Designing for Mechanical Integrity: Piping
|
|
- Cecilia Gaines
- 5 years ago
- Views:
Transcription
1 Designing for Mechanical Integrity: Piping Daniel Dettmers Associate Researcher, IRC More information at:
2 Key Considerations Prior to Design Documentation from designer/fabricator Materials certification (mill reports) Welding certifications (welders and welds) Piping drawings (isometrics, weld maps, ) Inspection (visual/pressure) report of pipe Other Documentation Criteria for acceptable corrosion PSM documents (PHA s, ) Results and analysis of independent inspection Develop method to store information
3 Key Considerations Prior to Design Longevity of piping Proper specification of pipe materials Proper specification of weld procedures Proper installation of piping & components Preparation and treatment of base pipe Ongoing maintenance of insulation system Insulation system specification & installation Design for MI inspection Visual (Routine & Annual) NDT testing (Independent)
4 Designing Piping for MI 1. Minimize High Risk areas Protect piping Reduce potential trouble spots 2. Make inspection easy as possible Accessible inspection points How? Must know potential failure mechanisms
5 Potential Failure Mechanics There are many potential piping failures, but which are important? Corrosion? Erosion? Weld Failure? Pitting? Stress Corrosion Cracking? Primary concern: Corrosion Under Insulation (CUI)
6 Corrosion The deterioration of a material, usually a metal, by reaction with its environment. - National Association of Corrosion Engineers (NACE) An anodic-cathodic reaction Positive ions detach at the anode and travel through a fluid (i.e. water, ice, etc.) which acts as a carrier (electrolyte) to the cathode. Can create a pitted surface Can reduce over all wall thickness
7 General Corrosion Gradual corrosion of wall material Looks like effects of sandpaper on wood May be small pits present Danger is from wall thinning sufficient to allow cracking
8 Pitting Corrosion Deep pits form in surface Danger from pit extending through wall
9 Corrosion Under Insulation (CUI) CUI is general corrosion that occurs undetected under piping insulation Water enters through a break in the jacket/vapor barrier Insulation aids rusting process by holding the water tight to the pipe Pipe must also be without or have a failure in the surface protection (i.e. pipe paint)
10 Corrosion Under Insulation (CUI) Vapor Barrier Pipe Rust/Insulation Inside Insulation Outside Insulation
11 Corrosion Under Insulation (CUI) Paint/coat the base pipe! SSPC-PS 13.01, and others Specify & install proper insulation system Install vapor barrier and jacket outside insulation but assume it will fail due to weather, damage or eventual degradation 1/6 th original thickness
12 Corrosion Low Risk Areas Uninsulated, painted pipe Easy to see any rust forming High temperature pipe If pipe is on the high side of the system and insulated (i.e. HPL) there aren t large driving forces pulling moisture Always Frozen The water needs to flow to cause corrosion Ice locks down moisture and severely retards corrosion process Pitting General Deposit Always Frozen
13 Always Frozen Be careful of always frozen pipe Wet suction returns often frozen on bottom only where liquid sits Periodically used processing equipment (i.e. spiral freezers) may warm up Exposed valves may help local pipe to thaw Wet Suction Return With Compromised Insulation
14 Corrosion High Risk Areas Piping that is near to or above the freezing point Piping that cycles temp (defrost condensate) Piping that has circumferential temp distribution (wet suction) Low points in the piping system Dips in line or end/corner of horizontal run Bottom of vertical run Bottom edge of a horizontal piece of pipe
15 Erosion The destruction of materials by the abrasive action of moving fluids, usually accelerated by the presence of solid particles or matter in suspension Externally, not typically a problem Internally, usually found in piping where a denser particle is suspended in a fast moving medium Dirt & debris in liquid lines Liquid droplets in wet suction return piping
16 Internal Erosion
17 Erosion High Risk Areas Wet suction returns Entrained liquid droplets erodes pipe internally Worst is on the outside radius of elbows or valves that cause direction change High pressure liquid piping far from high pressure receiver/high elevations where flashing may create bubbles Opposite injection points, where a pipe T s into a second pipe Dirty systems
18 Other High Risk Areas Insulated piping susceptible to damage (or that has been damaged) because it is located in area of heavy traffic, outside in an area heavily exposed to the elements or in an area subject to frequent clean-up wash downs At welds and screwed connection joints (particularly those that experience vibration)
19 Develop an Inspection Program Hire a certified inspection contractor Help develop inspection program and plan piping design for easy inspection Determine documentation to be provided by designer/installation contractor Establish the inspection plan Develop isometric drawings Include pipe slope and elevation, tagged component and weld location Document everything
20 Develop an Inspection Program Baseline Thickness Measurement Locations (TML) After fabrication but prior to insulation, easy to take with UT Establish excess TML s Measurement is quick Use RBI to determine needed TML TML s should include: High Risk locations Periodic spots on long piping runs Every 40 feet at the butt weld Every 100 feet Mark location Mark, removable plug, different insulation, etc.
