1 Ontario Provincial Standards 301 St. Paul St., 2 nd Floor North St. Catharines, ON L2R 7R4 Telephone: Fax: REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS VOLUME 1 GENERAL CONDITIONS OF CONTRACT AND SPECIFICATIONS FOR CONSTRUCTION MANUAL REVISION #77 NOVEMBER 2006 UPDATING ONTARIO PROVINCIAL STANDARDS FOR YOUR USE Each roads and public works owner (Owner) is responsible for determining implementation dates and directions for use of Ontario Provincial Standards; therefore, manual holders are cautioned about immediately discarding superseded and cancelled standards. IMPORTANT NEWS FOR USERS OF OPS TAKE TIME TO READ THIS NOTICE April Two New Initiatives for the Ontario Provincial Standards Both of the following initiatives may have an impact on your Tendering Documents and Contract Documents. Beginning with the April 2007 publication, the Ontario Provincial Standards for Roads and Public Works (OPS) organization will be publishing three different types of Ontario Provincial Standards and will be changing its once a year publishing to twice a year. 1) Three Types of Ontario Provincial Standard Specifications (OPSS) The three types of OPSSs will be: Common for provincial and municipal use specifications Construction and material specifications developed for use in both provincial and municipal oriented Contracts. The administration, testing, and payment policies, procedures, and practices reflected in this type of specification correspond to those used by many municipalities and the Ontario Ministry of Transportation (MTO) alike. This type is the same type of specification that has been published by OPS since its inception. Common specifications will continue to be published in the current: OPS Volume 1, (renamed) Common General Specifications and Construction Specifications for Use in Municipal and Provincial Contracts, and OPS Volume 2, (renamed) Common Material Specifications for Use in Municipal and Provincial Contracts. Rev. Info Sheet - OPS Volume 1: Rev. Number 77 (Date: 11/2006) Page 1

2 Provincial oriented specifications Construction and material specifications developed to reflect the administration, testing, and payment policies, procedures, and practices of the Ontario Ministry of Transportation. Provincial oriented specifications will be published in the new: OPS Volume 5, Provincial Oriented General Conditions of Contract, General Specifications, and Construction Specifications, and OPS Volume 6, Provincial Oriented Material Specifications. Municipal oriented specifications Construction and material specifications developed to reflect the administration, testing, and payment policies, procedures, and practices of many municipalities in Ontario. Municipal oriented specifications will be published in the new: OPS Volume 7, Municipal Oriented General Conditions of Contract, General Specifications, and Construction Specifications and OPS Volume 8, Municipal Oriented Material Specifications Each specification type will be identified by its specification designation: Common for provincial and municipal use specification OPSS nnn Provincial oriented specification OPSS.PROV nnn Municipal oriented specification OPSS.MUNI nnn (where nnn is the number that represents the subject matter of the specification) It is suggested that Owners indicate clearly in their Contract Documents to the Contractor which type of Ontario Provincial Standards apply to their Contract, for example: For municipal Contracts, Only the common standards in OPS Volumes 1 to 4 and the municipal oriented specifications in OPS Volumes 7 and 8 apply to this Contract, unless specified elsewhere in the Contract Documents. For provincial Contracts, Only the common standards in OPS Volumes 1 to 4 and the provincial oriented specifications in OPS Volumes 5 and 6 apply to this Contract, unless specified elsewhere in the Contract Documents. This initiative affects only OPS specifications. The OPS drawings in OPS Volume 3 and OPS Volume 4 are not affected. For more information go to the OPS website ( News and Information. 2) Twice-A-Year Publishing Ontario Provincial Standards ready and approved for publishing in April or November of each year will be published at the end of that month. The April publication will contain municipal or provincial oriented specifications and common specifications that are revised because of the publishing of a municipal or provincial specification. The November publication will contain the specifications and drawings developed and revised by the OPS Specialty Committees. Once-a-year publication began to avoid problems and claims for municipal Contracts that contained statements such as, The most current Ontario Provincial Standards apply to this Contract in their Contract Documents. When the Contract Documents contain this sort of statement, and, if a revised standard is published part way through the term of a Contract and it contains new or changed material, methods, quality assurance, measurement, or payment information, there is a chance that confusion, disputes, and claims may occur when one party or the other of the Contract attempts to apply the new or old standard. This situation was mitigated with once-a-year publication. Page 2 Rev. Info Sheet - OPS Volume 1: Rev. Number 77 (Date: 11/2006)

