1 W Greenleaf Ave Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report). Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank or ) or full replacement (rank, 3 or ). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main 9 3, $3,89, Addition 999 3,9 $,3,3 Gymnasium 99,3 $,9 Lunch room/kitchen 999 9,39 $8,3 SITE $38,99 Campus Total, $,,3 Building: Main Category: Building Exterior Entrance Entrance Control - Audio and Video EA $ Exterior Doors - Exterior FRP Door EA $, Exterior Doors - Exterior Steel Door EA $,9 Exterior Doors - Transom Lite EA Exterior Stairs - Concrete 3 LF $39 Exterior Stairs - Concrete 89 LF Power Door Operator and Controls EA Ramp Handrail - Steel_Ramp Handrail LF $,3 Ramps - Concrete 8 LF Stair Handrail - Steel_Stair Handrail LF $33 Foundation Lighting Foundation - Masonry LF Superstructure - Steel with Clay Tile Arch, SF Exterior Lighting - Parapet or Roof Mounted EA $,9 ARMSTROG G Page of 9 Assessment Date: /9/

2 Building: Main Category: Building Exterior Lighting W Greenleaf Ave Chicago, IL Exterior Lighting - Wall Mounted 8 EA $,3 Roof System Walls Windows Cell Tower EA $3 Chimney - Brick Chimney- Concrete/ Mortar Liner 8 LF Coping - Metal LF $3,33 Coping - Stone LF $8, Coping - Stone LF Downspouts - Exterior Downspouts 33 LF $,9 Downspouts - Interior Downspouts 3 LF $,9 Parapet - " - 3" Height LF $,88 Parapet - " - 3" Height LF Parapet - Parapet < " Height LF Roof - Metal 3 SF $, Roof - Metal SF $,9 Roof - Modified Bitumen, SF $,39 Roof - Modified Bitumen 3, SF $3,8 Roof - Modified Bitumen,3 SF Roof Structure - Steel / Metal Deck/ Concrete Topping SF Roof Structure - Steel with Clay Tile Arch 9,3 SF Canopy - Concrete/ Stucco, SF $33,9 Cheek-Wall - Concrete SF Cheek-Wall - Stone SF $, Cornice - Metal Projecting 8 LF $, Exterior Walls - Brick 33, SF $,8 Exterior Walls - Prefabricated Metal Panel Wall SF $,9 Exterior Walls - Stone-Cast,99 SF $,3 Curtain wall - Insulated Panel SF $8, Guard - Guards wire guard,8 SF $3, Lintels - Steel 8 LF $3,38 Skylite - Glass Single-Pane 9 SF $,33 Windows - Sash Lexan, SF $8, Windows - Sash Lexan, SF $3,9 ARMSTROG G Page of 9 Assessment Date: /9/

3 Building: Main Category: Building Exterior W Greenleaf Ave Chicago, IL Building Exterior Subtotal: $,89,9 Building: Main Category: Electrical System Emergency System Automatic Transfer Switch EA $8 Emergency A/C Power - Corridors and Stairs,393 SF $3, Emergency A/C Power - Multipurpose Room, SF $, Emergency Battery Packs - Multipurpose Room EA $,3 Exit Signs - Corridors and Stairs 8 EA $9,89 Exit Signs - Multipurpose Room 8 EA $,3 Security System - Intrusion Detection, SF $,888 Main Service Power Distribution Independent Electrical Service for emergency power EA Main Electrical Service - A /8/3PH EA $,8 PA System, SF Lighting and Power Panels - A EA $98 Lighting and Power Panels - A EA Lighting and Power Panels - Above A EA Main Distribution Panels - - amp EA Electrical System Subtotal: $3,8 Building: Main Category: Safty System Fire Alarm Fire Alarm Strobe Lights, SF $, Fire Alarm_System, SF $8,8 Safty System Subtotal: $9,93 Building: Main ARMSTROG G Page 3 of 9 Assessment Date: /9/

