Explain in writing if the address of the building is different than the address on this form:

Size: px
Start display at page:

Download "Explain in writing if the address of the building is different than the address on this form:"

Transcription

1 ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO SCHOOL DIST Chicago, IL, 669 DATE LAST THREE YEAR REINSPECTION WAS COMPLETED 3/13/213 If the address on this form is different than the address of the building, submit a written explanation. SECTION II (Please type or print) PLEASE COMPLETE THE FOLING FOR YOUR THREE YEAR REINSPECTION: DATE REINSPECTION COMPLETED: 5/3/216 ENROLLMENT IDPH INSPECTOR LICENSE NUMBER: IDPH LICENSED INSPECTOR NAME (Please Print): Allizon Brooks IDPH MP LICENSE NUMBER: IDPH LICENSED MANAGEMENT PLANNER NAME (Please Print): Todd Huffer DESIGNATED PERSON (Please Print): Robert Christlieb PHONE: 357 (773) /3/216 Signature of Designated Person Date SECTION III PLEASE COMPLETE THE FOLING INFORMATION FOR ANY CHANGES WITHIN THE SCHOOL DISTRICT. School building has been sold. Date of Sale: School has been closed. Date closed: School building has been demolished. School building is asbestos free since last reinspection: Please explain in writing why the school building is now asbestos free and include the supporting documentation. If a new school building has been added to the district, submit either and exclusionary statement or a management plan and inspection report. Include the complete name, address and city of school building. Explain in writing if the address of the building is different than the address on this form: IL Revised 1.3

2 THREE YEAR REINSPECTION CHICAGO SCHOOL DIST 299 Chicago, IL, 669 Unit: Building ID: 471 IDPH ID Number: REPORT DATE: Tuesday, May 3, 216 Prepared for: 125 S. Clark Street Chicago, IL 663 Prepared by: 6 West Van Buren St., Ste 5 Phone (312) Fax (312) DO NOT REMOVE FROM SCHOOL REQUIRED BY FEDERAL LAW

3 March 9, 216 Mr. R. Kent Cook Asbestos Program Illinois Department of Public Health 525 West Jefferson Street Springfield, Illinois Re: Three-Year Reinspections Dear Mr. Cook:, Managing Environmental Consultant (MEC), conducted the ThreeYear Reinspections and performed management plan updates for the (CPS) facilities in Region 3,4,5 Elementary Schools. Please update your records with the following information. School District: 299 Unit: School: Region: 4 IDPH ID: Building ID: 471 Address: Chicago, IL, 669 Building Contact: Shew, Daniel Contact Phone: Current Building Owners: Review 5/3/216 Inspector: Allizon Brooks Management Planner: Todd Huffer Inspector IDPH License: Management Planner IDPH License: If you have any questions or comments, please contact us at (312) Sincerely, Todd Huffer 1-987

4 Environmental tification to Occupants To: Faculty, Staff and Parents From: March 9, 216 RE:, Unit Chicago, IL, 669 Dear Faculty, Staff and Parents, This letter is to notify you that the 216 asbestos three year re-inspection has been completed at, following the Federal Asbestos Hazard Emergency Response Act (AHERA), 4 CFR Part 763, Subpart E and is available for your review at the main office of the school. Although asbestos-containing materials have been identified at, there is no reason to believe that any threat to the health of students or staff exists at this time. CPS will continue to carefully monitor the condition of asbestos-containing materials and if conditions warrant, all appropriate steps will be taken to maintain the health and safety of all building occupants. If you have any questions regarding this matter or require additional information, please feel free to contact Robert Christlieb, the designated Local Education Authority's Designated Person at (773)

5 Table of Contents I. School and Inspection Information II. Executive Summary III. Methodology IV. Abatement History V. Reassessments and Recommendations VI. Conclusions Table I: Inspector's Reinspection Findings Table II: Management Planner's Review APPENDICES: Appendix A: Assessment Sheets, Drawings and Photos Appendix B: Inspector and Management Planner Licenses Appendix C: Laboratory Accreditations Appendix D: Laboratory Results Appendix E: Chain of Custody Forms

6 SCHOOL AND INSPECTION INFORMATION 1. School Information School: Address: IDPH ID: Contact: Shew, Daniel Unit: Chicago, IL, 669 Building ID: 471 Phone: Description of Facility Original Construction: 1881 Total Square Footage: 5818 Current Occupancy: Additional Construction: of Floors: 3 LEA Designated Person Contact: Robert Christlieb Address: 125 South Clark Street, 17th Floor Chicago, IL Phone: (773) Managing Environmental Consultant MEC: Contact: Dan Juneau Address 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector Inspector Name: Allizon Brooks Signature: 3/9/216 Inspector IDPH license # Region: 4 Management Planner Management Planner Name: Todd Huffer Management Planner IDPH license # Review 5/3/ LEA Designated Person's Acknowledgement Signature: 5/3/216 The reinspection report and recommendations have been received by me and appropriate action will be taken by the School District. Signature: 5/3/216 Name: Robert Christlieb Unit : Building: 471

7 II. EXECUTIVE SUMMARY was retained by the (CPS) to perform a three-year asbestos reinspection of the. This inspection was conducted in accordance with the United States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA) part (b), and the ongoing Operations and Maintenance Program (O&M) originally designed in the School's Asbestos Management Plan. The purpose of this three-year reinspection is to record any condition changes in the asbestos-containing building material (ACBM) in the school since the previous three-year reinspection and the six-month periodic surveillance, to identify, assess, and include any Homogeneous Areas (HA) not identified in the Management Plan, and to recommend an appropriate response action to manage asbestos. The inspector conducted a three-year reinspection of this facility under Illinois Department of Public Health (IDPH) school reinspection requirements and AHERA, sections and The main building and each addition to the main building, if constructed at different dates, were inspected separately. Laboratory accreditations are included in Appendix C, laboratory results are included in Appendix D, and chain of custody forms are included in Appendix E. te: During previous inspections, some of the HA(s) were identified together as 9" x 9" floor tile (FT), mastics assoc. with 9" x 9" FT, 12" x 12" FT, mastics assoc. with 12" x 12" FT, pipe insulation, etc. Some of these HA(s) have been re-identified by areas that are uniform in color, texture, construction date, application date, and general appearance. The inspector has determined the following: A. The following HAs have changed assessment categories for Building 471: Unit: 14 Gypsum Board 15 Gypsum Board Joint Compound 18 Glazed Block 26 Interior & Exterior Brick Interior and Exterior Brick Mortar Interior & Exterior Brick Interior & Exterior Brick Mortar Incinerator Brick 33 Incinerator Door Insulation Building: 471

8 Unit: 4 12"x12" Brn Floor Tile w/dk Brn & Wh Spkles Mastic 51 Light Beige ceramic wall tile grout 52 Light Beige ceramic wall tile adhesive A Fiberglass Pipe Insulation Building: 471

