017 Grouting Principles Geotechnical Grouting: The injection of pumpable fluid materials
More informationGrouting Bilfinger Spezialtiefbau GmbH
Grouting Bilfinger Spezialtiefbau GmbH Goldsteinstrasse 114 D-60528 Frankfurt Phone: +49 69 6688-345 Fax: +49 69 6688-277 Email: info.spezialtiefbau@bilfinger.com www.foundation-engineering.bilfinger.com
More informationConstruction Technology B (CON4313)
3 - Basement 1 Quick Revision 1.1 Problems arising from basement construction a. Excavation method. b. Surface and ground water control c. Lateral stability of basement excavation. d. Stability of adjoining
More informationCivil Engineering Construction I (CBE5031)
Civil Engineering Construction I (CBE5031) Basement 1 1 Quick Revision 1.1 Problems arising from basement construction a) Excavation method. b) Surface and ground water control c) Lateral stability of
More informationGround Improvement. Cutter Soil Mixing Multi-Axis Soil Mixing Deep Soil Mixing Jet Grouting Vibro Systems Specialized Geotechnical Grouting
Ground Improvement Cutter Soil Mixing Multi-Axis Soil Mixing Deep Soil Mixing Jet Grouting Vibro Systems Specialized Geotechnical Grouting www.malcolmdrilling.com Cutter Soil Mixing Multi-Axis Soil Mixing
More informationJET GROUTING Implenia Spezialtiefbau GmbH
JET GROUTING Implenia Spezialtiefbau GmbH Robert Bosch Straße 25 D-63225 Langen Phone: +49 6103 988 345 Fax: +49 6103 988 277 Email: info.spezialtiefbau@implenia.com www.foundation-engineering.implenia.com
More informationMisan University - College of Engineering Civil Engineering Department
CHAPTER 2 Soil and Excavations Soil investigation including two phases: surface investigation and subsurface investigation Surface investigation involves making a preliminary judgment about the site s
More informationDIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS
DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS Implenia Spezialtiefbau GmbH Robert Bosch Straße 25 D-63225 Langen Phone: +49 6103 988 345 Fax: +49 6103 988 277 Email: info.spezialtiefbau@implenia.com
More informationBrochure E. The Soilcrete Jet Grouting Process
Brochure 67-03 E The Soilcrete Jet Grouting Process Contents History...3 Soilcrete Jet Grouting Process... 4 Process Variations... 6 Construction Forms... 7 Construction Sequences... 8 Stabilisation...
More informationGolder Associates Innovative Applications (GAIA) Inc.
Golder Associates Innovative Applications (GAIA) Inc. Environmental and Geotechnical Applications of Cutter Soil Mixing RemTech October, 2007 Presented by: Brian Wilson www.gaiacontractors.com What is
More informationFigure (12.1) Foundation Grouting
Chapter 12 - Foundation Grouting 12. Foundation Grouting 12.1. Introduction: The construction of structures on weak ground often requires the soil to be improved in order to ensure the safety and the stability
More informationWater Well Decommissioning Guidelines
Water Well Decommissioning Guidelines Approval Date: June 1, 2007 Effective Date: September 10, 2007 Approved By: Gerard MacLellan Version Control: This is a new guideline I. Introduction The Water Well
More information> GRouTING systems. The experience and expertise to deliver the right grouting solution for the job. Grouting is the most diverse
> GRouTING systems The experience and expertise to deliver the right grouting solution for the job Grouting is the most diverse of all specialty geotechnical disciplines. It encompasses a range of individual
More informationJet Grout Soilcrete Stabilization Version 2006
Version 2006 GUIDE TECHNICAL SPECIFICATIONS JET GROUTING SOIlCRETE STABILIZATION (This technical specification is to be used to guide the writer in the contract requirements for Soilcrete Stabilization
More information#47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA)
#47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA) by Michael J. Carey Michael J. Fisher Steven R. Day Presented at: International Containment Technology
More informationAPPLICATIONS SOILFRAC SOILCRETE PERMEATION COMPACTION INFILL. Underpinning. Settlement Control. Settlement Reversal. Void Grouting.