3 Due to the need for publishing specifications twice-a-year, Owners are encouraged to review their Contract Documents and revise the above such statements to, The Ontario Provincial Standards in affect when the call for Tenders for this Contract were advertised shall apply for the duration of the Contract, or other such wording. This initiative affects all OPS specifications and drawings. ONTARIO PROVINCIAL STANDARDS NOTICE OF ACCESS Current users of the Ontario Provincial Standards for Roads and Public Works (OPS) will not be receiving notices for OPS updates as they have in the past. Methods of notification from Publications Ontario for the future are being investigated and you will be informed of them as they become available. In the interim, an will be sent to OPS users who have registered their OPS manuals and CDs with Marg Gordon, Clerk, (OPS) Standards Management New OPS manuals and the latest published updates for each of the four OPS manuals are available as follows: Available electronically on the MTO website. Online access to the current, updated, and archived standards; indexes; OPS User Notes; and publication Revision Information Sheets are available free of charge at the site. ( Hard-copy format available from Publications Ontario or by telephone at Updates and OPS manuals are available for a cost-recovery fee. ( The four OPS manuals of standards are available on one CD in PDF format. The OPS drawings published in Volumes 3 and 4 are available in AutoCAD format on a separate CD. These CDs are available from Publications Ontario or by telephone at for a cost-recovery fee. The updates are not available on CDs as an update package. ( At the Publications Ontario Web page, you can type Ontario Provincial Standards, OPS, OPSS, or OPSD in the search box, and all related products for the Ontario Provincial Standards will be listed, click on the item you wish to purchase, add the item to your cart, then follow the instructions to complete your order. If trying to order an OPS product online from Publications Ontario and it is shown as Out of Stock, you can backorder the product by telephone at In order to receive the Municipal Engineers Association (MEA) purchase price, MEA members should visit the MEA website ( for the MEA Publications Ontario order form for hardcopy manuals and CDs. MTO employees should contact Simon Leung, Account Representative at Publications Ontario, by (simon.leung@ontario.ca) to set up an account in order to receive the MTO purchase price for technical publications, including the Ontario Provincial Standards. Links to Publications Ontario and the Ontario Provincial Standards on the MTO Library website are available on the OPS website ( Also on this site under News and Activities are notices for updates and changes in OPS. Questions should be directed to Marg Gordon, Clerk, Standards Management, by . (marg.gordon@ontario.ca). Rev. Info Sheet - OPS Volume 1: Rev. Number 77 (Date: 11/2006) Page 3

4 YOU NEED TO REGISTER YOUR OPS MANUALS AND CDs Current and new owners of OPS manuals are requested to register their OPS hard-copy manuals and CDs with the OPS section. This gives us the ability to contact you when an update is available. The registration form and submission instructions are available on the OPS website ( Miscellaneous Info, OPS Forms. WAITING TO HEAR FROM YOU If you have a suggestion to revise a standard or you have a standard that works in your ministry, municipality, or area, send it to the Head, OPS Administration, for possible inclusion into the Ontario Provincial Standards. THIS MANUAL IS REVISED AS FOLLOWS: Index Pages Volume 1 Please remove the entire index and replace with the attached revised index. Standard Specifications Volume 1 Superseded/Cancelled (Remove) Revised/New (Insert) OPSS Dated OPSS Dated General September 1999 General November 2006 Conditions Conditions Of Of Contract Contract Remarks GENERAL CONDITIONS OF CONTRACT 304 April November 2006 CONSTRUCTION SPECIFICATION FOR SINGLE AND DOUBLE SURFACE TREATMENT 309 October November 2006 CONSTRUCTION SPECIFICATION FOR COLD MIXED, COLD LAID, OPEN AND DENSE GRADED BITUMINOUS MIX 315 September Cancelled CONSTRUCTION SPECIFICATION FOR CEMENT TREATED GRANULAR BASE AND SUBBASE The specification no longer represents current practice. 353 September November 2006 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS 355 September November 2006 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS Page 4 Rev. Info Sheet - OPS Volume 1: Rev. Number 77 (Date: 11/2006)

5 Superseded/Cancelled (Remove) Revised/New (Insert) Remarks OPSS Dated OPSS Dated 410 April November 2006 CONSTRUCTION SPECIFICATION FOR PIPE SEWER INSTALLATION IN OPEN CUT November 2006 New Specification CONSTRUCTION SPECIFICATION FOR MANURE PIPELINE INSTALLATION IN OPEN CUT November 2006 New Specification CONSTRUCTION SPECIFICATION FOR PIPELINE REHABILITATION BY CURED-IN-PLACE PIPE 510 November November 2006 CONSTRUCTION SPECIFICATION FOR REMOVAL 518 April November 2006 CONSTRUCTION SPECIFICATION FOR CONTROL OF WATER FROM DEWATERING OPERATIONS 540 May November 2006 CONSTRUCTION SPECIFICATION FOR STANDARD HIGHWAY FENCE 542 March November 2006 CONSTRUCTION SPECIFICATION FOR EXPANDED METAL ANTI- GLARE SCREEN 550 June November 2006 CONSTRUCTION SPECIFICATION FOR INERTIAL MODULE SYSTEM 559 August November 2006 CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - EXTRUDER TERMINAL SYSTEM 577 February November 2006 CONSTRUCTION SPECIFICATION FOR TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES 610 September November 2006 CONSTRUCTION SPECIFICATION FOR THE REMOVAL OF ELECTRICAL EQUIPMENT AND MATERIALS 612 September Cancelled CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF SIGN LUMINAIRES Sign luminaires are no longer being used. 615 September November 2006 CONSTRUCTION SPECIFICATION FOR POLE ERECTION Rev. Info Sheet - OPS Volume 1: Rev. Number 77 (Date: 11/2006) Page 5

