TOWN OF PAWLING-BUILDING/ZONING DEPARTMENT FEE SCHEDULE REVISED JANUARY 2017

Size: px
Start display at page:

Download "TOWN OF PAWLING-BUILDING/ZONING DEPARTMENT FEE SCHEDULE REVISED JANUARY 2017"

Transcription

1 Building Permit Fees-Residential New Construction / Additions Renovations / Alterations Garages Carports/Covered Membrane Structures Sheds sq ft Open Deck Covered/Screened Sunrooms Roofing: where stripped to deck Siding: where stripped to vapor barrier or sheathing Application and Certificate of Occupancy Fee $ 150 plus: $0.85 per sq ft $0.05 per sq ft $0.05 per sq ft Other Building Permit Fees-Residential Application and Certificate of Compliance included in fee Sheds over 144 sq ft or more than one, up to 200 sq ft, $90.00 Pools- Above Ground $ Pools-In Ground $ Spas- Hot Tubs $ Fireplaces/Pellet, Coal, or Wood Stoves $ Boilers/Furnances/Heating Equipment $ Oil Tank Removal/Installation - per tank $ Electric service (no inspections by Building Depaetment) $60.00 Generators/Solar Electric Systems/Central Air $ All other electrical work that requires inspection by Building Department $ Demolition Permit $ Minor Demolition Permit (under 400 sq ft) $ Blasting Permit (per site-valid 3 months) $ Issuance of Stop Work Order $ Lift a Stop Work Order $ Sign Structure Permit $ Minimun fee for Building Permit for any construction/installation not listed $ plus $0.85 per sq ft or $75.00 per inspection Temporary CO (residential only) will be valid for up to 3 months only ( 11-7.D $ IF WORK HAS NOT BEGUN WITHIN FIRST SIX(6) MONTHS FROM DATE OF PERMIT ISSUANCE THE PERMIT IS NULL AND VOID. ANY WORK THAT WAS PERFORMED PRIOR TO OBTAINING A BUILDING PERMIT WILL BE DOUBLE THE REQUIRED FEE Building Permits are valid for one (1) year Renewal fee for all permits is 55% of original Building Permit Fee

2 Building Permit Fees-Commercial New Commercial Building Renovation Alteration & Structural Repair (with no change of occupancy) Application and Certificate of Occupancy Fee $ plus $1.15 per sq ft $0.70 per sq ft Application & Certificate of Occupancy Fee $375 plus $80.00 per inspection Other Building Permit Fees-Commercial Application and Certificate of Compliance included in fee Change of Use/Occupancy $ Roofing: Flat Roof $0.15 per sq ft Other Roofs $0.10 per sq ft Siding: Where Stripped to Vapor Barrier or Sheathing $0.10 per sq ft Fireplaces / Pellet, Coal or Wood Stoves $ Boilers / Furnaces / Heating Equipment $ Tank Removal/Installation (one tank) $ Electrical Service Upgrade $ All other Electric Work that Requires an Inspection $ Generator / Solar Electric System / Central Air $ Pools-In Ground (not including any accessory structures) $ Demolition permit $ Minor Demolition - Under 400 sqft $ Blasting Permit (per site - Valid for 3 Months) $ Cell Towers/Windmills $4, Colocation of Antennas $3, Replacement of equipment or any other permitted work on cell tower $ Sign Structure Permit $ Issuance of Stop Work Order $1, Lift a Stop Work Order $1, Construction/Contractor/Sales Trailers (valid one year) $ Minimum fee for Building Permit for any Construction/Installation not listed$37 $ plus $1.10 per sq ft or $85.00 per inspection Fee for third re-inspection (paid prior to any additional inspections) $75.00 Temporary CO (commercial only) will be valid for up to 3 months only ( $ IF WORK HAS NOT BEGUN WITHIN FIRST SIX(6) MONTHS FROM DATE OF PERMIT ISSUANCE THE PERMIT IS NULL AND VOID. Building Permits are valid for one (1) year Renewal fee for all permits is 55% of original Building Permit Fee ANY WORK THAT WAS PERFORMED PRIOR TO OBTAINING A BUILDING PERMIT WILL BE DOUBLE THE REQUIRED FEE

3 OTHER PERMITS: Creative Filming (Movie, Commercials or like) $ / shoot Metal Detection (Town Property with Permit) $ FIRE INSPECTION FEES Places of Public Assembly-Annual Inspection $ Re-Inspection within 30 days $50.00 Re-Inspection after 30 days $90.00 Multiple Dwelling (first three units) Every 3 Years $ Each additional dwelling unit $65.00 Fire Protection Equipment Sprinkler & Fire Suppression Equipment Inspection $ Modifications to Existing Fire & Sprinkler $ Fire Alarm installations $ Zoning Fees Area Variance $ Use Variance $ Zoning Interpretation by ZBA $ Administrative Appeal $ Municipal Search Fees Municipal Search-Residential $ Municipal Search-Commercial $380.00

4

5