RITES LIMITED (A GOVERNMENT OF INDIA ENTERPRISE) PART 2 FINANCIAL BID SCHEDULE (BILL) OF QUANTITIES (PERCENTAGE RATE CONTRACT)

Size: px
Start display at page:

Download "RITES LIMITED (A GOVERNMENT OF INDIA ENTERPRISE) PART 2 FINANCIAL BID SCHEDULE (BILL) OF QUANTITIES (PERCENTAGE RATE CONTRACT)"

Transcription

1 RITES LIMITED (A GOVERNMENT OF INDIA ENTERPRISE) NIT : 07/OT/NTPC-LARA/ KRL-LARA SECTION /PKG-II C / 2016 Dated NAME OF WORK: Execution of Earthwork in formation, Construction of Minor Bridges, Blanketing, P. Way linking works including supply of P-way fittings, Track ballast, PSC Sleeper and Points & Crossings in connection with construction of Railway Infrastructure from 3/771 KM to 12/000 KM LP, Lines of ROR Section from Ch. 0/000 KM to 1/000 KM ROR of NTPC Railway Siding, in Raigarh District, Chhattisgarh State (Package II C) PART 2 FINANCIAL BID SCHEDULE (BILL) OF QUANTITIES (PERCENTAGE RATE CONTRACT) Issued to (Name of Tenderer): Address of tenderer: Signature of officer issuing the documents Designation Date of Issue RITES LIMITED (A Govt. of India Enterprise) Regional Project Office, RAIGARH 40/424, Rajat Shree House, 1st Floor, Near SBI Kotra Road, Raigarh (Chhattisgarh) raigarhpo@gmail.com, raigarhpo@rites.com 1 P a g e

2 PART 2 FINANCIAL BID SCHEDULE (BILL) OF QUANTITIES PERCENTAGE RATE CONTRACT NAME OF WORK: Execution of Earthwork in formation, Construction of Minor Bridges, Blanketing, P. Way linking works including supply of P-way fittings, Track ballast, PSC Sleeper and Points & Crossings in connection with construction of Railway Infrastructure from 3/771 KM to 12/000 KM LP, Lines of ROR Section from Ch. 0/000 KM to 1/000 KM ROR of NTPC Railway Siding, in Raigarh District, Chhattisgarh State (Package II C) POINT TO BE NOTED WHILE QUOTING PERCENTAGE RATE 1. The time allowed for completion will be 18 (Eighteen) months from the date of start which is defined in schedule-f under clause 5.1a of clause of contract. 2. Where tender has been invited on percentage rate basis, percentages on the estimated cost (whether above or below) are to be quoted for schedule. 2 P a g e

3 PART 2 SCHEDULE (BILL) OF QUANTITIES, (PERCENTAGE RATE TENDER), ABSTRACT OF COST PERCENTAGE ABOVE (+) OR BELOW (-) OF TOTAL ESTIMATED COST (SECTION WISE) SECTION DESCRIPTION TOTAL ESTIMATED COST (IN RUPEES) 1 Earth work in Formation 36,07,66, IN FIGURES IN WORDS TOTAL QUOTED COST BASED ON PERCENTAGE QUOTED (+) OR (-) (RUPEES) (SECTION WISE) RS IN FIGURES RS IN WORDS 2 Minor Bridge, Retaining wall, Side drain, Goomty, FOB etc. 57,64,66, Supply of P. way Materials 9,46,38, Supply of track ballast & P. way linking 7,86,17, TOTAL COST (RUPEES) 1,11,04,89, P a g e

4 LESS UNCONDITIONAL REBATE (%) IF ANY (IN WORDS) LESS UNCONDITIONAL REBATE (%) IF ANY (IN FIGURES) NET QUOTED COST (RUPEES IN WORDS) (RUPEES IN FIGURES) *Strike out which is not applicable i) SIGNATURE OF AUTHORISED SIGNATORY OF TENDERER ii) NAME OF SIGNATORY iii) NAME AND SEAL OF TENDERER iv) DATE v) PLACE NOTE: TENDERERS ARE REQUESTED TO QUOTE THEIR RATE IN THIS PAGE ONLY AND NOT IN SCHEDULES, BASIC ESTIMATED RATES HAS BEEN SHOWN IN SCHEDULES FOR GUIDENCE 4 P a g e

5 Name of work: Execution of Earthwork in formation, Construction of Minor Bridges, Blanketing, P. Way linking works including supply of P-way fittings, Track ballast, PSC Sleeper and Points & Crossings in connection with construction of Railway Infrastructure from 3/771 KM to 12/000 KM LP, Lines of ROR Section from Ch. 0/000 KM to 1/000 KM ROR of NTPC Railway Siding, in Raigarh District, Chhattisgarh State (Package II C) Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in Section-1 (Earth work in Formation) 1 Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. A Girth over 30 cm and upto 60 cm Each ,41, B Girth over 60 cm and upto 1.5m Each ,46, C Girth over 1.5m upto 3 m Each ,02, D Girth over 3 m Each ,33, Earthwork in cutting (Classified) in railway/road formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of all labour, machine and materials and removing & leading all cut spoils either to make spoil dumps beyond 10m from cutting edge or for filling in embankment with initial free lead of 50 m limit, with all lifts, ascent, descent, loading, unloading, all taxes/royalty, including site clearance and all incidental charges, bailing & pumping out water if required, etc., complete as per directions of the Engineer-in-Charge. The work is to be executed as per Latest / updated edition of "Guidelines for Earthwork in Railway Projects" issued by RDSO, Lucknow. te - (i) All hard rock / boulders not fit for filling will be stacked by the contractor at location shown / decided by Engineer-in-charge. Page 5

