Chicago Technology Academy High School (Medill ES)
|
|
- Holly Hampton
- 5 years ago
- Views:
Transcription
1 ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO SCHOOL DIST Chicago Technology Academy High School (Medill ES) Chicago, IL, 668 DATE LAST THREE YEAR REINSPECTION WAS COMPLETED 3/4/213 If the address on this form is different than the address of the building, submit a written explanation. SECTION II (Please type or print) PLEASE COMPLETE THE FOLING FOR YOUR THREE YEAR REINSPECTION: DATE REINSPECTION COMPLETED: 6/14/216 ENROLLMENT IDPH INSPECTOR LICENSE NUMBER: IDPH LICENSED INSPECTOR NAME (Please Print): Dionne Carey IDPH MP LICENSE NUMBER: IDPH LICENSED MANAGEMENT PLANNER NAME (Please Print): Evan Christian DESIGNATED PERSON (Please Print): Robert Christlieb PHONE: 26 (773) /14/216 Signature of Designated Person Date SECTION III PLEASE COMPLETE THE FOLING INFORMATION FOR ANY CHANGES WITHIN THE SCHOOL DISTRICT. School building has been sold. Date of Sale: School has been closed. Date closed: School building has been demolished. School building is asbestos free since last reinspection: Please explain in writing why the school building is now asbestos free and include the supporting documentation. If a new school building has been added to the district, submit either and exclusionary statement or a management plan and inspection report. Include the complete name, address and city of school building. Explain in writing if the address of the building is different than the address on this form: IL Revised 1.3
2 THREE YEAR REINSPECTION CHICAGO SCHOOL DIST 299 Chicago Technology Academy High School (Medill ES) Chicago, IL, 668 Unit: 6391 Building ID: IDPH ID Number: REPORT DATE: Tuesday, June 14, 216 Prepared for: 125 S. Clark Street Chicago, IL 663 Prepared by: 6 West Van Buren St., Ste 5 Phone (312) Fax (312) DO NOT REMOVE FROM SCHOOL REQUIRED BY FEDERAL LAW
3 April 2, 216 Mr. R. Kent Cook Asbestos Program Illinois Department of Public Health 525 West Jefferson Street Springfield, Illinois Re: Three-Year Reinspections Dear Mr. Cook:, Managing Environmental Consultant (MEC), conducted the ThreeYear Reinspections and performed management plan updates for the (CPS) facilities in Region 3,4,5 Elementary Schools. Please update your records with the following information. School District: 299 Unit: Region: 3 School: Chicago Technology Academy High School (Medill ES) IDPH ID: Building ID: Address: Chicago, IL, 668 Building Contact: Contact Phone: Current Building Owners: Review 6/14/216 Inspector: Dionne Carey Management Planner: Evan Christian Inspector IDPH License: Management Planner IDPH License: If you have any questions or comments, please contact us at (312) Sincerely, Evan Christian
4 Environmental tification to Occupants To: Faculty, Staff and Parents From: April 2, 216 RE: Chicago Technology Academy High School (Medill ES), Unit 6391 Chicago, IL, 668 Dear Faculty, Staff and Parents, This letter is to notify you that the 216 asbestos three year re-inspection has been completed at Chicago Technology Academy High School (Medill ES), following the Federal Asbestos Hazard Emergency Response Act (AHERA), 4 CFR Part 763, Subpart E and is available for your review at the main office of the school. Although asbestos-containing materials have been identified at Chicago Technology Academy High School (Medill ES), there is no reason to believe that any threat to the health of students or staff exists at this time. CPS will continue to carefully monitor the condition of asbestos-containing materials and if conditions warrant, all appropriate steps will be taken to maintain the health and safety of all building occupants. If you have any questions regarding this matter or require additional information, please feel free to contact Robert Christlieb, the designated Local Education Authority's Designated Person at (773)
5 Table of Contents I. School and Inspection Information II. Executive Summary III. Methodology IV. Abatement History V. Reassessments and Recommendations VI. Conclusions Table I: Inspector's Reinspection Findings Table II: Management Planner's Review APPENDICES: Appendix A: Assessment Sheets, Drawings and Photos Appendix B: Inspector and Management Planner Licenses Appendix C: Laboratory Accreditations Appendix D: Laboratory Results Appendix E: Chain of Custody Forms
6 SCHOOL AND INSPECTION INFORMATION 1. School Information School: Chicago Technology Academy High School (Medill ES) Address: IDPH ID: Contact: 2. Unit: Chicago, IL, 668 Building ID: Phone: Description of Facility Original Construction: Total Square Footage: Current Occupancy: Additional Construction: of Floors: LEA Designated Person Contact: Robert Christlieb Address: 125 South Clark Street, 17th Floor Chicago, IL Fax: (312) Inspector Inspector Name: Dionne Carey Signature: 4/2/216 Inspector IDPH license # 6. Phone: (773) Managing Environmental Consultant MEC: Contact: Dan Juneau Address 6 West Van Buren St., Ste 5 Phone: (312) Region: 3 Management Planner Management Planner Name: Evan Christian Management Planner IDPH license # Review 6/14/ LEA Designated Person's Acknowledgement Signature: 6/14/216 The reinspection report and recommendations have been received by me and appropriate action will be taken by the School District. Signature: 6/14/216 Name: Robert Christlieb Unit : Chicago Technology Academy High School (Medill ES) Building:
7 II. EXECUTIVE SUMMARY was retained by the (CPS) to perform a three-year asbestos reinspection of the Chicago Technology Academy High School (Medill ES). This inspection was conducted in accordance with the United States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA) part (b), and the ongoing Operations and Maintenance Program (O&M) originally designed in the School's Asbestos Management Plan. The purpose of this threeyear reinspection is to record any condition changes in the asbestos-containing building material (ACBM) in the school since the previous three-year reinspection and the six-month periodic surveillance, to identify, assess, and include any Homogeneous Areas (HA) not identified in the Management Plan, and to recommend an appropriate response action to manage asbestos. The inspector conducted a three-year reinspection of this facility under Illinois Department of Public Health (IDPH) school reinspection requirements and AHERA, sections and The main building and each addition to the main building, if constructed at different dates, were inspected separately. Laboratory accreditations are included in Appendix C, laboratory results are included in Appendix D, and chain of custody forms are included in Appendix E. te: During previous inspections, some of the HA(s) were identified together as 9" x 9" floor tile (FT), mastics assoc. with 9" x 9" FT, 12" x 12" FT, mastics assoc. with 12" x 12" FT, pipe insulation, etc. Some of these HA(s) have been re-identified by areas that are uniform in color, texture, construction date, application date, and general appearance. The inspector has determined the following: A. The following HAs have changed assessment categories for Building : Unit: "x12" White Floor Tile w/specks & Streaks Mastic 34 12"x12" Tan Floor Tile w/white and Brown Streaks 38 12" x 12" White Floor Tile w/gray Specks 8 2' X 4' Ceiling Tile 81 Elbows on Runs 82 Wall Board Glue Pucks E Aircell Pipe Insulation F Hard Joint Compound on Aircell Pipe Insulation Chicago Technology Academy High School (Medill ES) Building:
8 B. The following new homogenous areas have been identified for Building : Unit: Elbows on Runs 82 Wall Board Glue Pucks Chicago Technology Academy High School (Medill ES) Building:
9 C. This reinspection covered only physically accessible and visible areas and materials that were identified in the LEA's management plan. The following materials were concealed and/or contained in areas that were inaccessible for sampling and have been classified as Assumed: D K Unit: " x 12" White Floor Tile w/specks & Streaks 12"x12" White Floor Tile w/specks & Streaks Mastic 12" x 12" Beige Floor Tile w/wh & Brn Strks 12"x12" Tan Floor Tile w/white and Brown Streaks 12" x 12" Brown Floor Tile w/multi-colored Specks 12" x 12" White Floor Tile w/gray Specks 12"x12" Tan Floor Tile w/brown & White Specks Carpet Mastic 12" x 12" Beige w/streaks Mottled Floor Tile 12"x12" Beige w/streaks Mottled Floor Tile Mastic 12"x12"Off-White w/mauve & Blue Streaks Floor Tile 12"x12"Off-White w/mauve & Blue Streaks FT Mastic 12" x 12" Beige w/dk. Beige Streaks Floor Tile 12" x 12" Brownish Gray w/streaks FT Mastic for HA 6 & 61 (Checkboard pattern) 12x12 White FT Patch 12x12 White FT Patch Mastic 9x9 Grey with White Specs 9x9 Grey with White Specs Mastic Dark Grey Carpet Mastic Blue with Blue Specs 12x12 Grey with White Green Burgundy Specs Blue with Blue Specs Mastic 12x12 Grey with White Green Burgundy Specs Green Grout Floor (Ceramic) Beige Floor Grout (Ceramic) Brown Floor Grout (Ceramic) 9x9 Salmon Floor Tile 9x9 Salmon Floor Tile Mastic Ceramic Floor Tile Yellow Linoleum Yellow Linoleum Mastic 2' X 4' Ceiling Tile Elbows on Runs Wall Board Glue Pucks Hard Joint Cmpd. On Cardboard Pipe Insulation Duct Jacket Chicago Technology Academy High School (Medill ES) Building:
10 The following areas were deemed to be inaccessible: " x 9" Olive Floor Tile w/dark Specks Mastic 9" x 9" Beige Floor Tile Mastic 9" x 9" Light Brown Floor Tile w/specks Mastic 9" x 9" Olive Floor Tile w/white Specks Mastic 9"x9" Brn FT Patch w/multi-colored Strks Mastic 9" x 9" Cream Floor Tile Mastic Patch 9"x 9" Tan Floor Tile Mastic Patch 12"x12" White Floor Tile w/specks & Streaks Mastic 12" x12" Beige Floor Tile w/ Wh & Brn Strks Mastic 12" x 12" White Floor Tile w/gray Specks Mastic 12"x12" Dark Gray Floor Tile w/brown Specks Mastic 12"x12" Tan Floor Tile w/brn & White Specks Mastic 12"x12" Beige w/streaks Mottled Floor Tile Mastic 12"x12"Off-White w/mauve & Blue Streaks FT Mastic Mastic for HA 6 & 61 (Checkboard pattern) 12x12 White FT Patch Mastic 9x9 Grey with White Specs Mastic Dark Grey Carpet Mastic Blue with Blue Specs Mastic 12x12 Grey with White Green Burgundy Specs 9x9 Salmon Floor Tile Mastic Materials were also listed as "assumed" if they were in good condition and sampling was not conducted to avoid damage. This reinspection was conducted by Dionne Carey, IDPH License #. The Management Plan was updated by Evan Christian, IDPH License # Inspector and Management Planner Licenses are included in Appendix B. Unit: 6391 Chicago Technology Academy High School (Medill ES) Building:
11 III. METHODOLOGY Tasks performed on-site included the following: IV. 1. Review current management plan, identify HA(s) and extract appropriate information. 2. Examine and verify abatement records. 3. Touch and visually and physically reinspect and reassess the condition of all friable known or assumed ACBM. 4. Touch and visually and physically reinspect all non-friable known or assumed ACBM to determine whether these materials have become friable since the last inspection or periodic surveillance. 5. Identify any condition changes that may affect Hazard Ranking of known ACBM or Assumed ACBM, as well as any HA(s) that have become friable since the last reinspection. 6. Collect bulk samples from each newly discovered friable HA or previously assumed and submit for laboratory analysis. 7. Tabulate reinspection findings and submit for management planner review and recommendations with appropriate response actions based on the AHERA Damage Category of the ACBM. 8. Submit reinspection findings and management planner recommendations to the LEA within thirty (3) days for inclusion into the management plan. ABATEMENT HISTORY The information collected from the existing management plan and inspection report(s) and from interviews with the school official revealed that the following asbestos abatement was conducted at the school since the previous Three year Reinspection. Abatement Dates: V. REASSESSMENTS AND RECOMMENDATIONS The reassessments and recommendations are summarized in Tables I and II on the following pages. Detailed Hazard Assessment Sheets and Drawings and Photos (if applicable) are included in Appendix A. VI. CONCLUSIONS The Chicago Technology Academy High School (Medill ES) Building Three-Year reinspection has been completed and response actions have been recommended for both friable and non-friable materials. A timely execution of the response actions recommended will enable the LEA and the Designated Person(s) to effectively manage the existing ACBM. This three-year reinspection report should be inspected in the current Management plan at the CPS Central Office, and one (1) copy should be kept at the school for use when planning any renovation and/or demolition activities in areas where ACBM has been identified. Also, periodic surveillance documentation and any summary reports from any response actions that are executed at the school should be used to update the Management Plan. Unit: 6391 Chicago Technology Academy High School (Medill ES) Building:
12 Table I Inspector's Reinspection Findings