6 Superseded/Cancelled (Remove) Revised/New (Insert) Remarks OPSS Dated OPSS Dated 701 April November 2006 CONSTRUCTION SPECIFICATION FOR WATERMAIN INSTALLATION IN OPEN CUT 905 May November 2006 CONSTRUCTION SPECIFICATION FOR STEEL REINFORCEMENT FOR CONCRETE 907 February November 2006 CONSTRUCTION SPECIFICATION FOR STRUCTURAL WOOD SYSTEMS 913 November November 2006 CONSTRUCTION SPECIFICATION FOR EMBEDDED WORK IN STRUCTURES FOR ELECTRICAL SYSTEMS 928 May November 2006 CONSTRUCTION SPECIFICATION FOR STRUCTURE REHABILITATION - CONCRETE REMOVAL Page 6 Rev. Info Sheet - OPS Volume 1: Rev. Number 77 (Date: 11/2006)

7 SUMMARY OF REVISIONS TO GENERAL CONDITIONS OF CONTRACT November 2006 GENERAL CONDITIONS OF CONTRACT GC Abbreviations for ACI, CCIL, ISO, OTM, and SCC have been added. Abbreviation for MTC has been deleted. GC Definitions for Addendum, Agreement, Business Day, End Result Specification, Lot, Quarried Rock, and Quarry have been added. Definitions for Base and Subgrade have been rewritten. GC Definition for Contract Drawings or Contract Plans, deleted standard drawings at the end of clause. GC Has been rewritten. GC Owner s Standard Specifications has been added. GC Has been revised to include in writing by the Contractor at the end of the sentence. GC Has been revised to include for the Owner s approval at the end of the sentence. GC Has been rewritten. GC Has been rewritten. GC Has been added. GC Has been added. GC Has been moved to GC Other subsections have been reordered. GC Clause.03 has been added. GC Has been revised to include 10 Days prior to the start of construction in the first sentence. GC Has been revised from 10 Days to 5 Days in the first sentence. GC Has been rewritten. GC Has been revised to include attempt to in the first sentence and the second sentence of the clause has been added. GC Engineering Arbitration has been revised to Arbitration. GC 3.14 and Engineering Arbitration has been revised to Arbitration in the titles. GC and Engineering Arbitration has been revised to Arbitration. GC Clause.04 has been added. GC Has been revised from Project approval to design of the Work. GC b) - Has been revised to include cement products and asphalt. The second instance of the word asbestos has been deleted. Also, the word is has been revised to may be. Rev. Info Sheet - OPS Volume 1: Rev. Number 77 (Date: 11/2006) Page 7

8 GC Clauses.02 and.03 have been added. GC Has been rewritten. Clause.02 has been added. GC Has been deleted as GC 4.05 covers the clause. Other subsections have been reordered. GC Has been added. GC Clause.09 has been added. GC Has been rewritten. GC Has been revised to include protective work or works in the first sentence. The word provisions has been deleted. Added and payment in the last sentence with such work. GC The last sentence has been added. GC Has been revised to include elected officials in the first paragraph. GC Has been revised to include their elected officials in the first sentence. GC Clause.02 has been added. GC Deleted dated 8-87 in the last sentence. GC Has been rewritten. GC Has been rewritten to separate the insurances for aircraft and watercraft liability. GC Has been revised to include to the satisfaction of the Owner at the end of the sentence. GC Has been added. GC New clause.04 has been added. Other clauses have been reordered. GC Has been revised to include as amended after the Occupational Health and Safety Act and Ontario Regulation 213/91 of the first paragraph. GC New clause.11 has been added. Other clauses have been reordered. GC Has been rewritten. GC New clause.15 has been added. Other clauses have been reordered. GC Has been rewritten. GC Has been revised to include under the supervision of in the second sentence. GC Has been rewritten. GC Has been added. GC Has been revised to include and prevention of dust nuisance, mud, and ponding water. GC Has been rewritten. Page 8 Rev. Info Sheet - OPS Volume 1: Rev. Number 77 (Date: 11/2006)