Specialist Grouting GROUTING SOLUTIONS Keller Ground Engineering has sixty years grouting experience. Whether a common application or one that draws upon our unparalleled experience and creativity throughout
More informationTunnelling and Underground. Construction Technology
Construction Technology Course Lectures Part 2.2 Ground Improvement Dr Ákos TÓTH 1 Ground Treatment and Improvement In order to improve the construction process when tunnelling through poor ground, a double
More informationLIMITED MOBILITY GROUTING -- PRACTICE IN NORTH AMERICA. Michael Byle, D.GE, F.ASCE,
LIMITED MOBILITY GROUTING -- PRACTICE IN NORTH AMERICA Michael Byle, D.GE, F.ASCE, Overview INTRODUCTION COMPACTION GROUTING LIMITED MOBILITY GROUTING LMG MATERIALS AND TECHNOLOGY EQUIPMENT GROUT INJECTION
More informationWassara Jet grouting hammer. - Enabling single fluid jet grouting in difficult formations!
Wassara Jet grouting hammer - Enabling single fluid jet grouting in difficult formations! Jet grouting Jet grouting is a ground stabilization procedure which uses the principle of high velocity injection
More informationLesson 2 Substructure. Dr S.Sreenath BSc Engg, MSc Engg, MSc (ICM), MBA, PhD
Lesson 2 Substructure Dr S.Sreenath BSc Engg, MSc Engg, MSc (ICM), MBA, PhD Outline Syllabus 1. Demolition 2. Site problems 3. Substructure 4. Basements 5. Structural Frames 6. Floors 7. External walls
More informationGround Improvement. Martin G. Taube, P.E., P.G. February 4, 2003
ODOT Geotechnical Information Exchange Seminar Ground Improvement Martin G. Taube, P.E., P.G. February 4, 2003 Nicholson Construction Company 12 McClane Street Cuddy, PA 15031 ph. (412) 221-4500 fax (412)
More informationGround Improvement Techniques
GRD Journals Global Research and Development Journal for Engineering Recent Advances in Civil Engineering for Global Sustainability March 2016 e-issn: 2455-5703 Ground Improvement Techniques 1 Nimisha
More informationITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows:
ITEM 416 DRILLED SHAFT FOUNDATIONS 416.1. Description. This Item shall govern for the construction of foundations consisting of reinforced concrete drilled shafts and/or nonreinforced concrete drilled
More informationLesson 4. Construction Techniques and Materials. Learning Outcomes. Basic Construction
Lesson 4 Construction Techniques and Materials schnabel-eng.com Learning Outcomes Describe sequence of construction for a micropile Identify materials used to construct a micropile Describe principle function
More informationGROUND IMPROVEMENT GROUND TREATMENT USING GROUTING
Lecture 21 NPTEL Course GROUND IMPROVEMENT GROUND TREATMENT USING GROUTING Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Email: gls@civil.iisc.ernet.in
More informationSELF-HARDENING SLURRY STORY
THE SELF-HARDENING SLURRY STORY A simple idea that works for patient people. It may even work for less patient people. For those of you familiar with cement-bentonite slurry (CB), is similar but properties
More informationSITE INVESTIGATION. Foundation Engineering
SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface
More informationINNOVATIVE SLOPE STABILISATION BY USING ISCHEBECK TITAN SOIL NAILS
Dipl.-Wirt.Ing. Oliver Freudenreich Friedr. Ischebeck GmbH phone: ++49 2333 8305-0 Loher Str. 31 79 fax: ++49 2333 8305-55 e-mail: freudenreich@ischebeck.de D-58256 Ennepetal www.ischebeck.com INNOVATIVE
More informationSlurry Trench / Diaphragm Walls
UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Temporary Structures Slurry Trench / Diaphragm Walls CM 420 TEMPORARY
More information* The use of these areas can vary from car park space, where little waterproofing is required through to store rooms or plant rooms where a high
1 2 Demand for space in cities often makes it essential to use space below buildings. The concept of deep basement technology has been employed since the middle of last century, but is becoming more popular
More informationWalls generally range from 600 to 1500 mm thickness, in wide between 2000 and 3500 mm and can be excavated to depths of 60m or more.