4 Category: Mechanical System Air Handling Systems W Greenleaf Ave Chicago, IL Air Handling Unit- Built Up- Single Zone- Steam Coils cfm EA $,3 Air Handling Unit- Built Up-Multi Zone- Steam Coils - - cfm EA $, Air Intake EA $, Air Intake EA Auxiliaries - - cfm EA $, Auxiliaries cfm EA $,3 Return Duct Work - Indoor- Vertical Shaft and Ducts LF $9,39 Return Duct Work - Indoor- Vertical Shaft and Ducts LF Zone Dampers EA $3,3 Boiler Systems Heating Devices Temperature Control Ventilation Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler - - HP EA $,3 Chemical Feed System EA $,8 Chemical Feeder EA $,8 Combustion Dampers EA $88 Condensate Pump 3 EA $,88 Feed Water Pumps and Tank EA $3, on Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler - - HP EA $,3 Piping - Condensate Pipe- Steel LF $9 Piping - Steam Pipe- Steel LF $9 Steam Traps EA $,38 Radiators - Steam EA $3,3 Unit Heater - Electric EA $, Unit Heater - Gas EA $8 Wall Heater - Electric 8 EA $, Pneumatic System, SF $,9 Thermostats - Pneumatic 3 EA Exhaust Fans- Roof Mounted CFM 3 EA $, Mechanical System Subtotal: $, Building: Main Category: Plumbing System ARMSTROG G Page of 9 Assessment Date: /9/

5 Building: Main Category: Plumbing System Hot Water W Greenleaf Ave Chicago, IL Gas Heater BTU/HR EA $3 Gas Heater - Less than BTU/HR EA $,9 Piping Pumps Domestic Piping-Cold Water from Risers to Fixtures, SF $,3 Domestic Piping-Cold Water Horizontal Lines, SF $, Domestic Piping-Cold Water Risers, SF $, Domestic Piping-Hot Water from Risers to Fixtures, SF $9,9 Domestic Piping-Hot Water Horizontal Lines, SF $, Domestic Piping-Hot Water Return Lines, SF $8,8 Domestic Piping-Hot Water Return Risers, SF $8,8 Sanitary Piping, SF $,9 Storm Piping, SF $3,8 Vent Piping, SF $,8 Pumps - Domestic Booster Pump-Simplex EA $, Pumps - Sump-Simplex EA $ Plumbing System Subtotal: $3, Building: Main Category: Classrooms (9 rooms) AC Units 8 EA $3,8 Casework 8 LF $,3 Ceiling - Lay-in,3 SF $,8 Chalk Board,8 LF $3, Doors - Side-lite SF $33 Doors - Transom Window 33 SF $,89 Doors - Wood Doors inclu hw 9 EA $8,9 Floor - Carpet,3 SF $3,3 Floor - Tile/Sheet 3,9 SF $3,9 Floor - Wood, SF $,388 Lighting - Lay-in 3 EA $3, Marker Board 39 LF $8,83 Storage/ Closet SF $ ARMSTROG G Page of 9 Assessment Date: /9/

6 Building: Main Category: Classrooms (9 rooms) W Greenleaf Ave Chicago, IL Storage/ Closet 9 SF $,9 Walls - Plaster/Drywall SF $ Walls - Plaster/Drywall 3, SF $9,9 Work Sink EA $8 Classrooms Subtotal: $9,9 Building: Main Category: Rooms (Other Than Classrooms) Administrative Suites/Offices AC Unit 3 EA $,8 Ceiling - Exposed 9 SF $83 Ceiling - Lay-in, SF $,9 Ceiling - Plaster/Drywall SF $,9 Doors - Side-lite 8 SF $3 Doors - Transom Window SF $,9 Doors - Wood Doors inclu hw 9 EA $,9 Floor - Carpet 39 SF $8 Floor - Concrete 9 SF $ Floor - Concrete Epoxy/ Painted 98 SF $ Floor - Tile/Sheet,38 SF $, Lighting - Lay-in EA $3,93 Lighting - Pendent/Surface EA $,39 Power Distribution EA Storage/ Closet SF $33 Walls - Masonry 3 SF $,3 Walls - Plaster/Drywall,9 SF $,3 Work SInk EA $8 Gymnasia Ceiling - Lay-in,89 SF $8,9 Ceiling - Plaster/Drywall 3,33 SF $, Doors - Wood Doors inclu hw EA $, Floor - Wood, SF $, Lighting - Pendent/Surface EA $, Main Floor Seating EA $3,9 ARMSTROG G Page of 9 Assessment Date: /9/

7 Building: Main Category: Rooms (Other Than Classrooms) Gymnasia Mechanical/ Service Rooms W Greenleaf Ave Chicago, IL Sound System EA $, Stage SF $, Stage Lighting System EA $,39 Stage-Stairs - Wood LF $ Walls - Masonry 3, SF $9,9 Air Intake Plenums, SF $, Air Tunnel 3,8 SF $,8 Boiler Room, SF $,8 Coal Room SF $,9 Interior Stairs LF $3 Janitor's Closet SF $, Mechanical/ Service Rooms, SF $, Storage Room 3 SF $,3 Restroom Accessories 3, SF $3, Ceiling - Plaster/Drywall 3, SF $,8 Doors - Wood Doors inclu hw 9 EA $,9 Floor - Concrete SF $8 Floor - Tile Ceramic/ Porcelain 3, SF $, Floor - Tile/Sheet 83 SF $83 Floor Drain EA $, Hand Dryer EA $3, Lavatory 9 EA $, Lighting - Pendent/Surface 3 EA $3,9 Lighting - Wall Mounted EA $8 Partitions 8 EA $8,3 Urinals EA $, Walls - Concrete Block 3 SF $ Walls - Masonry 3, SF $, Walls - Plaster/Drywall, SF $,9 Water Closet 3 EA $,9 Rooms (Other Than Classrooms) Subtotal: $38,9 Building: Main ARMSTROG G Page of 9 Assessment Date: /9/