13 School Chicago Technology Academy High School (Medill ES) Unit Building ID Address Region 3 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description 1 1 1' x 1' Ceiling Tile w/large Holes 9" x 9" Olive Floor Tile w/dark Specks 11 9" x 9" Olive Floor Tile w/dark Specks Mastic 12 Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Type NO_ACBM CHR N NONE CHR N CHR CHR 9,1 9,1 9" x 9" Beige Floor Tile " x 9" Beige Floor Tile Mastic " x 9" Light Brown Floor Tile w/specks 15, 15 9" x 9" Light Brown Floor Tile w/specks Mastic 15, 16 9" x 9" Olive Floor Tile w/white Specks 6, " x 9" Olive Floor Tile w/white Specks Mastic 6, " x 9" Brown FT patch w/multi-colored Streaks "x9" Brn FT Patch w/multi-colored Strks Mastic ' x 8' Ceiling Tile 9" x 9" Brown Floor Tile w/orange SpecksRemoved 21 9" x 9" Brown Floor Tile w/ Orange Specks Mastic- Removed 22 9" x 9" Cream Floor Tile Patch 2 Throughout Facility Rooms 16, 112, 114, 118, 119, 2327, 218, Rec Room & Hall Rooms 16, 112, 114, 118, 119, 2327, 218, Rec Room & Hall Office, Rooms 117, 121, 21, 22, , 214, 215, 219 Office, Rooms 117, 121, 21, 22, , 214, 215, , 211, 213, 215, 217, 219, 221, Office Rooms117, 211, 213, 215, 217, 219, 221, Office Office, Rooms 21, 22, 23, 25, 27, 29, Storage Office, Rooms 21, 22, 23, 25, 27, 29, Storage Rooms 115,121, 23, 25, 27, 29, 213, 214 1st and 2nd floor Corridors, Rooms 115, 121, 23, 25, 27, 29, 213, 214 Gymnasium Patches Throughout Second Floor Corridor Patches Throughout Second Floor Corridor 25, " x 9" Cream Floor Tile Mastic Patch 21 25, 27 Damage Quantity Damage Units Change in Assessment Category Damage Category Damage Reason Disturbance Potential ACBM with the potential for damage NONE ACBM with the potential for damage N NONE ACBM with the potential for damage N NONE ACBM with the potential for damage CHR N NONE ACBM with the potential for damage CHR N NONE ACBM with the potential for damage CHR N NONE ACBM with the potential for damage CHR N NONE ACBM with the potential for damage CHR N NONE ACBM with the potential for damage CHR N NONE ACBM with the potential for damage CHR N NONE CHR N NONE ACBM with the potential for damage ACBM with the NO_ACBM ABATED ABATED
14 School Chicago Technology Academy High School (Medill ES) Unit Building ID Address Region 3 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description 24 9" x 9" Tan Floor Tile Patch 25 9"x 9" Tan Floor Tile Mastic Patch 26 9" x 9" Aqua Floor Tile - REMOVED 27 9" x 9" Aqua Floor Tile Mastic REMOVED 28 9" x 9" Gray Floor Tile w/streaks REMOVED 29 9" x 9" Gray Floor Tile w/ Streaks MasticRemoved 3 3 Hard Ceiling Plaster 12" x 12" White Floor Tile w/specks & Streaks Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Type 2 26 CHR N NONE 2 Patches in 26 CHR N NONE ABATED ABATED ABATED ABATED NO_ACBM ASSUMED N NONE ACBM with the potential for damage ASSUMED N NONE Yes ACBM with the potential for damage ASSUMED N NONE ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage 22 12"x12" White Floor Tile w/specks & Streaks Mastic 2 12" x 12" Beige Floor Tile w/wh & Brn Strks 12" x12" Beige Floor Tile w/ Wh & Brn Strks Mastic 12"x12" Tan Floor Tile w/white and Brown Streaks 12"x12" Tan Floor Tile w/wh and Brn Streaks Mastic 45 1st Floor Corridor Across From the Boiler Room 1st Floor Corridor Across From the Boiler Room As Patches in the Second Floor Corridor As Patches in the Second Floor Corridor Throughout Facility Various Locations Throughout First Floor Various Locations Throughout First Floor Throughout Facility 12" x 12" Brown Floor Tile w/multicolored Specks 12"x12" Brn Floor Tile w/multi-colored Spks Mastic 12" x 12" White Floor Tile w/gray Specks 12" x 12" White Floor Tile w/gray Specks Mastic Damage Quantity Damage Units Change in Assessment Category Damage Category potential for damage ACBM with the potential for damage ACBM with the potential for damage Damage Reason Disturbance Potential 45 Throughout Facility CHR N NONE 1,679 Throughout Facility ASSUMED N NONE Yes 1,679 CHR N NONE 1 Throughout Facility, Main Office, Rm 19, Lunch Room, 111, 1st floor hallway, 2nd floor hallway Throughout Facility ASSUMED N NONE ACBM with the potential for damage CHR 2,5 Kitchen Storage Room on platform Gymnasium ASSUMED N NONE Yes Gymnasium CHR N NONE ACBM with the potential for damage ACBM with the potential for damage 4,
15 School Chicago Technology Academy High School (Medill ES) Unit Building ID Address Region 3 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description 4 12" x 12" Dark Gray Floor Tile w/brown Specks 12"x12" Dark Gray Floor Tile w/brown Specks Mastic 12"x12" Tan Floor Tile w/brown & White Specks 12"x12" Tan Floor Tile w/brn & White Specks Mastic 1'x1' Ceiling Tile With Small Holes Glue Vibration Isolator Cloth Interior Window Glaze Roof Field - t AHERA Roof Flashing - t AHERA Parapet Wall Light Color Caulk - t AHERA Parapet Wall Dark Color Caulk - t AHERA Exterior Brick - t AHERA Exterior Brick Mortar - t AHERA Exterior Window Glaze - t AHERA Exterior Window Caulk - t AHERA Carpet Mastic 12" x 12" Beige w/streaks Mottled Floor Tile "x12" Beige w/streaks Mottled Floor Tile Mastic 58 12"x12"Off-White w/mauve & Blue Streaks Floor Tile 12"x12"Off-White w/mauve & Blue Streaks FT Mastic 1' x 1' Ceiling Tile w/small Holes 12" x 12" Beige w/dk. Beige Streaks Floor Tile " x 12" Brownish Gray w/streaks FT Material Quantity Material Units 1 Room 214 CHR N NONE Change in Assessment Category 1 Room 214 CHR N NONE 2 N NONE As Patches in 2nd Floor Corridor As Patches in 1st Floor Corridor Throughout Facility Gymnasium Throughout Facility Roof Roof Roof Parapet Wall ASSUMED 2 CHR N NONE NO_ACBM NO_ACBM NO_ACBM NO_ACBM CHR NO_ACBM Roof Parapet Wall CHR Exterior Exterior Exterior Exterior Room 212 1st/2nd Floor Corridors, Principal's Office, Room 214 and 1A 1st/2nd Floor Corridors, Principal's Office, Room 214 and 1A Patches in Main Office, Library Patches in Main Office, Library Throughout Facility Rooms 17, 15, 13, 12 & 11 (Checkboard pattern) Rooms 17, 15, 13, 12 & 11 (Checkboard pattern) NO_ACBM NO_ACBM NO_ACBM CHR ASSUMED ASSUMED N ne NONE ACBM with the potential for damage ASSUMED N NONE ACBM with the potential for damage ASSUMED N NONE N NONE ACBM with the potential for damage ACBM with the potential for damage ASSUMED NO_ACBM ASSUMED N NONE ACBM with the potential for damage ASSUMED N NONE ACBM with the potential for damage 8, 8, , 5, Material Location Asbestos Type Material Category Friable Damage Type Damage Quantity Damage Units Damage Category ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage Damage Reason Disturbance Potential Low