6 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in and will be property of the NTPC- Lara/Railways. A All types of soil Cum ,30, B Soft rock Cum ,71, Leading of cut spoil/excavated earth to approach bank or at indicated places beyond free lead of 50 m with all lifts as directed by Engineer-in-Charge. A Lead beyond 50m upto 1 km Cum ,41, B Lead beyond 1Km upto 2 km Cum ,35, C Lead beyond 2Km upto 3 km Cum ,12, D Lead beyond3km upto 4 km Cum ,45, E Lead beyond 4Km upto 5 km Cum ,34, Earth work in filling in railway/road formation for, guide bunds, around buried type abutments, bridge gaps, trolley refuges, rain bunds, if provided, platforms etc. in layers not more than Cum ,33,78, cm compacted thick with contractor's labour, material, crew, fuel etc.as per profile and specification in all types of soil, other than black cotton soil from outside the NTPC land boundary entirely arranged by the contractor at his own cost as per RDSO's latest guidelines and specifications and special condition of contract including all leads, lifts, ascents, descents, handling/rehandling, crossing of nallahs or any other obstructions. The rates shall include site clearance, removing of shrubs, roots of vegetations growth, heavy grass, benching of existing slope of old bank, breaking clouds, spreading & dressing of bank to final profile etc as a complete job but excluding compaction. The rate also includes all taxes, octroi, royalty, testing & all incidental charges. 5 Spreading & dressing of excavated Cum ,54, serviceable earth lead to bank formation in layers not more than 30cm compacted thick by mechanical means, breaking clouds. The rates shall include all spreading & dressing of bank to final profile, demarcation Page 6

7 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in and setting out of profile, removing of shrubs, roots of vegetations growth, heavy grass, etc complete as per Rly specification but excluding compaction. Amount in 6 Supplying, Spreading and approved blanketing material as per IR Specifications and RDSO's guide lines inclusive of all taxes, royalty, transport charges from source to site, handing, rehandling, dressing of the formation including making good all undulations complete. The rate is inclusive of initial site clearance, cutting of shrubs, removal of roots of vegetation growth & heavy grass, surfacing & leveling to give required slope, benching, if required on existing bank slope, dressing and finishing of bank, all lead & lift, ascent, descent, crossing of nallahs / other obstructions, spreading the material and final dressing of slopes and top surface as per specified camber using contractor s own machinery, equipment, T&P, labour etc. as a complete job but excluding compaction. 7 Extra for mechanical compaction of earth/blanketing material filled in embankment with contractor s rollers of suitable capacity, type and size to achieve specified density as per specification, testing as per IS codes including cost of water, T&P, consumable material and all labour as a complete job. The work is to be executed as per Latest edition of "Guidelines for Earthwork in Railway Projects" issued by RDSO, Lucknow. Cum ,05,28, Cum ,04,82, Page 7

8 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in 8 Turfing in embankment / cutting Sqm ,13,74, formation slopes with grass sods 50mm thick including ramming, watering and preserving until properly rooted, replacing the dead turf as per IR Specifications and directions of Engineer in-charge. The cost is all inclusive of cost of material, labour, transport, lead and lift as involved. 9 Providing and laying Jute Geo-Textile (JGT) in slopes of Railway embankment in accordance with RDSO's guidelines for application of Jute Geotextile in Railway embankments and hill slopes no. RDSO/2007/GE: G-0008 or its subsequent versions, including incidental earthwork and fixing arrangements. a With GJ - Type 1 Sqm ,61, Boundary pillar (Reinforced cement Each ,40, concrete M15 grade boundary pillars of standard design as per IRC: 25, fixed in position including finishing and lettering but excluding painting as per clause 807). 11 G.I Barbed wire Fencing 1.8 m high (Providing and fixing 1.8m high GI barbed wire fencing with 2.4m angle iron posts 50mm x 50mm x 6mm placed every 3m centre to centre founded in M- 15 grade cement concrete, 0.6 meters below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with 12 horizontal lines and 2 diagonals iterwoven with horizontal wires, fixed MTR ,46, with GI staples, turn buckles etc. complete as per clause 808) mm thick stone pitching A Providing and laying Pitching with stone boulders weighing not less than 35kg each with the voids filled with cement sand mortar 1:4 on slopes laid over prepared filter media including boulder apron laid dry in front of toe of Cum ,10, embankment complete as per specification. The rate shall include cost of all materials, leads & lifts, taxes, Page 8

