SCHUYLKILL COUNTY SR 125(JFR) # PROPOSAL:$20.76 PLANS 8.5X11:$1.20

Size: px
Start display at page:

Download "SCHUYLKILL COUNTY SR 125(JFR) # PROPOSAL:$20.76 PLANS 8.5X11:$1.20"

Transcription

1 SCHUYLKILL COUNTY SR 125(JFR) # PROPOSAL:$20.76 PLANS 8.5X11:$1.20 The emergency project consists of rock protection and underpinning of the piers to prevent future scouring and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0125, SECTION JFR, in Schuylkill COUNTY Eldred TOWNSHIP at the Bridge over Branch of Mahantango Creek at Segment 390 offset 1316 to Segment 390 offset ALLEGHENY COUNTY SR 3035(A04) # PROPOSAL:$21.60 PLANS:$ X18:$ X36:$ Ex St:$ x18:$ x36:$ The description and location of the project is as follows: This is a full Design Build roadway project. Design activities are limited to: Culvert, roadway, permits, utility coordination, right-of-way acquisition For the culvert replacement, bituminous approach, drainage, guiderail, signing and pavement marking, and other miscellaneous construction, all within a length of linear feet (0.046 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 3035, SECTION A04 (Stewart Avenue), in ALLEGHENY COUNTY, CITY OF PITTSBURGH, WHITEHALL BOROUGH, Commonwealth of Pennsylvania. The project being situated as follows: From the intersection of Provost Road and Fairhaven Road at Segment 0030 Offset 0894 (Station 2+50) to the northern intersection of Saw Mill Run Boulevard at Segment 0030 Offset 1136 (Station 0+08). INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated on August 3, 2018 BERKS COUNTY SR 0000(---) # PROPOSAL:$35.40 Installation of hot thermoplastic and epoxy pavement markings on roadways with 2 lanes or more, and other miscellaneous construction in Berks, Carbon, Lehigh, Monroe, Northampton and Schuylkill Counties on various SR's in various Municipalities in District 5-0. ERIE COUNTY SR 6(GRP) # PROPOSAL:$12.36 PLANS 8.5x11:$0.96 For the crack and joint sealing and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0006, SECTION GRP, for VARIOUS STATE ROUTES in ERIE COUNTY, VARIOUS TOWNSHIPS. 1

2 LACKAWANNA COUNTY SR 3022(FP2) # PROPOSAL:$19.08 PLANS 8.5x11:$2.64 This project is for the resurfacing of approximate total of 3.42 miles of existing bituminous roadway on the following STATE ROUTES: (S.R. 3022: Segment 0010 Offset 0000 to Segment 0010 Offset 3882 (.74 MI), S.R. 3022: Segment 0011 Offset 0000 to Segment 0011 Offset 3985 (.75 MI). S.R. 8005: Segment Offset 0010 to Segment 0010 Offset 1402 (Ramp A-.27 MI). S.R. 8005: Segment 0250 Offset 0000 to Segment 0250 Offset 1846 (Ramp C MI). S.R: 8005 Segment 0260 Offset 0000 to Segment 0260 Offset 1421 (Ramp B-.27 MI) and S.R. 8005: Segment 0270 Offset 0000 to Segment 0270 Offset 0410 (Ramp F-.77 MI), S.R. 8005: Segment 0500 Offset 0000 to Segment 0500 Offset 0598 (Ramp D-.12 MI), S.R. 8025: Segment 0500 Offset 0000 to Segment 0500 Offset 0626 (Ramp B-.07 MI), ), S.R. 8025: Segment 0510 Offset 0000 to Segment 0510 Offset 0532 (Ramp C.10 MI), S.R. 8025: Segment 0250 Offset 0000 to Segment 0250 Offset 1442 (Ramp D-.10 MI) 8025: Segment 0750 Offset 0000 to Segment 0750 Offset 1890 (Ramp E-.35 MI), IN Lackawanna COUNTY IN VARIOUS MUNICIPALITIES in the COMMONWEALTH OF PENNSYLVANIA with Warm Mix Design Asphalt Wearing and Scratch Courses, Milling, Safety Improvement up grades (Glare Screen with Fluorescent Reflector Panels attached to Median Barrier), Line Painting and Pavement Markings Updated on July 30, 2018 CLEARFIELD COUNTY SR 219(A16) #85198 PROPOSAL:$28.08 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ The description and location of the project is as follows: For the improvement of certain sections of STATE HIGHWAY in CLEARFIELD COUNTY, BELL TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0219 SECTION A16 and SECTION A17. The project is situated as follows: On State Route 0219 from Segment 0200 Offset 1156 to Segment 0210 Offset 0529 for the SR 0219 Section A16 portion. On State Route 0219 from Segment 0210 Offset 1854 to Segment 0210 Offset 2654 for the SR 0219 Section A17 portion. The total construction length is approximately 1639 feet (.31 miles) For the removal of the existing structures and construction of their replacements, Prestressed Concrete Box Culverts. Construction includes Superpave Asphalt Mixture Designs for the base, binder, and wearing courses, guide rail, pavement markings, and miscellaneous construction as indicated on the approved drawings included in the bid package. NORTHAMPTON COUNTY SR 2006(PRP) # PROPOSAL:$19.92 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$39.00 This project is the replacement of an existing failed 48-inch CMP and two drop structures that carries storm drain water from Interstate 78 under State Route 2006 with a 72-inch reinforced concrete pipe, a concrete energy dissipater, design-build wingwall structure, step pools, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 2006, SECTION PRP, in Northampton County, Lower Saucon Township from Segment 0080 Offset 1079 to Segment 0080 Offset 1564 for a project length of approximately 485 feet (0.09 miles). NORTHAMPTON COUNTY SR 0248(M89) # PROPOSAL:$22.20 PLANS 8.5x11:$2.04 The project involves base replacement, milling, scratch course, wearing course, guide rail, ADA curb ramps, pavement markings, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 248, SECTION M89, in NORTHAMPTON COUNTY LEHIGH, MOORE, & EAST ALLEN TOWNSHIP & BATH BOROUGH from segment 70 offset 0000 to segment 290 offset