16 School Chicago Technology Academy High School (Medill ES) Unit Building ID Address Region 3 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description Mastic for HA 6 & 61 (Checkboard pattern) 12x12 White FT Patch x9 Grey with White Specs Mastic 67 Dark Grey Carpet Mastic Blue with Blue Specs 12x12 Grey with White Green Burgundy Specs Blue with Blue Specs Mastic 7 Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Type Damage Quantity Damage Units 1, ASSUMED N NONE 1 Rooms 17, 15, 13, 12 & 11 Room 19 Change in Assessment Category ASSUMED N NONE 12x12 White FT Patch Mastic 1 Room 19 ASSUMED N NONE 9x9 Grey with White Specs 72 ASSUMED N NONE ASSUMED N NONE ASSUMED N NONE Rm. 14C in Boiler Room Rm. 14 C in Boiler Room Rm. 19 1,44 Rm. 113, 115 Lunch Room, 19 ASSUMED ASSUMED N NONE 1,2 Rm. 113, 115 ASSUMED N NONE 1,44 ASSUMED N NONE 7 ASSUMED N NONE 5 ASSUMED N NONE 1, ASSUMED N NONE 1 Lunch Room, Rm. 19 1st Floor Men's Toilet, Unisex Toilet 1st Floor Women's Toilet 2nd Floor Girls/Boys Toilet Rm. 219 ASSUMED N NONE 72 12x12 Grey with White Green Burgundy Specs Green Grout Floor (Ceramic) 73 Beige Floor Grout (Ceramic) 74 Brown Floor Grout (Ceramic) 75 9x9 Salmon Floor Tile 76 9x9 Salmon Floor Tile Mastic 1 Rm. 219 ASSUMED N NONE 77 Ceramic Floor Tile 3, ASSUMED N NONE 78 Yellow Linoleum 3, 1st/2nd Floor Stair Wells & Landings Rms. 11, 12 ASSUMED N NONE 79 Yellow Linoleum Mastic 3, Rms. 11, 12 ASSUMED N NONE 8 8 1' x 1' Ceiling Tile w/large Holes Adhesive 2' X 4' Ceiling Tile 3, Throughout Facility Rms. 11, 12 NO_ACBM ASSUMED Y NONE Yes 81 Elbows on Runs 6 Gym ASSUMED TSI Y LOC 2 Yes 82 Wall Board Glue Pucks 15 All Classrooms ASSUMED N LOC 2 Yes 71 Damage Category Damage Reason Disturbance Potential ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage Any remaining friable ACBM or friable suspect ACBM Damaged or significantly damaged friable thermal system insulating ACBM ACBM with the 1 MODERATE 5
17 School Chicago Technology Academy High School (Medill ES) Unit Building ID Address Region 3 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description C D Cardboard Insulation on Piping Hard Joint Cmpd. On Cardboard Pipe Insulation Aircell Pipe Insulation Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Type Damage Quantity Damage Units Change in Assessment Category Damage Category Damage Reason Disturbance Potential Boiler Room Boiler Room CHR ASSUMED TSI TSI Gym Storage, Boiler Room, Unexcavated Area, Above Corridor Ceilings, Teacher Storage Room 11B Gym Storage, Boiler Room, Unexcavated Area, Above Corridor Ceilings Boiler Room CHR TSI Y NONE Yes Any remaining friable ACBM or friable suspect ACBM CHR TSI Y NONE Yes Any remaining friable ACBM or friable suspect ACBM UNDEFINE D NO_ACBM CHR TSI Y NONE ASSUMED TSI Y NONE Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM potential for damage E F Hard Joint Compound on Aircell Pipe Insulation G H J Mag Block Insulation on Domestic Water Tank Water Main Line Insulation Mag Block Insulation K Duct Jacket 258 LF 5 1 LF Boiler Room Boiler Room, Gym Storage 32 Boiler Room ne ne Low Low
18 School Chicago Technology Academy High School (Medill ES) Unit Building ID Address Region 3 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report Reinspection Date 4/2/216 Inspector Name Inspector's Comments Dionne Carey 5/15/217 Inspector's IDPH License Number / Expiration Date HA Number: Inspector Comments: t observed in Room 119 t observed in Room 119
19 School Chicago Technology Academy High School (Medill ES) Unit Building ID Address Region 3 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: Inspector Comments: t observed 216 t observed 216
20 School Chicago Technology Academy High School (Medill ES) Unit Building ID Address Region 3 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: C D E F Inspector Comments: t observed 216 Damage is located in Room 25 t observed 216 t observed 216
21 School Chicago Technology Academy High School (Medill ES) Unit Building ID Address Region 3 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: G H J K Inspector Comments: t observed 216
22 Table II Management Planner's Review
23 School Address Chicago Technology Academy High School (Medill ES) Unit Building ID Chicago, IL, 668 Region 3 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units 1 1 1' x 1' Ceiling Tile w/large Holes 9" x 9" Olive Floor Tile w/dark Specks 9,1 11 9" x 9" Olive Floor Tile w/dark Specks Mastic 9,1 12 9" x 9" Beige Floor Tile " x 9" Beige Floor Tile Mastic " x 9" Light Brown Floor Tile w/specks 15, 15 9" x 9" Light Brown Floor Tile w/specks Mastic 15, 16 9" x 9" Olive Floor Tile w/white Specks 6, " x 9" Olive Floor Tile w/white Specks Mastic 6, " x 9" Brown FT patch w/multi-colored Streaks "x9" Brn FT Patch w/multi-colored Strks Mastic ' x 8' Ceiling Tile 9" x 9" Brown Floor Tile w/orange SpecksRemoved 9" x 9" Brown Floor Tile w/ Orange Specks MasticRemoved 9" x 9" Cream Floor Tile Patch 9" x 9" Cream Floor Tile Mastic Patch 9" x 9" Tan Floor Tile Patch 9"x 9" Tan Floor Tile Mastic Patch 9" x 9" Aqua Floor Tile - REMOVED 27 9" x 9" Aqua Floor Tile Mastic - REMOVED Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response Throughout Facility Rooms 16, 112, 114, 118, 119, 2327, 218, Rec Room & Hall Rooms 16, 112, 114, 118, 119, 2327, 218, Rec Room & Hall Office, Rooms 117, 121, 21, 22, , 214, 215, 219 Office, Rooms 117, 121, 21, 22, , 214, 215, , 211, 213, 215, 217, 219, 221, Office Rooms117, 211, 213, 215, 217, 219, 221, Office Office, Rooms 21, 22, 23, 25, 27, 29, Storage Office, Rooms 21, 22, 23, 25, 27, 29, Storage Rooms 115,121, 23, 25, 27, 29, 213, 214 1st and 2nd floor Corridors, Rooms 115, 121, 23, 25, 27, 29, 213, 214 Gymnasium Patches Throughout Second Floor Corridor Patches Throughout Second Floor Corridor 25, 27 25, Patches in 26 1st Floor Corridor Across From the Boiler Room 1st Floor Corridor Across From the Boiler Room ACBM Chrysotile 6 ACBM with the potential for damage Chrysotile 6 ACBM with the potential for damage Chrysotile 6 ACBM with the potential for damage Chrysotile 6 ACBM with the potential for damage Chrysotile 6 ACBM with the potential for damage Chrysotile 6 ACBM with the potential for damage Chrysotile 6 ACBM with the potential for damage Chrysotile 6 ACBM with the potential for damage Chrysotile 6 ACBM with the potential for damage Chrysotile 6 ACBM with the potential for damage Chrysotile Chrysotile Chrysotile Chrysotile Abated 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage Abated ACBM Abated Abated
