Aurora Genmounts Install LT Installation Manual
|
|
- Oswin Cross
- 5 years ago
- Views:
Transcription
1 Aurora Genmounts Install LT Installation Manual
2 TABLE OF CONTENTS 1.0 INTRODUCTION 2.0 PRODUCT OVERVIEW 3.0 TECHNICAL SPECS 4.0 INSTALLER RESPONSIBILITY 5.0 SITE SELECTION 6.0 TOOLS REQUIRED 7.0 COMPONENT LIST 8.0 ASSEMBLY, INSTALLATION & GROUNDING INSTRUCTIONS 9.0 MAINTENANCE 10.0 CERTIFICATIONS
3 WARNING The Patriot Genmounts Aurora mounting LT mounting system system is engineered is engineered and tested and tested to withstand to withstand specifications specifications when installed when installed properly. properly. Failure Failure to install to install properly properly may decrease may decrease the performance the performance of the installation of the or installation void the warranty. or void the warranty. SAFETY All regional safety requirements should be be followed when installing the Genmounts. Patriot Aurora. All equipment/tools All should should be properly be properly maintained and and inspected inspected prior prior to use. to use. This This installation manual is intended for use by professional installers with a a working knowledge of of construction principals. principles.
4 1.0 Introduction The purpose of of this document is is to to provide instructions on on how to to properly install the Genmounts Aurora racking LT Racking system. System. 2.0 Product Overview Patriot Genmounts offers a offers low profile a low easy profile installation easy installation solar mounting solar mounting system to system be used to on be the used ground on the or ground on flat or roofs. on flat All roofs. Patriot All Genmounts components are components made from are uncoated made 5052 from uncoated H32 aluminum, 5052 H32 but custom aluminum, materials but custom and finishes materials can and be used finishes at the can customers be used at request. the customers request. The key components of hte Genmounts Aurora racking LT Racking system are System the following: are the following: Ballast & South Pans Bonding Compression Clamps Hardware Features of of the technologically advanced Aurora Genmounts racking system LT Racking are: System are: 1. Lightweight stackable aluminum mounting pans that provide attachment of two (2) modules per pan 2. Two (2) connections per pan maximum 3. Complete electrical bonding at all connection points per pan 4. Low installation labor costs 3.0 Technical Specs All materials are made from non-corrosive materials, stainless steel or or aluminum, with a a product warranty of ten (10) (15) years.
5 4.0 Installer Responsibility The installer is responsible for the following: Complying with all the applicable local local or national or national codes codes including any any that that may may supersede the relevant requirements stated in in this manual. Ensuring that the Aurora Genmounts system components system components are appropriate are appropriate for the particular for the particular installation and installation the installation and the environment installation environment Ensuring that the selected structure can support the Genmounts system under actual Ensuring that the selected structure can support the Aurora system under actual environmental loading conditions environmental loading conditions. Using only Genmounts approved parts and installer supplied parts as specified by Using Genmounts. only Aurora Substitution approved parts parts and may installer void the supplied warrantyparts as specified by Patriot. Substitution Ensuring Genmounts parts may void systems the warranty. are not installed on roofs with a slope greater than 3. Ensuring (Unless approved Aurora systems by EOR) are not installed on roofs with a slope greater than 3 degrees (unless Ensuring approved racking by allows EOR.) for proper thermal expansion and contraction properties by Ensuring placing a racking break in allows the array for proper every 100 thermal feet. expansion (utilize alternate and contraction mounting properties holes in racking) by placing Ensuring a break safe installation the array of every all electrical 100 feet. aspects (Utilize of alternate the Solar mounting PV System holes in racking.) Ensuring safe the installation shall of all be electrical conducted aspects by qualified of the Solar service PV System. personnel only Ensuring the installation shall be conducted by qualified service personnel only. 5.0 Site Selection Proper preparation of of the the ground or building rooftop must be be ensured for a well-performing system to to be be installed. For ground mount applications, the Aurora Genmounts system LT will system typically will be typically mounted be on mounted a flat surface on a flat or slightly surface graded or slightly surface graded facing surface South. facing South. For rooftop mount applications, the Genmounts LT system must be mounted on a debris free For rooftop mount applications, the Aurora system must be mounted on a debris free surface that surface that passed inspection for structural support and can withstand the additional pv array passed load. inspections for structural support and can withstand the additional pv array load. General guidelines include: Choose a clear area free of shading Prepare a well-drained pad of no more than five (5) degree slope west to east and zero (0) degrees north to south Suggested three (3) foot border surrounding array
6 6.0 Materials and Tools Required The following tools are required for the installation of the Aurora Genmounts system: LT system: Open end, 7/16 Box Wrench 3/8 Drive Socket Wrench and 7/16 Deep Sockets Suggested impact wrench, torque 12ft. lbs (144 in.lbs.) String line Concrete or stone ballast (project specific wind load analysis shall be used to determine minimum weight requirements)
7 7.0 Component List The aurora Genmounts system LT contains system the contains following the parts: following parts: Pans (Ballast Pan & South Pan) Top-Down Compression Bonding Mid Clamp Top-Down Compression Bonding End Clamp 18-8 Stainless Steel Hardware (1/4-20 serrated flange nut,1/4"-20 serrated flange screw) Ballast Pan South Pan Top-Down Compression Bonding Mid Clamp Top-Down Compression Bonding End Clamp
8 18-8 Stainless Steel Hardware 1/4"-20 Serrated Flange Screw 1/4"-20 Serrated Flange Nut
9 8.0 ASSEMBLY AND INSTALLATION INSTRUCTIONS Step Step 1: 1: Install Install Aurora Genmounts South Pans LT South Pans SOUTH PAN (TYP) EAST WEST LINE 1. Strike an east - west reference line to mark the beginning of the array. 2. Place free edge of end pan along east west line ensuring the pans remain square. a. a pre-measured spacer the length of the module can be used to predetermine pan spacing east to west. 3. Install ballast block in pans to secure location and prevent movement.