9 GC and Have been added. GC Deleted the first two sentences. GC Amended MUTCD to OTM at the end of the sentence. GC Has been revised to include and all other Utilities. GC Has been revised to include the owner of the works. GC Has been revised to include Saturdays and Statutory Holidays. GC Has been revised to include coordinate the Work. GC Has been revised to include Unless otherwise specified in the Contract Documents for certain Materials or components of the Work. GC Has been added. GC Has been added. GC Inserted Payment to Completion Certificate. GC Inserted or lump sum in the last sentence. GC Inserted Payment to Completion Certificate in the last paragraph. GC a) - Replaced reasonable cost with actual cost in the last sentence. GC a) - Has been revised to include deliver the Material to a site approved by the Contract Administrator and the Contractor shall. Deleted and notify the Contract Administrator of their locations at the end of the sentence. GC b) i. (1) - Has been revised to include Granular O, BI, BII, and BIII. GC Has been revised to include Contract Administrator has verified that the. GC Has been rewritten. GC The definition for Rented Equipment has been revised to include the word associate. GC Has been rewritten. GC Has been revised to include Change Directive or Change in the second sentence. GC Has been added. GC Has been added. GC Has been rewritten. GC Revised title of clause to Taxes. Rev. Info Sheet - OPS Volume 1: Rev. Number 77 (Date: 11/2006) Page 9

10 SUMMARY OF REVISIONS TO OPSS 304 November 2006 CONSTRUCTION SPECIFICATION FOR SINGLE AND DOUBLE SURFACE TREATMENT Section 2, References, OPSS 102 and OPSS 1001 have been deleted. Section 2, References, OPSS 1006 has been added. Section 2, References, the following Ministry of Transportation Publications have been deleted: LS-601, LS-602, LS-604, LS-607, LS-608, LS-609, LS-618, LS-619, and LS 703/704. Section 2, References, the following Ministry of Transportation Publication has been added: Ontario Traffic Manual, Book 7 - Temporary Conditions. Section 3, Definitions, end nozzle has been added. Subsection , Aggregates, clause , and subsection , Pilot Vehicle, have been rewritten. Subsection , Operational Constraints, has been renumbered as subsection and the other subsections have been reordered. Existing subsection , General, has been renumbered and renamed , Sampling, and rewritten. Existing subsection , Determination of Binder and Aggregate Application Rates, has been rewritten. Existing subsection , Protection of Work and Traffic Control, has been deleted. Other subsections have been reordered. Subsections , Surface Preparation; , Application of Binder; and , Traffic Convoy, have been rewritten. Subsections , Protection of Work, and , Management of Excess Material, have been added. Section , Basis of Payment, has been rewritten. Tables 1 and 2 have been deleted. Other Tables have been reordered. SUMMARY OF REVISIONS TO OPSS 309 November 2006 CONSTRUCTION SPECIFICATION FOR COLD MIXED, COLD LAID, OPEN AND DENSE GRADED BITUMINOUS MIX Title of specification revised. Bituminous pavement changed to bituminous mix throughout specification. Section 2, References, has been updated. Section 2, References, OPSS 502, OPSS 1150, and ASTM D 2419 have been deleted. Section 2, References, OPSS 1003 has been added. Page 10 Rev. Info Sheet - OPS Volume 1: Rev. Number 77 (Date: 11/2006)

11 Section 2, References, MTO laboratory test procedure numbers and titles added. Section 3, Definitions, CL mix, Fat Spots, and Segregation have been rewritten. Sections , Submission and Design Requirements, and , Materials, have been rewritten. Subsection , Production and Placement, has been rewritten. Subsection , Hot Mix Plants, has been deleted. Clause has been rewritten. Clauses , , , , , have been rewritten. Section , Measurement for Payment, has been rewritten. Section , Basis of Payment, has been rewritten. Tables 1 and 3 deleted. Existing Table 6 has been renumbered Table 1 and revised. Other tables reordered. SUMMARY OF REVISIONS TO OPSS 353 November 2006 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS References have been updated. Reference to OPSS 502 has been deleted. Subsection , Slipform, has been added. Other subsections have been reordered. Existing subsection , Joints, has been rewritten. Radius of short edging tool has been revised from 6 mm to 5 mm throughout. Existing subsection , Hook Bolt Dowels, has been deleted. Existing clause has been rewritten. Existing subsection , Extrusion Methods, has been deleted. Other subsections have been reordered. Existing subsection , Identification Stamp, has been rewritten. Subsection , Management of Excess Material, has been added. Section , Measurement for Payment, has been rewritten. Section , Basis of Payment, has been rewritten. Rev. Info Sheet - OPS Volume 1: Rev. Number 77 (Date: 11/2006) Page 11

