1 ADDENDUM NO. 5 ITB-CD-CME Southern Well Field Expansion: Equip 5 Wells and New Raw Water Main Phase 2 ISSUE DATE: August 22, 2016 DUE DATE: August 25, 2:00 p.m. SUBJECT: Addendum No. 5 INTENT: This addendum is issued prior to the date bids are due in order to incorporate the following clarifications, additions, omissions, deletions, or changes into the Contract Documents. Except as hereinafter specified, the work shall be in accordance with the drawings and specifications. Bidders are to use the changed quantities of the items listed in this addendum in their proposals, and it shall become a part of the Contract Documents when construction is executed. Bidders are reminded that this addendum must be noted on the Official City Acknowledgment Form when they submit their proposal. A signed copy of the addendum must also be included with the bid submittal. 1. STATEMENTS A. All of the telemetry equipment for this project is hereby removed. This includes the following material: i. Remote Telemetry Unit ii. Radio iii. Antenna Tower Any and all buried conduit from the RTU cabinet to the antenna tower location shall be installed, brought above grade and capped. The Sensus ACT-PAK transmitter shall also be installed. B. Per the EPA, portable/trailer-mounted generators must meet the EPA Tier 4 emission requirements, which will take effect in In the interim, there are manufacturers that have Tier 4 final certified engines, or Tier 4 Interim Compliant Engines or Tier 3 Flex Credit Engines. The engine for the portable generator must be one of the previously mentioned, and must also have a 48-hour sub-base fuel tank and an aluminum enclosure. Anything else is not acceptable. Location of the control panel and electrical connections is not an issue. Section has been revised to reflect the above. 2. PROJECT MANUAL A. Section i. The following paragraphs have been revised: 1.01-A; 1.02-B; 1.02-D; 1.02-F; 1.04-A. Delete this Section in its entirety and substitute a new R section, which is attached and made part of this Addendum. 3. QUESTIONS & RESPONSES A. Question: Bid form page requires listing the manufacturer used for PVC pipe in section After reading we found that there are four different types of PVC listed with different manufacturers named (DR18, SDR21, SCH 40 & SCH 80). Which PVC pipe type is listed on the bid form? Response: DR18. Page 1 of 4 ITB-CD-CME Southern Well Field Expansion: Equip 5 Wells and New Raw Water Main Phase 2

2 B. Question: Are there geotechnical reports available? They are listed in the table of contents but we are unable to find them. Same question for Permits. Response: The geotechnical report and FDEP permit were included within Addendum #3. C. Question: Can you furnish contact information for KW Controls, Inc. Response: Since all of the telemetry has been removed, other than the Sensus flow transmitter and buried conduit, this question does not require an answer. D. Question: Air release valve located at STA is does not appear to be at a high point in the line segment. Can this air release be relocated further downstream (Approx. STA ), or should another air release be installed? Response: Bid the project with the air release valve as shown. Any change in location will be made with the Contractor awarded the project. E. Question: Should there be an Air release valve located between STA , and STA ? Response: Possibly; however, bid the project as designed. F. Question: Is there a local water source for Hydrostatic testing, pigging, and flushing of the pipeline? If there is, where is it located? Response: This question was addressed in Addendum #3. G. Question: A 12 valve is shown at STA on piping profile, but not on the Plan view. Is this valve to be included? Response: Yes. The 12 valve will be placed to the east of the 12 6 tee. H. Question: Can well reports, including inner and outer casing material (i.e. DR) be provided? Response: Well completion reports were provided in Addendum #3. The 12 Certa-Lok SDR 17 casing ID is I. Question: Please confirm Non-permanent O-Rings are to be fitted in the Certa-lok Pump column couplers. Response: Yes. Non-permanent O-rings will be used in the column couplers. J. Question: Please confirm method of connection for the plain ends of the 8 /6 stainless pipe at the well cap, and the 8 /6 Certa-lok male x PE adapter. Response: The callouts on the drawing are correct. K. Question: The capacities, and discharge size of Grudfos pumps noted for use in the well table on Drawing C-25 appear to be slightly lower than the capacities specified in section Will the pumps in the well table on Drawing C-25 be acceptable? Response: Yes. L. Question: Components of the well cap that penetrate the base plate (8 SS pipe, 2 SS vent, and 1 ½ SS cable entry) will not fit in the well as shown on Drawing C-25. Please review and confirm wellhead configuration. Response: As part of this addendum, the column pipe for the submersible pumps has been changed to 6 ; this should now provide adequate space to install the miscellaneous small pipe. Page 2 of 4 ITB-CD-CME Southern Well Field Expansion: Equip 5 Wells and New Raw Water Main Phase 2

3 M. Question: Bid Form Page says Indemnification is $ or 1% of the bid whichever is greater. Bid Item 28 says MAX 1% of bid. Will Bid Item 28 need to be 1% of the sum of Bid Items 1 thru 27? Same question for the Additive Alternate. Response: Both Bid Item Nos. 28 and 44 will use a maximum 1% of the Bid. N. Question: Spec calls for ceramic epoxy lined fittings in all applications except for potable water or reuse water. As the wells are raw water, are ceramic epoxy lined fittings required on this job or are cement mortar lined fittings acceptable? Response: Cement mortar-lined fittings are acceptable. O. Question: Sheets E4 thru E6 show directional drills for the FPL service to these well sites. Are these drills paid for under Bid Item #24A? If not, which Bid Item? Response: Yes. Bid Item #24a has been revised in Addendum #3 to include the drills for the FPL service. P. Question: We have not received the soils report yet & understand it s to come with the next addendum. Spec calls for 3 of material to be removed & replaced with compacted backfill while the clearing is being done. Since the clearing is basically done at most of the well sites, does this dirt need to be removed & replaced? Or just to the depth where organics are encountered? Or just follow the soils report recommendations? Response: The dirt at the well sites does not require removal and replacement. Removal of undesirable material and replacement with select fill will occur between STA and STA Q. Question: Sheet C-24, Well LW-108, has See Note 1 & See Note 4 on the Layout Plan but there are no notes. Which notes are we to reference? Response: A revised Sheet C-24 has been included with this Addendum that lists the pertinent notes for this well site. R. Question: Sheets C-20 thru C-23, Note 1 calls for a herbicide treatment per spec prior to installing the weed fabric. Is this treatment required under the well pump slabs & driveways per the spec? Response: Yes. S. Question: Please clarify depth of limerock base for asphalt open cut areas? Response: The limerock shall be 8 minimum thickness or twice the thickness of the existing base, whichever is greater. T. Question: Please clarify well site clearing. Is the contractor expected to clean all vegetation within clear limits and only clear 6 trees outside of this area? Response: Any well sites where it states to extend the cleared area, all material will be removed except trees 6 in diameter or greater. U. Question: The Plans do not have referenced notes on LW 108 site plan. Response: A revised Sheet C-24 has been included with this Addendum that lists the pertinent notes for this well site. V. Question: Will the load bank test be Resistive only or Resistive & Reactive? Response: Resistive only. Page 3 of 4 ITB-CD-CME Southern Well Field Expansion: Equip 5 Wells and New Raw Water Main Phase 2