TECHNOLOGY Diaphragm walls Diaphragm walls are one of the most important technologies of special foundation engineering. A diaphragm wall is constructed using a trench excavated in ground and supported
More informationNPTEL Course GROUND IMPROVEMENT USING MICROPILES
Lecture 22 NPTEL Course GROUND IMPROVEMENT USING MICROPILES Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Email: gls@civil.iisc.ernet.in Contents
More informationCivil Engineering Practice
Lecture # 5 Civil Engineering Practice Foundation Grouting Instructor: Engr. Dr. Attaullah Shah Department of Civil Engineering Swedish College of Engineering and Technology-Wah Cantt. 2 Grouting Grout
More informationSECANT PILE. Introduction:
SECANT PILE Introduction: Over the last few decades construction of retaining walls in urban areas has grown significantly, as a result of territorial and economical development of the cities. In most
More informationAppendix VIII. Guidelines for groundwater bores and wells
Appendix VIII Guidelines for groundwater bores and wells Appendix VIII Guidelines for groundwater bores and wells 1. Construction Bores used for water supply are normally constructed by drilling, either
More informationEMBANKMENT DAM SEEPAGE MODIFICATIONS CHOICES AND CONSIDERATIONS. John W. France, PE, D.WRE 1 ABSTRACT INTRODUCTION
This paper is reproduced from the Proceedings of the 2014 United States Society on Dams (USSD) Annual Conference, with the permission of USSD. EMBANKMENT DAM SEEPAGE MODIFICATIONS CHOICES AND CONSIDERATIONS
More informationJet Grouting for Seepage Control at Lac Des Iles (LDI) Water Management Facility
Jet Grouting for Seepage Control at Lac Des Iles (LDI) Water Management Facility Naresh Gurpersaud, P.Eng., M.ASCE, 1 Daniel Lees, P.Eng., 2 and Frank Hu, P.Eng. 3 1 Geo-Foundations Contractors, 302 Main
More informationSECTION STRUCTURAL EXCAVATION FOR STRUCTURES
1 1 1 0 1 0 1 0 1 SECTION 1. STRUCTURAL EXCAVATION FOR STRUCTURES BASED ON DFD MASTER SPECIFICATION DATED /1/1 P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all
More informationSUSTAINABLE FOUNDATION ENGINEERING MIXED-IN- PLACE TECHNIQUES FOR DURABLE CUT-OFF WALLS
SUSTAINABLE FOUNDATION ENGINEERING MIXED-IN- PLACE TECHNIQUES FOR DURABLE CUT-OFF WALLS Peter, BAUER Spezialtiefbau GmbH, Schrobenhausen, Germany, +49 8252 974266, +49 8252 971496, peter.banzhaf@bauer.de
More informationCOPYRIGHTED MATERIAL. Contents PART ONE: THEORY...1. Preface to the Third Edition xiii. About the Authors xv. Acknowledgements xvii
Preface to the Third Edition xiii About the Authors xv Acknowledgements xvii Contents PART ONE: THEORY...1 1. Groundwater in Construction...3 1.1 Groundwater in the Hydrologic Cycle 3 1.2 Origins of Dewatering
More informationGROUND ENGINEERING. Vibro Ground Improvement
Vibro Ground Improvement Deep vibro techniques present flexible solutions for soil improvement. They are mainly used under foundations of structures that are to be constructed on soils of low bearing capacity
More informationCONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02
More informationmtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida
mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,
More informationFINAL DRAFT. The Use of Filter Press Tests in Soil-Bentonite Slurry Trench Construction
Reference: Ruffing, D.G., Evans, J.C., Spillane, V.A., and Malusis, M.A., (2016). The Use of Filter Press Tests in Soil-Bentonite Slurry Trench Construction, ASCE GeoChicago Sustainability, Energy, and
More informationDiaphragm wall Construction
Diaphragm wall Construction Diaphragm wall is a continuous wall constructed in ground in to facilitate certain construction activities, such as: a) As a retaining wall b) As a cut-off provision to support
More informationCVO/169897A OCTOBER 30, PLASTIC CONCRETE CUTOFF WALL
SECTION 02276 PLASTIC CONCRETE PART 1 GENERAL 1.1 SECTION INCLUDES A. Construction of a deep plastic concrete cutoff wall. The cutoff shall be constructed by excavation with slurry through soil (earth
More informationHISTORY TECHNOLOGY EXAMPLES OF APPLICATIONS
ROCK-SOIL TECHNOLOGY AND EQUIPMENTS HISTORY TECHNOLOGY EXAMPLES OF APPLICATIONS THE JET GROUTING www.pacchiosi.com - 1 TABLE OF CONTENTS 1. Introduction. p. 3 2. History and development of the method.
More informationCETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE
CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE 1.0 GENERAL 1.1 Scope A. This specification guideline covers the technical requirements for furnishing all labor, materials, equipment, and incidentals
More informationForensics by Freezing
Forensics by Freezing Joseph A. Sopko, Ph.D., P.E., M.ASCE Moretrench American Corporation, 100 Stickle Avenue, Rockaway, NJ 07866, e-mail: jasopko@moretrench.com ABSTRACT Subsurface conditions in water
More informationTECHNICAL SPECIFICATION BIO-POLYMER SLURRY DRAINAGE TRENCH CONSTRUCTION GROUNDWATER COLLECTOR TRENCH
TECHNICAL SPECIFICATION BIO-POLYMER SLURRY DRAINAGE TRENCH CONSTRUCTION GROUNDWATER COLLECTOR TRENCH (This technical specification is to be used to guide the writer in the contract requirements for Bio-Polymer
More informationSoil Improvement by Compaction Grouting
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 31-3223.12 Soil Improvement by Compaction Grouting Part 1 - General 1.01 Introduction
More informationBrochure E. Deep Vibro Techniques
Brochure 1-2 E Deep Vibro Techniques Deep vibro techniques present flexible solutions for soil improvement. They are mainly used under foundations of structures that are to be constructed on soils of low
More informationGround Freezing for Tunnel, Shafts, and Adits
Ground Freezing for Tunnel, Shafts, and Adits Joseph A. Sopko, Adam Curry Moretrench American Corporation Bianca Messina Skanska USA Civil Stephen Njoloma McMillen Jacobs Associates ABSTRACT Construction
More informationProceedings of the 10 th Australia New Zealand Conference on Geo-Mechanics, Common Ground Brisbane Australia, October 2007
Page 1 of 6 Proceedings of the 10 th Australia New Zealand Conference on Geo-Mechanics, Common Ground Brisbane Australia, October 2007 Vertical groundwater barriers for contaminated site reclamation Christopher
More informationPost-Grouting of Drilled Shaft Tips on the Sutong Bridge: A Case History
Post-Grouting of Drilled Shaft Tips on the Sutong Bridge: A Case History Dr. Osama Safaqah 1, P.E., Robert Bittner 2, P.E. & Xigang Zhang 3 1 Project Manager, Ben C. Gerwick, Inc., 20 California Street,
More informationSPECIFICATION FOR JET GROUTING
SPECIFICATION FOR JET GROUTING 1.0 GENERAL The Specialist Contractor shall construct jet grout columns of nominal diameter and spacing as specified in the drawing(s) to the requirements of the Contract.
More informationDistribution Restriction Statement Approved for public release; distribution is unlimited.
CECW-EG Engineer Regulation 1110-1-1807 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design PROCEDURES FOR DRILLING IN EARTH EMBANKMENTS ER 1110-1-1807
More informationGEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE
GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE Prof. J. N. Mandal Department of civil engineering, IIT Bombay, Powai, Mumbai 400076, India. Tel.022-25767328 email: cejnm@civil.iitb.ac.in Module - 4
More informationScope of Discussion. Foundation Related Issues. Foundation Preparation and Treatment During Dam Construction 10/14/2014
Foundation Preparation and Treatment During Dam Construction John W. France, PE, D.WRE URS Corporation Denver, Colorado October 14, 2014 1 Scope of Discussion Broad discussion of treatment of foundations
More informationCOPYRIGHT. Sand Control Fundamentals. Virtual Instructor Led Session #2
Sand Control Fundamentals Non-Gravel Pack Applications Virtual Instructor Led Session #2 Open Hole with Slotted Liner Open Hole with Screen or Prepacked Screen Slotted liners and screens in a non-gravel
More informationPreliminary Concepts for Soil-Bentonite Cutoff Wall Topock Compressor Station, Needles, California
TECHNICAL MEMORANDUM Preliminary Concepts for Soil-Bentonite Cutoff Wall Topock Compressor Station, Needles, California DATE: April 14, 2004 Pacific Gas and Electric Company (PG&E) is undertaking an expedited
More informationSECTION GEOTECHNICAL INSTRUMENTATION
SECTION 13510 GEOTECHNICAL INSTRUMENTATION PART 1 GENERAL 1.1 WORK INCLUDED A. This section covers the work necessary for furnishing and installing new piezometers, movement monuments, and inclinometers
More informationBrochure 66-01E. Compaction Grouting
Brochure 66-01E Compaction Grouting Contents The method on the market... 3 Process description... 4 Soil improvement... 6 Foundation rehabilitation... 8 Cavity grouting... 10 2 Development The compaction