9 B. The following new homogenous areas have been identified for Building 471: Unit: Building: 471

10 C. This reinspection covered only physically accessible and visible areas and materials that were identified in the LEA's management plan. The following materials were concealed and/or contained in areas that were inaccessible for sampling and have been classified as : A 3C Unit: Plaster Assigned to "x12" Floor Tile Assigned to "x12" Floor Tile Mastic Exterior Window Glaze (t AHERA) Gypsum Board Gypsum Board Joint Compound Vinyl Wall Base Vinyl Wall Base Mastic Glazed Block Glazed Block Mortar Plaster Concrete Block Concrete Block Mortar Ceramic Tile Ceramic Tile Grout Brown Coat Plaster Asphalt Flooring Interior & Exterior Brick 1881 Interior and Exterior Brick Mortar 1881 Browncoat Plaster Asphalt Flooring Interior & Exterior Brick 1896 Interior & Exterior Brick Mortar 1896 Incinerator Brick Incinerator Door Insulation Refractory Cement in Doors Boiler Firebrick Roofing Material (t AHERA) Green Carpet Mastic Gray Carpet Mastic 12"x12" Red Floor Tile 12"x12" Beige Floor Tile Mastic 12"x12" Light Brown Floor Tile 12"x12" Light Brown Floor Tile Mastic Gray Carpet Mastic 12X12 Lt. Brown w/ White Floor Tile mastic 12"x12"cream floortile w/brown&green specks mastic 4" Beige vinyl baseboard 4" Beige vinyl caseboard adhesive 4" Black vinyl baseboard 2'x4' Ceiling Panels Building: 471

11 A PA 4" Black vinyl baseboard Light Beige ceramic wall tile grout Light Beige ceramic wall tile adhesive Sink under coating 12"x12" Brown speckled floor tile 12'x12' brown specked floor tile mastic 12"x12" green speckled floor tile 12"x12" green specked floor tile mastic Blue Carpet Mastic 12X12 Lt. Brown w/white Floor Tile Burlap Wall Covering 12X12 Lt. Brown w/ White Floor Tile mastic 12X12 Lt. Green w/dark Green Floor Tile 12X12 Lt. Green w/ Dark Green Floor Tile Mastic Blackboards Blackboard Adhesive 12" X 12" Dull Brown VFT 12" X 12" Dull Brown VFT Mastic Fiberglass Pipe Insulation Incinerator Brick The following areas were deemed to be inaccessible: A 8B 8C 8D Unit: Vinyl Wall Base Mastic Incinerator Door Insulation Green Carpet Mastic Gray Carpet Mastic 12"x12" Brn Floor Tile w/dk Brn & Wh Spkles Mastic 12"x12" Light Brown Floor Tile Mastic Gray Carpet Mastic 12X12 Lt. Brown w/ White Floor Tile mastic 12"x12"cream floortile w/brown&green specks mastic 4" Beige vinyl caseboard adhesive Light Beige ceramic wall tile adhesive 12'x12' brown specked floor tile mastic 12"x12" green specked floor tile mastic 12X12 Lt. Brown w/ White Floor Tile mastic 12X12 Lt. Green w/ Dark Green Floor Tile Mastic Blackboard Adhesive 12" X 12" Dull Brown VFT Mastic 12" x 12" Red Floor Tile Mastic 12" x 12" White Floor Tile and Mastic 12" x 12" Beige Floor Tile Mastic 12" x 12" Burnt-Orange Floor Tile Mastic Building: 471

12 D/P E/Q Hard Joint Compound on Cardboard Pipe Insulation Aircell Pipe Insulation Materials were also listed as "assumed" if they were in good condition and sampling was not conducted to avoid damage. This reinspection was conducted by Allizon Brooks, IDPH License # The Management Plan was updated by Todd Huffer, IDPH License # Inspector and Management Planner Licenses are included in Appendix B. Unit: Building: 471

13 III. METHODOLOGY Tasks performed on-site included the following: IV. 1. Review current management plan, identify HA(s) and extract appropriate information. 2. Examine and verify abatement records. 3. Touch and visually and physically reinspect and reassess the condition of all friable known or assumed ACBM. 4. Touch and visually and physically reinspect all non-friable known or assumed ACBM to determine whether these materials have become friable since the last inspection or periodic surveillance. 5. Identify any condition changes that may affect Hazard Ranking of known ACBM or ACBM, as well as any HA(s) that have become friable since the last reinspection. 6. Collect bulk samples from each newly discovered friable HA or previously assumed and submit for laboratory analysis. 7. Tabulate reinspection findings and submit for management planner review and recommendations with appropriate response actions based on the AHERA Damage Category of the ACBM. 8. Submit reinspection findings and management planner recommendations to the LEA within thirty (3) days for inclusion into the management plan. ABATEMENT HISTORY The information collected from the existing management plan and inspection report(s) and from interviews with the school official revealed that the following asbestos abatement was conducted at the school since the previous Three year Reinspection. Abatement Dates: V. REASSESSMENTS AND RECOMMENDATIONS The reassessments and recommendations are summarized in Tables I and II on the following pages. Detailed Hazard Assessment Sheets and Drawings and Photos (if applicable) are included in Appendix A. VI. CONCLUSIONS The Building 471 Three-Year reinspection has been completed and response actions have been recommended for both friable and non-friable materials. A timely execution of the response actions recommended will enable the LEA and the Designated Person(s) to effectively manage the existing ACBM. This three-year reinspection report should be inspected in the current Management plan at the CPS Central Office, and one (1) copy should be kept at the school for use when planning any renovation and/or demolition activities in areas where ACBM has been identified. Also, periodic surveillance documentation and any summary reports from any response actions that are executed at the school should be used to update the Management Plan. Unit: Building: 471

14 Table I Inspector's Reinspection Findings

15 School Unit Building ID 471 Address Region 4 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description 1 Plaster 1 Assigned to "x12" Floor Tile Assigned to "x12" Floor Tile Mastic Exterior Window Caulk (t AHERA) 13 Exterior Window Glaze (t AHERA) 14 Gypsum Board 15 Gypsum Board Joint Compound 16 Vinyl Wall Base 17 Vinyl Wall Base Mastic 18 Glazed Block 19 Glazed Block Mortar 2 Plaster 2 Concrete Block 21 Concrete Block Mortar 22 Ceramic Tile Material Quantity 5, Material Units Material Location Asbestos Type Material Category Friable Damage Type 1881 Construction ASSUMED SURFACE Y NONE ne Found in That Addition ne Found in That Addition Throughout Building Throughout Building Second Floor Washrooms and Basement Storage Second Floor Washrooms and Basement Storage Room 38, 1st Floor Lounge, 2nd Floor Lunchroom 38, 1st Floor Lounge, 2nd Floor Lunchroom Basement Washrooms Basement Washrooms 1896 Construction ASSUMED ASSUMED CHR ASSUMED ASSUMED N ASSUMED ASSUMED Pump Room, Boy's and Girl's Play Rooms Basement Washrooms Girl's, Boy's, and Men's 2nd Floor Washrooms Girl's, Boy's, and Men's 2nd Floor Washrooms N. Basement Foyer, Rooms 14, 22, 37, Office 1, 1 1, 25 1,5 5 15, 1,5 15 3, Ceramic Tile Grout 3 Brown Coat Plaster 3, Damage Quantity Damage Units Damage Category Change in Assessment Category Damage Reason Disturbance Potential Any remaining friable ACBM or friable suspect ACBM NONE Yes ACBM with the potential for damage N NONE Yes ACBM with the potential for damage N NONE ACBM with the potential for damage ASSUMED N NONE ACBM with the potential for damage ASSUMED N NONE Yes ASSUMED N NONE ASSUMED SURFACE Y NONE ASSUMED N NONE ACBM with the potential for damage ACBM with the potential for damage Any remaining friable ACBM or friable suspect ACBM ACBM with the potential for damage ASSUMED N NONE N NONE ACBM with the potential for damage ACBM with the potential for damage ASSUMED ASSUMED N NONE ACBM with the potential for damage ASSUMED SURFACE Y NONE Any remaining friable ACBM or friable suspect ACBM