21 What About Other Materials? Stainless steel SCC can occur in stainless steel when exposed to chloride solutions Usually in excess of 150 F, but still a risk at room temperature Salt on a pipe in high moisture environment, seacoast locations, rainwater leaching chlorides from insulation and Perspiration dripping on warm stainless steel can initiate cracking. 1 1 Stress Corrosion Cracking: Austenitic Stainless Steels, Vol. 11,ASM Handbooks Online
22 Conclusion Proper design of piping for MI will cost more up front Require much more documentation Requires more engineering to the pipe layout Requires more inspection to verify proper pipe is used and installed correctly Proper design of piping for MI will save money, downtime and headaches More reliable system Easier to inspect Less down time for plant
Mechanical Integrity and Carbon Steel Refrigerant Piping
The following article was published in ASHRAE Journal, October 2007. Copyright 2007 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. It is presented for educational purposes
More informationStress Corrosion Cracking (SCC)
Daniel Dettmers Associate Researcher, IRC Doug Reindl Director, IRC More information at: www.irc.wisc.edu Stress Corrosion Cracking (SCC) The initiation and propagation of cracks caused by the combined
More informationCUI (CORROSION UNDER INSULATION) MECHANISM THEORY AND PRACTICE
CUI (CORROSION UNDER INSULATION) MECHANISM THEORY AND PRACTICE Prepared By: Mohammed AbuALRub SAFCO Reliability Dept. December 10, 2015 CONTENT Introduction CUI PhenomenaMain components of the cold insulation
More informationsites under the deposit become anode and the lead to pitting. Hence, a good design should not allow the built up of impurities on surface
CORROSION CONTROL BY DESIGN As an old adage says corrosion prevention must start at the blackboard, at design stage, A good design is no more costly than a bad design. A bad design is always more expensive
More informationGPA GCC (Corrosion in Gas Plants) 28 November 2007 (Bahrain)
Root Cause Analysis Booster Station 150 Stainless Steel Piping Failure Kuwait Oil Company Gas Management Group GPA GCC (Corrosion in Gas Plants) 28 November 2007 (Bahrain) M. F. Al-Otaibi, A. W. Al-Mithin
More informationOUTLINE ATMOSPHERIC CORROSION INTEGRITY MANAGMENT
ATMOSPHERIC CORROSION INTEGRITY MANAGMENT Michael Surkein ExxonMobil Development Company Houston, TX AUCSC OUTLINE 1. ATMOSPHERIC CORROSION DOT REGULATIONS REGARDING ATMOSPHERIC CORROSION CONTROL CAUSES
More informationCorrosion Under Insulation Detection Methods and Inspection
Corrosion Under Insulation Detection Methods and Inspection June 18, 2013 NACE Section Meeting James Higgins PetroChem Inspection OVERVIEW General causes of CUI Suspect Areas- how to find and where to
More informationUNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION OFFICE OF NEW REACTORS WASHINGTON, DC
UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION OFFICE OF NEW REACTORS WASHINGTON, DC 20555-0001 February 23, 2011 NRC INFORMATION NOTICE 2011-04: CONTAMINANTS AND STAGNANT
More informationSECTION HYDRONIC PIPING
PART 1 GENERAL 1.1 REFERENCES SECTION 23 21 13 HYDRONIC PIPING A. ASME BPVC Section IX - Welding and Brazing Qualifications B. ASME B16.3 - Malleable Iron Threaded Fittings Classes 150 and 300 C. ASME
More informationSECTION HYDRONIC PIPING
PART 1 GENERAL 1.1 REFERENCES SECTION 23 21 13 HYDRONIC PIPING A. ANSI/ASME SEC 9: Welding and Brazing Qualifications B. ANSI/ASME B16.3: Malleable Iron Threaded Fittings Class 150 and 300 C. ANSI/ASME
More informationPRESSURE VESSELS Part III: Design Loads, Wind & Seismic, Skirts, Legs, Saddles, Nonstandard
PRESSURE VESSELS Part III: Design Loads, Wind & Seismic, Skirts, Legs, Saddles, Nonstandard Flanges. STUDY NOTES Instructor: Javier Tirenti Index Introduction... 4 1. Material selection... 8 1.1) Corrosion...