More informationLarge-diameter bored piles and Large-hole drillings Applications
Large-diameter bored piles and Large-hole drillings Applications Implenia Spezialtiefbau GmbH Robert Bosch Straße 25 D-63225 Langen Phone: +49 6103 988 345 Fax: +49 6103 988 277 Email: info.spezialtiefbau@implenia.com
More informationAn Introduction to Keller in the UK COLCRETE EURODRILL GETEC PHI GROUP. Piling and Ground Improvement. Grouting, Soil Nails and Anchors
An Introduction to Keller in the UK Piling and Ground Improvement Grouting, Soil Nails and Anchors Retaining Walls Equipment Manufacture Monitoring and Instrumentation PHI GROUP GETEC COLCRETE EURODRILL
More informationTECHNOLOGY. Continuous Flight Auger
TECHNOLOGY Continuous Flight Auger CFA (Continuous Flight Auger) technology joins the advantages of driven piles with the versatility of application of drilled piles. Moreover, a wide range of diameters
More informationMulti-Institutional Academic Health Science & Research Center Evansville, IN
SECTION 02370 AUGER CAST PILES PART 1 - GENERAL 1.1 SECTION INCLUDES: The work covered by these specifications consists of furnishing all labor, equipment and materials for the installation of auger cast
More informationJune i TABLE OF CONTENTS
June 2005 - i - 05-526 TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION... 1 1.1 Purpose of the Investigation... 1 1.2 Description of the Project and Scope of Work... 1 1.3 Site Geology... 1 1.4 Site Description
More informationCHAPTER 5 WELL CONSTRUCTION
CHAPTER 5 WELL CONSTRUCTION Wells Shallow ( < 15 meters) Deep ( > 15 meters) Shallow Wells Include Dug wells Kanats Vertical wells Horizontal wells They are drilled by: digging, boring, driving, and jetting
More informationTRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)
PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without
More informationThe Soilcrete Jet Grouting Process
The Soilcrete Jet Grouting Process Brochure 67-03 E ? Contents 3 History 4 Soilcrete Jet Grouting Process 6 Process Variations 7 Construction Forms 8 Construction Sequences 10 Stabilisation 11 Sealing
More informationJet Grouting to Increase Lateral Resistance of Pile Group in Soft Clay
GROUND MODIFICATION, PROBLEM SOILS, AND GEO-SUPPORT 265 Jet Grouting to Increase Lateral Resistance of Pile Group in Soft Clay Kyle M. Rollins 1, Matthew E. Adsero 2, and Dan A. Brown 3 1 Prof. Civil &
More informationtwenty four foundations and retaining walls Foundation Structural vs. Foundation Design Structural vs. Foundation Design
ALIED ARCHITECTURAL STRUCTURES: STRUCTURAL ANALYSIS AND SYSTEMS DR. ANNE NICHOLS SRING 2018 lecture twenty four Foundation the engineered interface between the earth and the structure it supports that
More informationDEPARTMENT OF THE ARMY ER U.S. Army Corps of Engineers CECW-CE Washington, DC Regulation No March 2006
DEPARTMENT OF THE ARMY ER 1110-1-1807 U.S. Army Corps of Engineers CECW-CE Washington, DC 20314-1000 Regulation No. 1110-1-1807 1 March 2006 Engineering and Design PROCEDURES FOR DRILLING IN EARTH EMBANKMENTS
More informationBackground. AEM Tier 2 Worksheet Farmstead Water Supply Evaluation. AEM Principle: Glossary
AEM Tier 2 Worksheet Glossary Casing: Steel or plastic pipe installed while drilling a well, to prevent collapse of the well bore hole and the entrance of contaminants, and to allow placement of a pump
More informationBauer Jet Grouting. Process
Bauer Jet Grouting Process Advantages of the Jet Grouting Process During the jet grouting process, the soil surrounding the drill string is eroded by a high energy fluid jet and mixed with a self hardening
More informationSOIL IMPROVEMENT TO MITIGATE SETTLEMENTS. H. R. AI-Alusi,' Member, ASCE
Reprinted from Vertical and Horizontal Deformations of Foundations and Embankments Proceedings of Settlement '94 Sponsored by the Geotechnical Engineering Div.lASCE Held June 16-18, 1994, College Station,
More informationSlurry walls for the rehabilitation disposal sites
Slurry walls for the rehabilitation disposal sites of land J, C. Evans Department of Civil and Environmental Engineering, Bucknell Universi~, USA Abstract Slurry trench cutoff walls have been used as vertical
More informationNorth End and South End Section Hauled Wastewater Receiving Facilities Page 1 Bid Opportunity No
Hauled Wastewater Receiving Facilities Page 1 Part 1 General 1.1 SECTION INCLUDES.1 Materials and installation for sewage force mains. 1.2 RELATED SECTIONS.1 CW 2110 Watermains and all specifications referenced
