1 Sorted By rict (Subject to Departmental Changes) Future Prog Beyond Prompt By Run : 10/5/ /09/ D01 Const Insp FY20 / FY21 inspection contract in rict 1 for FY20 & FY21 24 month Inspection Agreement to provide construction inspection and administration as needed throughout the district. Contract value will be $1,000, D01/D02 ENV FY20 Task Environmental task order agreement for rict 1 and rict 2. focused mainly on projects in ricts 1 and 2. The duration D01/D02 ENV FY21 Task Environmental task order agreement for rict 1 and rict 2. focused mainly on projects in ricts 1 and 2. The duration 05/03/ D01 UBI FY21 Use a consultant to perform underwater bridge inspections. Consultant to perform underwater bridge inspections for approximately twenty structures in rict D01 GPR FY22 Hire a firm by way of Task Agreement to perform Ground Penetrating Radar inspection on various structures and pavements. 24 month agreement. Ground penetrating radar (GPR) services on various structures and pavements. The completion time will be 24 months from the date of authorization to proceed. The maximum prime compensation shall not exceed $200, /07/ D01 Const Insp FY22 / FY23 inspection contract in rict 1 for FY22 & FY23 24 month Inspection Agreement to provide construction inspection and administration as needed throughout the district. Contract value will be $1,000, D01/D02 ENV FY22 Task Environmental task order agreement for rict 1 and rict 2. focused mainly on projects in ricts 1 and 2. The duration 09/06/ D01/D02 ENV FY23 Task Environmental task order agreement for rict 1 and rict 2. focused mainly on projects in ricts 1 and 2. The duration 05/08/ D01 GPR FY24 Hire a firm by way of Task Agreement to perform Ground Penetrating Radar inspection on various structures and pavements. 24 month agreement. Ground penetrating radar (GPR) services on various structures and pavements. The completion time will be 24 months from the date of authorization to proceed. The maximum prime compensation shall not exceed $200, /05/ D01 Const Insp FY24 / FY25 inspection contract in rict 1 for FY24 & FY25 24 month Inspection Agreement to provide construction inspection and administration as needed throughout the district. Contract value will be $1,000,000. Page 1 of 8

2 Sorted By rict (Subject to Departmental Changes) Future Prog Beyond Prompt By Run : 10/5/ /05/ D01/D02 ENV FY24 Task Environmental task order agreement for rict 1 and rict 2. focused mainly on projects in ricts 1 and 2. The duration rict Subtotal: /09/ $1,100,000 LUC Corey Bridge Replace deck of Corey Rd Bridge over I-475 in Lucas County; perform necessary related work. Replace deck of Corey Road Bridge over I-475(SLM 11.38) Geotechnical, Environmental, Survey and Design services required. rict Subtotal: /09/ $850,000 WAY US WAY (over Branch of Apple Creek) 10/01/21 10/01/ $5,000,000 CRA US Bridge-Replace bridge decks, approach slabs, Brgs. CRA-US L& R Bridge Design ODOT to complete environmental ODOT to complete survey control and ROW 01/06/ D03 Bridge Inspection FY2021 Underwater Bridge Inspection Underwater Bridge Inspection $1,000,000 RIC SR ? Presstress box beam bridge? SFN $650,000 $650,000 HUR SR WAY SR HUR-SR WAY over a Ditch- Approximately 1200' south or Warwick Road. rict will complete environmental $950,000 $1,860,000 LOR US ERI US LOR US Bridge Rehabilitation over Norfolk Southern RailroadERI-US Bridge Repacement Replace bridge deck, paint, repair piers and abutments, replace bearings. 01/04/21 05/03/ $700,000 $8,000,000 $2,700,000 MED US RIC US LOR US Replace Box Beam SuperstructureMED US Twin structures over Koogle Road Bridge Deck Replacement - LOR (LOR-611D ove LOR-6) - LOR (Martins Run) Replace concrete box beams 05/08/ $9,000,000 RIC US s RIC L&R (US 30 over US 42) 10/01/26 10/01/26 rict Subtotal: /09/ D06 CON ENGR FY 20P Bridge painting inspection services on various project in D6 for CY 2019 & 2010 Page 2 of 8 Consultant to provide Paint Inspection Services on various projects as requested by rict 6. Contract duration 24 months.