10 Step 2: 2: Install Install Aurora Genmounts Ballast Pans LT Ballast Pans 1. Install ballast pans as per site specific ballast plan and continue to populate the array. a. use a pre-cut spacer, the length of the short side of the module, to space pans north to south. 2. Adding ballast block to pans as they are laid out helps ensure minimal displacement of pans while assembling array. (repeat process, see below) BALLAST PAN W/ BLOCK (TYP)
11
12 Step 3: Install Modules 1. Install modules starting at south edge, using the flanges of the pan to ensure the module is mounted square to the pans. (see images below) a. the next pan to the north can be pushed up against the frame of the module to ensure the rack is properly installed under the module. South Side North Side
13 Step 4: Install Bonding Top-Down Compression Clamps 1. Install top-down compression bonding mid clamps utilizing the 1/4"-20 serrated flange screw and nut through clamp and secure module to the racking by fastening the clamp. (Clamp model shown as representation of installation sequence. Actual clamp may vary.) a. torque hardware to 12 ft. lbs. b. use the middle of the (3) supplied mounting holes on the ballast pans, unless roof conditions dictate otherwise. 2. Utilize the bonding end clamps on the edge of the array as shown.
14 End row mounting condition: Aurora Genmounts pans have LT pans additional have mounting additional holes mounting located holes near the located edge of near the pan the edge which of are the to be pan used which when are to terminating be used when an individual terminating row an of a individual sub-array. row This of reduces a sub-array. the amount This which reduces the pan the extends amount past which the the module pan extends and decreases past overall the module array dimensions. and decreases overall array dimensions. The image below depicts the optional mounting location for row termination.
15 Step 5: Repeat Process to Populate Array 1. Install remaining ballast block as per construction documents and ensure all hardware has been properly installed and torqued to 12 ft. lbs.
16 Step 6: Grounding General Notes: The The modules modules and and pans pans are all are electrically electrically bonded bonded together, together, left right left and to right front and to back front to to form back one to single form structure. one single However, structure. each However, sub-array each needs sub-array to be properly needs grounded to be properly from ANY grounded single point from on ANY that sub-array single to point an appropriate on that sub-array grounding to source. an appropriate Patriot s Aurora grounding system source. is certified Genmounts to a short LT circuit system fuse is rating certified of 419 to Amps a short maximum. circuit fuse One rating (1) ground of 419 connection Amps maximum. is required One per (1) sub-array ground rated connection at a maximum is required of 419 per Amps. The sub-array grounding rated conductor at a maximum shall be a of copper 419 Amps. #10 AWG The wire. grounding **Please conductor confirm with shall an be electrician, a copper as #10 this is their AWG responsibility. wire. **Please confirm with an electrician, as this is their responsibility** The graphics below depict typical grounding details. Option 1: Option 2:
17 9.0 Maintenance 1. Genmounts recommends a yearly inspection of all PV systems performed by an installer. Special attention shall be paid to loose or corroded electrical or mechanical connections and verify proper grounding. 2. The installer shall adequately spot check the torque of all the fasteners. 3. In the unusual event that a PV module or racking component must be replaced or retorqued, proceed with the same care as during the initial installation. 4. The installer shall also verify that all ballast blocks are: a. free from damage or degradation b. properly positioned in the pans c. installed according to the plans and calculations of the project Genmounts Renewable Energy Holdings 97 River Road 2 nd Floor Flemington, NJ T: F: Version Certification Patriot s Aurora
GROUND MOUNT INSTALLATION MANUAL
GROUND MOUNT INSTALLATION MANUAL Contents DISCLAIMER 1 CHECKLIST 2 1. ERECT BASe 3 2. CONNECT PIPES 3 3. PLACE RAILS 4 4. SECURE LUGS 4 5. CLAMP MODULES 5 DIAGONAL BRACES (OPTIONAL) 6 UNDER CLAMPS (OPTIONAL)
More informationASSEMBLY INSTRUCTIONS COMMERCIAL ROOF SOLUTIONS D DOME RAILLESS 2 SYSTEM. UL 2703 Listed System USA
ASSEMBLY INSTRUCTIONS COMMERCIAL ROOF SOLUTIONS D DOME RAILLESS 2 SYSTEM UL 2703 Listed System USA TABLE OF CONTENTS TABLE OF CONTENTS SAFETY REGULATIONS MATERIALS REQUIRED BONDING AND GROUNDING FIRE RATING