4 4. DRAWINGS Sheet No. Description C-6 Overlapping notes removed at Match Line; notes are located on Sheet 7-A. C-24 Added Notes. C-25 Revised callout for concrete pipe support. Changed pump column diameters from 8 to 6. Added 2 pipe to pump pier. Revised 8 stainless steel blind flange to 6. Revised 8 6 stainless steel tee to 6 6. Revised 8 stainless steel pipe that penetrates the base plate to 6. Added note to extend steel casing to a height that will accept the 2 pipe connection. Added note related to the reduction in the pump column size from 8 to 6. E-2 Service disconnect and internal load break switch and fuses changed to a breaker symbol. E-8 Internal load break changed to internal load breaker. Revised control transformer and where it is to be mounted. E-9 Control cabinet description revised to show 316SS and to call out inner door right hinge only. Acknowledgment: Signature and Date Printed Name and Title Company Name Attachments: Section 16215R: Standby Engine Generator Set (Trailer Mounted) Drawings: C-6; C-24; C-25; E-2; E-8; E-9 END OF ADDENDUM NO. 5 Page 4 of 4 ITB-CD-CME Southern Well Field Expansion: Equip 5 Wells and New Raw Water Main Phase 2

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

Forsyth County Procurement

Forsyth County Procurement Forsyth County Procurement Donna Kukarola, CPPO, CPPB, Procurement Director August 21, 2017 ADDENDUM # 3 BID NO. 17-74-3340 For: Construction of the Newton Pumping Station and Sanitary Sewer This addendum

More information

CITY OF PUNTA GORDA, FLORIDA

CITY OF PUNTA GORDA, FLORIDA CITY OF PUNTA GORDA, FLORIDA PHONE: (941) 575-3351 FAX: (941) 575-3340 EMAIL: pgpurch@pgorda.us PROCUREMENT DIVISION 326 West Marion Avenue Punta Gorda, Florida, 33950 October 9, 2014 SOLICITATION #F2013124/CONS-PIPEREPL/WWTP

More information

TITLE: Construction Services for the US-1 South Re-Pump and Booster Pump Station Project

TITLE: Construction Services for the US-1 South Re-Pump and Booster Pump Station Project Procurement Department Bid Office Customer Center 1 st Floor, Room 002 21 W. Church Street Jacksonville, Florida 32202 June 06, 2018 ADDENDUM NUMBER: One (1) TITLE: Construction Services for the US-1 South

More information

C o u n t y o f F a i r f a x, V i r g i n i a

C o u n t y o f F a i r f a x, V i r g i n i a 001961 Page 2 C o u n t y o f F a i r f a x, V i r g i n i a A D D E N D U M DATE: August 2, 2016 ADDENDUM NO. 4 TO: REFERENCE: FOR: DUE DATE/TIME: ALL PROSPECTIVE BIDDERS Government Center Generator System

More information

Pump Station No. 1 and Storage Tank

Pump Station No. 1 and Storage Tank ADDENDUM NO. 3 Pump Station No. 1 and Storage Tank HMM Project No. 299802 CFWB Bid No. ITB 12-028 August 16, 2012 This addendum forms a part of the Contract Documents and modifies the original Project

More information

ASHCROFT PUMP STATIONS 2 & 3 CAPACITY IMPROVEMENTS PROJECT ACSA Project No Addendum 1 June 20, 2018

ASHCROFT PUMP STATIONS 2 & 3 CAPACITY IMPROVEMENTS PROJECT ACSA Project No Addendum 1 June 20, 2018 ASHCROFT PUMP STATIONS 2 & 3 CAPACITY IMPROVEMENTS PROJECT ACSA Project No. 2014-10 Addendum 1 June 20, 2018 ALBEMARLE COUNTY SERVICE AUTHORITY ALBEMARLE COUNTY, VIRGINIA Prepared for: Albemarle County

More information

QUESTIONS & ANSWERS ITB HELEN MCCALL PARK IMPROVEMENTS

QUESTIONS & ANSWERS ITB HELEN MCCALL PARK IMPROVEMENTS QUESTIONS & ANSWERS ITB 017-030 HELEN MCCALL PARK IMPROVEMENTS QUESTION: Site Lighting. The prints show that the existing site lighting structures are to be relocated on site. Is this the only site lighting

More information

AD 1-1 ITB U CITATION BLVD./OLD KINGS ROAD TO S.R. 100 WATER MAIN

AD 1-1 ITB U CITATION BLVD./OLD KINGS ROAD TO S.R. 100 WATER MAIN ADDENDUM NO. 1 ITB-U-11-05 CITATION BLVD./OLD KINGS ROAD TO S.R. 100 WATER MAIN ISSUE DATE: February 14, 2011 BID DATE: TO: SUBJECT: INTENT: March 1, 2011 @ 2:00 P.M. All Prospective Bidders and Others

More information

ADDENDUM NO. 2 ITB-PW-U CITY OF PALM COAST WTP 3 ELECTRICAL DISTRIBUTION FACILITIES TO SERVE WELL SITES PH 2

ADDENDUM NO. 2 ITB-PW-U CITY OF PALM COAST WTP 3 ELECTRICAL DISTRIBUTION FACILITIES TO SERVE WELL SITES PH 2 ADDENDUM NO. 2 ITB-PW-U-12-09 CITY OF PALM COAST WTP 3 ELECTRICAL DISTRIBUTION FACILITIES TO SERVE WELL SITES PH 2 ISSUE DATE: August 20, 2012 BID DATE: August 28, 2012, at 2:00 PM This addendum is issued

More information

CHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE

CHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 February 27, 2014 ITB NO. 14-33 WAKEFIELD PUMPING STATION UPGRADE ADDENDUM NUMBER

