1 B.O.Q FOR INTERIOR FURNISHING WORK FOR BANK OF INDIA AT KABISURYANAGAR. Sl. Particular 1 FULL HEIGHT PARTITION ( including partly glazed door) Providing and fixing in poition partly glazed full Height Partition work including door a per drawing,in frame work at 2 x2 grind (horizontally and vertically) compriing of 2 x1 ½ T.W. Section and/or a per frame work hown in the drawing with 6 mm plywood on both ide finihed with 1 mm thick laminate of approved hade and colour a hown in drawing. Item to include 8 mm thick gla with etching and froting a per deign and 2 x2 T.W. member for door ide and gla ide and T.W. door frame to take 8 mm thick gla with etching and froting.all expoed T.W. urface to be finihed in melamine polih of matching laminate colour a directed including all neceary Stainle Steel finih fitting/hardware, door cloer, Godrej lock and wood preervative paint etc. a per lit of approved material and a approved by the Project Conultant/Bank complete in all repect.(note : In cae of fale ceiling, the vertical T.W. member to be fixed with pucca ceiling but the area of partition payable will be below the fale ceiling only) 2 LOW HEIGHT PARTITION ( 4'-0" HT.) Providing and fixing in poition partly glazed low height partition 2 ½ thick) in frame work with T.W. vertical member at 2 c/c and 3 horizontal member at equal ditance compriing of 2 x1 ½ T.W. Section with 6 mm plywood on both ide finihed with 1 mm thick laminate of approved made and hade a hown in drawing (14) or (3). Item to include 12 mm thick gla (clear/froted) to be fixed a hown in Drawing. The expoed edge of the gla to be finihed in mirror polih. T.W. runner hould be melamine polihed in matching colour of laminate etc. complete in all repect.

2 Particular 3 FRONT OFFICE COUNTER Providing and fixing in poition Front Office Counter 2-6 wide a per drawing compriing of the following complete in all repect. (i) Working top made with 25 mm thick plywood finihed with 1 mm thick laminate. Outide edge of the working top hall be provided with 1 ¼ x 1 Teak wood moulding finihed with melamine polih. Inide edge will be provided with ½ x 1 T.W. beading patti with melamine finih. (ii) Vertical facia (Apron) made with 18 mm thick plywood finihed with 1 mm thick laminate with 1 mm thick groove at the joint of laminate of two different hade. Rft (III) vertical drop (horizontal band) hall be provided on the facia below the working top made with 18 mm thick plywood finihed with 1 mm thick laminate with proviion for concealed light, 1 mm thick groove hall be provided at the joint of two different hade of laminate. (iv) Glazed partition above working top to be provided with 12 mm thick clear gla cut to the tandard hape fixed to partition a per fixing detail and to boxing with concealed S.S. finihed D bracket a hown in the drawing. The expoed edge of the gla hall be finihed in mirror polih. (v) 3-10 high Boxing (10 x10 ) made with 18 mm thick plywood finihed with 1 mm thick laminate including providing and fixing 6 mm thick quare froted gla at a height 3-2 above finihed floor level. (vi) 1-9 high Boxing (5 x5 ) made with 12 mm thick plywood finihed with 1 mm thick laminate. (vii) Vertical upport made with 18 mm thick plywood finihed with white enamel paint.

3 Particular (viii) Telecopic CPU Stand/ready made Keyboard tray hall be provided of approved model and make. (ix) Footret made with T.W. member of ize 4 x 1 ½ finihed with French polih. (x) Drawer unit a per drawing hall be provided with multipurpoe Godrej lock in Each drawer. Facia of drawer unit hall be finihed with 1 mm thick laminate and all other ide hall be finihed with white enamel paint. The drawer will be provided with handle (Stainle Steel finih) and channel a per approval of the Project Conultant/Bank. (xi) Boxing a per drawing made with 12 mm thick plywood finihed with Synthetic enamel paint hall be provided below the table top for electrical conduiting and at the bottom for the LAN cabling/telephone wire conduiting.the item to include all neceary hardware and fitting in Stainle Steel finih, lipping to all edge and making proviion only for electrical fitting behind the front. Vertical drop and alo in the 10 x 10 boxing a hown in the drawing. Neceary beading with melamine polih for fixing the gla are to be provided. 4 CASH COUNTER Providing and fixing in poition Cah Counter 2-9 wide a per drawing compriing of the following: (i) Working top made with 25 mm thick plywood finihed with 1 mm thick laminate. Outide edge of the working top hall be provided with 1 ¼ x1 Teak Wood moulding finihed with melamine polih. Inide edge will be provided with ½ x1 T.W. beading patti with melamine polih. (ii) Vertical facia (Apron) made with 18 mm thick plywood finihed with 1 mm thick laminate with 1 mm thick groove at the joint of laminate of two different hade. (iii) Vertical drop (horizontal band) hall be provided on the facia below the working top made with 18 mm thick plywood finihed with 1 mm thick laminate with proviion for concealed light, 1 mm thick groove hall be provided at the joint of two different hade of laminate. Rft