9 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in royalty, transportation ascent & descent labour, tools & plants & other incidental charges as complete work in all respect. Stone boulders not less than 30 kg each and not more than 54kg each). B Providing & laying hand packed over Cum ,11, ground or bank dressed to section as directed by Engineer in charge. The rate shall include cost of all materials, leads & lifts, taxes, royalty, transportation ascent & descent labour, tools & plants & other incidental charges as complete work in all respect. Stone boulders not less than 30 kg each and not more than 54kg each). Road work 13 Providing and laying water bound macadam with specified stone aggregate, stone screening and binding material including screening, sorting, spreading to template and consolidation with power road roller of 8 to 10 tonne capacity etc. complete. a Sub-base with stone aggregate 90mm to Cum ,55, mm including stone screening 13.2mm size b Base course with 63mm to 45mm size Cum ,57, including stone screening 13.2mm size 14 Surface dressing one coat on new Sqm ,17, surface with bitumen emulsion (minimum 50% bitumen content- RS grade conforming to IS: 8887) at a rate of 1.95kg/sqm of surface area with 1.5cum of stone chippings 13.2mm nominal size per 100 sqm of road surface including consolidation with road roller of 6 to 8tonne capacity etc. complete. 15 Providing and laying Dense Bituminous macadam on prepared surface with specified graded crushed stone aggregate for profile corrective base / binding course, mixing of stone aggregate, filler and bitumen in hot mix plant, transporting the mixed material and laying with paver finisher fitted with electronic sensing device to the required level and grade and rolling by road roller Page 9

10 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in as per specifications, to achieve the desired density, but excluding the cost of primer / tack coat. a 75mm average compacted thickness with bitumen of 60/70 3.5% by weight of total mix Sqm ,51, Providing and applying tack coat using Sqm , bitumen emulsion (Rapid setting) complying with IS: , spraying the bitumen emulsion with mechanically operated spray unit, cleaning and preparing the existing road surface as per specification On bituminous 0.25kg/ sqm. 17 Providing and laying 2.5cm premix Sqm ,50, carpet surfacing with 3cum of stone chippings 10mm nominal size and 288kg bitumen emulsion (medium setting min. 65% bitumen content) complying with IS: per 100sqm including consolidation with road roller etc. complete. Total of Section-1= 36,07,66, Schedule-2 (MINOR BRIDGE, Return wall, Drain, Goomty, FOB ETC) 18 Earthwork in excavation for foundations and floors of the bridges, Abutment, pier, RCC box, retaining walls, drop wall, drain etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil upto a lead of 50m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. A All types of Soil Cum ,66, B Soft Rock Cum ,22, C Hard rock requiring blasting Cum , D Hard rock- blasting prohibited Cum ,15, Supplying, spreading and filling coarse sand of approved quality including watering and ramming in foundation, plinth for a require depth as per Cum ,06, approved drawing and as per direction of Engineer-in-charge. The Page 10

11 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in rate includes all lead, lift, ascent, descent, crossing of Railway line, royalty, taxes etc. complete with contractor s labour, machinery, materials, tools and plant. 20 Providing and laying in position machine mixed, machine vibrated and machine batched Design Mix Cement Concrete M-20 grade (cast in-situ) base course/levelling course in foundation for box, return wall, retaining wall, drop wall, wearing course, and couping etc using 20mm graded crushed stone aggregate with screening and cleaning of aggregate and coarse sand of approved quality. The rate includes cost of design of concrete mix, cement, sand, aggregates, admixture, providing of thermocoal at expansion joint, labour, tools & plant, manufacturing of concrete by batching plant, Placement of concrete using concrete pump, compaction, curing of concrete up to specified period in all respect including royalty of aggregates, all lead, lift, crossing road / track etc and finishing complete as per drawings and technical specifications as directed by Engineer in charge. The contractor has to construct the approach road to site at his own cost, if required. extra payment will be made for this. Shuttering & centering shall be paid separately. A All works upto avg ground level Cum ,96,47, B All works above avg. ground level Cum ,10, Providing and laying in position machine mixed, machine vibrated and machine batched Design Mix Cement Concrete M-25 grade (cast in-situ RCC/CC) for road, Drain etc. using 20mm graded crushed stone aggregate with screening and cleaning of aggregate and coarse sand of approved quality The rate includes cost of design of concrete mix, cement, sand, aggregates, admixture, providing of thermocoal at expansion joint, labour, tools & plant, manufacturing of Page 11

12 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in concrete by batching plant, Placement of concrete using concrete pump, compaction, curing of concrete up to specified period in all respect including all lead, lift, crossing road / track etc and finishing complete as per drawings and technical specifications as directed by Engineer in charge. The contractor has to construct the approach road to site at his own cost, if required. extra payment will be made for this. Cost of steel reinforcement, shuttering & centering shall be paid separately. A All works upto Avg ground level Cum ,03, B All works above Avg ground level Cum ,51, Providing and laying in position machine mixed, machine vibrated and machine batched Design Mix Cement Concrete M-35 grade (cast in-situ RCC/CC) for bridge construction of RCC box, return wall, abutment, pier etc. using 20mm graded crushed stone aggregate with screening and cleaning of aggregate and coarse sand of approved quality The rate includes cost of design of concrete mix, cement, sand, aggregates, admixture, providing of thermocoal at expansion joint, labour, tools & plant, manufacturing of concrete by batching plant, Placement of concrete using concrete pump, compaction, curing of concrete up to specified period in all respect including all lead, lift, crossing road / track etc and finishing complete as per drawings and technical specifications as directed by Engineer in charge. The contractor has to construct the approach road to site at his own cost, if required. extra payment will be made for this. Cost of steel reinforcement, shuttering & centering shall be paid separately. A All works upto Avg ground level Cum ,20,27, B All works above Avg ground level Cum ,46,78, Providing, hoisting and fixing in Cum ,42, position up to floor two level M35 Page 12

