$1,314, SW King Street and SW Mauldin Ave Bid Opening 5/3/2018 Company Name Amount. Anderson Columbia. Curt s Construction

Size: px
Start display at page:

Download "$1,314, SW King Street and SW Mauldin Ave Bid Opening 5/3/2018 Company Name Amount. Anderson Columbia. Curt s Construction"

Transcription

1 Bid No Columbia County Board of County Commissioners SW King Street and SW Mauldin Ave Bid Opening 5/3/2018 Company Name Amount Anderson Columbia C.A. Boone Construction Curt s Construction 1,187, ,193, ,314,883.38

2 COLUMBA COUNTY BOARD OF COUNTY COMMSSONERS PROJECT NUMBER SW KNG STREET AND SW MAULDN AVENUE - ROADWAY MPROVEMENTS BD PROPOSAL THE UNDERSGNED hereby propose to furnish all materials, labor and supervision for the construction of the subject project including conformance with the construction requirements and specifications for the following unit prices: TEM UNT QUANTTY UNT PRCE TOTAL 5732.ôo Mobilization LS 1 S3 2 Maintenance of Traffic LS 1 L U c3o 3 StakedSiltEence LF 2,000 j Z 5 3 jco, oo 4 Milling, SY 38,500 s i So,oO 5 Limerock TN 7,155. C 3 OL? Subsoil Excavation CY 827 q 7 s)g 3L0. q 7 Borrow Material CY 653 j ) q) a. o 8 GradingandFinishing(Roadway&Shoulder) [3 1 3c.9 l1,3lc. 9 Asphaltic Concrete SP 12.5, 165 b/sy, Structural TN 3, AsphalticConcreteSP9.5, 1351b/sy,Surface TN 2,900 jq.07 %7?,ô3.co 11 ResurfacingCountylntersections TN i% CJ. Z)5 12 PipeCulvert,RCP,Roundl8 LE 104 ( S.c% 3 13 Mitered EndSection, 18 EA 4 -f ConcreteBoxCulvert LS 1 J 7i.ôo J?7,Jn1.Oo 15 Sod Strip 42 SY 13,400 -), S. o 16 Seed and Mulch LS 1 3 L1 L L 3 17 Pavement Markings LS 1 9)S tu L0 qçlj, Contractor Signature: flyl N1Au2XL) TOTAL 33.3 PAY TEM NOTES tem 2 - Shall include all elements required per FDOT standards and include temporary centerline/stop bar delineation at all non-working times, stationing/offsets with profile of existing centerline elevations, all detour items, and any edge of pavement reclamation. tem 3 - Shall be placed at all areas of potential stormwater runoff as directed by the Engineer. tem 4 - Average depth is 1 ¾ inches and shall be achieved with a milling machine capable of providing millings with sizes no greater than 2-3 in size. tem 5 - Shall include hauling and spreading to achieve 8 base thickness. tem 6 - Shall include cost to remove 24 in depth and replace with suitable fill at 6 compacted lifts. tem 7 - Shall be placed and Engineer s direction tem - ncludes all construction layouts required, scarifying, widening, shaping, compacting, finishing, and priming for placement of asphalt and sod. Roadway shall have a 2% cross slope prior to placement of prime coat. Page2ofll

3 COLUMBA COUNTY BOARD OF COUNTY COMMSSONERS PROJECT NUMBER SW KNG STREET AND SW MAULDN AVENUE - ROADWAY MPROVEMENTS tem l-ncludes placement of SP blsy. tem 12 ncludes placement of 18 RCP 72 LF at CR 240 and two 16 LF RCP extensions at Dyal Avenue. Pipe lengths are inclusive of mitered end pipe sections. Poured concrete portion of mitered end section will be paid for under tem 13, Mitered End Section, 18, EA. tem 14 - Shall include all materials, labor, and equipment needed per FDOT specifications to construct box culvert per engineered drawings including all incidental items. tem 15 ncludes cost to place 42 sod strip along edge of pavement and in areas directed by the engineer. tem 16 - Shall be placed at all disturbed areas not sodded, as directed by the engineer. tem 17 - Shall include striping the roadway back to existing layout and shall include stop bars at all stop conditions, centerline/edgeline striping (2 coats each), and RPM s throughout. White edgeline paint will be placed 1 off Edge of Pavement, creating 10 travel lanes and 1 paved shoulders. ALL TEMS MAY BE NCREASED, DECREASED, OR OMTTED AS DRECTED BY THE ENGNEER. ALL MATERALS AND CONSTRUCTON SHALL CONFORM TO BOTH THE REQUREMENTS OF THE LATEST FDOT STANDARD SPECFCATONS FOR ROAD AND BRDGE CONSTRUCTON AND THE LATEST FDOT DESGN STANDARDS. ALL NCDENTAL WORK NCLUDED N THESE TEMS. ALL UNT PRCE AND TOTAL SPACES MUST BE FLLED N TO CORRELATE WTH EACH TEM Company Name: e C Authorized Company Representative: Cuc-ks thn5 Printed Name Attested By:1 )fl rv, LnheS Printed Name Sr n / (SEAL) 0 Signature Total Bid Amount: ) lh Date: s- Page3ofll