More information

ADDENDUM NO.2 REQUEST FOR PROPOSALS FOR CITY OF PALM COAST

ADDENDUM NO.2 REQUEST FOR PROPOSALS FOR CITY OF PALM COAST ADDENDUM NO.2 REQUEST FOR PROPOSALS FOR CITY OF PALM COAST WASTEWATER TREATMENT PLANT NO.2 MEMBRANE BIOREACTOR EQUIPMENT City Project No. RFP- U- 08-10 DATE: March 28, 2008 TO: Prospective Membrane Bioreactor

More information

RFB # ADDENDUM NO. 1 ISSUED APRIL 23, 2018 PRE-BID MEETING MINUTES NEW HANOVER COUNTY LANDFILL GAS COLLECTION AND CONTROL SYSTEM CONSTRUCTION

RFB # ADDENDUM NO. 1 ISSUED APRIL 23, 2018 PRE-BID MEETING MINUTES NEW HANOVER COUNTY LANDFILL GAS COLLECTION AND CONTROL SYSTEM CONSTRUCTION RFB # 18-0197 ADDENDUM NO. 1 ISSUED APRIL 23, 2018 PRE-BID MEETING MINUTES NEW HANOVER COUNTY LANDFILL GAS COLLECTION AND CONTROL SYSTEM CONSTRUCTION The following information was conveyed and discussed

More information

ADDENDUM NO. 2. Except as hereinafter specified, the work shall be in accordance with the drawings and specifications.

ADDENDUM NO. 2. Except as hereinafter specified, the work shall be in accordance with the drawings and specifications. ITB-CD-CM-14-03 Scoreboards for Indian Trails Sports Complex ISSUE DATE: January 15, 2014 DUE DATE: January 22, 2014 @ 2:00pm ADDENDUM NO. 2 SUBJECT: Bidder question and Clarifications INTENT: This addendum

More information

November 29, CITY OF PLANT CITY Purchasing Division (813)

November 29, CITY OF PLANT CITY Purchasing Division (813) November 29, 2018 CITY OF PLANT CITY Purchasing Division (813) 659-4270 IFB 18-014UM-LG 12-inch Water Transmission Main-Franklin St., Hancock St. and Terrace Drive West ADDENDUM No. 3 *Bidders are required

More information

SEMINOLE TRIBE OF FLORIDA PURCHASING DEPARTMENT RFB MABEL T FRANK WAY ROADWAY CONSTRUCTION BIG CYPRESS INDIAN RESERVATION

SEMINOLE TRIBE OF FLORIDA PURCHASING DEPARTMENT RFB MABEL T FRANK WAY ROADWAY CONSTRUCTION BIG CYPRESS INDIAN RESERVATION SEMINOLE TRIBE OF FLORIDA PURCHASING DEPARTMENT RFB MABEL T FRANK WAY ROADWAY CONSTRUCTION BIG CYPRESS INDIAN RESERVATION 6300 STIRLING ROAD HOLLYWOOD, FLORIDA 33024 ADDENDUM NUMBER THREE June 12, 2015

More information

TO ALL HOLDERS OF PLANS AND SPECIFICATIONS:

TO ALL HOLDERS OF PLANS AND SPECIFICATIONS: ABCD October 27, 2016 TO ALL HOLDERS OF PLANS AND SPECIFICATIONS: 102 Asma Boulevard Suite 305 Lafayette, LA 70508 (337)232-5182 LA WATS(800)737-5182 FAX (337)237-7132 www.dsaengineering.com RE: South

More information

legend. #1 is a gas relief valve? If so does Enbridge supply with station?

legend. #1 is a gas relief valve? If so does Enbridge supply with station? Michael Pacholok, Director Purchasing and Materials Management Division City Hall, 8 th Floor, West Tower 00 Queen Street West Toronto, Ontario M5H N Joanne Kehoe Manager Construction Services May 4, 06

More information

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018 155 Corey Avenue St. Pete Beach, FL 33706-1839 www.stpetebeach.org Addendum 1 Valve & Valve Vault Replacement Issued June 13, 2018 Note that this Addendum does not change the bid due date and time as stated

More information

ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,

More information

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders. Addendum #1 Project: Coteau Street & Utility Improvements Bid Date: 1:00 P.M., Local Time, March 20, 2017 Bid Location: Office of the City Administrator/Clerk, City of Lake Benton 106 S. Center Street

More information

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction. General: 1. Construct utilities in accordance to TWA approved plans and shop drawings. Any deviation from the approved plans shall be approved by the DEVELOPER S ENGINEER and TWA 2. A preconstruction meeting

More information

Masterson 24-Inch Water Main Extension Solicitation Number: CO Job No.: ADDENDUM 2 July 3, 2018

Masterson 24-Inch Water Main Extension Solicitation Number: CO Job No.: ADDENDUM 2 July 3, 2018 Masterson 24-Inch Water Main Extension Solicitation Number: CO-00177 Job No.: 18-1018 ADDENDUM 2 July 3, 2018 To Bidder of Record: This addendum, applicable to work referenced above, is an amendment to

More information

This document shall become attached to and part of the Construction Documents for the aforementioned project.

This document shall become attached to and part of the Construction Documents for the aforementioned project. ADDENDUM Pre Bid Addendum No. 01 TO PLANS AND SPECIFICATIONS FOR Livonia Public Schools High School Press Boxes SHW Project No. 7113.059, 7113.060 & 7113.061 February 20, 2014 NOTE: If you have questions

More information

ISSUE DATE JANUARY 1st, 2008 SECTION 5G FIBERGLASS PACKAGE LIFT STATION

ISSUE DATE JANUARY 1st, 2008 SECTION 5G FIBERGLASS PACKAGE LIFT STATION ISSUE DATE JANUARY 1st, 2008 SECTION 5G FIBERGLASS PACKAGE LIFT STATION FIBERGLASS PACKAGE LS SITE PLAN PAGE No. 111 NUMBER: FG-LS-SITE-PLN FIBERGLASS PACKAGE LS PIPING PLAN PAGE No. 112 NUMBER: FG-LS-PIPE-PLN

More information

Please note: Drawings M105, M109, M203, M204, M205 and M207 were attached to ADDENDUM 2 and replace the previous drawings.

