1 Contractor Health, Safety and Environment Guidelines (Pacific Region) Table of Contents

2 Introduction and Overview Page CBRE Health and Safety Policy 3 Introduction 4 General Contractor Requirements 4 Induction 6 Contractor Safety Guidelines Page Confined Spaces 7 Contractor Vehicles 7 Drugs and Alcohol 7 Electrical Safety 8 Emergency Procedures 8 Fire Protection 8 First Aid 9 Hazard, Incident and Injury Reporting 9 Hazardous Materials 9 Hazardous Chemicals 9 Health and Safety Performance Monitoring 10 Hot and Cold Works 10 Housekeeping 11 Manual Handling 11 Noise 12 Permits to Work 12 Personal Protective Equipment 12 Plant Isolation 13 Plant Safety 13 Restricted Access Areas 14 Working At Heights 14 Working with Insulated Sandwich Panelling 15 Appendices Page Contractor SWMS Review Checklist 17 Contractor Sign Off Page Health and Safety Induction SIGN OFF 18 Version: 3 Date Printed: 05/04/2016 Page: 2 of 18

3 CBRE Health, Safety and Environmental Policy At CBRE we are committed to the health, safety and welfare of all our staff and to the parties affected by our undertakings, including contractors, tenants and visitors. CBRE are similarly committed to protection of the environment. We recognise that our commitment to the management of health, safety and environment (HSE) is a critical component of our overall business strategy. It is an important part of the value added services we offer to clients, which sets us apart from our competitors. Commitments As part of our overall HSE program, CBRE is committed to: Establishing measurable objectives and targets to ensure continued improvement aimed at minimisation of work related injury, illness and environmental impact; Complying, where appropriate, with relevant HSE legislation, codes of practice, standards and guidelines applicable to CBRE; Assigning responsibility for HSE management to all staff levels within the organisation; Documenting, implementing and communicating the HSE Policy to all staff and other interested parties; Providing adequate resources, including training of staff, to ensure the HSE program is appropriately implemented; Seeking, valuing and incorporating staff opinions in relation to decision making processes impacting HSE management; Actively promoting and developing initiatives to improve HSE performance across CBRE; Making the HSE Policy readily accessible to all staff and interested parties; and Periodically reviewing the HSE program, including the HSE Policy, to ensure it remains relevant and appropriate given the nature of our business. Objectives The key objectives of our HSE program are: To minimise work related injuries; To have effective and meaningful consultation with staff and other relevant parties regarding issues that affect their health, safety and welfare; To implement a HSE risk management program which, where reasonably practicable, identifies, assesses and controls HSE risks generated by the undertakings of our business, and To provide all staff and other relevant parties with appropriate HSE systems, information, training, instruction and supervision to ensure work is conducted in the safest and most environmentally friendly manner possible Authorised Tom Southern President and CEO Pacific Dated: 5 th October 2011 Version: 3 Date Printed: 05/04/2016 Page: 3 of 18

4 INTRODUCTION CBRE is committed to ensuring the health and safety of their contractors, as well as to protection of the environment. CBRE has established a Health, Safety and Environmental (HSE) Management System (HSEMS) to assist in meeting this commitment. The purpose of these guidelines is to provide an overview of the CBRE HSEMS and contractor requirements. Please note that these guidelines are not intended to be exhaustive, nor do they seek to replace the requirement for contractors to have in place their own comprehensive health and safety policies and procedures. All contractors, sub-contractors and their employees engaged by CBRE, or conducting works at CBRE managed premises or offices, are obliged to assist CBRE in complying with all statutory requirements in relation to HSE as well as the CBRE or client specific HSE MS. GENERAL CONTRACTOR REQUIREMENTS Contractor Pre-Qualification Requirements Prior to commencement of works, all contractors engaged by CBRE are required to meet the CBRE Pre-Qualification Requirements. In summary, the following must be provided by the contractor: Evidence of appropriate insurance cover (for example workers compensation, public liability and (where appropriate) professional or products indemnity); For major contractors (defined below) the contractor must complete and return to CBRE the Major Contractor Evaluation Checklist. For minor contractors (defined below), the contractor must complete and return to CBRE the Minor Contractor Evaluation Checklist. A copy of their HSE Policy and HSE Management System; and Copies of site specific safe work method statements (SWMS), risk assessments or job safety analyses (JSAs) relating to the works they have been engaged to perform. Note: The SWMS must comply with the requirements of the attached SWMS Review Form prior to allowing access to site. Definitions For the purposes of this document, the following definitions apply. If you are uncertain as to whether you are a major or minor contractor please contact CBRE who will clarify this for you. Version: 3 Date Printed: 05/04/2016 Page: 4 of 18

5 Major Contractor Minor Contractor A company where the contract may be characterised by the following: Risk: Contracts involving multiple high risk activities such as construction work and major refurbishments are classified as major. More sophisticated management systems are expected when engaging contractors to perform high risk work. Complexity: Where a contract involves the use of subcontractors, suitable systems of selection and supervision will apply to subcontractors. Where the use of subcontractors is likely, the contract should be classified as high risk. Duration: Contracts which extend beyond 1 month or are established on an ongoing basis are considered sufficiently large to expect that contractors have formalised HSE management systems which reflect the type of work they are performing. A company where the contract may be characterised by the following: Risk: Contracts involving low to medium risk activities such as minor maintenance work and repairs are classified as minor. Less sophisticated management systems are expected when engaging contractors to perform low to medium risk work. Complexity: Where work is performed by a small business with no subcontractors, the level of complexity is reduced; therefore the contract is classed as minor. Duration: Contracts which are short term such as a few hours on site, or are one-off contracts are not required to have formalised H&S management systems. However, the small business will be expected to provide CBRE with a risk assessment of the planned works. General Requirements In general contractors, sub-contractors and their employees are responsible for ensuring the following: All works are carried out in accordance with all relevant HSE legislation, codes of practice, Australian and New Zealand Standards and guidance notes; They adhere to site specific policies and procedures, the requirements outlined in this document, all statutory requirements as well as their own HSE policies and procedures; Providing appropriate training and supervision of their employees; Meeting the CBRE contractor prequalification requirements and providing the necessary documentation to CBRE prior to the commencement of work; In relation to CBRE managed premises or offices: making contact with the CBRE site contact prior to the commencement of work. The purpose of making such contact is to advise CBRE of when the contractor will be on site, to complete site inductions, sign attendance registers and gain access keys/passes to the property etc. Where the site does not have a CBRE representative on site the contractor is responsible for ensuring they have completed a site induction and gain the necessary access keys/cards and permits prior to commencing works at the property. Version: 3 Date Printed: 05/04/2016 Page: 5 of 18

6 Prior to commencement of work, contractors are required to identify health and safety hazards associated with the specific work being undertaken and to identify and implement appropriate control strategies. SWMS must be reviewed and revised in consultation with workers prior to work commencing if they do not adequately address the task or risks. INDUCTION In relation to CBRE managed premises: prior to commencement of work on site, all contractors shall attend a site induction which may include information on the following: Review and explanation of this document Details on relevant CBRE HSE policies, procedures and requirements Site emergency procedures Hazard and incident reporting procedures First aid procedures Hazards associated with the task and with the location of the task Location of hazardous materials Security and access Site specific risks Specific site hazards and requirements Inductions are required to be reviewed at least two yearly, when site conditions change significantly or contractors personnel change. In certain circumstances, face-to-face induction at remote or unattended sites is often not possible. In these cases, induction may be undertaken by providing relevant information to the contractor using alternative means, including phone, fax and , using written information (including risk assessments and JSA s), graphics, photographs, videos etc. CONFINED SPACES Any contractors accessing confined spaces must be appropriately qualified to access such environments. Qualified contractors engaged in works in areas classified as confined spaces shall conduct a pre-entry risk assessment prior to entering the space in question. The pre-entry risk assessment shall take into consideration the following: The nature and inherent hazards of the confined space; The work required to be done, including the need to enter the confined space; The range of methods by which the work can be done; Version: 3 Date Printed: 05/04/2016 Page: 6 of 18