More informationMounting systems for solar technology
Mounting systems for solar technology ASSEMBLY INSTRUCTIONS CROSSRAIL TILT KIT 7 / 0 / 5 TILT FOR LOW-SLOPE AND STEEP-SLOPE ROOFS TABLE OF CONTENTS TABLE OF CONTENTS THE COMPANY SAFETY REGULATIONS MATERIALS
More informationInstallation Guide EcoFoot5D High Density 5-Degree Ballasted Racking System Document No. ES10560
Installation Guide Installation Guide EcoFoot5D High Density 5-Degree Ballasted Racking System Document No. ES10560 Rev 1.0, September 2017 Sales: 740-249-1877 Sales@EcolibriumSolar.com Field Support:
More informationInstallation Guide EcoFoot2+ 10-Degree Ballasted Racking System Document No. ECO-002_850. Rev 1.6, January 2018
Installation Guide EcoFoot2+ 10-Degree Ballasted Racking System Document No. ECO-002_850 Rev 1.6, January 2018 Sales: 740-249-1877 Sales@EcolibriumSolar.com Field Support: 866-488-6794 FieldSupport@EcolibriumSolar.com
More informationPRR. Flush Mount Racking System. Installation Manual
PRR Flush Mount Racking System Installation Manual Release, September 2014 Table of Contents 1. Introduction 1.1 Product Overview 1.2 About This Manual 1.3 Product Liability 1.4 Standards Compliance 1.5
More informationPRB. Flush Mount Racking System. Installation Manual
PRB Flush Mount Racking System Installation Manual Released 5th April 2015 TABLE OF CONTENTS 1. INTRODUCTION 1.1 Product Overview 1.2 About This Manual 1.3 Product Liability 1.4 Standards Compliance 1.5
More informationPV-ezRack Trapezoidal Installation Guide V2.0
PV-ezRack Trapezoidal Installation Guide V2.0 Introduction Clenergy s PV-ezRack Trapezoidal is the most simple and cost-effective flat roof mounting system suitable for trapezoid metal sheet roof. The
More informationBallasted Roof Mounting Installation Manual
Ballasted Roof Mounting Installation Manual www.ironridge.com 800-227-9523 Rev C, July 2012 This manual s part #: BRM-MAN-IM Copyright 2012 IronRidge, Inc. All rights reserved. 2 Ballasted Roof Mounting
More informationSTP Mount Series. Installation Manual. STP-LSCR-MAN 2017 Edition v1.0. For models: STP-SCR/045 STP-SCR/060 STP-SCR/070 STP-LCR/090 STP-LCR/120
Installation Manual STP-LSCR-MAN 2017 Edition v1.0 For models: STP-SCR/045 STP-SCR/060 STP-SCR/070 STP-LCR/090 STP-LCR/120 Table of Contents Introduction... 1 Customer Support... 1 Tools Required... 2
More informationFor HatiCon Solar Mounting System only
Washer, Electrical Equipment Bond WEEB Patent Pending INSTALLATION INSTRUCTIONS For HatiCon Solar Mounting System only Please read carefully before installing. Burndy LLC. recommends that the sufficient
More informationPV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual
PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual Series 200 UL Introduction Series 200 UL Introduction SnapNrack Series
More informationWasher, Electrical Equipment Bond. WEEB Patent Pending INSTALLATION INSTRUCTIONS. For POWER-STRUT Mounting System only
Washer, Electrical Equipment Bond WEEB Patent Pending INSTALLATION INSTRUCTIONS For POWER-STRUT Mounting System only Please read carefully before installing. Burndy LLC recommends that the sufficient details
More informationSWH Solar Racking Ground Mount Installation Guide
Version 16.02.v1 SWH Solar Racking Ground Mount Installation Guide Installer responsibility The installer is solely responsible for: Complying with all local or national building codes, including any that
More informationGroundTrac. Installation Manual
APPLICATION: The GroundTrac system is designed with a minimum amount of installed footings at greatly reduced labor. The system integrates with ordinary 1-1/2 schedule #40 galvanized water pipe. This ground
More informationASSEMBLY INSTRUCTIONS RESIDENTIAL SOLUTION CROSSRAIL GROUND MOUNT SYSTEM USA
ASSEMBLY INSTRUCTIONS RESIDENTIAL SOLUTION CROSSRAIL GROUND MOUNT SYSTEM USA TABLE OF CONTENTS TABLE OF CONTENTS SAFETY REGULATIONS MATERIALS REQUIRED ASSEMBLY ENGINEERING DRAWINGS TERMS AND CONDITIONS
More informationFor Silverback Solar
Washer, Electrical Equipment Bond WEEB Patent Pending INSTALLATION INSTRUCTIONS For Silverback Solar Please read carefully before installing. Wiley Electronics recommends that the sufficient details of
More informationmoment Engineering + Design Warwick Avenue, Suite #C5 Fairfax, VA Phone: Web:
CrossRail48SConnector RE: CrossRail48SConnectorEvaluation DesignReferenceDocuments MinimumDesignLoadsforBuildingsandOtherStructures 2010AluminumDesign MetalCurtainWallFasteners Overview Methods&DesignParameters
More informationModular. Lighter. Quicker.