13 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in Grade precast RCC work of specified size as per approved drawing for foot over bridge including setting in cement mortar 1:3 (1 cement : 3 coarse sand) and finishing smooth with 6mm thick cement plaster 1:3 (1 cement : 3 fine sand) on exposed surfaces complete including cost of centering, shuttering, finishing, Admixtures in recommended proportion (as per IS:9103) to accelerate, retard setting of concrete, improve workability without impairing strength and durability, steel reinforcement, as per approved plan & direction of Engineer in charge. 24 Providing and laying in position machine mixed, machine vibrated and machine batched Design Mix Cement Concrete M 45 grade using Cum ,52, mm graded crushed stone aggregate and coarse sand of approved quality for the Precast Prestressed (Pre tensioned) concrete girder (Spans upto 9.1 M) in contractor s casting yard, including finishing, using Admixtures in recommended proportions (as per IS 9103), if approved in Mix design, to accelerate, retard setting of concrete, improve workability without impairing strength and durability, complete as per specifications and direction of the Engineer. Payment for Shuttering, reinforcement, HTS cables, sheathing, anchorage cones, stressing of cables and grouting of the ducts will be done extra. Launching of girder/slab in position is not included in this item. 25 Supplying and Laying steel MT ,546 27,92,84, reinforcement Thermo Mechanically Treated- TMT 500/550 in RCC works and surface reinforcement of CC works including straightening, cutting, bending, hooking, placing in position and binding with contractor's binding wire of requisite gauge all complete as per approved drawing & specifications. The rate Page 13

14 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in include cost of all tools and plants, testing etc. All reinforcement steel shall be TMT 500/550 grade procured from primary producers like SAIL, TISCO, RINL, JSPL or from any other equivalent approved make. 26 Providing, fabricating & fixing in position to exact design profiles, MT ,62,182 77,84, prestressing H.T.S. cables of all classification made from Low Relaxation strands conforming to IS in Prestressed Concrete girders/slabs etc. including supplying, cutting, making into cables with necessary spacers, colour coding, protecting with water soluble oil at all time, anchoring of cables, supplying and placing spiral corrugated type galvanized metal steel ducts sheathing made up of Cold Rolled Cold Annealed (CRCA) mild steel conforming to IS 513 of required diameter/thickness, vent pipe, placing, bending, routing, fixing, stressing & grouting of cable ducts with cement grout, Anchorage sets in required number with provision for future prestressing, if any, including all lead and lift with contractor s own materials, labour, equipments, etc. complete as per drawings & specifications. Rate also includes covering anchorage pads with epoxy mortar of approved quality to avoid corrosion. 27 Centring and shuttering including strutting, propping etc. and removal of form work for CC/RCC raft foundation, Abutment, pier, wing walls, return walls, drop wall, toe wall, drain CC road etc, Approach slab at formation level, Dirt wall/ ballast wall at formation level, road darin. In Bottom/top slab, side walls, toe wall and sumps haunch filling head walls or any other component including all complete. A Foundations, footings, bases for Sqm ,48, columns of RCC Box and return wall etc B In RCC Box walls, Retaining walls, return walls, walls (any thickness) Sqm ,18,13, Page 14

15 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in including attached plasters, buttresses, plinth and string courses fillets, kerbs and steps etc C Lintels, beams, plinth beams, girders, Sqm , bressumers and cantilevers. with water proof ply 12 mm thick D Columns, piers, abutments, pillars, Sqm ,95, posts and struts E In slab of RCC Box, bridges etc and Sqm ,92, Suspended floors, roofs, landings, balconies and access platform. with water proof ply 12 mm thick 28 Supplying and providing Boulder Backing behind wing wall, return wall, retaining wall with hand packed boulders & cobbles with smaller size boulders toward the back including. Cum ,77, The rate shall include cost of all materials, leads & lifts, taxes, royalty, transportation ascent & descent labour, tools & plants & other incidental charges as complete work in all respect. 600mm thick behind the walls with boulders size 200mm to 250mm dia approx. 29 Providing & laying 300 mm thick stone pitching hand packed over ground or bank dressed to section as directed by Engineer in charge. The rate shall include cost of all materials, leads & lifts, taxes, royalty, transportation ascent & descent labour, tools & plants & other incidental charges as complete work in all respect. Stone boulders not less than 30 kg each and not more than 54kg each). Cum ,33, Brick work with modular bricks of class designation 7.5 in cement mortar 1:4 in foundations and plinth. The rate includes testing of bricks, cost of bricks, sand, cement, royalty, labour, tools & plant including bailing out water, striking joints on unexposed faces, racking out joints on exposed faces and watering complete. Cum , Page 15