7 The hazards involved and the associated risks involved with the actual method selected and equipment proposed to be used; Emergency response procedures; The competence of persons to undertake the work, and Selection of appropriate control measures to be taken prior to entry into the confined space. Upon the completion of the review of the pre-entry risk assessment, a confined space entry permit shall be obtained from CBRE. The confined space entry permit shall be completed accordingly and shall include: Precautions and clear instructions for the safe entry and execution of work; Confirmation that a necessary stand-by person will be present; The names of persons entering the confined space; and The equipment being introduced into the confined space. Upon the completion of works, the confined space entry permit shall be completed with all persons and equipment accounted for. Under no circumstances shall confined spaces be entered without completing a CBRE Confined Space Permit. All work in confined spaces shall be conducted in accordance with AS 2865 Safe Working in a Confined Space. CONTRACTOR VEHICLES Contractors bringing work vehicles onto CBRE managed properties shall observe all site speed limits where they are imposed and shall not block any access or egress points to and from the premises. All loads must be appropriately secured. All parking signage shall be adhered to where posted and where required, vehicle site permits must be obtained from CBRE and displayed in the windscreen of the contractor vehicle. DRUGS AND ALCOHOL Alcohol and non-prescription drugs are not permitted onto, or to be consumed on, whilst under the engagement of CBRE, or whilst undertaking works at a CBRE managed property. Any person suspected to be under the influence or in the possession of such substances will be requested to leave the property and immediately cease works. ELECTRICAL SAFETY Immediately prior to the commencement of any work involving electrical equipment, contractors must notify CBRE to define the scope and limits of work. Where possible, work is not to be undertaken on energised electrical equipment. Works must not must not commence without full implementation of lockout procedures (refer to the plant isolation section for more information). Where work on energised equipment is unavoidable, work must isolated equipment, contractors undertaking this work must be suitably qualified/licensed and must consider the requirements of all relevant Australian Standards and Codes of Practice. Version: 3 Date Printed: 05/04/2016 Page: 7 of 18

8 Appropriate safety tags including danger (tags and/or locks) and out of service tags are to be provided by the contractors. Out of Service tags must only be removed by an authorised person once a competent person confirms the item is fit for service. All persons working on electrical installations must affix their own personal danger tag and ideally, personal lock and remove it upon completion. Personal danger tags/locks must not be removed by anyone other than the person who attached it. Equipment must only be re-energised when all tags are removed, relevant checklists completed, and it is safe to do so. All electrical leads shall be connected to the nearest electrical point and not be overloaded. Where the building is not fitted with RCD protection, a portable RCD must be used. All power tools and leads are to be tested and tagged by a licensed electrician prior to being brought on site, and then reviewed on a monthly basis. Leads must be located and protected to prevent damage from vehicles, hot equipment, falling objects, water etc. and must be fitted with earth leakage devices. Leads must be suitably positioned to ensure they do not create a trip hazard. EMERGENCY PROCEDURES Prior to commencing work on a CBRE managed premises or a CBRE office; the contractor shall inform CBRE of their presence on site. CBRE shall ensure that the contractor is appropriately inducted with regard to the site evacuation and location of emergency assembly points. Should an emergency evacuation drill occur whilst the contractor is on site, the contractor shall ensure that they follow all instructions communicated by fire wardens and participate in the emergency evacuation drill. FIRE PROTECTION Fire protection requirements must be considered prior to the commencement of work. The contractor must conduct work in a manner so as to prevent the proliferation of fire. This may involve careful selection of tools, work methods and materials. Contractors are also responsible for ensuring flammable liquids remain closed when not in use and be stored in appropriate facilities. A Hot Work Permit is required for any activity likely to produce a source of ignition. Any impairment to Fire Services must be discussed with CBRE and a Fire Impairment Notification Form submitted. FIRST AID Prior to the commencement of work, the contractor shall ensure that provisions are available for prompt treatment in the event of an injury. In general contractors are expected to supply their own first aid equipment. In an emergency, first aid equipment may be available on site either via CBRE building management or the tenants, however, availability is not guaranteed should be confirmed prior to commencing work. HAZARD, INCIDENT AND INJURY REPORTING Any hazard or incident affecting health and safety or the environment must be reported immediately to CBRE. An incident report form is available from your CBRE contact. Version: 3 Date Printed: 05/04/2016 Page: 8 of 18

9 The contractor shall comply with the relevant state legislative requirements for reporting of incidents and accidents to the relevant health and safety regulatory body. HAZARDOUS MATERIALS Where hazardous materials are present, CBRE will provide the contractor with relevant details, location and condition of such materials. Usually, such information will be provided via the hazardous materials register for the property. If the site is not attended by a CBRE representative, the contractor shall seek instructions as to the location of such register. Any work on hazardous materials shall only be undertaken by an appropriately licensed and qualified contractor and in compliance with statutory requirements. If any asbestos or asbestos-like material is found or suspected, any works must cease immediately and CBRE must be contacted as soon as possible. HAZARDOUS CHEMICALS Where contractors are required to use, handle and/or store hazardous chemicals on site, the contractor is responsible for the appropriate use, storage and safe keeping of these chemicals. A risk assessment must be completed in relation to all hazardous chemicals used by the contractor and provided to CBRE prior to the commencement of work. Where control measures have been outlined in the risk assessment, these shall be implemented on site. Contractors are responsible for ensuring that their workers have been provided with the appropriate training for the storage, use and handling of hazardous chemicals. Hazardous chemicals shall be stored, handled and labelled in accordance with all relevant statutory requirements. Where hazardous chemicals are required to be stored on site and a current safety data sheets (SDSs) shall be made available. HSE PERFORMANCE MONITORING Non-compliance with the requirements of these guidelines or any other site specific requirements may result in the suspension of personnel and/or termination of the contract. Contractor HSE performance may be monitored via one or more of the following means: Inspections of the work area to ensure compliance with health and safety documentation and/or legislative requirements. Submission of reports detailing hazards, incidents and injuries occurring on the work site; Review of contractor insurances and licenses; Such monitoring may be undertaken by any contracting staff member by CBRE at any time. HOT AND COLD WORKS General Requirements Prior to the commencement of any hot and/or cold works, a risk assessment shall be completed by the contractor. Such a risk assessment must take into consideration the following (at a minimum): Version: 3 Date Printed: 05/04/2016 Page: 9 of 18

10 The nature and inherent hazards of the hot or cold work activity; The work required to be done, including the need to conduct the hot or cold work; The hazards involved and the associated risks involved with the hot or cold work and equipment proposed to be used; Fire and emergency response procedures, and The competence of persons to undertake the work. Hot Works A Hot Work Permit shall be obtained from CBRE and completed prior to engaging in any hot work. Hot work is defined as any work involving open flames producing heat and/or sparks. This includes, but is not limited to: Brazing and Soldering; Cutting. Grinding; Thawing pipe; Torching; Welding Hot work shall be undertaken in accordance with the following requirements: All equipment shall be in good repair; Ensure that all hazardous areas surrounding the hot work area are isolated or otherwise controlled so as to prevent the ignition of any materials, contaminants, agents or conditions that may be harmful to a person or property; Whilst hot work is being carried out, the contractor is to ensure that one or more firewatch persons are present to ensure that no nearby items are ignited. The fire-watch person(s) must be assessed as being a competent person and must remain in close proximity to the hot work area and be capable of continuous communication with the person conducting the hot work; Within 10 metres of the work the following apply: Ground swept clean of combustibles; Combustible floors and fittings wet down, covered with damp sand, metal or other shields; No combustible materials or flammable liquids shall be present; Combustible materials or liquids appropriately shielded, or Means of collecting and containing sparks is in place. When work is to be undertaken on enclosed equipment it shall be cleaned of all combustibles and purged of flammable vapours; Fire extinguishing equipment shall be available for the duration of the works and at least one hour after the completion of works On completion of work, the contractor is to acknowledge in writing that the work has been completed and all persons involved in the work have left the work area safely. The firewatch person(s) must also conduct checks of the hot works area (e.g. routine checks, security patrols etc) for 60 minutes (or more) after the work has been completed to ensure the hot work area is safe. This is to be documented on the Hot Work Permit. Welding A Hot Works Permit is required for any welding works. Gas cylinders used for oxy-acetylene or oxy- LPG welding must be securely fixed in an appropriate trolley and kept upright at all times. Welding equipment shall be fitted with flashback arresters and a fire extinguisher must be located in close Version: 3 Date Printed: 05/04/2016 Page: 10 of 18

