1 ADDENDUM # Project: Willamette Valley o Research & Development Facility 67 McKinley Street PIVOT Project Number Date: Friday, June 8, 08 To: hambers onstruction and Interested Sub-Bidders Prepared by: William D. Seider, FAIA This Addendum modifies the Project Manual, Specifications, and Drawings as follows:. General Information.. Availability of digital files of the ontract Documents: hambers onstruction is distributing digital bidding documents.. hanges to the Project Manual.. Section TABLE OF ONTENTS... Revise the title of Section 33 to Laminated Wood Laboratory asework.. Section BID FORM... Replace the Bid Form with the copy of the Bid Form attached to this addendum..3. Section ALTERNATES.3.. Paragraph.03 SHEDULE OF ALTERNATES - Add the following: D. Alternate No. 4 arpet Offices. In lieu of lean and Sealing of the existing concrete floor, provide arpet Tile PT- in the following rooms: Waiting/Reception 0, Open Office 04, Mail Room 0, QA 08, Office 09, Phone 0, Offices 3, 4,, 6, 7 and 8, ollaboration Nook 9, North Lab Entry, and NE Hall0B extended down to Door 3A..4. Section AOUSTIAL EILINGS.4.. Paragraph.0: Delete Paragraph F in its entirety. AT-4 should only refer to the Folded Plain eiling system... Section FLUID-APPLIED FLOORING... Paragraph.03 AESSORIES Delete reference to mesh sand. Page of 3

2 Willamette Valley o. Research & Development Facility Addendum # June 8, Paragraph 3.03 D Delete reference to mesh sand. 3. hanges to the Drawings 3.. Sheet D0 Demolition First Floor Plan Replace sheet D0 with the revised drawing attached to this Addendum Note clouded changes showing the necessary protection of the existing IT equipment room and the communications equipment currently located there during construction until the new IT room is completed, and the communication equipment can be relocated and made operational during only very short outage. 3.. Sheet A First Floor Plan Sector A 3... Rotate service wall at lab benches 90 degrees and move to south end of benches in ANALYTIAL TESTING room Sheet A0 Finish Plan First Floor Sector A Add note to sheet to reference Alternate No. 4 arpet Offices. In lieu of lean and Sealing of the existing concrete floor, provide arpet Tile PT- in the following rooms: Waiting/Reception 0, Open Office 04, Mail Room 0, QA 08, Office 09, Phone 0, Offices 3, 4,, 6, 7 and 8, ollaboration Nook 9, North Lab Entry, and NE Hall0B extended down to Door 3A. 4. onsultant Addendum 4... Mechanical Design Build - Replace the following drawing sheets with the drawings attached drawings M00, M0, M30, M30,, M403.. Substitution Approvals.. Section AOUSTIAL EILINGS... Under.0 - Manufacturers of Acoustical Tiles/Panels Add:... Rockfon, for the following product substitutions:... AT- Rockfon Artic... AT- Rockfon Alaska...3. AT-3 Rockfon olor-all...4. AT-4 Rockfon Sonar... Under.0 - Manufacturers of Suspension Systems Add:... Armstrong... ertainteed orp hicago Metallic.. Section SOUND ABSORBING WALL AND EILING UNITS... Under.0 Manufacturer s Add: Page of 3

3 Willamette Valley o. Research & Development Facility Addendum # June 8, Valhalla Silent Treatment Sound Panels, Valhalla onstruction Products, (03) , Section 33 - LABORATORY FUME HOODS.3.. Under.0 Manufacturer s Add:.3... Thermo Fisher Scientific, 300 Industry Drive, Pittsburgh, PA 7, Office: (74) Section 33 - LAMINATED WOOD LABORATORY ASEWORK.4.. Under.0.B Manufacturer s Add:.4... Thermo Fisher Scientific, 300 Industry Drive, Pittsburgh, PA 7, Office: (74) Section 34 - LABORATORY BENHES... Under.0.B Manufacturer s Add:... Thermo Fisher Scientific, 300 Industry Drive, Pittsburgh, PA 7, Office: (74) End of Addendum # 6. Attachments 6.. Section BID FORM 6.. Sheet D0 Demolition First Floor Plan 6.3. Mechanical Drawings M00, M0, M30, M30,, M403. Page 3 of 3

