1 ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # TRACS No. Project No. County District Gross Length Net Length Prepared By: 082 CH 046 F000201C 082-A-(204)T 6727 COCHISE SOUTHCENT 0.2 Ghorbani Mahmood Highway Termini Location Work Description NOGALES-TOMBSTONE HIGHWAY (SR 82) Rain Valley Wash Bridge STR # BRIDGE DECK REPAIR AND SCOUR RETROFIT

2 Printed: 10/20/2017 Page 1 of 7 BID RESULTS FOR Bid Opening Date : 9/29/2017, Prequalification Required, Engineer Specialist : Ghorbani Mahmood Completion Date: 90 Working Days The proposed rehabilitate bridge deck and scour retrofit work for project is located in Cochise County on SR 82 west of Town of Tombstone between MP and MP The bridge deck rehabilitate work include of milling bituminous pavement, polyester polymer concrete overly, remove guardrail, install new guardrail and all related work. The bridge scour retrofit work will be performed on the Rain Valley Wash Str. # 395. The work includes of constructing concrete floors underneath the existing bridge (Str. # 395), placing shotcrete and other related work. Bid Rank Department Estimate Bid Amount Contractor Extended Sum of s +% $323, DEPARTMENT ESTIMATE $323, % $527, % $564, K E & G CONSTRUCTION, INC Paseo San Luis Suite 202 Sierra Vista, AZ SOUTHWEST CONCRETE PAVING CO N. 19TH AVENUE, SUITE B-100 PHOENIX, AZ Winning Bidder is 63.3% Over Department Estimate (Difference = $204,679.10) $527, $564,052.30

3 Printed: 10/20/2017 Page 2 of 7 Measure Description Quantity Unit Price Extended Amount EACH REMOVE (GUARDRAIL TRANSITION AFTER W/RUBRAIL) Bid Rank Department Estimate $ $2, K E & G CONSTRUCTION, INC. $ $ % 2 SOUTHWEST CONCRETE PAVING CO. $ $1, % EACH REMOVE (BREAKAWAY CABLE TERMINAL) Bid Rank Department Estimate $ $1, K E & G CONSTRUCTION, INC. $ $ % 2 SOUTHWEST CONCRETE PAVING CO. $ $ % L.FT. REMOVE GUARD RAIL Bid Rank Department Estimate 1, $8.000 $8, K E & G CONSTRUCTION, INC. $ $13, % 2 SOUTHWEST CONCRETE PAVING CO. $3.500 $3, % SQ.YD. REMOVE BITUMINOUS PAVEMENT (MILLING) (4 1/2" TO 6") Bid Rank Department Estimate $7.000 $2, K E & G CONSTRUCTION, INC. $ $8, % 2 SOUTHWEST CONCRETE PAVING CO. $ $16, % SQ.YD. REMOVE BRIDGE DECK SURFACE (MECHANICAL MILLING) Bid Rank Department Estimate $5.000 $2, K E & G CONSTRUCTION, INC. $ $51, % 2 SOUTHWEST CONCRETE PAVING CO. $ $17, % CU.YD. STRUCTURAL EXCAVATION Bid Rank Department Estimate $ $7, K E & G CONSTRUCTION, INC. $ $14, % 2 SOUTHWEST CONCRETE PAVING CO. $ $14, % TON FOG COAT Bid Rank Department Estimate $1, $1, K E & G CONSTRUCTION, INC. $7, $7, % 2 SOUTHWEST CONCRETE PAVING CO. $ $ % TON BLOTTER MATERIAL Bid Rank Department Estimate $ $ K E & G CONSTRUCTION, INC. $1, $1, % 2 SOUTHWEST CONCRETE PAVING CO. $ $ % TON ASPHALTIC CONCRETE (MISCELLANEOUS STRUCTURAL) Bid Rank Department Estimate $ $35, K E & G CONSTRUCTION, INC. $ $24, % 2 SOUTHWEST CONCRETE PAVING CO. $ $75, %

