GILMORE & ASSOCIATES, INC. Engineers - Surveyors Columbus, Nebraska Howard Blvd.; P.O. Box 581 Columbus, NE Telephone: (402)

Size: px
Start display at page:

Download "GILMORE & ASSOCIATES, INC. Engineers - Surveyors Columbus, Nebraska Howard Blvd.; P.O. Box 581 Columbus, NE Telephone: (402)"

Transcription

1 Page 1 of 5 Set 1 of 2 Bid Security Contractor Obrist & Company, Inc Howard Blvd.; P.O. Box 581 Columbus, NE Telephone: (402) Tilden, NE Fax: (402) Fax: (402) Fax: (308) john@obristandcompany.com adam@rutjensconstruction.com myerco@kdsi.net GROUP A - LIFT STATION NO. 1 (3RD AVENUE AND SOUTH 5TH STREET) 1. Construct New Lift Station No. 1, Complete; Including Lift Station Structure w/frp Liner, Flow Measurement Manhole, Flow Meter, Ventilation Manhole, All Ventilation and Drain Piping, All Structural Concrete, Reinforcing Steel, Submersible Pumps and Controls, Interior Piping, Fittings, and Valves Inside All Structures, All Piping and Fittings Between Wet Well and Valve Vault, Ventilation System, Miscellaneous Metals, Accessories, Painting, Electrical Service and Electrical Work, Site Work, and All Other Required and Related Work as Shown on the Drawings and/or as Specified. 1 JOB $ 325, $ 325, $ 365, $ 365, $ 384, $ 384, Construct New Valve Vault, Complete; Including All Structural Concrete, Reinforcing Steel, Formwork and Finishing, Interior Piping, Fittings, and Valves, Miscellaneous Metals, Accessories, Electrical Work, Site Work, Ventilation System, Drain Line to New Wet Well, and All Other Required and Related Work as Shown on the Drawings and/or as Specified. 1 JOB 56, , , , , , Construct Modifications to Existing Valve Vault, Complete; Including all Interior Piping, Fittings, and Valves, Piping Removals, and New Drain Line 1 JOB 15, , , , , , Rutjens Construction, Inc. 900 Lucas Lane; P. O. Box 99 Telephone: (402) Myers Construction, Inc Hwy 2 Broken Bow, NE Telephone: (308)

2 Page 2 of 5 Set 1 of 2 Contractor Obrist & Company, Inc. Rutjens Construction, Inc. Myers Constrction, Inc. GROUP A - LIFT STATION NO. 1 (3RD AVENUE AND SOUTH 5TH STREET) - CONT'D PVC, PS 115 Sanitary Sewer Main 130 L.F. $ $ 11, $ $ 10, $ $ 17, PVC, SDR26 Sanitary Sewer Main 83 L.F , , , D.I.P. Force Main w/restrained Joints 160 L.F , , , Plug Valve w/restrained Joints 3 Each 4, , , , , , Wye w/restrained Joints 2 Each , , , , º Bend w/restrained Joints and Thrust Blocking 1 Each º Bend w/restrained Joints and Thrust Blocking 2 Each , º Bend w/restrained Joints 7 Each , , , Dresser Coupling 1 Each 1, , , , , , I.D. Sanitary Sewer Manhole 30 V.F , , , I.D. Sanitary Sewer Manhole 24 V.F , , , x 4 Service Wye w/bend 1 Each Saw Cut and Remove Existing Paving 312 Sq. Yds , , , P.C. Concrete Paving, NDOR Type 47B Sq. Yds , , , Crushed Rock Surfacing 300 Tons , , , Plug and Abandon Existing 27 Sewer Main 1 Each 2, , Plug and Abandon Existing 8 Sewer Main 1 Each 1, , All Required Bypass Pumping 1 JOB 10, , , , , , Abandon Existing Lift Station No. 1 1 JOB 3, , , , , , Box Culvert Undercrossing by Boring For 12 D.I.P. Sewer Force Main Including 24 Diameter Steel Casing, Not Including Force Main Piping 1 JOB 27, , , , , , Box Culvert Undercrossing by Boring For 27 PVC Sanitary Sewer Main Including 36 Diameter Steel Casing, Not Including Sewer Main Piping 1 JOB 45, , , , , , NPDES PERMIT, MS4, SWPPP, and all Required BMP s 1 JOB 3, , , , , , Dewatering and Dewatering Permits 1 JOB 15, , , , , ,000.00

