6 Prior Airport Noise Retrofit

7 Windows with Storms

8 Mechanicals

9 Airtightness Initial Test 8.5 ACH50 [2,100 CFM50]

10 Pre-Existing Conditions

11

12

13

14

15

16 So, Where Are We? Structure Weather Barrier? Insulation Airtightness Moisture Management Ventilation/ Air Quality Comfort Daylight Durability (30 years?) Design (Sign of the Times)

17 Where do we go?

18 what we need Image Source: Wikipedia

19 + 3 Bedrooms + 2 Baths + Mudroom Better kitchen Better living areas Homeschool room Safe stairs Weather-tight envelope Durable structure Healthy interiors Comfort & daylight Low operating cost Energy performance The List

20

21 Passive House Institute Dr. Wolfgang Feist Rheinstraße 44/ Darmstadt Germany EnerPHit and EnerPHit +i Certification Criteria for Energy Retrofits with Passive House Components If an energy retrofit of an existing building meets Passive House criteria (for new builds), it, too, can be certified as a Certified Passive House. It is, however, often difficult to feasibly achieve the Passive House Standard in older buildings for a variety of reasons. Passive House technology for relevant building components in such buildings does, nevertheless, lead to considerable improvements with respect to thermal comfort, structural longevity, cost-effectiveness over the building lifecycle and energy use. Buildings that have been retrofitted with Passive House components and, to a great extent, with exterior wall insulation can achieve EnerPHit certification as evidence of both building quality and fulfilment of specific energy values. The EnerPHit +i designation is applied if more than 25 % of the opaque exterior wall surface has interior insulation.

22 How do we get there?

23 Holistic Energy Reduction Retrofit Weatherization

24 Sports car?

25 The Plan for Success Set goals for performance and design Overlay architectural program Make the home safe for people (code compliance) Control temperature, air, and moisture Add ventilation Make the envelope air- and weather-tight Add continuous insulation to meet the energy goals Assess moisture transfer through shell Implement robust climate zone-appropriate assemblies Reduce energy demand by 2/3 and air-leakage 10X to meet Passive House retrofit standard (EnerPHit)

26 The Concept

27 Basement PERIMETER OF STRUCTURE ABOVE UNEXCAVATED UP DEMO STAIR BATH - DEMO & SALVAGE FIXTURES DEMO FLOOR SLAB & EXCAVATE FOR NEW ASSEMBLY CHIMNEY ABOVE DEMO AND REPLACE LOAD BEARING WALL & FOUNDATION TEMP. BRACE FLOOR 16" O.C. LAUNDRY ROOM DEMO GLASS BLOCK & FILL TO MATCH FND. WALL 16" O.C. WORKOUT ROOM REPLACE GLASS BLOCK W/ EGRESS WNDWS

28 Basement 3 1. Homeschool Room 2. Mechanical 3. Unexcavated UP 1 2 3

29 Basement PERIMETER OF STRUCTURE ABOVE UNEXCAVATED 1. Retrofit 2. Reconstruction 3. Addition UP UP DEMO STAIR BATH - DEMO & SALVAGE FIXTURES DEMO FLOOR SLAB & EXCAVATE FOR NEW ASSEMBLY CHIMNEY ABOVE DEMO AND REPLACE LOAD BEARING WALL & FOUNDATION TEMP. BRACE FLOOR 16" O.C. LAUNDRY ROOM DEMO GLASS BLOCK & FILL TO MATCH FND. WALL 16" O.C. WORKOUT ROOM REPLACE GLASS BLOCK W/ EGRESS WNDWS

30 First Floor ENTRY VEST. SOFFIT DEMO FLOOR SYSTEM ABOVE SLAB REMOVE AND SALVAGE DOORS AS INDICATED 2x V.I.F. KID'S ROOM DEMO FLOOR SYSTEM ABOVE SLAB DN DN DEMO STAIRS, UP AND DOWN UP DN DN REMOVE AND SALVAGE WNDWS, TYP. DEMO LANDING BRICK CHIMNEY, SEAL AIRTIGHT KITCHEN - DEMO ALL BUILT-INS - DEMO & SALVAGE EQUIPMENT LIVING ROOM DEMO EXIST. SOFFIT DINING ROOM 2x10s V.I.F. 2x10s V.I.F.

