Explain in writing if the address of the building is different than the address on this form:

Size: px
Start display at page:

Download "Explain in writing if the address of the building is different than the address on this form:"

Transcription

1 ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO SCHOOL DIST Chicago, IL, 6629 DATE LAST THREE YEAR REINSPECTION WAS COMPLETED 2/26/21 If the address on this form is different than the address of the building, submit a written explanation. SECTION II (Please type or print) PLEASE COMPLETE THE FOLING FOR YOUR THREE YEAR REINSPECTION: DATE REINSPECTION COMPLETED: 4/29/213 ENROLLMENT IDPH INSPECTOR LICENSE NUMBER: IDPH LICENSED INSPECTOR NAME (Please Print): Beinville Brooks IDPH MP LICENSE NUMBER: IDPH LICENSED MANAGEMENT PLANNER NAME (Please Print): Todd Huffer DESIGNATED PERSON (Please Print): Ms. Lynn Crivello PHONE: 1256 (773) /29/213 Signature of Designated Person Date SECTION III PLEASE COMPLETE THE FOLING INFORMATION FOR ANY CHANGES WITHIN THE SCHOOL DISTRICT. School building has been sold. Date of Sale: School has been closed. Date closed: School building has been demolished. School building is asbestos free since last reinspection: Please explain in writing why the school building is now asbestos free and include the supporting documentation. If a new school building has been added to the district, submit either and exclusionary statement or a management plan and inspection report. Include the complete name, address and city of school building. Explain in writing if the address of the building is different than the address on this form: IL Revised 1.3

2 THREE YEAR REINSPECTION CHICAGO SCHOOL DIST 299 Chicago, IL, 6629 Unit: Building ID: 531 IDPH ID Number: REPORT DATE: Monday, April 29, 213 Prepared for: 125 S. Clark Street Chicago, IL 663 Prepared by: 6 West Van Buren St., Ste 5 Phone (312) Fax (312) DO NOT REMOVE FROM SCHOOL REQUIRED BY FEDERAL LAW

3 March 29, 213 Mr. R. Kent Cook Asbestos Program Illinois Department of Public Health 525 West Jefferson Street Springfield, Illinois Re: Three-Year Reinspections Dear Mr. Cook:, Managing Environmental Consultant (MEC), conducted the ThreeYear Reinspections and performed management plan updates for the (CPS) facilities in Region 3,4,5 Elementary Schools. Please update your records with the following information. School District: 299 Unit: School: Region: 5 IDPH ID: Building ID: 531 Address: Chicago, IL, 6629 Building Contact: Burke, Martin Contact Phone: Current Building Owners: Review 4/29/213 Inspector: Beinville Brooks Management Planner: Todd Huffer Inspector IDPH License: Management Planner IDPH License: If you have any questions or comments, please contact us at (312) Sincerely, Todd Huffer 1-987

4 Environmental tification to Occupants To: Faculty, Staff and Parents From: March 29, 213 RE:, Unit Chicago, IL, 6629 Dear Faculty, Staff and Parents, This letter is to notify you that the 213 asbestos three year re-inspection has been completed at, following the Federal Asbestos Hazard Emergency Response Act (AHERA), 4 CFR Part 763, Subpart E and is available for your review at the main office of the school. Although asbestos-containing materials have been identified at, there is no reason to believe that any threat to the health of students or staff exists at this time. CPS will continue to carefully monitor the condition of asbestos-containing materials and if conditions warrant, all appropriate steps will be taken to maintain the health and safety of all building occupants. If you have any questions regarding this matter or require additional information, please feel free to contact Ms. Lynn Crivello, the designated Local Education Authority's Designated Person at (773)

5 Table of Contents I. School and Inspection Information II. Executive Summary III. Methodology IV. Abatement History V. Reassessments and Recommendations VI. Conclusions Table I: Inspector's Reinspection Findings Table II: Management Planner's Review APPENDICES: Appendix A: Assessment Sheets, Drawings and Photos Appendix B: Inspector and Management Planner Licenses Appendix C: Laboratory Accreditations Appendix D: Laboratory Results Appendix E: Chain of Custody Forms

6 SCHOOL AND INSPECTION INFORMATION 1. School Information School: Address: IDPH ID: Contact: Burke, Martin Unit: Chicago, IL, 6629 Building ID: 531 Phone: Description of Facility Original Construction: 1926 Total Square Footage: 648 Current Occupancy: Additional Construction: of Floors: Phone: (773) Managing Environmental Consultant MEC: Contact: Dan Juneau Address 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector Inspector Name: Beinville Brooks Signature: 3/29/213 Inspector IDPH license # LEA Designated Person Contact: Ms. Lynn Crivello Address: 125 South Clark Street, 17th Floor Chicago, IL Region: 5 Management Planner Management Planner Name: Todd Huffer Management Planner IDPH license # Review 4/29/ LEA Designated Person's Acknowledgement Signature: 4/29/213 The reinspection report and recommendations have been received by me and appropriate action will be taken by the School District. Signature: 4/29/213 Name: Ms. Lynn Crivello Unit : Building: 531