Modular. Lighter. Quicker. PR-1 2.0 Ballasted Rooftop Mounting System Installation Manual *Supports all 60 and 72-cell Framed Modules. Table Of Contents Table Of Contents 1. Introduction 4 1.1 Product
More informationRadiant Solar Tripod Planning and Installation Guide V1.2 With Australia AS/NZS1170.2
Radiant Solar Tripod Planning and Installation Guide V1.2 With Australia AS/NZS1170.2 The Solar Tripod System has been developed as a universal system for roof-mounting on flat roofs. The use of patented
More informationRadiant PV-RoofTopRac System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT
Radiant PV-RoofTopRac System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT 2-2012 The PV-RoofTopRac System has been developed as a universal system for roof-mounting on pitched roofs.
More informationDynoRaxx EVOLUTION PR Quick Guide Installation Steps
DynoRaxx EVOLUTION PR Quick Guide Installation Steps Publication Number 100611 866.620.2410 dynoraxx.com Installer Responsibilities: Thank you for choosing Evolution PR, a revolutionary technology for
More informationInstallation and Users Manual
Installation and Users Manual *Please read carefully. This document is binding for any warranty case. * Any installed PV system less than 500m from coastline, please refer to the Near-coast installation
More informationINSTALLATION GUIDE REV2016NOV15 DOCUMENT REVISION HISTORY - INTERNAL USE ONLY - NOT FOR PUBLIC RELEASE REVISED EQUATIONS - PAGE 1 - ADDITIONAL CHANGES
INSTALLATION GUIDE DOCUMENT REVISION HISTORY - INTERNAL USE ONLY - NOT FOR PUBLIC RELEASE REVISION DATE 2016MAY31 2016OCT17 2016NOV15 Notes / Changes INITIAL RELEASE REVISED EQUATIONS REVISED EQUATIONS
More informationCOUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT PHOTOVOLTAIC PERMITTING GUIDELINES
COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT Mike Lara Building Official PHOTOVOLTAIC PERMITTING GUIDELINES PLANS AND PERMITS In order to minimize installation problems, plans must be provided that
More informationPRU-D INSTALLATION MANUAL MONO-LEG SYSTEM. PRU-D / Portrait - Revision B July 31 st, 2017 Polar Racking Inc.
PRU-D INSTLLTION MNUL MONO-LEG SYSTEM Table of Contents Table of Contents... 2 1. Safety... 3 Basic Safety Considerations... 3 Warnings and Symbols... 3 Responsibilities of the Installer... 3 Responsibilities
More informationBenefits in Speed and Logistics using the RL System. snapnrack.com
Benefits in Speed and Logistics using the RL System snapnrack.com Agenda About SnapNrack Overview of Residential Solar Mounting Systems Benefits of railless systems What you should look for in a railless
More informationTABLE OF CONTENTS (CONT):
TABLE OF CONTENTS: Tools & Specifications System Components System Level Fire Code Compliance Locate Array & Place Bays Place Ballast Place Modules & Attach Clamps Attach Clamps Module Installation & Wire
More informationA. Division 01: Administrative, procedural, and temporary work requirements apply to this section.
