1 TRUCKEE HIGH SCHOOL POOL RENOVATIONS TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT ADDENDUM CC3 DLR GROUP th Street Sacramento, CA o: 916/ d: 916/ DATE: January 6, 2017 DSA Application No.: File No.: 34-H4 Truckee High School Pool Renovations Tahoe Truckee Unified School District Bid No.: NOTICE TO BIDDERS: Amend the Project Manuals and Drawings to the above referenced project as follows: PROJECT MANUAL VOLUME 1 ITEM NO. 1 SECTION AGREEMENT FORM STIPULATED SUM (SINGLE-PRIME CONTRACT) A. Item No. 6, REVISE Liquidated Damages: Time is of the essence for all work under this Agreement. It is hereby understood and agreed that it is and will be difficult and/or impossible to ascertain and determine the actual damage that the District will sustain in the event of and by reason of Contractor's delay; therefore, Contractor agrees that it shall pay to the District the sum of Three Hundred and Fifty dollars ($350.00) per day as liquidated damages for each and every day's delay beyond the time herein prescribed in finishing the Work. The project completion date is April 3, 2017, liquidated damages will not commence until April 5, 2017 ITEM NO. 2 TRUCKEE HIGH SCHOOL POOL COMPLEX FUNCTIONAL SPACE NOTES (FSN) & MAP JANUARY 5, 2017 A. ADD Truckee High School Pool Complex Functional Space Notes (FSN) & Map, January 5, 2017 as included in this Addendum. PROJECT MANUAL VOLUME 2 ITEM NO. 3 SECTION BUILDING AUTOMATION SYSTEM A. DELETE paragraph Quality Assurance 1.4 A in its entirety. B. DELETE paragraph Definitions 1.2 D in its entirety, and REPLACE with the following: BAS Contractor: The Contractor to provide the work of this Section under separate contract direct to Owner. The Contractor shall be the primary manufacturer, installer, commissioner and ongoing service provider for the BAS work. TTUSD has a 5 year Master Agreement with EMCOR Services Nevada for all DDC controls Projects. Contact Scott Cooper (no exceptions).

2 TRUCKEE HIGH SCHOOL POOL RENOVATIONS TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT DRAWINGS ITEM NO. 4 DRAWING A1.1 DEMOLITION AND IMPROVEMENT PLANS A. ADD to Demolition Legend Notes: Note 10: Existing pool basins to be infilled with concrete, refer to Structural, HVAC and Plumbing plans for the extent of work. B. At Detail 1/A1.1, Room G123, (E) Equipment, ADD Demolition Legend Note 10. C. At Detail 2/A1.1, Room G123, (E) Equipment, ADD Improvement Legend Note 1. ITEM NO. 5 DRAWING A2.2 TEMPORARY CHANNEL 6 STUDIO A. ADD this drawing as per Attachment A1 as included in this Addendum. ITEM NO. 6 DRAWING S SECTIONS A. Detail A/S3.21, ADD 1-0 Min. and CHANGE 1-6 to 1-6 Max. to the dimension string. ITEM NO. 7 DRAWING P2.1 PLUMBING FLOOR PLANS A. DELETE Sheet Note 19 in its entirety and REPLACE with Sheet Note: 19 Remove floor drain, cap piping below floor drain and abandon piping. B. DELETE Sheet Note 22 in its entirety and REPLACE with Sheet Note 22: Remove clean out, can cap piping below grade. C. DELETE Sheet Note 24 in its entirety and REPLACE with Sheet Note 24: Remove vacuum outlet and cap piping below grade. ITEM NO. 8 DRAWING E0.2 SCHEDULES A. DELETE this sheet in its entirety and REPLACE per Attachement E1 as included in this Addendum. ITEM NO. 9 DRAWING E1.0 OVERALL SITE PLAN A. DELETE this sheet in its entirety and REPLACE per Attachement E2 as included in this Addendum. ITEM NO. 10 DRAWING E1.1 LIGHTING PLANS, DEMOLITON & NEW WORK A. DELETE this sheet in its entirety and REPLACE per Attachment E3 as included in this Addendum. ITEM NO. 11 DRAWING E2.1 POWER & SIGNAL PLANS, DEMOLITION & NEW WORK A. DELETE this sheet in its entirety and REPLACE per Attachment E4 as included in this Addendum. ITEM NO. 12 DRAWING E3.1 FIRE ALARM, DEMOLITION & NEW WORK A. DELETE this sheet in its entirety and REPLACE per Attachment E5 as included in this Addendum. ITEM NO. 13 RFI QUESTIONS A. QUESTION No. 1: The structural drawings reflect crushed rock at the pool site, however, the Geotechnical Report recommends slurry backfill or compacted fill. Would crushed rock be considered engineer fill? RESPONSE: Yes B. QUESTION No. 2: The Bid Documents show a deductive alternate, however the Spec Book reflects N/A. ADDENDUM CC3