7 II. EXECUTIVE SUMMARY was retained by the (CPS) to perform a three-year asbestos reinspection of the. This inspection was conducted in accordance with the United States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA) part (b), and the ongoing Program (O&M) originally designed in the School's Asbestos Management Plan. The purpose of this three-year reinspection is to record any condition changes in the asbestos-containing building material (ACBM) in the school since the previous three-year reinspection and the six-month periodic surveillance, to identify, assess, and include any Homogeneous Areas (HA) not identified in the Management Plan, and to recommend an appropriate response action to manage asbestos. The inspector conducted a three-year reinspection of this facility under Illinois Department of Public Health (IDPH) school reinspection requirements and AHERA, sections and The main building and each addition to the main building, if constructed at different dates, were inspected separately. Laboratory accreditations are included in Appendix C, laboratory results are included in Appendix D, and chain of custody forms are included in Appendix E. te: During previous inspections, some of the HA(s) were identified together as 9" x 9" floor tile (FT), mastics assoc. with 9" x 9" FT, 12" x 12" FT, mastics assoc. with 12" x 12" FT, pipe insulation, etc. Some of these HA(s) have been re-identified by areas that are uniform in color, texture, construction date, application date, and general appearance. The inspector has determined the following: A. The following HAs have changed assessment categories for Building 531: Unit: T Mag pipe insulation 21C mastic beneath 9"x9" vft, tan 22A mastic beneath 12"x12" vft, off-white/tan streaks 22C 12x12 blue ft mastic 22D 12x12 beige ft mastic 23B 12x12 white/ green & white dark green speck ft 23D 12x12 beige speckled ft 27 green carpet mastic Building: 531

8 B. The following new homogenous areas have been identified for Building 531: Unit: Building: 531

9 C. This reinspection covered only physically accessible and visible areas and materials that were identified in the LEA's management plan. The following materials were concealed and/or contained in areas that were inaccessible for sampling and have been classified as : T 3 4 2D 2E 21D 21E 23A 23B 23C 23D 24B 24C 25B 25C B C D E F G G-2 G-2A G-3 G-3A G-4 G-4A G-5 G-5A H I I-2 I-3 J J-2 J-3 K Unit: Mag pipe insulation Plaster Terrazzo 12"x 12" Beige w/brown Floor Tile 12"x 12" Beige w/brown Floor Tile 12"x 12" Beige w/brown Floor Tile Mastic 12"x12" Beige w/brown Floor Tile Mastic 12x12 offwhite / tan specks ft 12x12 white/ green & white dark green speck ft 12x12 blue ft 12x12 beige speckled ft Linoleum Linoleum Linoleum Adhesive Linoleum Adhesive 12x12 white floor tile 2'x4' Pinhole and Fissure Ceiling Tile Insulation in Fire Doors Insulation in Fire Doors Rolled Flooring Rolled Flooring Adhesive 12"x12" Beige Floor Tile 12" x 12" blue floor tile part of pattern 12" x 12" light blue floor tile part of pattern 12" x 12" pink floor tile part of pattern 12" x 12" gray floor tile part of pattern 2' x 2' ceiling tile Drywall Drywall Drywall Compound Drywall Drywall Comound Drywall Drywall Compound Drywall Drywall Compound Floor tile mastic Gray base board Light Brown Baseboard Lightr Brown Baseboard Gray base board mastic Light Brown Baseboard Adhesive Light Brown Baseboard Adhesive Drywall joint compound Building: 531

10 L L-2 M M-1 M-2 N O-1 P-1 Q-1 R S W X Y Z 12" x 12" vft, cream speck 12"x12" Beige Floor Tile mastic beneath 12" x 12" vft, cream speck 12"x12" Beige Floor tile Adhesive 12"x12" Beige Floor Tile Adhesive Cream texture transite texture wall 4' x 8' textured ceiling panels Cream base board cream base board mastic Aircell pipe insulation Cementitious Pipe Joint Insulation Chalkboard Chalkboard Adhesive Chalkboard Chalkboard Adhesive The following areas were deemed to be inaccessible: 21A 21B 21C 21D 21E 22A 22B 22C 22D 25B 25C J-2 J-3 M-1 M-2 X Z mastic beneath 9"x9" vft, orange 9x9 dark bown ft mastic mastic beneath 9"x9" vft, tan 12"x 12" Beige w/brown Floor Tile Mastic 12"x12" Beige w/brown Floor Tile Mastic mastic beneath 12"x12" vft, off-white/tan streaks 12x12 white/green & dark green specks ft mastic 12x12 blue ft mastic 12x12 beige ft mastic Linoleum Adhesive Linoleum Adhesive gray carpet mastic green carpet mastic Insulation in Fire Doors Insulation in Fire Doors Rolled Flooring Adhesive Light Brown Baseboard Adhesive Light Brown Baseboard Adhesive 12"x12" Beige Floor tile Adhesive 12"x12" Beige Floor Tile Adhesive Chalkboard Adhesive Chalkboard Adhesive Materials were also listed as "assumed" if they were in good condition and sampling was not conducted to avoid damage. This reinspection was conducted by Beinville Brooks, IDPH License # The Management Plan was updated by Todd Huffer, IDPH License # Inspector and Management Planner Licenses are included in Appendix B. Unit: Building: 531

11 III. METHODOLOGY Tasks performed on-site included the following: IV. 1. Review current management plan, identify HA(s) and extract appropriate information. 2. Examine and verify abatement records. 3. Touch and visually and physically reinspect and reassess the condition of all friable known or assumed ACBM. 4. Touch and visually and physically reinspect all non-friable known or assumed ACBM to determine whether these materials have become friable since the last inspection or periodic surveillance. 5. Identify any condition changes that may affect Hazard Ranking of known ACBM or ACBM, as well as any HA(s) that have become friable since the last reinspection. 6. Collect bulk samples from each newly discovered friable HA or previously assumed and submit for laboratory analysis. 7. Tabulate reinspection findings and submit for management planner review and recommendations with appropriate response actions based on the AHERA Damage Category of the ACBM. 8. Submit reinspection findings and management planner recommendations to the LEA within thirty (3) days for inclusion into the management plan. ABATEMENT HISTORY The information collected from the existing management plan and inspection report(s) and from interviews with the school official revealed that the following asbestos abatement was conducted at the school since the previous Three year Reinspection. Abatement Dates: V. REASSESSMENTS AND RECOMMENDATIONS The reassessments and recommendations are summarized in Tables I and II on the following pages. Detailed Hazard Assessment Sheets and Drawings and Photos (if applicable) are included in Appendix A. VI. CONCLUSIONS The Building 531 Three-Year reinspection has been completed and response actions have been recommended for both friable and non-friable materials. A timely execution of the response actions recommended will enable the LEA and the Designated Person(s) to effectively manage the existing ACBM. This three-year reinspection report should be inspected in the current Management plan at the CPS Central Office, and one (1) copy should be kept at the school for use when planning any renovation and/or demolition activities in areas where ACBM has been identified. Also, periodic surveillance documentation and any summary reports from any response actions that are executed at the school should be used to update the Management Plan. Unit: Building: 531