12 SUMMARY OF REVISIONS TO OPSS 355 November 2006 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS References have been updated. References to OPSS 180 and OPSS 315 have been deleted. References to OPSS 313 revised to OPSS 310. Reference to OPSS 1860 has been added. Definitions for Business Days and Manufactured Sand have been added. Definitions for Concrete Pavers and Laying Face have been rewritten. Section 4, Submissions and Design Requirements, has been added. Subsection , Bedding and Joint Sand, has been rewritten. Subsection , Concrete Pavers, has been rewritten. Subsections , Edge Restraints, and , Geotextile, have been added. Subsection , Subbase and Base, has been rewritten. Clause has been rewritten. Subsections , Laying Pattern; , Joint Sand Compaction; and , Removal of Unacceptable Concrete Pavers, have been rewritten. Clause has been rewritten. Section , Basis of Payment, has been rewritten. SUMMARY OF REVISIONS TO OPSS 410 November 2006 CONSTRUCTION SPECIFICATION FOR PIPE SEWER INSTALLATION IN OPEN CUT In section , References, references for OPSS 180 and ASTM C 171 have been deleted, and the references for OPSS 510 and 1205 have been added. Clause , third paragraph has been deleted. Subsection , Clay Seal, has been added. Other subsections have been reordered. Subsection , Removals, has been added. Other subsections have been reordered. Subsection , Backfilling and Compacting, has been rewritten. Clause has been rewritten. Clause has been rewritten. Clause has been rewritten. Page 12 Rev. Info Sheet - OPS Volume 1: Rev. Number 77 (Date: 11/2006)

13 Clause has been rewritten. Clause has been rewritten. Clause has been rewritten. Clause has been rewritten. Clause , formula for allowable deflected pipe diameter has been rewritten. Clause has been rewritten. Subsection , Clay Seals, has been added. Other subsections have been reordered. Subsection , Management of Excess Material, has been rewritten and the title of the subsection has been revised. Clause has been rewritten. SUMMARY OF REVISIONS TO OPSS 510 November 2006 CONSTRUCTION SPECIFICATION FOR REMOVAL Section 2, References, Roadside Safety Manual has been added. Section 3, Definitions, energy attenuator has been added. Clause has been rewritten. Payment references in clauses , , and have been moved to subsection , Removal Items. References to guide rail end treatments deleted from clause Clause has been rewritten. The first paragraph of clauses and has been rewritten. Subsection , Overhead Signs and Sign Support Work, has been rewritten. Presentation of information in Section 10, Basis of Payment, has been reordered. SUMMARY OF REVISIONS TO OPSS 518 November 2006 CONSTRUCTION SPECIFICATION FOR CONTROL OF WATER FROM DEWATERING OPERATIONS Section , Scope, has been rewritten. In section , References, reference for the Fisheries Act has been added. In section , Definitions, definitions for Dewatering Operation, Natural Attenuation Area, Sediment, and Uncontaminated Water have been added. Subsection , Disposal of Water, has been rewritten. Rev. Info Sheet - OPS Volume 1: Rev. Number 77 (Date: 11/2006) Page 13

14 Subsection , Surface Drainage, has been rewritten. Subsection , Settling Ponds and Sediment Basins, has been rewritten. Subsection , Management of Excess Material, has been added. SUMMARY OF REVISIONS TO OPSS 540 November 2006 CONSTRUCTION SPECIFICATION FOR STANDARD HIGHWAY FENCE Title revised. Section , References, OPSS 1508 and NLGA have been deleted and OPSS 510 and ASTM A 780 have been added. Section , Definitions, definitions have been reordered and rewritten. Definitions for Line Wire and Stay Wire have been added. Existing subsection , Fences, has been renamed to Highway Fence and rewritten. Existing subsection , Wood, has been moved to OPSS Subsection , Removal, has been added. Existing subsection , Highway Fence, has been renumbered to and rewritten. Existing clause has been renumbered to and rewritten. Existing clause has been divided into three separate clauses and rewritten as , , and Existing clause has been renumbered to and rewritten. Existing clause has been renumbered to and rewritten. Existing subsection , Brace Panels, has been renumbered to and rewritten. Existing subsection , Gates, has been renumbered to and rewritten. Subsection , Zinc Coating Repairs, has been added. Subsection , Site Restoration, has been added. Subsection , Management of Excess Material, has been added. Section , Quality Assurance, has been added. Section , Measurement For Payment, has been rewritten. Section , Basis Of Payment, has been rewritten. Page 14 Rev. Info Sheet - OPS Volume 1: Rev. Number 77 (Date: 11/2006)