Please note: Drawings M105, M109, M203, M204, M205 and M207 were attached to ADDENDUM 2 and replace the previous drawings. Procurement Department Bid Office Customer Center 1 st Floor, Room 002 21 W. Church Street Jacksonville, Florida 32202 June 20, 2016 ADDENDUM NUMBER: THREE (3) TITLE: 081-16 Arlington East WRF Secondary

More information

CIVIC CENTER NORTH PUMP STATION AND JOHN DUCKETT PUMP STATION STANDBY GENERATOR REPLACEMENT PROJECT

CIVIC CENTER NORTH PUMP STATION AND JOHN DUCKETT PUMP STATION STANDBY GENERATOR REPLACEMENT PROJECT FOR BIDDING ONLY MARIN COUNTY, CALIFORNIA CIVIC CENTER NORTH PUMP STATION AND JOHN DUCKETT PUMP STATION STANDBY GENERATOR REPLACEMENT PROJECT JOB NO. 10300-11/-09 VOLUME 4: DRAWINGS NOVEMBER 2011 DISTRICT

More information

PROJECT NAME: NAVAJO TRIBAL UTILITY AUTHORITY WASTEWATER TREATMENT PLANT UPGRADES

PROJECT NAME: NAVAJO TRIBAL UTILITY AUTHORITY WASTEWATER TREATMENT PLANT UPGRADES Solutions for Today Vision for Tomorrow ADDENDUM 5 DATE: June 16, 2016 PROJECT NAME: NAVAJO TRIBAL UTILITY AUTHORITY WASTEWATER TREATMENT PLANT UPGRADES PROJECT NO. 115111 TO: ALL PLAN HOLDERS OF RECORD

More information

ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION THE TOWN OF MALTA AND A PORTION OF THE 115KV

ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION THE TOWN OF MALTA AND A PORTION OF THE 115KV ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION IN THE TOWN OF MALTA AND A PORTION OF THE 115KV LUTHER FOREST STATION IN THE TOWN OF STILLWATER SARATOGA

More information

ADDENDUM # 3 CITY OF CAPE CANAVERAL BID # CITY OF CAPE CANAVERAL WWTP IMPROVEMENTS FOR OXIDATION DITCH REHABILITATION June 24, 2016

ADDENDUM # 3 CITY OF CAPE CANAVERAL BID # CITY OF CAPE CANAVERAL WWTP IMPROVEMENTS FOR OXIDATION DITCH REHABILITATION June 24, 2016 ADDENDUM # CITY OF CAPE CANAVERAL BID #- CITY OF CAPE CANAVERAL WWTP IMPROVEMENTS FOR OXIDATION DITCH REHABILITATION June, All contents of this addendum shall be incorporated into the solicitation documents

More information

NOTICE TO BIDDERS FOR THE

NOTICE TO BIDDERS FOR THE NOTICE TO BIDDERS FOR THE STRUCTURAL REPAIRS, APPLICATION OF 150 MIL THICK POLYURETHANE FOR INTERNAL LINING OF RESERVOIR 4A, REMOVAL AND REPLACEMENT OF A 7.5 HP PUMP, PIPES, FITTINGS, ELECTRICAL CONDUITS,

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION CITY OF ALBANY Public Works Department ADDENDUM # ST-6-02 CROCKER LANE RECONSTRUCTION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall

More information

Request for Proposal # Cane Creek Park Fiber Optic Cable Upfit

Request for Proposal # Cane Creek Park Fiber Optic Cable Upfit Request for Proposal # 2018-049 Cane Creek Park Fiber Optic Cable Upfit ADDENDUM NO. 1 ISSUE DATE: February 2, 2018 Bidders on this project are hereby notified that this Addendum shall be attached to and

More information

OCONEE COUNTY PROCUREMENT OFFICE 415 S. PINE STREET, ROOM 100 WALHALLA, SC Robyn M. Courtright, CPPO, Procurement Director

OCONEE COUNTY PROCUREMENT OFFICE 415 S. PINE STREET, ROOM 100 WALHALLA, SC Robyn M. Courtright, CPPO, Procurement Director OCONEE COUNTY PROCUREMENT OFFICE 415 S. PINE STREET, ROOM 100 WALHALLA, SC 29691 Robyn M. Courtright, CPPO, Procurement Director Tronda Spearman, CPPB, Assistant Procurement Director Telephone: 864-638-4141

More information

UTILITIES COMMISSION CITY OF NEW SMYRNA BEACH, FLORIDA 200 CANAL STREET P.O. BOX 100 NEW SMYRNA BEACH, FL

UTILITIES COMMISSION CITY OF NEW SMYRNA BEACH, FLORIDA 200 CANAL STREET P.O. BOX 100 NEW SMYRNA BEACH, FL DATE: January 5, 2018 UTILITIES COMMISSION CITY OF NEW SMYRNA BEACH, FLORIDA 200 CANAL STREET P.O. BOX 100 NEW SMYRNA BEACH, FL 32170-010 ITB# 04-18 REPLACE 12 WATER MAIN AT TURNBULL BAY (DAMAGED DURING

More information

ADDENDUM #4. Lanier Filter Plant Ozone System Safety Improvements BL079-14

ADDENDUM #4. Lanier Filter Plant Ozone System Safety Improvements BL079-14 September 24, 2014 ADDENDUM #4 Lanier Filter Plant Ozone System Safety Improvements BL079-14 Q1. Please clarify how many submarine doors the perimeter gaskets and gasket hardware must be replaced on. A1.

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01026 PART 1 GENERAL 1.1 SECTION INCLUDES A. Explanation and Definitions B. Measurement C. Payment D. Schedule of Values E. Application for Payment 1.2 EXPLANATION AND DEFINITIONS A. The following

More information

SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO SOLICITATION NO. CO ADDENDUM-6

SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO SOLICITATION NO. CO ADDENDUM-6 SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO. 18-4501 SOLICITATION NO. CO-00198 ADDENDUM 6 (September 10, 2018) To Respondent of Record: This addendum, applicable to work referenced

More information

ADDENDUM #1. The following sheets have been revised and are being reissued as part of this addendum:

ADDENDUM #1. The following sheets have been revised and are being reissued as part of this addendum: ADDENDUM #1 AIRFIELD IMPROVEMENTS EXTEND, MARK, AND LIGHT RUNWAY 6-24 AND TAXIWAY ALPHA REHABILITATE RUNWAY 6-24 at the LAKE WALES MUNICIPAL AIRPORT FAA AIP NO: TBD FDOT FM NO: TBD BID NO: 16-412 5/11/16

More information

CITY OF VENICE PROCUREMENT- FINANCE DEPARTMENT 401 W. VENICE AVE. - ROOM # 204 VENICE, FL (941) FAX (941) ADDENDUM NO.