12 Table I Inspector's Reinspection Findings

13 School Unit Building ID 531 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description A T 12 X 12 Cream Floor Tile- abated Mag pipe insulation Acoustical Wall Plaster Plaster Walls and Ceilings Plaster 4 Terrazzo 2A 2B Material Quantity 1 Material Units LF Material Location Asbestos Type Material Category Friable Damage Type Throughout Annex Boiler room and tunnels ABATED ASSUMED TSI N NONE Auditorium Throughout Facility Engineer Office and Washrooms in Boiler House Throughout Corridors, Stairways, Janitor Closets, 114B, 28 room 12 NO_ACBM NO_ACBM ASSUMED SURFACE SURFACE SURFACE N ASSUMED CHR CHR Damage Quantity Damage Units Change in Assessment Category Damage Category Damage Reason Disturbance Potential Yes Any remaining friable ACBM or friable suspect ACBM NONE ACBM with the potential for damage N NONE ACBM with the potential for damage N NONE N NONE CHR N NONE ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage MODERATE ne 4 1,9 9"x9" vft, orange speckled 72 9x9 dark brown ft 1 2C 9"x9" vft, tan 15 2D 12"x 12" Beige w/brown Floor Tile 1,564 engineers office & toilet main office, storage room 51/52 ASSUMED N NONE 2E 12"x 12" Beige w/brown Floor Tile 1,564 53/54 ASSUMED N NONE 21A mastic beneath 9"x9" vft, orange 72 room 12 CHR N NONE 21B 9x9 dark bown ft mastic 1 CHR N NONE 21C mastic beneath 9"x9" vft, tan CHR N NONE Yes 21D 12"x 12" Beige w/brown Floor Tile Mastic ASSUMED N NONE 21E 22A High 15 1,564 engineers office & toilet main office, storage room 51/52 12"x12" Beige w/brown Floor Tile Mastic 1,564 53/54 ASSUMED N NONE mastic beneath 12"x12" vft, off-white/tan streaks 15,925 CHR N ne Yes 22B 12x12 white/green & dark green specks ft mastic 3,87 CHR N NONE ACBM with the potential for damage 22C 12x12 blue ft mastic 2,64 CHR N NONE Yes 12x12 beige ft mastic 4 CHR N NONE Yes ACBM with the potential for damage ACBM with the 22D 1st&2nd fl corridors, rooms: 112, 114, 116, 117, 118, 21, 212, 213, 216, 217, 219, 22 main office, lunchroom, rooms 18, 215, 218 rooms 11, 224, 222, 211 storage room in

14 School Unit Building ID 531 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description 23A 12x12 offwhite / tan specks ft 23B Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Type Damage Quantity Damage Units Change in Assessment Category ASSUMED N NONE ASSUMED N NONE Yes ACBM with the potential for damage ASSUMED N NONE ASSUMED N NONE Yes ACBM with the potential for damage ACBM with the potential for damage ABATED 15,925 12x12 white/ green & white dark green speck ft 3,17 23C 12x12 blue ft 2,64 23D 12x12 beige speckled ft 4 24 linoleum, brown 24B Linoleum 238 lunch room 1st&2nd fl corridors, rooms: 112, 114, 116, 117, 118, 21, 212, 213, 216, 217, 219, 22 main office, lunchroom, rooms 18, 215, 218 rooms 11, 224, 222, 211 storage room in lunchroom auditorium under seating on 1st floor 51/52 ASSUMED N NONE 24C Linoleum /54 Washroom ASSUMED N NONE 25 linoleum mastic ABATED 25B Linoleum Adhesive 238 auditorium under seating area on 1st floor 51/52 Washroom ASSUMED N NONE 25C Linoleum Adhesive /54 Washroom ASSUMED N NONE 26 gray carpet mastic 1,626 N NONE green carpet mastic 73 CHR N NONE Yes 28 12x12 white floor tile 12,72 ASSUMED N NONE 29 2'x4' Pinhole and Fissure Ceiling Tile 82, ASSUMED Y NONE 3 Insulation in Fire Doors 84 main office, library, room 214 room 114, teachers lounge, 2nd floor mens teacher toilet Annex, 12, main office, storage room, eng. office and toilet, lunchroom... All classrooms, offices and corridors 51/52 CHR 27 ASSUMED TSI Y 31 Insulation in Fire Doors 84 53/54 ASSUMED TSI Y 32 Aircell Pipe Insulation 4 LF Room 18 Storage Access-South CHR TSI N Damage Category potential for damage ACBM with the potential for damage ne Damage Reason Disturbance Potential Low ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage NONE NONE NONE ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage Any remaining friable ACBM or friable suspect ACBM ne

