1 ATTACHMENT 8 STIPULATED UNIT PRICES 1. Work Package Item Prices (2 pages) 2. General Description of Work Items (3 pages)

2 PQOC SMALL SIDEWALK CONTRACTORS LIST STIPULATED UNIT PRICES City of Los Angeles - Department of Public Works - Bureau of Engineering NO. WORK PACKAGE ITEM UNIT UNIT PRICE 1 Mobilization LS $3, Traffic Control and Permits LS $3, Temporary Drainage Inlet Protection LS $ Remove Sidewalk SF $ Remove Curb LF $ Remove Curb and Gutter LF $ Remove Driveway SF $ " Concrete Sidewalk SF $ Concrete Curb LF $ Concrete Curb and Gutter LF $ " Concrete Driveway and Sidewalk SF $ " Concrete Driveway and Sidewalk SF $ " Concrete Driveway and Sidewalk SF $ Patterned / Decorative / Brick Sidewalk SF $ Concrete Grinding EA SITE $1, Curb Ramp (ADA Compliant) EA $4, Tree Root Pruning / Shaving EA $ Tree Canopy Pruning EA $1, Tree Removal (6" to 24" Diameter) EA $ Tree Removal (Over 24" Diameter) EA $2, " Box Size Tree (Furnish and Plant) EA $ Root Control Barrier (Furnish and Install) EA $ Water Tree (Up to 30 gallons / week) for Two Months EA $ Bike Rack EA $ Newspaper Dispenser / Trash Bin 26 Bus Shelter Reimbursement EA $ EA $4, Parking Meter EA $ Street Sign EA $ New Sign Post (Furnish and Install) EA $ Remove Unsuitable Base Material CY $ Attachment 8 Page 1 of 5

3 PQOC SMALL SIDEWALK CONTRACTORS LIST STIPULATED UNIT PRICES City of Los Angeles - Department of Public Works - Bureau of Engineering NO. WORK PACKAGE ITEM UNIT UNIT PRICE 31 Untreated Base Material CY $ Metal Tree Well Grates EA $ Bollard EA $ Bollard (Furnish and Install) EA $ Backfill Decomposed Granite CY $ Asphalt Concrete SF $ Epoxy Concrete Patch EA SITE $ Paint Curb LF $ Modify Existing Irrigation System EA SITE $1, Adjust Utility Maintenance Hole to Grade EA $ Adjust Utility Pull Box to Grade EA $ Adjust Utility Vault to Grade EA $ Adjust Water / Gas Meter to Grade EA $ Type 2 Composite Street Lighting Pull Box EA $ Type 3 Composite Street Lighting Pull Box EA $ Type 2 Traffic Signal Pull Box with Lid EA $ Type 3 Traffic Signal Pull Box with Lid EA $ " X 23" X 11" (No. 2) DWP Meter Box EA $ " X 23" (No. 2) DWP Meter Composite Lid Only EA $ " X 23" (No. 2) DWP Meter Steel Cover Lid Only EA $ " X 30" X 11" (No. 3) DWP Meter Box EA $ " X 30" (No. 3) DWP Meter Composite Lid Only EA $ " X 30" (No. 3) DWP Meter Steel Cover Lid Only EA $ " X 15" DWP Meter Box with Lid EA $ Parkway Culvert Sidewalk Drain EA $ " Diameter Schedule 80 PVC Pipe EA $ " Diameter Schedule 80 PVC Pipe EA $ " Diameter Ductile Iron Pipe EA $ " Diameter Ductile Iron Pipe EA $ Unit abbreviation: CY=cubic yard, EA=each, LF=linear foot, LS=lump sum per Work Package, SF=square foot Attachment 8 Page 2 of 5