More informationDesign and Construction Standards SECTION HYDRONIC PIPING
SECTION 15510 HYDRONIC PIPING PART 1 GENERAL 1.1 REFERENCES A. ANSI/ASME SEC 9: Welding and Brazing Qualifications. B. ANSI/ASME B16.3: Malleable Iron Threaded Fittings Class 150 and 300. C. ANSI/ASME
More informationSECTION HYDRONIC PIPING
PART 1 GENERAL 1.1 REFERENCES SECTION 15510 HYDRONIC PIPING A. ANSI/ASME SEC 9: Welding and Brazing Qualifications. B. ANSI/ASME B16.3: Malleable Iron Threaded Fittings Class 150 and 300. C. ANSI/ASME
More informationMatch your Inspection Ports to your Process Temperatures
ACCESS PLUG FLANGE, INC. The Worldwide Leader In Inspection Port Technology. O 1200 F Match your Inspection Ports to your Process Temperatures O 600 F O -32 F O -185 F Match your Inspection Ports to your
More informationINSTALLATION GUIDELINES FOR CHILL WATER PIPE INSULATION
PermaTherm, Inc. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.insulate.pipe.com/ Temperature Range 34 F to 167 F INSTALLATION GUIDELINES FOR CHILL WATER PIPE INSULATION PERMATHERM,
More informationThe Perfect Fit For Metal Retrofit
D u r o - S h i e l d M e t a l R e t r o f i t R o o f i n g S y s t e m The Perfect Fit For Metal Retrofit Lock out leaks. Lock in your investment. Has time caught up with your metal roof? There are
More informationA. Prepare formwork shop drawings using qualified professional engineer. Include detail of fabrication, assembly, and support of formwork.
DIVISION 03 CONCRETE 03 0100 MAINTENANCE OF CONCRETE 03 0505 UNDER SLAB VAPOR BARRIER A. Sheet vapor retarder shall be polyethylene sheet, ASTM D 4397, 10 mils thick minimum. Consult with Facilities Management
More informationAn Examination of Surface Morphology and In-Situ Study on ASTM A106-Gr.B CUI Piping in EDC Plant
ISSN : 2248-9622, Vol. 7, Issue 8, ( Part -4) August 2017, pp.35-40 RESEARCH ARTICLE OPEN ACCESS An Examination of Surface Morphology and In-Situ Study on ASTM A106-Gr.B CUI Piping in EDC Plant A.C. Mariappan*,
More informationCITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO
SECTION 07220 - ROOF INSULATION PART 1 - GENERAL 1.01 DESCRIPTION A. Work included: The Roofing Contractor will provide all polyisocyanurate insulation and high density wood fiber roof insulation (tapered
More informationBest Practice Corrosion/Erosion Monitoring and Critical Process Indicators Salton Sea KGRA. by Dr. Dan Hoyer, PE Veizades & Associates, Inc.
1 Best Practice Corrosion/Erosion Monitoring and Critical Process Indicators Salton Sea KGRA by Dr. Dan Hoyer, PE Veizades & Associates, Inc. Outline Process Indicators Challenges in High Temperature Corrosion
More informationTECHNICAL BULLETIN. Dissimilar Metal Corrosion in Roofing Installations
TECHNICAL BULLETIN Dissimilar Metal Corrosion in Roofing Installations This Technical Bulletin provides guidance when working with different metals used in roofing installations. Most metals used for construction
More informationA. This section is intended to provide design guidelines for Utility Direct Buried Piping and Conduit Systems.