15 School Unit Building ID 531 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description 33 Rolled Flooring 34 Rolled Flooring Adhesive 35 12"x12" Beige Floor Tile B 12" x 12" blue floor tile part of pattern C D E 12" x 12" gray floor tile part of pattern F 2' x 2' ceiling tile G G-2 Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Type Damage Quantity Damage Units 728 Annex Washroom ASSUMED N NONE Change in Assessment Category 728 Annex Washroom ASSUMED N NONE 6 N NONE 41/42 Modular Unit Annex ASSUMED 1 ASSUMED N NONE 12" x 12" light blue floor tile part of pattern 1 Annex ASSUMED N NONE 12" x 12" pink floor tile part of pattern 1 Annex ASSUMED N NONE 1 ASSUMED N ne 13,5 Throughout annex ASSUMED N NONE Drywall 35 N NONE 1,319 On all interior new load bearing walls 41/42 ASSUMED Drywall ASSUMED Y NONE G-2A Drywall Compound 1,319 41/42 ASSUMED Y NONE G-3 Drywall 1,319 43/44 ASSUMED Y NONE G-3A Drywall Comound 1,319 43/44 ASSUMED Y NONE G-4 Drywall 1,319 51/52 ASSUMED Y NONE G-4A Drywall Compound 1,319 51/52 ASSUMED Y NONE G-5 Drywall 1,319 53/54 ASSUMED Y NONE G-5A Drywall Compound 1,319 53/54 ASSUMED Y NONE H Floor tile mastic 13,5 Throughout annex ASSUMED Y NONE I Gray base board 1,6 Throughout annex ASSUMED N NONE I-2 Light Brown Baseboard 36 LF 51/52 ASSUMED N NONE I-3 Lightr Brown Baseboard 36 LF 53/54 ASSUMED N NONE J Gray base board mastic 1,6 Throughout annex ASSUMED N NONE Damage Category ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage Damage Reason Disturbance Potential Low

16 School Unit Building ID 531 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description J-2 Light Brown Baseboard Adhesive J-3 Light Brown Baseboard Adhesive K Drywall joint compound L 12" x 12" vft, cream speck L-2 12"x12" Beige Floor Tile M mastic beneath 12" x 12" vft, cream speck M-1 M-2 N Cream texture transite texture wall O-1 4' x 8' textured ceiling panels P-1 Q-1 R Aircell pipe insulation S Cementitious Pipe Joint Insulation U Boiler tank jacket V W Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Type Damage Quantity Damage Units 36 LF 51/52 ASSUMED N NONE Change in Assessment Category 36 LF 53/54 ASSUMED N NONE NONE 35 Throughout annex ASSUMED N 1,2 throughout N & S modulars 43/44 Modular Unit Throughout N & S modulars 41/42 Modular Unit 43/44 Modular Building Throughout rth modulars Throughout rth and South modulars Throughout rth & South modulars Throughout rth & South modulars Boiler room and tunnels Boiler room and tunnels boiler room ASSUMED N ASSUMED N NONE ASSUMED N NONE ASSUMED N NONE ASSUMED N NONE ASSUMED N NONE ASSUMED N NONE ASSUMED N NONE ASSUMED N NONE ASSUMED TSI Y NONE ASSUMED TSI Y NONE CHR TSI N NONE 6 1,2 12"x12" Beige Floor tile Adhesive 6 12"x12" Beige Floor Tile Adhesive ,2 Cream base board 16 LF cream base board mastic 16 LF 1,66 LF 15 LF 2,4 Pipe fittings 1 LF TSI N ne 14 Pipe Chases in Bathrooms 41/42 CHR Chalkboard ASSUMED N NONE X Chalkboard Adhesive 14 41/42 ASSUMED N NONE Y Chalkboard 14 43/44 ASSUMED N NONE Z Chalkboard Adhesive 14 43/44 ASSUMED N NONE Damage Category ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage Any remaining friable ACBM or friable suspect ACBM ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage Damage Reason Disturbance Potential

17 School Unit Building ID 531 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report Reinspection Date 3/29/213 Inspector Name Inspector's Comments Beinville Brooks /15/213 Inspector's IDPH License Number / Expiration Date HA Number: A T A 2B 2C 2D 2E 21A 21B 21C 21D 21E 22A 22B 22C 22D 23A 23B 23C 23D Inspector Comments: Auditorium Abated 212, now a concrete floor. Room 119 abated 212 Auditorium Abated 212, now a concrete floor. Room 119 abated 212

18 School Unit Building ID 531 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: 24 24B 24C 25 25B 25C B C D E F G G-2 G-2A G-3 G-3A G-4 G-4A G-5 Inspector Comments: t Observed.

19 School Unit Building ID 531 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: G-5A H I I-2 I-3 J J-2 J-3 K L L-2 M M-1 M-2 N O-1 P-1 Q-1 R S U V W X Y Z Inspector Comments: t Observed. 4LF of pipe insulation was abated in 12/21 in basement. Removed in 28.

20 School Unit Building ID 531 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report

21 Table II Management Planner's Review

22 School Address Unit Building ID Chicago, IL, Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units A T 12 X 12 Cream Floor Tile- abated Mag pipe insulation 1 LF Acoustical Wall Plaster Plaster Walls and Ceilings Plaster 4 4 Terrazzo 1,9 2A 2B 2C 2D 2E 21A 21B 21C 21D 21E 22A 9"x9" vft, orange speckled 9x9 dark brown ft 9"x9" vft, tan 12"x 12" Beige w/brown Floor Tile 12"x 12" Beige w/brown Floor Tile mastic beneath 9"x9" vft, orange 9x9 dark bown ft mastic mastic beneath 9"x9" vft, tan 12"x 12" Beige w/brown Floor Tile Mastic 12"x12" Beige w/brown Floor Tile Mastic mastic beneath 12"x12" vft, off-white/tan streaks ,564 1, ,564 1,564 15,925 22B 12x12 white/green & dark green specks ft mastic 3,87 22C 22D 23A 12x12 blue ft mastic 12x12 beige ft mastic 12x12 offwhite / tan specks ft 2, ,925 23B 12x12 white/ green & white dark green speck ft 3,17 23C 23D 24 24B 12x12 blue ft 12x12 beige speckled ft linoleum, brown Linoleum 2, Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response Throughout Annex Boiler room and tunnels Abated TSI LF 7 Any remaining friable ACBM or friable suspect ACBM Auditorium Throughout Facility Engineer Office and Washrooms in Boiler House Throughout Corridors, Stairways, Janitor Closets, 114B, 28 room 12 engineers office & toilet main office, storage room 51/52 53/54 room 12 engineers office & toilet main office, storage room 51/52 53/54 1st&2nd fl corridors, rooms: 112, 114, 116, 117, 118, 21, 212, 213, 216, 217, 219, 22 main office, lunchroom, rooms 18, 215, 218 rooms 11, 224, 222, 211 storage room in lunch room 1st&2nd fl corridors, rooms: 112, 114, 116, 117, 118, 21, 212, 213, 216, 217, 219, 22 main office, lunchroom, rooms 18, 215, 218 rooms 11, 224, 222, 211 storage room in lunchroom auditorium under seating on 1st floor 51/52 ACBM ACBM SURFACE SURFACE SURFACE Chrysotile Chrysotile Chrysotile Chrysotile Chrysotile Chrysotile Chrysotile Chrysotile Chrysotile Chrysotile Abated