31 First Floor D W 1. Entry 2. Powder room 3. Mud room/ laundry 4. Living room 5. Kitchen 6. Dining area 7. Family area 8. Covered entry 9. Rear entry 10.Patio REF

32 First Floor ENTRY VEST. DEMO FLOOR SYSTEM ABOVE SLAB REMOVE AND SALVAGE DOORS AS INDICATED 2x V.I.F. KID'S ROOM SOFFIT DEMO FLOOR SYSTEM ABOVE SLAB 1. Retrofit 2. Reconstruction 3. Addition D W DN DN DEMO STAIRS, UP AND DOWN UP DN DN REMOVE AND SALVAGE WNDWS, TYP. DEMO LANDING BRICK CHIMNEY, SEAL AIRTIGHT KITCHEN - DEMO ALL BUILT-INS - DEMO & SALVAGE EQUIPMENT REF LIVING ROOM DEMO EXIST. SOFFIT DINING ROOM 2x10s V.I.F. 2x10s V.I.F.

33 Second Floor DEMO ROOF SYSTEM ABOVE ENTRY OFFICE DEMO STAIR & LANDINGS DN DN DEMO BALCONY BATH - DEMO & SALVAGE FIXTURES DN DN BRICK CHIMNEY MASTER BEDROOM REMOVE AND SALVAGE DOORS AS INDICATED BEDROOM REMOVE AND SALVAGE WNDWS, TYP.

34 Second Floor 1 1. Bedroom 1 2. Bedroom 2 3. Master Bedroom 4. Master Closet. 5. Master Bath 6. Bedroom 3 7. Kid s Bath 8. Toilet Room

35 Second Floor DEMO ROOF SYSTEM ABOVE ENTRY OFFICE 1. Retrofit 2. Reconstruction 3. Addition DEMO STAIR & LANDINGS DN DN DEMO BALCONY BATH - DEMO & SALVAGE FIXTURES DN DN BRICK CHIMNEY MASTER BEDROOM REMOVE AND SALVAGE DOORS AS INDICATED BEDROOM REMOVE AND SALVAGE WNDWS, TYP.

36 PASSIVE SOLAR HEAT GAINS (WINTER) SOLAR SHADING (SUMMER) HEAT-RECOVERY VENTILATION & SMALL HEATER AIR-INTAKE EXHAUST LARGE "ACTIVE" MECHANICAL SYSTEM - FURNACE OR BOILER EXISTING CONDITION - INSUFFICIENT INSULATION - LOW-PERFORMANCE WINDOWS AND DOORS - AIR LEAKAGE - NO VENTILATION EXTRACT AIR SUPPLY AIR INTERNAL HEAT GAINS - PEOPLE - EQUIPMT. RETROFIT CONDITION - WATER PROOFING AND MANAGEMENT - ADDED INSULATION - MITIGATION OF THERMAL BRIDGES EXISTING CONDITION - NO WATER PROOFING AND MANAGEMENT - NO INSULATION AT AND BELOW GRADE - THERMAL BRIDGES TYPICAL EXISTING BUILDING (BEFORE) DEEP ENERGY REDUCTION RETROFIT (AFTER) OPTIONAL SOLAR THERMAL OR SOLAR PHOTOVOLTAIC RETROFIT CONDITION - ADVANCED WINDOWS AND DOORS - AIR-TIGHTNESS LAYER - CONTINUOUS INSULATION PACKAGE Retrofit Concept

37 PASSIVE SOLAR HEAT GAINS (WINTER) SOLAR SHADING (SUMMER) HEAT-RECOVERY VENTILATION & SMALL HEATER AIR-INTAKE EXHAUST LARGE "ACTIVE" MECHANICAL SYSTEM - FURNACE OR BOILER EXISTING CONDITION - INSUFFICIENT INSULATION - LOW-PERFORMANCE WINDOWS AND DOORS - AIR LEAKAGE - NO VENTILATION EXTRACT AIR SUPPLY AIR INTERNAL HEAT GAINS - PEOPLE - EQUIPMT. RETROFIT CONDITION - WATER PROOFING AND MANAGEMENT - ADDED INSULATION - MITIGATION OF THERMAL BRIDGES EXISTING CONDITION - NO WATER PROOFING AND MANAGEMENT - NO INSULATION AT AND BELOW GRADE - THERMAL BRIDGES TYPICAL EXISTING BUILDING (BEFORE) DEEP ENERGY REDUCTION RETROFIT (AFTER) OPTIONAL SOLAR THERMAL OR SOLAR PHOTOVOLTAIC RETROFIT CONDITION - ADVANCED WINDOWS AND DOORS - AIR-TIGHTNESS LAYER - CONTINUOUS INSULATION PACKAGE Retrofit Concept