3 Sorted By rict (Subject to Departmental Changes) Future Prog Beyond Prompt By Run : 10/5/ /09/ D06 CON ENGR FY 20G General construction inspection services on various projects in D6 for CY 2020 & 2021 Consultant to provide general construction inspection services as requested by rict 6. Duration 24 months from authorization $1,000,000 FRA Placing epoxy overlay on the following bridge deck:fra FRA FRA B FRA B FRA FRA A FRA Consultant to prepare plans for epoxy overlays on seven bridges. 01/01/21 01/02/ $44,480,000 FRA IR Major rehabilitation of IR-71 and widening to 3 lanes in both directions entire length of project.replace and widen 2 pairs of mainline structures.design included with Provide construction inspection services for duration of project 07/01/20 07/01/20 09/07/ D06 CON ENGR FY 22P Bridge painting inspection on construction projects in D6 for CY 2020 & 2021 Consultant to provide Paint Inspection Services on various projects as requested by rict 6. Contract duration 24 months. rict Subtotal: /06/ $20,110,251 MOT IR Major rehabilitation of the Interstate 75 pavement by rebuilding the asphalt pavements. Consultant to deliver the following items associated with the design of this project: AER, Stage 1, Stage 2, Stage 3, Final Tracings. Consultant shall also be available or Pre-Bid Activities and On Going Services during construction $16,889,749 MOT IR Major rehabilitation of the Interstate 75 pavement by rebuilding the asphalt pavements. Consultant to deliver the following items associated with the design of this project: AER, Stage 1, Stage 2, Stage 3, Final Tracings. Consultant shall also be available or Pre-Bid Activities and On Going Services during construction $2,000,000 MOT IR Bridge RepairReplace bridge deck. Upgrade existing Guardrail and end assemblies. Remove/replace railing, sidewalk/safety curb, and vandal fencing. Place new strip seal expansion joints. Paint Structural Steel. Patch Abutments, Pier Columns & Caps, and Backwalls using anodes and SCC. Correct Slope protection. Replace Steel rocker Bearings with new Elastomeric bearings at the abutments. Complete survey and develop construction plan for deck replacement of the bridge in Montgomery County on Loop Road over IR /04/ $4,219,000 MOT SR /18.03 MOT Replace deteriorated bridge decks, investigate retrofit vs superstructure replacement, investigate semi-integral abutment conversion and other miscellaneous patching of substructure units.mot Replace expansion joint seals, replace fa iled flexible scupper connectors, patch substructure Consultant will be required to complete the following: AER, Stage 1, 2, & 3 plans, Final Tracings, and assist in PreBid Activities, as well as provide On Going Services during Page 3 of 8

4 Sorted By rict (Subject to Departmental Changes) Future Prog Beyond Prompt By Run : 10/5/2018 rict Subtotal: /09/ D07/D08 GES Task FY 20/21 rict 7 & 8 Design Task for FY2020 and FY2021 This task order will provide general engineering services on a variety of projects in ricts 7 & 8. The contract limit will be $1.5 million with a 24 month duration D08/D07 ES Task FY 20/21 rict 7 & 8 Environmetal Services Task for FY2020 & FY2021 Environmental services on a task order basis in ricts 7 and 8. The completion time with be 24 months from authorization. The contract limit will be $500, $1,500,000 CLE SIGNS FY2021 Systematic sign upgrade of all signs on all routes in Clermont County. Locations to be determined. Includes I-275, 2 interchanges. Systematic sign upgrade of all signs and data collection on all routes in Clermont County. Locations to be determined. Includes I-275, 2 interchanges. 04/01/21 04/01/21 01/06/ $462,000 BUT US Rehabilitate Bridge BUT over the Great Miami River by patching and strengthening piers with (Fiber Reinforced Polymer) FRP Consultant to prepare complete construction plans as well as environmental as needed HAM Mt. Adams Inspection FY21-23 Inspection, monitoring, and maintenance of the Mt. Adam Slope Stability System. Three year contract beginning July 1, Inspection and maintenance of the Mt. Adams slope stability system for a period of 3 years. Consultant may be required t complete maintenance construction contract plans to repair items identified D08 CEINSP FY20-22 rict wide general project inspection for FY FY2022 rict wide general project and bridge painting inspection for FY2021/2022 (A) D08 CE Paint Insp FY21/22 rict wide bridge painting inspection for FY21-FY22 rict wide general project and bridge painting inspection for FY2021/2022 (B) HAM SR CEINSP rict 8 project specific inspection for FY rict wide general project and bridge painting inspection for FY2021/2022 (A) D08 TSINSP FY2021/FY2022 FY2021/FY2022 traffic signal inspection contract. FY2021/2022 construction traffic signal inspection contract $1,411,111 PRE IR Rehabilitate Bridge PRE which carries Monroe Central Road over I-70 by replacing the concrete deck. Consultant to prepare complete construction plans D08 BI 2021/2022 (A) D8 Consultant Bridge Inspection Contract for various truss bridges in the rict for calendar year 2021 and Annual Bridge inspection for various fracture critical steel pier caps for calendar years 2021 and D08 BI 2021/2022 (B) D8 Consultant Bridge Inspection Contract for calendar year 2021 and Includes various fracture critical steel pier caps and the Brent Spence Bridge Approach Bridges. Annual bridge inspection for various truss bridges in rict 8 for calendar years 2021 and $500,000 HAM SIGNS FY 2022 Systematic Sign Replacement-general routes. Systematic sign upgrade and data collection of all signs on all routes in Hamilton County. 04/01/22 04/01/22 Page 4 of 8