CITY OF VENICE PROCUREMENT- FINANCE DEPARTMENT 401 W. VENICE AVE. - ROOM # 204 VENICE, FL (941) FAX (941) ADDENDUM NO. CITY OF VENICE PROCUREMENT- FINANCE DEPARTMENT 401 W. VENICE AVE. - ROOM # 204 VENICE, FL. 34285 (941) 486-2626 FAX (941) 486-2790 ADDENDUM NO. 1 Date: June 23, 2014 To: All Prospective Proposers Re: ITB#

More information

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS SECTION 02670 UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of containment

More information

JANUARY 25, 2016 ADDENDUM NO. 3 FOR. ORD Baggage Service Road Retaining Wall Repair

JANUARY 25, 2016 ADDENDUM NO. 3 FOR. ORD Baggage Service Road Retaining Wall Repair JANUARY 25, 2016 ADDENDUM NO. 3 FOR ORD Baggage Service Road Retaining Wall Repair Specifications and Contract Documents Number: 132110 CDA Project Number: H6163.15-02 For which bids are scheduled to be

More information

ADDENDUM NO. 3. Please make note of the following clarifications:

ADDENDUM NO. 3. Please make note of the following clarifications: Purchasing Division ADDENDUM NO. 3 DATE: March 6, 2019 FROM: City of Grand Junction Purchasing Division TO: All Offerors RE: Raw Water Irrigation Supply and Waterline Replacement IFB-4611-19-DH Offerors

More information

TWIN VALLEY PUMP STATION IMPROVEMENTS - CITY OF FARMINGTON FARMINGTON, MI 48335

TWIN VALLEY PUMP STATION IMPROVEMENTS - CITY OF FARMINGTON FARMINGTON, MI 48335 TWIN VALLEY PUMP STATION IMPROVEMENTS - CITY OF FARMINGTON FARMINGTON, MI 48335 BIDS TO BE RECEIVED UNTIL 1:00 P.M., LOCAL TIME, WEDNESDAY, OCTOBER 28, 2015, AT THE OFFICE OF THE CITY CLERK LOCATED AT

More information

NOTICE TO BIDDERS FOR THE

NOTICE TO BIDDERS FOR THE NOTICE TO BIDDERS FOR THE STRUCTURAL REPAIR, APPLICATION OF 200 MIL THICK POLYURETHANE FOR INTERNAL LINING OF RESERVOIR 4A, REMOVAL AND REPLACEMENT OF AN EXISTING RETAINING WALL, A 7.5 HP PUMP, PIPES,

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density

More information

CITY OF GLENDORA COUNTRY CLUB RESERVOIR IMPROVEMENTS PLAN NO REQUEST FOR INFORMATION (RFI) LOG RFI # DATE SHEET # RFI RESPONSE DATE

CITY OF GLENDORA COUNTRY CLUB RESERVOIR IMPROVEMENTS PLAN NO REQUEST FOR INFORMATION (RFI) LOG RFI # DATE SHEET # RFI RESPONSE DATE CITY OF GLENDORA COUNTRY CLUB RESERVOIR IMPROVEMENTS PLAN NO. 1124 REQUEST FOR INFORMATION (RFI) LOG RFI # DATE SHEET # RFI RESPONSE DATE 1 4/13/2016 Questions below pertain to note 4 per drawing, which

More information

DUCTILE IRON PIPE AND FITTINGS

DUCTILE IRON PIPE AND FITTINGS Section 02501 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Ductile iron pipe and fittings for water lines, wastewater force mains, gravity sanitary sewers, and storm sewers. 1.02 MEASUREMENT AND PAYMENT

More information

Invitation to Bid # CC Project Title: High Zone 5.0 Million Gallon Reinforced Concrete Culinary Water Tank Project No.

Invitation to Bid # CC Project Title: High Zone 5.0 Million Gallon Reinforced Concrete Culinary Water Tank Project No. Riverton City Purchasing Department 12830 South 1700 West Riverton, UT 84065 801-208-3175 Fax: 801-254-1810 May 5, 2017 ADDENDUM #3 Invitation to Bid # CC17-332 Project Title: High Zone 5.0 Million Gallon

More information

SUBJECT: ADDENDUM No. 1 FILE: Finished Water Pump Station Electrification Phase 2 WT7074

SUBJECT: ADDENDUM No. 1 FILE: Finished Water Pump Station Electrification Phase 2 WT7074 Water Division 202 Fleming Hill Road Vallejo CA 94589 707.648.4307 April 4, 2017 TO: Prospective Bidders SUBJECT: ADDENDUM No. 1 FILE: Finished Water Pump Station Electrification Phase 2 WT7074 The following

More information

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1 DATE: May 18, 2016 TO: FROM: All Bidders/Proposers Willie Velez, CPPB Procurement Administrator City of Casselberry Purchasing Division SUBJECT: ITB-2016-0023, Oxford Road Complete Street Improvements

More information

RIVER OAKS PUMP STATION RENOVATIONS/MODIFICATIONS, PHASE II for the LAFAYETTE CONSOLIDATED GOVERNMENT LAFAYETTE, LOUISIANA (DS&A #4628.

RIVER OAKS PUMP STATION RENOVATIONS/MODIFICATIONS, PHASE II for the LAFAYETTE CONSOLIDATED GOVERNMENT LAFAYETTE, LOUISIANA (DS&A #4628. ADDENDUM TO CONTRACT DOCUMENTS AND SPECIFICATIONS RIVER OAKS PUMP STATION RENOVATIONS/MODIFICATIONS, PHASE II for the LAFAYETTE CONSOLIDATED GOVERNMENT LAFAYETTE, LOUISIANA (DS&A #4628.02) ADDENDUM NO.

More information

Avenue 52/Grapefruit Boulevard Railroad Grade Separation Project PRE-BID REQUEST FOR INFORMATION

Avenue 52/Grapefruit Boulevard Railroad Grade Separation Project PRE-BID REQUEST FOR INFORMATION The City received a total of 67Pre-Bid Questions listed in table below. Note that some of the questions are duplicate. Formal responses are forthcoming via addendum shortly. No. 1 2 3 4 5 6 Plan/SSP/ Page

More information

Port KC RFP NORTHLAND PARK BUILDING V

Port KC RFP NORTHLAND PARK BUILDING V Port KC RFP NORTHLAND PARK BUILDING V 1. The RFP refers to landscaping plans. However, it does not appear that the landscaping plans were issued with the rest of the RFP. Will these be issued with an addendum?