3 ERIE COUNTY SR 5(24M) # PROPOSAL:$36.96 PLANS:$ X18:$ X36:$ For the construction or improvement of a certain section of STATE HIGHWAY in ERIE COUNTY, CITY OF ERIE, Commonwealth of Pennsylvania, STATE ROUTE 0005, SECTION 24M. This project being situated as follows, From approximately 0.7 miles east from the intersection with State Route 0008 (Parade St.) at Segment 0620 Offset 0854 (Station ) then east to the intersection with Franklin Ave. at Segment 0650 Offset 1795 (Station ). For the bituminous milling and resurfacing of a 4-lane roadway with Superpave Asphalt Mixture WMA Designs 62' to 68' in width, also for concrete curb, curb ramps, drainage, traffic signal, signs, and pavement markings all within a project length of 8, feet (1.577 miles) as indicated on the approved drawings. Updated on July 25, 2018 PHILADELPHIA COUNTY SR 76(TRE) # PROPOSAL:$14.52 This project is for the clearing, clean-up, and stabilization of an 18 acres area in Philadelphia County along Interstate 76. This will involve removal of trees in the area as well as trimming of specimen trees which will remain in place. The work will also include seeding and matting of the cleared areas to stabilize them, and the maintenance and repair of all seeded areas until the end of the project. It will be required that all removed material is taken away from the site. CENTRE COUNTY SR 26(A04) #3117 PROPOSAL:$22.80 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$62.40 The description and location of the project is as follows: For the improvement of a certain section of STATE HIGHWAY in CENTRE COUNTY, MARION TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0026, SECTION A04. The project being situated as follows: On State Route 0026 from Segment 0590/Offset 1100 to Segment 0590/Offset 2300, approximately 1.4 miles South of the Borough of Howard. For the removal of the existing Single Span Reinforced Concrete Arch Structure and construction of its replacement Single Span Prestessed Concrete Spread Box Beam Bridge, approach work consisting of superpave asphalt mixture designs for the base, binder and wearing course, guide rail, pavement markings, and miscellaneous construction for a total construction length of approximately 1080 feet (0.204 miles) as indicated on the approved drawings. ADAMS COUNTY SR 116(032) #18147 PROPOSAL:$32.76 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$39.00 This project consists of a two-span bridge replacement with a pre-stressed spread box beam bridge over Willoughby Run and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0116, SECTION 032, in ADAMS COUNTY, CUMBERLAND TOWNSHIP, located west of Gettysburg Borough from Segment 0200 Offset 2461 to Segment 0210 Offset 0547, for an overall project length of linear feet (0.134 mile). ELK COUNTY SR 4001(A01) # PROPOSAL:$35.88 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: For the improvement of a certain section of STATE HIGHWAY in ELK COUNTY, RIDGWAY TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 4001, SECTION A01. The project being situated as follows: On State Route 4001 from Segment 0010/Offset 1654 to Segment 0010/Offset 2239 approximately 0.3 miles north of the intersection with SR For the rehabilitation of the existing concrete box culvert involving, wing replacement, grouting of open joints, post tensioning and a distribution slab. Work also involves Superpave Asphalt Mixture Designs for the base, binder and wearing courses, inlet placement, 15, 24, and 30 inch pipe, water and sewer line relocation, guide rail, pavement markings and miscellaneous construction for a total construction length of approximately 385 feet (0.073 miles) as indicated on the approved drawings included in the bid package. 3