16 School Unit Building ID 471 Address Region 4 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Type ASSUMED N NONE ASSUMED N ASSUMED ASSUMED SURFACE ASSUMED Damage Quantity Damage Units Change in Assessment Category Damage Category ACBM with the potential for damage NONE Yes N NONE Yes Y NONE ACBM with the potential for damage ACBM with the potential for damage Any remaining friable ACBM or friable suspect ACBM N NONE ACBM with the potential for damage ASSUMED N NONE Yes ACBM with the potential for damage ASSUMED N NONE Yes ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the 25 Asphalt Flooring 23, 26 Interior & Exterior Brick , 27 Interior and Exterior Brick Mortar , 28 Browncoat Plaster 3, 29 Asphalt Flooring 1, 3 Interior & Exterior Brick , 31 Interior & Exterior Brick Mortar , 32 Incinerator Brick 4 Lunchroom, Corridor in 1881 Construction 1st, 2nd, and 3rd Floor rth Stairs in 1881 Construction Interior & Exterior 1881 Construction Interior & Exterior 1881 Construction S Basement Foyer, Gym, 2nd Floor Stairwell and Corridor, Rooms 11, 16, 31 in 1896 Construction 1st, 2nd, and 3rd Floors- South Stairs in 1896 Construction Interior & Exterior of 1896 Construction Interior & Exterior of 1896 Construction Boiler Room ASSUMED N NONE Yes 33 Incinerator Door Insulation 2 Boiler Room ASSUMED N NONE Yes 34 Refractory Cement in Doors 3 Boiler #s- 1, 2, and 3 ASSUMED Y NONE 35 Boiler Firebrick 3 Boiler #s- 1, 2, and 3 ASSUMED Y NONE Roofing Material (t AHERA) Green Carpet Mastic 15 Roof Office ASSUMED ASSUMED N NONE 38 Gray Carpet Mastic 15 ASSUMED N NONE 39 12"x12" Brown Floor Tile w/dk Brn & Wh Speckles 12"x12" Red Floor Tile 75 Conference Room, Counselor Office, and Main Office Room 38 CHR N NONE 1,5 Rooms 14 ASSUMED N NONE 3A Damage Reason Disturbance Potential

17 School Unit Building ID 471 Address Region 4 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description 3B 12"x12" White Floor Tile 3C Material Units Material Location Asbestos Type Material Category Friable Damage Type 195 CHR N NONE 12"x12" Beige Floor Tile Mastic 1,6 1st Floor Teachers Lounge Office, Room 13 ASSUMED N NONE 3D 12"x12" Burnt-Orange Floor Tile 55 N NONE 9" x 9" Floor Tile-ABATED (before 1998) ABATED 4 9 CHR N NONE Yes ACBM with the potential for damage Boiler Room ABATED TSI 42 12"x12" Brn Floor Tile w/dk Brn & Wh Spkles Mastic Insulation Under Shell of IncineratorABATED 21 12"x12" Light Brown Floor Tile Room 25 Storage Room Lunch RoomAbated Before 1998 Room 38 CHR 4 2 ASSUMED N NONE ACBM with the potential for damage 43 12"x12" Light Brown Floor Tile Mastic 2 ASSUMED N NONE ACBM with the potential for damage 44 Gray Carpet Mastic 1,8 Room 18 Washroom, 2nd Floor Teacher's Lounge Washroom, Room 18 Washroom, 2nd Floor Teacher's Lounge Washroom Library, 32 ASSUMED N NONE Room 18 ASSUMED N NONE 926 Room 18 ASSUMED N NONE 47 12X12 Lt. Brown w/ White Floor Tile mastic 12"x12"cream floortile w/brown&green specks mastic 4" Beige vinyl baseboard 18 N NONE 4" Beige vinyl caseboard adhesive 18 LF ASSUMED N NONE 49 4" Black vinyl baseboard 162 LF ASSUMED N NONE 5 2'x4' Ceiling Panels 9 Room 18, washroom Room 18, washroom rm 18, lunchroom, 2nd fl teacher's lounge and washroom Room 11 ASSUMED 48 ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ASSUMED Y NONE 5 4" Black vinyl baseboard 162 LF ASSUMED N NONE 51 Light Beige ceramic wall tile grout 68 rm 18, lunchroom, 2nd fl teacher's lounge and washroom Rm 18, washroom Any remaining friable ACBM or friable suspect ACBM ACBM with the potential for damage ASSUMED N NONE Yes ACBM with the potential for damage Material Quantity Damage Quantity Damage Units Change in Assessment Category Damage Category potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage Damage Reason Disturbance Potential

18 School Unit Building ID 471 Address Region 4 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description 52 Light Beige ceramic wall tile adhesive 53 Sink under coating 54 Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Type Damage Quantity Damage Units 68 ASSUMED N NONE 3 Room 18, washroom Room 18 Change in Assessment Category Yes ASSUMED SURFACE N NONE 12"x12" Brown speckled floor tile 143 ASSUMED N NONE 55 12'x12' brown specked floor tile mastic 143 ASSUMED N NONE 56 12"x12" green speckled floor tile 92 Room 14, washroom, 2nd floor teacher's lounge Room 14, washroom, 2nd floor teacher's lounge Lunchroom 28 ASSUMED N NONE 57 12"x12" green specked floor tile mastic 92 Lunchroom ASSUMED N Blue Carpet Mastic 12X12 Lt. Brown w/white Floor Tile ASSUMED ASSUMED 6 6 ASSUMED ASSUMED ACBM with the potential for damage NONE ACBM with the potential for damage ACBM with the potential for damage N NONE ACBM with the potential for damage N NONE ACBM with the potential for damage ASSUMED N NONE ASSUMED N NONE ASSUMED N NONE ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the Burlap Wall Covering 12X12 Lt. Brown w/ White Floor Tile mastic X12 Lt. Green w/dark Green Floor Tile X12 Lt. Green w/ Dark Green Floor Tile Mastic Blackboards ,5 64 Blackboard Adhesive 1,5 Classrooms ASSUMED N NONE 65 12" X 12" Dull Brown VFT 2,5 1st Floor Corridor ASSUMED N NONE 66 12" X 12" Dull Brown VFT Mastic 2,5 1st Floor Corridor ASSUMED N NONE 7 Vibration Collar 8A 12" x 12" Red Floor Tile Mastic 8B 12" x 12" White Floor Tile and Mastic 8C 12" x 12" Beige Floor Tile Mastic 8D 12" x 12" Burnt-Orange Floor Tile Mastic 1 Lunchroom CHR N NONE 1,5 Rooms 14 CHR N NONE 1st Floor Teacher's Lounge Office, Room 13, 1st Floor Corridor, 34 Wardrobe 25 Wardrobe CHR N NONE CHR N NONE CHR N NONE 75 Disturbance Potential Damage Reason ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage Rooms 31 & 35 2nd Floor Teacher's Lounge, Washroom, Lunchroom Pantry Throughout Facility 2nd Floor Teacher's Lounge, Washroom, Lunchroom Pantry 2nd Floor Lunchroom 2nd Floor Lunchroom Classrooms 1,5 Damage Category

