1 1 of Construction Manager Services EA CMH Roofing Restoration EA CMH Wall Renovations EA Children's Village Kitchen Renovations EA Highland Oaks Centralized Gravel Parking Lot EA Orion Oaks Dog Park Pavilion EA Addison Oaks Conference Center Interior Renovations AMT Addison Oaks Conference Center - Roofing AMT Red Oaks Connector Trail AMT Oakland County Jail Sally Port Concrete Repair Project AMT Oakland Sheriff's Office Forensic Science Laboratory Renovation AMT Oakland County Courthouse Steam Tunnel Repair Project AMT Addison Oaks Campground Pavilion Project AMT Oakland County Sheriff's Portable Incinerator Project AMT Addison Oaks Campground Pull Through Site and Concrete Pads Project AMT Courthouse South Pedestrian Plaza Project AMT Architectural Improvements to the Addison Oaks Conference Center AMT Concessions Improvements Project AMT Information Technology Chiller Replacement AMT Security Enhancements - Priority #1 For $772, AMT 1.00

2 2 of House Demo. Demolition of two (2) structures. $77,454.00/AMT AMT Priority II Security Fence/gates Building 41 W NTE: $448, AMT Priority II Security Fence/gates Building E NTE: $1,296, AMT Priority II Security Fence/gates Building 49 W NTE: $53, AMT Priority II Security Fence & gates project. NTE $1,431, AMT E to 38 E Steam Tunnel Restoration Not to Exceed $2,337, AMT Jail Floor project Not to Exceed $823, AMT Motorized Gate Replacement NTE $122, AMT Courthouse North Side Gate Project NTE $1,058, AMT Novi Security Gate Project NTE $254, AMT Treasurer's Office Demolition projects NTE $118, AMT Security Enhancements Novi Court AMT Pike Street $38, AMT Sally Port coating $13, AMT Steam $496, AMT Troy $802, AMT Power $550, AMT Rochester Court Security NTE $667, AMT /05/03 CJB Contract Finalized 2013/08/06 cmc CO 01 Add the following projects to the contract as described below CMH Roofing Restoration $316,811.00

3 3 of 12 CMH Wall Renovations $499, Children's Village Kitchen Renovations $444, Add $1,261, to the contract Not to Exceed (NTE) amount. The contract NTE will change from $100, to $1,361, /08/07 CLA CO 02 Added $135, to the contract Not to Exceed (NTE) amount. The contract NTE changed from $1,361, to $1,496, Added the following item to the contract as described. SCOPE OF SERVICES BASE BID #1 Highland Oaks Centralized Gravel Parking Lot Includes all but not limited to the construction of a new centralized gravel parking lot at Highland Oaks County Park, including site grading, asphalt paving, site grading, aggregate surfacing, installation of fencing and gates, tree/brush removal, permitting, testing, signage and site restoration. Lump/Unit Base Sum $135, TOTAL AMOUNT - $135, /08/09 cmc CO 03 Add $227, to the contract Not to Exceed (NTE) amount. The contract NTE will change from $1,496, to $1,723, Add the following to the contract as described below: BASE BID #1 Orion Oaks Dog Park Pavilion Includes all, but not limited to materials, labor, permit, overhead and profit for the modifications to the site grading, drainage, sidewalks, and all architectural, mechanical, and electrical work of structure as shown in the construction documents that have been made a part of this proposal. Bid shall also include all, but not limited to materials, labor, permit overhead and profit for an inclusive phasing plan that keeps the park fully operational during construction to be developed and implemented by selected vendor. TOTAL CHANGE ORDER AMOUNT: $227, /09/04 AEC CO 04 Extend contract expiration date from 11/30/2013 to 11/30/ /11/22 AEC CO 05 Add the following contract scope of work as described below:

4 4 of 12 BASE BID #1 Addison Oaks Conference Center Interior Renovations o Includes but not limited to interior renovations at the ballroom and main floor of the Addison Oaks Conference Center. Scope includes painting ceiling and walls, wall covering, carpeting, new wood dance floor, refinishing wood flooring, new drapes and structural improvements. Included are general conditions, construction manager fee, subcontractor trades work, testing, permits, site management costs, allowances and contingency for unforeseen conditions. o Lump Base Sum $340, ALTERNATE 1 Garden Room o Includes but not limited to interior renovations at the Garden Room of the Addison Oaks Conference Center. Scope includes painting ceiling and walls, wall covering, carpeting and flooring. Included are subcontractor trades work, testing, permits, site management costs, allowances and contingency for unforeseen conditions. o Lump/Unit Base Sum $24, ALTERNATE 3 Light Fixtures o Includes but not limited to light fixtures at the Addison Oaks Conference Center. Scope includes but is not limited to removal and replacement chandeliers and sconces throughout the building. Included are subcontractor trades work, testing, permits, site management costs, allowances and contingency for unforeseen conditions. o Lump/Unit Base Sum $73, ALTERNATE 5 Upstairs o Includes but not limited to upstairs renovations at the Addison Oaks Conference Center. Scope includes painting ceiling and walls, wall covering, carpeting and flooring. Included are subcontractor trades work, testing, permits, site management costs, allowances and contingency for unforeseen conditions. o Lump/Unit Base Sum $44, ALTERNATE 6 Toilet Rooms o Includes but not limited to restroom renovations at the Addison Oaks Conference Center. Scope includes painting ceiling and walls, wall covering, carpeting and flooring. Included are subcontractor trades work, testing, permits, site management costs, allowances and contingency for unforeseen conditions. o Lump/Unit Base Sum $8, ALTERNATE 6 Re-finish Wood Base o Includes but not limited to refinishing the wood base at the Addison Oaks Conference Center. Included are subcontractor trades work, testing, permits, site management costs, allowances and contingency for unforeseen conditions. o Lump/Unit Base Sum $2, ALLOWANCE A Furniture and Artwork o Includes but not limited to artwork and furniture procurement for the Addison Oaks Conference Center per provided quantities. o Allowance Sum $177, TOTAL AMOUNT $672, Add $672, to the contract Not to Exceed amount. The Contract NTE will change from $1,723, to $2,396, /12/18 AEC CO 06 For the Highland Oaks Centralized Gravel Parking Lot Project: Add $34, to the contract Not to Exceed amount. The Contract NTE will change from $2,396, to $2,430, /02/03 cmc CO 07 Add the following to the contract scope of work:

5 5 of 12 BASE BID #1 Addison Oaks Conference Center Estate House Roofing o Includes but not limited to removal and replacement of the roofing on the original Buhl estate house. Scope includes coordination of removal of hazardous materials containing roofing and underlayment, and installation of new roofing materials, gutters, downspouts and de-icing cables. Included are general conditions, construction manager fee, subcontractor trades work, testing, permits, site management costs, allowances and contingency for unforeseen conditions. o Lump Base Sum $471, BASE BID #2 Addison Oaks Conference Center Banquet Center Addition Roofing o Includes but not limited to removal and replacement of the roofing on the banquet center addition. Scope includes removal of existing roofing and underlayment, and installation of new roofing materials, gutters and downspouts. Included are general conditions, construction manager fee, subcontractor trades work, testing, permits, site management costs, allowances and contingency for unforeseen conditions. o Lump Base Sum $226, ALTERNATE 1 Credit for Tandem Construction o Includes a credit to construct both base bids at the same time. o Lump/Unit Base Sum ($20,567.00) ALTERNATE 2 Lightning Protection o Includes but not limited to installation of a lightning protection system on the original Buhl estate house at the Addison Oaks Conference Center. Scope includes but is not limited installation of a lightning protection system. Included are subcontractor trades work, testing, permits, site management costs, allowances and contingency for unforeseen conditions. o Lump/Unit Base Sum $40, TOTAL AMOUNT $717, Add $717, to the contract Not to Exceed amount. The Contract NTE will change from $2,430, to $3,148, /03/10 AEC CO 08 Add $359, to the contract Not to Exceed amount. The Contract NTE will change from $3,148, to $3,508, BASE BID #1 Red Oaks Connector Trail Includes all but not limited to the installation of new 8 W asphalt pathway connecting the Red Oaks Waterpark and Red Oaks Dog Park, including earthwork/grading per proposed site plan, new asphalt pathway, fencing, retaining wall, tree removal and relocation, landscaping, construction staking, soil erosion silt fencing, and site restoration. Lump/Unit Base Sum $359, TOTAL AMOUNT - $359, /03/26 AEC CO 09 Oakland County Jail Sally Port Concrete Repair $142, Add $142, to the contract Not to Exceed amount. The Contract NTE will change from $3,508, to $3,650,