15 SUMMARY OF REVISIONS TO OPSS 542 November 2006 CONSTRUCTION SPECIFICATION FOR EXPANDED METAL ANTI-GLARE SCREEN Section , Scope, has been rewritten. Section , References, updated. OPSS 541 and ASTM A 569 have been deleted and OPSS 1541 and ASTM A 1011/A 1011M have been added. Existing subsection , Sheet Metal, has been renamed and rewritten. Existing subsection , Mesh, has been renumbered to and 1 st, 6 th, and 7 th paragraph have been rewritten. Existing subsection , Posts and Fasteners, has been renumbered to , renamed to Posts and Wire Fasteners, and rewritten. Existing subsection , Tension and Tie Wires, has been renumbered to and rewritten. Existing subsection , Miscellaneous Hardware, has been renumbered to and rewritten. Existing subsection , Post Caps, has been renumbered to Paragraphs under existing section , Construction, have been renumbered to subsection , General, and rewritten. Existing subsection , Steel Beam Guide Rail, has been renumbered to , renamed to Expanded Metal Anti-Glare Screens on Steel Beam Guide Rail, and rewritten. Existing subsection , Chain Link Fence, has been renumbered to , renamed to Expanded Metal Anti-Glare Screens on Chain-Link Fence, and rewritten. Existing subsection , Concrete Barrier, has been renumbered to , renamed to Expanded Metal Anti-Glare Screens on Concrete Barrier, and rewritten. Section , Measurement For Payment, has been rewritten. SUMMARY OF REVISIONS TO OPSS 550 November 2006 CONSTRUCTION SPECIFICATION FOR INERTIAL MODULE SYSTEM Title revised. Section , Scope, inertial barrier modules revised to inertial module systems throughout specification. Section , References, Manual of Uniform Traffic Control Devices has been deleted and CSA G164 has been added. Existing section , Definitions, has been deleted. Existing subsection , Inertial Barrier Modules, has been renamed to General and rewritten. Existing subsection , Granular, has been renamed to Granular A and rewritten. Rev. Info Sheet - OPS Volume 1: Rev. Number 77 (Date: 11/2006) Page 15

16 Existing subsection , Bolts, has been renumbered to and rewritten. Existing subsection , Nails, has been renumbered to and rewritten. Existing subsection , Stop Brackets, has been renumbered to and rewritten. Subsection , General, has been rewritten. Clause has been rewritten. Existing subsection , Assembly Of Inertial Barrier Modules, has been deleted. Existing subsection , Inertial Barrier Modules, Temporary, has been deleted. Existing subsection , Inertial Barrier Modules, Relocation, has been renumbered to , renamed to Relocation, and rewritten. Existing subsection , Delineators, has been renumbered to and rewritten. Existing subsection , Management and Disposal of Excess Material, has been renumbered to SUMMARY OF REVISIONS TO OPSS 559 November 2006 CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - EXTRUDER TERMINAL SYSTEM Title revised. Extruder system renamed to Extruder Terminal system throughout specification. Section , References, CSA G4, CAN/CSA G40.21, CAN/CSA G164, CSA W59, CSA W47.1, CGSB 1-GP-181M, ANSI B18.6.4, ASTM A449, ASTM A567, and ASTM A741 have been deleted and ASTM A 780 has been added. Existing subsection , Cable Assembly, has been deleted. New subsection , General, has been added. Existing subsection , Timber Posts and Blocks, has been renamed to Wooden Posts and Blocks and rewritten. Existing subsection , Miscellaneous Steel Components, has been deleted. Existing subsection , Steel Beam Guide Rail, Nuts, Bolts, Washers and Lag Bolts, has been renumbered to ; renamed to Steel Beam Guide Rails, Nuts, Bolts, and Washers; and rewritten. Subsection , General, has been rewritten. Existing subsection , Posts and Post Anchors, has been renamed to Posts and Steel Foundation Tubes, 1 st and 2 nd paragraphs have been rewritten, and new 5 th paragraph has been added. Subsection , Steel Beam Guide Rail, 1 st and 2 nd paragraphs have been rewritten and new 3 rd, 4 th, and 5 th paragraphs have been added. Page 16 Rev. Info Sheet - OPS Volume 1: Rev. Number 77 (Date: 11/2006)

17 Subsection , Field Fabrication, has been rewritten. Subsection , Damage to Galvanizing, has been rewritten. Subsection , Object Markers, has been added. Section , Measurement for Payment, has been rewritten. Section , Basis of Payment, has been rewritten. SUMMARY OF REVISIONS TO OPSS 577 November 2006 CONSTRUCTION SPECIFICATION FOR TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES Section , References, added references CGSB No.7.3 and No.10. Deleted CGSB Existing references updated. Section , Definitions, added definitions for Waterbody and Watercourse. Section , Materials, revised subsections for Geosynthetics, Control Measure Support Material, Sandbags, Rock, and Chutes. Section , Construction, added subsection for General, Turbidity Curtains, Cofferdams, and Management of Excess Material. Deleted subsection for In-Water Controls. Existing subsections revised. Clause deleted. Subsection and sections and revised to remove heavy-duty straw bale barriers. Section , Measurement for Payment, revised subsection for Actual Measurement. Section , Basis Of Payment, revised existing subsections. SUMMARY OF REVISIONS TO OPSS 610 November 2006 CONSTRUCTION SPECIFICATION FOR THE REMOVAL OF ELECTRICAL EQUIPMENT AND MATERIALS Title of specification revised. Section , References, updated. The Environmental Protection Act has been deleted and OPSS 507 has been added. Section , Submission and Design Requirements, has been added. Subsection , General, has been added. Other subsection reordered. Existing subsection , Excavation, and subsection , Backfill and Trimming, have been combined, renumbered to , renamed to Excavation, Backfilling, and Trimming, and rewritten Subsection , Demolition, trim offset revised from 300 m to 300 mm and existing 3 rd paragraph has been deleted. Rev. Info Sheet - OPS Volume 1: Rev. Number 77 (Date: 11/2006) Page 17