4 ARMSTRONG COUNTY SR 422(117) # PROPOSAL:$16.68 PLANS:$ X18:$ X36:$97.50 For resurfacing, including milling of existing bituminous wearing courses, bituminous patching, paving, leveling, binder and wearing courses and minor drainage and guiderail upgrades and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 422, SECTION 117, in Armstrong COUNTY Plumcreek TOWNSHIP and Elderton Borough from approximately 1.4 miles east of SR 422/SR 2005 (Margaret road) intersection at segment 0460 offset 1528 to approximately the INDIANA/ARMSTRONG county line at segment 0540 offset 0790 and STATE ROUTE 0422, SECTION 417 in Indiana COUNTY Armstrong TOWNSHIP from approximately the Indiana/Armstrong county line at segment 0010 offset 0010 to approximately the.2 miles west of the SR 0422/SR 56 intersection at segment 0030 offset SCHUYLKILL COUNTY SR 7411(MSB) # PROPOSAL:$30.12 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$35.10 Culvert top slab replacement of two one-block portions of the Market Street Bridge including full depth pavement reconstruction, mill and overlay, ADA ramp installation and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 7411, SECTION MSB, in SCHUYLKILL COUNTY, MAHANOY CITY BOROUGH from Station to Station , approximately 90 feet west of the South Linden Street/Market Street intersection to approximately 50 feet east of the South Locust Street/Market Street intersection and approximately 50 feet west of the South 2nd Street/Market Street intersection to 50 feet east of the South 3rd Street/Market Street intersection. INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION LYCOMING COUNTY SR 2014(83B) # PROPOSAL:$ PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ The description and location of the project is as follows: Roadway reconstruction, sanitary sewer construction, water line construction, storm sewer construction, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 2014, SECTION 83B, from approximately 0.8 mile east of State Route 3015 at Segment 0050 Offset 0973 to the interchange with SR 15 in the CITY OF WILLIAMSPORT in LYCOMING COUNTY. TIOGA COUNTY SR 4017(024) #97575 PROPOSAL:$14.76 PLANS:$ X18:$ X36:$70.20 The description and location of the project are as follows: The work is the furnishing and installation of a 19-0 x 8-6 precast reinforced concrete box culvert and inlet and outlet sections over Losey Creek at a Department prepared site all within a length of linear feet (0.148 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 4017, SECTION 024 from approximately 3.51 miles northwest of the intersection with State Route 249 at Segment 0080 Offset 1963 to approximately 6.89 miles south of the intersection with State Route 49 at Segment 0080 Offset 2746 in CHATHAM TOWNSHIP, TIOGA COUNTY. 4

