1 Treatment Plant Norfolk Berthed at Nauticus, the Battleship Wisconsin is one of the largest and last battleships ever built by the U.S. Navy.

2 3Q AB Q Legend Treatment Plant CIP Interceptor Point _ CIP PumpStation Point CIP Interceptor Line ^_ CIP Abandonment Treatment Plant Service Area HRSD Interceptor Force Main HRSD Interceptor Gravity Main 3Q HRSD Treatment Plant 3 PRS HRSD Pressure Reducing Station 3PS HRSD Pump Station Feet 0 1,850 3,700 7,400 11,100 14,800 AB Treatment Plant Service Area CIP Projects Treatment Plant Projects Ü CIP Location Service Area

3 SG-001 SF-235 SG-196 TIDEWATER DR TAUSSIG BLVD ADMIRAL TAUSSIG BLVD SF-007 TERMINAL PRS SF-005 AB TERMINAL BLVD SF A SF-005 I C SF-008 SF-006 W LITTLE CREEK RD NORTH SHORE RD HAMPTON BLVD GRANBY ST THOLE ST RICHMOND CRESCENT HANOVER AVE MONROE PLACE POWHATAN AVE SF-045 JAMESTOWN CRESCENT NORVIEW AVE Legend ^_ CIP Interceptor Point _ CIP Pump Station Point CIP Interceptor Line Project Interceptor Line!]^ Project Interceptor Point!]^ Project Pump Station Point Project Area CIP Abandonment CIP Project Area HRSD Interceptor Force Main HRSD Interceptor Gravity Main 3Q HRSD Treatment Plant 3 PRS HRSD Pressure Reducing Station 3PS HRSD Pump Station Feet 0 1,000 2,000 4,000 6,000 8, Inch and 20-Inch Transmission Main Replacements / CIP Location Norfolk

4 24-Inch and 20-Inch Transmission Main Replacements PR_ System: Type: Pipelines Driver Category: Project Status: Regulatory: I&I Abatement-Rehabilitation Plan Design Delay Rehab Plan Phase Two Prog Cost PROGRAM CASH FLOW PROJECTION ($,000) Exp to Previous Year FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 $23,173 $834 $0 $1,607 $4,832 $13,629 $2,271 $0 $0 $0 $0 $0 PROJECT DESCRIPTION This project is to study, design and construct a replacement interceptor for Line SF-04, approximately 9,460 ft of 24-inch cast iron pipe and 5,585 ft of 20-inch cast iron pipe and Line SF-05, approximately 12,559 ft of 20-inch reinforced concrete pipe. This project will also replace the main line valves, branch valves, valve complexes at Valve Guides AB-2001 and AB-2005 and replace yard valves and wall sleeves at the Terminal Boulevard Pressure Reducing Station. A single line is planned to replace these twin lines along the current alignment. HART analysis has determined the replacement pipe size to be 30-inch. This project also includes abandoning a portion of line SG-003, a section of gravity pipe from MH-SG to MH-SG at the intersection of Baker Street and Hampton Boulevard that is not in service and is deteriorating. The City of Norfolk Department of Utilities has requested that HRSD's design and construction package include 2,300 linear feet (LF) of 24-inch diameter waterline replacement along Hampton Boulevard between Terminal Boulevard and Baker. The construction value of this work is estimated at $1,900,000 and will be reimbursed by the City to HRSD in accordance with a pending agreement. PROJECT JUSTIFICATION This project will address SF-04 that was designed and built in 1956 according to the plans inherited from the City of Norfolk. The same plans show an existing 20-inch concrete line, now HRSD line number SF-05. Since SF-05 was turned over to HRSD in 1956, it is at least 50 years old. Both lines have multiple repairs installed by HRSD and repair history prior to HRSD ownership is unknown. Multiple branch valves along this alignment are 1948 or 1956 valves that are difficult to repair or get replacement parts. The valve guide AB-2005 has several inoperable valves and an abandoned dead-end section of pipe that has a high risk of failure. These lines are the main interceptors conveying wastewater from the City of Norfolk to the Treatment Plant. This project also includes abandoning the gravity line SF-002. Flow is currently bypassing this section of pipe and the pipe is in poor condition from tuberculation and infiltration. FUNDING TYPE CONTACTS Funding Type: Revenue Bond Contacts-Requesting Dept: Operations-Interceptors Contacts-Dept Contacts: Katherine Linares Contacts-Managing Dept: Engineering PROPOSED SCHEDULE START DATE PrePlanning 11/01/2012 PER 06/01/2013 Design Delay 12/01/2013 Design 07/01/2019 Bid Delay 09/01/2020 PreConstruction 09/01/2020 Construction 03/01/2021 Closeout 09/01/2022 COST ESTIMATE Cost Estimate Class: Class 4 PrePlanning $0 PER $158,936 Design $2,542,000 PreConstruction $21,218 Construction $20,451,100 Closeout $0 Est. Program Cost $23,173,254 Contingency Budget $4,076,220 Est. Project Costs $27,249,474