4 Attachment 8 NO. WORK PACKAGE ITEM GENERAL DESCRIPTION 1 Mobilization 2 Traffic Control and Permits Follow the Watch Manual and apply necessary permits from LADOT. 3 Temporary Drainage Inlet Protection Labor (including placement) and material. 4 Remove Sidewalk 5 Remove Curb 6 Remove Curb and Gutter 7 Remove Driveway 8 4" Concrete Sidewalk 9 Concrete Curb 10 Concrete Curb and Gutter 11 4" Concrete Driveway and Sidewalk 12 6" Concrete Driveway and Sidewalk 13 8" Concrete Driveway and Sidewalk 14 Patterned / Decorative / Brick Sidewalk 15 Concrete Grinding Equipment and labor. 16 Curb Ramp (ADA Compliant) 17 Tree Root Pruning / Shaving 18 Tree Canopy Pruning 19 Tree Removal (6" to 24" Diameter) 20 Tree Removal (Over 24" Diameter) 21 24" Box Size Tree (Furnish and Plant) 22 Root Control Barrier (Furnish and Install) 23 Water Tree (Up to 30 gallons/week) for Two Months 24 Bike Rack 25 Newspaper Dispenser / Trash Bin 26 Bus Shelter Reimbursement Demolition (including saw-cut when needed), equipment, labor, and disposal. Equipment, labor (including placement and forming), and material (including formwork). *Note: High-early strength concrete is used for fire stations and residential driveways. Submittals are required for the high-early strength concrete mix and is included in the bid item. Equipment, labor (including demolition, saw-cut, forming and placement), material (including concrete, formwork and truncated domes), and disposal of existing material. Equipment, labor, and disposal. *Note: An Arborist will be provided by the City for consultation. Equipment, labor, and material (including cost of tree and delivery). *Note: All newly planted trees must have a root control barrier and must be watered. Equipment, labor, and safe storage. *Note: The GC shall contact BSL of bus shelter removal prior to construction and reinstallation after the completion of the site. 27 Parking Meter Equipment, labor, and safe storage of the posts. *Note: The GC shall contact DOT to remove the meter heads in advance of construction. PQOC SMALL SIDEWALK CONTRACTORS LIST Page 3 of 5

5 Attachment 8 NO. WORK PACKAGE ITEM GENERAL DESCRIPTION 28 Street Sign 29 New Sign Post (Furnish and Install) 30 Remove Unsuitable Base Material 31 Untreated Base Material Equipment, labor, material, and safe storage. *Note: If the existing post of the sign is damaged before construction, the GC shall replace it with a new one (see Item: Furnish & Install New Sign Post). Equipment, labor, and disposal. *Note: This item is exclusive to unacceptable subgrade. Clearing other debris (concrete, tree roots, etc.) is included in other removal bid items as indicated above. Equipment, labor (including placement and compaction), and material (including import). 32 Metal Tree Well Grates 33 Bollard Equipment, labor and safe storage. *Note: If the City wishes to dispose or salvage the material, the GC shall do so at no extra cost. 34 Bollard (Furnish and Install) Equipment, labor, and material. 35 Backfill Decomposed Granite 36 Asphalt Concrete 37 Epoxy Concrete Patch 38 Paint Curb 39 Modify Existing Irrigation System Equipment, labor (including placement and compaction), and material. Equipment, labor (including placement), and material. Equipment, labor, and material. *Note: Applied on existing sprinklers which are impacted when expanding the sidewalk or constructing a new curb ramp. The GC shall relocate the irrigation line and the sprinkler heads along the newly expanded sidewalk as needed. 40 Adjust Utility Maintenance Hole to Grade 41 Adjust Utility Pull Box to Grade 42 Adjust Utility Vault to Grade 43 Adjust Water / Gas Meter to Grade Equipment, labor, and material (such as concrete or stacked rings to adjust as needed). *Note: The GC is only responsible for adjusting sewer and storm drain maintenance holes. The GC shall coordinate with Inspector and CM in contacting utility companies. 44 Type 2 Composite Street Lighting Pull Box 45 Type 3 Composite Street Lighting Pull Box 46 Type 2 Traffic Signal Pull Box with Lid 47 Type 3 Traffic Signal Pull Box with Lid 48 16" X 23" X 11" (No. 2) DWP Meter Box 49 16" X 23" (No. 2) DWP Meter Composite Lid Only 50 16" X 23" (No. 2) DWP Meter Steel Cover Lid Only 51 22" X 30" X 11" (No. 3) DWP Meter Box 52 22" X 30" (No. 3) DWP Meter Composite Lid Only 53 22" X 30" (No. 3) DWP Meter Steel Cover Lid Only Equipment, labor (including removal and installation), and material (including furnishment of boxes, and material needed to install per standard plans, such as gravel placed below pull boxes). Equipment, labor (including removal and installation), and material (including furnishment of boxes, and material needed to install per standard plans, such as gravel placed below meter boxes). All other types of DWP boxes shall be change order work " X 15" DWP Meter Box with Lid PQOC SMALL SIDEWALK CONTRACTORS LIST Page 4 of 5

6 Attachment 8 NO. WORK PACKAGE ITEM GENERAL DESCRIPTION 55 Parkway Culvert Sidewalk Drain 56 4" Diameter Schedule 80 PVC Pipe 57 6" Diameter Schedule 80 PVC Pipe 58 4" Diameter Ductile Iron Pipe 59 6" Diameter Ductile Iron Pipe Labor (including adjusting or installing in the event these items cannot be protected) and material (including furnishing and delivery). *Note: The GC is to protect-in-place as much as possible. PQOC SMALL SIDEWALK CONTRACTORS LIST Page 5 of 5