5 WESTMORELAND COUNTY SR 119(J10) # PROPOSAL:$25.56 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ Ex St:$ x18:$ x36:$ The project includes highway lighting replacement, concrete pavement reconstruction on portions of two ramps (i.e. Ramp A and H), concrete repairs (patching, dowel bar retrofits, joint repairs, diamond grinding) on two ramps (i.e. Ramp C and F) and a 600 foot section of SR 119, and bridge preservation activities on two structures on ramps that span Sewickley Creek and Railroad. As part of the Ramp H reconstruction, project will improve the acceleration lane through reconstruction of asphalt shoulder along NB SR 119. All work will focus on Department owned roadways and ramps within the US 119 Interchange with SR 3091 and Toll 66 (Amos K. Hutchinson Bypass). Project will also include signing, pavement markings, guide rail and and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0119 SECTION J10, in WESTMORELAND COUNTY, NEW STANTON BOROUGH and HEMPFIELD TOWNSHIP within US 119 Interchange from segment 0150/0151 offset 2330/2330 (Station ) to segment 170/0171 offset 1640/1630 (Station ). BEDFORD COUNTY SR 1019(01B) #88126 PROPOSAL:$19.44 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$31.20 This project is for the replacement of the existing structure carrying SR 1019 over Ravers Run in Bedford County. The existing structure will be replaced with a 17'-0 x 9'-0" Precast R.C. Box Culvert and includes minor roadway approach work, guiderail and drainage upgrades and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 1019, SECTION 01B in BEDFORD COUNTY, LIBERTY TOWNSHIP at the following location: STATION TO STATION SEGMENT 0080, OFFSET 2233 TO SEGMENT 0080, OFFSET 2833 SOMSERSET COUNTY SR 7206(353) #23507 PROPOSAL:$24.84 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$27.30 This project is for the rehabilitation of the historic Maust Bridge which carries Moser Road over the Casselman River in Somerset County. Rehabilitation will require the bridge to be removed, disassembled on site, and transported to a fabrication shop for repairs. The bridge will be transported back to the site, reassembled and placed on the improved abutments and abutment seats. The rehabilitated bridge will remain a one-lane bridge. The project also involves limited approach roadway work. All work on this project to be completed as indicated on the approved drawings included in the bid package for TOWNSHIP ROAD 7206, SECTION 353 in SOMERSET COUNTY, ELK LICK & SUMMIT TOWNSHPS at Station to Station FOREST COUNTY SR 666(WA2) #97041 PROPOSAL:$14.64 PLANS:$ X18:$ X36:$54.60 X-SEC:$ X18:$ X36:$85.80 The description and location of the project is as follows: For the slide correction repair with geosynthetic reinforced slope system, Also for the construction of roadway with Superpave Asphalt Mixture Designs, paved shoulder, guide rail and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0666, SECTION WA2, in FOREST COUNTY HOWE TOWNSHIP from segment 0540 offset 0150 to segment 0540 offset LACKAWANNA COUNTY SR 11(WAL) #95485 PROPOSAL:$16.56 PLANS:$ X18:$ X36:$ Ex St:$ x18:$ x36:$58.50 For the rehabilitation and improvement of a certain sections of STATE HIGHWAYS in LACKAWANNA and LUZERNE COUNTIES, Commonwealth of Pennsylvania, STATE ROUTE 0011, SECTION WAL. This project has various locations in Lackawanna and Luzerne Counties as indicated on the approved plans. The project consists of Bridge Preservation on Various State Routes in Various Municipalities, Lackawanna and Luzerne Counties. There are 3 projects in this preservation contract. Projects consists of repairing the following: 1. S.R segment 252 along Scranton Central City Expressway - repair deteriorated metal cribbing retaining walls with steel angles and wood lagging 2. S.R segment 291 along State Route repair deteriorated metal cribbing retaining walls with steel angles and wood lagging 3. S.R segment 0074 offset 0713 EB - remove and replace existing deteriorated concrete parapets, deck patching, replace existing gland in strip seal dam, substructure repairs, update guiderail. 4. S.R segment 0075 offset 0687 WB - remove and replace existing deteriorated concrete parapets, deck patching, replace existing gland in strip seal dam, substructure repairs, update guiderail. 5

6 ALLEGHENY COUNTY SR 0000(LOC) # PROPOSAL:$28.92 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$39.00 The description of the project is as follows: This is a partial Design Build roadway project. Design activities are limited to: Curb Ramps and Temporary Traffic Signal For the milling and resurfacing, drainage, guide rail, curb and sidewalk, signing and pavement marking, signals, and other miscellaneous construction, all within a length of 5, linear feet (1.107 miles) as indicated on the approved drawings included in the bid package for HOMESTEAD-DUQUENSE ROAD (CO# & 03 & 04) and HOMEVILLE ROAD (CO# ), in ALLEGHENY COUNTY, WEST MIFFLIN BOROUGH, Commonwealth of Pennsylvania. This project being situated as follows: From a point approximately 2,370 feet south of Municipal Road (Station 59+00) to a point approximately 1,220 feet east of Grant Avenue Extension (Station 45+20). LEBANON COUNTY SR 7101(BRG) #20392 PROPOSAL:$23.64 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$15.60 Construction of a Single Span Prestressed Spread Box Beam Bridge over the Quittapahilla Cree and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for SOUTH SPRUCE STREET, in LEBANON COUNTY, ANNVILLE TOWNSHIP, from Station 7+50 to Station 14+00, for an overall project length of linear feet (0.101 mile). FULTON COUNTY SR 655(05B) #98775 PROPOSAL:$36.72 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ This project is for the replacement of two existing structures in Fulton County on SR s 0655 & 0913 and one existing structure in Huntingdon County on SR The existing structure that carries SR 0655 over Sideling Hill Creek will be replaced with a 1-Span Prestressed Concrete Spread Box Beam Bridge. The existing structure that carries SR 0913 over Roaring Run will be replaced with a 1-Span Prestressed Concrete Spread Box Beam Bridge. The existing structure that carries SR 2001 over Sideling Hill Creek will be replaced with a 1-Span Prestressed Concrete Spread Box Beam Bridge. Other work included in this project is minor roadway approach work, guiderail & drainage upgrades and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0655, SECTION 05B, in FULTON COUNTY, TAYLOR, WELLS & CLAY TOWNSHIPS at the following locations: SR 0655, Section 05B STATION TO STATION SEGMENT 0610, OFFSET 1883 TO SEGMENT 0620, OFFSET 0232 SR 0913, Section 02B STATION TO STATION SEGMENT 0040, OFFSET 0869 TO SEGMENT 0050, OFFSET 0605 SR 2001, Section 01B STATION TO STATION SEGMENT 0010, OFFSET 0000 TO SEGMENT 0010, OFFSET 0525 CHESTER COUNTY SR 7403(DOW) #14354 PROPOSAL:$74.64 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$27.30 The description and location of the project is as follows: The replacement of the Chestnut Street bridge over Amtrak & Norfolk Southern railroad and other miscellaneous construction, including design-build of ADA curb ramps, all as indicated on the drawings approved for STATE ROUTE 7403, SECTION DOW, in CHESTER COUNTY, DOWNINGTOWN BOROUGH from approximately BOOT ROAD (SR 2020) to approximately JACKSON AVENUE. LEBANON COUNTY SR 4008(026) #91348 PROPOSAL:$18.12 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$35.10 Ex St:$ x18:$ x36:$19.50 This project consists of the superstructure replacement of an existing two-span, noncomposite, prestressed concrete adjacent box beam bridge with a composite prestressed concrete spread box beam superstructure. Work also includes minor roadway approach work and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 4008, SECTION 026, in LEBANON COUNTY, NORTH ANNVILLE & NORTH LONDONDERRY TOWNSHIPS, from Segment 0070 Offset 2697 to Segment 0080 Offset 0205, for an overall project length of linear feet (0.138 mile). 6