11 proximity to welding or grinding works (persons conducting such works trained in the use of the extinguishers). Cold Works A Cold Work Permit shall be obtained from CBRE prior to engaging in any cold work. HOUSEKEEPING Contractors shall maintain a high standard of housekeeping at any premises in which they are conducting works. It is the responsibility of the contractor to maintain their materials, tools and other equipment in an orderly manner on site. All debris and waste resulting from contractor activity on site shall be removed by the responsible contractor. All materials and debris must be lowered and not dropped from elevated locations and platforms. All materials, tools and waste shall be located so as to reduce risks to health and safety prior to leaving the site daily. Working areas, stairways, passages and emergency exits must be kept clear of obstructions at all times. If required, working areas must be barricaded off and appropriate warning notices erected. MANUAL HANDLING Incorrect lifting techniques can cause serious injuries and accidents. Prior to the commencement of work, contractors must establish safe manual handling methods in accordance with state regulations. Contractors and their employees shall be appropriately trained in their organisations safe manual handling methods, along with training on the use of any lifting aids provided. NOISE Noisy works are not permitted between 7.30am and 6.00 pm weekdays (excluding public holidays). Such works outside these hours must be authorised by CBRE. Notification of such works will be issued to the building occupants at the discretion of the CBRE and the property owner. The contractor is responsible for signposting work areas requiring hearing protection and for ensuring such protection is available and used by all persons entering into that area when noisy works are in progress. PERMITS TO WORK Permits to work are required prior to commencement of any of the following: Working at Heights Confined Space Entry Hot Work Cold Work Riser Access Core Holing/Chasing Working with Insulated Sandwich Panelling Version: 3 Date Printed: 05/04/2016 Page: 11 of 18

12 Isolation of Fire Systems Any other specific tasks that may be specified by CBRE from time to time. The relevant permit will be provided to the contractor by CBRE. The originals are to be maintained by the contractor completing the works. A copy of the permit is to be returned at the completion of works and will be signed off by the contractor s personnel. Note permits cannot be issued and authorised by the same person. PERSONAL PROTECTIVE EQUIPMENT (PPE) The contractor shall: Assess the suitability of the PPE, prior to the commencement of works, required to allow them to undertake the works safely; Outline any personal protective equipment required in the control methods on the contractor risk assessment/swms/jsa documents, which are submitted to CBRE prior to works; Supply PPE appropriate for the hazards identified; Supervise the use and maintenance of the PPE; Ensure that all PPE complies with current legislation, Australian Standards and Codes of Practice; and Ensure that PPE is worn in accordance with contractor s health and safety procedures or signage throughout the property. PLANT ISOLATION General Lock Out and Tag Out (Out of Service Tags) Where plant is identified as unserviceable, faulty, requiring repairs or maintenance, or where the plant is to be isolated for an extended period, an out of service tag is to be placed on the plant by the contractor. Should such a tag be applied by a contractor, CBRE must be immediately informed. Any repair, maintenance, inspection or modification tasks will require specific locks and tags to be applied. Contractors are responsible for removal of such tags (if applied by them) only once the item is fit for service. Maintenance Lock Out and Tag Out (Danger Tags) Contractors are to ensure plant is isolated, locked out and tagged out prior to and for the duration of any repair, maintenance, inspection or modification tasks. Sources of energy which require isolation including electrical, stored pressure, thermal, pneumatic, hydraulic, or mechanical hazards, must be monitored by the contractor for the duration of the lock out and tagged out phase. Isolation of plant and the application of locks and danger tags are to be undertaken by the contractor if they are working on the item of plant. Before work commences the isolation and lock outs are to be verified by the contractor undertaking the works for effectiveness. Before each lock and tag is removed the contractor is to verify no other person will be exposed to a hazard. Where an item of plant is left unattended (e.g. at the end of the working day) and cannot be returned to service, the plant is to remain isolated, locks and tags removed and replaced with an out of service tag to prevent operation. Locks and tags must be re-applied when work recommences. Isolation, lock out and tag out requirements are to be identified and recorded in the relevant risk assessment and JSA s provided by the contractor. PLANT SAFETY Version: 3 Date Printed: 05/04/2016 Page: 12 of 18

13 General Requirements Contractors must provide, maintain and operate plant in a safe manner, complying with appropriate statutory requirements for the safe operation of plant. As a minimum, contractors shall ensure that: Inspection of plant shall be undertaken prior to commencing work on site; Risk assessments have been undertaken for all items of plant under their control; Employees of contractors required to operate or work with plant shall be instructed on the safe use of that plant and where required have the appropriate certification to operate plant; Specific items of plant requiring registration are registered in accordance with relevant State legislation; Regular inspections and maintenance is undertaken on items of plant in accordance with manufacturer s instructions, industry standards and statutory requirements. In some circumstances, CBRE may request to review specific documentation relating to specific items of plant (e.g. maintenance records and documented risk assessments). The contractor shall provide this information to CBRE if requested to do so. Building Maintenance Units (BMUs) BMU s shall only be installed, maintained and used by appropriately trained and competent persons. For additional requirements of contractors relating to BMU s refer to Appendix 3 BMU Contractor Standards. Vehicles, Mobile Equipment, Mobile Scaffolding, Forklifts, Elevating Work Platforms, Scissor Lifts, Boom Lifts and Cherry Pickers In relation to this equipment, contractors must ensure the following: Load bearing capacities shall be adhered to at all times. As far as practicable, loads shall not be suspended or travel over people. Loads being transported shall be secured. Scaffolding shall comply with AS 1576 Scaffolding; be erected, maintained and dismantled by suitable qualified scaffolders. If scaffolding height exceeds 4 metres the scaffolding shall have edge protection, safe access and egress, be inspected and marked by a suitably qualified scaffolder before use, after any alteration or at intervals no greater than 30 days. RESTRICTED ACCESS AREAS From time to time, areas throughout a property, deemed to pose a health and safety risk, may be signed as restricted access areas. Such areas may present some hazards in common with confined spaces but do not meet all the criteria for classification as a confined space. For example, an area may have an atmosphere which contains potentially harmful levels of contaminants but it is primarily designed as a place of work. Version: 3 Date Printed: 05/04/2016 Page: 13 of 18

