1 PERMIT APPLICATION REQUIREMENTS MANDATORY DOCUMENTS: NEW MULTIFAMILY STRUCTURES CODES USED: CURRENT ADOPTED FLORIDA BUILDING CODE AND NEC 1. COMPLETED MULTIFAMILY PERMIT APPLICATION PACKET. ALL LINE ITEMS MUST BE FILLED OUT AS STRUCTURES (i.e. CLUB HOUSE, FENCES, GUARD SHACK, ETC.) APPLICABLE.LIST ALL 2. TWO (2) COMPLETE SET OF PLANS (24X36) & ONE (1) CD, SIGNED & SEALED IS REQUIRED ON THE FOLLOWING: A. PROJECTS $25,000 OR OVER B. BUILDING 5,000 SQUARE FOOT AND OVER (MAY REQUIRE ICC PLAN REVIEW) C. BUILDINGS (THREE) 3 STORIES AND OVER (MAY REQUIRE ICC PLAN REVIEW) D. ALL ASSEMBLY OCCUPANCIES (F.S ) (SCHOOLS, AUDITORIUMS, AND OTHER PUBLIC USE BLDGS) E. ELECTRICAL SYSTEMS OVER 800 AMPS OR $125,000 F. PLUMBING OVER 250 FIXTURE UNITS OR $125,000 G. MECHANICAL OVER 15 TONS OR $125, TWO (2) FULL SIZE (24X36) SETS SCALED SITE PLAN OR SURVEY CONFORMING TO LAND DEVELOPMENT CODE SECTION APPLICATION FOR PERMIT AND GENERAL PLAN REQUIREMENTS. Including Article and for Tree Preservation and Protection 4. FLORIDA PRODUCT APPROVAL NUMBERS for exterior doors, windows, skylights, panel walls, (EIFS) storefronts, roofing products, shutters, structural components and new exterior envelope products. (F.S ) 5. COMPLETE ENERGY PACKET (F.S.553) (Signed & sealed by Florida registered engineer or architect if exceeds $125,000 or 15 tons)(f.s ) 6. DESTIN FIRE CONTROL DISTRICT PERMIT APPROVAL LETTER BASED ON CONSTRUCTION DRAWINGS ( ) 7. RECORDED COPY OF NOTICE OF COMMENCEMENT (Florida Statutes ) NOC must be recorded with Okaloosa County Clerk of Court and posted at the job site. 8. ANY OTHER CITY/STATE/FEDERAL PERMITS (Right of Way, DEP, DOT, ARMY COE, ETC.) 9. FEMA FLOOD ELEVATION CERTIFICATE REQUIRED (AE & V zones): for pre construction, under construction (for foundation finished floor or placement of first horizontal structural member) and final construction. (Use current FEMA form) Final certificate must be provided prior to final inspection. (FEMA MAP) (LDC SECTION )(as applicable) 10. V ZONE CERTIFICATION (signed and sealed): DESIGN FOR CONSTRUCTION COMPLIANCE (as applicable) 11. SIGNED SEALED STORMWATER DESIGN CERTIFICATION OR APPROVED DEVELOPMENT ORDER 12. DESTIN WATER USERS APPRVOVAL LETTER OR APPROVED DEVELOPMENT ORDER 13. SIGNED AND SEALED DUST CONTROL AND VIBRATION IMPACT MITIGATION PLAN ( LDC) OR APPROVED DEVELOPMENT ORDER 14. STORMWATER MAINTENANCE PLAN (EXECUTED BY PARCEL OWNER) FOR ALL NEW STORMWATER FACILITIES. 15. CONSTRUCTION VEHICLE PARKING MITIGATION PLAN AND SITE SCREENING PLAN ( LDC) OR APPROVED DEVELOPMENT ORDER OTHER REQUIREMENTS: a. SLAB SURVEY PRIOR TO DRY-IN. SURVEY MUST SHOW FINISHED FLOOR ELEVATION & ELEVATION OF CENTERLINE OF ROAD. (LDC A/C). SLAB ELEVATION FOR ALL STRUCTURES SHALL BE A MINIMUM OF 12 ABOVE CROWN OF ROAD (LDC (A)5) b. SIGNED SEALED WINDLOAD CERTIFICATION LETTER PRIOR TO DRY-IN c. PORT-O-LET OR BATHROOM FACILITIES MUST BE ON THE JOB PRIOR TO FIRST INSPECTION. d. TRASH AND DEBRIS MUST BE CONTAINED e. ADEQUATE POTABLE WATER MUST BE AVAILABLE f. MAINTAIN EROSION AND SEDIMENT CONTROL PER LDC (B) DURING CONSTRUCTION OF PROJECT. INSPECTION REQUIRED PRIOR TO BEGINNING CONSTRUCTION. g. ALL EXISTING AND PROPOSED STORMWATER FACILITIES SHALL BE SHOWN ON SUBMITTED SITE PLAN. SEE LDC SECTION h. CITY IMPACT FEES MUST BE PAID PRIOR TO ISSUANCE OF CERTIFICATE OF OCCUPANCY/COMPLETION. i. ALL D.O. REQUIREMENTS & FEES PAID PRIOR TO C.O.,AS BUILT SURVEY PRIOR TO FINAL INSPECTION j. ALL EXISTING AND PROPOSED TOPOGRAPHY SHALL BE SHOWN ON GRADING PLAN AS REQUIRED BY LDC SECTION k. STORMWATER AS BUILT CERTIFICATION PRIOR TO C.O.