19 School Unit Building ID 471 Address Region 4 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description 9 9" x 9" Floor Tile Mastic- ABATED (before 1998) Fiberglass Pipe Insulation Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Type Damage Quantity Damage Units Change in Assessment Category Lunch RoomAbated Before 1998 Throughout Facility ABATED ASSUMED TSI Y NONE Yes CHR TSI Y NONE CHR TSI Y NONE CHR TSI Y NONE CHR TSI Y Damage Category Damage Reason Disturbance Potential potential for damage A 5,5 LF 12 LF 2 LF 1 LF 22 LF Rms 18,11,2nd fl washrooms;basemen t playrms,boys&girls washrms, water sprinkler rm, conference rm Main Building: basemt, common aream janitor's storage room Main Building: Basement, common area, janitor's storage room South Foyer 4 LF South Foyer CHR TSI B/N Hard Joint Compound on Fiberglass Insulation Lines C/O Cardboard Pipe Insulation D/P Hard Joint Compound on Cardboard Pipe Insulation E/Q Aircell Pipe Insulation F/R Hard Joint Compound on Aircell Insulation G Boiler Room ABATED TSI Boiler Room ABATED TSI I J Mag Block Insulation on Pipes-ABATED 21 Hard Joint Compound on Mag Block Insulation-ABATED Mag Block Insulation on Water Tank Tank Insulation (Fiberglass) Boiler Room Boiler Room TSI TSI K/S Aircell Sheet Insulation on Ducts L M Boiler Gaskets-ABATED (before 1998) Hard Joint Compound and Horsehair Pipe Insulation Incinerator Brick rth and South Basement Foyers and East Girl's Playroom Abated Before 1998 Water Main PipingAbated before 1998 Boiler Room CHR NOT_TEST ED CHR ABATED ABATED ASSUMED ABATED H PA T Mag Block Insulation on Boilers-ABATED 21 2 Boiler Room Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM NONE Y NONE Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM N NONE ACBM with the potential for damage TSI

20 School Unit Building ID 471 Address Region 4 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report Reinspection Date 3/9/216 Inspector Name Inspector's Comments Allizon Brooks /15/217 Inspector's IDPH License Number / Expiration Date HA Number: Inspector Comments: t observed 216 t observed 216

21 School Unit Building ID 471 Address Region 4 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: A 3B 3C 3D Inspector Comments:

22 School Unit Building ID 471 Address Region 4 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: A 8B 8C 8D 9 A B/N C/O D/P E/Q F/R G H I J Inspector Comments: t observed 216 t observed 216 t observed 216

23 School Unit Building ID 471 Address Region 4 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: K/S L M PA T Inspector Comments: t observed 216

24 Table II Management Planner's Review

25 School Address Unit Building ID Chicago, IL, Region 4 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response 1 Plaster 5, 1881 Construction SURFACE Yes 7 Any remaining friable ACBM or friable suspect ACBM Assigned to "x12" Floor Tile Assigned to "x12" Floor Tile Mastic Exterior Window Caulk (t AHERA) Exterior Window Glaze (t AHERA) Gypsum Board 1, Chrysotile 6 ACBM with the potential for damage 15 Gypsum Board Joint Compound 1 6 ACBM with the potential for damage 16 Vinyl Wall Base 1, 6 ACBM with the potential for damage 17 Vinyl Wall Base Mastic 25 6 ACBM with the potential for damage Glazed Block Glazed Block Mortar Plaster 1,5 5 15, ne Found in That Addition ne Found in That Addition Throughout Building Throughout Building Second Floor Washrooms and Basement Storage Second Floor Washrooms and Basement Storage Room 38, 1st Floor Lounge, 2nd Floor Lunchroom 38, 1st Floor Lounge, 2nd Floor Lunchroom Basement Washrooms Basement Washrooms 1896 Construction SURFACE Yes 2 Concrete Block 1, Concrete Block Mortar Ceramic Tile 15 3, 6 ACBM with the potential for damage 6 ACBM with the potential for damage 23 Ceramic Tile Grout 3 6 ACBM with the potential for damage 24 Brown Coat Plaster 3, SURFACE Yes 7 Any remaining friable ACBM or friable suspect ACBM 25 Asphalt Flooring 23, 6 ACBM with the potential for damage Interior & Exterior Brick 1881 Interior and Exterior Brick Mortar 1881 Browncoat Plaster 7, 7, 3, SURFACE Yes 6 ACBM with the potential for damage 6 ACBM with the potential for damage 7 Any remaining friable ACBM or friable suspect ACBM 29 Asphalt Flooring 1, Pump Room, Boy's and Girl's Play Rooms Basement Washrooms Girl's, Boy's, and Men's 2nd Floor Washrooms Girl's, Boy's, and Men's 2nd Floor Washrooms N. Basement Foyer, Rooms 14, 22, 37, Office Lunchroom, Corridor in 1881 Construction 1st, 2nd, and 3rd Floor rth Stairs in 1881 Construction Interior & Exterior 1881 Construction Interior & Exterior 1881 Construction S Basement Foyer, Gym, 2nd Floor Stairwell and Corridor, Rooms 11, 16, 31 in 1896 Construction 1st, 2nd, and 3rd Floors- South Stairs 6 ACBM with the potential for damage 6 ACBM with the potential for damage 7 Any remaining friable ACBM or friable suspect ACBM 6 ACBM with the potential for damage 6 ACBM with the potential for damage