18 Existing subsection , Disposal of Debris, has been deleted. Existing subsection , Poles, has been deleted. Existing subsection , Luminaries, Signal Heads, Internally Illuminated Signs, has been renumbered to , renamed to Luminaires, and rewritten. Existing subsection , Brackets, Mast Arms, Pole Attachments, has been deleted. Existing subsection , Cables and Conduit, has been renumbered to and rewritten. Existing subsection , Transformers, has been renumbered to and rewritten. Existing subsection , Substation Equipment; subsection , Pole Mounted Power Supply Control Equipment; subsection , Sign Equipment; subsection , Traffic Signal Controllers and Electronic Equipment; and subsection , Concrete Footings, Pads, Manholes, Junction Boxes, have been deleted. Subsection , Disposal of PCB Wastes, has been added. Existing subsection , Temporary Installations, has been renumbered to and rewritten. Existing clause has been deleted. Other clause renumbered. Existing clause has been renumbered to , renamed, and rewritten. Existing clause has been renumbered to and rewritten. Existing clause has been deleted. Existing subsection , Restoration Work, has been renumbered to , renamed to Site Restoration, and rewritten. Subsection , Management of Excess Material, has been added. Section , Basis of Payment, has been rewritten. SUMMARY OF REVISIONS TO OPSS 615 November 2006 CONSTRUCTION SPECIFICATION FOR POLE ERECTION Section , References, updated. OPSS 2440 and OPSS 2451 have been deleted and OPSS 507, OPSS 510, and the Ontario Electrical Safety Code have been added. Subsection , Concrete, has been rewritten. Subsection , Poles, existing 4 th paragraph has been deleted. Subsection , Frangible Bases, has been rewritten. Subsection , General, installation requirements have been added. Clause has been rewritten. Page 18 Rev. Info Sheet - OPS Volume 1: Rev. Number 77 (Date: 11/2006)

19 Existing clause has been deleted. Existing clause has been renamed, renumbered to , and rewritten. Existing subsection , Assembly of Sectional Steel Poles, has been renumbered to and rewritten. Clause , 2 nd paragraph has been rewritten. Clause has been rewritten. Clause has been rewritten. Clause has been rewritten. Subsection , Guy Anchors, has been rewritten. Subsection , Guy Spans, has been deleted. Subsection , Site Restorations, has been renamed, renumbered to , and rewritten. Section , Measurement for Payment, has been rewritten. Section , Basis of Payment, Aluminum Poles with Frangible Coupling, Direct Buried in Earth; Aluminum Poles with Frangible Coupling, Direct Buried in Rock; and Guy Spans items have been deleted. SUMMARY OF REVISIONS TO OPSS 701 November 2006 CONSTRUCTION SPECIFICATION FOR WATERMAIN INSTALLATION IN OPEN CUT Section , References, added NSF/ANSI 61, CSA B64.5, and AWWA C510. All other references updated. Section , Definitions, Business Day deleted and definition for End Cover added. Subsection , General, third paragraph added. Subsection , Double Check Valve Backflow Preventers, has been added. Other subsections reordered. Subsection , General, second paragraph added. Subsection , Removals, has been added. Other subsections reordered. Subsection , Transporting, Unloading, Storage, and Handling Pipe, second and third paragraphs added. Subsection , Temporary Potable Water Supply System, has been added. Other subsections reordered. Subsection , Installation of Pipes, second paragraph deleted. Clause , first sentence added. Rev. Info Sheet - OPS Volume 1: Rev. Number 77 (Date: 11/2006) Page 19