8 Category: Building Interior Corridor W Greenleaf Ave Chicago, IL Ceiling - Lay-in 9,3 SF $, Doors - Steel Doors incl hw 3 EA $93 Doors - Wood Doors include hw EA $3, Drinking Fountains - Single Fountain EA $, Floor - Asphalt Floor 3, SF $, Floor - Concrete Epoxy/ Painted, SF $,98 Lighting - Lay-in EA $8,38 Lighting - Pendent/Surface 3 EA $,8 Walls - Plaster/Drywall 3,3 SF $9,93 Stairs Ceiling - Plaster/Drywall SF $, Floor - Asphalt,8 SF $9, Handrails 3 LF $3, Lighting - Pendent/Surface EA $,8 Lighting - Wall Mounted EA $9 Stairs - Asphalt LF $, Walls - Plaster/Drywall, SF $,3 Building Interior Subtotal: $, Total Building Cost $3,89, Building: Addition Category: Building Exterior Entrance Entrance Control - Audio and Video EA $,3 Exterior Doors - Exterior Steel Door EA $,3 Exterior Doors - Side lite EA Exterior Doors - Store Front EA $,3 Exterior Doors - Transom Lite EA Foundation Lighting Foundation - Concrete 8 LF Superstructure - Steel,9 SF Exterior Lighting - Wall Mounted EA $ ARMSTROG G Page 8 of 9 Assessment Date: /9/

9 Building: Addition Category: Building Exterior Lighting W Greenleaf Ave Chicago, IL Exterior Lighting - Wall Mounted EA $, Roof System Walls Windows Cell Tower EA $3 Chimney - Metal Flue LF Coping - Metal LF Coping - Stone,8 LF Downspouts - Interior Downspouts LF $,93 Parapet - " - 3" Height 3 LF Parapet - Parapet < " Height 9 LF Parapet - Parapet > 3" 3 LF Roof - Modified Bitumen, SF $3,8 Roof - Modified Bitumen 9,8 SF Roof Structure - Steel / Metal Deck/ Concrete Topping,8 SF Exterior Walls - Brick 33,89 SF Exterior Walls - Concrete Block,8 SF Exterior Walls - Stone-Cast,83 SF Guard - Guards perforated,9 SF $9,9 Lintels - Steel 9 LF Windows - Louver SF Windows - Sash Aluminum Double-pane,9 SF Building Exterior Subtotal: $8, Building: Addition Category: Electrical System Emergency System Automatic Transfer Switch EA Emergency A/C Power - Corridors and Stairs 9,9 SF $,883 Emergency Battery Packs - Corridors and Stairs EA $3, Emergency Battery Packs - Students Toilets EA $, Exit Signs - Corridors and Stairs 9 EA $,89 Security System - Intrusion Detection,9 SF $8,9 ARMSTROG G Page 9 of 9 Assessment Date: /9/

10 Building: Addition Category: Electrical System Main Service W Greenleaf Ave Chicago, IL Independent Electrical Service for emergency power EA Main Electrical Service - A /8/3PH EA PA System,9 SF Power Distribution Lighting and Power Panels - A EA $99 Lighting and Power Panels - Above A EA Main Distribution Panels - - amp EA Transformers - /8 - /8 EA Electrical System Subtotal: $, Building: Addition Category: Safty System Fire Alarm Fire Alarm Panel EA $,8 Fire Alarm Strobe Lights,9 SF $,3 Fire Alarm_System,9 SF $8,8 Fire Pump Controller EA $,83 Pump Room Assembly Sprinkler System Fire Pump - - hp EA $,8 Jockey Pump EA $8 Sprinkler Heads,9 SF Sprinkler Piping,9 SF Wet Sprinkler System,9 SF Safty System Subtotal: $,89 Building: Addition Category: Mechanical System Air Conditioning Chiller-Air Cooled- Recipricating-Roof Mounted - - tons EA $,3 Glycol Feed EA ARMSTROG G Page of 9 Assessment Date: /9/