26 School Address Unit Building ID Chicago, IL, Region 4 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Interior & Exterior Brick 1896 Interior & Exterior Brick Mortar 1896 Incinerator Brick Incinerator Door Insulation Refractory Cement in Doors 3, 3, Boiler Firebrick Roofing Material (t AHERA) Green Carpet Mastic Gray Carpet Mastic A 3B 3C 3D , , "x12" Brown Floor Tile w/dk Brn & Wh Speckles 12"x12" Red Floor Tile 12"x12" White Floor Tile 12"x12" Beige Floor Tile Mastic 12"x12" Burnt-Orange Floor Tile 9" x 9" Floor Tile-ABATED (before 1998) 12"x12" Brn Floor Tile w/dk Brn & Wh Spkles Mastic Insulation Under Shell of Incinerator-ABATED 21 12"x12" Light Brown Floor Tile "x12" Light Brown Floor Tile Mastic , Gray Carpet Mastic 12X12 Lt. Brown w/ White Floor Tile mastic 12"x12"cream floortile w/brown&green specks mastic 4" Beige vinyl baseboard 4" Beige vinyl caseboard adhesive 4" Black vinyl baseboard LF LF 5 2'x4' Ceiling Panels 9 Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response in 1896 Construction Interior & Exterior of 1896 Construction Interior & Exterior of 1896 Construction Boiler Room Boiler Room Boiler #s- 1, 2, and 3 Yes Boiler #s- 1, 2, and 3 Yes 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM Roof Office Conference Room, Counselor Office, and Main Office Room 38 Rooms 14 1st Floor Teachers Lounge Office, Room 13 Room 25 Storage Room Lunch Room- Abated Before 1998 Room 38 6 ACBM with the potential for damage 6 ACBM with the potential for damage Chrysotile Chrysotile Chrysotile Abated Chrysotile 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage Boiler Room Room 18 Washroom, 2nd Floor Teacher's Lounge Washroom, Room 18 Washroom, 2nd Floor Teacher's Lounge Washroom Library, 32 Room 18 Room 18 Abated TSI 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage Room 18, washroom Room 18, washroom rm 18, lunchroom, 2nd fl teacher's lounge and washroom Room 11 LF LF 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage Yes 7 Any remaining friable ACBM or friable

27 School Address Unit Building ID Chicago, IL, Region 4 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response 5 4" Black vinyl baseboard 162 LF Light Beige ceramic wall tile grout Light Beige ceramic wall tile adhesive Sink under coating 12"x12" Brown speckled floor tile SURFACE 55 12'x12' brown specked floor tile mastic "x12" green speckled floor tile 12"x12" green specked floor tile mastic Blue Carpet Mastic 12X12 Lt. Brown w/white Floor Tile Burlap Wall Covering 12X12 Lt. Brown w/ White Floor Tile mastic A 8B 8C 12X12 Lt. Green w/dark Green Floor Tile 12X12 Lt. Green w/ Dark Green Floor Tile Mastic Blackboards Blackboard Adhesive 12" X 12" Dull Brown VFT 12" X 12" Dull Brown VFT Mastic Vibration Collar 12" x 12" Red Floor Tile Mastic 12" x 12" White Floor Tile and Mastic 12" x 12" Beige Floor Tile Mastic ,5 1,5 2,5 2,5 1 1, ,5 8D 9 A 12" x 12" Burnt-Orange Floor Tile Mastic 9" x 9" Floor Tile Mastic- ABATED (before 1998) Fiberglass Pipe Insulation 75 5,5 LF rm 18, lunchroom, 2nd fl teacher's lounge and washroom Rm 18, washroom Room 18, washroom Room 18 Room 14, washroom, 2nd floor teacher's lounge Room 14, washroom, 2nd floor teacher's lounge Lunchroom 28 Lunchroom Rooms 31 & 35 2nd Floor Teacher's Lounge, Washroom, Lunchroom Pantry Throughout Facility 2nd Floor Teacher's Lounge, Washroom, Lunchroom Pantry 2nd Floor Lunchroom 2nd Floor Lunchroom Classrooms Classrooms 1st Floor Corridor 1st Floor Corridor Lunchroom Rooms 14 1st Floor Teacher's Lounge Office, Room 13, 1st Floor Corridor, 34 Wardrobe 25 Wardrobe Lunch Room- Abated Before 1998 Throughout Facility LF suspect ACBM 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage Chrysotile Chrysotile Chrysotile Chrysotile 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage Chrysotile Abated TSI 6 ACBM with the potential for damage Yes LF Chrysotile TSI Yes LF 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM B/N Hard Joint Compound on Fiberglass Insulation Lines 12 LF Rms 18,11,2nd fl washrooms;basement

28 School Address Unit Building ID Chicago, IL, Region 4 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response Chrysotile TSI Yes LF Chrysotile TSI Yes LF Chrysotile TSI Yes LF Yes LF 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 6 ACBM with the potential for damage C/O Cardboard Pipe Insulation 2 LF D/P 1 LF E/Q Hard Joint Compound on Cardboard Pipe Insulation Aircell Pipe Insulation 22 LF playrms,boys&girls washrms, water sprinkler rm, conference rm Main Building: basemt, common aream janitor's storage room Main Building: Basement, common area, janitor's storage room South Foyer F/R Hard Joint Compound on Aircell Insulation 4 LF South Foyer Chrysotile TSI G H Mag Block Insulation on Pipes-ABATED 21 Hard Joint Compound on Mag Block InsulationABATED Mag Block Insulation on Water Tank Tank Insulation (Fiberglass) Aircell Sheet Insulation on Ducts Boiler Room Boiler Room Abated Abated TSI TSI Boiler Room Boiler Room rth and South Basement Foyers and East Girl's Playroom Abated Before 1998 Water Main Piping- Abated before 1998 Chrysotile t Tested Chrysotile TSI TSI TSI Abated Abated Boiler Room Boiler Room Abated I J K/S L M PA T Boiler Gaskets-ABATED (before 1998) Hard Joint Compound and Horsehair Pipe Insulation Incinerator Brick Mag Block Insulation on Boilers-ABATED 21 2

29 School Address Unit Building ID Chicago, IL, 669 Region ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report 5/3/216 Review Date Manager Planner Name Todd Huffer /15/216 Manager IDPH License /Expiration HA Number Management Comments Material t Observed in 216 Material t Observed in 216

30 School Address Unit Building ID Chicago, IL, 669 Region ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number A 3B 3C 3D Management Comments

31 School Address Unit Building ID Chicago, IL, 669 Region ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number A 8B 8C 8D 9 Management Comments Material t Observed in 216 Material t Observed in 216

32 School Address Unit Building ID Chicago, IL, 669 Region ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number A B/N C/O D/P E/Q F/R G H I J K/S L M PA T Management Comments Material t Observed in 216 Material t Observed in 216

33 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 1 Plaster HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: 1881 Construction 5 COMMENTS: Inspector's Signature: 3/9/216

34 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Plaster 1881 Construction 5 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

35 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 1 Assigned to "x12" Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: ne Found in That Addition COMMENTS: t observed 216 Inspector's Signature: 3/9/216

36 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Assigned to "x12" Floor Tile ne Found in That Addition 471 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Material t Observed in 216 Management Planner's Signature: 5/3/216

37 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 11 Assigned to "x12" Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: ne Found in That Addition COMMENTS: t observed 216 Inspector's Signature: 3/9/216