24 School Address Chicago Technology Academy High School (Medill ES) Unit Building ID Chicago, IL, 668 Region 3 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description 28 9" x 9" Gray Floor Tile w/streaks - REMOVED 29 9" x 9" Gray Floor Tile w/ Streaks Mastic- Removed 3 3 Hard Ceiling Plaster 12" x 12" White Floor Tile w/specks & Streaks Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response Abated Abated ACBM Assumed 6 ACBM with the potential for damage Assumed 6 ACBM with the potential for damage Assumed Chrysotile Assumed Chrysotile 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage Assumed Chrysotile Assumed Chrysotile Chrysotile Chrysotile 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 22 12"x12" White Floor Tile w/specks & Streaks Mastic 12" x 12" Beige Floor Tile w/wh & Brn Strks 12" x12" Beige Floor Tile w/ Wh & Brn Strks Mastic 12"x12" Tan Floor Tile w/white and Brown Streaks 12"x12" Tan Floor Tile w/wh and Brn Streaks Mastic ,679 1,679 12" x 12" Brown Floor Tile w/multi-colored Specks 12"x12" Brn Floor Tile w/multi-colored Spks Mastic 12" x 12" White Floor Tile w/gray Specks 12" x 12" White Floor Tile w/gray Specks Mastic 12" x 12" Dark Gray Floor Tile w/brown Specks 12"x12" Dark Gray Floor Tile w/brown Specks Mastic 12"x12" Tan Floor Tile w/brown & White Specks 12"x12" Tan Floor Tile w/brn & White Specks Mastic 1'x1' Ceiling Tile With Small Holes Glue Vibration Isolator Cloth Interior Window Glaze Roof Field - t AHERA Roof Flashing - t AHERA Parapet Wall Light Color Caulk - t AHERA Parapet Wall Dark Color Caulk - t AHERA Exterior Brick - t AHERA 1 2,5 4, 1 1 As Patches in the Second Floor Corridor As Patches in the Second Floor Corridor Throughout Facility Various Locations Throughout First Floor Various Locations Throughout First Floor Throughout Facility Throughout Facility Throughout Facility Throughout Facility, Main Office, Rm 19, Lunch Room, 111, 1st floor hallway, 2nd floor hallway Throughout Facility Kitchen Storage Room on platform Gymnasium Gymnasium Room 214 Room As Patches in 2nd Floor Corridor As Patches in 1st Floor Corridor Assumed Chrysotile Throughout Facility Gymnasium Throughout Facility Roof Roof Roof Parapet Wall Roof Parapet Wall Exterior ACBM ACBM ACBM ACBM Chrysotile ACBM Chrysotile ACBM
25 School Address Chicago Technology Academy High School (Medill ES) Unit Building ID Chicago, IL, 668 Region 3 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Exterior Brick Mortar - t AHERA Exterior Window Glaze - t AHERA Exterior Window Caulk - t AHERA Carpet Mastic 12" x 12" Beige w/streaks Mottled Floor Tile 8, 57 12"x12" Beige w/streaks Mottled Floor Tile Mastic 8, "x12"Off-White w/mauve & Blue Streaks Floor Tile 12"x12"Off-White w/mauve & Blue Streaks FT Mastic 1' x 1' Ceiling Tile w/small Holes 12" x 12" Beige w/dk. Beige Streaks Floor Tile Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response ACBM ACBM Chrysotile Assumed Assumed Exterior Exterior Exterior Room 212 1st/2nd Floor Corridors, Principal's Office, Room 214 and 1A 1st/2nd Floor Corridors, Principal's Office, Room 214 and 1A Patches in Main Office, Library 6 ACBM with the potential for damage Assumed 6 ACBM with the potential for damage Assumed 6 ACBM with the potential for damage 82 Patches in Main Office, Library Assumed 6 ACBM with the potential for damage 5, Throughout Facility Rooms 17, 15, 13, 12 & 11 (Checkboard pattern) Rooms 17, 15, 13, 12 & 11 (Checkboard pattern) Rooms 17, 15, 13, 12 & 11 Room 19 Room 19 Rm. 14C in Boiler Room Rm. 14 C in Boiler Room Rm. 19 Rm. 113, 115 Lunch Room, 19 Rm. 113, 115 Lunch Room, Rm. 19 1st Floor Men's Toilet, Unisex Toilet 1st Floor Women's Toilet 2nd Floor Girls/Boys Toilet Rm. 219 Rm st/2nd Floor Stair Wells & Landings ACBM Assumed 6 ACBM with the potential for damage 12" x 12" Brownish Gray w/streaks FT 5, Assumed 6 ACBM with the potential for damage Mastic for HA 6 & 61 (Checkboard pattern) 12x12 White FT Patch 12x12 White FT Patch Mastic 9x9 Grey with White Specs 9x9 Grey with White Specs Mastic Dark Grey Carpet Mastic Blue with Blue Specs 12x12 Grey with White Green Burgundy Specs Blue with Blue Specs Mastic 12x12 Grey with White Green Burgundy Specs Green Grout Floor (Ceramic) Beige Floor Grout (Ceramic) Brown Floor Grout (Ceramic) 9x9 Salmon Floor Tile 9x9 Salmon Floor Tile Mastic Ceramic Floor Tile 1, Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 1,44 1,2 1, , 1 1 3,
26 School Address Chicago Technology Academy High School (Medill ES) Unit Building ID Chicago, IL, 668 Region 3 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response Yellow Linoleum Yellow Linoleum Mastic 1' x 1' Ceiling Tile w/large Holes Adhesive 2' X 4' Ceiling Tile 3, 3, 6 ACBM with the potential for damage 6 ACBM with the potential for damage Assumed Assumed ACBM Assumed 3, Rms. 11, 12 Rms. 11, 12 Throughout Facility Rms. 11, 12 Yes 81 Elbows on Runs 6 Gym Assumed TSI Yes 2 82 C D E Wall Board Glue Pucks Cardboard Insulation on Piping Hard Joint Cmpd. On Cardboard Pipe Insulation Aircell Pipe Insulation 15 TSI TSI TSI 2 LF Assumed Chrysotile Assumed Chrysotile 258 Yes LF 7 Any remaining friable ACBM or friable suspect ACBM F Hard Joint Compound on Aircell Pipe Insulation 5 Chrysotile TSI Yes 7 Any remaining friable ACBM or friable suspect ACBM G H J Mag Block Insulation on Domestic Water Tank Water Main Line Insulation Mag Block Insulation 1 LF All Classrooms Boiler Room Boiler Room Gym Storage, Boiler Room, Unexcavated Area, Above Corridor Ceilings, Teacher Storage Room 11B Gym Storage, Boiler Room, Unexcavated Area, Above Corridor Ceilings Boiler Room Boiler Room Boiler Room, Gym Storage 7 Any remaining friable ACBM or friable suspect ACBM 1 Damaged or significantly damaged friable thermal system insulating ACBM 6 ACBM with the potential for damage Undefined ACBM Chrysotile TSI Yes LF K Duct Jacket 32 Boiler Room Assumed TSI Yes Repair Repair 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM
27 School Address Chicago Technology Academy High School (Medill ES) Unit Building ID Chicago, IL, 668 Region 3 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report 6/14/216 Review Date Manager Planner Name Evan Christian /15/216 Manager IDPH License /Expiration HA Number Management Comments If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan.
28 School Address Chicago Technology Academy High School (Medill ES) Unit Building ID Chicago, IL, 668 Region 3 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number Management Comments If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan.
29 School Address Chicago Technology Academy High School (Medill ES) Unit Building ID Chicago, IL, 668 Region 3 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number Management Comments If identified follow O&M plan. If identified follow O&M plan.
30 School Address Chicago Technology Academy High School (Medill ES) Unit Building ID Chicago, IL, 668 Region 3 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number C D E F G H J K Management Comments Patch and repair as needed then follow O&M procedure. Repair as needed then follow O&M procedure. If identified follow O&M plan. If identified follow O&M plan. If identified follow O&M plan.