5 SG-002 SF-235 SG-001 RAILROAD AVE LAGOON RD BAKER ST SG-952 SG-003 SF-002 SG-003 W MAIN ST 13TH ST 11TH ST 8TH ST BULKHEAD ST 7TH ST 9TH ST 7TH ST 6TH ST 5TH ST Legend ^_ CIP Interceptor Point _ CIP Pump Station Point CIP Interceptor Line Project Interceptor Line!]^ Project Interceptor Point!]^ Project Pump Station Point Project Area CIP Abandonment CIP Project Area HRSD Interceptor Force Main HRSD Interceptor Gravity Main 3Q HRSD Treatment Plant 3 PRS HRSD Pressure Reducing Station 3PS HRSD Pump Station Feet ,240 Treatment Plant Improvements - Phase III / CIP Location Norfolk

6 Treatment Plant Improvements - Phase III PR_ System: Type: Wastewater Treatment Driver Category: Project Status: Regulatory: Nutrient Reduction Design Nutrient Reduction Prog Cost PROGRAM CASH FLOW PROJECTION ($,000) Exp to Previous Year FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 $122,522 $121,278 $1,244 $0 $0 $0 $0 $0 $0 $0 $0 $0 PROJECT DESCRIPTION This project will provide for biological nutrient removal (BNR) to meet recently adopted regulatory requirements. The treatment process will be designed to meet an annual average of 5.0 mg/l total nitrogen concentration and a 1.0 mg/l total phosphorus concentration in the effluent discharge. Improvements to existing facilities will also be needed to address the BNR process upgrades including the installation of a distributed control system, grit removal improvements and generator/switchgear upgrades. A number of other site improvements will also be needed on this relatively small and fully utilized site. The improvement project will also include a number of existing CIP projects already scheduled to move ahead. These projects include: Aeration Tank Influent Pipe Replacement, Primary Clarifier Influent Pipe Replacement, Foreign Biosolids Facility Improvements. PROJECT JUSTIFICATION The Virginia State Water Control Board adopted new Water Quality Regulations on November 1, The regulations established mass loading limits by river basin. As part of HRSD's negotiations with VDEQ on the implementation of these limits, it was agreed that at least one plant in the James River Basin would be upgraded to BNR. An HRSD team has determined that the Treatment Plant should be upgraded to meet part of this mass-loading requirement. FUNDING TYPE CONTACTS Funding Type: Revenue Bond Contacts-Requesting Dept: Operations-Treatment Contacts-Dept Contacts: Katherine Linares Contacts-Managing Dept: Engineering PROPOSED SCHEDULE START DATE PrePlanning 09/01/2006 PER 01/01/2007 Design Delay 07/01/2007 Design 07/01/2007 Bid Delay 12/01/2009 PreConstruction 12/01/2009 Construction 07/01/2010 Closeout 07/01/2016 COST ESTIMATE Cost Estimate Class: Class 5 PrePlanning $0 PER $1,088,348 Design $8,343,312 PreConstruction $0 Construction $109,481,790 Closeout $3,608,286 Est. Program Cost $122,521,736 Contingency Budget $0 Est. Project Costs $122,521,736

7 MAURY ARCH SHIRLAND AVE TERMINAL BLVD FECHTELER RD TERMINAL BLVD S MAIN ST TERMINAL BLVD AB SF-006 SWINK ST SF-005 HARRISON RD SF-004 N SHIRLAND AVE MEADS RD LAMBERT PL CLONCURRY RD DANIEL AVE MILSON AVE GLENEAGLES RD HAMPTON BLVD TROUVILLE AVE SHIRLAND AVE W LITTLE CREEK RD ARGYLE AVE RUNNYMEDE RD CORTLANDT PL MUIRFIELD RD NORTH SHORE RD SPS-117 HAMPTON BLVD N SHORE RD AB Legend ^_ CIP Interceptor Point _ CIP Pump Station Point CIP Interceptor Line Project Interceptor Line!]^ Project Interceptor Point!]^ Project Pump Station Point Project Area CIP Abandonment CIP Project Area HRSD Interceptor Force Main HRSD Interceptor Gravity Main 3Q HRSD Treatment Plant 3 PRS HRSD Pressure Reducing Station 3PS HRSD Pump Station Feet ,080 AB Section W Force Main Replacement / CIP Location Norfolk

