1 UPCOMING CONSTRUCTION PROJECTS 3 rd Quarter 2017 (Project & Construction Management)

2 Rail Spur at Bayport Terminal Construction of approximately 6500 track feet of rail at the Bayport Terminal. This rail will cross State Highway (SH) 146 and connect the existing rail from Strang Rail line to within 900 feet of the Container Freight Station (CFS) Road in the Bayport Intermodal Facility. This project will also include clearing, grubbing, drainage, rail crossings, signalization, and perhaps a sound wall, if required. 4th Qtr th Qtr Clearing Brush Storm Water Controls Flagman Traffic Controls Surveying Photography Material Testing Rail Roads Brenda Trevino btrevino@poha.com

3 Bayport West Empty Container Yard Security Provide security CTV cameras, conduits, manholes and network connections. 4th Qtr Security Conduit Photography Electrical Alvin Jackson

4 Bayport - Construct Container Yard 7 Construction of approximately 50 acres of reinforced and roller compacted 18-inch concrete pavement, including the construction of a storm water collection system, water and sanitary sewer mains, high mast lighting and communication conduit. 1st. Qtr rd Qtr Concrete Grading Storm Drainage Structures Barbara H. Smith bhsmith@poha.com

5 Bayport - Container Yard 7 Security Provide security CTV cameras, conduits, manholes and network connections. 2nd. Qtr rd Qtr Security Conduit Photography Electrical Alvin Jackson ajackson@poha.com

6 Wharf 3 Telecom Pre-Outage at BCT The projects consists of the installation of two new communications pathways in the terminal which will enable all signals to bypass the C3 Amenities building which will be demolished during the rehabilitation of the wharf 3. 4th Qtr st Qtr Telecommunications Equipment Fiber Optics Cables Network Programming Conduits and Inner ducts Bill Aguirre baguirre@poha.com

7 Demolition of 2 Wharf Cranes and Moving a Crane at BCT Two wharf cranes will be demolished, dismantling the cranes in a safe manner, and transporting the pieces off site for disposal or salvage. A third crane to be moved 1000ft from its current position at Barbours Cut. 4th Qtr Photography Fuel Supply Alvin Jackson ajackson@poha.com

8 Barbours Cut - Rehabilitation of Wharf 3 The wharf will be upgraded in order to support 100 feet gauge dock cranes and to accommodate larger ships. This project consists of the upgrade of 1000 feet of wharf, a new stevedore support building, structural elements, high mast pole lighting, and electrical infrastructure required to power three new dock cranes. 3rd Qtr th Qtr Material Testing Surveying Storm Water Controls Photography Chain Link Fence Security Electrical Signs and Paint Striping Bill Aguirre baguirre@poha.com

9 Barbours Cut - Lash Dock Demolition The project consists of the demolition of the Lash Dock located at the East End of Barbours Cut Terminal. The work includes the removal of all concrete structures such as decks and piles and dredging. 1st Qtr nd Qtr Photography Demolition of Structures Concrete Traffic Barriers Barge Services Bill Aguirre baguirre@poha.com

10 Install Fender System at Wharf Nos. 1 & 2 at CARE Terminal Project will remove the existing fenders and install new fenders at Wharf 1 & 2 at the CARE Terminal. 4th Qtr st Qtr Fender Replacement Pile Diving Alvin Jackson ajackson@poha.com

11 Drainage System at Volkswagen Yard at Turning Basin Terminal PROJECT 2 PROJECT 1 Improvement of existing drainage system tied to IH-610 feeder road at the Volkswagen yard at the Turning Basin terminal. Project 1: TxDot construction of drainage improvements to the 610 feeder road. Project 2: PHA construction of drainage improvements to the Volkswagen Yard. Project 2 Construction Time Frame Project 2 NIGP Codes Project 2 Small Business Opportunities PHA Contact 4th Qtr nd Qtr Storm Drainage Structures Grading Concrete Brenda Trevino btrevino@poha.com

12 Rehabilitation of Transit Shed Floor at Wharf No. 46 at Turning Basin Terminal Repair of top floor slab of the transit shed. 4th Qtr th Qtr Concrete and Rebar Storm Drainage Structures Compaction Grouting / Mud Jacking Barbara H. Smith bhsmith@poha.com

13 Replace Water Line Under Various Docks at Turning Basin Terminal Replaces the existing water line along with attachments at various wharves at Turning Basin Terminal. 4th Qtr nd Qtr Waterline Pipes and Attachments Alvin Jackson

14 Turning Basin South Repairs at Wharf 1 Structural concrete repairs of columns, caps, strut beams and top deck. 3rd Qtr st Qtr Structural Concrete Repair Eddy Kharrazi ekharrazi@poha.com

15 Annual Concrete Replacement at Turning Basin Terminal 2018 The removal and replacement of deteriorating and or damaged existing concrete pavement throughout the facility for st Qtr th Ort Concrete Pavement Barbara H. Smith

16 Woodhouse Shed Retaining Wall Repair New retaining wall and downspout repair or replace. 4th Qtr Concrete Structure Excavation Saw Cutting Storm Water Control Barbara H. Smith