3 TRUCKEE HIGH SCHOOL POOL RENOVATIONS TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT RESPONSE: Bid Documents show possibility of one. There is not one at this time. END OF ADDENDUM ADDENDUM CC3

4 C:\Revit\ _AR_2015_Central_vcarrasco.rvt 1/6/ :18:33 AM AM F.E. (E) 4-HR WALL (E) BUILDING - TYPE III-1HR, FIRE SPRINKLER DISASSEMBLE & RELOCATE PARTIONS FROM THE EXISTING CHANNEL 6 STUDIO - PRIOR TO ASSEMBLY OF PARTITIONS, VERIFY LAYOUT WITH THE CHANNEL 6 STAFF FIELD HOUSE 101 RELOCATE & ASSEMBLE 20'x 20' CONTROL BOOTH PARTITIONS 10' - 0" CONTROL BOOTH RELOCATE & ASSEMBLE 8'x15' EDITING BOOTH PARTITIONS EDITING EXTEND POWER/DATA OVERHEAD TO EDITING AND CONTROL BOOTH - COORDINATE WITH THE CHANNEL 6 STAFF FOR LOCATION 10' - 0" F.E. VESTIBULE SF NORTH TEMPORARY CHANNEL 6 STUDIO SCALE: 3/32" = 1'-0" DLR Group Architecture Engineering Planning Interiors, DLR, DLR Group Group inc. inc. of, California, a a California corporation, corporation, ALL RIGHTS ALL RESERVED RIGHTS RESERVED A /30/16 TEMPORARY CHANNEL 6 STUDIO TRUCKEE HIGH SCHOOL POOL RENOVATIONS TRUCKEE, CA CA CONSTRUCTION Attachment No. A1 to DOCUMENTS ADDENDUM CC3 Dated: 01/06/17

5 01/06/17 ADDENDUM CC3 2 Attachment No. E1 to Addendum CC3

6 Attachment No. E2 to Addendum CC3 2 ADDENDUM CC3 01/06/17

7 2 ADDENDUM CC3 01/06/17 Attachment No. E3 to Addendum CC3

8 2 ADDENDUM CC3 01/06/17 Attachment No.. E4 to Addendum CC3

9

10 Truckee High School Pool Complex Functional Space Notes (FSN) & Map January 5, 2017 ADDENDUM CC3

11 ADDENDUM CC3 Functional Space Notes HAZARD MANAGEMENT SERVICES, INC. Client: Tahoe - Truckee Unified School District HMS Project Number: S15026 Site: Truckee High School Date of Inspection: April 7, 2015 Building: Building Materials Building A - Main Building First Floor Multiple building dates throughout the site, within the same building footprint. Ranges from 1950 to Material Class Percent Asbestos Hmgns Matrl # Sampled Here? Footage Friable? Sq/Ln/Jnts Yes/No Building: Building A - Main Building First Floor Room: Pool Floor: 1" Ceramic Tile and Grout - Blue MISC None Detected 78 78B 280 sq This material is lead-containing. Material Grout is suspect material for asbestos. Floor: Pool Boarder Aggregate Grout MISC None Detected A 280 sq Floor: Pool Border Aggregate MISC None Detected A 280 sq Floor: Pool Concrete MISC None Detected A 1969 sq Floor: Pool Plaster MISC None Detected A, 177B, 177C, 177D 5906 sq Walls: CMU and Grout MISC None Detected sq Ceiling: Drywall - Skip Trowel MISC None Detected sq Room Comments: Pipes insulated with suspect materials may exist below floors or walls of space. Transite piping may also be associated with the pool systems. Building: Building A - Main Building First Floor Room: Pool Entry/Exit Foyer Floor: Concrete NON Non-Suspect Tan paint on concrete floor is lead containing. Baseboard: 4" Baseboard and Mastic - Black MISC None Detected 4 32 ln Walls: CMU and Grout MISC None Detected sq Green paint is lead-containing. Walls: Plaster MISC None Detected sq Ceiling: Plaster MISC None Detected sq Door: Fire Door Frame MISC Assumed 27 2 ea No Door frame may have suspect insulation material within. Sampling will void UL Rating and should be completed prior to impact or disposal. Door: Metal Fire Door MISC Assumed 80 4 dr No Door may contain suspect insulation materials. Sampling of the door will void UL Rating and should be performed prior to impact or disposal. Room Located on the northeast side of the pool space. Comments: Date Printed: 1/5/2017 Inspected By: Chris Chipponeri and Shannon Johanson Page 158of of 7 64