11 Building: Addition Category: Mechanical System Air Conditioning Air Handling Systems Boiler Systems Gas Booster Heating Devices Mechanical Plumbing Temperature Control W Greenleaf Ave Chicago, IL Heat Pump- Ceiling Mounted- Hot Water Heating & DX Cooling- Self Contained Air Cooled EA $3,9 Compressor - Less than 3 tons Pipes - Chilled Water Pipe- Copper LF $89 Pipes - Chilled Water Pipe- Steel LF $ Air Handling Unit-Package Single Zone- Indoor- Hot Water and Chilled Water Coils - - EA $3,3 cfm Air Handling Unit-Package Single Zone- Indoor- Hot Water and Chilled Water Coils - Greater EA $3,3 than 3, cfm Air Intake 3 EA Fan Power Box - Fan Power Box with Hot Water Coil 8 EA $9,38 Indoor Return Fans- Centrifugal Inline - - CFM EA $,8 Indoor Return Fans- Centrifugal Inline - Greater than CFM EA $,33 VAV Box EA $8, Boiler Auxiliary- on Condensing Hot Water - - MBH EA $3,88 Combustion Dampers EA $,3 Glycol Feed System EA $, on Condensing- Water Tube- Flexible Tube- Force Draft- Hot Water Boiler - - MBH EA $8,9 Gas Booster EA Cabinet Heaters - With Hot Water Coil 8 EA $,83 Unit Heater - Electric EA $ Unit Heater - Hot Water EA $, Chilled Water Pump - - HP EA $,8 Hot Water Pump - - HP EA $,8 Hot Water Pump - Less than EA $, Hydronic Supply and Return - Copper,3 LF $8, Hydronic Supply and Return - Steel LF $, DDC System,9 SF $, Thermostats - DDC EA ARMSTROG G Page of 9 Assessment Date: /9/

12 Building: Addition Category: Mechanical System Ventilation W Greenleaf Ave Chicago, IL Exhaust Fans- Indoor - - CFM EA $,8 Mechanical System Subtotal: $, Building: Addition Category: Plumbing System Hot Water Gas Heater BTU/HR EA $,98 Piping Pumps Domestic Piping-Cold Water from Risers to Fixtures,9 SF Domestic Piping-Cold Water Horizontal Lines,9 SF Domestic Piping-Cold Water Risers,9 SF Domestic Piping-Hot Water from Risers to Fixtures,9 SF Domestic Piping-Hot Water Horizontal Lines,9 SF Domestic Piping-Hot Water Return Lines,9 SF Domestic Piping-Hot Water Return Risers,9 SF Sanitary Piping,9 SF Storm Piping,9 SF Vent Piping,9 SF Pumps - Domestic Booster Pump-Duplex EA $,9 Pumps - Sump-Simplex EA $ Plumbing System Subtotal: $, Building: Addition Category: Classrooms Computer Lab ( room) Casework 3 LF $3,83 Ceiling - Lay-in, SF $3, Chalk Board LF $8 Charging Station EA $,939 Doors - Side-lite 8 SF $3 ARMSTROG G Page of 9 Assessment Date: /9/

13 Building: Addition Category: Classrooms Computer Lab ( room) W Greenleaf Ave Chicago, IL Doors - Wood Doors inclu hw EA $3 Floor - Tile/Sheet, SF $, Lighting - Lay-in EA Storage/ Closet 3 SF $9 Walls - Concrete Block 3 SF $, Walls - Plaster/Drywall 3 SF $,9 Wireless System EA $3 Kindergarten ( rooms) Pre School (3 rooms) Casework LF $, Ceiling - Lay-in,83 SF $, Chalk Board 3 LF $3,3 Chalk Board LF $, Doors - Side-lite 3 SF $3 Doors - Wood Doors inclu hw EA $, Floor - Tile/Sheet,83 SF $,83 Lighting - Lay-in 8 EA Marker Board 3 LF Storage/ Closet SF $, Walls - Concrete Block 3, SF $9, Walls - Plaster/Drywall, SF $,3 Work Sink EA $,9 Casework LF $3,88 Ceiling - Lay-in 3, SF $,3 Chalk Board LF $, Chalk Board LF $ Doors - Side-lite SF $ Doors - Wood Doors inclu hw 3 EA $93 Floor - Tile/Sheet 3, SF $3,8 Lighting - Lay-in EA Marker Board 8 LF $ Marker Board LF Storage/ Closet SF $,9 Walls - Concrete Block, SF $, Walls - Plaster/Drywall,9 SF $, Work Sink 9 EA $3, ARMSTROG G Page 3 of 9 Assessment Date: /9/