Copyright 2016 Metal Roof Innovations, Ltd. www.s-5.com SECTION 26 31 00.01 PHOTOVOLTAIC COLLECTOR ATTACHMENT SYSTEM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Photovoltaic Collector Attachment
More informationRISE Certified Solar Roofing Professional (CSRP) Job Task Analysis August 2011 RISE CERTIFIED SOLAR ROOFING PROFESSIONAL (CSRP) JOB TASK ANALYSIS
RISE CERTIFIED SOLAR ROOFING PROFESSIONAL (CSRP) JOB TASK ANALYSIS Primary Objective: Given a proposed roof-mounted photovoltaic (PV) system design, a solar roofing professional will apply essential knowledge,
More informationTABLE OF CONTENTS (CONT):
TABLE OF CONTENTS: System Components System Level Fire Code Compliance Attach Module Clips Locate Array / Set-Up On Roof Module to RM Bay Instructions Module to RM Bay instructions - Cont. Module Clip
More informationPermitting and Inspecting PV Systems. PV Codes and Standards 101. Photovoltaic System Basics
Permitting and Inspecting PV Systems Presented by Bill Brooks, PE Brooks Engineering PV Codes and Standards 101 What are the applicable codes and standards for PV systems? Electrical codes - NEC Article
More informationSECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph
More informationPV-ezRack SolarMatrix Pro
PV-ezRack SolarMatrix Pro Planning and Installation Guide Contents 1 Introduction 2 2 Installation Tools & Components 4 3 Installation Instruction 6 4 Service 10 1. Introduction PV-ezRack SolarMatrix Pro
More informationUnirac Code-Compliant Installation Manual
Planning and Assembly Installer responsibility The installer is solely responsible for: Complying with all local or national building codes, including any that may supercede this manual. Ensuring that
More informationRadiant PV-Solar Tripod System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT
Radiant PV-Solar Tripod System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT 2-2012 The PV-Solar Tripod System has been developed as a universal system for tilt solar panel roof-mounting
More informationTRAPEZOIDAL SHEET METAL RAIL LIFT/VARIO for trapezoidal sheet metal roofs
Photovoltaic mounting systems Assembly Instructions TRAPEZOIDAL SHEET METAL RAIL LIFT/VARIO for trapezoidal sheet metal roofs 1 Table of contents 1 Introduction 1.1 Intended use 3 1.2 About the document
More informationINSTALLATION GUIDE ROOF MOUNT PUB15JUL09. NOTE: Refer to construction drawings for project specific details. Construction drawings have
RM ROOF PUB15JUL09 NOTE: Refer to construction drawings for project specific details. Construction drawings have precedence over these installation guidelines. SYSTEM COMPONENTS 1 TECHNICAL DATA SHEET
More informationPV-ezRack SolarTerrace III-A Installation Guide V1.2
PV-ezRack SolarTerrace III-A Installation Guide V1.2 CONTENT 1. Introduction...2 2. Tools & Components...3 3. Installation Guide. 10 4. Service..12 Clenergy Australia 11/20 Duerdin St, Clayton VIC 3168
More informationInstallation Instruction for DMEGC Photovoltaic Module
Content 1. PURPOSE... 1 1.1 GENERAL TERM... 1 2. SAFETY PRECAUTIONS FOR SOLAR PV SYSTEM INSTALLATION... 3 3. INSTALLATION CONDITION... 4 3.1 INSTALLATION LOCATION AND WORKING CONDITIONS... 4 3.2 SELECTION
More informationINSTRUCTIONS FOR ASSEMBLING NEBS FLOODED RACKS
INSTRUCTIONS FOR ASSEMBLING NEBS FLOODED RACKS Publication No. US-NEBS-IM-003 September 2013 INSTRUCTIONS for ASSEMBLING NEBS FLOODED RACKS Read all instructions carefully and observe all warnings before
More informationMounting systems for solar technology
Mounting systems for solar technology ASSEMBLY INSTRUCTIONS S-DOME SYSTEM GB TABLE OF CONTENTS TABLE OF CONTENTS THE COMPANY SAFETY REGULATIONS MATERIALS REQUIRED TOOLS REQUIRED ASSEMBLY 2 3 4 5 8 9 Table
More informationASSEMBLY INSTRUCTIONS for DATASAFE TM HX and HX FRONT TERMINAL UBC BATTERY RACKS
US-HXRACK-IM-002 ASSEMBLY INSTRUCTIONS for DATASAFE TM HX and HX FRONT TERMINAL UBC BATTERY RACKS Read all instructions carefully and observe all warnings before installation. See Installation, Operation
More informationSECTION DUALGARD SNOW GUARDS
Copyright 2016 Metal Roof Innovations, Ltd. www.s-5.com SECTION 07 72 53 DUALGARD SNOW GUARDS This section has been prepared by Metal Roof Innovations, Ltd. for use in the preparation of a project specification.