12 ADDENDUM CC3 Functional Space Notes HAZARD MANAGEMENT SERVICES, INC. Client: Tahoe - Truckee Unified School District HMS Project Number: S15026 Site: Truckee High School Date of Inspection: April 7, 2015 Building: Building Materials Building A - Main Building First Floor Multiple building dates throughout the site, within the same building footprint. Ranges from 1950 to Material Class Percent Asbestos Hmgns Matrl # Sampled Here? Footage Friable? Sq/Ln/Jnts Yes/No Building: Building A - Main Building First Floor Room: Storage Floor: Grey Non-Slip Mat - Diamond Pattern MISC None Detected 98 98A 80 sq Baseboard: 4" Baseboard and Mastic - Black MISC None Detected 4 24 ln Walls: Chain Link Fencing NON Non-Suspect Used to split the space into two storage areas. Walls: Drywall - Smooth Texture MISC 2-4 % sq No Asbestos in both the joint compound and skimcoat layer. Will need to be disposed of as a hazardous asbestos-containing material. Walls: Wall Aggregate MISC None Detected sq Material is painted white in the space. Material This appears to be an exterior material/wall that is now part of interior spaces as well as exterior. The expansion joint sealant associated with this material was found to contain PCB's. Ceiling: Drywall - Smooth Texture MISC 2-4 % 2 80 sq No Asbestos in both the joint compound and skimcoat layer. Will need to be disposed of as a hazardous asbestos-containing material. Room Storage space at the Pool Entry/Exit Foyer. This space is visible from the storage space next to weight room. Comments: Building: Building A - Main Building First Floor Room: Locker Room Foyer Floor: Pool Concrete MISC None Detected sq Baseboard: Pool Concrete MISC None Detected ln Floor material coved up onto walls. Walls: Drywall - Skip Trowel MISC None Detected A, 179B 147 sq Walls: Drywall - Small Knockdown Texture MISC None Detected A, 180B 441 sq Walls: FRP and Glue - Cream MISC None Detected sq Ceiling: Drywall - Small Knockdown Texture MISC None Detected sq Building: Building A - Main Building First Floor Room: Office NOT IN CONTRACT NOT IN CONTRACT Walls: Drywall - Small Knockdown Texture MISC None Detected sq Walls: FRP and Glue - Cream MISC None Detected sq Ceiling: Drywall - Small Knockdown Texture MISC None Detected sq Date Printed: 1/5/2017 Inspected By: Chris Chipponeri and Shannon Johanson Page 259of of 7 64