4 Particular (iv) Glazed partition of 1-4 height above working top provided with 12 mm thick toughened and froted gla beide non-tranparent film from inide fixed to partition a per fixing detail and to boxing with concealed S.S. finihed d bracket a hown in the drawing. The expoed edge of the gla hall be finihed in mirror polih. (v) Tranaction top hall be provided with 12 mm thick toughened gla (Partly glazed partly froted) fixed horizontally with concealed Stainle Steel D bracket. Both expoed edge (inide and outide) hall be moulded and finihed in mirror polih. (vi) Glazed partition having height 1-0 above the tranaction top (in facia) hall be provided with 12 mm thick gla (clear) with cutout of 8 x 4 a per drawing. The edge of cut out and the top edge of gla are to be mirror polihed and to be fixed to partition a per fixing detail and to boxing with concealed S.S. finihed D bracket a hown in gla (Clear) above the Slit to be fixed to partition a per fixing detail and to boxing with concealed S.S. finihed D bracket a hown in the drawing. The expoed edge hall be finihed in mirror polih. (viii) 7-7 high Boxing (10 x10 ) made with 18 mm thick plywood a per drawing with 1-6 horizontal extenion at the top including providing and fixing 6 mm thick quare froted gla at a height of 5-11 above Finihed Floor level. (ix) 1-9 high boxing (5 x5 ) made with 12 mm thick plywood finihed with 1 mm thick laminate are to be provided. 5 STORAGE CABINET Providing and fixing in poition full height torage / low height torage / back torage (Credenza) a hown in Drg. uing Plywood of required thickne finihed with 1 mm thick laminate a hown in the drawing and all other ide hall be finihed with white enamel paint a detailed therein.the torage unit hall be provided with handle. (Stainle Steel finih) a per approval of the Project Conultant/Bank.All expoed plywood urface to be finihed with 1 mm thick laminate of approved make & hade and all expoed edge of plywood to have 1 x ¼ T.W. Lipping. All expoed T.W. ection to be melamined in matching colour laminate and internal urface to have white enamel paint a directed. Item to include all neceary hardware and fitting in Stainle Steel finih, Godrej multi purpoe lock including magnetic ball catcher etc. complete in all repect.

5 Particular 6 FALSE CEILING (Gypum Board) Fale Ceiling (Gypum Board)Providing & fixing in poition fale ceiling in Gypboard 12 mm thick for horizontal & Vertical fixed over G.I. frame work a pecified by India Gupm Co. Ltd. including trap door for A.C. in 18 mm thick M. R. Grade Plywood with Stainle Steel hinge & lock with moulding 1 x 1 for edge including finihing with White Platic Emulion Paint etc. complete in all repect.(note :- Only the plan area will be meaured for payment. No extra payment will be made for cutout, groove, moulding etc.) 7 FALSE CEILING ( Armtrong) Providing & fixing in poition fale ceiling in Armtrong 600 x 600 mm x 15/16 mm Dune Supreme RH 99 Prima tile with Tegular edge framework a pecified by Armtrong Co. with upender wherever required. Making neceary framework for A. C. ducting, if any, and neceary cutout for diffuer and light fitting, taping and finihing to proper line & level, including making groove and trap door for A. C. unit in 18 mm thick M. R. Grade Plywood with Stainle Steel hinge & lock with moulding 1 x 1 for edge including finihing with White Platic Emulion Paint etc. complete in all repect.(note :- Only the plan area will be meaured for payment. No extra payment will be made for cutout, groove, moulding etc.) 8 MANAGER'S TABLE Providing and fixing in poitioin Manager Table of ize No 5-6 x 3-0 a per drawing,including Side Storage (Credenza) by uing 25 mm thick ply wood for top and 18 mm thick plywood for all other horizontal and vertical member.telecopic CPU Stand/ready made Keyboard tray hall be provided of approved model and make. Footret made with T.W. member of ize 4 x1 ½ finihed with French polih.side Storage (Credenza) a per drawing hall be provided. Facia of Side Storage (Credenza) hall be finihed with 1mm thick laminate a hown in the drawing and all other ide hall be finihed with white enamel paint. The ide Storage

