5 Revision 1 Dated October 2, UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE: PEYTON DRIVE WIDENING - PHASE 3 AND ENGLISH CHANNEL IMPROVEMENTS Project No s. S12012 & Item No. Description Est. Qty. Unit Unit Price Amount 1 MOBILIZATION 2 PROVIDE TRAFFIC CONTROL 3 CLEARING & GRUBBING 4 SHEETING, SHORING AND BRACING 5 6 EARTHWORK AND GRADING ENGLISH CHANNEL EARTHWORK AND GRADING PEYTON DRIVE & EUCALPYTUS AVE. 7 REMOVE EXISTING TREE 10 EA 8 9 SAWCUT EXISTING ASPHALT PAVEMENT REMOVE EXISTING ASPHALT PAVEMENT 2,560 LF 86,000 SF 10 REMOVE EXISTING AC BERM 1,335 LF 11 REMOVE EXISTING PCC CURB 35 LF RELOCATE EXISTING CHAIN LINK FENCE AND GATES AS INDICATED REMOVE EXISTING STEEL BRIDGE, WALKWAY AND DRAINAGE INLET FACILITY REMOVE EXISTING CMP INLET AND ABANDON CONNECTOR PIPE PER SPECIFICATIONS 500 LF City of Chino Hills Part I 1-23

6 Revision 1 Dated October 2, UNIT PRICE BID SCHEDULE (CON T.) SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE: PEYTON DRIVE WIDENING - PHASE 3 AND ENGLISH CHANNEL IMPROVEMENTS Project No s. S12012 & Item No Description Est. Qty. Unit Unit Price Amount ABANDON EXISTING 18 VCP SEWER AND MANHOLES PER SPECIFICATION REMOVE EXISTING CAB WITHIN PROPOSED MEDIAN AND PROVIDE CLEAN REPLACEMENT FILL TO TOP OF MEDIAN CURB CONSTRUCT 6 PCC MEDIAN CURB PER CITY STD ,000 SF 4,772 LF CONSTRUCT 8 CURB AND GUTTER PER CITY STD. 109 CONSTRUCT 4 PCC SIDEWALK PER CITY STD. 107 CONSTRUCT RESIDENTIAL DRIVE APPROACH PER CITY STD. 116 & 117 CONSTRUCT ADA ACCESS RAMP PER CITY STD. 108 COLD MILL ASPHALT PAVEMENT, 0.16 DEPTH 3,118 LF 18,302 SF 3,990 SF 3 EA 23,000 SF 23 CONSTRUCT 0.16 ASPHALT OVERLAY 3,000 TON CONSTRUCT FULL DEPTH AC PAVEMENT, 6 THICK CONSTRUCT ASPHALT CONCRETE BASE COURSE (4 OR 6 THICK) 1,775 SF 4,425 TON 26 CONSTRUCT CLASS II AGGREGATE BASE (10.5 OR 16 THICK) 13,000 TON City of Chino Hills Part I 1-24

7 Revision 1 Dated October 2, UNIT PRICE BID SCHEDULE (CON T.) SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE: PEYTON DRIVE WIDENING - PHASE 3 AND ENGLISH CHANNEL IMPROVEMENTS Project No s. S12012 & Item No Description ADJUST MANHOLE FRAME AND COVER TO GRADE PER CITY STD. S-5 ADJUST WATER VALVE BOX TO GRADE PER CITY STD. W-4 Est. Qty. 12 EA 28 EA Unit Unit Price Amount 29 CONSTRUCT 18 RCP, 2000D 114 LF 30 CONSTRUCT 24 RCP, 1800D 163 LF 31 CONSTRUCT 60 RCP, 1500D 95 LF 32 CONSTRUCT 66 RCP, 1500D 80 LF CONSTRUCT 7 x3.5 REINFORCED CONCRETE BOX CULVERT - PER CALTRANS STD. D80 CONSTRUCT CATCH BASIN PER CITY STD. 205, W=10, V=5 CONSTRUCT CATCH BASIN PER CITY STD. 205, W=14, V=9 CONSTRUCT CATCH BASIN PER CITY STD. 205, W=14, V=4 CONSTRUCT LOCAL DEPRESSION PER CITY STD. 202 INSTALL CATCH BASIN WATER QUALITY INSERT PER SPECIFICATIONS CONSTRUCT TRANSITION STRUCTURE PER SSPWC STD LF 3 EA 5 EA 5 EA City of Chino Hills Part I 1-25

8 Revision 1 Dated October 2, UNIT PRICE BID SCHEDULE (CON T.) SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE: PEYTON DRIVE WIDENING - PHASE 3 AND ENGLISH CHANNEL IMPROVEMENTS Project No s. S12012 & Item No Description CONSTRUCT 36" DIAMETER CMP INLET PER DETAIL ON SHEET NO. 17 CONSTRUCT CONCRETE COLLAR PER CITY STD SD-103 PLACE 1/4 TON, QUARRYSTONE, RIP RAP PER SSPWC CONSTRUCT CONCRETE HEADWALL PER CALTRANS STD. D89 REMOVE AND DISPOSE EXIST. STORM DRAIN INLET AND 18 CMP REMOVE AND DISPOSE EXIST. 66 RCP, 36 CMP AND ALL ASSOCIATED APPURTENANCES CONSTRUCT PIPE CULVERT HEADWALL PER CALTRANS STD. D90, L=75, H=10 CONSTRUCT JUNCTION STRUCTURE PER SSPWC STD MODIFY EXISTING 24 X24 DRAINAGE INLET PER DETAILS ON SHEET NO. 17 CONSTRUCT 24-8 X12 CONCRETE DRAINAGE CHANNEL PER DETAILS ON SHEET 17 CONSTRUCT DOUBLE 12 X9 REINFORCED CONCRETE BOX CULVERT - PER CALTRANS STD. D81 CONSTRUCT INLET STRUCTURE WITH DEBRIS WALL PER DETAILS ON SHEET 17 & 18. Est. Qty. 4 EA 100 SF 249 LF 338 LF Unit Unit Price Amount City of Chino Hills Part I 1-26