More informationDPA Solar Racking Solutions Ground Mount Installation Guide V1.5
DPA Solar Racking Solutions Ground Mount Installation Guide V1.5 Introduction It is important to note that the installer is responsible for the following: Complying with all applicable local or national
More informationObjectives and Task Analysis for the Installer of Grid Connect Photovoltaic System
Objectives and Task Analysis for the Installer of Grid Connect Photovoltaic System Introduction This document presents an in-depth task analysis (job analysis or key skills analysis) for practitioners
More informationR Scale: 3/32 = 1-0. Scale: 3/32 = 1-0
145-0 SIGN SCHEDULE A1 A2 A3 B C D E F G B G F A1 INTERNALLY ILLUMINATED CHANNEL LETTERS INTERNALLY ILLUMINATED CHANNEL LETTERS INTERNALLY ILLUMINATED CHANNEL LETTERS D/F INTERNALLY ILLUMINATED MONUMENT
More informationPV-ezRack SolarTerrace III
PV-ezRack SolarTerrace III Planning and Installation Guide Complying with AS/NZS1170.2:2011 Contents 1 Introduction 2 2 Installation Tools & Components 3 3 Installation Guide 5 4 Service 11 1. Introduction
More informationSnapNrackTM GROUND MOUNT CODE COMPLIANT INSTALLATION MANUAL
SnapNrackTM PV MOUNTING SYSTEM GROUND MOUNT CODE COMPLIANT INSTALLATION MANUAL Table of Contents 1. INTRODUCTION...2 1.1 Overview of the Ground Mount System...2 1.2 Overview of this manual...3 1.3 Your
More informationMOUNTING SYSTEMS PRODUCT CATALOG
MOUNTING SYSTEMS PRODUCT CATALOG MOUNTING SYSTEMS Reliable solar modules support Mounting systems, as solar modules supporting equipment, represent an important part of the final solar solution. Integrated,
More informationBulletin Grounding and bonding of solar photovoltaic systems Rules , , , and
Bulletin 64-2-0 Grounding and bonding of solar photovoltaic systems Rules 64-064, 64-066, 64-068, 64-070 and 64-222 Scope (1) Introduction (2) Grounding of solar photovoltaic system output, ac grounding
More informationRack-in-a-BoxTM INSTALLATION MANUAL
INSTALLATION MANUAL TM 1.0 INTRODUCTION 3 2.0 PRODUCT RANGE 4 2.1 Systems 4 2.2 Accessories 4 3.0 PREPARATION FOR INSTALLATION 5 3.1 Applications 5 3.2 Tools for Installation 5 3.3 Additional Materials
More informationSTRUCTURAL REPORT. Magerack Series 101 PV Mounting System. 130 mph Wind, Exposure B & C. California DESIGNER OF RECORD
STRUCTURAL REPORT Magerack Series 101 PV Mounting System 130 mph Wind, Exposure B & C California DESIGNER OF RECORD Magerack Corporation 4453 Enterprise Street Fremont, CA 94538 Date: January 1, 2015 S
More informationMounting systems for solar technology
Mounting systems for solar technology ASSEMBLY INSTRUCTIONS S-DOME SYSTEM GB TABLE OF CONTENTS TABLE OF CONTENTS THE COMPANY SAFETY REGULATIONS MATERIALS REQUIRED TOOLS REQUIRED ASSEMBLY 3 4 5 8 9 Table
More informationTallSlateTM Grandee Installation Manual
TallSlateTM Grandee Installation Manual PLEASE READ THIS GUIDE COMPLETELY BEFORE INSTALLING OR USING THE SOLAR ELECTRIC MODULES Disclaimer of Liability...2 General Information...2 General Safety...2 TM
More informationMRac Tile Roof Installation Guide
MRac Tile Roof Installation Guide Tile Interface 117HA AS/NZS1170.2 Content 1. Product Introduction-------------------------------------------------------P2 2. Installation Tools& Components---------------------------------------P3
More informationTindo Karra. Installation and Specifications Manual. Introduction
Tindo Karra Installation and Specifications Manual Introduction Thank you for choosing a Tindo Solar Module. Background to our name TINDO Tindo is a word from the Kaurna warra Aboriginal language which
More informationUNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:
SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section. 1.2 SUMMARY A. This Section
More informationSunground. pole Mount System MADE IN ONTARIO
Sunground pole Mount System Disponible chez / Available at : REMATEK-Energie 514-333-6414 info@rematek-energie.com www.rematek-energie.com MADE IN ONTARIO DESIGN AND AESTHETICS Opsun Structural SOLIDITY
More informationSECURE. UNIVERSAL. MOUNTING. Tilt Kit Installation Manual
SECURE. UNIVERSAL. MOUNTING Tilt Kit Installation Manual 1.0 INTRODUCTION... 3 2.0 KITS / PRODUCT RANGE... 4 2.1 Leg Kits... 4 2.2 Rail Kits... 4 3.0 PREPARATION FOR INSTALLATION... 5 3.1 Applications...