5 Sorted By rict (Subject to Departmental Changes) Future Prog Beyond Prompt By Run : 10/5/ $553,000 GRE US 35/ /2.47 Rehabilitate bridges GRE that carries North Fairfield Rd over US 35 and and GRE that carries 235 over US 35 by strengthening the piers with Fiber Reinforced Polymer (FRP) and installing Vandal Protection Fences. Consultant to prepare complete construction plans $2,769,000 HAM IR /18.58 Rehabilitate bridge HAM (Cooper Rd over I-71) by replacing the concrete parapets. Rehabilitate bridge HAM (Snider Rd over I-71) by replacing deck and raising the structure. Consultant to prepare complete construction plans D08/D07 GES Task FY 22/23 rict 7 and 8 Design Task for FY2022/FY2023 GES D07/D08 ES Task FY 22/23 rict 7 & 8 Environmetal Services Task for FY2022 & FY2023 Environmental services Task $1,008,000 HAM IR Replace the overlay and repair the sidewalk of the HAM Bridge that carries Woodburn Ave over I-71. Preparation of detailed construction plans through Final Engineering HAM Tunnel Insp/Tunnel FY20/21 Project to Inspect and maintain the Lytle Tunnel (Structur HAM ) that passes I-71 under Lytle Park in downtown Cincinnati. Includes NTIS inspection, routine excercising of ventilation, standpipe, air quality sensors, fire detection systems, draina ge systems and egress systems. Includes NTIS inspection, routine excercising of ventilation, standpipe, air quality sensors, fire detection systems, drainage systems and egress systems $650,000 BUT SR R Replace the boxbeam superstructure of bridge BUT R Complete design services - Reservoir target sale date 01/04/ $691,000 BUT SR 122D 1.47 Replace bridge BUT-122D-0148, a 5 cell CMP pipe arch structure (87"x63") that carries SR 122 over the hydraulic canal in Middletown. Preparation of detailed construction plans and environmenta document. 01/01/25 01/01/25 09/07/ D08 CEINSP FY2023/FY2024 (A) rict wide general project and bridge painting inspection for FY2023/2024 (A) rict Wide general project and bridge painting inspection for FY2023/ D08 CEINSP FY2023/FY2024 (B) rict wide general project and bridge painting inspection for FY2023/2024 (B) rict Wide general project and bridge painting inspection for FY2023/ D08 CEINSP FY2023/FY2024 (C) rict wide general project and bridge painting inspection for FY2023/2024 (C) rict Wide general project and bridge painting inspection for FY2023/ D08 TSINSP FY2023/FY2024 FY2023/FY2024 traffic signal inspection contract. FY2023/FY2024 traffic signal inspection 05/09/ $300,000 WAR SR Rehabiltate Bridge No. WAR , SFN: over a tributary of Halls Creek by replacing the inlet wingwalls, patching and performing other minor rehabilitation items. Preparation of detailed construction plans and environmenta document. 01/01/26 01/01/ D08 BI FY2023/2024 (A) D8 Consultant Bridge Inspection Contract for truss and complex bridges in rict 8 for calendar year 2023 and Page 5 of 8 Consultant bridge inspection for truss and complex bridges in rict 8 for calendar year 2023 and 2024