23 School Address Unit Building ID Chicago, IL, Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response 24C 25 Linoleum linoleum mastic 238 Abated 25B 25C Linoleum Adhesive Linoleum Adhesive gray carpet mastic green carpet mastic , Chrysotile Chrysotile 28 12x12 white floor tile 12, 'x4' Pinhole and Fissure Ceiling Tile Insulation in Fire Doors Insulation in Fire Doors Aircell Pipe Insulation 82, LF 53/54 Washroom auditorium under seating area on 1st floor 51/52 Washroom 53/54 Washroom main office, library, room 214 room 114, teachers lounge, 2nd floor mens teacher toilet Annex, 12, main office, storage room, eng. office and toilet, lunchroom... All classrooms, offices and corridors 51/52 53/54 Room 18 Storage Access-South Chrysotile TSI TSI TSI Yes Yes Yes LF B C D E F G G-2 G-2A G-3 G-3A G-4 G-4A G-5 G-5A H I I-2 Rolled Flooring Rolled Flooring Adhesive 12"x12" Beige Floor Tile 12" x 12" blue floor tile part of pattern 12" x 12" light blue floor tile part of pattern 12" x 12" pink floor tile part of pattern 12" x 12" gray floor tile part of pattern 2' x 2' ceiling tile Drywall Drywall Drywall Compound Drywall Drywall Comound Drywall Drywall Compound Drywall Drywall Compound Floor tile mastic Gray base board Light Brown Baseboard ,5 35 1,319 1,319 1,319 1,319 1,319 1,319 1,319 1,319 13,5 1,6 36 LF Annex Washroom Annex Washroom 41/42 Modular Unit Annex Annex Annex Yes Yes Yes Yes Yes Yes Yes Yes Yes LF 7 Any remaining friable ACBM or friable suspect ACBM Throughout annex On all interior new load bearing walls 41/42 41/42 43/44 43/44 51/52 51/52 53/54 53/54 Throughout annex Throughout annex 51/52

24 School Address Unit Building ID Chicago, IL, Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response I-3 J J-2 J-3 K L L-2 M M-1 M-2 N O-1 P-1 Q-1 R S U Lightr Brown Baseboard Gray base board mastic Light Brown Baseboard Adhesive Light Brown Baseboard Adhesive Drywall joint compound 12" x 12" vft, cream speck 12"x12" Beige Floor Tile mastic beneath 12" x 12" vft, cream speck 12"x12" Beige Floor tile Adhesive 12"x12" Beige Floor Tile Adhesive Cream texture transite texture wall 4' x 8' textured ceiling panels Cream base board cream base board mastic Aircell pipe insulation Cementitious Pipe Joint Insulation Boiler tank jacket 36 1, ,2 6 1, , , ,4 LF LF LF LF LF LF LF 53/54 Throughout annex 51/52 53/54 Throughout annex throughout N & S modulars 43/44 Modular Unit Throughout N & S modulars 41/42 Modular Unit 43/44 Modular Building Throughout rth modulars Throughout rth and South modulars Throughout rth & South modulars Throughout rth & South modulars Boiler room and tunnels Boiler room and tunnels boiler room Chrysotile TSI TSI TSI Yes Yes LF LF LF LF LF LF LF V W X Y Z Pipe fittings Chalkboard Chalkboard Adhesive Chalkboard Chalkboard Adhesive LF Pipe Chases in Bathrooms 41/42 41/42 43/44 43/44 Chrysotile TSI LF 7 Any remaining friable ACBM or friable suspect ACBM

25 School Address Unit Building ID Chicago, IL, 6629 Region ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report 4/29/213 Review Date Manager Planner Name Todd Huffer /15/213 Manager IDPH License /Expiration HA Number A T A 2B 2C 2D 2E 21A 21B 21C 21D 21E Management Comments

26 School Address Unit Building ID Chicago, IL, 6629 Region ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number Management Comments 22A 22B 22C 22D 23A 23B 23C 23D 24 24B 24C 25 25B 25C B C D Auditorium Abated 212, now a concrete floor. Room 119 abated 212 Auditorium Abated 212, now a concrete floor. Room 119 abated 212

27 School Address Unit Building ID Chicago, IL, 6629 Region ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number Management Comments E F G G-2 G-2A G-3 G-3A G-4 G-4A G-5 G-5A H I I-2 I-3 J J-2 J-3 K L L-2 M M-1 M-2 N O-1 P-1 t Observed.

28 School Address Unit Building ID Chicago, IL, 6629 Region ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number Q-1 R S U V W X Y Z Management Comments 4LF of pipe insulation was abated in 12/21 in basement. Removed in 28.