31 School Address Chicago Technology Academy High School (Medill ES) Unit Building ID Chicago, IL, 668 Region 3 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report
32 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 1 1' x 1' Ceiling Tile w/large Holes HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Facility COMMENTS: Inspector's Signature: 4/2/216
33 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ ' x 1' Ceiling Tile w/large Holes Throughout Facility In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
34 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 1 9" x 9" Olive Floor Tile w/dark Specks HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Rooms 16, 112, 114, 118, 119, 23-27, 218, Rec Room & Hall 91 COMMENTS: t observed in Room 119 Inspector's Signature: 4/2/216
35 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 9" Olive Floor Tile w/dark Specks Rooms 16, 112, 114, 118, 119, 23-27, 218, Rec Room & Hall 91 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 6/14/216
36 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 11 9" x 9" Olive Floor Tile w/dark Specks Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Rooms 16, 112, 114, 118, 119, 23-27, 218, Rec Room & Hall 91 COMMENTS: t observed in Room 119 Inspector's Signature: 4/2/216
37 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 9" Olive Floor Tile w/dark Specks Mastic Rooms 16, 112, 114, 118, 119, 23-27, 218, Rec Room & Hall 91 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 6/14/216
38 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 12 9" x 9" Beige Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Office, Rooms 117, 121, 21, 22, , 214, 215, COMMENTS: Inspector's Signature: 4/2/216
39 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 9" Beige Floor Tile Office, Rooms 117, 121, 21, 22, , 214, 215, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
40 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 13 9" x 9" Beige Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Office, Rooms 117, 121, 21, 22, , 214, 215, COMMENTS: Inspector's Signature: 4/2/216
41 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 9" Beige Floor Tile Mastic Office, Rooms 117, 121, 21, 22, , 214, 215, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
42 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 14 9" x 9" Light Brown Floor Tile w/specks HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 117, 211, 213, 215, 217, 219, 221, Office 15 COMMENTS: Inspector's Signature: 4/2/216
43 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 9" Light Brown Floor Tile w/specks 117, 211, 213, 215, 217, 219, 221, Office 15 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
44 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 15 9" x 9" Light Brown Floor Tile w/specks Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Rooms117, 211, 213, 215, 217, 219, 221, Office 15 COMMENTS: Inspector's Signature: 4/2/216
45 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 9" Light Brown Floor Tile w/specks Mastic Rooms117, 211, 213, 215, 217, 219, 221, Office 15 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
46 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 16 9" x 9" Olive Floor Tile w/white Specks HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Office, Rooms 21, 22, 23, 25, 27, 29, Storage 685 COMMENTS: Inspector's Signature: 4/2/216
47 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 9" Olive Floor Tile w/white Specks Office, Rooms 21, 22, 23, 25, 27, 29, Storage 685 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
48 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 17 9" x 9" Olive Floor Tile w/white Specks Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Office, Rooms 21, 22, 23, 25, 27, 29, Storage 685 COMMENTS: Inspector's Signature: 4/2/216
49 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 9" Olive Floor Tile w/white Specks Mastic Office, Rooms 21, 22, 23, 25, 27, 29, Storage 685 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
50 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 18 9" x 9" Brown FT patch w/multi-colored Streaks HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Rooms 115,121, 23, 25, 27, 29, 213, COMMENTS: Inspector's Signature: 4/2/216
51 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 9" Brown FT patch w/multi-colored Streaks Rooms 115,121, 23, 25, 27, 29, 213, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
52 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 19 9"x9" Brn FT Patch w/multi-colored Strks Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1st and 2nd floor Corridors, Rooms 115, 121, 23, 25, 27, 29, 213, COMMENTS: Inspector's Signature: 4/2/216
53 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ "x9" Brn FT Patch w/multi-colored Strks Mastic 1st and 2nd floor Corridors, Rooms 115, 121, 23, 25, 27, 29, 213, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
54 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 2 2.5' x 8' Ceiling Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Gymnasium COMMENTS: Inspector's Signature: 4/2/216
55 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ ' x 8' Ceiling Tile Gymnasium In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
56 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 2 9" x 9" Brown Floor Tile w/orange Specks- Removed HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Patches Throughout Second Floor Corridor COMMENTS: Inspector's Signature: 4/2/216
57 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 9" Brown Floor Tile w/orange Specks- Removed Patches Throughout Second Floor Corridor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 6/14/216
58 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 21 9" x 9" Brown Floor Tile w/ Orange Specks Mastic- Removed HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Patches Throughout Second Floor Corridor COMMENTS: Inspector's Signature: 4/2/216
59 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 9" Brown Floor Tile w/ Orange Specks Mastic- Removed Patches Throughout Second Floor Corridor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 6/14/216
60 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 22 9" x 9" Cream Floor Tile Patch HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 25, 27 2 COMMENTS: Inspector's Signature: 4/2/216
61 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 9" Cream Floor Tile Patch 25, 27 2 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
62 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 23 9" x 9" Cream Floor Tile Mastic Patch HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 25, COMMENTS: Inspector's Signature: 4/2/216
63 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 9" Cream Floor Tile Mastic Patch 25, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
64 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 24 9" x 9" Tan Floor Tile Patch HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 26 2 COMMENTS: Inspector's Signature: 4/2/216
65 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 9" Tan Floor Tile Patch 26 2 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
66 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 25 9"x 9" Tan Floor Tile Mastic Patch HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Patches in 26 2 COMMENTS: Inspector's Signature: 4/2/216
67 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ "x 9" Tan Floor Tile Mastic Patch Patches in 26 2 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
68 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 26 9" x 9" Aqua Floor Tile - REMOVED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Abated RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1st Floor Corridor Across From the Boiler Room COMMENTS: Inspector's Signature: 4/2/216
69 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 9" Aqua Floor Tile - REMOVED 1st Floor Corridor Across From the Boiler Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 6/14/216
70 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 27 9" x 9" Aqua Floor Tile Mastic - REMOVED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Abated RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1st Floor Corridor Across From the Boiler Room COMMENTS: Inspector's Signature: 4/2/216
71 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 9" Aqua Floor Tile Mastic - REMOVED 1st Floor Corridor Across From the Boiler Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 6/14/216
72 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 28 9" x 9" Gray Floor Tile w/streaks - REMOVED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: As Patches in the Second Floor Corridor COMMENTS: Inspector's Signature: 4/2/216
73 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 9" Gray Floor Tile w/streaks - REMOVED As Patches in the Second Floor Corridor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 6/14/216
74 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 29 9" x 9" Gray Floor Tile w/ Streaks Mastic- Removed HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: As Patches in the Second Floor Corridor COMMENTS: Inspector's Signature: 4/2/216
75 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 9" Gray Floor Tile w/ Streaks Mastic- Removed As Patches in the Second Floor Corridor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 6/14/216
76 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 3 Hard Ceiling Plaster HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Facility COMMENTS: Inspector's Signature: 4/2/216
77 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/216 3 Hard Ceiling Plaster Throughout Facility In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
78 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 3 12" x 12" White Floor Tile w/specks & Streaks HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Various Locations Throughout First Floor 22 COMMENTS: Inspector's Signature: 4/2/216
79 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 12" White Floor Tile w/specks & Streaks Various Locations Throughout First Floor 22 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
80 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 31 12"x12" White Floor Tile w/specks & Streaks Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Various Locations Throughout First Floor 2 COMMENTS: Inspector's Signature: 4/2/216
81 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ "x12" White Floor Tile w/specks & Streaks Mastic Various Locations Throughout First Floor 2 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
82 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 32 12" x 12" Beige Floor Tile w/wh & Brn Strks HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Facility 45 COMMENTS: Inspector's Signature: 4/2/216
83 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 12" Beige Floor Tile w/wh & Brn Strks Throughout Facility 45 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
84 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 33 12" x12" Beige Floor Tile w/ Wh & Brn Strks Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Facility 45 COMMENTS: Inspector's Signature: 4/2/216
85 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x12" Beige Floor Tile w/ Wh & Brn Strks Mastic Throughout Facility 45 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
86 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 34 12"x12" Tan Floor Tile w/white and Brown Streaks HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Facility 1679 COMMENTS: Inspector's Signature: 4/2/216