13 ADDENDUM CC3 Functional Space Notes HAZARD MANAGEMENT SERVICES, INC. Client: Tahoe - Truckee Unified School District HMS Project Number: S15026 Site: Truckee High School Date of Inspection: April 7, 2015 Building: Building Materials Building A - Main Building First Floor Multiple building dates throughout the site, within the same building footprint. Ranges from 1950 to Material Class Percent Asbestos Hmgns Matrl # Sampled Here? Footage Friable? Sq/Ln/Jnts Yes/No Building: Building A - Main Building First Floor Room: Custodial Closet Floor: Pool Concrete MISC None Detected sq Baseboard: Pool Concrete MISC None Detected ln Floor material coved onto the walls. Walls: Drywall - Small Knockdown Texture MISC None Detected sq Walls: FRP and Glue - White MISC None Detected sq Ceiling: Drywall - Small Knockdown Texture MISC None Detected sq Building: Building A - Main Building First Floor Room: Plumbing Attic Floor: Wood NON Non-Suspect Walls: Wood NON Non-Suspect Ceiling: Wood NON Non-Suspect Room Comments: Attic space above the custodial closet. No suspect TSI materials found to be associated iwth the copper piping in space. Building: Building A - Main Building First Floor Room: Mens Locker Room Floor: 2" Ceramic Tile and Grout- Grey w/green MISC None Detected A 40 sq Floor: Pool Concrete MISC None Detected sq Baseboard: Pool Concrete MISC None Detected ln Floor material coved onto walls. Walls: Drywall - Small Knockdown Texture MISC None Detected sq Includes the material on partition walls in the space. Walls: FRP and Glue - Cream MISC None Detected A 200 sq Walls: FRP and Glue - White MISC None Detected sq Walls: Mirror Mastic MISC 10 % sq No Represented by sample S A-C collected in Ceiling: Drywall - Small Knockdown Texture MISC None Detected sq Counter Top: 2" Ceramic Tile and Grout- Grey w/green MISC None Detected B 10 sq This material is lead containing. Date Printed: 1/5/2017 Inspected By: Chris Chipponeri and Shannon Johanson Page 360of of 7 64

14 ADDENDUM CC3 Functional Space Notes HAZARD MANAGEMENT SERVICES, INC. Client: Tahoe - Truckee Unified School District HMS Project Number: S15026 Site: Truckee High School Date of Inspection: April 7, 2015 Building: Building Materials Building A - Main Building First Floor Multiple building dates throughout the site, within the same building footprint. Ranges from 1950 to Material Class Percent Asbestos Hmgns Matrl # Sampled Here? Footage Friable? Sq/Ln/Jnts Yes/No Building: Building A - Main Building First Floor Room: Ladies Locker Room Floor: 2" Ceramic Tile and Grout- Grey w/pink MISC None Detected sq Floor: Pool Concrete MISC None Detected sq Baseboard: Pool Concrete MISC None Detected ln Floor material coved onto walls. Walls: Drywall - Small Knockdown Texture MISC None Detected sq Includes the material on partition walls in the space. Walls: FRP and Glue - Cream MISC None Detected sq Walls: Mirror Mastic MISC 10 % sq No Represented by sample S A-C collected in Ceiling: Drywall - Small Knockdown Texture MISC None Detected sq Counter Top: 2" Ceramic Tile and Grout- Grey w/pink MISC None Detected A 20 sq This material is lead containing. Building: Building A - Main Building First Floor Room: Pool Equipment Storage Floor: Concrete NON Non-Suspect Speckled paint applied to the floor. Walls: CMU and Grout MISC None Detected sq Walls: Drywall - Orange Peel Texture MISC None Detected 5 5I 235 sq Walls: Wall Aggregate MISC None Detected sq This appears to be an exterior material/wall that is now part of interior spaces as well as exterior. The expansion j oint sealant associated with this material was found to contain PCB's. Ceiling: Drywall - Knockdown Texture MISC None Detected 39 39C 280 sq Door: Fire Door Frame MISC Assumed 27 1 ea No Door frame may have suspect insulation material within. Sampling will void UL Rating and should be completed prior to impact or disposal. Pipes: Foam Pipe Insulation NON Non-Suspect Door: Metal Fire Door MISC Assumed 80 2 dr No Door may contain suspect insulation materials. Sampling of the door will void UL Rating and should be performed prior to impact or disposal. Date Printed: 1/5/2017 Inspected By: Chris Chipponeri and Shannon Johanson Page 61 4 of of 7 64