14 Building: Addition Category: Classrooms (8 rooms) W Greenleaf Ave Chicago, IL Casework 89 LF $,3 Ceiling - Lay-in SF $8 Ceiling - Lay-in,99 SF,8 Ceiling - Lay-in 9 SF Chalk Board 98 LF $8,8 Chalk Board LF $,338 Doors - Side-lite 8 SF $3, Doors - Transom Window SF $ Doors - Wood Doors inclu hw 33 EA $9,933 Floor - Carpet 3 SF $,39 Floor - Tile/Sheet, SF $, Lighting - Lay-in 8 EA $, Lighting - Lay-in EA Marker Board 3 LF $3 Marker Board LF Storage/ Closet SF $9 Walls - Concrete Block 3,9 SF $,83 Walls - Concrete Block 3 SF Walls - Plaster/Drywall 3,3 SF $3,83 Work Sink 9 EA $, Classrooms Subtotal: $33,939 Building: Addition Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Ceiling - Lay-in SF $8 Ceiling - Lay-in,3 SF $9, Doors - Transom Window 9 SF $,9 Doors - Wood Doors inclu hw EA $3, Floor - Carpet 9 SF $,93 Floor - Terrazzo SF $ Floor - Tile/Sheet, SF $, Lighting - Lay-in EA $38 Lighting - Lay-in 3 EA Power Distribution 8 EA $,999 ARMSTROG G Page of 9 Assessment Date: /9/

15 Building: Addition Category: Rooms (Other Than Classrooms) Administrative Suites/Offices W Greenleaf Ave Chicago, IL Power Distribution EA Storage/ Closet 9 SF Walls - Concrete Block,3 SF $,83 Walls - Plaster/Drywall, SF $,9 Work SInk EA $, Library MDF_IDF Casework 9 LF $,83 Ceiling - Lay-in, SF $, Doors - Side-lite 8 SF $3 Doors - Wood Doors inclu hw EA $3 Floor - Carpet, SF $3,3 Lighting - Lay-in 8 EA Walls - Concrete Block, SF $3, Walls - Plaster/Drywall SF $, AC Unit EA $9 Doors - Steel Doors incl hw EA $3 Finishes 8 SF $, Ventilation and Cooling EA $,8 Mechanical/ Service Rooms Interior Stairs 3 LF $ Janitor's Closet 8 SF Mechanical/ Service Rooms, SF $39, Vaults SF $,83 Restroom Accessories, SF $8, Ceiling - Lay-in SF $, Ceiling - Plaster/Drywall, SF $, Doors - Wood Doors inclu hw EA $3,3 Floor - Terrazzo,33 SF $,8 Floor Drain 3 EA $,3 Hand Dryer EA $, Lavatory 9 EA $9,9 Lighting - Lay-in EA $38 Lighting - Lay-in EA ARMSTROG G Page of 9 Assessment Date: /9/

16 Building: Addition Category: Rooms (Other Than Classrooms) Restroom W Greenleaf Ave Chicago, IL Partitions EA $, Urinals 9 EA $3, Walls - Structural Glazed Tile 8, SF $,39 Water Closet 38 EA $, Rooms (Other Than Classrooms) Subtotal: $,39 Building: Addition Category: Building Interior Corridor Ceiling - Lay-in 8,39 SF $,8 Ceiling - Plaster/Drywall SF $3 Doors - Steel Doors incl hw 33 EA $9,933 Doors - Store Front EA $, Drinking Fountains - Single Fountain EA $, Floor - Terrazzo 8,39 SF $,3 Lighting - Lay-in 383 EA Stairs - Terrazzo 3 LF $8 Walls - Concrete Block,8 SF $3, Walls - Structural Glazed Tile, SF $8, Stairs Vertical Conveyance Ceiling - Exposed SF $ Ceiling - Lay-in,3 SF $3,9 Floor - Terrazzo, SF $,8 Handrails LF $3, Lighting - Lay-in EA Lighting - Pendent/Surface EA Lighting - Wall Mounted 8 EA Stairs - Terrazzo 8 LF $, Walls - Plaster/Drywall SF $ Walls - Structural Glazed Tile,88 SF $,9 Elevator - Hydraulic Elevator EA $9,38 ARMSTROG G Page of 9 Assessment Date: /9/