16 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in 31 Providing cement plaster 12 mm thick in a single coat in cement mortar 1:4 finish to concrete or brick surface in all positions including scaffolding and curing etc. complete. Sqm , Providing weep holes by making suitable opening or drilling in existing Brick masonry/plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia PVC pipe, extending through the full width of the structure complete 33 Providing and applying two coats of coal tar or bitumen confirming to IS on the top and sides of RCC 1.70 Kgs / Sqm after cleaning the surface with all labour and materials complete job as directed by the Engineer-in-charge. RMT ,94, Sqm ,36, Providing and laying n Pressure NP- 4 class (Heavy duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete where necessary. The rates includes labour, supplying from the manufacturers at site and concrete/mortar mixing for collar joint etc complete as per direction of Engineer-In-Charge. a 1000 mm dia. RMT ,01, Providing and fixing structural steel for apron drain cover etc including fabrication as per drawing including providing two coats of red lead paint MT 3 63,172 1,89, of approved make. The rate shall include cost of all materials, leads & lifts, taxes, transportation, ascent & descent labour, tools & plants & other incidental charges as complete work in all respect. 36 Structural steel work (FOR FOB MAIN COLUMNS & STAIRS) welded in single section including cutting, Page 16

17 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in bending, straightening, hoisting, fixing in position, including applying a priming coat of approved steel primer, complete - upto 6m height above GL. The rate shall include cost of all materials, leads & lifts, taxes, transportation, ascent & descent labour, tools & plants & other incidental charges as complete work in all respect. a In RSJ, tees, angles and channels MT 48 69,004 33,12, b In flats, plates, round or square bars MT 17 69,004 11,73, Supplying and fixing lewis/ holding KG , down bolts of approved design with nuts and washers complete. 38 Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coats 0.90ltr/ 10sqm over an under coat of primer 0.80ltr/ 10sqm of approved brand or manufacture. Sqm ,17, Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm ( %), total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self-drilling /selftapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. The rate shall include cost of all materials, leads & lifts, taxes, transportation, ascent & descent labour, tools & plants & other incidental charges as complete work in all respect. Sqm ,20, Page 17

18 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in 40 Providing and fixing precoated RMT , galvanised steel sheet roofing accessories 0.50 mm ( %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat microns using self drilling/ self tapping screws complete :Ridges plain ( mm).The rate shall include cost of all materials, leads & lifts, taxes, transportation, ascent & descent labour, tools & plants & other incidental charges as complete work in all respect. 41 Erecting roof trusses, tank stagings, steel tanks etc. including riveting for work upto 10 m height above GL The rate shall include cost of all materials, leads & lifts, taxes, transportation, ascent & descent labour, tools & plants & other incidental charges as complete work in all respect 42 Demolishing R.C.C. work by manually /mechanical means and disposal of dismantled materials up to a lead of 2 kilometre including loading, unloading & stacking serviceable and unserviceable material separately including cutting reinforcement bars. (For encased pipe culvert)the rate shall include cost of labour, tools & plants & other incidental charges as complete work in all respect 43 Demolishing cement concrete manually / by mechanical means including disposal of material upto a lead of 2Km including loading, unloading & stacking as per direction of Engineer-in - charge. (For encased pipe culvert)the rate shall include cost of labour, tools & plants & other incidental charges as complete work in all respect MT ,77, Cum 55 1,283 70, Cum 55 1,021 56, Page 18

19 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in 44 Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable Cum , material and disposal of unserviceable material upto a lead of 2Km including loading, unloading & stacking as per direction of Engineerin Charge: The rate shall include cost of labour, tools & plants & other incidental charges as complete work in all respect 45 Providing road crane of different capacity with diff. jib length revolving type for material handling, Per day 5 17,561 87, assembly & erection of girders/slab/rcc Box etc. 40 MT capacity with 75 feet jib 46 Load testing of one or more spans of bridge as selected by the Engineer as per approved load test procedure following relevant IS/IRC/Railway Each 5 80,681 4,03, codes with contractor s labour, deflection measuring instruments, loading materials, recoding and analyzing the load testing results including all lead & lift, etc. complete as required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the Kent ledges /loading material etc. The load shall be 1.25 times the stipulated design load Based on Design load & not span 47 Providing and fixing G.I. chain link fabric fencing of required width in mesh size 25x25 mm made of G.I. wire of dia 3 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge 48 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering (All works up to plinth level). Sqm ,62, i) (1:3:6) of graded stone aggregate 40 Cum , mm nominal size Upto P.L ii) All work above plinth level Cum , Page 19

20 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in 49 Making plinth protection 50mm thick of cement concrete 1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size ) over 75 mm bed by dry brick ballast 40mm nominal size well rammed and consolidated and grouted with fine sand including finishing the top smooth. Sqm , Providing cement plaster in suitable thickness in a single coat in specified cement mortar finish to concrete or brick surface in all positions including royalty, scaffolding and curing etc complete. a 12mm CM 1:6 Sqm , b 15 mm cement plaster on rough side Sqm , c 6 mm cement plaster of mix: 1:3(1 cement: 3 fine sand) (ceiling + rise and tread of staircase and steps). Sqm , Distempering with 1st quality acrylic washable distemper (ready mixed) of approved manufacturer and of required shade and colour complete as per manufacture's specification. With two or more coats on new work. 52 Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade with two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. 53 Grading roof for water proofing treatment with: a Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) Sqm , Sqm , Cum 2 5,198 10, Providing precast cement concrete Jali 1:2:4 (1 cement : 2 coarse sand: 4 graded stone aggregate 6 mm nominal size), reinforced with 1.6 mm dia mild steel wire, including centering and shuttering, roughening cleaning, fixing and finishing in Page 20