9 Revision 1 Dated October 2, UNIT PRICE BID SCHEDULE (CON T.) SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE: PEYTON DRIVE WIDENING - PHASE 3 AND ENGLISH CHANNEL IMPROVEMENTS Project No s. S12012 & Item No Description CONSTRUCT CHANNEL ACCESS RAMP PER DETAILS ON SHEET 19 CONSTRUCT REINFORCED CONCRETE BOX WINDOW PER SSPWC STD CONSTRUCT 1/2 TON CLASS ROCK SLOPE PROTECTION, 3.3-FEET THICK, METHOD A PLACEMENT PER CALTRANS SPECIFICATIONS REMOVE AND DISPOSE EXISTING 26 x10 REINFORCED CONCRETE CHANNEL CONSTRUCT DOUBLE 12-8 x 8 REINFORCED CONCRETE BOX CULVERT PER CALTRANS STD D81. REMOVE AND RELOCATE EXISTING 6- FOOT CHAIN LINK FENCE AND GATES PER SBCFCD STANDARDS. REMOVE EXISTING AC PAVEMENT AT CARBON CANYON CHANNEL ACCESS, AND PLACE CLASS II BASE SUBGRADE AS SHOWN ON SHEET NO. 14. CONSTRUCT 8" THICK CONCRETE PAVEMENT WITH TRANSVERSE GROOVING CONSTRUCT 16 CML&CSP WATERLINE, 10 GA. INSTALL 16 WELDED 45 DEGREE ELBOW, CML&CSP INSTALL 4 BLOWOFF PER CITY STD. W-7 Est. Qty. 2 EA 3 EA 5,200 SF 38 LF 38 LF 3,300 SF 56 LF 4 EA Unit Unit Price Amount 63 JOIN EXISTING 16 D.I. WATERLINE 2 EA City of Chino Hills Part I 1-27

10 Revision 1 Dated October 2, UNIT PRICE BID SCHEDULE (CON T.) SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE: PEYTON DRIVE WIDENING - PHASE 3 AND ENGLISH CHANNEL IMPROVEMENTS Project No s. S12012 & Item No Description REMOVE EXISTING 16 DUCTILE IRON WATERLINE AS NECESSARY MODIFY EXISTING TRAFFIC SIGNAL AT EUCALYPTUS AVE PER SHEET NO. 27 MODIFY EXISTING TRAFFIC SIGNAL AT MORNINGFIELD AVE PER SHEET NO. 26 INSTALL IRRIGATION SYSTEM AS SHOWN PER PROJECT PLANS AND SPECIFICATIONS. INSTALL LANDSCAPING AS SHOWN PER PROJECT PLANS AND SPECIFICATIONS Est. Qty. Unit Unit Price Amount 69 SIGNING AND STRIPING 70 FEDERAL TRAINEE PROGRAM 10 EA INSTALL STREET LIGHTING CONDUIT, PULLBOXES AND FOUNDATIONS PER APPROVED SCE DESIGN PLAN CONSTRUCT AND MAINTAIN TEMPORARY DETOUR DURING CONSTRUCTION PERIOD 73 INSTALL PVC TRAIL FENCE 1,000 LF 74 REMOVE EXISTING PVC TRAIL FENCE 900 LF EDGE GRIND EXISTING AC PAVEMENT 0 TO 0.16 IN DEPTH (5 WIDE) RELOCATE EXISTING FIRE HYDRANT PER CITY STD. W-9 4,700 LF 2 EA City of Chino Hills Part I 1-28

11 Revision 1 Dated October 2, UNIT PRICE BID SCHEDULE (CON T.) SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE: PEYTON DRIVE WIDENING - PHASE 3 AND ENGLISH CHANNEL IMPROVEMENTS Project No s. S12012 & RELOCATE EXISTING BLOW-OFF PER CITY STD. W-7 RELOCATE EXISTING AIR VALVE PER CITY STD. W-6 INSTALL LOOP DETECTOR PER CITY STD EA 12 EA TOTAL OF ALL BID ITEMS (1-79) OF THE BID SCHEDULE: $ (Price in figures) (Price in words) QUANTITIES OF WORK: The quantities of work or material stated in the unit price items of the Bid Schedule are supplied only to give an indication of the general scope of the Work. The City does not expressly nor by implication agree that the actual amounts of work or material will correspond therewith, and reserves the right, after award, to increase or decrease the quantity of any unit price bid item, by an amount up to 25 percent of increase or decrease, without a change in the unit prices, and shall have the right to delete any bid item in its entirety, and receive full credit in the amount shown in the Bid Schedule for the deleted item of Work. Name of Bidder or Firm City of Chino Hills Part I 1-29