2 Community Development Department Building Division 4200 Indian Bayou Trail, Destin, Fl Phone: (850) Fax: (850) New Multi-Family Residential Permit Application (Condo, Apartment, Townhomes, Duplex) DATE: JOB SITE NAME OF PROJECT: PARCEL ID: LOT: BLOCK: SUBDIVISION: OWNER OF PROPERTY: CONTRACTOR COMPANY NAME: QUALIFIER NAME: CITY, STATE, ZIP: STATE LICENSE #: COMP#: PHONE: FAX: MOBILE/CELL: CITY, STATE, ZIP: FEE SIMPLE TITLEHOLDER (If other than owner): PHONE: FAX: CITY, STATE, ZIP: CONTACT PERSON: MOBILE/CELL: ARCHITECT/ENGINEER: BONDING COMPANY: MORTGAGE LENDER NAME: DESCRIPTION OF WORK TO BE DONE: CATEGORY TYPE: Duplex Townhome Apartment Condo Other CURRENT CODE: OCCUPANCY USE: R1 R2 R3 R4 # OF UNITS: HEIGHT:STORY: TYPE OF CONSTRUCTION: I-A I-B II-A II-B III-A III-B IV V-A V-B SPRINKLED / UNSPRINKLED FLOOD ZONE: SOUTH OF CCCL: YES NO TOTAL VALUE (MATERIAL & LABOR): (excluding lot) TOTAL SQUARE FOOT: (including garage, porches, etc.) TOTAL VALUE OF OTHER STRUCTURES: (detached garages, fences, sheds, etc.) FINAL INSPECTION IS REQUIRED ON ALL PERMITS-Failure to obtain a final inspection may result in legal action. AS REQUIRED BY FLORIDA STATUTE AND FLORIDA ADMINISTRATIVE CODE 9B-72, PLEASE PROVIDE THE INFORMATION AND APPROVAL NUMBERS ON THE BUILDING COMPONENTS IF THEY WILL BE UTILIZED ON THE CONSTRUCTION PROJECT FOR WHICH YOU ARE APPLYING FOR A BUILDING PERMIT. (Product approval specification sheet are available). Applicants Signature: Reviewed by: (Building Div. Permit Officer) Applicants Printed Name: Received By: (initials)