Date Description of Change Pages / Sections Modified ID 6/15/16 Entire document - mgl44 PART 1 - INTRODUCTION 1.1 PURPOSE A. This section is intended to provide design guidelines for Utility Direct Buried
More informationSolving Corrosion Under Insulation Utilizing FOAMGLAS Cellular Glass Insulation Systems
Solving Corrosion Under Insulation Utilizing FOAMGLAS Cellular Glass Insulation Systems NACE International Jubail, Kingdom of Saudi Arabia November 30, 2010 Steven T. Oslica Director of Marketing FOAMGLAS
More informationPrevention Strategies Design and Coatings
Lecture 14 Prevention Strategies Design and Coatings Keywords: Corrosion Prevention, Designs, Protective Coatings. There are a number of methods to control corrosion. The choice of any one control technique
More informationMarina Coast Water District Marina, CA Steel Reservoir #2
WATER TANK INSPECTION REPORT Prepared for the Marina Coast Water District Marina, CA Steel Reservoir #2 October 26, 2005 490 Industrial Park Road Deep River, CT 06417 Tel: (860) 526-2610 Fax:(860) 526-5018)
More informationSECTION WELDED STEEL WATER STORAGE TANKS
SECTION 33 16 20 WELDED STEEL WATER STORAGE TANKS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Elevated tanks. 2. Appurtenances and accessories. B. Related Sections: 1. Section 03 31 20 - Concrete
More informationSECTION ALUMINUM-FRAMED HIGH PERFORMANCE THERMAL ENTRANCE DOORS
PART 1 GENERAL SECTION 08 1116 ALUMINUM-FRAMED HIGH PERFORMANCE THERMAL ENTRANCE DOORS 1.01 SECTION INCLUDES A. Aluminum-framed storefront, with vision glass. B. Infill panels of glass. C. Aluminum doors
More informationConcrete and H2S Gas in Wet Wells and Tanks. James Orr - Project Manager NACE Inspector - Dixon Engineering
Concrete and H2S Gas in Wet Wells and Tanks James Orr - Project Manager NACE Inspector - Dixon Engineering What can H2S Gas do to Concrete????????? Ho Chunk WWTP Influent Wet Well Recoating Project Influent
More informationSTANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL
STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL 1. SCOPE 2. DESIGN 3. MATERIALS 4. CONSTRUCTION 5. METHOD OF MEASUREMENT AND PAYMENT SCOPE This Specification sets out requirements for the design,
More informationSpecifications for Concrete Embedment Liner
Specifications for Concrete Embedment Liner Part 1: GENERAL 1.01 SECTION INCLUDES A. Specifications and guidelines for MANUFACTURING high-density polyethylene embedment liners. 1.02 REFERENCES A. American
More informationApplication Guide HI-TEMP 1027 APPLICATION GUIDE. Number: AG-3001 Revision: Page 1 of Introduction. 2. Where to apply Hi-Temp 1027
Page 1 of 7 This document provides information and details for the use and application of Hi-Temp 1027. It is designed to supplement the Hi-Temp 1027 Product Data sheet (PDS) and MSDS, not to replace them.
More informationSTAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM
STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM Installed in Pre-engineered Steel Buildings Provides Lowest Cost Construction Method for CORROSIVE AND WET Environments PREFERRED SOLUTIONS, INC.
More informationSECTION GROUND WATER STORAGE TANKS
SECTION 33 16 13 GROUND WATER STORAGE TANKS PART 1: GENERAL 1.01 SCOPE A. Section includes requirements for designing, fabricating, and erecting a welded steel ground storage tank. 1.02 SYSTEM DESCRIPTION
More informationDEPARTMENT OF DEFENSE TEST METHOD STANDARD METHOD 101, SALT ATMOSPHERE (CORROSION)
INCH-POUND MIL-STD-202-101 18 April 2015 SUPERSEDING MIL-STD-202G w/change 2 (IN PART) 28 June 2013 (see 6.1) DEPARTMENT OF DEFENSE TEST METHOD STANDARD METHOD 101, SALT ATMOSPHERE (CORROSION) AMSC N/A
More informationProtective Coatings for Underground Utility Concrete Structures. By: John E. Davis Inside Sales & Marketing Specialist: Sauereisen, Inc.
Protective Coatings for Underground Utility Concrete Structures By: John E. Davis Inside Sales & Marketing Specialist: Sauereisen, Inc. As our cities and municipalities grow older, the utility and wastewater
More informationFinding the Root Cause is Critical
Finding the Root Cause is Critical Have you ever repaired a tube leak and put the boiler back in service, only to be forced off-line by another leak? Identifying and correcting the root cause is essential.