More informationAssalamualaikum & Good Morning (May All Of You Gain A Better Understanding)
Assalamualaikum & Good Morning (May All Of You Gain A Better Understanding) Always Try To Do The Best In Your Life TYPES OF FOUNDATION TYPES OF FOUNDATION a) Shallow Foundation System i) Spread Foundation
More informationA Case Study: Foundation Design in Liquefiable Site
RESEARCH ARTICLE OPEN ACCESS A Case Study: Foundation Design in Liquefiable Site Tahar Ayadat* *(Department of Civil Engineering, College of Engineering, PMU University, P.O. Box 1664, Al-Khobar, 31952,
More informationUNIT V RETAINING WALLS RETAINING WALL 2.5. Retaining walls are structures used to retain earth or water or other materials such as coal, ore, etc; where conditions do not permit the mass to assume its
More informationTechnical Data Sheet NEC/GRAN/95:01
Technical Data Sheet NEC/GRAN/95:01 Installation Guidance Notes Granular Surround Note : These guidance notes refer only to the installation of Granular surround underground tanks. These guidance notes
More informationSoil Services SCS Ferretti International Soil Services Soil Services Industrial Construction Infrastructures Real Estate Soil Services Soil Services
COMPANY PROFILE Soil Services position in the industry of Special Subterranean and Deep Foundations is based on the successful combination of skills, knowledge and experience of its employees and partners.
More informationtwenty six concrete construction: foundation design ELEMENTS OF ARCHITECTURAL STRUCTURES: FORM, BEHAVIOR, AND DESIGN DR. ANNE NICHOLS SPRING 2013
ELEMENTS OF ARCHITECTURAL STRUCTURES: FORM, BEHAVIOR, AND DESIGN DR. ANNE NICHOLS SPRING 2013 lecture twenty six concrete construction: www.tamu.edu foundation design Foundations 1 Foundation the engineered
More informationSand Control. Gravel packing is the oldest and simplest method of sand control. Works in both on and off shore wells.
Sand Control Marine deposited sands, most oil and gas reservoir sands, are often cemented with calcareous or siliceous minerals and may be strongly consolidated. In contrast, Miocene or younger sands are
More information3.5 GEOLOGY, SOILS, AND GROUNDWATER
TIER II DRAFT ENVIRONMENTAL IMPACT STATEMENT 3.5 GEOLOGY, SOILS, AND GROUNDWATER The analyses conducted in this section of the Tier II Draft EIS focus on the potential impacts on adjacent resources. Potential
More informationRemedial Foundation Solutions for Existing Tanks
Remedial Foundation Solutions for Existing Tanks 2009 Aboveground Storage Tank Management Conference and Trade Show September 11, 2009 Houston, Texas Presentation Types of Settlement Remedial Methods Grouting
More informationCHAPTER 32 - WELL ABANDONMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted September 5, Part 1 Introduction...2
CHAPTER 32 - WELL ABANDONMENT ORDINANCE OF DUBUQUE COUNTY, IOWA Adopted September 5, 1989 Table of Contents Page Part 1 Introduction...2 32-1 Purpose...2 32-2 Applicability...2 32-3 Definitions...2 32-4
More informationSTANDARD SPECIFICATION Section Auger-Grout Injected Piles Civil Engineering Group Revised: August, 2000
DIVISION 2: SITE WORK SECTION 02320 AUGER-GROUT INJECTED PILES STANDARD SPECIFICATION PART 1 GENERAL 1.0 DESCRIPTION OF WORK This work shall include all excavation, concrete, equipment and accessories
More information1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.
MTS Jack and Bore Design Criteria Note: For the purposes of this Design Criteria and subsequent Construction Notes, the term Jack and Bore is used generically to refer to a number of trenchless construction
More informationSECTION GRAVEL PACKED WATER WELL
SECTION 02520 GRAVEL PACKED WATER WELL PART 1 GENERAL 1.01 SECTION INCLUDES A. Gravel packed water well includes drilling, installing, cleaning, developing, testing, videoing, abandoning, and site clean
More informationModular Course on Foundations and Earth retaining Structures for Building and Infrastructure Projects 9th March 2000
The Institution of Engineers of Ireland Modular Course on Foundations and Earth retaining Structures for Building and Infrastructure Projects 9th March 2000 MODULE 4 RETAINING STRUCTURES DEEP EXCAVATIONS
More informationCONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF
More informationCONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 November 2015 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT TABLE OF CONTENTS D 422.01 D 422.02 D 422.03
More information