4 COLUMBA COUNTY BOARD OF COUNTY COMMSSONERS PROJECT NUMBER SW KNG STREET AND SW MAULDN AVENUE - ROADWAY MPROVEMENTS BD PROPOSAL THE UNDERSGNED to furnish all materials, labor and supervision for the construction of the project including with the construction and specifications for the following unit prices: TEM UNT QUANTTY UNT PRCE TOTAL 1 Mobilization LS 1 subject /7/73/ /o7/7,j 2 Maintenance of Traffic LS 1 3 Staked Silt Fence LF 2,000 4 Milling, +/ SY 38,500 S Limerock TN 7,155 6 Subsoil Excavation CV Borrow Material CV Grading and Finishing , 165 b/sy, Structural TN 3, b/sy, Surface TN 2, Resurfacing County TN Pipe Culvert, RCP, Round 18 LF Mitered End Section, 18 EA 4 14 Concrete BoxCulvert LS 1 15 SodStrip42 SY 13,400 AsphalticConcreteSP AsphalticConcreteSP9.5, (Roadway&Shoulder) ntersections J,5%/ p, 95 /9 99 LS 1 73/? Qh,9/? 32 J5rCL.3t575,7 /7 59/3.J8 q_y353 C) qq5 /55 o / g77j7 /5/77,y 16 Seed and Mulch LS 1 7/ 17 Pavement Markings- LS 1 Contractor Signature E. hereby propose conformance Cotumb 1liJr.,iePdn requirements,,7o3 27 /5f7(] 1/, 3 - yç.3 o TOTALf //7/7/7 tem 2 - Shall include all required per FDOT and include temporary bar delineation at all non-working times, stationing/offsets with profile of existing centerline elevations, all detour items, and any of reclamation. elements edge pavement PAY TEM NOTES standards centerline/stop tem 3 - Shall be placed at all areas of potential stormwater runoff as directed by the Engineer. tem 4 - Average depth is 1 ¾ with no sizes inches greater than 2-3 and shall in size. be achieved with a milling machine capable of providing millings tem 5 - Shall include hauling and spreading to achieve 8 base thickness. tem 6 - Shall include cost to remove 24 in depth and replace with suitable fill at 6 compacted lifts. tem 7 - Shall be placed and Engineer s direction tem 8 - ncludes all construction layouts required, scarifying, widening, shaping, compacting, finishing, and priming for of and sod. Roadway shall have a 2% slope prior to placement of prime coat. placement asphalt cross Page 2 of 11

5 COLUMBA COUNTY BOARD OF COUNTY COMMSSONERS PROJECT NUMBER SW KNG STREET AND SW MAULDN AVENUE ROADWAY MPROVEMENTS - tem 11 - ncludes placement of SP 135 lblsy. tem 12 ncludes placement of 18 RCP 72 LF at CR240 and two 16 LF RCP extensions at Dyal Avenue. Pipe lengths are inclusive of mitered end pipe sections. Poured concrete portion of mitered end section will be paid for under tem 13, Mitered End Section, 18, EA. tem 14 - Shall include all materials, labor, and equipment needed per FDOT specifications to construct box culvert per engineered drawings including all incidental items. tem 15 ncludes cost to place 42 sod strip along edge of pavement and in areas directed by the engineer. tem 16 - Shall be placed at all disturbed areas not sodded, as directed by the engineer. tem 17 - Shall include striping the roadway back to existing layout and shall include stop bars at all stop conditions, centerline/edgeline striping (2 coats each), and RPM s throughout. White edgeline paint will be placed 1 off Edge of Pavement, creating 10 travel lanes and 1 paved shoulders. ALL TEMS MAY BE NCREASED, DECREASED, OR OMTTED AS DRECTED BY THE ENGNEER. ALL MATERALS AND CONSTRUCTON SHALL CONFORM TO BOTH THE REQUREMENTS OF THE LATEST FDOT STANDARD SPECFCATONS FOR ROAD AND BRDGE CONSTRUCTON AND THE LATEST FDOT DESGN,. STANDARDS.. \.44 /4 ALL NCDENTAL WORK NCLUDED N THESE TEMS. ALL UNT PRCE AND TOTAL SPACES MUST B(LLED4N.,... TO CORRELATE WTH EACH TEM J. q.. L.,) -, ø..) ),c;: G,,. Company Name: Authorized Company Representative: Attested By: Total Bid Amount: Anderson Columbia Co., nc Printed N!fi. Tony Williams, Jr Pident i /1&6%yG Pn ted Nati g,l/1y1 1)371/q19. /7QJ4LL (SEAL) Signature Signature Date: May 3, 2018 Page 3 of 11