3 Community Development Department Planning Division 4200 Indian Bayou Trail, Destin, FL Phone: (850) Fax: (850) NEW MULTI-FAMILY RESIDENTIAL (e.g. Condo, Apartment, Townhouse, Duplex) Building/Construction Permit Application Supplement JOB SITE PARCEL ID(S): FINAL DEVELOPMENT ORDER NO. (If applicable): D.O.- - DESCRIPTION OF WORK (Related to Permit Type): HEIGHT (Refer to Comp Plan/LDC Definition for Building/Structure): NUMBER OF STORIES: GROSS FLOOR AREA (Refer to Comp Plan/LDC Definition): SQ. FT. ANY EXISTING STRUCTURES ON SITE? Yes No (If YES, what is the setback of the existing structures to the new residence? CONSTRUCTION WITHIN CITY RIGHT-OF-WAY? Yes No (If YES, provide a copy of the ROW permit) SOUTH OF COASTAL CONSTRUCTION CONTROL LINE? Yes No (If YES, provide a copy of the FDEP permit).for OFFICIAL USE ONLY ZONING DISTRICT : REQUIRED SETBACKS: FRONT: SIDE: REAR: WHITE SAND ZONE: ZONE I / ZONE II / NONE FEMA FLOOD ZONE(S) & BASE FLOOD EL.: Received by Planning: Received by Storm water: Planning Review: Storm water Review: Flood Provision Review: Right of Way Review Date;

4 CITY OF DESTIN - BUILDING DIVISION PERMIT APPLICATION NOTICE TO OWNER / CONTRACTOR JOB SITE NAME OF PROJECT: PARCEL ID: LOT: BLOCK: SUBDIVISION: Application is hereby made to obtain a permit to do the work and installation as indicated. I certify that no work or installation has been commenced prior to issuance of a permit and that all work will be performed to meet all codes, standards and laws governing construction in this jurisdiction. I also certify that all required insurances for me and any trades are in accordance with state laws. I understand that a separate permit must be secured for BUILDING, ELECTRICAL WORK, PLUMBING, MECHANICAL, ROOFING, SIGNS, POOLS and Right of Way (ROW) CONSTRUCTION, etc. OWNER / CONTRACTOR AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning per State and City of Destin. If the direct contract is greater than $2500, the applicant/owner must file a NOTICE OF COMMENCEMENT. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. FINAL INSPECTION IS REQUIRED ON ALL PERMITS-Failure to obtain a final inspection may result in legal action. Must be signed in presence of a Notary Signature Owner or Agent (including contractor) Signature Contractor STATE OF FLORIDA COUNTY OF OKALOOSA Sworn to (or affirmed) and subscribed before me this STATE OF FLORIDA COUNTY OF OKALOOSA Sworn to (or affirmed) and subscribed before me this day of, 20 day of, 20 by. by. Personally known OR Personally known OR Produced Identification Produced Identification Notary Signature as to Owner Notary Signature as to Contractor SEAL: SEAL:

5 CITY OF DESTIN Building Division MINIMUM REQUIREMENTS FOR INSPECTION INSPECTIONS DUE DATE A certified Notice of Commencement must be posted at the job site. A copy BEFORE 1 ST of the certified notice or an affidavit must be given to the Building Division. INSPECTION 1. TEMPORARY ELECTRIC SERVICE 2. ELECTRICAL GROUNDING 3. FOOTING Minimum size footing for wood frame construction is 10" x 20". Two #5 rebar and vertical steel is required every 8 feet. 4. UNDERGROUND PLUMBING 5. SLAB - MONOLITHIC ***FOUNDATION/SLAB SURVEY IS REQUIRED TO BE REVIEWED PRIOR TO A DRY-IN INSPECTION*** (All Surveys must show finished floor elevation & elevation of centerline of road right-of-way. LDC A/C) 6. SHEATHING Must be nailed every 3" at top, bottom and corners, 12 in field. 7. WINDOW ATTACHMENT 8. BRICK TIES 9. SEWER Wind load certification letter from an architect or engineer required for all buildings which have sealed engineered drawings. BEFORE DRY-IN 10. DRY-IN* PLUMBING ROUGH-IN ELECTRICAL ROUGH-IN MECHANICAL ROUGH-IN GAS ROUGH-IN FRAMING 11. INSULATION 12. EARLY POWER FINAL AS-BUILT SURVEY & STORMWATER CERTIFICATION REQUIRED PRIOR TO C.O. SITE INSPECTION Street address posted. BEFORE FINAL Sidewalks installed. BEFORE FINAL Parking completed. BEFORE FINAL Landscaping completed BEFORE FINAL Final Survey BEFORE FINAL Storm water Certification from engineer BEFORE FINAL Certificate of Termite Treatment BEFORE FINAL Blower Door Test BEFORE FINAL 13. FINAL* PLUMBING ELECTRICAL MECHANICAL GAS ROOFING GENERAL CONTRACTOR *All subcontractors and the general contractor must call in before dry-in and final inspections are scheduled.