38 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Assigned to "x12" Floor Tile Mastic ne Found in That Addition 471 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Material t Observed in 216 Management Planner's Signature: 5/3/216

39 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 12 Exterior Window Caulk (t AHERA) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Building COMMENTS: Inspector's Signature: 3/9/216

40 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Exterior Window Caulk (t AHERA) Throughout Building 471 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

41 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 13 Exterior Window Glaze (t AHERA) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Building COMMENTS: Inspector's Signature: 3/9/216

42 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Exterior Window Glaze (t AHERA) Throughout Building 471 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

43 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 14 Gypsum Board HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Second Floor Washrooms and Basement Storage 1 COMMENTS: Inspector's Signature: 3/9/216

44 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Gypsum Board Second Floor Washrooms and Basement Storage 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

45 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 15 Gypsum Board Joint Compound HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Second Floor Washrooms and Basement Storage 1 COMMENTS: Inspector's Signature: 3/9/216

46 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Gypsum Board Joint Compound Second Floor Washrooms and Basement Storage 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

47 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 16 Vinyl Wall Base HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room 38, 1st Floor Lounge, 2nd Floor Lunchroom 1 COMMENTS: Inspector's Signature: 3/9/216

48 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Vinyl Wall Base Room 38, 1st Floor Lounge, 2nd Floor Lunchroom 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

49 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 17 Vinyl Wall Base Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 38, 1st Floor Lounge, 2nd Floor Lunchroom 25 COMMENTS: Inspector's Signature: 3/9/216

50 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Vinyl Wall Base Mastic 38, 1st Floor Lounge, 2nd Floor Lunchroom 25 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

51 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 18 Glazed Block HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Basement Washrooms 15 COMMENTS: Inspector's Signature: 3/9/216

52 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Glazed Block Basement Washrooms 15 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

53 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 19 Glazed Block Mortar HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Basement Washrooms 5 COMMENTS: Inspector's Signature: 3/9/216

54 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Glazed Block Mortar Basement Washrooms 5 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

55 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 2 Plaster HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: 1896 Construction 15 COMMENTS: Inspector's Signature: 3/9/216

56 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Plaster 1896 Construction 15 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

57 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 2 Concrete Block HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Pump Room, Boy's and Girl's Play Rooms 15 COMMENTS: Inspector's Signature: 3/9/216

58 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Concrete Block Pump Room, Boy's and Girl's Play Rooms 15 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

59 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 21 Concrete Block Mortar HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Basement Washrooms 15 COMMENTS: Inspector's Signature: 3/9/216

60 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Concrete Block Mortar Basement Washrooms 15 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

61 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 22 Ceramic Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Girl's, Boy's, and Men's 2nd Floor Washrooms 3 COMMENTS: Inspector's Signature: 3/9/216

62 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Ceramic Tile Girl's, Boy's, and Men's 2nd Floor Washrooms 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

63 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 23 Ceramic Tile Grout HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Girl's, Boy's, and Men's 2nd Floor Washrooms 3 COMMENTS: Inspector's Signature: 3/9/216

64 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Ceramic Tile Grout Girl's, Boy's, and Men's 2nd Floor Washrooms 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

65 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 24 Brown Coat Plaster HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: N. Basement Foyer, Rooms 14, 22, 37, Office Lunchroom, Corridor in 1881 Construction 3 COMMENTS: Inspector's Signature: 3/9/216

66 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Brown Coat Plaster N. Basement Foyer, Rooms 14, 22, 37, Office Lunchroom, Corridor in 1881 Construction 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

67 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 25 Asphalt Flooring HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1st, 2nd, and 3rd Floor rth Stairs in 1881 Construction 23 COMMENTS: Inspector's Signature: 3/9/216

68 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Asphalt Flooring 1st, 2nd, and 3rd Floor rth Stairs in 1881 Construction 23 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

69 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 26 Interior & Exterior Brick 1881 HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Interior & Exterior 1881 Construction 7 COMMENTS: Inspector's Signature: 3/9/216

70 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Interior & Exterior Brick 1881 Interior & Exterior 1881 Construction 7 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

71 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 27 Interior and Exterior Brick Mortar 1881 HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Interior & Exterior 1881 Construction 7 COMMENTS: Inspector's Signature: 3/9/216

72 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Interior and Exterior Brick Mortar 1881 Interior & Exterior 1881 Construction 7 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

73 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 28 Browncoat Plaster HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: S Basement Foyer, Gym, 2nd Floor Stairwell and Corridor, Rooms 11, 16, 31 in 1896 Construction 3 COMMENTS: Inspector's Signature: 3/9/216

74 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Browncoat Plaster S Basement Foyer, Gym, 2nd Floor Stairwell and Corridor, Rooms 11, 16, 31 in 1896 Construction 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

75 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 29 Asphalt Flooring HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1st, 2nd, and 3rd Floors- South Stairs in 1896 Construction 1 COMMENTS: Inspector's Signature: 3/9/216

76 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Asphalt Flooring 1st, 2nd, and 3rd Floors- South Stairs in 1896 Construction 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

77 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 3 Interior & Exterior Brick 1896 HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Interior & Exterior of 1896 Construction 3 COMMENTS: Inspector's Signature: 3/9/216

78 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Interior & Exterior Brick 1896 Interior & Exterior of 1896 Construction 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

79 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 31 Interior & Exterior Brick Mortar 1896 HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Interior & Exterior of 1896 Construction 3 COMMENTS: Inspector's Signature: 3/9/216

80 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Interior & Exterior Brick Mortar 1896 Interior & Exterior of 1896 Construction 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

81 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 32 Incinerator Brick HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room 4 COMMENTS: Inspector's Signature: 3/9/216

82 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Incinerator Brick Boiler Room 4 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

83 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 33 Incinerator Door Insulation HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room 2 COMMENTS: Inspector's Signature: 3/9/216

84 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Incinerator Door Insulation Boiler Room 2 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

85 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 34 Refractory Cement in Doors HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler #s- 1, 2, and 3 3 COMMENTS: Inspector's Signature: 3/9/216

86 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Refractory Cement in Doors Boiler #s- 1, 2, and 3 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

87 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 35 Boiler Firebrick HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler #s- 1, 2, and 3 3 COMMENTS: Inspector's Signature: 3/9/216

88 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Boiler Firebrick Boiler #s- 1, 2, and 3 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

89 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 36 Roofing Material (t AHERA) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Roof COMMENTS: Inspector's Signature: 3/9/216

90 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Roofing Material (t AHERA) Roof 471 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

91 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 37 Green Carpet Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Office 15 COMMENTS: Inspector's Signature: 3/9/216

92 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Green Carpet Mastic Office 15 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

93 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 38 Gray Carpet Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Conference Room, Counselor Office, and Main Office 15 COMMENTS: Inspector's Signature: 3/9/216

94 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Gray Carpet Mastic Conference Room, Counselor Office, and Main Office 15 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

95 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 39 12"x12" Brown Floor Tile w/dk Brn & Wh Speckles HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room COMMENTS: Inspector's Signature: 3/9/216