21 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in cement mortar 1:3 (1 cement: 3 fine sand) etc complete, excluding plastering of the jambs, sills and soffits. Amount in i) 50mm thick. Sqm STEEL WORK 55 Providing and fixing M.S grill of required pattern in frames of windows etc. with M.S flats, square or round bars etc all complete. i) Fixed to openings /wooden frames with rawl plugs screws etc. Kg , Providing and fixing T-iron frames for doors, windows and ventilators of mild steel Tee-sections, joints mitred and welded, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer. i) Fixing with 15x3 mm lugs 10 cm long embedded in cement concrete block 15x10x10 cm of C.C. 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) Kg , FLOOR 57 Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS: type A including jointing with seal ring conforming to IS: 5382 leaving 10 mm gap for the thermal expansion (i) single socketed pipes. i) 110 mm diameter. mtr DOOR & WINDOW Aluminium work 58 Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, Page 21

22 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in fixed with rawl plugs and screws or with fixing clips, or with expansion hold fasteners including necessary filling up of gaps at junctions, at top, bottom and sides with required PVC/neoprene felt etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / panelling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing and panelling to be paid for separately) a For fixed portion. Anodised Kg , aluminium (anodised transparent or dyed to required shade according to IS: 1868, Minimum anodic coating of grade AC 15) Glazing 59 Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with PVC/neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge. (Cost of aluminium snap beading shall be paid in basic item). With float glass panes of 5.50 mm thickness. i) i)with float glass panes of 4.0 mm Sqm , thickness 60 Providing and fixing 35 mm thick factory made laminated veneer lumber door shutter conforming to IS : and TADS 15:2001 (Part B), including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws, all complete as per directions of Engineer in-charge and panelling with panels of : a 12 mm thick plain grade - 1, medium density flat pressed three layer particle board FPT - I or graded wood Sqm. 3 2,289 6, particle board FPTI, IS : 3087 marked, bonded with BWP type synthetic resin adhesive as per IS : 848 : Page 22

23 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in 61 Providing and fixing factory made panel PVC door shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 19 mm x 19 mm for styles and 15x15 mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame covered with 5 mm thick heat moulded PVC C channel of size 30 mm thickness, 70 mm width out of which 50 mm shall be flat and 20 mm shall be tapered in 45 degree angle on both side forming styles and 5 mm thick, 95 mm wide PVC sheet out of which 75 mm shall be flat and 20 mm shall be tapered in 45 degree on the inner side to form top and bottom rail and 115 mm wide PVC sheet out of which 75 mm shall be flat and 20 mm shall be tapered on both sides to form lock rail. Top, bottom and lock rails shall be provided both side of the panel. 10 mm (5 mm x 2 ) thick, 20 Sqm 5 2,566 12, mm wide cross PVC sheet be provided as gap insert for top rail & bottom rail, paneling of 5 mm thick both side PVC sheet to be fitted in the M.S. frame welded/ sealed to the styles & rails with 7 mm (5 mm+2 mm) thick x 15 mm wide PVC sheet beading on inner side, and joined together with solvent cement adhesive. An additional 5 mm thick PVC strip of 20 mm width is to be stuck on the interior side of the C Channel using PVC solvent adhesive etc. complete as per direction of Engineer-in-charge, manufacturer s specification & drawing. 30 mm thick plain PVC door shutters sqm Providing and fixing DOOR handles a bright finished brass handles with screws etc. complete: 125mm 63 Providing and fixing tower bolt a Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete : 200x10 mm s , Each Page 23

24 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in b aluminium tower bolts, ISI marked, Each anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete : 150x10 mm 64 Providing and fixing bright finished Each brass door latch with necessary screws etc. complete : 250x16x5 mm (SANITARY WORKS) 65 Construction Brick masonry manhole in cement mortar 1:4 (1 Cement: 4 coarse sand) R.C.C. top slab with 1:2:4 mix (1 cement: 2 coarse sand :4 Each 4 7,938 31, graded stone aggregate 20mm nominal size), foundation concrete 1:4:8 mix (1 cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) inside plastering 12mm thick with cement mortar 1:3 (1 cement : 3 coarse sand ) finished with floating coat of neat cement and making channels in cement concrete 1:2:4 ( cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) finished with a floting coat of neat cement complete as per standard design. (a) Inside size 90 x 80 cm and 45cm deep including C.I cover with frame (light duty) 455 x 610mm internal dimensions total weight of cover and frame to be not less than 38 kg (weight of cover 23 kg and weight of frame15 kg): With F.P.S bricks class designation Making soak pit 2.5 diameter 3.0 metre deep with 45 x 45 cm dry brick honey comb shaft with bricks of class designation 75 and S.W drain pipe 100 mm diameter 1.8m long complete as per standard design in Fly Ash- cement bricks. a With common burnt clay F.P.S. (non modular) bricks of class designation Supply and fixing C.I cover with frame for manholes with 500 mm diameter C.I cover (medium duty) the weight of the cover to be not less than 58 Kg. each 1 17,085 17, each 3 2,562 7, Page 24