17 Building: Addition Category: Building Interior W Greenleaf Ave Chicago, IL Building Interior Subtotal: $3,8 Total Building Cost $,3,3 Building: Gymnasium Category: Building Exterior Entrance Exterior Doors - Exterior Steel Door 8 EA $3,8 Exterior Doors - Side lite EA Exterior Doors - Transom Lite EA Exterior Stairs - Concrete 3 LF Stair Handrail - Steel_Stair Handrail LF Foundation Lighting Roof System Walls Windows Foundation - Concrete LF Superstructure - Steel,3 SF Exterior Lighting - Wall Mounted EA $,3 Coping - Stone LF Downspouts - Exterior Downspouts 3 LF $,8 Downspouts - Interior Downspouts 88 LF $,9 Parapet - Parapet < " Height LF Roof - Metal,9 SF Roof - Modified Bitumen 3, SF Roof Structure - Steel / Metal Deck/ Concrete Topping,3 SF Exterior Walls - Brick,33 SF Exterior Walls - Stone-Cast SF $, Curtain wall - Glazed Double Pane 3 SF $,3 Lintels - Steel 98 LF Windows - Decorative SF $,3 ARMSTROG G Page of 9 Assessment Date: /9/

18 Building: Gymnasium Category: Building Exterior W Greenleaf Ave Chicago, IL Building Exterior Subtotal: $,89 Building: Gymnasium Category: Electrical System Emergency System Emergency A/C Power - Corridors and Stairs 8 SF Emergency A/C Power - Gym, SF Exit Signs - Corridors and Stairs EA $,9 Exit Signs - Gym EA $, Security System - Intrusion Detection,3 SF $, Main Service PA System,3 SF Electrical System Subtotal: $3,98 Building: Gymnasium Category: Safty System Fire Alarm Fire Alarm Strobe Lights,3 SF $, Fire Alarm_System,3 SF $,88 Sprinkler System Sprinkler Heads,3 SF Sprinkler Piping,3 SF Wet Sprinkler System,3 SF Safty System Subtotal: $8,33 Building: Gymnasium Category: Mechanical System Air Handling Systems Roof Top Unit-Single Zone-Roof Mounted- DX Cooling Only with Self Contained Compressor tons EA $, ARMSTROG G Page 8 of 9 Assessment Date: /9/

19 Building: Gymnasium Category: Mechanical System Temperature Control W Greenleaf Ave Chicago, IL DDC System,3 SF Thermostats - DDC EA Ventilation Exhaust Fans- Roof Mounted - - CFM EA $9 Mechanical System Subtotal: $, Building: Gymnasium Category: Plumbing System Piping Storm Piping,3 SF Plumbing System Subtotal: Building: Gymnasium Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Ceiling - Lay-in SF $, Doors - Steel Doors incl hw EA $3 Doors - Wood Doors inclu hw EA $3 Floor - Tile/Sheet SF $ Lighting - Lay-in EA $ Power Distribution EA Walls - Concrete Block, SF $3, Walls - Plaster/Drywall SF $,88 Gymnasia Ceiling - Exposed, SF $,8 Doors - Wood Doors inclu hw EA Floor - Sport Flooring, SF $3, Lighting - Pendent/Surface EA $,39 Sound System EA $, Walls - Concrete Block, SF $,33 ARMSTROG G Page 9 of 9 Assessment Date: /9/

20 Building: Gymnasium Category: Rooms (Other Than Classrooms) Restroom W Greenleaf Ave Chicago, IL Accessories 3 SF $,8 Ceiling - Plaster/Drywall 3 SF $3 Doors - Steel Doors incl hw EA Doors - Wood Doors inclu hw EA $3 Floor - Concrete Epoxy/ Painted 3 SF $9 Floor Drain 3 EA $3, Lavatory 3 EA $99 Lighting - Lay-in 3 EA $3 Walls - Concrete Block 3 SF $, Water Closet 3 EA $,8 Rooms (Other Than Classrooms) Subtotal: $83,3 Building: Gymnasium Category: Building Interior Corridor Ceiling - Lay-in 8 SF $, Doors - Steel Doors incl hw EA $, Floor - Tile/Sheet 8 SF $ Lighting - Lay-in 8 EA $9 Student Lockers - Two Tiers EA $ Walls - Concrete Block,3 SF $, Building Interior Subtotal: $9, Total Building Cost $,9 Building: Lunch room/kitchen Category: Building Exterior Entrance Exterior Doors - Exterior Steel Door EA $,83 Exterior Doors - Exterior Steel Door EA $,883 Exterior Stairs - Concrete LF Ramp Handrail - Steel_Ramp Handrail LF $99 ARMSTROG G Page of 9 Assessment Date: /9/