7 LACKAWANNA COUNTY SR 380(245) # PROPOSAL:$14.04 PLANS 8.5x11:$6.60 For the improvement of a certain section of highway in LACKAWANNA and Wayne COUNTY in Covington, CLIFTON, Spring Brook, Roaring Brook AND Lehigh TOWNSHIPS and Moscow Borough, SR 0380, Section 245. The project being situated as follows: LACKAWANNA COUNTY SR 0380 SB- from segment 0194 offset 0050 to segment 0240 offset 2086 along SR 0380 NB. LACKAWANNA COUNTY SR 0380 NB- from segment 0137 offset 0000 to segment 0235 offset 1500 along SR 0380 SB. LACKAWANNA COUNTY SR 0084 NB- from segment 0035 offset 0000 to segment 0035 offset 0225 along SR 0084 WB. WAYNE COUNTY SR 0380 SB- from segment 0133 offset 1000 to segment 0133 offset 1150 along SR 0380 SB. LACKAWANNA COUNTY SR 8008 (Ramp A) - from segment 0750 offset 0000 to segment 0750 offset 2346 LACKAWANNA COUNTY SR 8043 (Ramp A) - from segment 0250 offset 0000 to segment 0250 offset 1029 LACKAWANNA COUNTY SR 8043 (Ramp D) - from segment 0500 offset 0000 to segment 0500 offset 0832 LACKAWANNA COUNTY SR 8043 (Ramp C) - from segment 0750 offset 0000 to segment 0750 offset 1297 LACKAWANNA COUNTY SR 8045 (Ramp A) - from segment 0500 offset 0000 to segment 0500 offset 0772 LACKAWANNA COUNTY SR 8045 (Ramp B) - from segment 0500 offset 0000 to segment 0500 offset 0570 LACKAWANNA COUNTY SR 9202 (Weigh Station) - from segment 0010 offset 0000 to segment 0010 offset 1829 This project consists of milling and resurfacing of an existing bituminous interstate roadways. Other work includes guiderail, impact attenuating devices, temporary traffic control and pavement markings all contained within an overall length of 80,750 linear feet ( miles) as indicated on the approved drawings included in the bid package. ALLEGHENY COUNTY SR 0000(LOC) #28180 PROPOSAL:$30.72 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: This is a partial Design Build roadway project. Design activities are limited to: Special traffic signal support foundation, structural sidewalk slab. For the signal improvements, curb and sidewalk, highway lighting, signing and pavement marking, and other miscellaneous construction, all within a length of linear feet (0.53 miles) as indicated on the approved drawings included in the bid package for CENTRAL BUSINESS DISTRICT SIGNALS PHASE 3, in ALLEGHENY COUNTY, CITY OF PITTSBURGH, Commonwealth of Pennsylvania. This project being situated as follows: At the various intersections indicated throughout the Central Business District (CBD) of the City of Pittsburgh. INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION 7