6 ncludes COLUMBA COUNTY BOARD OF COUNTY COMMSSONERS PROJECT NUMBER SW KNG STREET AND SW MAULDN AVENUE - ROADWAY MPROVEMENTS BD PROPOSAL THE UNDERSGNED hereby propose to furnish all materials, labor and supervision fot the construction of the subject project including conformance with the construction requirements and specifications for the following unit prices: TEM UNT O.UANTTY UNT PRCE TOTAL 1 Mobilization LS Maintenance of Traffic LS , Staked Silt Fence LF 2, Milling, SY 38, , Limerock TN 7, , Subsoil Excavation CY , Borrow Material CY , Grading and Finishing (Roadway & Shoulder) LS 1 63, Asphaltic Concrete SP 12.5, 165 b/sy, Structural TN 3, , Asphaltic Concrete SP 9.5, 135 lb/ny, Surface TN 2, , Resurfacing County ntersections TN , Pipe Culvert, RCP, Round 18 LF , Mitered End Section, 18 EA , Concrete Box Culvert [ , , Sod Strip 42 SY 13, , Seed and Mulch S 1 3, , Pavement Markings , , Contractor Signature TOTAL 1,193, James FpePresident C.A. Boone Construction, nc PAY TEM NOTES tem 2 - Shall include all elements required per FDOT standards and include temporary centerline/stop bar delineation at all non-working times, stationing/offsets with profile of existing centerline elevations, all detour items, and any edge of pavement reclamation. tem 3 - Shall be placed at all areas of potential stormwater runoff as directed by the Engineer. tem 4 - Average depth is 1 ¼ inches and shall be achieved with a milling machine capable of providing millings with sizes no greater than 2-3 in size. tem 5 - Shall include hauling and spreading to achieve 8 base thickness. tem 6 - Shall include cost to remove 24 in depth and replace with suitable fill at 6 compacted lifts. tem 7 - Shall be placed and Engineer s direction tem 8 - all construction layouts required, scarifying, widening, shaping, compacting, finishing, and priming for placement of asphalt and sod. Roadway shall have a 2% cross slope prior to placement of prime coat. Page

7 See COLUMBA COUNTY BOARD OF COUNTY COMMSSONERS PROJECT NUMBER SW KNG STREET AND SW MAULDN AVENUE - ROADWAY MPROVEMENTS tem 11-ncludes placement of SP b/sy. tem 12 ncludes placement of 18 RCP 72 CF at CR 240 and two 16 CF RCP extensions at Dyal Avenue. Pipe lengths are inclusive of mitered end pipe sections. Poured concrete portion of mitered end section will be paid for under tem 13, Mitered End Section, 18, EA. tem 14 - Shall include all materials, labor, and equipment needed per FDOT specifications to construct box culvert per engineered drawings including all incidental items. Note - Attached tem 15 ncludes cost to place 42 sod strip along edge of pavement and in areas directed by the engineer. tem 16 - Shall be placed at all disturbed areas not sodded, as directed by the engineer. tem 17 - Shall include striping the roadway back to existing layout and shall include stop bars at all stop conditions, centerline/edgeline striping (2 coats each), and RPM s throughout. White edgeline paint will be placed 1 off Edge of Pavement, creating 10 travel lanes and l paved shoulders. ALL TEMS MAY BE NCREASED, DECREASED, OR OMTTED AS DRECTED BY THE ENGNEER. ALL MATERALS AND CONSTRUCTON SHALL CONFORM TO BOTH THE REQUREMENTS OF THE LATEST FDOT STANDARD SPECFCATONS FOR ROAD AND BRDGE CONSTRUCTON AND THE LATEST FDOT DESGN STANDARDS. ALL NCDENTAL WORK NCLUDED N THESE TEMS. ALL UNT PRCE AND TOTAL SPACES MUST4E FLLED N TO CORRELATE WTH EACH TEM. z(.j a Company Name: Authorized Company Representative: Printed Name Attested By: Total Bid Amount: 1,193, Date: May2,201S Page