21 Building: Lunch room/kitchen Category: Building Exterior Entrance W Greenleaf Ave Chicago, IL Ramp Handrail - Steel_Ramp Handrail 8 LF Ramps - Concrete LF Stair Handrail - Steel_Stair Handrail LF $ Foundation Lighting Roof System Walls Windows Foundation - Concrete 338 LF Superstructure - Steel 9,39 SF Exterior Lighting - Wall Mounted EA $,88 Chimney - Metal Flue 3 LF $, Coping - Stone 38 LF Downspouts - Interior Downspouts LF $,98 Parapet - " - 3" Height 38 LF Roof - Modified Bitumen 9,39 SF Roof Structure - Steel / Metal Deck/ Concrete Topping 9,39 SF Cheek-Wall - Concrete SF Exterior Walls - Brick 9,8 SF Exterior Walls - Stone-Cast, SF $8, Clerestory - Glass Double-Pane 33 SF Lintels - Steel LF Windows - Louver 8 SF Building Exterior Subtotal: $3, Building: Lunch room/kitchen Category: Electrical System Emergency System Emergency A/C Power - Corridors and Stairs,3 SF $3 Emergency A/C Power - Lunchrooms,33 SF $,3 Emergency Battery Packs - Corridors and Stairs EA $ Emergency Battery Packs - Lunchrooms EA $,3 ARMSTROG G Page of 9 Assessment Date: /9/

22 Building: Lunch room/kitchen Category: Electrical System Emergency System Main Service Power Distribution W Greenleaf Ave Chicago, IL Exit Signs - Corridors and Stairs EA $ Exit Signs - Lunchroom EA $3,3 Security System - Intrusion Detection 9,39 SF $,9 PA System 9,39 SF Lighting and Power Panels - Above A EA Main Distribution Panels - - amp EA Transformers - /8 - /8 EA Electrical System Subtotal: $,9 Building: Lunch room/kitchen Category: Safty System Fire Alarm Sprinkler System Fire Alarm Strobe Lights 9,39 SF $3,3 Fire Alarm_System 9,39 SF $,39 Sprinkler Heads 9,39 SF Sprinkler Piping 9,39 SF Wet Sprinkler System 9,39 SF Safty System Subtotal: $3,8 Building: Lunch room/kitchen Category: Mechanical System Air Conditioning Air Handling Systems Pipes - Chilled Water Pipe- Steel LF $89 Air Handling Unit-Package Single Zone- Indoor- Hot Water and Chilled Water Coils - - EA $8,9 cfm Air Intake EA ARMSTROG G Page of 9 Assessment Date: /9/

23 Building: Lunch room/kitchen Category: Mechanical System Air Handling Systems W Greenleaf Ave Chicago, IL Auxiliaries - - cfm EA Fan Power Box - Fan Power Box with Hot Water Coil 9 EA $,8 Indoor Return Fans- Centrifugal Inline - - CFM EA $,8 Make Up Air Unit- Roof Mounted- Gas Heating - Less than cfm EA $,3 Heating Devices Mechanical Plumbing Temperature Control Ventilation Cabinet Heaters - With Hot Water Coil EA Unit Heater - Electric EA $8 Unit Heater - Hot Water EA Hydronic Supply and Return - Copper LF Hydronic Supply and Return - Steel LF DDC System 9,39 SF Thermostats - DDC 9 EA Exhaust Fans- Indoor CFM EA $9 Exhaust Fans- Roof Mounted CFM EA $9 Roof Mounted Duct Work LF $3,9 Type I Exhaust Hood- Kitchen EA $,9 Type II Exhaust Hood- Warming Kitchen EA $,8 Mechanical System Subtotal: $, Building: Lunch room/kitchen Category: Plumbing System Hot Water Electric Heater - Greater than KW EA $, Gas Heater BTU/HR EA $,98 Piping Domestic Piping-Cold Water from Risers to Fixtures 9,39 SF Domestic Piping-Cold Water Horizontal Lines 9,39 SF Domestic Piping-Hot Water Horizontal Lines 9,39 SF Domestic Piping-Hot Water Return Lines 9,39 SF ARMSTROG G Page 3 of 9 Assessment Date: /9/