87 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ "x12" Tan Floor Tile w/white and Brown Streaks Throughout Facility 1679 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
88 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 35 12"x12" Tan Floor Tile w/wh and Brn Streaks Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Facility, Main Office, Rm 19, Lunch Room, 111, 1st floor hallway, 2nd floor hallway 1679 COMMENTS: Inspector's Signature: 4/2/216
89 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ "x12" Tan Floor Tile w/wh and Brn Streaks Mastic Throughout Facility, Main Office, Rm 19, Lunch Room, 111, 1st floor hallway, 2nd floor hallway 1679 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
90 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 36 12" x 12" Brown Floor Tile w/multi-colored Specks HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Facility 1 COMMENTS: Inspector's Signature: 4/2/216
91 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 12" Brown Floor Tile w/multi-colored Specks Throughout Facility 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
92 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 37 12"x12" Brn Floor Tile w/multi-colored Spks Mastic HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Kitchen Storage Room on platform COMMENTS: t observed 216 Inspector's Signature: 4/2/216
93 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ "x12" Brn Floor Tile w/multi-colored Spks Mastic Kitchen Storage Room on platform In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 6/14/216
94 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 38 12" x 12" White Floor Tile w/gray Specks HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Gymnasium 25 COMMENTS: Inspector's Signature: 4/2/216
95 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 12" White Floor Tile w/gray Specks Gymnasium 25 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
96 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 39 12" x 12" White Floor Tile w/gray Specks Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Gymnasium 4 COMMENTS: Inspector's Signature: 4/2/216
97 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 12" White Floor Tile w/gray Specks Mastic Gymnasium 4 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
98 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 4 12" x 12" Dark Gray Floor Tile w/brown Specks HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room COMMENTS: Inspector's Signature: 4/2/216
99 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 12" Dark Gray Floor Tile w/brown Specks Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
100 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 41 12"x12" Dark Gray Floor Tile w/brown Specks Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room COMMENTS: Inspector's Signature: 4/2/216
101 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ "x12" Dark Gray Floor Tile w/brown Specks Mastic Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
102 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 42 12"x12" Tan Floor Tile w/brown & White Specks HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: As Patches in 2nd Floor Corridor 2 COMMENTS: Inspector's Signature: 4/2/216
103 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ "x12" Tan Floor Tile w/brown & White Specks As Patches in 2nd Floor Corridor 2 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
104 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 43 12"x12" Tan Floor Tile w/brn & White Specks Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: As Patches in 1st Floor Corridor 2 COMMENTS: Inspector's Signature: 4/2/216
105 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ "x12" Tan Floor Tile w/brn & White Specks Mastic As Patches in 1st Floor Corridor 2 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
106 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 44 1'x1' Ceiling Tile With Small Holes Glue HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Facility COMMENTS: Inspector's Signature: 4/2/216
107 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ 'x1' Ceiling Tile With Small Holes Glue Throughout Facility In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
108 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 45 Vibration Isolator Cloth HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Gymnasium COMMENTS: Inspector's Signature: 4/2/216
109 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ Vibration Isolator Cloth Gymnasium In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
110 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 46 Interior Window Glaze HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Facility COMMENTS: Inspector's Signature: 4/2/216
111 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ Interior Window Glaze Throughout Facility In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
112 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 47 Roof Field - t AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Roof COMMENTS: Inspector's Signature: 4/2/216
113 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ Roof Field - t AHERA Roof In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
114 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 48 Roof Flashing - t AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Roof COMMENTS: Inspector's Signature: 4/2/216
115 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ Roof Flashing - t AHERA Roof In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
116 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 49 Parapet Wall Light Color Caulk - t AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Roof Parapet Wall COMMENTS: Inspector's Signature: 4/2/216
117 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ Parapet Wall Light Color Caulk - t AHERA Roof Parapet Wall In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
118 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 5 Parapet Wall Dark Color Caulk - t AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Roof Parapet Wall COMMENTS: Inspector's Signature: 4/2/216
119 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/216 5 Parapet Wall Dark Color Caulk - t AHERA Roof Parapet Wall In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
120 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 51 Exterior Brick - t AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Exterior COMMENTS: Inspector's Signature: 4/2/216
121 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ Exterior Brick - t AHERA Exterior In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
122 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 52 Exterior Brick Mortar - t AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Exterior COMMENTS: Inspector's Signature: 4/2/216
123 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ Exterior Brick Mortar - t AHERA Exterior In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
124 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 53 Exterior Window Glaze - t AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Exterior COMMENTS: Inspector's Signature: 4/2/216
125 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ Exterior Window Glaze - t AHERA Exterior In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
126 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 54 Exterior Window Caulk - t AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Exterior COMMENTS: Inspector's Signature: 4/2/216
127 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ Exterior Window Caulk - t AHERA Exterior In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
128 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 55 Carpet Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Low Room 212 COMMENTS: t observed 216 Inspector's Signature: 4/2/216
129 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ Carpet Mastic Room 212 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 6/14/216
130 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 56 12" x 12" Beige w/streaks Mottled Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1st/2nd Floor Corridors, Principal's Office, Room 214 and 1A 8 COMMENTS: Inspector's Signature: 4/2/216
131 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 12" Beige w/streaks Mottled Floor Tile 1st/2nd Floor Corridors, Principal's Office, Room 214 and 1A 8 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
132 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 57 12"x12" Beige w/streaks Mottled Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1st/2nd Floor Corridors, Principal's Office, Room 214 and 1A 8 COMMENTS: Inspector's Signature: 4/2/216
133 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ "x12" Beige w/streaks Mottled Floor Tile Mastic 1st/2nd Floor Corridors, Principal's Office, Room 214 and 1A 8 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
134 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 58 12"x12"Off-White w/mauve & Blue Streaks Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Patches in Main Office, Library 82 COMMENTS: Inspector's Signature: 4/2/216
135 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ "x12"Off-White w/mauve & Blue Streaks Floor Tile Patches in Main Office, Library 82 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
136 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 59 12"x12"Off-White w/mauve & Blue Streaks FT Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Patches in Main Office, Library 82 COMMENTS: Inspector's Signature: 4/2/216
137 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ "x12"Off-White w/mauve & Blue Streaks FT Mastic Patches in Main Office, Library 82 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
138 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 6 1' x 1' Ceiling Tile w/small Holes HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Facility COMMENTS: Inspector's Signature: 4/2/216
139 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ ' x 1' Ceiling Tile w/small Holes Throughout Facility In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
140 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 6 12" x 12" Beige w/dk. Beige Streaks Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Rooms 17, 15, 13, 12 & 11 (Checkboard pattern) 5 COMMENTS: Inspector's Signature: 4/2/216
141 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 12" Beige w/dk. Beige Streaks Floor Tile Rooms 17, 15, 13, 12 & 11 (Checkboard pattern) 5 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
142 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 61 12" x 12" Brownish Gray w/streaks FT HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Rooms 17, 15, 13, 12 & 11 (Checkboard pattern) 5 COMMENTS: Inspector's Signature: 4/2/216
143 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ " x 12" Brownish Gray w/streaks FT Rooms 17, 15, 13, 12 & 11 (Checkboard pattern) 5 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
144 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 62 Mastic for HA 6 & 61 (Checkboard pattern) HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Rooms 17, 15, 13, 12 & 11 1 COMMENTS: Inspector's Signature: 4/2/216
145 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ Mastic for HA 6 & 61 (Checkboard pattern) Rooms 17, 15, 13, 12 & 11 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
146 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 63 12x12 White FT Patch HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room 19 1 COMMENTS: Inspector's Signature: 4/2/216