6 6 of /05/05 AEC CO 10 Add $746, to the contract Not to Exceed amount. The Contract NTE will change from $3,650, to $4,397, Oakland Sheriff's Office Forensic Science Laboratory $746, /06/26 AEC CO 11 Add $947, to the contract Not to Exceed amount. The Contract NTE will change from $4,397, to $5,344, Oakland County Courthouse Steam Tunnel Repair $947, /07/21 AEC CO 12 Add $376, to the contract Not to Exceed amount. The Contract NTE will change from $5,344, to $5,720, BASE BID #1 Addison Oaks Campground Pavilion Includes but not limited to the construction of a campground recreation pavilion at Addison Oaks County Park. Scope includes paved site access and accessible parking, covered pavilion and vending area with adjacent storage, masonry seat walls and fireplace, lighting and water. Allowances A C as listed below are included in the lump base sum. In addition to subcontractor trades work and allowances, also included are testing, permits, site management costs and contingency. Lump Base Sum $376, ALLOWANCE A Masonry o Masonry construction per construction documents including fireplace and seat walls Allowance Sum $62, ALLOWANCE B Architectural o Includes sealing and staining of pavilion wood Allowance Sum $10, ALLOWANCE C Site Restoration o Site restoration per construction documents Allowance Sum $15, TOTAL AMENDMENT AMOUNT $376, /07/29 cmc CO 13 Add $124, to the contract Not to Exceed amount. The Contract NTE will change from $5,720, to $5,845, Oakland County Sheriff's Portable Incinerator $124, /07/31 CJB CO 14 Add $138, to the contract Not to Exceed amount. The Contract NTE will change from $5,845, to $5,984, Update the scope of work for the Oakland County Jail Sally Port Concrete Repair Project as described below: $ 8, Phase 1 changes (DRV 1.1) Additional thickness of concrete cap

7 7 of 12 $ 9, Phase 2 changes (DRV 1.2) Additional thickness of concrete cap $ 15, Phase 2 Brick (DRV 2.1) Re-work lower three courses of brick $ 1, Phase 1 Brick (DRV 7/7/14, 2.6) Re-work lower three courses of brick (small area) $ Top side, Type C Repair 9 x $19.00 $ 6, Top side, Type D Repair 295 x $23.00 $ A.1 Lap #5 Bars 18 x $17.50 $ 37, Phase 2 Full Depth Repair ( ) sq ft x $126 (DRV 4/15/14, 2.4) $ 36, Phase 2 Forms over duct work 111 sq ft x $326 (DRV 6/30/14, 2.6) $ 3, Phase 2 Sika Waterproofing in lieu of Euclid (DRV 5/14/14, 1.4) $ 3, Bollard covers (27 x $119) $ 3, Phase 1 Sika Waterproofing in lieu of Euclid DRV (5/14/14, 1.3) $ 12, Auch Services (Additional GC due to extended schedule) $ 138, TOTAL 2014/08/15 cmc CO 15 Extend contract expiration date from 11/30/2014 to 11/30/ /09/11 CLA CO 16 Added $227, to the contract Not to Exceed amount. The Contract NTE changed from $5,984, to $6,212, BASE BID #1 Addison Oaks Campground Pull Through Sites and Concrete Pads Includes all but not limited to the installation of interior pull through sites with interior access road, concrete pads for interior sites, site grading and earthwork, landscape and restoration. Lump/Unit Base Sum $227, TOTAL AMOUNT $227, /10/09 CJB CO 17 Add $84, to the contract Not to Exceed amount. The Contract NTE will change from $6,212, to $6,296, Courthouse South Pedestrian Plaza $84, /10/21 CLA CO 18 Added $140, to the contract Not to Exceed amount. The Contract NTE changed from $6,296, to $6,437, Updated the scope of work for the Oakland County Jail Sally Port Concrete Repair Project as described below: Additional Concrete and demo work including CM $140, /12/22 CLA CO 19 Added $70, to the contract Not to Exceed amount. The Contract NTE changed from $6,437, to $6,507, Added the following contract item as described below:

8 8 of Architectural Improvements to the Addison Oaks Conference Center 2015/04/08 CJB CO 20 Add $197, to the contract Not to Exceed amount. The Contract NTE will change from $6,507, to $6,705, Concessions Improvements Project: BASE BID #1 Groveland Oaks Concessions Phase I o Includes but not limited to building modifications relative to the removal and replacement of equipment and facilitating additional retail space at the Groveland Oaks concessions building including testing, permitting, site management, allowances and contingency. o Lump/Unit Base Sum $75,096 BASE BID #1 Red Oaks Concessions Phase I o Includes but not limited to building modifications relative to the removal and replacement of equipment and facilitating additional retail space at the Red Oaks concessions building including testing, permitting, site management, allowances and contingency. o Lump/Unit Base Sum $57,604 BASE BID #1 Waterford Oaks Concessions Phase I o Includes but not limited to building modifications relative to the removal and replacement of equipment and facilitating additional retail space at the Waterford Oaks concessions building including testing, permitting, site management, allowances and contingency. o Lump/Unit Base Sum $65,054 TOTAL AMOUNT - $197, /04/22 cmc CO 21 Add $4, to the contract Not to Exceed (NTE) amount. The Contract NTE will change from $6,705, to $6,709, Add three (3) bonding handrails $2, CM Fee, General Liability & Performance Bond $1, TOTAL AMOUNT - $4, /04/28 AEC CO 22 Add $762, to the contract Not to Exceed (NTE) amount. The Contract NTE will change from $6,709, to $7,472, Information Technology Chiller $762, /07/14 cmc CO 23 Add $6, to the contract Not to Exceed (NTE) amount. The contract NTE will change from $7,472, to $7,478, Update the contract with the following addition to the scope of work SITE WORK: Strip topsoil haul excess to designated area Grade pad and compact with a 2% slope from finish grade using material from designated area leaving it six inches below finish grade for stone by others

9 9 of 12 Material needed from designated area loaded on our truck by county at a cost of $6, /08/12 cmc CO 24 Add the following to the contract: The Contractor shall be responsible for providing a current, updated project status report at the beginning of each month. This report shall include the following information on an excel worksheet provided by Facilities Management: O.C. Managing Department & Division, O.C. Project Manager, O.C. Project #, Project Department & Location, Project Description, Date Assigned to Vendor, Status, Project Completion Date, Notes, and Priority. The Priority column will be assigned by Facilities Management and the form returned to the vendor. 2015/09/15 AEC CO 25 Extend the contract expiration date from 11/30/2015 to 11/30/2017. Add/Update the following contract items as described in Attachment A (page 3) 2015/10/06 CLA CO 26 Added $17, to the contract Not to Exceed (NTE) amount. The contract NTE changed from $7,478, to $7,496, Add/Update the following contract items as described in Attachment A (page 3) 2015/12/21 CLA CO 27 Added $685, to the contract Not to Exceed (NTE) amount. The contract NTE changed from $7,496, to $8,181, Added/Updated the following contract items as described in Attachment A (page 3) 2016/04/14 AEC CO 28 Add $772, to the contract Not to Exceed (NTE) amount. The contract NTE will change from $8,181, to $8,954, Add/Update the following contract items as described in Attachment A (page 3) 2016/11/29 CLA CO 29 Subtract $6, of the contract Not to Exceed (NTE) amount for the IT Chiller Replacement project. The over-all contract NTE changed from $8,954, to $8,947, /01/19 CLA CO 30 Updated scope of work: House Demo. Demolition of two (2) structures. Added $77, of the contract Not to Exceed (NTE). The NTE changed from $8,947, to $9,025, /04/21 CMK CO 31 Add $1,799, to the contract Not to Exceed (NTE) amount. The contract NTE will change from $9,025, to $10,824, Add the following Line Items to the contract: Priority II Security Fence/gates Building 41 $ 448, Priority II Security Fence/gates Building $1,296, Priority II Security Fence/gates Building 49 $ 53, Update the contract items as described in Attachment A (page 3)