29 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION A 12 X 12 Cream Floor Tile- abated HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Annex COMMENTS: Inspector's Signature: 3/29/213

30 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ A 12 X 12 Cream Floor Tile- abated Throughout Annex 531 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

31 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION T Mag pipe insulation HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: MODERATE Boiler room and tunnels 1 LF LF COMMENTS: Inspector's Signature: 3/29/213

32 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ T Mag pipe insulation Boiler room and tunnels 1 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

33 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 1 Acoustical Wall Plaster HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Auditorium COMMENTS: Inspector's Signature: 3/29/213

34 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ Acoustical Wall Plaster Auditorium 531 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

35 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 2 Plaster Walls and Ceilings HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: High Throughout Facility COMMENTS: Inspector's Signature: 3/29/213

36 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ Plaster Walls and Ceilings Throughout Facility 531 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

37 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 3 Plaster HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Engineer Office and Washrooms in Boiler House 4 COMMENTS: Inspector's Signature: 3/29/213

38 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ Plaster Engineer Office and Washrooms in Boiler House 4 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

39 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 4 Terrazzo HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Corridors, Stairways, Janitor Closets, 114B, COMMENTS: Inspector's Signature: 3/29/213

40 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ Terrazzo Throughout Corridors, Stairways, Janitor Closets, 114B, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

41 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 2A 9"x9" vft, orange speckled HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: room COMMENTS: Inspector's Signature: 3/29/213

42 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ A 9"x9" vft, orange speckled room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

43 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 2B 9x9 dark brown ft HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: engineers office & toilet 1 COMMENTS: Inspector's Signature: 3/29/213

44 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ B 9x9 dark brown ft engineers office & toilet 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

45 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 2C 9"x9" vft, tan HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: main office, storage room 15 COMMENTS: Inspector's Signature: 3/29/213

46 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ C 9"x9" vft, tan main office, storage room 15 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

47 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 2D 12"x 12" Beige w/brown Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 51/ COMMENTS: Inspector's Signature: 3/29/213

48 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ D 12"x 12" Beige w/brown Floor Tile 51/ In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

49 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 2E 12"x 12" Beige w/brown Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 53/ COMMENTS: Inspector's Signature: 3/29/213

50 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ E 12"x 12" Beige w/brown Floor Tile 53/ In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

51 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 21A mastic beneath 9"x9" vft, orange HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: room COMMENTS: Inspector's Signature: 3/29/213

52 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ A mastic beneath 9"x9" vft, orange room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

53 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 21B 9x9 dark bown ft mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: engineers office & toilet 1 COMMENTS: Inspector's Signature: 3/29/213

54 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ B 9x9 dark bown ft mastic engineers office & toilet 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

55 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 21C mastic beneath 9"x9" vft, tan HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: main office, storage room 15 COMMENTS: Inspector's Signature: 3/29/213

56 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ C mastic beneath 9"x9" vft, tan main office, storage room 15 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

57 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 21D 12"x 12" Beige w/brown Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 51/ COMMENTS: Inspector's Signature: 3/29/213

58 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ D 12"x 12" Beige w/brown Floor Tile Mastic 51/ In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

59 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 21E 12"x12" Beige w/brown Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 53/ COMMENTS: Inspector's Signature: 3/29/213

60 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ E 12"x12" Beige w/brown Floor Tile Mastic 53/ In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

61 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 22A mastic beneath 12"x12" vft, off-white/tan streaks HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1st&2nd fl corridors, rooms: 112, 114, 116, 117, 118, 21, 212, 213, 216, 217, 219, COMMENTS: Auditorium Abated 212, now a concrete floor. Inspector's Signature: 3/29/213

62 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ A mastic beneath 12"x12" vft, off-white/tan streaks 1st&2nd fl corridors, rooms: 112, 114, 116, 117, 118, 21, 212, 213, 216, 217, 219, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Auditorium Abated 212, now a concrete floor. Management Planner's Signature: 4/29/213

63 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 22B 12x12 white/green & dark green specks ft mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: main office, lunchroom, rooms 18, 215, COMMENTS: Room 119 abated 212 Inspector's Signature: 3/29/213

64 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ B 12x12 white/green & dark green specks ft mastic main office, lunchroom, rooms 18, 215, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Room 119 abated 212 Management Planner's Signature: 4/29/213

65 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 22C 12x12 blue ft mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: rooms 11, 224, 222, COMMENTS: Inspector's Signature: 3/29/213

66 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ C 12x12 blue ft mastic rooms 11, 224, 222, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

67 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 22D 12x12 beige ft mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: storage room in lunch room 4 COMMENTS: Inspector's Signature: 3/29/213

68 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ D 12x12 beige ft mastic storage room in lunch room 4 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

69 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 23A 12x12 offwhite / tan specks ft HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1st&2nd fl corridors, rooms: 112, 114, 116, 117, 118, 21, 212, 213, 216, 217, 219, COMMENTS: Auditorium Abated 212, now a concrete floor. Inspector's Signature: 3/29/213

70 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ A 12x12 offwhite / tan specks ft 1st&2nd fl corridors, rooms: 112, 114, 116, 117, 118, 21, 212, 213, 216, 217, 219, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Auditorium Abated 212, now a concrete floor. Management Planner's Signature: 4/29/213

71 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 23B 12x12 white/ green & white dark green speck ft HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: main office, lunchroom, rooms 18, 215, COMMENTS: Room 119 abated 212 Inspector's Signature: 3/29/213

72 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ B 12x12 white/ green & white dark green speck ft main office, lunchroom, rooms 18, 215, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Room 119 abated 212 Management Planner's Signature: 4/29/213

73 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 23C 12x12 blue ft HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: rooms 11, 224, 222, COMMENTS: Inspector's Signature: 3/29/213

74 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ C 12x12 blue ft rooms 11, 224, 222, In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

75 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 23D 12x12 beige speckled ft HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: storage room in lunchroom 4 COMMENTS: Inspector's Signature: 3/29/213

76 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ D 12x12 beige speckled ft storage room in lunchroom 4 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