More informationDistribution Review. Corrosion Control. Corrosion Control Vocabulary. American Water College 1. Corrosion Control Training Objectives
Distribution Review Corrosion Control Corrosion Control Training Objectives To gain an understanding of: Corrosion control vocabulary The factors affecting corrosion Methods used to control corrosion Alkalinity
More informationCorrosion Under Insulation (CUI) and the Insulation System. By Soeren Nyborg Rasmussen ROCKWOOL Technical Insulation, Jubail, 10 December 2015
Corrosion Under Insulation (CUI) and the Insulation System By Soeren Nyborg Rasmussen ROCKWOOL Technical Insulation, Jubail, 10 December 2015 The issue Corrosion of steel occurs in the presence of water
More informationGuidance for repair/rehabilitation of concrete transport infrastructures (CTIS)
Guidance for repair/rehabilitation of concrete transport infrastructures (CTIS) Activity Lead Partner Queen s University Belfast, Northern Ireland, UK Investing in our common future Causes of deterioration
More informationBuildingName The Description of the Project P DOCUMENTS
ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION
More informationSECTION 92 METER LIFT ASSEMBLIES
2019 - SECTION 92 METER LIFT ASSEMBLIES 92.1 GENERAL This section of the specifications shall form a part of the contract documents and should be read in conjunction with them. The work shall include the
More informationSTEEL SURFACE PREPARATION
Technical Note STEEL SURFACE PREPARATION (For purposes of this Technote, painting and coating are interchangeable. Also, this Technote deals with carbon steel, stainless steel, and other ferrous metals
More informationLIQUID PENETRANTS USER S MANUAL in accordance to specifications: EN 571, ASTME 1417, AMS 2644, MIL, ASME, DIN, UNI, BS, AFNOR, etc..
LIQUID PENETRANTS USER S MANUAL in accordance to specifications: EN 571, ASTME 1417, AMS 2644, MIL, ASME, DIN, UNI, BS, AFNOR, etc.. The liquid penetrant examination method is an effective means for detecting
More informationGuide Specifications ADP Series SECTION SHEET METAL ROOFING
PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Sheet metal roofing panels, metal trim, accessories, fasteners, closures, and sealants. [Specifier Note: Edit paragraph below to suit project requirements.]
More informationSECTION HVAC PIPING INSULATION
SECTION 23 0719 HVAC PIPING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install insulation on above ground refrigerant piping and fittings as described in Contract
More informationMetal Retrofit Systems from Royalty Roofing
Metal Retrofit Systems from Royalty Roofing Roofing Integrity, Quality, Value and Service Since 1986 Has time caught up with your metal roof? There are good reasons to choose metal roofing, including lower
More informationTRABUE, HANSEN & HINSHAW, Inc.
CONSULTING ENGINEERS 1901 Pennsylvania Drive Columbia, MO 65202 TRABUE, HANSEN & HINSHAW, Inc. March 4, 2014 Mr. Larry Hubbard Director of Campus Facilities Plan, Design & Construction E111 General Services
More informationFactors Influencing Materials Selection in Condensing Economizers
Materials Selection for Condensing Economizers Gary M. Carinci, Ph.D. Outokumpu Stainless Outokumpu Stainless Factors Influencing Materials Selection in Condensing Economizers Temperature ph control Sulfur
More informationInspection and Welding Repairs of Pressure Vessels
Inspection and Welding Repairs of Pressure Vessels BY S. V. GUPTE B.E., D.M.E. ASNT LEVEL III - RT,MT,PT,VT PRESSURE VESSEL INSPECTOR (API 510), (CCOE) PAINT AND COATING INSPECTOR (NACE INDIA) LEAD AUDITOR
More informationITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:
ITEM 431 PNEUMATICALLY PLACED CONCRETE 431.1. Description. This Item shall govern for furnishing and placing of "Pneumatically Placed Concrete" for encasement of designated structural steel members, the
More informationUnderground Steam Condensate Distribution Piping
University of New Hampshire University of New Hampshire Scholars' Repository Division 33 Utilities Chapter 5 Technical Construction and Renovation Standards Spring 4-16-2018 336313 Underground Steam Condensate
More informationK. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.
DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:
More informationOctaform Quick Liner Wall & Ceiling Panels Guide Specification CAN Page 1
Guide Specification CAN Page 1 This master guide specification Section is intended for use when specifying plastic panelling. This section includes performance, and descriptive type specifications; edit
More informationGUTTERS TYPICAL PROBLEMS AND SOLUTIONS
GUTTERS TYPICAL PROBLEMS AND SOLUTIONS Alexandra Pinto Technical Manager & Solutions Development @ Up-way Systems & Partners A Gutters and its impact on the integrity of a building Gutters have one function:
More informationTreads, Tread Repair Covers and Nosings
ALGRIP Slip-Resistant Metal Stair Treads, Tread Repair Covers and Nosings Remarkably versatile, slip-resistant tread solutions for new and existing stairways ALGRIP Slip-Resistant Metal Stair Treads, Tread
More informationINSTALLATION GUIDELINES FOR COLD/CRYOGENIC PIPE INSULATION
PermaTherm, Inc. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.insulate.pipe.com/ Temperature Range -310 F to 32 F INSTALLATION GUIDELINES FOR COLD/CRYOGENIC PIPE INSULATION PERMATHERM,
More informationGC-Compass : A Software Tool for Galvanic Corrosion Prediction and Materials Galvanic Compatibility Assessment
GC-Compass : GC-Compass: A Software Tool for Galvanic Corrosion Prediction and Materials... Page 1 of 15 Advisory Consultancy Training Expert Witness FA Diagnosis Design Review Corrosion Test Inspection
More informationCommercial Roof Cover Maintenance and Repair Risk Engineering Your Business Insurance Specialists
Commercial Roof Cover Maintenance and Repair Risk Engineering Your Business Insurance Specialists With information provided by the Insurance Institute for Business & Home Safety Protection from the top
More informationWhite Paper. Fire Sprinkler Riser Corrosion. (May 2014) Jeffrey Kochelek (Engineered Corrosion Solutions, LLC) V.1.0.1
White Paper Fire Sprinkler Riser Corrosion (May 2014) Jeffrey Kochelek (Engineered Corrosion Solutions, LLC) V.1.0.1 Copyright 2014 Engineered Corrosion Solutions, LLC. All rights reserved. This white
More informationLIFETIME WATERPROOFING SEALANT FREQUENTLY ASKED QUESTIONS
Welcome to the world's finest water sealant product. This page is designed to answer the most frequently asked questions about Lifetime Water Sealant 1). How many coats should I apply? One coat. Apply
More informationSelections from ANSI/TPI National Design Standard for Metal Plate Connected Wood Truss Construction
Selections from ANSI/TPI 1-00 National Design Standard for Metal Plate Connected Wood Truss Construction Page 1 6. ADJUSTMENTS TO DSIGN VALUES 6..1 Load Duration Factor (C D ) 6..1.1 Design values shall
More informationSSL-175. Specifications
SSL-175 Specifications Everlast Metals 10 Enterprise Court Lebanon, PA 17042 Phone: (717) 270-6554 Fax: (717) 270-6569 www.everlastmetals.com 7410 Preformed Metal Roofing PART 1: GENERAL 1.01 SECTION INCLUDES
More informationThermal Insulation Inspector Program. Introducing the Thermal Insulation Inspector Program (TIIP)
Thermal Insulation Inspector Program Introducing the Thermal Insulation Inspector Program (TIIP) TIIP Objective The Thermal Insulation Inspector Program (TIIP) course is designed for those individuals
More informationMetropolitan Water Reclamation District of Greater Chicago 10/19/ Mark Joyce Senior Mechanical Engineer Engineering Department
Metropolitan Water Reclamation District of Greater Chicago 10/19/201 2 Mark Joyce Senior Mechanical Engineer Engineering Department 1 Definition of Corrosion Corrosion is the deterioration of a substance
More informationBridge Preservation Product Advantages:
Specializing in the rail and highway markets, Bridge Preservation manufactures high performance membrane systems designed to permanently protect rail and highway structures. These rapid setting high build
More informationITW INSULATION SYSTEMS
ITW INSULATION SYSTEMS 1SCOPE TRYMER RIGID POLYISOCYANURATE INSULATION IN LIQUEFIED NATURAL GAS APPLICATIONS (-260 F) 1.1 This guideline covers the installation of Trymer* Rigid Polyisocyanurate Insulation
More informationAgenda ISO Corrosion Protection Of steel Structures
Introduction to Control Corrosion in line with ISO 12944 latest edition 2018 Agenda ISO 12944 Corrosion Protection Of steel Structures Introduction to Jotun Cost Of Corrosion Corrosion mechanism Introduction
More informationITW INSULATION SYSTEMS
ITW INSULATION SYSTEMS 1SCOPE TRYMER RIGID POLYISOCYANURATE INSULATION IN LIQUEFIED NATURAL GAS APPLICATIONS (Cryogenic to -70 F) 1.1 This guideline covers the installation of TRYMER Rigid Polyisocyanurate
More informationInspection & Maintenance of Concrete Facilities By Cheyenne Wohlford CCS GROUP, LLC
Inspection & Maintenance of Concrete Facilities By Cheyenne Wohlford 1 Introduction Most Grain Elevators were built between 1950 and 1960 with a life expectancy of 30 years. Operational changes since 1960
More informationby David Crowe and Randy Nixon Corrosion Probe, Inc.
by David Crowe and Randy Nixon Corrosion Probe, Inc. Introduction to Stainless Steels Austenitic 300 Series 304/304L and 316/316L Are Most Common Face-Centered Cubic Arrangement of Atoms We Call This Microstructure
More informationACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT
ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT Specification for Acoustical Insulation (Lagging) for Piping and Equipment 1 of 5 TABLE OF CONTENTS 1.0SCOPE..... 3 2.0REFERENCED PUBLICATIONS...