10 10 of /05/31 AEC CO 32 Add $1,431, to the contract Not to Exceed (NTE) amount. The contract NTE will change from $10,824, to $12,255, Update the contract scope of services as follows: Priority II Security Fence & gates project Not to Exceed $1,431, /06/30 CMK CO 33 Add $3,160, to the contract Not to Exceed (NTE) amount. The contract NTE will change from $12,255, to $15,415, Update the contract scope of services as follows: 32E to 38 E Steam Tunnel Restoration project Not to Exceed $2,337, Jail Floor project Not to Exceed $823, /07/18/17 CMK CO 34 Add $122, to the contract Not to Exceed (NTE) amount. The contract NTE will change from $15,415, to $15,538, Add/Update the following contract items as described in Attachment A (page 3) 2017/07/20 CMK CO 35 Add $1,313, ($1,058, $254,713.00) to the contract Not to Exceed (NTE) amount. The contract NTE will change from $15,538, to $16,851, Add the following scopes of work to the contract: Courthouse North Side Scope: Furnish and install Hy-Security Strong Arm M-30 gates according to construction documents including photo eyes, loop detectors and traffic signal lights. Furnish and install electrical at all gates including 1" power and 2" communications conduits as required by construction documents. Furnish and install Oaks-Fieldstone random retaining wall - sandstone according to construction documents including excavation, aggregate base, drain pipe w/sock. Create berm using clean fill approx 10 ft back from wall tapered to existing grade, finish with topsoil and sod. Provide irrigation repair, site restoration etc as necessary. Provide all site survey, layout and material testing services. Not to Exceed $1,058, Novi Scope: Furnish and install (2) Hy-Security Strong Arm M30 Anti-ram drop arm barrier gates according to construction documents. Furnish and install electrical service to gates including 1" power and 2" conduits as required by construction documents. Provide all site restoration including sod and irrigation. Provide all site survey, layout and material testing services. Not to Exceed $254, /08/18 AEC CO 36 Add $118, to the contract Not to Exceed (NTE) amount. The contract NTE will change from $16,851, to $16,969, Update the contract to include the Treasurer's Office Demolition Project as described in Attachment A (page 3) 2017/10/02 CMK CO 37 Add $544, to the contract Not to Exceed amount. The Contract NTE will change from $16,969, to $17,514, Add the following contract items as described below and as described in attachment A (page 3) 1 - Security Enhancements Novi Court - Subcontractor trades work, testing, allowances, site management costs, and contingency for unforeseen conditions for the work on the plans dated 8/30/17. Subcontractor trades work includes site

11 11 of 12 work, asphalt, fencing, retaining walls and restoration of lawns and $544, /10/10 CLA CO 38 Added $38, to the contract Not to Exceed amount. The Contract NTE changed from $17,514, to $17,553, Added the following contract item as described below: Pike Street $38, /11/28 CJS CO 39 Add $13, to the contract Not to Exceed amount. The Contract NTE will change from $17,553, to $17,566, Update the contract scope of work as described in Attachment A (page 3) which adds a project for the Sally Port Coating Repair. 2017/12/13 CJS CO 40 Extend the contract expiration date from 11/30/2017 to 3/31/ /03/20 CJS CO 41 Add $1,848, to the contract Not to Exceed (NTE) amount. The contract NTE will change from $17,566, to $19,415, Scope of work: Spot-repairs to the tunnel wall and floor in the north 800-feet of the $496, East Scope: Furnish and install powered Hy-Security Strong Arm M-30 vehicle gate according to construction documents including photo eyes, loop detectors and traffic signal lights. Furnish and install Nasatka manual vehicle gate according to construction documents. Furnish and install electrical at all gates including 1" power and 2" communications conduits as required by construction documents. Provide all site restoration etc as necessary including sod. Provide all site survey, layout and material testing $550, Troy District Court Scope: Furnish and install powered Hy-Security Strong Arm M-30 vehicle gates according to construction documents including photo eyes, loop detectors and traffic signal lights. Furnish and install electrical at all gates including 1" power and 2" communications conduits as required by construction documents. Furnish and install Oaks-Fieldstone random retaining wall - sandstone according to construction documents including excavation, aggregate base, drain pipe w/sock. Create berm using clean fill approx 10 ft back from wall tapered to existing grade, finish with topsoil and sod. Provide site restoration including sod and irrigation. Provide irrigation repair, site restoration etc as necessary. Provide all site survey, layout and material testing $802, Update the following contract items as described in Attachment A. Add 3 line items: Steam $496,800.00, Troy $802,006.00, Power $550, /04/12 AEC System Change A Extend contract expiration date from 3/31/2018 to 4/30/ /04/30 AEC CO 42 Add $667, to the contract Not to Exceed (NTE) amount. The contract NTE will change from $19,415, to $20,082, Scope of work: Furnish and install uni-lock Pisa 2 random retaining wall - to match existing according to contractions document

12 12 of 12 including excavation, aggregate base, drain pipe w/sock. Create berm using clean fill approx. 10 ft back form wall tapered to existing grade, finish with topsoil and sod. Furnish and install asphalt and concrete according to construction documents. Provide site restoration including sod and irrigation. Provide all site survey, layout and material testing services. Reference Attachment A. Subtract $25, from the contract Not to Exceed (NTE) amount. the contract NTE will change from $20,082, to $ Reference Attachment B.