15 ADDENDUM CC3 Functional Space Notes HAZARD MANAGEMENT SERVICES, INC. Client: Tahoe - Truckee Unified School District HMS Project Number: S15026 Site: Truckee High School Date of Inspection: April 7, 2015 Building: Building Materials Building A - Main Building First Floor Multiple building dates throughout the site, within the same building footprint. Ranges from 1950 to Material Class Percent Asbestos Hmgns Matrl # Sampled Here? Footage Friable? Sq/Ln/Jnts Yes/No Building: Building A - Main Building First Floor Room: Pool Chemical Storage Floor: Concrete NON Non-Suspect Floor has been painted with a tan speckled paint. Walls: CMU and Grout MISC None Detected sq White paint is lead-containing. Walls: Drywall - Small Knockdown Texture MISC None Detected sq Ceiling: Drywall - Small Knockdown Texture MISC None Detected sq Door: Fire Door Frame MISC Assumed 27 1 ea No Door frame may have suspect insulation material within. Sampling will void UL Rating and should be completed prior to impact or disposal. Door: Metal Fire Door MISC Assumed 80 2 dr No Door may contain suspect insulation materials. Sampling of the door will void UL Rating and should be performed prior to impact or disposal. Building: Building A - Main Building First Floor Room: Chlorine Storage Floor: Concrete NON Non-Suspect Walls: CMU and Grout MISC None Detected sq White paint is lead-containing. Ceiling: Drywall - Knockdown Texture MISC None Detected sq Building: Building A - Main Building First Floor Room: Pool Pump Room Floor: Concrete NON Non-Suspect Floor has been painted with a tan speckled paint. Walls: CMU and Grout MISC None Detected sq White paint is lead-containing. Ceiling: Drywall - Knockdown Texture MISC None Detected sq Pipes: 12" Gasket-Red MISC None Detected A 3 ea Pipes: 8" Gasket-Black MISC 30 % A 2 ea No Pipes: Foam Pipe Insulation NON Non-Suspect Building: Building A - Main Building First Floor Room: Attic Ceiling: Fireproofing - Classrooms SURF None Detected A, 193B Date Printed: 1/5/2017 Inspected By: Chris Chipponeri and Shannon Johanson Page 62 5 of of 7 64

16 ADDENDUM CC3 Functional Space Notes HAZARD MANAGEMENT SERVICES, INC. Client: Tahoe - Truckee Unified School District HMS Project Number: S15026 Site: Truckee High School Date of Inspection: April 7, 2015 Building: Building Materials Building A - Main Building First Floor Multiple building dates throughout the site, within the same building footprint. Ranges from 1950 to Material Class Percent Asbestos Hmgns Matrl # Sampled Here? Footage Friable? Sq/Ln/Jnts Yes/No Building: Building A - Main Building First Floor Room: Exterior Walls: Aggregate Expansion Joint Sealant MISC None Detected A 48 ln Located between panels of aggregate walls at interior and exterior of the buildings. This material contains PCB's. Walls: Black Door Frame Sealant MISC None Detected A 48 ln Walls: Door Frame Sealant MISC None Detected A Located between door frame and exterior wall material. Walls: Exterior Expansion Joint Sealant MISC None Detected A Located between joints of different wall materials at exterior of buildings. Walls: Gray Coating SURF None Detected A 20 sq Ground: Asphalt NON Non-Suspect Roof: Black Penetration Mastic MISC None Detected A 20 sq Roof: Black Penetration Mastic 2 MISC None Detected A Roof: Black Roof Patch Mastic MISC None Detected A 60 sq Roof: Black/Yellow Flashing Mastic MISC 5 % Ch A 70 ln No Roof: Brown Rolled Roofing MISC None Detected A 40 sq Roof: Built-up Roofing MISC None Detected A Roof: Gray Duct Sealant MISC None Detected A 24 ln Roof: Gray Flashing Sealant MISC None Detected A Windows: Grey Window Frame Sealant MISC None Detected A Located between the window frame and building opening. Roof: Metal Roof Cap Sealant MISC None Detected A 100 ln Roof: Red Flashing Sealant MISC None Detected A 80 ln Roof: Red/Pink Roof Cap Seam Sealant MISC None Detected A 8 ln Roof: Rolled Roofing-Gray/Black MISC None Detected A, 195B, 195C Roof: Silver Duct Tape/Mastic MISC None Detected A 110 ln Roof: Silver Paint MISC <1 % A 90 ln No Roofs: Single Ply Roofing-White MISC None Detected A Roof: Tan Screw Sealant MISC None Detected A 4 sq Roof: White Pipe Penetration Sealant MISC None Detected A 3 sq Roof: White/Gray Sealant MISC None Detected A Windows: Window Frame Sealant MISC None Detected A Found between window frame and building opening. Date Printed: 1/5/2017 Inspected By: Chris Chipponeri and Shannon Johanson Page 63of of 7 64

17 ADDENDUM CC3 NOT IN SCOPE Page 7 of 7