1 Public Works and Government Services Canada 344 Edmonton Street, Winnipeg, Manitoba, Transport Canada Accommodation Fit-Up Addendum No. 6 Page 1 of 2 Project No.: R September 13, 2016 The following changes to the tender documents are effective immediately and will form part of the contract documents: 1.1 SPECIFICATION REVISIONS.1 SECTION ARCHITECTURAL WOODWORK.1 REVISE item : Solid surface thickness 13mm (1/2 inch) minimum..2 SECTION ROOM FINISH SCHEDULE.1 REVISE Rm 2-07:.1 Floor: CPT..2 Base: WB-2..3 SECTION VISUAL DISPLAY SURFACES.1 REPLACE Item with DE-3: Future wall mounted visual display surface (NIC). Provide blocking for install of future wall mounted visual display surfaces at locations indicated in drawings..2 REVISE Item DE-4 to DE-2..4 SECTION FLEXIBLE DUCTS.1 ADD entire section to specification (attached). 1.2 CLARIFICATIONS ARCHITECTURAL.1 Please see attached for our substation request regarding the polyester acoustic panels in the McDonald Building, Transport Canada, Accommodation FitUp project. Response: This is a performance specification..2 We are requesting that the Horton Automatics Series 4100LE swing door operator be considered as an equal to the specified Besam Sw200i operators. The Horton 4100LE operator are ULC approved and meets or exceeds the ANSI A requirements for power operated doors. Response: This is a performance specification. The product listed is a standard of acceptance..3 Our supplier for the Folding Panel Partitions says that the operable walls are too small to make electric and so they wish to quote an alternate for their paired panel manually operated folding panel partitions. Response: Requests for Substitutions that do not meet the performance of the specification are not accepted..4 I am submitting the following Acoustic Ceiling Tile and Wall Panel data sheets on behalf of my customer Custom Drywall looking for approval to price that section of the job. Response: This is a performance specification. The product listed is a standard of acceptance.

2 Public Works and Government Services Canada 344 Edmonton Street, Winnipeg, Manitoba, Transport Canada Accommodation Fit-Up Addendum No. 6 Page 2 of 2 Project No.: R September 13, 2016 END OF ADDENDUM NO. 6

3 Winnipeg, MB Page 1 of 3 Part 1 General 1.1 REFERENCES.1 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (ASHRAE).2 National Fire Protection Association (NFPA).1 NFPA 90A, Standard for the Installation of Air-Conditioning and Ventilating Systems..2 NFPA 90B, Standard for Installation of Warm Air Heating and Air- Conditioning Systems..3 Sheet Metal and Air-Conditioning Contractors' National Association (SMACNA).1 SMACNA HVAC Duct Construction Standards - Metal and Flexible..2 SMACNA IAQ Guideline for Occupied Buildings under Construction..4 Underwriters' Laboratories (UL).1 UL 181, Standard for Factory-Made Air Ducts and Air Connectors..5 Underwriters' Laboratories of Canada (ULC).1 CAN/ULC-S110, Standard Methods of Tests for Air Ducts. 1.2 ACTION AND INFORMATIONAL SUBMITTALS.1 Submit in accordance with Section Submittal Procedures..2 Product Data:.1 Submit manufacturer's instructions, printed product literature and data sheets for flexible ducts and include product characteristics, performance criteria, physical size, finish and limitations..2 Indicate:.1 Thermal properties..2 Friction loss..3 Acoustical loss..4 Leakage..5 Fire rating..3 Test and Evaluation Reports:.1 Catalogue or published ratings to be those obtained from tests carried out by manufacturer or independent testing agency signifying adherence to codes and standards. 1.3 DELIVERY, STORAGE AND HANDLING.1 Deliver, store and handle materials in accordance with Section Common Product Requirements and with manufacturer's written instructions.

4 Winnipeg, MB Page 2 of 3.2 Delivery and Acceptance Requirements: deliver materials to site in original factory packaging, labelled with manufacturer's name and address..3 Storage and Handling Requirements:.1 Store materials off ground, indoors, in dry location and in accordance with manufacturer's recommendations in clean, dry, well-ventilated area..2 Store and protect flexible ducts from nicks, scratches, and blemishes..3 Replace defective or damaged materials with new. Part 2 Products 2.1 GENERAL.1 Factory fabricated to CAN/ULC-S Pressure drop coefficients listed below are based on relative sheet metal duct pressure drop coefficient of Flame spread rating not to exceed 25. Smoke developed rating not to exceed NON-METALLIC - INSULATED.1 Non-collapsible, inner duct of woven and coated fibreglass liner permanently bonded to, and helically supported by, external steel wire with factory applied, flexible fibreglass thermal insulation with vapour barrier and reinforced metallized film laminate jacket..2 Performance:.1 Factory tested to 2.5 kpa without leakage..2 Thermal loss/gain: 1.35 W/m 2. degrees C mean..3 Flexible air ducts shall conform to UL-181 Standard and NFPA 90A. Flexible air ducts shall have a fire rating of at least one-half hour as measured by UL-181 Standard, paragraph No.7, Flame Penetration Test..4 Do not restrict duct free area. Conform to NBFU Pamphlet 90A, paragraph 113, (a) revised to date. Attach with galvanized wire hose clamps and duct sealer. Connections to operate at 2.5 kpa without leakage or bursting. 2.3 NON-METALLIC - ACOUSTIC INSULATED.1 Non-collapsible, inner duct of woven and coated chlorinated polyethylene liner permanently bonded to, and helically supported by, external steel wire with factory applied, flexible fibreglass thermal insulation with vapour barrier and reinforced metallized film laminate jacket..2 Performance:.1 Factory tested to 1.5 kpa without leakage..2 Acoustical performance: Minimum attenuation (db per 3 meter of length at 12.7 meters/second) to following table:

5 Winnipeg, MB Page 3 of 3 Frequency (Hz) Duct Diam: Flexible air ducts shall conform to UL-181 Standard and NFPA 90A. Flexible air ducts shall have a fire rating of at least one-half hour as measured by UL-181 Standard, paragraph No.7, Flame Penetration Test..4 Do not restrict duct free area. Conform to NBFU Pamphlet 90A, paragraph 113, (a) revised to date. Attach with galvanized wire hose clamps and duct sealer. Connections to operate at 2.5 kpa without leakage or bursting. Part 3 Execution 3.1 DUCT INSTALLATION.1 Install in accordance with: CAN/ULC-S110, UL 181, NFPA 90A, NFPA 90B, and SMACNA..2 For connections between rigid ductwork and grille, register, or diffuser: 3.2 CLEANING.1 Provide rigid metal ductwork horizontally up to grille, register, or diffuser..2 Elbow fitting from horizontal to vertical ductwork shall be constructed of rigid metal ductwork..3 Flexible ductwork shall be installed in vertical direction between elbow fitting to grille, register, or diffuser..1 Progress Cleaning: clean in accordance with Section Cleaning..1 Leave Work area clean at end of each day..2 Final Cleaning: upon completion remove surplus materials, rubbish, tools and equipment in accordance with Section Cleaning. END OF SECTION