More information

CHARLES COUNTY GOVERNMENT ITB NO MATTAWOMAN WATER RECLAMATION FACILITY (MWRF) PRIMARY CLARIFIER NO. 1 IMPROVEMENTS

CHARLES COUNTY GOVERNMENT ITB NO MATTAWOMAN WATER RECLAMATION FACILITY (MWRF) PRIMARY CLARIFIER NO. 1 IMPROVEMENTS CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 February 07, 2017 ITB NO. 17-17 MATTAWOMAN WATER RECLAMATION FACILITY (MWRF) PRIMARY

More information

NOTICE TO OFFERORS ADDENDUM NO. 1 WASTE COLLECTION SITE DEVELOPMENT PLAN FOR THE COUNTY OF SHENANDOAH

NOTICE TO OFFERORS ADDENDUM NO. 1 WASTE COLLECTION SITE DEVELOPMENT PLAN FOR THE COUNTY OF SHENANDOAH November 29, 2018 NOTICE TO OFFERORS ADDENDUM NO. 1 WASTE COLLECTION SITE DEVELOPMENT PLAN FOR THE COUNTY OF SHENANDOAH To Holders of Bid Proposals: Please make the following clarifications, additions,

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL Page 312 VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS-12-01 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the IL ROUTE

More information

SUM i) Carry out calibration of 100,000 litres day tank. ii) Pipes, valves and other fittings connection to fuel offloading SUM

SUM i) Carry out calibration of 100,000 litres day tank. ii) Pipes, valves and other fittings connection to fuel offloading SUM 31 st July 2017 TENDER FOR RELOCATION OF ONE GE FRAME 6 GAS TURBINE FROM EMBAKASI IN NAIROBI TO MUHORONI NEAR KISUMU: KGN-GT-012-2017 KenGen wishes to make the following clarification and changes through

More information

The Metropolitan Sewer District of Greater Cincinnati

The Metropolitan Sewer District of Greater Cincinnati The Metropolitan Sewer District of Greater Cincinnati Dry Run Area Sewers, Phase 1 and Phase 2 Contract A, Project ID 10270000_10270005 Date Issued: 03/25/2010 ADDENDUM NO. 2 This addendum will only be

More information

MRI Chiller Installation Guidelines

MRI Chiller Installation Guidelines MRI Chiller Installation Guidelines *These Items are the responsibility of the installing contractor to complete prior to the startup of the MRI Chiller.* **Please refer to DTS chiller manual for further

More information

STREET LIGHTING. Springville City Power standard street lights will be installed in accordance with Springville City Power's Line Extension Policy.

STREET LIGHTING. Springville City Power standard street lights will be installed in accordance with Springville City Power's Line Extension Policy. General The following general requirements shall apply to street lights installed in new underground residential subdivisions or developments located within the service area of Springville City Power (within

More information

Ohio Department of Transportation - Prebid Questions

Ohio Department of Transportation - Prebid Questions Project No. 110467 Sale Date - 8/25/2011 HAM-83469 - CR-CR 239-9.49 (WINTON/ S. GILMORE ROAD) 8/22/2011 9:56:54 AM Pole E on plan page 323 shows that 2" anchor bolts should be used for this pole. However,

More information

East Wenatchee Water District Supplemental Provisions to the 2012 WSDOT/APWA Standard Specifications

East Wenatchee Water District Supplemental Provisions to the 2012 WSDOT/APWA Standard Specifications East Wenatchee Water District Supplemental Provisions to the 2012 WSDOT/APWA Standard Specifications 1-01 DEFINITIONS and TERMS 1-01.3 Definitions This section is supplemented with the following Deleted

More information

DISTRICT OF TOFINO BARRS MOUNTIAN RESERVOIR REPLACEMENT PROJECT. Attached, please find Addendum # 1 for the above noted project.

DISTRICT OF TOFINO BARRS MOUNTIAN RESERVOIR REPLACEMENT PROJECT. Attached, please find Addendum # 1 for the above noted project. DATE DESTINATION EMAIL NO OF PAGES (INCL THIS PAGE) FILE January 13, 2017 n/a 11 2231-35306-02 TO FROM ALL DOCUMENT HOLDERS C. Pogson COMPANY CITY ORIGINALS TO BE: Filed Mailed Couriered OTHER (SPECIFY)

More information

SAN ANTONIO WATER SYSTEM University Pump Station Improvements Project SAWS Job No Solicitation No. B DD

SAN ANTONIO WATER SYSTEM University Pump Station Improvements Project SAWS Job No Solicitation No. B DD TO BIDDER OF RECORD: SAN ANTONIO WATER SYSTEM University Pump Station Improvements Project SAWS Job No. 12-6002 Solicitation No. B-14-002-DD ADDENDUM NO. 1 February 17, 2014 The following changes, additions,

More information

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE CITY OF BRECKSVILLE,

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE CITY OF BRECKSVILLE, CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE FOR THE CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS RQ# 41677 BIDS DUE ON: May 1, 2018, at 2:00 p.m. ADDENDUM NUMBER 1, April 25, 2018, Page

More information

CITY OF PLACERVILLE, CALIFORNIA DEVELOPMENT SERVICES DEPARTMENT ENGINEERING DIVISION

CITY OF PLACERVILLE, CALIFORNIA DEVELOPMENT SERVICES DEPARTMENT ENGINEERING DIVISION CITY OF PLACERVILLE, CALIFORNIA DEVELOPMENT SERVICES DEPARTMENT ENGINEERING DIVISION ADDENDUM #4 DATE: 02/08/2016 PROJECT: CONTRACT No: 40604 BID DATE, TIME: 02/11/2016, 2:00PM NOTICE TO ALL CONTRACTORS

More information

SANTEE LAKES GENERAL STORE, ADMINISTRATION BUILDING & TEEN CENTER (JN ) ADDENDUM NO. 2

SANTEE LAKES GENERAL STORE, ADMINISTRATION BUILDING & TEEN CENTER (JN ) ADDENDUM NO. 2 March 15, 2019 SANTEE LAKES GENERAL STORE, ADMINISTRATION BUILDING & TEEN CENTER ADDENDUM NO. 2 Bid Opening Date: March 27, 2019 Bid Opening Time: 1:00 p.m. Date Addendum Issued: March 15, 2019 NOTICE

More information

IN2 Sleeves and Sleeve Seals for Electrical Raceways and Cabling

IN2 Sleeves and Sleeve Seals for Electrical Raceways and Cabling Illinois Math and Science Academy DigitalCommons@IMSA Project Manuals IN2 2015 IN2 Sleeves and Sleeve Seals for Electrical Raceways and Cabling Illinois Mathematics and Science Academy Follow this and

More information

SPECIAL SPECIFICATION 3504 Septic Tank System

SPECIAL SPECIFICATION 3504 Septic Tank System 1993 Specifications CSJ s 3136-01-126, etc. & 0683-01-070, etc. SPECIAL SPECIFICATION 3504 Septic Tank System 1. Description. This Item shall govern for all materials, equipment and labor necessary for