More informationSPECIAL SPECIFICATION. Transparent Noise Barrier Panels
2004 Specifications CSJ 0047-06-139 SPECIAL SPECIFICATION 4659 Transparent Noise Barrier Panels 1. Description. Furnish the materials and construct a transparent panel noise barrier as shown on the plans
More informationWater Management & Damage Prevention: A Guide for Homeowners
Water Management & Damage Prevention: A Guide for Homeowners This article provides homeowners with basic information to make these decisions and take the appropriate actions to keep their homes dry and
More informationInstallation Guidelines for ITW Insulation Systems Metal Jacketing Used on Insulated Pipe
Installation Guidelines for ITW Insulation Systems Metal Jacketing Used on Insulated Pipe 1 SCOPE 1.1 This guideline covers the installation of ITW Insulation Systems Pabco-Childers brand aluminum and
More information.1 Thermal insulation for insulated piping and piping accessories affected by construction and new pipe sections as indicated on drawings.
BID OPPORTUNITY NO. 253-2011 PAGE 1 OF 8 PART 1 GENERAL 1.1 SUMMARY.1 Section Includes: 1.2 REFERENCES.1 Thermal insulation for insulated piping and piping accessories affected by construction and new
More informationHigh Energy Piping Inspection Program for Power Generation and Process Industries. For Regulatory Compliance, Safety, and System Longevity
High Energy Piping Inspection Program for Power Generation and Process Industries For Regulatory Compliance, Safety, and System Longevity EAPC Industrial Services offers an inspection plan for assessment
More informationCHAPTER 11 CONDUITS AND FITTINGS
CONDUITS AND FITTINGS CHAPTER 11 CONDUITS AND FITTINGS The standards and requirements for conduits and fittings used for traffic control signal and lighting systems are presented in this chapter. 11.1
More informationDISTRIBUTION OPERATIONS AND MAINTENANCE
EB-00-0 Exhibit F Schedule Page of 0 DISTRIBUTION OPERATIONS AND MAINTENANCE PREVENTIVE MAINTENANCE Preventive Maintenance is intended to maintain or improve customer service reliability, extend equipment
More informationCool Science for Cold Service.
Cool Science for Cold Service. Extruded Polystyrene Pipe Insulation Billet (XPS PIB) Saran CX Vapor Retarder Film and Tape for Pipes, Vessels, Valves, and Fittings 2 3 XPS PIB features a 180 day aged k-factor
More informationEnvironmental concerns include the presence of oxygen, moisture (water), contact with dissimilar metals, and chemicals.
Construction Concern: Corrosion Article and photos by Gregory Havel May 9, 2018 Corrosion of a metal can be defined as its degrading from a reaction with its environment. This degradation can cause weakening
More information20 YEARS WARRANTY Against Corrosion
20 YEARS WARRANTY Against Corrosion Relating to the quality of Magnelis ZM310-type coated flat carbon steel. Subject to the conditions of this document, this warranty covers the non-perforation nonrupture
More informationCONCRETE STEPS, HANDRAILS, AND SAFETY RAIL
SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9080 - Concrete Steps, Handrails, and Safety Rail CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL PART - GENERAL.0 SECTION INCLUDES
More informationREAFFIRMATION WITH EDITORIAL REVISION October Process Industry Practices Insulation. PIP INEG1000 Insulation Design Guide
REAFFIRMATION WITH EDITORIAL REVISION October 2010 Process Industry Practices Insulation PIP INEG1000 Insulation Design Guide PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the
More informationPLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING!