77 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 24 linoleum, brown HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Low auditorium under seating on 1st floor COMMENTS: Inspector's Signature: 3/29/213

78 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ linoleum, brown auditorium under seating on 1st floor 531 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

79 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 24B Linoleum HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 51/ COMMENTS: Inspector's Signature: 3/29/213

80 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ B Linoleum 51/ In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

81 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 24C Linoleum HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 53/54 Washroom 238 COMMENTS: Inspector's Signature: 3/29/213

82 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ C Linoleum 53/54 Washroom 238 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

83 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 25 linoleum mastic HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: auditorium under seating area on 1st floor COMMENTS: Inspector's Signature: 3/29/213

84 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ linoleum mastic auditorium under seating area on 1st floor 531 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

85 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 25B Linoleum Adhesive HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 51/52 Washroom 238 COMMENTS: Inspector's Signature: 3/29/213

86 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ B Linoleum Adhesive 51/52 Washroom 238 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

87 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 25C Linoleum Adhesive HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 53/54 Washroom 238 COMMENTS: Inspector's Signature: 3/29/213

88 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ C Linoleum Adhesive 53/54 Washroom 238 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

89 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 26 gray carpet mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: main office, library, room COMMENTS: Inspector's Signature: 3/29/213

90 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ gray carpet mastic main office, library, room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

91 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 27 green carpet mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: room 114, teachers lounge, 2nd floor mens teacher toilet 73 COMMENTS: Inspector's Signature: 3/29/213

92 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ green carpet mastic room 114, teachers lounge, 2nd floor mens teacher toilet 73 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

93 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 28 12x12 white floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Annex, 12, main office, storage room, eng. office and toilet, lunchroom COMMENTS: Inspector's Signature: 3/29/213

94 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ x12 white floor tile Annex, 12, main office, storage room, eng. office and toilet, lunchroom In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

95 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 29 2'x4' Pinhole and Fissure Ceiling Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: All classrooms, offices and corridors 82 COMMENTS: Inspector's Signature: 3/29/213

96 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ 'x4' Pinhole and Fissure Ceiling Tile All classrooms, offices and corridors 82 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

97 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 3 Insulation in Fire Doors HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 51/52 84 COMMENTS: Inspector's Signature: 3/29/213

98 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ Insulation in Fire Doors 51/52 84 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

99 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 31 Insulation in Fire Doors HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 53/54 84 COMMENTS: Inspector's Signature: 3/29/213

100 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ Insulation in Fire Doors 53/54 84 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

101 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 32 Aircell Pipe Insulation HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Room 18 Storage Access-South 4 LF LF COMMENTS: Inspector's Signature: 3/29/213

102 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ Aircell Pipe Insulation Room 18 Storage Access-South 4 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

103 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 33 Rolled Flooring HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Annex Washroom 728 COMMENTS: Inspector's Signature: 3/29/213

104 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ Rolled Flooring Annex Washroom 728 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

105 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 34 Rolled Flooring Adhesive HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Annex Washroom 728 COMMENTS: Inspector's Signature: 3/29/213

106 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ Rolled Flooring Adhesive Annex Washroom 728 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

107 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION 35 12"x12" Beige Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 41/42 Modular Unit 6 COMMENTS: Inspector's Signature: 3/29/213

108 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ "x12" Beige Floor Tile 41/42 Modular Unit 6 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

109 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION B 12" x 12" blue floor tile part of pattern HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Annex 1 COMMENTS: Inspector's Signature: 3/29/213

110 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ B 12" x 12" blue floor tile part of pattern Annex 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

111 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION C 12" x 12" light blue floor tile part of pattern HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Annex 1 COMMENTS: Inspector's Signature: 3/29/213

112 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ C 12" x 12" light blue floor tile part of pattern Annex 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

113 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION D 12" x 12" pink floor tile part of pattern HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Annex 1 COMMENTS: Inspector's Signature: 3/29/213

114 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ D 12" x 12" pink floor tile part of pattern Annex 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

115 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION E 12" x 12" gray floor tile part of pattern HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Low COMMENTS: 1 t Observed. Inspector's Signature: 3/29/213

116 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ E 12" x 12" gray floor tile part of pattern In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: t Observed. Management Planner's Signature: 4/29/213

117 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION F 2' x 2' ceiling tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout annex 135 COMMENTS: Inspector's Signature: 3/29/213

118 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ F 2' x 2' ceiling tile Throughout annex 135 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

119 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION G Drywall HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: On all interior new load bearing walls 35 COMMENTS: Inspector's Signature: 3/29/213

120 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ G Drywall On all interior new load bearing walls 35 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

121 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION G-2 Drywall HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 41/ COMMENTS: Inspector's Signature: 3/29/213

122 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ G-2 Drywall 41/ In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

123 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION G-2A Drywall Compound HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 41/ COMMENTS: Inspector's Signature: 3/29/213

124 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ G-2A Drywall Compound 41/ In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

125 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION G-3 Drywall HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 43/ COMMENTS: Inspector's Signature: 3/29/213

126 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ G-3 Drywall 43/ In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

127 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION G-3A Drywall Comound HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 43/ COMMENTS: Inspector's Signature: 3/29/213

128 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ G-3A Drywall Comound 43/ In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

129 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION G-4 Drywall HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 51/ COMMENTS: Inspector's Signature: 3/29/213

130 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ G-4 Drywall 51/ In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

131 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION G-4A Drywall Compound HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 51/ COMMENTS: Inspector's Signature: 3/29/213

132 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ G-4A Drywall Compound 51/ In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

133 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION G-5 Drywall HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 53/ COMMENTS: Inspector's Signature: 3/29/213

134 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ G-5 Drywall 53/ In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

135 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION G-5A Drywall Compound HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 53/ COMMENTS: Inspector's Signature: 3/29/213