More informationSPECIAL SPECIFICATION 6664 Level (3) Communications System
2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6664 Level (3) Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Level (3) Communications,
More informationSPECIAL SPECIFICATION 6658 Time Warner Communications System
2004 Specifications CSJ 1200-05-014 1. Description. SPECIAL SPECIFICATION 6658 Time Warner Communications System A. This Item will govern the installation of all facilities belonging to Time Warner Cable
More informationZS880 Linear Shower Drain Installation Instructions
Introduction PATENT PENDING The Zurn ZS880 Stainless Steel Linear Shower Drain incorporates a simple approach to bathroom shower design, when compared to traditional point-drain applications. The linear
More informationThe Racking System Designed By Installers for Installers
The Racking System Designed PV Racking Ground System Installation Instructions Key benefits: Easy installation. No clamps! No more straining to lean over and fasten bolts! Module installation time is far
More informationMounting systems for solar technology
Mounting systems for solar technology SSEMLY INSTRUCTIONS SINGLEHOOK 1.1 SINGLEHOOK VRIO STINLESS STEEL ROOF HOOKS WITH DPTER G GENERL SFETY INFORMTION Please note that our general mounting instructions
More informationSection 2: Underground
Section 2: Underground GENERAL INSTALLATION REQUIREMENTS FOR UNDERGROUND FACILITIES Underground electric service and meter location will be established by NHEC upon site visit. In some instances the type,
More informationBuilding and Safety Division Public Information
B&S STD E-18 Solar Photovoltaic (PV) Systems Revised: January, 2017 The following document outlines the requirements for the issuance of building and electrical permits for solar photovoltaic systems.
More informationSUBMITTAL REQUIREMENTS FOR EXPEDITED ROOF TOP SOLAR PERMITTING
KERN COUNTY PUBLIC WORKS DEPARTMENT CRAIG M. POPE, P.E., DIRECTOR 2700 M STREET BAKERSFIELD, CA 93301-2370 ADMINISTRATION & ACCOUNTING OPERATIONS & MAINTENANCE BUILDING & DEVELOPMENT ENGINEERING Phone:
More informationSECTION GROUNDING
SECTION 16450 GROUNDING PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies general grounding and bonding requirements of electrical and telecommunication installations for personnel safety, equipment
More informationOVERHEAD SERVICES - SECONDARY
OVERHEAD SERVICES - SECONDARY Contents - Overhead Services... O-1 General Requirements for Overhead Service... O-2 Names of Parts for Overhead Service... O-3 Service Attachment on an Unguyed Service Mast...
More informationSECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System
SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF MODULAR PAN SYSTEM PART 1 GENERAL 1.1
More informationifix INSTALLATION MANUAL PV flat roof installation system Version
ifix PV flat roof installation system INSTALLATION MANUAL Version 2012-09-06 ifix Installation Manual Version 2012-09-06 Seite 1 Table of contents Table of contents... 1 Special characteristics of ifix...
More informationSECTION FACILITY LIGHTNING PROTECTION
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 41 00 FACILITY LIGHTNING PROTECTION SPEC WRITER NOTE: Delete between //----//if not applicable to project. Also delete any other item or paragraph not applicable
More informationMonocrystalline Solar Module LGXXXS1C(W)-G4. Installation Instructions MFL
Monocrystalline Solar Module LGXXXS1C(W)-G4 Installation Instructions MFL69021001 Table of Contents 1. Safety 3 2. Before & After Installation 4 3. Electrical Installation 4 4. Mechanical Installation
More informationV 2.0 ASSEMBLY GUIDE. TS Platform Scale Series 2
V 2.0 ASSEMBLY GUIDE Series 2 TABLE OF CONTENTS OVERVIEW General Specifications...1 Cautions and Disclaimers...1 Contents of Kit...1 Tools Required For Assembly...2 Time Required to Assemble...2 ASSEMBLING
More informationPRG INSTALLATION MANUAL
PRG INSTALLATION MANUAL Table of Contents Table of Contents... 2 1. Safety... 3 Basic Safety Considerations... 3 Warnings... 3 Responsibilities Of The Installer... 3 Responsibilities Of The Operator...
More informationAdjustable S-Tile Installation Manual
Adjustable S-Tile Installation Manual Contents Check List SolaRack Components Marking Recommended Spacing Mounting Instructions: Portrait Mounting Instructions: Landscape Grounding & Electrical Diagram
More informationClenergy ezrack SolarRoof Code-Compliant Planning and Installation With Australia AS/NZS1170
Clenergy ezrack SolarRoof Code-Compliant Planning and Installation With Australia AS/NZS1170 The ezrack has been developed as a universal system for roof-mounting on pitched roofs. The use of patented
More informationINSTALLATION MANUAL. All Types F Series Rev G
INSTALLATION MANUAL All Types - 1570 F Series Page 1 of 16 TABLE OF CONTENTS DESCRIPTION PAGE GENERAL INFORMATION & ADVISORIES 2 PRODUCT INFORMATION 3 GET TO KNOW YOUR CBU 4 HARDWARE AND COMPONENTS 5 CONCRETE
More informationInspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)
TOOLKIT DOCUMENT #7 Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan) This document has two sections. Neither section is all-inclusive
More informationEssex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationOWNER S MANUAL SERIES MDS-96-BK, SM, DR
SERIES MDS-96-BK, SM, DR OWNER S MANUAL Introduction... 1 Bill of Materials... 2 Assembly Instructions. 3 Warranty....12 IMPORTANT NOTES, WARNINGS AND SAFETY INSTRUCTIONS Ensure that all employees understand
More informationPhotovoltaic Module Grounding:
Photovoltaic Module Grounding: Issues and Recommendations Greg Ball BEW Engineering Tim Zgonena, Chris Flueckiger Underwriters Laboratories, Inc. Solar ABCs Stakeholder Meeting October 21, 2011 Dallas,
More informationBUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466
BUSWAY LOW VOLTAGE (POW-R-WAY III) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein
More informationStealth Residential Roof Mount System Installation Manual
www.pvracking.com Stealth Residential Roof Mount System Installation Manual 2703 Listed PV Mounting System Table of Contents OVERVIEW OF COMPONENTS... 3 COMPONENTS... 3 OVERVIEW... 6 PV STEALTH ROOF INSTALLATION...