14 Restricted areas are not required to be managed with the same criterion as for a confined space, but do require a pre-entry risk assessment to identify the hazards, assess the risks and define risk controls. Should access be required to a restricted area, the contractor must contact CBRE. WORKING AT HEIGHTS All work where there is a risk of a fall to another level shall be performed in accordance with the relevant state legislation for fall prevention/safe work on roofs. Prior to the commencement of working at heights where there is a risk of falling over 1.8m, a working at heights permit must be obtained from CBRE building management and completed by the contractor. In addition, a risk assessment must be completed by the contractor for the proposed works. Such a risk assessment must take into consideration the following: How work is done How often the task is complete The conditions or physical surroundings where such work is undertaken. Circumstances that should be considered during the assessment include: The nature, size and layout of the workplace The duration, extent and type of work to be undertaken. (Example: is just a visual check required or is installation/repair needed? How long will the job take?) What height will workers be required to access or undertake work? Training and experience of employees undertaking the work? How to get access to the work area (consider terrain, travel distance, ease of access for equipment) The number and movement of people and plant on the work site. (Example: are workers or vehicles nearby that could interfere with fall prevention measures? Do their movements cross paths with one another increasing the likelihood of a fall?) Conditions of work (Example: Is it windy or slippery? Is there poor lighting, sloping surfaces etc). The provision of appropriate fall arrest and prevention devices (i.e. those already in place and those to be provided by the contractor). The provision of personal protective equipment to combat glare, thermal stress, noise or other physical hazards. The selection and use of fall arrest systems, safety mesh, scaffolding safety nets, guardrails and the selection of control measures shall be in accordance with the relevant State legislation, Australian Standards and Codes of Practice. All ladders used on site shall comply with ANZS 1892 Portable Ladders. Contractors shall ensure they have undergone appropriate training for the selection, use and maintenance of fall arrest and prevention devices. Contractors are also responsible for the training and instruction of their employees and shall ensure they are provided with the appropriate training. All tools, equipment and other loose items shall be affixed to the work platform or building at all times. No material shall be thrown from a height. Version: 3 Date Printed: 05/04/2016 Page: 14 of 18

15 WORKING WITH INSULATED SANDWICH PANELLING Prior to the commencement of any works involving insulated sandwich panelling (ISP), an ISP Permit must be obtained from CBRE. It is the responsibility of the contractor to ensure that the ISP Permit has been appropriate completed, any special precautions listed and the permit authorised. The following precautions must be considered prior to the issue of the ISP work permit (including but not limited to): Ensure that no hot work is being undertaken near the ISP work. Where panels need to be cut, ensure that only cold cutting methods such as shearing (hand-operated tools), low speed drills or handsaws are used. Secure fixings to panels using adhesives (water based where possible) or mechanical fasteners. Where flammable adhesives must be used ensure that no hazard ignition sources (i.e. battery chargers, electrical panels or spark producing equipment) are operating within the area (approximately 3 metres). Smoking and other ignition sources are NOT PERMITTED during work on the panels. At the end of the work, ensure that any exposed core has been re-sealed with metal capping. Pipe penetrations should be sealed with a metal facia mechanically clamped onto the pipe and riveted on the metal face of the panel. An air gap of 25mm should be provided around all heat generating exhaust ducts that penetrate ISP walls or ceiling with metal capping around the opening to seal the sandwich panel core. Dispose of any panel off-cuts immediately. Waste panel material (particularly cores) should be disposed of outside and stored clear of the building by more than 10 metres. A fire extinguisher is to be on hand at all times. Check that all fire protection equipment (fixed and mobile) is in good working order and that staff have received appropriate training in use of this equipment. Version: 3 Date Printed: 05/04/2016 Page: 15 of 18

16 APPENDICES Safe Work Method Statement Review Checklist (version 3) Note to user: The purpose of this review is to ensure that the SWMS is of a reasonable standard, and contains both legislative and CBRE required information. Contractor Name SWMS Description / Reference Date Reviewed by SWMS Criteria: The SWMS provided by the criteria should include the following information: A. Items 1-12 must be included on a SWMS to be accepted 1. Includes the details of the site/sites the work is being conducted eg. Address. 2. Contractor company name, ABN/ACN, address, contact person. 3. Details of the person responsible for implementing, monitoring reviewing & ensuring compliance with the SWMS. 4. Include a description of the activity / scope of work addressed by the SWMS. Nb. The SWMS must identify high risk construction work (if applicable) see examples below. 5. Includes specific competencies and training required to undertake the activity including inductions, licenses, qualifications, trade certificates etc. 6. The SWMS breaks down the steps / tasks required to complete the work activity. 7. For each step/task the hazards are identified and risks assessed. Nb. There must be evidence that a risk assessment has been conducted eg. Risk score column. Version: 3 Date Printed: 05/04/2016 Page: 16 of 18

17 8. Control measures must be documented for identified hazards Nb. Controls should be allocated in accordance with the hierarchy of controls eg. Elimination, substitution, minimization in preference to PPE 9. Are relevant Legislation, Codes of Practice, Australian Standards& Guidance Notes that will be complied with specified? 10. Does the SWMS specify task-specific emergency/rescue procedures e.g. arrested falls, confined space, 11. Lists plant and equipment required to undertake the task. 12. The names, positions & signatures of any contractors competent/trained in the SWMS should be provided. Nb. an electronic signature is acceptable where online contractor management systems are used. Examples of high risk construction work: construction work that involves: falling >2m, disturbance of asbestos, structural alterations requiring temporary support, demolition of an element that is load bearing, a confined space, artificial extremes of temperature, adjacent to a road, work on chemical, fuel or refrigerant lines, on energized electrical installations, work on or near pressurized gas distribution piping/mains. Comment: SWMS meets criteria listed above: Yes / No If No, return to contractor for resubmission. Version: 3 Date Printed: 05/04/2016 Page: 17 of 18

18 Contractor HSE Guidelines Issued To: Name: I acknowledge having received a copy of the CBRE Contractor HSE Guidelines. As a contractor working in a CBRE managed area, I have read the Contractor HSE Guidelines and understand their contents in full. I agree to abide by the conditions stated in these guidelines, health and safety legislative requirements and/or any other direction by CBRE or the property owner in relation to the health and safety of the site generally. Contractor(s) Name: Contractor(s) Signature: Date: Company Name: Issuing Officer: Signed: * Please read and ensure your understanding of the booklet, then sign the above form and return to CBRE

This document sets out the rules applicable to all contract companies and their personnel when working on a CF Fertilisers UK Limited (CF) site.

This document sets out the rules applicable to all contract companies and their personnel when working on a CF Fertilisers UK Limited (CF) site. CONTRACTOR EHS REQUIREMENTS FOR ON-SITE WORK Issued by:: EHS Page No: Issue No: Issue Date: Authorised By: Review date: 1 of 8 3 July 2016 N Cook July 2020 1. INTRODUCTION This document sets out the rules

More information

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW PROCEDURE Contractor Safety Issued with the authority of the Chief Commissioner and General Manager of Chief Commissioner signature Chief Executive Officer signature Sponsor Head of Risk Document type

More information

Construction, Demolition & Excavation Works Doc Reference: DoMN-WHSMS 3.14 Version Number: 2.2

Construction, Demolition & Excavation Works Doc Reference: DoMN-WHSMS 3.14 Version Number: 2.2 Purpose This procedure provides guidance to the Diocese of Maitland Newcastle (DoMN), principal contractors and other persons conducting a business or undertaking (PCBU) who commission or carry out construction,

More information

Safe Work Method Statement. 14/4/16 Approved by (Snr Management Rep):

Safe Work Method Statement. 14/4/16 Approved by (Snr Management Rep): ABN 39 137 318 873 Unit 2, 36 Lidco St Arndell Park NSW 2148 QAC swms2 Phone: 1300 121 544 Fax 1300 078 877 Safe Work Method Statement SWMS No: 1 Revision Date: 14/4/16 Approved by (Snr Management Rep):

More information

WHS Management Plans

WHS Management Plans WHS Management Plans Disclaimer This Guide provides general information about the obligations of persons conducting a business or undertaking and/or persons in control of premises and workers under the

More information

Contractor EHS Program Attachments

Contractor EHS Program Attachments Contractor EHS Program Attachments Contractor Environmental Health & Safety Program Safety Work Permit Attachments Attachment 1- Contractor Safety Work Permit The Contractor Safety Work Permit Checklist

More information

The Hong Kong Polytechnic University Facilities Management Office

The Hong Kong Polytechnic University Facilities Management Office The Hong Kong Polytechnic University Facilities Management Office Safety Precautions and Requirements The Contractor shall ensure as a priority in all activities connected with the Works, the safety and

More information

OHS Management of Contractors in Capital Works and Maintenance

OHS Management of Contractors in Capital Works and Maintenance OHS Management of Contractors in Capital Works and Maintenance Physical Resources/Risk, Health and Safety Prepared by: Physical Resources/Risk, Health and Safety Version: 08/04/2008 Contents Page 1. INTRODUCTION...