6 Sorted By rict (Subject to Departmental Changes) Future Prog Beyond Prompt By Run : 10/5/ /09/ D08 BI FY2023/2024 (B) rict 8 consultant inspection contract of various fracture critical steel pier caps in the rict for calender year 2023 and Consultant inspection of various fracture critical steel pier caps for calendar year 2023 and /06/ $2,059,000 GRE SR /18.83 For Bridge Nos. GRE and 1883, SFNs: and respectively: replace the existing concrete slabs on existing substructure units and perform other minor rehabilitation. The bridges carry SR 72 over the Little Miami River (1876) and a ta il race to the Little Miam River (1883). Consultant to prepare detailed construction plans through final engineering phase and prepare environmental document. 10/01/25 10/01/ HAM Tunnel Insp/Tunnel FY22/23 Project to Inspect and maintain the Lytle Tunnel (Structur HAM ) that passes I-71 under Lytle Park in downtown Cincinnati. Includes NTIS inspection, routine excercising of ventilation, standpipe, air quality sensors, fire detection systems, draina ge systems and egress systems. Includes NTIS inspection, routine excercising of ventilation, standpipe, air quality sensors, fire detection systems, drainage systems and egress systems. 01/08/ HAM Tunnel Insp/Tunnel FY24/25 Project to Inspect and maintain the Lytle Tunnel (Structur HAM ) that passes I-71 under Lytle Park in downtown Cincinnati. Includes NTIS inspection, routine excercising of ventilation, standpipe, air quality sensors, fire detection systems, draina ge systems and egress systems. Includes NTIS inspection, routine excercising of ventilation, standpipe, air quality sensors, fire detection systems, drainage systems and egress systems. rict Subtotal: LAW Ironton Russ Brdg Insp FY22 FY22 in depth Bridge Inspection In depth Bridge Inspection rict Subtotal: /09/ $2,076,900 BEL SR Replace deck on existing Steel beam bridge, replace bearings with elastomeric bearings and repair substructure units. Replace deck with new concrete deck made composite with existing beams. Detail MOT phasing $3,253,164 TUS US Rehabilitation of twin steel beam bridges by replacing the bridge decks and converting the abutments to semi-integral. Consultant request for Consultant to develop detailed plans for Rehabilitation of two structures on US 250 in Tuscarawa County. 10/01/25 10/01/ $3,292,189 TUS US Replace bridge deck and paint structural steel. To develop construction plans to replace deck and paint structural steel 01/01/27 01/01/ $6,800,658 BEL IR Replace deck and paint structural steel on two bridges Prepare detailed construction plans for the replacement of a deck and the painting of the structural steel on two bridges 10/01/25 10/01/25 01/04/ $2,883,934 BEL IR Replace existing deck with new reinforced concrete deck. Convert abutments to semi-integral. Page 6 of 8 To develop construction plans for deck replacement of BEL (SFN ) bridge. 10/01/26 10/01/26

7 Sorted By rict (Subject to Departmental Changes) Future Prog Beyond Prompt By Run : 10/5/ /04/ $4,206,898 TUS IR Replace existing superstructures of the twin bridges with new Slab superstructures. Replace Approach Slabs. Repair abutments/substructure. To prepare construction plans for replacement of superstructure on two bridges 09/07/ $950,134 BEL SR Replace superstructure on box beam bridge. Temp construction fill in Captina Creek. Prepare complete construction plans for the replacement of the exisitng boxbeam superstructure with a new superstructure type. 01/01/26 01/01/26 rict Subtotal: /09/ D12/D3 GES FY Traffic D12 & D3 SFY contract for traffic & safety related tasks. Tasks may include preparation or review of speed zones, signal studies, safety studies, traffic impact studies, IMS, traffic portions of project submissions, ODOT work orders, etc.o This project is programmed to replace upon completion. D12 & D3 SFY contract for traffic & safety relate tasks. 01/06/ $900,000 CUY SR Replace the 20' concrete culvert along Brecksville Rd (SR-21) over Hemlock Creek located just north of Selig Dr in Independence. Replace the 20' concrete culvert along Brecksville Rd (SR-21) over Hemlock Creek located just north of Selig Dr in Independence $96,000,000 CUY IR Major Rehab Replace the existing pavement along I-90 from the Hilliard Exit ramp bridge to I-71 in Rocky River, Lakewood and Cleveland. Work will include sections of median barrier replacement and lowering the pavement under several structures for vertical clearance. Replace the existing pavement along I-90 from Hilliard to I-7 in Rocky River, Lakewood, and Cleveland $3,500,000 CUY IR SW Deck Replace the deck of the ramp structure from SR-176NB t IR-90 WB over IR-490 in Cleveland. Work will include steel retrofits. Prepare construction contract plans to replace the deck of the structure from SR-176NB to IR-90 WB D12/D3 GES FY Survey rict 3 & year Surveying Contract for SFYs o This project is programmed to replace upon completion. 2 year survey services. rict General Engineering Services (GES) Survey contract for 2020 & Shared contract between D12 and D $4,200,000 CUY SR Replace the deck of the Detroit Rd (SR-2/SR-254) bridge over IR-90 in Rocky River. Replace the deck of the Detroit Rd bridge over I-90 in Rocky River. rict Subtotal: 6 Page 7 of 8

8 Sorted By rict (Subject to Departmental Changes) Future Prog Beyond Prompt By Run : 10/5/ /06/ SFY OTAP Consult. Serv Ohio Technical Assistance Program (OTAP): The Ohio Department of Transportation (ODOT) is soliciting proposals from qualified firms to assist ODOT?s Office of Transit, Ohio?s public transportation service providers, and human service transportation provid ers to address complex administrative and operating issues and comply with a myriad of federal and state program rules, regulations and requirements. We are seeking multiple consultants with an estimated 2-year budget of $1,800,000. Seeking Ohio' public transportation assistance providers and human transportation providers for SFY 2020 and 2021 rict Subtotal: 1 Total 79 Page 8 of 8