25 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in 68 Providing, laying and jointing glazed stoneware pipe grade 'A' with stiff mixture of cement mortar in the proportion of 1:1 (1 cement : 1 fine sand) including testing etc. complete. a For sewer line 100mm diameter Mtr , Providing and laying cement concrete 1:5:10 (1 cement: 5 coarse sand: 10 graded stone aggregate 40 mm nominal size) all-round S.W. pipes including bed concrete as per standard design. a For sewer line 100mm diameter Mtr , Providing and fixing terminal guard, Each mm with sand cast iron S & S as per IS Providing and fixing soil, waste and vent pipes : a 100 mm diameter sand cast iron S&S Mtr , pipe as per IS Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with Each specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : a W.C. pan with ISI marked white solid Each 1 4,465 4, plastic seat and lid 73 Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps 32 mm CP brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require with white vitreous China Each 1 2,175 2, wash basin size 630 x 450 mm with a pair of 15mm C.P brass pillar taps. 74 Providing and fixing 600 x 450 mm Each beveled edge mirror of superior glass (of approved quality) complete with 6 mm thick hard board ground fixed to wooden cleats with C.P brass screws and washers complete. ( WATER SUPPLY WORKS ) Page 25

26 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in 75 Providing and placing on terrace (at all litre , floor levels) polyethylene water storage tank ISI: marked with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings the base support for tank. Two tanks of capacity 1000 litre each. 76 Providing and fixing G.I pipes complete with G.I. fittings and clamps, including cutting and making good the walls etc with (Internal work- Exposed on wall). a 15 mm dia nominal bore. Mtr b 20 mm dia nominal bore. Mtr , Providing and fixing brass bib cock of approved quality a 15 mm dia nominal bore. Each Providing and fixing gun metal gate valve with C.I. wheel of approved quality (Screwed end) a 25 mm dia nominal bore. Each Painting G.I pipe and fitting with synthetic enamel white paint over a ready mixed priming coat both of approved quality for new work. a 15 mm diameter pipe. mtr b 20 mm diameter pipe. mtr Any other items which are not covered within this BOQ will be operated as LS at par 50,00, per DSR-2014 Total Cost is 50,00,000/- The Bidder may quote % (Above(+) or Below(-) or at per against this item Total of Section-2= 57,64,66, Section-3 (Supply of P. way Materials) Sleepers 81 Supply of 60Kg rail s monoblock BG PSC sleepers (category 1) as per RDSO drawing and IRS specification T with latest alteration. Drg. Each ,88,78, T duly inspected by RITES/Railway/authorised agency at manufactures work site with Inspection Certificate of the materials. The rate includes all taxes, inspection charges, insurance, octroi, levies etc as applicable and transport, loading, unloading & stacking including all Page 26

27 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in labour, machinery cost complete. The rate also includes loading, unloading, transportation from the contractor s stock yard to site of work. 82 Supply of prestressed monoblock Each ,46, concrete special sleepers (Pretenstioned type category) for BG 1673mm to DRG T-4088 with all fastenings and fixtures for provision under guard rails on bridges to suit for 60kg UIC rail section as per RDSO drawing and Design and IRS specification with amended up to date duly inspected by RITES/Railway/authorised agency at manufactures work site with Inspection Certificate of the materials. The rate includes all taxes, inspection charges, insurance, octroi, levies etc as applicable and transport, loading, unloading & stacking including all labour, machinery cost complete. The rate also includes loading, unloading, transportation from the contractor s stock yard to site of work. 83 Supply of prestressed monoblock Set ,98, concrete sleepers (Pretenstioned type category) for BG to DRG T-4089 to 4097 with all fastenings and fixtures for provision under guard rails on approaches of bridges to suit for 60kg UIC rail section as per RDSO drawing and Design and IRS specification with amended up to date duly inspected by RITES/Railway/authorised agency at manufactures work site with Inspection Certificate of the materials. The rate includes all taxes, inspection charges, insurance, octroi, levies etc as applicable and transport, loading, unloading & stacking including all labour, machinery cost complete. The rate also includes loading, unloading, transportation from the contractor s stock yard to site of work. Page 27

28 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in 84 Supply of B.G. turnout prestressed concrete sleepers (PSC) to suit 60 Kg rail, in 1 in 8 ½ layout (fan shaped) for broad gauge including approach and exit sleepers as per standard turnout assembly RDSO Drg.. T (with latest amendments) and IRS specifications duly inspected by RITES/Railway/authorised agency at Set ,41, manufactures work site with Inspection Certificate of the materials. The rate includes all taxes, inspection charges, insurance, octroi, levies etc as applicable and transport, loading, unloading & stacking including all labour, machinery cost complete. The rate also includes loading, unloading, transportation from the contractor s stock yard to site of work. 85 Supply of B.G. turnout prestressed concrete sleepers (PSC) to suit 60 Kg. rail, in 1 in 8.5 Derailing Switch sleepers for broad gauge including approach and exit sleepers as per standard turnout assembly RDSO Drg.. T (with latest amendments) and IRS specifications duly inspected by RITES/Railway/authorised agency at manufactures work site with Inspection Certificate of the materials. The rate includes all taxes, inspection charges, insurance, octroi, levies etc as applicable and transport, loading, unloading & stacking including all labour, machinery cost complete. The rate also includes loading, unloading, transportation from the contractor s stock yard to site of work. Points & X-ing 86 Supply of 1 in 8.5 points and crossings (curved) of 60 kg. UIC rails as per RDSO drawing. T- 4865, T and T with latest alteration complete suitable to 60 Kg. PSC sleeper fan shaped layout including lead rails insulated gauge tie plates with fittings, fish plates, fish bolts, leading and following stretcher bars, bracket lugs, rubber pads, Page 28 Set ,59, Set ,51,90,008.00