96 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ "x12" Brown Floor Tile w/dk Brn & Wh Speckles Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

97 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 3A 12"x12" Red Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Rooms COMMENTS: Inspector's Signature: 3/9/216

98 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ A 12"x12" Red Floor Tile Rooms In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

99 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 3B 12"x12" White Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1st Floor Teachers Lounge 195 COMMENTS: Inspector's Signature: 3/9/216

100 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ B 12"x12" White Floor Tile 1st Floor Teachers Lounge 195 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

101 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 3C 12"x12" Beige Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Office, Room COMMENTS: Inspector's Signature: 3/9/216

102 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ C 12"x12" Beige Floor Tile Mastic Office, Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

103 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 3D 12"x12" Burnt-Orange Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room 25 Storage Room 55 COMMENTS: Inspector's Signature: 3/9/216

104 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ D 12"x12" Burnt-Orange Floor Tile 471 Room 25 Storage Room 55 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

105 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 4 9" x 9" Floor Tile-ABATED (before 1998) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Lunch Room- Abated Before 1998 COMMENTS: Inspector's Signature: 3/9/216

106 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ " x 9" Floor Tile-ABATED (before 1998) Lunch Room- Abated Before In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

107 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 4 12"x12" Brn Floor Tile w/dk Brn & Wh Spkles Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room 38 9 COMMENTS: Inspector's Signature: 3/9/216

108 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ "x12" Brn Floor Tile w/dk Brn & Wh Spkles Mastic Room 38 9 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

109 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 41 Insulation Under Shell of Incinerator-ABATED 21 HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room COMMENTS: Inspector's Signature: 3/9/216

110 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Insulation Under Shell of Incinerator-ABATED 21 Boiler Room 471 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

111 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 42 12"x12" Light Brown Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room 18 Washroom, 2nd Floor Teacher's Lounge Washroom, 2 COMMENTS: Inspector's Signature: 3/9/216

112 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ "x12" Light Brown Floor Tile Room 18 Washroom, 2nd Floor Teacher's Lounge Washroom, 2 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

113 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 43 12"x12" Light Brown Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room 18 Washroom, 2nd Floor Teacher's Lounge Washroom 2 COMMENTS: Inspector's Signature: 3/9/216

114 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ "x12" Light Brown Floor Tile Mastic Room 18 Washroom, 2nd Floor Teacher's Lounge Washroom 2 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

115 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 44 Gray Carpet Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Library, COMMENTS: Inspector's Signature: 3/9/216

116 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Gray Carpet Mastic Library, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

117 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 45 12X12 Lt. Brown w/ White Floor Tile mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room COMMENTS: Inspector's Signature: 3/9/216

118 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ X12 Lt. Brown w/ White Floor Tile mastic Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

119 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 46 12"x12"cream floortile w/brown&green specks mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room COMMENTS: Inspector's Signature: 3/9/216

120 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ "x12"cream floortile w/brown&green specks mastic Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

121 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 47 4" Beige vinyl baseboard HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room 18, washroom 18 COMMENTS: Inspector's Signature: 3/9/216

122 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ " Beige vinyl baseboard Room 18, washroom 18 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

123 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 48 4" Beige vinyl caseboard adhesive HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room 18, washroom 18 LF LF COMMENTS: Inspector's Signature: 3/9/216

124 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ " Beige vinyl caseboard adhesive Room 18, washroom 18 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

125 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 49 4" Black vinyl baseboard HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: rm 18, lunchroom, 2nd fl teacher's lounge and washroom 162 LF LF COMMENTS: Inspector's Signature: 3/9/216

126 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ " Black vinyl baseboard rm 18, lunchroom, 2nd fl teacher's lounge and washroom 162 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

127 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 5 2'x4' Ceiling Panels HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Room 11 9 COMMENTS: Inspector's Signature: 3/9/216

128 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ 'x4' Ceiling Panels Room 11 9 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

129 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 5 4" Black vinyl baseboard HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: rm 18, lunchroom, 2nd fl teacher's lounge and washroom 162 LF LF COMMENTS: Inspector's Signature: 3/9/216

130 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ " Black vinyl baseboard rm 18, lunchroom, 2nd fl teacher's lounge and washroom 162 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

131 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 51 Light Beige ceramic wall tile grout HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Rm 18, washroom 68 COMMENTS: Inspector's Signature: 3/9/216

132 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Light Beige ceramic wall tile grout Rm 18, washroom 68 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

133 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 52 Light Beige ceramic wall tile adhesive HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room 18, washroom 68 COMMENTS: Inspector's Signature: 3/9/216

134 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Light Beige ceramic wall tile adhesive Room 18, washroom 68 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

135 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 53 Sink under coating HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room 18 3 COMMENTS: Inspector's Signature: 3/9/216

136 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Sink under coating Room 18 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

137 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 54 12"x12" Brown speckled floor tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room 14, washroom, 2nd floor teacher's lounge 143 COMMENTS: Inspector's Signature: 3/9/216

138 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ "x12" Brown speckled floor tile Room 14, washroom, 2nd floor teacher's lounge 143 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

139 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 55 12'x12' brown specked floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room 14, washroom, 2nd floor teacher's lounge 143 COMMENTS: Inspector's Signature: 3/9/216

140 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ 'x12' brown specked floor tile mastic Room 14, washroom, 2nd floor teacher's lounge 143 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

141 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 56 12"x12" green speckled floor tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Lunchroom COMMENTS: Inspector's Signature: 3/9/216

142 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ "x12" green speckled floor tile Lunchroom In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

143 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 57 12"x12" green specked floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Lunchroom 92 COMMENTS: Inspector's Signature: 3/9/216

144 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ "x12" green specked floor tile mastic Lunchroom 92 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

145 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 58 Blue Carpet Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Rooms 31 & 35 COMMENTS: t observed 216 Inspector's Signature: 3/9/216

146 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Blue Carpet Mastic Rooms 31 & In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Material t Observed in 216 Management Planner's Signature: 5/3/216

147 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 59 12X12 Lt. Brown w/white Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 2nd Floor Teacher's Lounge, Washroom, Lunchroom Pantry 26 COMMENTS: Inspector's Signature: 3/9/216

148 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ X12 Lt. Brown w/white Floor Tile 2nd Floor Teacher's Lounge, Washroom, Lunchroom Pantry 26 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

149 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 6 Burlap Wall Covering HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Facility COMMENTS: t observed 216 Inspector's Signature: 3/9/216

150 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Burlap Wall Covering Throughout Facility 471 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Material t Observed in 216 Management Planner's Signature: 5/3/216

151 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 6 12X12 Lt. Brown w/ White Floor Tile mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 2nd Floor Teacher's Lounge, Washroom, Lunchroom Pantry 26 COMMENTS: Inspector's Signature: 3/9/216

152 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ X12 Lt. Brown w/ White Floor Tile mastic 2nd Floor Teacher's Lounge, Washroom, Lunchroom Pantry 26 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

153 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 61 12X12 Lt. Green w/dark Green Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 2nd Floor Lunchroom 92 COMMENTS: Inspector's Signature: 3/9/216