24 Building: Lunch room/kitchen Category: Plumbing System Piping W Greenleaf Ave Chicago, IL Domestic Piping-Hot Water Return Risers 9,39 SF Sanitary Piping 9,39 SF Storm Piping 9,39 SF Vent Piping 9,39 SF Plumbing System Subtotal: $, Building: Lunch room/kitchen Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Ceiling - Lay-in SF $98 Doors - Steel Doors incl hw EA $3 Floor - Concrete SF $3 Lighting - Lay-in EA $9 Power Distribution EA Walls - Concrete Block 3 SF $ Kitchen Locker/Shower Room Ceiling - Lay-in,8 SF $,38 Doors - Steel Doors incl hw EA $, Floor - Concrete SF $ Floor - Concrete Epoxy/ Painted, SF $ Lighting - Lay-in EA $,38 Serving Line LF $3, Walls - Concrete Block,83 SF $,8 Accessories SF $9 Ceiling - Lay-In SF $ Doors - Wood Doors inclu hw EA $3 Floor - Concrete SF $ Lavatory EA $3 Lighting - Lay-in EA $9 Student Lockers - One Tier 9 EA $83 Walls - Concrete Block 3 SF $, Water Closet EA $33 ARMSTROG G Page of 9 Assessment Date: /9/

25 Building: Lunch room/kitchen Category: Rooms (Other Than Classrooms) Lunch & Multipurpose Room W Greenleaf Ave Chicago, IL Ceiling - Exposed,33 SF $8, Doors - Steel Doors incl hw EA Floor - Concrete Epoxy/ Painted,33 SF $3,33 Lighting - Chandelier, Incandescent 3 EA $,33 Lighting - Lay-in EA $,98 Lighting - Pendent/Surface EA $, Serving Line LF $,8 Walls - Concrete Block 8,9 SF $,9 Rooms (Other Than Classrooms) Subtotal: $, Building: Lunch room/kitchen Category: Building Interior Corridor Ceiling - Lay-in,3 SF $, Doors - Steel Doors incl hw EA $3 Floor - Concrete Epoxy/ Painted,3 SF $ Lighting - Lay-in EA $,39 Walls - Concrete Block,89 SF $,3 Building Interior Subtotal: $, Total Building Cost $8,3 SITE Category: Site Civil/Drainage Fencing Civil/ Drainage - Catch Basin 9 EA $9,8 Civil/ Drainage - Site Manhole EA Fencing - Guard Rail LF $, Fencing - ew Standard Ornamental LF $,88 Fencing - ew Standard Ornamental, LF $,93 ARMSTROG G Page of 9 Assessment Date: /9/

26 W Greenleaf Ave Chicago, IL SITE Category: Site Landscape Parking Lot Playground Sidewalks Signage Benches EA $, Landscape - Grass,8 SF $8,98 Landscape - Hardscape- Asphalt 3,3 SF Landscape - Hardscape- Concrete SF $,38 Landscape - Hardscape- Concrete 3, SF Lighting - Pole Mounted EA $, Parkway trees 3 EA $3, Planting Beds/ Area,3 SF $8,8 Retaining Wall - Concrete SF $,3 Retaining Wall - Masonry SF $3 Retaining Wall - Masonry SF $88 Trash Receptacles EA $3 Concrete Curbs 3 LF Interior Plantings LF $,3 Lighting - Pole Mounted EA $,8 Surface - Asphalt, SF $8,33 Surface - Concrete, SF Trash Compactor EA Trash Enclosure - Masonry,8 SF $,838 Vehicular Screening 3 LF $9, Equipment - Pre K 3- EA $3, Surface - Square Rubber Mats, SF $,9 Sidewalks - Internal Walks, LF $3, Sidewalks - Perimeter Sidewalks SF $9 Sidewalks - Perimeter Sidewalks 3,9 SF $,89 Flag Pole - Building Mounted Flag Pole EA $88 Flag Pole - Flag Pole EA Marquee - Building Mounted Back Lighted w/ LED EA Marquee - Free Standing Back Lighted EA Monument - Sign EA Monument - Sign EA ARMSTROG G Page of 9 Assessment Date: /9/

27 SITE Category: Site W Greenleaf Ave Chicago, IL Site Subtotal: $38,99 Total Site Cost $38,99 Campus Total ² ³ $,,3 ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked in this report; by the time the report is compiled, they have been resolved. ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. ARMSTROG G Page of 9 Assessment Date: /9/

28 W Greenleaf Ave Chicago, IL Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Library Kindergarten Office st Floor st Floor st Floor st Floor st Floor A A Adj. Room Addition Computer Lab Kindergarten Kindergarten Kindergarten Kindergarten Pre School Kindergarten Kindergarten Pre School Kindergarten Pre School st Floor st Floor st Floor st Floor st Floor 3 A A A A A A,,,,,, ARMSTROG G Page 8 of 9 Assessment Date: /9/

29 W Greenleaf Ave Chicago, IL Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Addition Pre School Pre School Pre School Pre School Art Room st Floor st Floor st Floor st Floor A 33 3/ A A A A A A A A A A A A A A /A A A A A A A A A A A A A A A A,, , , ARMSTROG G Page 9 of 9 Assessment Date: /9/