38 CLEAR TRUSS OUTSIDE OF STUDWALL TYPICAL VENTED COLD ROOF ASSEMBLY (R-77) Assemblies Walls a/ grade: R-10 to R-44 Walls b/ grade: R-1 to R-30+ Roof: R-20 to R-77 Slab: R-1 to R-25 MAINTAIN CONT. AIR BARRIER W/ SIGA BRAND TAPE AT SHEATHING TO TOP PLATE 5 1/2" EXIST. ROOF FRAMING TO BE DEMO'D MAINTAIN CONT. AIR BARRIER W/ SIGA BRAND TAPE AT SHEATHING TO TOP PLATE 20" 10 3/4" 9 1/4" 7" NOTE: REMOVE EXISTING ROOF STRUCTURE, BUILD PERIMETER KNEE WALL AND SET NEW TRUSSED HIP ROOF PER STRUCTURAL DRAWINGS EXTERIOR STANDING SEAM METAL 16" O.C. GRACE ICE & WATER SHIELD HT ROOFING UNDERLAYMENT, WEATHER RESISTANT BARRIER 3/4" PLYWOOD STRUCTURAL SHEATHING ATTIC AIRSPACE, OR VENT CHUTES STRUC. 24" O.C. WITH MIN. 20" CELLULOSE INSULATION 5/8" OSB SHEATHING, SEAL JOINTS AIRTIGHT VAPOR BARRIER, AIRTIGHTNESS LAYER 6" INSTALLATION CAVITY WITH SUSPENSION SYSTEM 5/8" WALLBOARD CEILING INTERIOR CONT. VENTING 24" 2 10 SNOW GUARDS PER MANUF. VENT CHUTES T.O. KNEEWALL +1'-8" GUTTER RETROFIT FRAMING EXIST. WALL ± 9 1/4" 1 1/2" T.O. ADDITION R.O.s +0'-0 1/2" T.O. EXISTING WALL 0'-0" T.O. EXISTING R.O. -0'-3" TYPICAL ABOVE GRADE WALL RETROFIT (R-44) INTERIOR EXISTING WALLBOARD & FINISH EXISTING FRAMING WITH 3-1/2" DENSE PACK INSULATION, 3.5 LBS/ CU FT EXISTING SHEATHING 5/8" OSB SHEATHING: SEAL JOINTS AIRTIGHT VAPOR BARRIER, AIRTIGHTNESS LAYER 9-1/2" I-JOIST FURR 24 O.C. WITH DENSE-PACK CELLULOSE INSULATION, 3.5 LBS/ CU FT 1/2" BUILDRITE SHEATHING WINDWASH BARRIER WEATHER RESISTANT BARRIER 3/4" VENT SPACE (1X FRAMING) CEMENT BOARD LAP SIDING EXTERIOR CONTINUOUS 5/8" SHEATHING CONNECTS EXISTING AND NEW CONSTRUCTION VAPOR BARRIER & AIRTIGHTNESS LAYER WEATHER RESISTANT BARRIER (WRB) AIRTIGHTNESS LAYER & VAPOR RETARDER (AB & VR) EXIST. WALL RETROFIT WALL TYPICAL ABOVE GRADE RETROFIT (R-44) ASSUMED EXISTING WALL ASSEMBLY INTERIOR PLASTER WALLBOARD 2X4 FRAMING, DENSE-PACK WITH CELLULOSE INSULATION (ADDED) 3.5 LBS/ CU FT EXTERIOR SHEATHING RETROFIT WALL ASSEMBLY 5/8" OSB SHEATHING: SEAL JOINTS AIRTIGHT VAPOR BARRIER, AIRTIGHTNESS LAYER 9-1/2" I-JOIST FURR EXIST. STUDS WITH DENSE-PACK CELLULOSE INSULATION, 3.5 LBS/ CU FT 1/2" FIBERBOARD SHEATHING (BILDRITE OR SIM.) WINDWASH BARRIER WEATHER RESISTANT BARRIER 3/4" VENT SPACE (1X FRAMING) CEMENT BOARD LAP SIDING EXTERIOR 7-1/2" TRIM INSECT SCREEN BACKFILL TYPICAL SLAB RETROFIT (R-25) NOTE: REMOVE EXISTING SLAB & EXCAVATE TO ACCOMODATE RETROFIT ASSEMBLY INTERIOR 4" CONCRETE SLAB WITH RADIANT IN-FLOOR HEATING SYSTEM 6-MIL POLY VAPOR BARRIER & AIRTIGHTNESS LAYER SEAL AIRTIGHT AT ALL JOINTS AND PROTRUSIONS 6" BELOW GRADE EPS INSULATION BOARD, COMPRESSIVE STRENGTH PER SE MIN. 2" GRAVEL EXTERIOR TYPICAL BELOW GRADE RETROFIT (R-40) INTERIOR 5/8" WALL BOARD 3-1/2" STEEL 24" O.C. WITH MIN. 2" CLOSED CELL SPRAY FOAM INSULATION VAPOR BARRIER & AIRTIGHTNESS LAYER EXIST. CONCRETE WALL (2) 3" EXTERIOR GRADE EPS INSULATION (EIFS) STO FLEXYL (EIFS) WEATHER RESISTANT BARRIER & FINISH (TIE TO FACE OF FOOTING) EXTERIOR