4 Printed: 10/20/2017 Page 3 of 7 Measure Description Quantity Unit Price Extended Amount SQ.YD. BRIDGE REPAIR (PATCH CONCRETE ) Bid Rank Department Estimate $10, $10, K E & G CONSTRUCTION, INC. $ $ % 2 SOUTHWEST CONCRETE PAVING CO. $1, $1, % SQ.YD. BRIDGE REPAIR (POLYESTER POLYMER CONCRETE BRIDGE DECK OVERLAY ) Bid Rank Department Estimate $ $53, K E & G CONSTRUCTION, INC. $ $178, % 2 SOUTHWEST CONCRETE PAVING CO. $ $191, % EACH PLACE DOWELS Bid Rank Department Estimate $ $2, K E & G CONSTRUCTION, INC. $ $6, % 2 SOUTHWEST CONCRETE PAVING CO. $ $2, % EACH TEMPORARY PAVEMENT MARKERS (CHIP SEAL) Bid Rank Department Estimate $ $ K E & G CONSTRUCTION, INC. $6.520 $ % 2 SOUTHWEST CONCRETE PAVING CO. $5.000 $ % EACH-DAY BARRICADE (TYPE II, VERT.PANEL, TUBULAR MARKER) Bid Rank Department Estimate $0.350 $ K E & G CONSTRUCTION, INC. $0.200 $ % 2 SOUTHWEST CONCRETE PAVING CO. $1.000 $ % EACH-DAY BARRICADE (TYPE III, HIGH LEVEL FLAG TREES) Bid Rank Department Estimate $1.000 $ K E & G CONSTRUCTION, INC. $0.460 $ % 2 SOUTHWEST CONCRETE PAVING CO. $1.500 $ % EACH-DAY PORTABLE SIGN STANDS (SPRING TYPE) Bid Rank Department Estimate $0.700 $ K E & G CONSTRUCTION, INC. $0.440 $ % 2 SOUTHWEST CONCRETE PAVING CO. $1.250 $ % EACH-DAY WARNING LIGHTS (TYPE A) Bid Rank Department Estimate 4, $0.200 $ K E & G CONSTRUCTION, INC. $0.130 $ % 2 SOUTHWEST CONCRETE PAVING CO. $1.000 $4, % EACH-DAY WARNING LIGHTS (TYPE C) Bid Rank Department Estimate $0.250 $ K E & G CONSTRUCTION, INC. $0.140 $ % 2 SOUTHWEST CONCRETE PAVING CO. $1.000 $ %

5 Printed: 10/20/2017 Page 4 of 7 Measure Description Quantity Unit Price Extended Amount EACH-DAY TRAFFIC CONE (28 INCHES) Bid Rank Department Estimate $0.200 $ K E & G CONSTRUCTION, INC. $0.140 $ % 2 SOUTHWEST CONCRETE PAVING CO. $0.500 $ % EACH-DAY EMBEDDED SIGN POST Bid Rank Department Estimate 6, $0.150 $ K E & G CONSTRUCTION, INC. $0.150 $ % 2 SOUTHWEST CONCRETE PAVING CO. $0.500 $3, % EACH-DAY TRUCK MOUNTED ATTENUATOR Bid Rank Department Estimate $ $1, K E & G CONSTRUCTION, INC. $ $ % 2 SOUTHWEST CONCRETE PAVING CO. $ $ % EACH-DAY TEMPORARY SIGN (10 S.F. OR MORE) Bid Rank Department Estimate $0.700 $ K E & G CONSTRUCTION, INC. $0.460 $ % 2 SOUTHWEST CONCRETE PAVING CO. $1.000 $ % EACH-DAY CHANGEABLE MESSAGE BOARD (CONTRACTOR FURNISHED) Bid Rank Department Estimate $ $2, K E & G CONSTRUCTION, INC. $ $3, % 2 SOUTHWEST CONCRETE PAVING CO. $ $6, % HOUR FLAGGING SERVICES (CIVILIAN) Bid Rank Department Estimate $ $6, K E & G CONSTRUCTION, INC. $ $6, % 2 SOUTHWEST CONCRETE PAVING CO. $ $5, % HOUR FLAGGING SERVICES (LOCAL ENFORCEMENT OFFICER) Bid Rank Department Estimate $ $5, K E & G CONSTRUCTION, INC. $ $6, % 2 SOUTHWEST CONCRETE PAVING CO. $ $6, % HOUR FLAGGING SERVICES (DPS) Bid Rank Department Estimate $ $5, K E & G CONSTRUCTION, INC. $ $5, % 2 SOUTHWEST CONCRETE PAVING CO. $ $5, % L.FT. PAVEMENT MARKING (WHITE EXTRUDED THERMOPLASTIC) (0.090") Bid Rank Department Estimate $2.000 $1, K E & G CONSTRUCTION, INC. $5.350 $3, % 2 SOUTHWEST CONCRETE PAVING CO. $ $6, %