More information

WORK HEALTH AND SAFETY AUDIT STANDARD

WORK HEALTH AND SAFETY AUDIT STANDARD WORK HEALTH AND SAFETY AUDIT STANDARD FORESTRY INDUSTRY South Australia, Victoria and Tasmania Safety Standards 2017 2017 Content I. Introduction... 2 II. Audit Criteria and Indicators... 3 1 PLANNING...

More information

REFURBISHMENT DEMOLITION

REFURBISHMENT DEMOLITION CONTRACTOR WHS HAZARD STANDARD REFURBISHMENT DEMOLITION EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

CONTRACTOR WHS SYSTEM STANDARD RISK MANAGEMENT EXTERNAL USE ONLY

CONTRACTOR WHS SYSTEM STANDARD RISK MANAGEMENT EXTERNAL USE ONLY CONTRACTOR WHS SYSTEM STANDARD RISK MANAGEMENT EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

The Health & Safety Policy

The Health & Safety Policy The Health & Safety Policy April 2014 Issue: 3 Page 1 of 16 Review Date: April 2015 Introduction This document sets out the Health & Safety arrangements for Astra Signs Ltd and represents our commitment

More information

HEALTH AND SAFETY POLICY AND PROCEDURES

HEALTH AND SAFETY POLICY AND PROCEDURES HEALTH AND SAFETY POLICY AND PROCEDURES Relevant Legislation The Health and Safety At Work Act 1974 The Management of Health and Safety At Work Regulations 1999(as amended) All associated Health and Safety

More information

HEALTH & SAFETY MANUAL Legislated Duties and Responsibilities

HEALTH & SAFETY MANUAL Legislated Duties and Responsibilities CONTRACTOR SAFETY PROGRAM PURPOSE: The Contractor Safety Program (CSP) establishes that contractors are required to work in compliance with legislation, regulations and the Town of Caledon health and safety

More information

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd Company Trading Address 242 Fort Austin Avenue Crownhill Plymouth PL6 5NZ Tel: 01752 657227 Fax: 01752 657227 Email: enquiries@jmc-sw.com

More information

SAFE WORK METHOD STATEMENT (SWMS)

SAFE WORK METHOD STATEMENT (SWMS) ABN: 12 345 678 910 ACN: 123 456 789 Address: Your Company Address PH: Your Company Phone E: Your Company Email Web: Your Company Website PROJECT DETAILS: Project: SAFE WORK METHOD STATEMENT (SWMS) Area:

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT COMPANY DETAILS: Company Name Address CLIENT DETAILS: Principal contractor Contact name Phone no. Mobile: Phone no. Mobile: Works manager Contact no.: Project/owner name Work activity Scope of work covered

More information

Policy Work Health and Safety (WHS) RCPA Introduction WHS legislation

Policy Work Health and Safety (WHS) RCPA Introduction WHS legislation Policy Subject: Work Health and Safety (WHS) Approval Date: July 2011, December 2014 Review Date: July 2018 Review By: Board of Directors Number: 1/2011 The Royal College of Pathologists of Australasia

More information

Asbestos Management Policy

Asbestos Management Policy ECM Document Set ID Number: 3428289 Revision Date: August 2016 July 2016 20 th July 2016 Risk Principal Approval Date: 20 th July 2016 Manager Works 20 th July 2016 Manager Building and Property Review

More information

ELECTROMAGNETIC ENERGY

ELECTROMAGNETIC ENERGY CONTRACTOR WHS HAZARD STANDARD ELECTROMAGNETIC ENERGY EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

HFM Asset Management Contractor Induction Queens Riverside Apartments

HFM Asset Management Contractor Induction Queens Riverside Apartments HFM Asset Management Contractor Induction Queens Riverside Apartments Contents Purpose About HFM Asset Management HFM Asset Management s Responsibilities Contractors Responsibilities Commencing Work Working

More information

The following is a description of the type of work that our Company undertakes:

The following is a description of the type of work that our Company undertakes: Health & Safety Introduction K9 Patrol is committed to providing a workplace that is healthy and safe for our employees and anyone who interacts with us e.g. customers and members of the public. Conformance

More information

M.B. Power Services (Essex) Ltd

M.B. Power Services (Essex) Ltd M.B. Power Services (Essex) Ltd HEALTH & SAFETY POLICY 1 POLICY STATEMENT The company recognises that under the Health & Safety at Work Act 1974 the Company has a legal duty to ensure so far as is reasonably

More information

HEALTH AND SAFETY CONTRACT BETWEEN EMPLOYER AND MANDATORY (CONTRACTOR) SECTION 37(2) OF THE OHS ACT, ACT 85 OF 1993

HEALTH AND SAFETY CONTRACT BETWEEN EMPLOYER AND MANDATORY (CONTRACTOR) SECTION 37(2) OF THE OHS ACT, ACT 85 OF 1993 P a g e 1 SUBJECT ISSUED BY APPROVED BY CONTRACT CONTRACT BETWEEN EMPLOYER AND MANDATORY SAFETY MANAGER: SUN CITY RESORT DIRECTOR OF OPERATIONS PAGE 1 OF 15 EFFECTIVE: REVISION NO: 1 HEALTH AND SAFETY

More information

Safe Management of Contractors Policy

Safe Management of Contractors Policy Safe Management of Contractors Policy Stour Federation Stour Federation Safe Management of Contractors, Page 1 1.! INTRODUCTION 1.1! Shipston-on-Stour Primary School and Acorns Primary School accept the

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy T. C. Garrett Ltd. Roofing and Scaffolding Contractor 1 January 2017 SECTION 1: HEALTH AND SAFETY POLICY STATEMENT It is the policy of T C Garrett Ltd. to provide so far as is

More information

Contractor and Supplier Expectations

Contractor and Supplier Expectations Contractor and Supplier Expectations GUI/1548 Issue 15 Page 1 of 10 16 September 2016 Contents 1. INTRODUCTION AND SCOPE 3 2. RICARDO ENERGY & ENVIRONMENT POLICIES 3 3. SUSTAINABILITY 4 4. MANAGEMENT OF

More information

Adelaide Airport Limited

Adelaide Airport Limited Induction Pack for Contractors Site Rules and Conditions for Contractors Revision: 7 November 2015 Site Rules and Conditions-Adelaide:Legal 42723757_1 1. GENERAL 1 2. BUILDING CONSENT AND APPROVAL 1 3.