3 Page 3 of 5 Set 1 of 2 Contractor Obrist & Company, Inc. Rutjens Construction, Inc. Myers Constrction, Inc. GROUP A - LIFT STATION NO. 1 (3RD AVENUE AND SOUTH 5TH STREET) - CONT'D 27. Testing, Traffic and Pedestrian Control, and All Other Required, Miscellaneous, Incidental, and Related Work Not Otherwise Itemized in the Bid Schedule 1 JOB $ 3, $ 3, $ 8, $ 8, $ 8, $ 8, TOTAL BASE BID GROUP A, LIFT STATION NO. 1, Item Nos. 1 through 27, inclusive: $ 605, $ 661, $ 754, GROUP B - LIFT STATION NO. 5 (EAST HIGHWAY 30) 28. Construct New Lift Station No. 5, Complete; Including Lift Station Structure w/frp Liner, Flow Measurement Manhole, Flow Meter, Ventilation Manhole, All Ventilation and Drain Piping, Valve Manhole, Structural Concrete, Reinforcing Steel, Submersible Pumps and Controls, Interior Piping, Fittings, and Valves Inside All Structures, Miscellaneous Metals, All Piping Between Wet Well and Valve Manhole, Couplings, Ventilation System, Accessories, Painting, Electrical Service and Electrical Work, Site Work, and All Other Required and Related Work as Shown on the Drawings and/or as Specified. 1 JOB 265, , , , , , D.I.P. Sanitary Sewer Main 17 L.F , , PVC, SDR26 Sanitary Sewer Main 111 L.F , , , PVC, DR14 Sanitary Sewer Main 288 L.F , , , PVC, DR14 Sanitary Sewer Main 165 L.F , , , D.I.P. Sewer Force Main w/restrained Joints 110 L.F , , , Plug Valve w/restrained Joints 3 Each 2, , , , , , Wye w/restrained Joints 2 Each , , º Bend w/restrained Joints 1 Each x 8 Increaser w/restrained Joints 1 Each º Bend w/thrust Blocking 1 Each Sleeve 1 Each I.D. Sanitary Sewer Manhole 46 V.F , , ,560.00

4 Page 4 of 5 Set 1 of 2 GROUP B - LIFT STATION NO. 5 (EAST HIGHWAY 30) - CONT'D 41. Crushed Rock Surfacing 170 Tons $ $ 6, $ $ 7, $ $ 5, Plug and Abandon Existing 15 Sewer Main 1 Each 1, , Plug and Abandon Existing 8 Sewer Force Main 1 Each Plug and Abandon Existing Sewer Service Line 1 Each Connect Existing Service Line 1 Each 1, , All Required Bypass Pumping 1 JOB 7, , , , , , Abandon Existing Lift Station No. 5 1 JOB 2, , , , , , NPDES PERMIT, MS4, SWPPP, and all Required BMP s 1 JOB 2, , , , , , Dewatering and Dewatering Permits 1 JOB 15, , , , , , Testing, Traffic and Pedestrian Control, and All Other Required, Miscellaneous, Incidental, and Related Work Not Otherwise Itemized in the Bid Schedule 1 JOB 5, , , , , , TOTAL BASE BID GROUP B, LIFT STATION NO. 5, Item Nos. 28 through 50, inclusive: Contractor Obrist & Company, Inc., Rutjens Construction, Inc. Myers Constrction, Inc. $ 352, $ 407, $ 455, GROUP C - LIFT STATION NO. 11 (26TH AVENUE AND 30TH STREET) 51. Construct New Lift Station No. 11, Complete; Including Lift Station Structure, Ventilation Manhole, All Ventilation and Drain Piping, Valve Manhole, Structural Concrete, Reinforcing Steel, Submersible Pumps and Controls, Interior Piping, Fittings, and Valves Inside all Structures, Miscellaneous Metals, All Piping Between Wet Well and Valve Manhole, Couplings, Ventilation System, Accessories, Painting, Electrical Service and Electrical Work, Site Work, and All Other Required and Related Work as Shown on the Drawings and/or as Specified. 1 JOB 180, , , , , , PVC, SDR26 Sanitary Sewer Main 306 L.F , , , PVC, DR18 Sewer Force Main 68 L.F , , , º Bend w/thrust Blocking 1 Each Sleeve 1 Each I.D. Sanitary Sewer Manhole 35 V.F , , ,970.00

5 Page 5 of 5 Set 1 of 2 Contractor Obrist & Company, Inc., Rutjens Construction, Inc. Myers Constrction, Inc. GROUP C - LIFT STATION NO. 11 (26TH AVENUE AND 30TH STREET) - CONT'D 57. Saw Cut and Remove Existing Paving 709 Sq. Yds. $ $ 9, $ 8.50 $ 6, $ 8.00 $ 5, P.C. Concrete Paving, NDOR Type 47B Sq. Yds , , , Saw Cut and Remove Existing Walk 61 Sq. Yds P.C. Concrete Walk, NDOR Type 47B Sq. Yds , , , Plug and Abandon Existing 12 Sewer Main 1 Each 1, , Plug and Abandon Existing 6 Sewer Force Main 1 Each 1, , All Required Bypass Pumping 1 JOB 5, , , , , , Abandon Existing Lift Station No JOB 6, , , , , , NPDES PERMIT, MS4, SWPPP, and all Required BMP s 1 JOB 3, , , , , , Dewatering and Dewatering Permits 1 JOB 10, , , , , , Testing, Traffic and Pedestrian Control, Coordination with Other Contractor(s) Working Adjacent to the Site, and All Other Required, Miscellaneous, Incidental, and Related Work Not Otherwise Itemized in the Bid Schedule 1 JOB 6, , , , , , TOTAL BASE BID GROUP C, LIFT STATION NO. 11, Item Nos. 51 through 67, inclusive: $ 285, $ 338, $ 381, TOTAL AGGREGATE BASE BID, LIFT STATION REPLACEMENTS 2016, GROUPS A, B, AND C, Item Nos. 1 through 67, Inclusive: $ 1,243, $ 1,407, $ 1,591, Contractor's Starting Date: December 1, 2016 November 14, 2016 Contractor's Substantial Completion Date for Groups A, B, and C: January 1, 2018 February 1, 2017 Contractor's Final Completion Date for Groups A, B, and C: January 1, 2018 August 1, 2017 April 1, 2017 September 30, 2017 October 31, 2017