More information

Ohio Department of Transportation - Prebid Questions

Ohio Department of Transportation - Prebid Questions Project No. 120625 Sale Date - 12/14/2012 ATB-76747 - IR-90-7.56, PART 1;ATB-90-13.60, PART 2 12/11/2012 8:03:55 AM Per Addendum 5 Item 184 was reduced drastically. With over 35,000 LF of new guardrail

More information

CITY OF CHESAPEAKE INVITATION FOR BID ADDENDUM NO. 1. Battlefield Golf Club Water Project, Centerville Turnpike

CITY OF CHESAPEAKE INVITATION FOR BID ADDENDUM NO. 1. Battlefield Golf Club Water Project, Centerville Turnpike CITY OF CHESAPEAKE INVITATION FOR BID ADDENDUM NO. 1 ISSUE DATE: September 1, 2009 IFB No. 10017 TITLE: Battlefield Golf Club Water Project, Centerville Turnpike ISSUED BY: DEPARTMENT: City of Chesapeake

More information

University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003

University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003 University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003 May 16, 2016 Addendum #1 Contract Number: UMA16-25 Project Number: 1000730 Speedtype: 157194 Title:

More information

ADDENDUM NO. 1 FOR CITY OF CUMMING 900-HP RAW WATER INTAKE PUMP. ADDENDUM DATE: February 10, BID DATE: February 15, 2017, 11:30 a.m.

ADDENDUM NO. 1 FOR CITY OF CUMMING 900-HP RAW WATER INTAKE PUMP. ADDENDUM DATE: February 10, BID DATE: February 15, 2017, 11:30 a.m. ADDENDUM NO. 1 FOR CITY OF CUMMING 900-HP RAW WATER INTAKE PUMP ADDENDUM DATE: February 10, 2017 BID DATE: February 15, 2017, 11:30 a.m. This ADDENDUM is issued to institute the included changes and/or

More information

Date: 13/04/2015 1:14:38 PM

Date: 13/04/2015 1:14:38 PM Date: 13/04/2015 1:14:38 PM Cad File No: J:\500-Cad-data\Standard_Drawings\Flow Systems\FSI-1000-FS_On-Lot Infrastructure Installation Set Out Details.dwg Date: 25/02/2015 11:18:14 AM Cad File No: J:\500-Cad-data\Standard_Drawings\Flow

More information

General Water Bid Items Item No.

General Water Bid Items Item No. BID PROPOSAL PROPOSAL OF, a corporation organized and existing under the laws of the State of, a partnership consisting of, an individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

Re: T.4992 Westminster Hwy from Gilley Rd to #23591 Westminster Hwy Road Construction Addendum No. 1

Re: T.4992 Westminster Hwy from Gilley Rd to #23591 Westminster Hwy Road Construction Addendum No. 1 October 9 2013 File: 10-6340-20-P.12202-Vol 01 Finance and Corporate Services Department Finance Division Telephone: 604-276-4218 Fax: 604-276-4162 Attention: To All Tenderers Dear Sir/Madame: Re: T.4992

More information

SPECIAL SPECIFICATION 6666 Charter Communications System

SPECIAL SPECIFICATION 6666 Charter Communications System 2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6666 Charter Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Charter Communications,

More information

THIS ADDENDUM IS FOR THE PURPOSE OF MAKING THE FOLLOWING CHANGES OR CLARIFICATIONS:

THIS ADDENDUM IS FOR THE PURPOSE OF MAKING THE FOLLOWING CHANGES OR CLARIFICATIONS: ADDENDUM NUMBER: Three (3) Procurement Department Bid Section Customer Center 1 st Floor, Room 002 21 W. Church Street Jacksonville, Florida 32202 December 3, 2018 TITLE: 024-19 PURCHASE AND INSTALLATION

More information

City of San Juan Bautista Well 6 Project ADDENDUM No. 1 July 6, 2018

City of San Juan Bautista Well 6 Project ADDENDUM No. 1 July 6, 2018 City of San Juan Bautista Well Project AENUM No. 1 July, 018 Notice is hereby given that the Bid ocuments for this project have been revised as prescribed by this Addendum. All bidders shall comply with

More information

MRI Chiller Installation Guidelines

MRI Chiller Installation Guidelines MRI Chiller Installation Guidelines *These Items are the responsibility of the installing contractor to complete prior to the startup of the MRI Chiller.* **Please refer to DTS chiller manual for further

More information

The following clarifications, changes, additions, and/or deletions are hereby made part of the Contract Documents

The following clarifications, changes, additions, and/or deletions are hereby made part of the Contract Documents CITY OF TAMARAC PURCHASING AND CONTRACTS DIVISION 7525 NW 88 TH AVENUE TAMARAC, FL 33321 Committed to Excellence...Always ADDENDUM NO. 1 BID NO.13-19B BID NO. 13-20B CITY OF TAMARAC NW 108 TERRACE / NW

More information

JOB BB0414 PORTER RD. HWY. 112/71B WIDENING & INTCHNG. IMPVTS. (S) AUGUST 10, 2016

JOB BB0414 PORTER RD. HWY. 112/71B WIDENING & INTCHNG. IMPVTS. (S) AUGUST 10, 2016 JOB BB0414 PORTER RD. HWY. 112/71B WIDENING & INTCHNG. IMPVTS. (S) AUGUST 10, 2016 Is it allowable to substitute the WF beams to Plate Girders on Bridge 05692? The substitution of a plate girder with flanges

More information

Energy Transfer Station Installation Only, Carleton to Sexton District Energy

Energy Transfer Station Installation Only, Carleton to Sexton District Energy ADDENDUM FORM INVITATION TO TENDER: #2015-021 ADDENDUM NO: 1 DATE ISSUED: February 23, 2015 ISSUED BY: Mike Drane DESCRIPTION: INSTRUCTIONS: Energy Transfer Station Installation Only, Carleton to Sexton

More information

EDS Upgrades and CBRA Improvements. Addendum No. 2 DATE OF ADDENDUM: 08/17/2016

EDS Upgrades and CBRA Improvements. Addendum No. 2 DATE OF ADDENDUM: 08/17/2016 EDS Upgrades and CBRA Improvements Addendum No. 2 DATE OF ADDENDUM: 08/17/2016 The following changes, additions, and/or deletions are considered as Addendum No. 1, and are hereby made a part of the contract

More information

BRYANS ROAD WELL NO. 7 WELL PUMP HOUSE AND CIVIL SITE DESIGN & WATER TOWER NO. 6 WATERLINE EXTENSION AND CIVIL SITE DESIGN