20 Subsection , Cutting of Pipe, second sentence added. Subsection , Installation of Valves and Fittings, title has been modified. Clause , added and fittings in the first two sentences and added last sentence. Subsection, , Management of Excess Material, second sentence of second paragraph deleted. SUMMARY OF REVISIONS TO OPSS 905 November 2006 CONSTRUCTION SPECIFICATION FOR STEEL REINFORCEMENT FOR CONCRETE Section , References, added references MTO Structural Manual, Laboratory Testing Manual LS-434; CSA G30.18, and S6; ASTM A 955/A 955M and E 8; and ISO Deleted OPSS 909 and 910; CSA G279 and W59; Reinforcing Steel Manual of Standard Practice; ASTM A 53, D 2239, and D Existing references updated. Section , added definitions for Coated Reinforcing Steel Bar and Reinforcing Stainless Steel Bars. Revised definitions for Mechanical Connection, Mechanical Connector, Reinforcing Steel Bars, Slip, Splice Bar, Splice, Steel Reinforcement, and Tensile Strength. Deleted definitions for Bridge, Day, Deviator Duct, Local Zone, Mechanical Connector - Post Tensioning, Post-tensioning, Prestressing Tendon, Stamped, and Swaged. Section , Submission and Design Requirements, section revised and subsections added for Mill Test Certificates and Return of Submissions. Section , Materials, added subsection for Reinforcing Stainless Steel Bars. Deleted subsections for Ducts, Anchorages, and Mechanical Connectors. Other subsections revised. Section , Construction, section revised. Added subsection for Management of Excess Material. Deleted subsections for Prestressing Steel, Sheaths and Anchorages, and Repairs to Coated Associated Hardware. Section , Quality Assurance, revised. Section , Measurement for Payment, deleted subsections for Reinforcing Steel Bars and Coated Reinforcing Steel Bars, and Splice Bars and Coated Splice Bars. Other subsections revised. Section , Basis of Payment, revised. SUMMARY OF REVISIONS TO OPSS 907 November 2006 CONSTRUCTION SPECIFICATION FOR STRUCTURAL WOOD SYSTEMS Section , References, added references OPSS 904, 905, 910, 1350, 1440, and 1860; Structural Manual; CSA S6; ASTM A 653, and A 722. Deleted references CSA G279, and O122; ASTM A 446; AWPA M4-84; Ontario Highway Bridge Design Code; NGLA; and SAE Existing references updated. Section , Definitions, added definitions for Dressed Wood, Grade, Preservative Treatment, Species, and Wood. Deleted definitions for Groove and Dap, Notch and Spike and Reinforcing Spike. Revised definitions for Stress-Laminated Wood Deck and for Fasteners and Hardware. Page 20 Rev. Info Sheet - OPS Volume 1: Rev. Number 77 (Date: 11/2006)

21 Section , Submission and Design Requirements, subsection added for Submission Requirements, with clauses added for General and for Return of Submissions. Existing clauses rewritten. Section , Material, revised. Added subsections for Geotextile, for Concrete, and for Steel Reinforcing Bar. Subsection , Hydraulic Jack System Stress-Laminated Wood Decks, revised. Section , Construction, added subsection for Concrete and for Reinforcing Steel Bar. Revised existing subsections. Section , Measurement for Payment, revised. Section , Basis of Payment, revised. SUMMARY OF REVISIONS TO OPSS 913 November 2006 CONSTRUCTION SPECIFICATION FOR EMBEDDED WORK IN STRUCTURES FOR ELECTRICAL SYSTEMS Section , References, updated; OPSS 2492, CSA B137 Series, CSA G164, ASTM A 563, ANSI B , SAE J403, and AISI C12L14 have been deleted; and OPSS 616 and CSA C22.2 No. 85 have been added. Subsection , Junction Boxes and Fittings, has been renamed and rewritten. Subsection , Rigid Ducts, has been renamed and rewritten. Subsection , Flexible Ducts and Fittings, has been rewritten. Subsection , Anchorage Assemblies and Hardware, has been rewritten. Clause has been rewritten. Clause has been rewritten. Clause has been rewritten. Subsection , Embedded Work in Structure, has been rewritten. Clause , 1 st paragraph has been rewritten. Clause , has been renamed, existing 2 nd paragraph has been deleted, existing 4 th paragraph has been rewritten, and new 2 nd paragraph has been added. Clause has been rewritten. Rev. Info Sheet - OPS Volume 1: Rev. Number 77 (Date: 11/2006) Page 21

22 SUMMARY OF REVISIONS TO OPSS 928 November 2006 CONSTRUCTION SPECIFICATION FOR STRUCTURE REHABILITATION - CONCRETE REMOVAL Section , References, added references Structural Manual and CSA S6. Section , Definitions, added definitions for Concrete Crusher, Concrete Removal- Partial Depth-Type A, Concrete Removal- Partial Depth-Type B, Concrete Removal- Partial Depth-Type C, Concrete Removal Sequence, Concrete Removal- Structural Component, Engineer, and Scarifying. Revised definitions for Layer, Mat, and Structure. Section , Submission and Design Requirements, section revised. Section , Equipment, revised. Section , Construction, revised with subsections added for General, Concrete Survey, Steel Reinforcement in Concrete Removal Areas, Operational Constraints, Concrete Removals, Remedial Work, and Management of Excess Material. Revised existing subsections for Access to Work Area, Work Platform, and Scaffolding; and Scarifying. Deleted subsections for Concrete Removal - Partial Depth - Types A, B and C; Concrete Removal - Full Depth and Complete Deck; and Concrete Removal - Deck Joint Assemblies and incorporated this information into new subsections. Section , Quality Assurance, added. Section , Measurement for Payment, revised. Section , Basis of Payment, revised. Page 22 Rev. Info Sheet - OPS Volume 1: Rev. Number 77 (Date: 11/2006)