1 Ahmed Mohamed Ali Ramadan 32 hassanien desouky street maadi Tel: (Egypt) Objective: Seeking a challenging position in a respectful and famous corporation where I can develop my educational and practical background and my interpersonal skills to achieve mutual benefit. PERSONAL DATA: Date of Birth 14 September 1982 Nationality Marital Status Military Status Driving License Egyptian Married Exempted Egyptian license and gulf license are available EDUCATION: MAY 2005 B.SC in Mechanical Engineering (Production engineering department). Graduation Project: Analysis and Reconfiguration manufacturing system based on Agility Concept Graduation Project Grade: Very Good. High School Name: Moharram Language School.

2 EXPERIENCE: First: DSD FERROMETALCO (as a production Engineer) from August 2005 to January 2008 This company is working in the field of steel structure manufacturing & metal cutting and machining by using computer numerical control (CNC) machines, conventional machines and wire cut machines. I was working in machining workshop and responsible for: 1- Making the monthly loading plane for the workshop according to projects priorities. 2- Determining no. of labors needed according to the production plane 3- Determining the man hour needed. 4- Determining the spare parts and maintenance needed for the machines according to the operating time. 5- Checking the issue vouchers of raw materials from the store to the factory and vouchers for final products from factory to the store and signs them and handle with store department the material and final products to and from the work shop 6- Monitoring the execution of the production plane and check the man hours and the quantity of raw materials issued to the workshop. 7- Making the weekly operating programs for the orders and check if it is applied or not. 8- Determining the overtime hours, determine when it needs to raise the shifts. 9- Determining the costing elements for the products. 10- Checking the quality of the raw materials and final products. 11 Follow up all the manufacturing process in the work shop and assure that the produced items are manufactured in a good quality in the required delivery dates. 12-Prepares and updates the Monthly Aggregate Production Plan (MAPP), Monthly Master Production Schedule (MMPS), and Weekly, daily Production Plan (DPP)

3 Second: Qatamy Works & Building Co. (as a maintenance engineer) in Kuwait: march 2008 to march 2009 I was responsible for: 1. Plan the routine maintenance of plant, equipments and machinery. 2. Attend breakdowns diagnose faults and oversee time critical repairs. 3. Follow up the preventive maintenance for all the machines and equipments. 4. Repair and fix any mechanical or electrical malfunctions. 5. Start and operate the machines, with a full supervision on the foreman and technicians. 6. Involved in all stages of the manufacturing process. 7. Work in co-ordination with production engineers, to improve production facilities, reduce the incidence of costly breakdowns and develop strategies to improve overall reliability and safety of plant, personnel and production processes. 8. Involved in the installation and commissioning process. 9. Understand the hydraulic & pneumatic systems and electrical circuits. 10. Understand the programmable logic control (PLC) systems. 11. Make the plane of the overhaul maintenance of the company. 12. Make the plane for spare parts procurement for the machines. Third Energya steel Fabrication Company as a senior projects engineer in the project management department in Egypt (from May 2009 Dec. 2012) and as a project manager (from January 2012 until now) * Job Responsibility 1.Following up of different projects during all projects phases 2. Technical assistance in solving problems facing the projects in any phase in order to get them ready on estimated date and with the best quality 3. Preparing the invoices and make the cash flow reports. 4. Preparing monthly reports (planned vs. actual) 5. Studying the monthly/weekly reports received from all departments of the company 6. Cost estimation of the projects

4 7. Estimating and Implementing the time schedule, man power, tools and Equipments of carrying out the projects and any other project resources. 8. Managing and controlling all activities of the projects to assure quality and timely execution 9. Managing the activities of the outside sub-contractors to assure their Compliance with the project time schedule and the project requirments 10. Full coordination with the client in regard with the project status awareness Through regular follow up meetings 11. Managing and controlling the actual cost of implementing the project to be Within the pre-set budget. 12. Implementing an evaluation report after completion of the project to evaluate the actual 13. Cost with the pre-set budget, deviations if any, reasons of deviations and remedy action 14. Align the project schedule / progress with stakeholders to maintain consistency of overall project development 15 Estimate the resources and participants needed to achieve project goals. 16 Draft and submit budget proposals, and recommend subsequent budget changes where necessary. 17 Develop & maintain project plans and milestones for all projects. 18 Plan, execute, and finalize projects according to strict deadlines and within budget. This includes acquiring resources and coordinating the efforts of team members and third-party contractors or consultants in order to deliver projects according to plan. also define the project s objectives and oversee quality control throughout its life cycle 19 Plan and schedule project timelines and milestones using appropriate tools. Track project milestones and deliverables. 20 Proactively manage changes in project scope, identify potential crises, and devise contingency plans. Projects S.N 1 Project Name Mill discharge Job Description Fabrication & Supply cement mill discharge Client 2 Sinai Cement Co. Supply, fabrication and painting of Kiln Shell 3 Eagruim Ammonia & Urea plant Supply, fabrication and painting 4 Libya Cement Co. Fabrication only of steel structure and plate work 5 Kiln section Fabrication and supply kiln section 6 Wadi elnile cement company Fabrication and supply steel structure and plate work equipments

5 7 8 Tabuk cement company upgrade Suez steel plant Upgrade in air lift system and 3 fan system in tabuk Cement company in KSA Supply, Fabrication and erection of steel factory in Suez 9 10 Hurgada internatio nal airport Tabuk Cement Palnt Supply, fabrication and erection of the new hurgada international airport Supply, fabrication andof cement plant in tabuk Courses: Professional program in project management (PRMG) in the AUC and preparation course for PMP SKILLS: Computer Skills - AutoCAD (2D)., (3D) -Primavera P3 for planning and management tasks. -Microsoft project for planning and management tasks. - Microsoft office (excel-word-powerpoint-access-outlook) Languages Arabic mother tongue. Fluent in English. Good in French

6 Special Skills Shared in audit process for Energya Steel Company to buy another steel company by evaluate the degree of success of its projects. Other Skills - Very Good presentation and communication skills. References furnished upon request.