BRYANS ROAD WELL NO. 7 WELL PUMP HOUSE AND CIVIL SITE DESIGN & WATER TOWER NO. 6 WATERLINE EXTENSION AND CIVIL SITE DESIGN CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 May 21, 2014 RFP NO. 14-32 BRYANS ROAD WELL NO. 7 WELL PUMP HOUSE AND CIVIL SITE DESIGN

More information

RFI REPLY. Project: Palm Coast Readiness Center Date: 07/22/16 Flagler County, Florida Comm. No.: 09005

RFI REPLY. Project: Palm Coast Readiness Center Date: 07/22/16 Flagler County, Florida Comm. No.: 09005 Project: Palm Coast Readiness Center Date: 07/22/16 Flagler County, Florida Comm. No.: 09005 To: All Bidding General Contractors Fax Email U.S. Mail Attn. Messenger We are sending the following: Quick

More information

CITY OF PORTSMOUTH, NEW HAMPSHIRE GREENLAND WELL PUMP STATION REPLACEMENT ADDENDUM NO. 1

CITY OF PORTSMOUTH, NEW HAMPSHIRE GREENLAND WELL PUMP STATION REPLACEMENT ADDENDUM NO. 1 Addendum No. 1 September 26, 2016 Page 1 of 8 CITY OF PORTSMOUTH, NEW HAMPSHIRE GREENLAND WELL PUMP STATION REPLACEMENT ADDENDUM NO. 1 This Addendum forms part of the original contract drawings and specifications

More information

Via Internet Posting 14 pages

Via Internet Posting 14 pages Michael Pacholok Director Purchasing and Materials Management Division City Hall, 18 th Floor, West Tower 100 Queen Street West Toronto, Ontario M5H 2N2 Joanne Kehoe Manager Construction Services March

More information

IN2 Sleeves and Sleeve Seals for Communications Pathways and Cabling

IN2 Sleeves and Sleeve Seals for Communications Pathways and Cabling Illinois Math and Science Academy DigitalCommons@IMSA Project Manuals IN2 2015 IN2 Sleeves and Sleeve Seals for Communications Pathways and Cabling Illinois Mathematics and Science Academy Follow this

More information

Bid Tabulation Report 2011 Pump Station Rehabilitations

Bid Tabulation Report 2011 Pump Station Rehabilitations Bidder No. 1 Bidder No. 2 Bidder No. 3 Bidder No. 4 Bonding Provided 5% 5% 5% 5% Bidder Acknowledges Receipt of Addendums - but only 1 Affadivit of Preferential Bidders Status has has has has Description

More information

CITY OF PANAMA CITY BEACH WWTF INFLUENT SCREENS REPLACEMENT April 14, 2017

CITY OF PANAMA CITY BEACH WWTF INFLUENT SCREENS REPLACEMENT April 14, 2017 CITY OF PANAMA CITY BEACH WWTF INFLUENT SCREENS REPLACEMENT April 14, 2017 ADDENDUM NO. 1 (This Form Must Be Signed and Submitted With Bid Form) Addendum No. 1 addresses the following issues: QUESTIONS

More information

March 6, Subject: Addendum No. 2 Invitation for Bid No Toyota Park Transit Center Phase II. Ladies and Gentlemen:

March 6, Subject: Addendum No. 2 Invitation for Bid No Toyota Park Transit Center Phase II. Ladies and Gentlemen: March 6, 2018 Subject: Addendum No. 2 Toyota Park Transit Center Phase II Ladies and Gentlemen: This Addendum No. 2 is being issued to provide responses to questions submitted by potential bidders and

More information

November 19, REVISED Bid Opening Date: December 4, 2018

November 19, REVISED Bid Opening Date: December 4, 2018 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y19-709-CH / ADDENDUM # 3 WESTERN REGIONAL WATER SUPPLY FACILITY IMPROVEMENTS PHASE 3B REVISED Bid Opening Date: December 4, 2018 This addendum is hereby

More information

ELECTRICAL SAFETY Information Bulletin

ELECTRICAL SAFETY Information Bulletin ELECTRICAL SAFETY Information Bulletin February 2019 Page 1 of 8 2018 CANADIAN ELECTRICAL CODE SUBJECT: Section 10 Grounding and bonding Rule 10-102 Grounding electrodes Replacing metal water service lines

More information

ADVERTISEMENT FOR BIDS

ADVERTISEMENT FOR BIDS ADVERTISEMENT FOR BIDS Todd County Water District P.O. Box 520 2201 New Highway 68 West Elkton, KY 42220 RE: Novelis Water Supply Project: Contract No. 1 Waterline Extensions The Todd County Water District

More information

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02 ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON April 23, 2015 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 30, 2015, in accordance

More information

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of a Partnership consisting of an Individual doing business as. TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction

More information

RFB Waco City Hall Chiller Replacement. Date: 3/20/2018 RFP No: Commodity: Waco City Hall Chiller Replacement

RFB Waco City Hall Chiller Replacement. Date: 3/20/2018 RFP No: Commodity: Waco City Hall Chiller Replacement CITY OF WACO RFB 18-022 Waco City Hall Chiller Replacement Purchasing Services Post Office Box 20 Waco, Texas 602-20 Phone: 2 / 0-80 Fax: 2 / 0-8063 kaseyg@wacotx.gov www.waco-texas.com Date: 3//18 RFP

More information

ADDENDUM NO. 2 MBR TREATMENT FACILITY UPGRADE REVISIONS TO CONTRACT DOCUMENTS

ADDENDUM NO. 2 MBR TREATMENT FACILITY UPGRADE REVISIONS TO CONTRACT DOCUMENTS ADDENDUM NO. 2 MBR TREATMENT FACILITY UPGRADE REVISIONS TO CONTRACT DOCUMENTS VOLUME 1 OF 3 BIDDING REQUIREMENTS, CONTRACT FORMS AND CONDITIONS OF CONTRACT 1. Instruction to Bidders a. Paragraph 1.1.7.4.1:

More information

TECHNICAL SPECIFICATIONS SOUTH MARTIN REGIONAL UTILITY

TECHNICAL SPECIFICATIONS SOUTH MARTIN REGIONAL UTILITY TECHNICAL SPECIFICATIONS SOUTH MARTIN REGIONAL UTILITY CONSTRUCTION AND TESTING OF SURFICIAL AQUIFER REPLACEMENT PRODUCTION WELL N15R AND REMEDIATION WELL R-4 HOBE SOUND, FLORIDA Submitted by: 4/2019 CONSTRUCTION

More information