More information

CONTRACTOR WHS HAZARD STANDARD FORMWORK & FALSEWORK EXTERNAL USE ONLY

CONTRACTOR WHS HAZARD STANDARD FORMWORK & FALSEWORK EXTERNAL USE ONLY CONTRACTOR WHS HAZARD STANDARD FORMWORK & FALSEWORK EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

Contractor Induction. Fabrication. April 2016

Contractor Induction. Fabrication. April 2016 Contractor Induction Fabrication April 2016 150 year old proud history Longest operating engineering company in Dunedin and probably NZ under the same trading name We offer a wide range of engineering

More information

Work Health & Safety Procedure

Work Health & Safety Procedure 1 PURPOSE This procedure explains the process for qualification of Contractors at Port of Newcastle (PON). It outlines the responsibilities for PON Representatives and Contractors. It also provides a system

More information

Safe Work Procedure for installation of

Safe Work Procedure for installation of Safe Work Procedure for installation of external cladding This procedure has been formulated to cover safe systems of work for the installation of external cladding. This instruction will be used to reduce

More information

Environmental, Health and Safety Policy for Contractors

Environmental, Health and Safety Policy for Contractors Environmental, Health and Safety Policy for Contractors The attached policy is a tool to help contractors understand and comply with RBC's Environmental, Health and Safety rules. The information that follows

More information

Constraints on how the Contractor Provides the Works

Constraints on how the Contractor Provides the Works Constraints on how the Contractor Provides the Works [DELETE AS APPROPRIATE: WHERE NOTIFIABLE CDM APPLIES:] CONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS 2007 In line with the requirements of the above

More information

Contractors Safety Code of Practice

Contractors Safety Code of Practice Document Control Revision No. Date Document Reviewed 8 October 2017 Publication on Web Site November 2017 Date of next Review October 2019 or following any changes Summary of main changes Change in format

More information

Health and Safety Policy and Procedures

Health and Safety Policy and Procedures 1 Health and Safety Policy and Procedures 2 This page is intentionally blank. Wadham College Contents General Policy A declaration of our intent to provide and maintain, so far as is reasonably practicable,

More information

PROCEDURE (Essex) / Linked SOP (Kent) Asbestos Management. Number: U 1005 Date Published: 22 July 2015

PROCEDURE (Essex) / Linked SOP (Kent) Asbestos Management. Number: U 1005 Date Published: 22 July 2015 1.0 Summary of Changes 1.1 This is a new joint procedure/sop for Essex Police and Kent Police. 2.0 What this Procedure is about 2.1 This document identifies how Essex Police and Kent Police shall manage

More information

Level 2 NVQ Diploma in Thermal Insulation (Construction) Qualification Specification

Level 2 NVQ Diploma in Thermal Insulation (Construction) Qualification Specification Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification Structure 4 Centre requirements 5 Support for candidates 5 Links to National Standards / NOS

More information

TECHNICAL SUPPORT ASSOCIATES HEALTH AND SAFETY POLICY STATEMENT

TECHNICAL SUPPORT ASSOCIATES HEALTH AND SAFETY POLICY STATEMENT TECHNICAL SUPPORT ASSOCIATES HEALTH AND SAFETY POLICY STATEMENT Technical Support Associates 57-59 High Street Bagshot Surrey GU19 5AH Tel: 01276 476237 Email: enquiries@tsaservices.co.uk Website: www.tsaservices.co.uk

More information

PICS Health and Safety Policy and Arrangements

PICS Health and Safety Policy and Arrangements PICS Health and Safety Policy and Arrangements H&S Manual 2016 page 1 of 16 Date issued: November 2016 Contents Policy Statement & Organisation Details... 3 Health and Safety Policy Statement... 4 Health

More information

XXVI. Contractor Safety & Environmental Guidelines (For General Contractors and Sub-Contractors)

XXVI. Contractor Safety & Environmental Guidelines (For General Contractors and Sub-Contractors) XXVI. Contractor Safety & Environmental Guidelines (For General Contractors and Sub-Contractors) 1. PURPOSE 1.1 This procedure highlights minimum safe working practices required for all contractors working

More information

Level 2 NVQ Certificate in Erection of Precast Concrete (Construction)

Level 2 NVQ Certificate in Erection of Precast Concrete (Construction) Level 2 NVQ Certificate in Erection of Precast Concrete (Construction) Qualification Specification ProQual 2016 Contents Introduction 3 Qualification profile 3 Qualification Structure 4 Pathway 1 Flooring

More information

Training Standard Draft Only

Training Standard Draft Only Title Duration Purpose/ Scope Occupational Relevance Health and Safety in Construction (Site Manager) Minimum 5 days of 6 learning hours per day Purpose: The purpose of training delivered against this

More information

CHAS Assessment Standards

CHAS Assessment Standards CHAS Assessment Standards Section 1 - All Prosecutions or Enforcement Notices The Supplier has provided details of any enforcement notices or prosecutions served on them in the last three years by the

More information

MVDC F041 Safety Inspection Checklist

MVDC F041 Safety Inspection Checklist MVDC F041 Safety Inspection Checklist JOB TITLE: DEPARTMENT: JOB NO.: DATE: LEGEND 1 Satisfactory 2 Requires Improvement 3 Non Existent 4 Not Applicable EMERGENCY PREPAREDNESS Emergency procedure is posted

More information

Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice)

Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice) Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice) Version 3 June 2014 Authorised by Arrium Safety Council TOOL75.WHS.COP.001 Critical Elements from the Code

More information

HEALTH AND SAFETY POLICY

HEALTH AND SAFETY POLICY HEALTH AND SAFETY POLICY Introduction It is the policy of the Company to take all reasonable steps to ensure the health, safety and welfare of its employees, and it will, so far as is reasonably practicable,

More information

1. PURPOSE 2. SCOPE 3. APPLICATIONS AND INTERPRETATION. This document is to be read and understood in conjunction with the following, inter alia:

1. PURPOSE 2. SCOPE 3. APPLICATIONS AND INTERPRETATION. This document is to be read and understood in conjunction with the following, inter alia: HEALTH & SAFETY SPECIFICATIONS FOR RENOVATION OF EXISTING BUILDINGS AND CONSTRUCTION OF NEW INFRASTRUCTURE IN THE NZG (PRETORIA AND MOKOPANE) AND THOHOYANDOU BOTANICAL GARDEN 1. PURPOSE The objective of

More information

PROPERTY SERVICES OPERATING PROCEDURE

PROPERTY SERVICES OPERATING PROCEDURE This is a internal document and is only applicable to the internal operations of the RMIT. OPERATING PROCEDURE INTENT The Permit to Work (PTW) procedure is a formal written system used to control certain

More information

Pre-Qualification Questionnaire Checklist

Pre-Qualification Questionnaire Checklist Pre-Qualification Questionnaire Checklist Thank you for your interest in becoming an Approved Contractor with Christchurch Airport. To ensure efficient processing of your application please utilise the

More information

Safe Work Method Statement

Safe Work Method Statement Safe Work Method Statement 01 WHAT IS A SWMS? A SWMS is a document that sets out the high risk construction work activities to be carried out at a workplace, the hazards arising from these activities and

More information

HS00: CONSTRUCTION PHASE HEALTH & SAFETY PLAN JOB THE PADDOCKS - SAMPLE PROJECT FOR TRIAL USERS: THE PADDOCKS 2015

HS00: CONSTRUCTION PHASE HEALTH & SAFETY PLAN JOB THE PADDOCKS - SAMPLE PROJECT FOR TRIAL USERS: THE PADDOCKS 2015 HS00: CONSTRUCTION PHASE HEALTH & SAFETY PLAN JOB THE PADDOCKS - SAMPLE PROJECT FOR TRIAL USERS: THE PADDOCKS 2015 Client: John Smith TEST Site Address: Principal Designer: [Principal Designer] Principal

More information

Level 2 NVQ Diploma in Thermal Insulation (Construction) (6191)

Level 2 NVQ Diploma in Thermal Insulation (Construction) (6191) Level 2 NVQ Diploma in Thermal Insulation (Construction) (6191) Candidate logbook 601/3202/4 601/3203/6 www.cityandguilds.com March 2016 Version 3 About City & Guilds As the UK s leading vocational education

More information

Safe System of Work Policy

Safe System of Work Policy Reviews and Revisions Safe System of Work Policy Action Date Reason Reviewer Safe System of Work Policy 1 1. Introduction Campus Services manage and deliver a wide range of activities, accommodation, catering,

More information

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY 1. Introduction 1.1 SCOPE & PURPOSE This policy (which includes this document and the work health and safety standards, policies, procedures and safety control