More informationL SERIES NEBS COMPLIANT STANDBY BATTERY RACKS ASSEMBLY INSTRUCTIONS
RETURN RECYCLE RS 1942 LEAD L SERIES NEBS COMPLIANT STANDBY BATTERY RACKS ASSEMBLY INSTRUCTIONS General: These instructions detail the proper procedure for installing C&D Technologies' Powercom Division
More informationF500 Steeplechase Waterjump with Valve Option
Gill Athletics www.gillathletics.com Phone: (800) 367-3090 Fax: (217) 367-8440 Excavation F500 Steeplechase Waterjump with Valve Option Installation Guide Read all instructions before installing!!! Establish
More informationFLORIDA PHOTOVOLTAIC BUILDINGS PROGRAM
FLORIDA PHOTOVOLTAIC BUILDINGS PROGRAM Mounting Methods for Rooftop Photovoltaic Arrays Shingle, Tile, and Metal Roofing Systems Florida Solar Energy Center 1679 Clearlake Road Cocoa, Florida 32922 February
More informationStructural Criteria for Residential Rooftop Solar Energy Installations
Structural Criteria for Residential Rooftop Solar Energy Installations STEP 3 Expedited Structural Criteria Use of this document This toolkit document includes a list of structural criteria for over-the-counter
More informationWHY VG-Solar. Material. Standard. Installati. Quality. Environs. Guarante
WHY VG-Solar VG-solar support people with a desire to have available to them. Deliver mounting solutions with freedom, flexibility, fewer cost and guide you through the design process from beginning to
More informationSECTION LOW-VOLTAGE TRANSFORMERS
PART 1 GENERAL 1.1 DESCRIPTION SECTION 26 22 00 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between // // if not applicable to project. Also, delete any other item or paragraph not
More informationSPORTSBEAMS 1500 LED USER MANUAL SPORTSBEAMS LIGHTING, INC. v.1.0
SPORTSBEAMS 1500 LED USER MANUAL v.1.0 SPORTSBEAMS LIGHTING, INC. 1.888.905.6680 WWW.SPORTSBEAMS.COM TABLE OF CONTENTS INTRODUCTION...1 SAFETY WARNINGS...2 POWER SUPPLY Wiring Diagram....3 Fuse Ratings....3
More informationUniversal Elevator Mount Owners Manual
REQUIRED TOOLS AND MATERIALS: 2 Capable Adults Universal Elevator Mount Owners Manual 1-00-spalding Carpenter s Level 15 Tape Measure Pencil Adult Assembly Required. This manual, accompanied by sales receipt,
More informationWelcome to Douglas County PUD
Welcome to Douglas County PUD We are committed to providing the best possible utility services at the lowest possible cost consistent with sound business principles. To better serve you, please fill out
More informationA. Division 01: Administrative, procedural, and temporary work requirements apply to this section.
Copyright 2015 Metal Roof Innovations, Ltd. www.s-5.com SECTION 07 72 53 COLORGARD SNOW GUARDS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Snow guards for metal roofs. 2. [Non-penetrating] [Face
More informationSECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS
SECTION 11000 MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 DESCRIPTION A. This section contains general information required to install mechanical equipment as shown on the plans and
More informationBERNALILLO COUNTY SOLAR PACKET
BERNALILLO COUNTY Planning & Development Services 111 Union Square SE, Suite 100 Albuquerque, NM 87102 (505) 314-0350 Fax: (505) 314-0480 www.bernco.gov SOLAR PACKET This packet contains: Building Permit
More informationClean Energy Creating A Bright Future
Clean Energy Creating A Bright Future Clean Energy Creating A Bright Future XIAMEN HOPERGY PHOTOVOLTAIC TECHNOLOGY CO.,LTD. ADD: 1001 Unit, No. 2366, Fangzhong Rd, Huli, Xiamen, 361015 P. R. China Tel:+86-592-5689685
More information