6 Printed: 10/20/2017 Page 5 of 7 Measure Description Quantity Unit Price Extended Amount L.FT. PAVEMENT MARKING (YELLOW EXTRUDED THERMOPLASTIC) (0.090") Bid Rank Department Estimate $2.000 $ K E & G CONSTRUCTION, INC. $5.350 $ % 2 SOUTHWEST CONCRETE PAVING CO. $ $ % EACH PAVEMENT MARKER, RAISED, TYPE D Bid Rank Department Estimate $ $ K E & G CONSTRUCTION, INC. $ $ % 2 SOUTHWEST CONCRETE PAVING CO. $ $ % ACRE SEEDING (CLASS II) Bid Rank Department Estimate $4, $4, K E & G CONSTRUCTION, INC. $5, $5, % 2 SOUTHWEST CONCRETE PAVING CO. $7, $7, % L.FT. EROSION CONTROL (SEDIMENT WATTLES)(20") Bid Rank Department Estimate $5.000 $1, K E & G CONSTRUCTION, INC. $9.100 $3, % 2 SOUTHWEST CONCRETE PAVING CO. $6.000 $2, % SQ.YD. EROSION CONTROL (CONSTRUCTION ENTRANCE/EXIT GRAVEL PAD) Bid Rank Department Estimate $ $5, K E & G CONSTRUCTION, INC. $ $2, % 2 SOUTHWEST CONCRETE PAVING CO. $ $1, % L.FT. EROSION CONTROL (WATTLES) (9") Bid Rank Department Estimate $3.000 $1, K E & G CONSTRUCTION, INC. $4.400 $1, % 2 SOUTHWEST CONCRETE PAVING CO. $3.000 $1, % L.SUM MOBILIZATION Bid Rank Department Estimate $35, $35, K E & G CONSTRUCTION, INC. $53, $53, % 2 SOUTHWEST CONCRETE PAVING CO. $60, $60, % L.FT. GUARD RAIL, W-BEAM, SINGLE FACE Bid Rank Department Estimate $ $19, K E & G CONSTRUCTION, INC. $ $21, % 2 SOUTHWEST CONCRETE PAVING CO. $ $23, % L.FT. GUARD RAIL, W-BEAM, SINGLE FACE, SHOP CURVED Bid Rank Department Estimate $ $1, K E & G CONSTRUCTION, INC. $ $1, % 2 SOUTHWEST CONCRETE PAVING CO. $ $2, %

7 Printed: 10/20/2017 Page 6 of 7 Measure Description Quantity Unit Price Extended Amount EACH GUARD RAIL TERMINAL (FLARE TYPE) Bid Rank Department Estimate $3, $9, K E & G CONSTRUCTION, INC. $2, $8, % 2 SOUTHWEST CONCRETE PAVING CO. $3, $10, % EACH GUARD RAIL, ANCHOR ASSEMBLY Bid Rank Department Estimate $1, $1, K E & G CONSTRUCTION, INC. $ $ % 2 SOUTHWEST CONCRETE PAVING CO. $1, $1, % EACH THRIE-BEAM GUARD RAIL TRANSITION SYSTEM Bid Rank Department Estimate $3, $12, K E & G CONSTRUCTION, INC. $3, $15, % 2 SOUTHWEST CONCRETE PAVING CO. $2, $10, % SQ.YD. SHOTCRETE (4") Bid Rank Department Estimate $ $22, K E & G CONSTRUCTION, INC. $ $11, % 2 SOUTHWEST CONCRETE PAVING CO. $ $9, % L.SUM FORCE ACCOUNT WORK (DRIDGE DECK REPAIR WITH PATCHING MATERIAL) Bid Rank Department Estimate $10, $10, K E & G CONSTRUCTION, INC. $10, $10, % 2 SOUTHWEST CONCRETE PAVING CO. $10, $10, % SQ.YD. MISCELLANEOUS WORK (CONTROL OF NOXIOUS PLANTS)(MAN/MECHANICAL METHODS) Bid Rank Department Estimate 1, $0.700 $ K E & G CONSTRUCTION, INC. $1.500 $1, % 2 SOUTHWEST CONCRETE PAVING CO. $1.250 $1, % SQ.YD. MISCELLANEOUS WORK (CONTROL OF NOXIOUS PLANTS)(HERBICIDE) Bid Rank Department Estimate 1, $0.600 $ K E & G CONSTRUCTION, INC. $1.050 $1, % 2 SOUTHWEST CONCRETE PAVING CO. $0.750 $1, % L.SUM CONSTRUCTION SURVEYING AND LAYOUT Bid Rank Department Estimate $10, $10, K E & G CONSTRUCTION, INC. $11, $11, % 2 SOUTHWEST CONCRETE PAVING CO. $4, $4, % A CU.YD. STRUCTURAL CONCRETE (CLASS S) (F'C = 3,000) Bid Rank Department Estimate $ $30, K E & G CONSTRUCTION, INC. $ $32, % 2 SOUTHWEST CONCRETE PAVING CO. $ $40, %

8 Printed: 10/20/2017 Page 7 of 7 Measure Description Quantity Unit Price Extended Amount A LB. REINFORCING STEEL Bid Rank Department Estimate 5, $1.300 $7, K E & G CONSTRUCTION, INC. $1.650 $9, % 2 SOUTHWEST CONCRETE PAVING CO. $2.000 $11, %