INSTALLATION GUIDE This guide is intended to aide in the installation of Dura-Trench systems. There are many different applications and situations for the use of this product and the installation procedures
More informationLaboratory and Field Corrosion Investigation of Galvanized Utility Poles
Laboratory and Field Corrosion Investigation of Galvanized Utility Poles M. Zamanzadeh 1, C. D. Kempkes 2, D. Aichinger 3 and D. Riley 4 1 MATCO Associates, Inc., President, Department of Research & Development,
More informationNortheast Gas Operation School Thursday June 5 th
Northeast Gas Operation School Thursday June 5 th Recognition and Assessment of Atmospheric Corrosion Presented by Donald A. Doubleday Jr. National Grid New England Corrosion Engineer & Team Lead Contents
More informationHVAC Piping Insulation FIBERGLAS Insulation. General Specification Guide SECTION
HVAC Piping Insulation FIBERGLAS Insulation General Specification Guide PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals,
More informationCONDUITS AND FITTINGS
CONDUIT AND FITTINGS Rigid Steel Conduit 3801 Rigid PVC Conduit 3803 HDPE Conduit 3803 Flexible Non Metallic Liquid Tight Conduit Type LFNC-B 3804 PVC Coated Urethane Lined Galvanized Rigid Steel Conduit
More informationBODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION
BODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION October 2009 (Replaces November 2008) API Authorized Aboveground Storage Tank Inspectors must have a broad knowledge
More informationComputational Methods in Science and Engineering
The effect of shot peening on the stress corrosion cracking resistance of 304 AISI stainless steel immersed in NaCl solution PROF. NASIR ALKLOUB DR. MUSA AL-TAL PROF. OMAR.O.BADRAN Al-Balqa` Applied University,
More informationGUJARAT NARMADA VALLEY FERTILIZERS & CHEMICALS LIMITED
CONTENTS 1. Scope 2. Referenced Documents 3. Abbreviations 4. Materials and Manufacture 5. Dimensions 6. Inspections and Tests 7. Markings 8. Preparation for Shipment - 1 - 1. Scope 1.1 This specification
More informationCorrosion. Cause of Corrosion: Electrochemical Mechanism of Corrosion (Rusting of Iron)
Corrosion Any process of deterioration (or destruction) and consequent loss of a solid metallic material, through an unwanted (or unintentional) chemical or electrochemical attack by its environment, starting
More informationCase Study: Failure Analysis of Sulfuric Acid Supply Line
Case Study: Failure Analysis of Sulfuric Acid Supply Line Introduction VGO Testing & Inspection Engineers was retained by an industrial client to determine the cause of failure of a 1-inch diameter carbon
More informationSpec Master 5/7/ For each product requiring color and texture selection, provide full size samples.
SECTION 04812 (042012) MECHANICALLY ATTACHED BRICK PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationTable of Contents. List of Drawings
SCOPE OF WORK Hastings Stadium Exhibition Park, 81 London Road, Guelph, Ontario Structural and Maintenance Remedial Work Prepared For City of Guelph City Hall, 1 Carden Street, Guelph, ON N1H 3A1 Prepared
More informationCathodic Protection of Steel in Concrete
Cathodic Protection of Steel in Concrete For many years industrial companies have fought to protect steel reinforced concrete from corrosion. The prime causes of corrosion in concrete include salt, chloride
More informationADDENDUM NUMBER 1 PARTICULARS 1.01 DATE: APRIL 6, 2018
PARTICULARS 1.01 DATE: APRIL 6, 2018 ADDENDUM NUMBER 1 1.02 PROJECT: MIDLANDS TECHNICAL COLLEGE NE CAMPUS - CET CHILLER REPLACEMENT 1.03 OWNER'S PROJECT NUMBER: H59-N991-FW 1.04 ENGINEER: GMK ASSOCIATES
More information10.1 APPLICATION 1 A. HOT PIPING 1 B. ANTI SWEAT PIPING 1 C. COLD PIPING FINISHES 2
SECTION 10: 10.1 APPLICATION 1 A. HOT PIPING 1 B. ANTI SWEAT PIPING 1 C. COLD PIPING 2 10.2 FINISHES 2 10.3 PIPING FORMAT 3 A. PIPE INSULATION 3 B. PIPE INSULATION 3 C. INSULATION ATTACHMENT 3 D. INSULATION
More informationCanadian Natural Resources Ltd. GENERAL PRESSURE VESSEL INFORMATION Job #
District: Karr Creek Facility: Sturgeon Lake Battery Vessel Name Equipment Number: Oil Treater Orientation: Horizontal Canadian Natural Resources Ltd. GENERAL PRESSURE VESSEL INFORMATION Job # 10.113812
More informationPIP INEG1000 Insulation Design Guide
December 2017 Insulation PIP INEG1000 Insulation Design Guide PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has been prepared