8 Section W Force Main Replacement PR_AB System: Type: Pipelines Driver Category: Project Status: Regulatory: Aging Infrastructure/Rehabilitation Design Delay None Prog Cost PROGRAM CASH FLOW PROJECTION ($,000) Exp to Previous Year FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 $2,185 $95 $97 $218 $1,253 $522 $0 $0 $0 $0 $0 $0 PROJECT DESCRIPTION This project is to study, design and construct a replacement interceptor for Line SF-06, approximately 2,642 linear feet (LF) of 10-inch cast iron force main that is the discharge line from HRSD Pump Station #117 (North Shore Road). This project will include replacement main line valves, branch valves, associated appurtenances and replace the existing force main through the walls into the pump station. HART analysis has determined that this force main will be downsized from 10-inch to 8- inch. The City of Norfolk Utilities Department needs to replace their 24-inch waterline along Hampton Blvd in conjunction with HRSD Force Main replacement. Therefore schedules need to align. PROJECT JUSTIFICATION This project will replace the 61 year old cast iron force main that was installed in There have been two documented repairs in 1964 and in Operations staff believes that there are additional undocumented repairs on the line as well. The pipeline is of a material and age for which HRSD has seen recent repeated failures in other parts of the interceptor system due to wastewater chemistry and soil corrosion. FUNDING TYPE CONTACTS Funding Type: Revenue Bond Contacts-Requesting Dept: Operations-Interceptors Contacts-Dept Contacts: Katherine Linares Contacts-Managing Dept: Engineering PROPOSED SCHEDULE START DATE PrePlanning 11/01/2012 PER 06/02/2013 Design Delay 12/01/2013 Design 12/01/2018 Bid Delay 03/01/2020 PreConstruction 03/01/2020 Construction 06/01/2020 Closeout 12/01/2021 COST ESTIMATE Cost Estimate Class: Class 4 PrePlanning $0 PER $19,644 Design $282,000 PreConstruction $2,358 Construction $1,881,000 Closeout $0 Est. Program Cost $2,185,002 Contingency Budget $376,200 Est. Project Costs $2,561,202

9 SG-002 LAGOON RD SG-952 SG-003 SF-002 SG-003 SF-952 AB TH ST 7TH ST AB Project Interceptor Line!]^ Project Interceptor Point!]^ Project Pump Station Point Project Area Legend ^_ CIP Interceptor Point _ CIP Pump Station Point CIP Interceptor Line CIP Abandonment CIP Project Area HRSD Interceptor Force Main HRSD Interceptor Gravity Main 3Q HRSD Treatment Plant 3 PRS HRSD Pressure Reducing Station 3PS HRSD Pump Station Feet AB Treatment Plant Solids Dewatering and Loading Facility / CIP Location

10 Treatment Plant Solids Dewatering and Loading Facility PR_AB System: Type: Biosolids Driver Category: Project Status: Regulatory: Capacity Improvements Proposed None Prog Cost PROGRAM CASH FLOW PROJECTION ($,000) Exp to Previous Year FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 $12,580 $0 $0 $0 $0 $0 $0 $413 $4,167 $8,000 $0 $0 PROJECT DESCRIPTION The Solids Dewatering and Loading Facility will provide for solids dewatering, screening, storage, and offsite distribution. The project will include structural, architectural, electrical, instrumentation controls, and all associated utilities for a central facility. The project scope includes conveyance of feed solids to the facility; solids screening; dewatering; polymer feed; two-day cake storage; distributive control; and appropriate support utilities. Ultimate distribution of the dewatered solids (e.g. off-site incineration or off-site anaerobic digestion), including requirements for solids screening and cake storage, will be determined subject to update of HRSD's Solids Master Plan. PROJECT JUSTIFICATION Repurposing the incinerator for activated carbon re-generation requires the construction of a separate plant solids dewatering and shipping facility. FUNDING TYPE CONTACTS Funding Type: Revenue Bond Contacts-Requesting Dept: Operations-Treatment Contacts-Dept Contacts: Brian McNamara Contacts-Managing Dept: Operations-Treatment PROPOSED SCHEDULE START DATE PrePlanning 07/01/2023 PER 07/01/2023 Design Delay 01/01/2024 Design 01/01/2024 Bid Delay 10/01/2024 PreConstruction 10/01/2024 Construction 01/01/2025 Closeout 07/01/2026 COST ESTIMATE Cost Estimate Class: Class 5 PrePlanning $0 PER $80,000 Design $500,000 PreConstruction $0 Construction $12,000,000 Closeout $0 Est. Program Cost $12,580,000 Contingency Budget $3,000,000 Est. Project Costs $15,580,000