More information

Employee Summary of Company Safety Arrangements SAFETY ARRANGEMENTS

Employee Summary of Company Safety Arrangements SAFETY ARRANGEMENTS 1. Introduction 2. The Company Health & Safety Management System 3. Accidents & Incidents 4. Consultation & Communication with Employees 5. Control of Substances Hazardous to Health (COSHH) 6. Contractors

More information

Evaluation of Occupational Health & Safety Management System

Evaluation of Occupational Health & Safety Management System Section 1 Legal Obligation Employers have a duty of care to provide a safe workplace and systems of work, to consult with workers, to identify and manage workplace hazards and to keep them informed about

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT Principal Contractor: ROBERT LIVINGSTONE Project Address: 123 SYDNEY ROAD SYDNEY NSW 2000 High Risk Work Hazards and Risks Identified Control Measures Persons working at a height

More information

Level 2 NVQ Diploma in Removal of Hazardous Waste (Construction) Licensed Asbestos

Level 2 NVQ Diploma in Removal of Hazardous Waste (Construction) Licensed Asbestos Level 2 NVQ Diploma in Removal of Hazardous Waste (Construction) Licensed Asbestos November 2016 This qualification has a Total Qualification time (TQT) of 420 Hours Guided Learning Hours: 191 Ofqual Qualification

More information

Site Specific Safety Plans (SSSP)

Site Specific Safety Plans (SSSP) 1.0 SCOPE/PURPOSE 1.1 The guidelines in this document provide a minimum framework for the development of a Site- Specific Safety Plan. They are not meant to supersede or replace regulatory requirements,

More information

Conforming to General Health, Safety and Welfare in the Workplace

Conforming to General Health, Safety and Welfare in the Workplace Unit Update A/503/1170: CONFORMING TO GENERAL HEALTH, SAFETY AND WELFARE IN THE WORKPLACE U s e f r o m 2 0 1 2 J a n u a r y This version of this unit replaces all previously published versions with effect

More information

Level 2 NVQ Diploma in Building Maintenance Multi-trade Repair and Refurbishment Operations (Construction)

Level 2 NVQ Diploma in Building Maintenance Multi-trade Repair and Refurbishment Operations (Construction) Level 2 NVQ Diploma in Building Maintenance Multi-trade Repair and Refurbishment Operations (Construction) Qualification Specification ProQual 2018 Contents Page Introduction 3 Qualification profile 3

More information

NORTHERN EDUCATION TRUST HEALTH AND SAFETY DOCUMENT OF POLICIES

NORTHERN EDUCATION TRUST HEALTH AND SAFETY DOCUMENT OF POLICIES NORTHERN EDUCATION TRUST HEALTH AND SAFETY DOCUMENT OF POLICIES Contents Policy on Health and Safety COSHH Policy Working with VDU's Policy Management of Health and Safety at Work Policy The Workplace

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy Effective Date: 22 October 2018 Review Date: October 2023* * This policy may be revised sooner if there is a change in working premises, conditions or laws directly affecting this

More information

Contractor safety for schools and services. Guidance

Contractor safety for schools and services. Guidance Health and safety services Health and safety services Contractor safety for schools and services Guidance Updated September 2008 and amended March/May 2009 Contents 1.0 Planning the work 1.1 Minor alterations

More information

North West Facilities Ltd

North West Facilities Ltd Project/Contract North West Facilities Ltd 17-18 Gaerwen Industrial Estate Gaerwen Isle of Anglesey LL60-6HR Tel: 01248-422555 Fax: 01248-422556 Mobile: 07891 557 581 Full bathroom refit Principle Contractor

More information

Contractors Code of Practice

Contractors Code of Practice Estates and Facilities Department of the University of Bradford In partnership with ICT Services Contractors Code of Practice Issue Date Comments 1 st Draft 2 nd Draft Issued 19/5/2010 Distributed as per

More information

WORKING AT ELEVATED PLACES Working on Roofs

WORKING AT ELEVATED PLACES Working on Roofs WORKING AT ELEVATED PLACES Working on Roofs University workers who carry out roof work are exposed to a potential risk of falling. Falls can occur over an unprotected edge on a roof, through a fragile

More information

Inspection Procedure Health, Safety & Environment

Inspection Procedure Health, Safety & Environment 1 Purpose and scope The Purpose of this procedure is to maintain safe working conditions and sound health, safety and environmental management practices by ensuring that Roy Hill Operations work areas

More information

JOB SAFETY ANALYSIS PROGRAM. Owner: Risk Management Revision No: 01. Document number: Q-001 Date last revised:

JOB SAFETY ANALYSIS PROGRAM. Owner: Risk Management Revision No: 01. Document number: Q-001 Date last revised: Table of Contents 1.0 Applicability...2 2.0 Scope...2 3.0 Definitions...2 4.0 Core Information and Requirements...2 5.0 Roles and Responsibilities...6 6.0 Goals, Objectives and Performance Measures...7

More information

PGR Innovations Limited. Company Policy For Health & Safety

PGR Innovations Limited. Company Policy For Health & Safety PGR Innovations Limited Company Policy For Health & Safety January 2012 CONTENTS Company Policy Statement 1.0 Organisation Duties And Responsibilities 2.0 Managing Director 2.1 Projects Managers and Site

More information

HEALTH AND SAFETY AT WORK ACT 1974 HEALTH AND SAFETY POLICY OF:

HEALTH AND SAFETY AT WORK ACT 1974 HEALTH AND SAFETY POLICY OF: HEALTH AND SAFETY AT WORK ACT 1974 HEALTH AND SAFETY POLICY OF: D J MACAULAY (CONSTRUCTION) LTD. The Health and Safety at Work Act 1974 places an obligation on all Employers to make every reasonable effort

More information

Level 2 NVQ Diploma in Accessing Operations And Rigging (Construction) Qualification Specification

Level 2 NVQ Diploma in Accessing Operations And Rigging (Construction) Qualification Specification Level 2 NVQ Diploma in Accessing Operations And Rigging (Construction) Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification structure 4 Centre requirements

More information

Health Safety and Welfare Policy

Health Safety and Welfare Policy Health Safety and Welfare Policy For IDG Tool Repair and Electrical Testing Ltd 19 Bourne Way Swanley Kent BR8 7HX David Griffiths CONSULTANT HSWS LTD 01322 662363 Section 1 Statement of General Policy

More information

SAMPLE PAGES. Construction Safety and Health Program. [Company name]

SAMPLE PAGES. Construction Safety and Health Program. [Company name] The safety and health of our employees is our top priority. Everyone goes home safe and healthy every day. Construction Safety and Health Program [Company name] [Date Authorized] [Version} 0 Contents Mission

More information

HEALTH & SAFETY POLICY AND ORGANISATIONAL ARRANGEMENTS

HEALTH & SAFETY POLICY AND ORGANISATIONAL ARRANGEMENTS HEALTH & SAFETY POLICY AND ORGANISATIONAL ARRANGEMENTS Enquin Environmental Limited 1 Ringside Business Centre Heol Y Rhosog Wentloog Cardiff CF3 2EW Enquin Environmental Ltd Page 1 of 10 March 2016 Introduction

More information

HEALTH AND SAFETY (MANAGEMENT IN CONSTRUCTION) (JERSEY) REGULATIONS 2016

HEALTH AND SAFETY (MANAGEMENT IN CONSTRUCTION) (JERSEY) REGULATIONS 2016 Arrangement HEALTH AND SAFETY (MANAGEMENT IN CONSTRUCTION) (JERSEY) REGULATIONS 2016 Arrangement Regulation PART 1 5 INTRODUCTORY 5 1 Interpretation... 5 2 Construction site... 8 3 Construction work...