6 BUILDING DIVISION Voice (850) Fax (850) CERTIFICATE OF OCCUPANCY COMPLETION REQUIREMENTS PROJECT NAME: 1. An "As Built" Survey shall be submitted to the Building Division. The As-Built Survey shall be prepared by or under the direct supervision of a Registered Land Surveyor and certified by the same. No Certificate of Occupancy shall be issued until the City has received and reviewed the survey to determine there are no violations of the City code requirements. *The As-Built Survey shall reflect sidewalks, parking, buildings and other structures on the property.* 2. FLOOD ZONE AREAS a. Flood zone certificate required in all AE and V zones. b. V-Zone certification. (Design and construction certificate required in all V-Zones) c. Declaration of non-conversion agreement. 3. A Storm water Certification (stating the storm water facilities have been constructed in compliance with the Storm water Management plan on file and/or with the Land Development Code must be submitted by the developer's Engineer or a registered Professional Engineer.) 4. For plans designed and sealed by an engineer or an architect, the builder/owner shall submit to the city a letter of certification by an engineer or an architect attesting to compliance with the coastal code of the city. (Due at time of in-wall dry in inspection) 5. Termite Protection Certificate Blower Door Certification Elevator Inspection Certification by third party inspection service. (Residential & Commercial) 8. Impact Fees paid. 9. Final Letter from Destin Fire Control District (Commercial projects only). 10. Landscape: Trees Required/Front Perimeter: Provided: Trees Required/Reforestation: Provided: Trees Required/Parking Lot: Provided: 11. Parking: Parking Spaces Required: Parking Spaces Provided: 12. Address Posted (Sec , LDC) 13. Sidewalks: Required Not Required (Sec , LDC) Right Of Way Inspection All Development Order Requirements Have Been Met All Site Inspections to include Final Pool Inspection ISSUANCE OF A CERTIFICATE OF OCCUPANCY MAY TAKE 10 BUSINESS DAYS OR LONGER FROM THE DATE THE REQUIRED AS-BUILT SURVEY/STORMWATER CERTIFICATE IS SUBMITTED.

7 Project Address: Name: Owner/Project Contractor: Contractor Phone #: PRODUCT APPROVAL SPECIFICATION SHEET As required by Florida Statute & Florida Administration Code 9B-72, please provide product approval numbers as applicable to project. Product suppliers should provide approval numbers for purchased items. ****Note whether doors and/or windows are: Impact or Non Impact ****State wide approval products are listed on line at: Category Windows Manufacturer Capital Product Description (Impact or Non Impact) Single-Hung (Impact) Model Number 165 Series, Alum Design Pressure +/- Approval # +50/-50 FL675 Applicant Signature Date

8 CITY OF DESTIN BUILDING DIVISION COMMERCIAL PROJECTS SIGN IN SHEET TO BE FILLED OUT BY APPLICANT PROJECT NAME DATE ADDRESS CONSTRUCTION TYPE PROTECTED SPRINKLERED HEIGHT OCCUPANCY GROUP NO. OF STORIES NO. OF UNITS TOTAL SQUARE FOOT UNDER ROOF (INCLUDING GARAGES, PORCHES, DECKS, ETC). Documentation Submitted Designer Name And Phone No. Architect, Engineer State No. Site Plan: Landscape/Irrigation Building Plan: Building Structural: Mechanical Plans: Plumbing Plans: Electrical Plans: Specifications: Structural Calcs: Soil Reports: Fire Dept Approval Ltr. Of Sprinkler Plan: A COMPLETE PLAN REVIEW (FLORIDA BUILDING CODES) REQUIRES THE SUBMITTAL OF ALL APPLICABLE DOCUMENTS LISTED ABOVE.