39 4" DC260 WEATHER RESISTANT BARRIER (WRB) AIRTIGHTNESS LAYER & VAPOR RETARDER (AB & VR) Details 4" 5 1/2" DRIP EDGE 5-1/2" TRIM 7-1/4" TRIM 3-1/2" TRIM EPS WEDGE EPS INFILL L-SECTION END CAP COMPRESSION TAPE OPT. 2X4 8 7/8" (225 MM) AIRTIGHT CONNECTION AIRTIGHT CONNECTION ROUGH OPENING ROUGH OPENING REFERENCE DETAILS: - STO W STO W U-SECTION END CAP STO DRIP EDGE STO FINISH PROFILE 8 7/8" (225 MM) WINDOW R.O. 1 3/4" 3/4" EXIST. R.O. WINDOW R.O. BLOCK R.O. 1 TYPICAL EXTERIOR WINDOW ELEVATION SCALE: 3" = 1'-0" 2 TYPICAL WINDOW HEAD & SILL SCALE: 3" = 1'-0" 5 TYPICAL WINDOW HEAD & SILL, BASEMENT SCALE: 3" = 1'-0" EXIST. ROUGH OPENING INTERIOR 1 3/4" RETROFIT ROUGH OPENING ROUGH OPENING INTERIOR WOOD SILL INT. JAMB EXTENSION AIRTIGHT CONNECTION EXT. JAMB 7" (180 MM) ROUGH OPENING TERRACE DOOR SILL COMPRESSION TAPE L-SECTION END CAP 1" POLYISOCYANURATE FOAM BOARD 3/4" PLYWOOD BUCK AIR TIGHT CONNECTION DOUBLE SIDED BUTYL TAPE PER MANF. 4" 5 1/2" WINDOW SET POINT PLYWOOD STRIP EPS FOAM STRIP FILL VOID WITH EPS FOAM OPT. 2X4 L-SECTION SILL END CAP EXTERIOR ALUMINUM SILL CRIPPLE WALL WITH DENSEGLASS GOLD SHEATHING EXT. STEP MIN. 1-3/8" STO FINISH PROFILE WINDOW SET POINT STO GUARD WET-FLASHING SYSTEM REFERENCE DETAILS: - STO W STO W 501 NOTE: VERIFY DIMENSIONS WITH ACTUAL PRODUCT EXTERIOR 3 TYPICAL WINDOW JAMB SCALE: 3" = 1'-0" 4 TYP. TERRACE DOOR SILL SCALE: 3" = 1'-0" 6 SCALE: 3" = 1'-0" TYPICAL WINDOW JAMB, BASEMENT

40 MEP Systems Boiler (existing, replaced) In-floor heat (existing, reused and expanded) Ventilation system (new) Domestic hot water system (new plumbing)

41 Construction Project

42

43