More information

ASBESTOS POLICY & MANAGEMENT PLAN UNIVERSITY OF ESSEX HUMAN RESOURCES / ESTATE MANAGEMENT SERVICE

ASBESTOS POLICY & MANAGEMENT PLAN UNIVERSITY OF ESSEX HUMAN RESOURCES / ESTATE MANAGEMENT SERVICE ASBESTOS POLICY & MANAGEMENT PLAN UNIVERSITY OF ESSEX HUMAN RESOURCES / ESTATE MANAGEMENT SERVICE Version 04.04.2017 Issue 1.2 (updated 17.01.2018) Approved by USG 10.10.17 1 CONTENTS 1 POLICY STATEMENT...1

More information

Work Health and Safety Management Systems and Auditing Guidelines

Work Health and Safety Management Systems and Auditing Guidelines Work Health and Safety Management Systems and Auditing Guidelines 5th edition, September 2013 (Updated May 2014) Work Health and Safety Management Systems and Auditing Guidelines These Guidelines are a

More information

Health and Safety Policy Statement. LONDONGUILD Ltd ELECTRICAL CONTRACTORS. The Palmerston Centre Oxford Road Wealdstone Harrow Middlesex HA3 7RG

Health and Safety Policy Statement. LONDONGUILD Ltd ELECTRICAL CONTRACTORS. The Palmerston Centre Oxford Road Wealdstone Harrow Middlesex HA3 7RG Statement LONDONGUILD Ltd ELECTRICAL CONTRACTORS The Palmerston Centre Oxford Road Wealdstone Harrow Middlesex HA3 7RG Contents 1 General Statement of Policy 2 Organisation and Roles and Responsibilities

More information

CORPORATE HEALTH AND SAFETY POLICY

CORPORATE HEALTH AND SAFETY POLICY CORPORATE HEALTH AND SAFETY POLICY Foreword Hawthorn Leisure is a pub group overseeing the management of a large group of pubs as well as providing statutory compliance services to tenanted pubs. At Hawthorn

More information

SAFETY STATEMENT. ABC Company. Address Line 1 Address Line 2. Approved by number. owner. number 01 xx/xx/xx Manager 1 Manager 1 1

SAFETY STATEMENT. ABC Company. Address Line 1 Address Line 2. Approved by number. owner. number 01 xx/xx/xx Manager 1 Manager 1 1 SAFETY STATEMENT ABC Company Address Line 1 Address Line 2 Revision Date Document Approved by Page owner 01 xx/xx/xx Manager 1 Manager 1 1 Contents PART 1 PART 2 PART 3 PART 4 Company Statement 1.1 Application

More information

Workplace Safety and Health Guidelines Contractor Management

Workplace Safety and Health Guidelines Contractor Management Published in September 2011 by the Workplace Safety and Health Council in collaboration with the Ministry of Manpower. All rights reserved. This publication may not be reproduced or transmitted in any

More information

SA Power Networks Work Health and Safety Directive

SA Power Networks Work Health and Safety Directive SA Power Networks Work Health and Safety Directive SA POWER NETWORKS Purpose Purpose To ensure that SA Power Networks workers (including employees and contractors etc), customers and any other persons

More information

1 IMHOFF CUSTOM SERVICES INC. AERIAL LIFT POLICY

1 IMHOFF CUSTOM SERVICES INC. AERIAL LIFT POLICY 1 IMHOFF CUSTOM SERVICES INC. AERIAL LIFT POLICY Purpose and Applicability The purpose of this Program is to ensure that Imhoff Custom Services Inc. employees who operate aerial or scissor lifts have the

More information

QUALIFICATION HANDBOOK

QUALIFICATION HANDBOOK QUALIFICATION HANDBOOK Level 2 NVQ Diploma in Plastering (Construction) (6573-22/24) March 2018 Version 1.0 Qualification at a glance Subject area Plastering (Construction) City & Guilds number 6573 Age

More information

Fall Protection Safety Program and Training Materials

Fall Protection Safety Program and Training Materials Prepared by Built Insurance Brokerage Fall Protection Safety Program and Training Materials Fall Protection Program... 1 Employee Fall Protection Flyer... 7 Fall Hazard Survey... 8 Requirements for Industrial

More information

Health & Safety Policy

Health & Safety Policy Health & Safety Policy Bracknell Glazing Unit 5, Long Shot Lane Bracknell Berkshire RG12 1RL Policy Date: 22 September 2010 1/14 Contents Page 1.0 General Statement of Intent 1.1 Principle Legislation

More information

Health, Safety and Welfare Policy

Health, Safety and Welfare Policy Health, Safety and Welfare Policy Contents Introduction Our objectives Health and Safety Policy Statement Health and safety organogram Responsibilities for health, safety and welfare 2 3 4 5 6 13 Arrangements

More information

Management of health and safety is very important to us and given the appropriate priority.

Management of health and safety is very important to us and given the appropriate priority. Health and Safety Policy Statement Management of health and safety is very important to us and given the appropriate priority. Compliance with health and safety legislation is regarded as the minimum standard

More information

Insulation and Building Treatments (Cavity Wall Insulation) Qualification Specification

Insulation and Building Treatments (Cavity Wall Insulation) Qualification Specification Level 2 NVQ Certificate in Insulation and Building Treatments (Cavity Wall Insulation) Qualification Specification Qualification Recognition Number: 600/6017/7 ABBE Qualification Code: CertIBT(CWI)L212

More information

LOADING UNLOADING OPERATIONS

LOADING UNLOADING OPERATIONS CONTRACTOR WHS HAZARD STANDARD LOADING UNLOADING OPERATIONS EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION

More information

HEALTH & SAFETY POLICY

HEALTH & SAFETY POLICY 1. Policy Statement CONTENTS 1. Policy Statement 2. Responsibilities 3. In Practice 3.1 Risk Assessments 3.2 COSHH 3.3 PPE 3.4 Safety Training 3.5 Accident Procedure 3.6 Emergency Procedure 3.7 Site Audits

More information

Health & Safety Policy & Management Systems. Guidance Note 13

Health & Safety Policy & Management Systems. Guidance Note 13 Health & Safety Policy & Management Systems Guidance Note 13 1 Health & Safety Policy & Management Systems Introduction This Guidance Note gives practical information regarding basic health and safety

More information

Local Rule: Engaging External Service Providers

Local Rule: Engaging External Service Providers Local Rule: Engaging External Service Providers 1. Significant Hazards Engaging incompetent Service Providers, failing to exchange appropriate health and safety information with them failing to adequately

More information

Contractor Induction Manual

Contractor Induction Manual Contractor Induction Manual Contractor Management September, 2014 Authored by: OHS Services Version 1.1 Contractor Induction Manual Table of Contents 1. INTRODUCTION... 2 2. CONTRACTOR MANAGEMENT INFORMATION...

More information

Corporate Policy and Procedure

Corporate Policy and Procedure Corporate Policy and Procedure POLICY CATEGORY AUTHORITY RELATED POLICIES APPROVED BY Safety Management When Outside Contractors are Retained (Contractor Safety Management Program) (the Policy ) Health

More information

Appendix 4A - SWMS Description

Appendix 4A - SWMS Description SAFE WORK METHOD STATEMENT (SWMS) Duty holders A person conducting a business or undertaking (PCBU) carrying out any high risk work in connection with a construction project is required to have a detailed

More information

HEALTH AND SAFETY POLICY

HEALTH AND SAFETY POLICY HEALTH AND SAFETY POLICY Prepared for: Limited Unit A9 Bell Lane Office Village Little Chalfont Bucks HP6 6GL Date of Issue: 3 Feb 2014 Current Issue 9 June 2017 Issue 5 Tel: 01494 765671 Fax: 01494 549852

More information

EMPLOYEE SAFETY HANDBOOK

EMPLOYEE SAFETY HANDBOOK EMPLOYEE SAFETY HANDBOOK This Employee Safety Handbook has been produced to provide you with Health and Safety information. It also includes information about your duties as an employee and will help you

More information