147 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ x12 White FT Patch Room 19 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
148 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 64 12x12 White FT Patch Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room 19 1 COMMENTS: Inspector's Signature: 4/2/216
149 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ x12 White FT Patch Mastic Room 19 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
150 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 65 9x9 Grey with White Specs HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Rm. 14C in Boiler Room 72 COMMENTS: Inspector's Signature: 4/2/216
151 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ x9 Grey with White Specs Rm. 14C in Boiler Room 72 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
152 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 66 9x9 Grey with White Specs Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Rm. 14 C in Boiler Room 72 COMMENTS: Inspector's Signature: 4/2/216
153 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ x9 Grey with White Specs Mastic Rm. 14 C in Boiler Room 72 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
154 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 67 Dark Grey Carpet Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Rm COMMENTS: Inspector's Signature: 4/2/216
155 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ Dark Grey Carpet Mastic Rm In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
156 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 68 Blue with Blue Specs HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Rm. 113, 115 COMMENTS: t observed 216 Inspector's Signature: 4/2/216
157 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ Blue with Blue Specs Rm. 113, 115 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 6/14/216
158 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 69 12x12 Grey with White Green Burgundy Specs HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Lunch Room, COMMENTS: Inspector's Signature: 4/2/216
159 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ x12 Grey with White Green Burgundy Specs Lunch Room, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
160 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 7 Blue with Blue Specs Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Rm. 113, COMMENTS: Inspector's Signature: 4/2/216
161 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/216 7 Blue with Blue Specs Mastic Rm. 113, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
162 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 71 12x12 Grey with White Green Burgundy Specs HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Lunch Room, Rm COMMENTS: Inspector's Signature: 4/2/216
163 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ x12 Grey with White Green Burgundy Specs Lunch Room, Rm In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
164 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 72 Green Grout Floor (Ceramic) HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1st Floor Men's Toilet, Unisex Toilet 7 COMMENTS: Inspector's Signature: 4/2/216
165 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ Green Grout Floor (Ceramic) 1st Floor Men's Toilet, Unisex Toilet 7 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
166 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 73 Beige Floor Grout (Ceramic) HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1st Floor Women's Toilet 5 COMMENTS: Inspector's Signature: 4/2/216
167 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ Beige Floor Grout (Ceramic) 1st Floor Women's Toilet 5 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
168 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 74 Brown Floor Grout (Ceramic) HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 2nd Floor Girls/Boys Toilet 1 COMMENTS: Inspector's Signature: 4/2/216
169 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ Brown Floor Grout (Ceramic) 2nd Floor Girls/Boys Toilet 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
170 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 75 9x9 Salmon Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Rm COMMENTS: Inspector's Signature: 4/2/216
171 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ x9 Salmon Floor Tile Rm In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
172 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 76 9x9 Salmon Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Rm COMMENTS: Inspector's Signature: 4/2/216
173 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ x9 Salmon Floor Tile Mastic Rm In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
174 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 77 Ceramic Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1st/2nd Floor Stair Wells & Landings 3 COMMENTS: Inspector's Signature: 4/2/216
175 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ Ceramic Floor Tile 1st/2nd Floor Stair Wells & Landings 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
176 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 78 Yellow Linoleum HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Rms. 11, 12 3 COMMENTS: Inspector's Signature: 4/2/216
177 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ Yellow Linoleum Rms. 11, 12 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
178 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 79 Yellow Linoleum Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Rms. 11, 12 3 COMMENTS: Inspector's Signature: 4/2/216
179 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ Yellow Linoleum Mastic Rms. 11, 12 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
180 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 8 1' x 1' Ceiling Tile w/large Holes Adhesive HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Facility COMMENTS: Inspector's Signature: 4/2/216
181 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ ' x 1' Ceiling Tile w/large Holes Adhesive Throughout Facility In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
182 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION 8 2' X 4' Ceiling Tile HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Rms. 11, 12 3 COMMENTS: Inspector's Signature: 4/2/216
183 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ ' X 4' Ceiling Tile Rms. 11, 12 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
184 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION C Cardboard Insulation on Piping HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Low Boiler Room COMMENTS: t observed 216 Inspector's Signature: 4/2/216
185 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/216 C Cardboard Insulation on Piping Boiler Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 6/14/216
186 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION D Hard Joint Cmpd. On Cardboard Pipe Insulation HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Low Boiler Room COMMENTS: t observed 216 Inspector's Signature: 4/2/216
187 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/216 D Hard Joint Cmpd. On Cardboard Pipe Insulation Boiler Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 6/14/216
188 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION E Aircell Pipe Insulation HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Gym Storage, Boiler Room, Unexcavated Area, Above Corridor Ceilings, Teacher Storage Room 11B 258 LF LF COMMENTS: Inspector's Signature: 4/2/216
189 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/216 E Aircell Pipe Insulation Gym Storage, Boiler Room, Unexcavated Area, Above Corridor Ceilings, Teacher Storage Room 11B 258 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
190 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION F Hard Joint Compound on Aircell Pipe Insulation HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Gym Storage, Boiler Room, Unexcavated Area, Above Corridor Ceilings 5 COMMENTS: Inspector's Signature: 4/2/216
191 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/216 F Hard Joint Compound on Aircell Pipe Insulation Gym Storage, Boiler Room, Unexcavated Area, Above Corridor Ceilings 5 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
192 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION G Mag Block Insulation on Domestic Water Tank HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Undefined FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room COMMENTS: t observed 216 Inspector's Signature: 4/2/216
193 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/216 G Mag Block Insulation on Domestic Water Tank Boiler Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: If identified follow O&M plan. Management Planner's Signature: 6/14/216
194 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION H Water Main Line Insulation HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room COMMENTS: Inspector's Signature: 4/2/216
195 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/216 H Water Main Line Insulation Boiler Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
196 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION J Mag Block Insulation HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room, Gym Storage 1 LF LF COMMENTS: Inspector's Signature: 4/2/216
197 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/216 J Mag Block Insulation Boiler Room, Gym Storage 1 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
198 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM PREVIOUS INSPECTION K Duct Jacket HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room 32 COMMENTS: Inspector's Signature: 4/2/216
199 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/216 K Duct Jacket Boiler Room 32 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 6/14/216
200 Inspector Assessment Form (New Homogeneous Area) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM CURRENT INSPECTION 81 Elbows on Runs Gym 6 MATERIAL CATEGORY: TSI FRIABLE: Yes ASBESTOS TYPE: Assumed DISTURBANCE POTENTIAL: MODERATE AHERA DAMAGE CATEGORY: CONDITION: 1 Damaged or significantly damaged friable thermal system insulating ACBM ACCESSIBILITY: Barely Reachable 2 DAMAGE REASON: DAMAGE REASON: DAMAGE REASON: COMMENTS: Inspector's Signature: 4/2/216
201 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ Elbows on Runs Gym 6 2 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: COMMENTS: Patch and repair as needed then follow O&M procedure. Management Planner's Signature: 6/14/216
202 Inspector Assessment Form (New Homogeneous Area) AHERA INSPECTOR: Dionne Carey Chicago Technology Academy High School (Medill ES) INSPECTION DATE: 4/2/216 INFORMATION FROM CURRENT INSPECTION 82 Wall Board Glue Pucks All Classrooms 15 MATERIAL CATEGORY: FRIABLE: ASBESTOS TYPE: Assumed DISTURBANCE POTENTIAL: AHERA DAMAGE CATEGORY: CONDITION: 6 ACBM with the potential for damage ACCESSIBILITY: Barely Reachable 2 DAMAGE REASON: DAMAGE REASON: DAMAGE REASON: COMMENTS: Damage is located in Room 25 Inspector's Signature: 4/2/216
203 Management Planner Review Form MANAGEMENT PLANNER: Evan Christian Chicago Technology Academy High School (Medill ES) REVIEW DATE: 6/14/ Wall Board Glue Pucks All Classrooms 15 2 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: COMMENTS: Repair as needed then follow O&M procedure. Management Planner's Signature: 6/14/216
204 APPENDIX B Inspector and Management Planner Licenses
205
206
207
208
209