136 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ G-5A Drywall Compound 53/ In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

137 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION H Floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout annex 135 COMMENTS: Inspector's Signature: 3/29/213

138 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ H Floor tile mastic Throughout annex 135 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

139 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION I Gray base board HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout annex 16 COMMENTS: Inspector's Signature: 3/29/213

140 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ I Gray base board Throughout annex 16 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

141 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION I-2 Light Brown Baseboard HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 51/52 36 LF LF COMMENTS: Inspector's Signature: 3/29/213

142 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ I-2 Light Brown Baseboard 51/52 36 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

143 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION I-3 Lightr Brown Baseboard HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 53/54 36 LF LF COMMENTS: Inspector's Signature: 3/29/213

144 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ I-3 Lightr Brown Baseboard 53/54 36 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

145 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION J Gray base board mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout annex 16 COMMENTS: Inspector's Signature: 3/29/213

146 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ J Gray base board mastic Throughout annex 16 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

147 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION J-2 Light Brown Baseboard Adhesive HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 51/52 36 LF LF COMMENTS: Inspector's Signature: 3/29/213

148 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ J-2 Light Brown Baseboard Adhesive 51/52 36 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

149 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION J-3 Light Brown Baseboard Adhesive HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 53/54 36 LF LF COMMENTS: Inspector's Signature: 3/29/213

150 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ J-3 Light Brown Baseboard Adhesive 53/54 36 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

151 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION K Drywall joint compound HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout annex 35 COMMENTS: Inspector's Signature: 3/29/213

152 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ K Drywall joint compound Throughout annex 35 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

153 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION L 12" x 12" vft, cream speck HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: throughout N & S modulars 12 COMMENTS: t Observed. Inspector's Signature: 3/29/213

154 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ L 12" x 12" vft, cream speck throughout N & S modulars In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

155 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION L-2 12"x12" Beige Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 43/44 Modular Unit 6 COMMENTS: Inspector's Signature: 3/29/213

156 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ L-2 12"x12" Beige Floor Tile 43/44 Modular Unit 6 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

157 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION M mastic beneath 12" x 12" vft, cream speck HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout N & S modulars 12 COMMENTS: Inspector's Signature: 3/29/213

158 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ M mastic beneath 12" x 12" vft, cream speck Throughout N & S modulars 12 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

159 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION M-1 12"x12" Beige Floor tile Adhesive HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 41/42 Modular Unit 6 COMMENTS: Inspector's Signature: 3/29/213

160 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ M-1 12"x12" Beige Floor tile Adhesive 41/42 Modular Unit 6 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

161 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION M-2 12"x12" Beige Floor Tile Adhesive HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 43/44 Modular Building 6 COMMENTS: Inspector's Signature: 3/29/213

162 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ M-2 12"x12" Beige Floor Tile Adhesive 43/44 Modular Building 6 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

163 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION N Cream texture transite texture wall HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout rth modulars 96 COMMENTS: Inspector's Signature: 3/29/213

164 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ N Cream texture transite texture wall Throughout rth modulars 96 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

165 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION O-1 4' x 8' textured ceiling panels HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout rth and South modulars 12 COMMENTS: Inspector's Signature: 3/29/213

166 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ O-1 4' x 8' textured ceiling panels Throughout rth and South modulars 12 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

167 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION P-1 Cream base board HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout rth & South modulars 16 LF LF COMMENTS: Inspector's Signature: 3/29/213

168 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ P-1 Cream base board Throughout rth & South modulars 16 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

169 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION Q-1 cream base board mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout rth & South modulars 16 LF LF COMMENTS: Inspector's Signature: 3/29/213

170 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ Q-1 cream base board mastic Throughout rth & South modulars 16 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

171 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION R Aircell pipe insulation HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler room and tunnels 166 COMMENTS: LF LF 4LF of pipe insulation was abated in 12/21 in basement. Inspector's Signature: 3/29/213

172 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ R Aircell pipe insulation Boiler room and tunnels 166 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: 4LF of pipe insulation was abated in 12/21 in basement. Management Planner's Signature: 4/29/213

173 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION S Cementitious Pipe Joint Insulation HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler room and tunnels 15 LF LF COMMENTS: Inspector's Signature: 3/29/213

174 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ S Cementitious Pipe Joint Insulation Boiler room and tunnels 15 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

175 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION U Boiler tank jacket HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: boiler room 24 COMMENTS: Inspector's Signature: 3/29/213

176 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ U Boiler tank jacket boiler room 24 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

177 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION V Pipe fittings HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Pipe Chases in Bathrooms 1 COMMENTS: LF LF Removed in 28. Inspector's Signature: 3/29/213

178 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ V Pipe fittings Pipe Chases in Bathrooms LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Removed in 28. Management Planner's Signature: 4/29/213

179 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION W Chalkboard HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 41/42 14 COMMENTS: Inspector's Signature: 3/29/213

180 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ W Chalkboard 41/42 14 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

181 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION X Chalkboard Adhesive HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 41/42 14 COMMENTS: Inspector's Signature: 3/29/213

182 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ X Chalkboard Adhesive 41/42 14 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

183 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION Y Chalkboard HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 43/44 14 COMMENTS: Inspector's Signature: 3/29/213

184 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ Y Chalkboard 43/44 14 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

185 213 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) 531 AHERA INSPECTOR: Beinville Brooks INSPECTION DATE: 3/29/ INFORMATION FROM PREVIOUS INSPECTION Z Chalkboard Adhesive HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 43/44 14 COMMENTS: Inspector's Signature: 3/29/213

186 213 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer REVIEW DATE: 4/29/ Z Chalkboard Adhesive 43/44 14 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/29/213

187 213 AHERA REINSPECTION

188 APPENDIX B Inspector and Management Planner Licenses

189

190

191

192

193