6 Particular (Credenza) hall be provided with handle (Stainle Steel finih) and channel a per approval of the Project Conultant/Bank. All expoed plywood urface to be finihed with 1mm thick laminate of approved make & hade, and all expoed edge of table top & ply vertical to have 1 x1/4 T.W.lipping. All expoed T.W. ection to be melamined and internal urface to have white enmel paint a directed. Item to include plywood boxing, all neceary hardware and fitting in Stainle Steel finih, lipping to all edge etc. complete in all repect. 9 PANELLING Providing, fitting & fixing paneling work made out of 60mm x60mm ection hard wood frame work. The wood ection are to be placed 600mm c/c. 6 mm ply to be nailed over the uface of the frame work and 1mm thick laminate of approved colour and brand to be pated over the ply urface a per deign. The edge to be covered with decorative beading, including two coat of wax polih to uperior finih, including cot of all labour & material. 10 FRONT ENTRANCE DOOR Providing and fixing Entrance Door (glazed) a per drawing in Silver Anodied aluminium door ection (Jindal make) in top and bottom, glazed with 12 mm thick gla of approved make with etching and froting. Item to include floor pring, lock, all neceary hardware of Stainle Steel finih a approved by the Project Conultant/Bank complete in all repect. 11 FLAP DOOR Providing, fitting and fixing of flap door with frame work made out of 35mmx35mm thick hard wood and nailed with 6mm. thick ply and finihed with 1mm. Thick laminate of approved colour and deign on both the urface of the frame work a per drawing and deign.the edge of the door to be covered with decorative wood moulding with two coat of uperior wax polih.the work i to be finihed with all material,labour,nail,crew,hing,lock,handle,door cloer and all other hard ware a per detail drawing. 12 NOTICE BOARD Providing oft board covered with approved fabric with wooden frame work and decorative beading for diplay drawing and document,with locking arrangementof the liding hutter made up of 8mm th. flot gla. The work hould be done including all labour and material.

7 Particular 13 WRITING LEDGE providing and fixing writing ledge along with wall including voucher tand a per deign made up of 18mm th.plywood. The expoed urface i to be finihed with 1mm th. Laminate and internal urface to be finihed with white enamel paint. 14 FAÇADE TO FRONT ENTRANCE DOOR Providing and fixing in poition Aluminium compoite panel boxing with PVDF coating & LDPE core laminated Eurobond / Altobond/ Alukbond Exterior Grade 4 mm thick with compoite of (0.5 mm 3 mm 0.5 mm) including fabrication for the ame with aluminium ection, required hardware, ilicon ealant (Dow corning 789) making tape, neceary caffolding etc. a detailed in drawing complete in all repect. No 15 Suggeion box/ Cheque drop box Supplying and erecting free-tanding uggetion box of No overall ize, 450 mm long x 300 mm deep x 900 mm high made of 19 mm thick phenol formaldehyde block board, all a in drawing, complete. with hardware. fitting and fixture of approved make and quality.top and all expoed urface of block board are to be finihed with 1mm thick laminate heet of approved hade and quality. Inner face of block board urface are to be finihed with minimum two coat of ynthetic ehemal paint of approved had and quality over a coat of approved primer. 16 Wall platic paint. Providing & applying 2 coat of platic emulion paint of royale ICI dulux & approved hade on wall, column, beam, ceiling, etc. of back office hall including locker room, including preparation of urface, and papering the intermediate coat, including cot of all material, labour, conveyance, taxe, royaltie, caffolding, watering, curing, undrie, T&P, etc., a per direction of Engineerin-charge.. 17 Wall Putty work. Providing and applying wall puttyputty work punning in order to make the total platered wall urface perfectly leveled, including cot of all material, labour, conveyance, taxe, royaltie, caffolding, watering, curing, undrie, T&P, etc., a per direction of Engineerin-charge..

8 Particular 18 SYNTHETIC ENAMEL PAINT Providing & upplying all material and application of one coat of primer paint two coat ynthetic enamel paint of approved colour and manufacture including preparation of urface, caffolding etc., complete including all material a per pecification and direction of Architect. 19 Door cloer Providing and fixing Godrej make over head door cloer in door with neceary fixture and fitting etc. No 20 Floor pring Providing and fixing Godrej make heavy duty floor pring in entrance door with neceary fixture and fitting etc. No 21 Night latch lock Providing and fixing Knightlatch lock of Godrej make to cah counter door with neceary fixture and fitting etc a per direction of architect. 22 Glazed diplay board. Providing and fixing glazed diplay board a per deign and intruction of architect of ize 1'6"x2'-6" of 12mm th. Gla of edge polihed and 1" edge beveled and fixed on wall with 1" SS tude a per direction. The work include all labour and material. TOTAL No No. Total amount in word:-

9 ALT-3 TOILET TOILET STORE ROOM 5'-6" SAFE ROOM 4'-7" Collapable gate at front. LOBBY 5'-6" 7'-3" B.M.CHAMBER t o r a g e U P S ENT. LOBBY writing ledge 12' 18'-6" CASH CASH t o r a g e 4' 4'-6" 4'-6" 83'-4" 5' 7'-8" 2'-11" A T M 6'-2" Collapable gate and rolling hutter at front. 3' UP rolling hutter at front. ROAD LEGEND DESCRIPTION WALL TO BE RETAINED 10" BRICK WALL TO BE CONSTRUCTED S W E N 5" BRICK WALL TO BE CONSTRUCTED CARPET AREA SFT.(Approx)