29 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in pandral clips, insulating liners, spring washers etc duly inspected by RITES/Railway/authorised agency with Inspection Certificate of the materials. The rate also includes supply of all fittings required for prestressed concrete sleepers including approach and exit sleepers, leading and following stretcher bars and tie plates should be insulated type. The gauge tie plates shall be of three pieces type to accommodate motor. Rate shall be excluding cost of PSC sleepers & hand lever point but including all taxes, inspection charges, insurance, octroi, levies etc as applicable and transport, loading, unloading & stacking including all labour, machinery cost complete. The rate also includes loading, unloading, transportation from the contractor s stock yard to site of work. 87 Supply of 1 in 8 ½ Derailing switch 60Kg 90 UTS IRS T-12 1st Quality rails including opposite side stock rail as per RDSO's drawing no. T with all fittings and fastenings Set ,72, complete duly inspected by RITES/Railway/authorised agency with proper Inspection Certificate of the materials. Rate shall be excluding cost of PSC sleepers & hand lever point but including all taxes, inspection charges, insurance, octroi, levies etc as applicable and transport, loading, unloading & stacking including all labour, machinery cost complete. The rate also includes loading, unloading, transportation from the contractor s stock yard to site of work. (Chhattisgarh) 88 Supply of Henry William box type self reversing hand lever or spring point lever type self reversing (Steel handle) , to RDSO drawing. MA-3040 including point connecting rod and other fittings, fixtures and other parts thereto complete in all respect including all taxes, inspection charges Page 29

30 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in and transport, loading, unloading & stacking complete. The rate also includes loading, unloading, transportation from the contractor s stock yard to site of work. Fittings 89 Supplying of Grooved Rubber Sole Plate for 60kg rail and 60 PSC sleeper to RDSO Drg.. T (upto date Each ,90, alteration) conforming to IRS Specification for 6 mm thick grooved rubber sole plates (Provisional) 1977 revised 2000 duly inspected by RITES/Railway/authorised agency with Inspection Certificate of the materials. The rate includes cost of packing, all taxes, inspection charges, insurance, octroi, levies etc as applicable and transport, loading, unloading & stacking including all labour, machinery cost complete. The rate also includes loading, unloading, transportation from the contractor s store to site of work. 90 Supplying of Metal liners to RDSO Each ,74, Drg.. T (upto date alterations) duly inspected by RITES/Railway/authorised agency with Inspection Certificate of the materials. The rate includes cost of packing, all taxes, inspection charges, insurance, octroi, levies etc as applicable and transport, loading, unloading & stacking including all labour, machinery cost complete. The rate also includes loading, unloading, transportation from the contractor s store to site of work. 91 Supplying of GFN-66 liners to RDSO Each ,45, Drg.. T (upto date alterations) conforming to IRS specification T duly inspected by RITES/Railway/authorised agency with Inspection Certificate of the materials. The rate includes cost of packing, all taxes, inspection charges, insurance, octroi, levies etc as applicable and transport, loading, unloading & stacking including all labour, machinery cost complete. Page 30

31 Sl. DESCRIPTION OF ITEMS Unit QTY. Rate in Amount in The rate also includes loading, unloading, transportation from the contractor s store to site of work. 92 Supplying of Elastic Rail clips with flat toe (MK. III) for BG 60 Kg rail section for use with 60 Kg PSC Sleepers to Each ,85, RDSO Drg.. T (Alt.3) conforming to specifications IRS-T- 31/89duly inspected by RITES/Railway/authorised agency with Inspection Certificate of the materials. The rate includes cost of packing, all taxes, inspection charges, insurance, octroi, levies etc as applicable and transport, loading, unloading & stacking including all labour, machinery cost complete. The rate also includes loading, unloading, transportation from the contractor s store to site of work. 93 Supplying of Elastic Rail clips type "J" as per RDSO Drg with upto date alt. confirming to IRS Each ,98, duly inspected by RITES/Railway/authorised agency with Inspection Certificate of the materials. The rate includes cost of packing, all taxes, inspection charges, insurance, octroi, levies etc as applicable and transport, loading, unloading & stacking including all labour, machinery cost complete. The rate also includes loading, unloading, transportation from the contractor s store to site of work. 94 Supplying of 1m long Fish Plates for 60Kg rails to RDSO Drg.. T-5916 Pairs ,54, and 6 s fish bolts & nuts (25x140mm) including spring washer for each pair of fish plates RDSO Drg.. T-1899, T-23 and steel round upto 63mm confirming to Specification T duly inspected by RITES/Railway/authorised agency with Inspection Certificate of the materials. The rate includes cost of packing, all taxes, inspection charges, insurance, octroi, levies etc as applicable and transport, loading, unloading & stacking including all labour, machinery cost complete. The rate also includes loading, unloading, Page 31