154 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ X12 Lt. Green w/dark Green Floor Tile 2nd Floor Lunchroom 92 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

155 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 62 12X12 Lt. Green w/ Dark Green Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 2nd Floor Lunchroom 92 COMMENTS: Inspector's Signature: 3/9/216

156 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ X12 Lt. Green w/ Dark Green Floor Tile Mastic 2nd Floor Lunchroom 92 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

157 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 63 Blackboards HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Classrooms 15 COMMENTS: Inspector's Signature: 3/9/216

158 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Blackboards Classrooms 15 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

159 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 64 Blackboard Adhesive HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Classrooms 15 COMMENTS: Inspector's Signature: 3/9/216

160 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Blackboard Adhesive Classrooms 15 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

161 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 65 12" X 12" Dull Brown VFT HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1st Floor Corridor 25 COMMENTS: Inspector's Signature: 3/9/216

162 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ " X 12" Dull Brown VFT 1st Floor Corridor 25 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

163 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 66 12" X 12" Dull Brown VFT Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1st Floor Corridor 25 COMMENTS: Inspector's Signature: 3/9/216

164 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ " X 12" Dull Brown VFT Mastic 1st Floor Corridor 25 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

165 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 7 Vibration Collar HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Lunchroom 1 COMMENTS: Inspector's Signature: 3/9/216

166 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ Vibration Collar Lunchroom 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

167 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 8A 12" x 12" Red Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Rooms COMMENTS: Inspector's Signature: 3/9/216

168 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ A 12" x 12" Red Floor Tile Mastic Rooms In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

169 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 8B 12" x 12" White Floor Tile and Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1st Floor Teacher's Lounge 195 COMMENTS: Inspector's Signature: 3/9/216

170 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ B 12" x 12" White Floor Tile and Mastic 1st Floor Teacher's Lounge 195 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

171 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 8C 12" x 12" Beige Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Office, Room 13, 1st Floor Corridor, 34 Wardrobe 15 COMMENTS: Inspector's Signature: 3/9/216

172 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ C 12" x 12" Beige Floor Tile Mastic Office, Room 13, 1st Floor Corridor, 34 Wardrobe 15 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

173 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 8D 12" x 12" Burnt-Orange Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 25 Wardrobe 75 COMMENTS: Inspector's Signature: 3/9/216

174 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ D 12" x 12" Burnt-Orange Floor Tile Mastic 25 Wardrobe 75 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

175 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 9 9" x 9" Floor Tile Mastic- ABATED (before 1998) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Lunch Room- Abated Before 1998 COMMENTS: Inspector's Signature: 3/9/216

176 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ " x 9" Floor Tile Mastic- ABATED (before 1998) Lunch Room- Abated Before In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

177 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION A Fiberglass Pipe Insulation HISTORICAL AHERA DAMAGE CATEGORY 7 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Facility 55 LF LF COMMENTS: Inspector's Signature: 3/9/216

178 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ A Fiberglass Pipe Insulation Throughout Facility 55 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

179 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION B/N Hard Joint Compound on Fiberglass Insulation Lines HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Rms 18,11,2nd fl washrooms;basement playrms,boys&girls washrms, water sprinkler rm, conference rm 12 LF LF COMMENTS: Inspector's Signature: 3/9/216

180 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ B/N Hard Joint Compound on Fiberglass Insulation Lines Rms 18,11,2nd fl washrooms;basement playrms,boys&girls washrms, water sprinkler rm, conference rm 12 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

181 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION C/O Cardboard Pipe Insulation HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Main Building: basemt, common aream janitor's storage room 2 LF LF COMMENTS: Inspector's Signature: 3/9/216

182 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ C/O Cardboard Pipe Insulation Main Building: basemt, common aream janitor's storage room 2 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

183 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION D/P Hard Joint Compound on Cardboard Pipe Insulation HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Main Building: Basement, common area, janitor's storage room 1 LF LF COMMENTS: Inspector's Signature: 3/9/216

184 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ D/P Hard Joint Compound on Cardboard Pipe Insulation Main Building: Basement, common area, janitor's storage room 1 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

185 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION E/Q Aircell Pipe Insulation HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: South Foyer 22 LF LF COMMENTS: Inspector's Signature: 3/9/216

186 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ E/Q Aircell Pipe Insulation South Foyer 22 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

187 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION F/R Hard Joint Compound on Aircell Insulation HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: South Foyer 4 LF LF COMMENTS: Inspector's Signature: 3/9/216

188 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ F/R Hard Joint Compound on Aircell Insulation South Foyer 4 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

189 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION G Mag Block Insulation on Pipes-ABATED 21 HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room COMMENTS: Inspector's Signature: 3/9/216

190 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ G Mag Block Insulation on Pipes-ABATED 21 Boiler Room 471 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

191 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION H Hard Joint Compound on Mag Block Insulation-ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room COMMENTS: Inspector's Signature: 3/9/216

192 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ H Hard Joint Compound on Mag Block Insulation-ABATED Boiler Room 471 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

193 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION I Mag Block Insulation on Water Tank HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room COMMENTS: t observed 216 Inspector's Signature: 3/9/216

194 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ I Mag Block Insulation on Water Tank Boiler Room 471 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Material t Observed in 216 Management Planner's Signature: 5/3/216

195 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION J Tank Insulation (Fiberglass) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: t Tested FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room COMMENTS: Inspector's Signature: 3/9/216

196 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ J Tank Insulation (Fiberglass) Boiler Room 471 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

197 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION K/S Aircell Sheet Insulation on Ducts HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: rth and South Basement Foyers and East Girl's Playroom COMMENTS: t observed 216 Inspector's Signature: 3/9/216

198 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ K/S Aircell Sheet Insulation on Ducts rth and South Basement Foyers and East Girl's Playroom 471 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Material t Observed in 216 Management Planner's Signature: 5/3/216

199 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION L Boiler Gaskets-ABATED (before 1998) HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Abated Before 1998 COMMENTS: Inspector's Signature: 3/9/216

200 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ L Boiler Gaskets-ABATED (before 1998) Abated Before In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

201 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION M Hard Joint Compound and Horsehair Pipe Insulation HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Water Main Piping- Abated before 1998 COMMENTS: Inspector's Signature: 3/9/216

202 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ M Hard Joint Compound and Horsehair Pipe Insulation Water Main Piping- Abated before In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

203 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 471 AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION PA Incinerator Brick HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room 2 COMMENTS: Inspector's Signature: 3/9/216

204 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ PA Incinerator Brick Boiler Room 2 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

205 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Allizon Brooks INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION T Mag Block Insulation on Boilers-ABATED 21 HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room COMMENTS: Inspector's Signature: 3/9/216

206 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 5/3/ T Mag Block Insulation on Boilers-ABATED 21 Boiler Room 471 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 5/3/216

207 216 AHERA REINSPECTION

208 APPENDIX B Inspector and Management Planner Licenses

209

210

211