4 SETION BID FORM Bid losing Time/Date: :00pm, June 3, 08 BID FOR: The Willamette Valley ompany R&D Facility Submitted by: (ompany Name) B # BASE BID The undersigned proposes to furnish all material, equipment, and labor required for the complete project, and to perform all work in strict accordance with the ontract Documents for the lump sum prices indicated below. Spec Section No. DESRIPTION BID AMOUNT. Total Base Bid $ BOND OST PERENTAGE RATE (to be added to above bids) % (Percentage) ALTERNATES (see Specification Section 0 300) No. : Additional Lab Bench Islands $ No. : Substitute Lab Furniture $ No. 3: Substitute Lab Furniture $ No. 4: arpet Tile In Lieu Of Sealed oncrete $ onstruction Documents Package BID FORM Willamette Valley o. R&D Remodel of

5 ATTAHMENTS Bidder s may include with bid form any attachments to the extent necessary to clarify Bidder s scope of work. BID SEURITY Not required. STIPULATIONS The undersigned agrees, if awarded the ontract, to execute and deliver to the hambers onstruction within ten (0) working days after receiving contract forms, the Subcontract Agreement and satisfactory Performance and Payment Bond (if requested) in an amount equal to 00 percent (00%) of the ontract Sum. If bonds are requested the bid value will be increased based on the bond rate indicated above. By submitting this Bid, the Bidder certifies that the Bidder: a) has available the appropriate financial, material, equipment, facility and personnel resources and expertise, or the ability to obtain the resources and expertise, necessary to meet all contractual responsibilities; b) has a satisfactory record of past performance; c) has a satisfactory record of integrity; d) is qualified legally to contract with hambers onstruction; and e) will promptly supply all necessary information in connection with any inquiry hambers onstruction, Architect, or Owner may make concerning the responsibility of the Bidder. Prior to award of a ontract, the Bidder shall submit, if requested, appropriate documentation to allow the M/G to determine whether or not the Bidder is responsible. The undersigned has received addenda numbers to inclusive and has included their provisions in the above Bid amounts. The undersigned has visited the site to become familiar with conditions under which the Work is to be performed and has correlated the Bidder's personal observations with the requirements of the proposed ontract Documents. Signed By: Printed Name: Telephone #: END OF SETION onstruction Documents Package BID FORM Willamette Valley o. R&D Remodel of

6 08 PIVOT ARHITETURE THIS IS THE EXISTING IT ROOM FOR 67 MKINLEY STREET, AND URRENTLY ONNETS ALL OF THE WILLAMETTE VALLEY O BUILDINGS ON MKINLEY STREET VIA FIBER ABLES ONNETED IN THIS ROOM. THE FIBER AND DIGITAL EQUIPMENT IN THIS ROOM IS TO BE PROTETED AND POWER MAINTAINED, DURING ALL PHASES OF ONSTRUTION UNTIL THE NEW IT ROOM # IS OPERATIONAL AND READY FOR THE TRANSFER OF THE EXISTING FIBER AND RELATED EQUIPMENT. OORDINATE ALL WORK RELATED TO THIS SYSTEM WITH OWNERS OMMUNIATIONS VENDORS ADD 0 0' - 0" 0' - 0" GENERAL NOTES - DEMOLITION A. THE ADJAENT EXISTING FAILITIES SHALL REMAIN IN FULL OPERATION DURING DEMOLITION AND DURING ALL ONSTRUTION WORK. B. MAINTAIN SAFE AESS TO AND EGRESS FROM THE BUILDING AT ALL TIMES. DO NOT BLOK ANY REQUIRED EXIT PATHS.. PREVENT INTERRUPTION IN UTILITIES OR SERVIES THAT WOULD INONVENIENE ADJAENT BUILDING OUPANTS D. OORDINATE WITH THE OWNER TO MAINTAIN ONTINUITY OF OWNER'S OPERATIONS. E. PROTET ALL EXISTING ONSTRUTION TO REMAIN. F. OORDINATE WITH OWNER FOR REMOVAL AND STORAGE OF REMAINING (E) EQUIPMENT AND ASEWORK TO BE SALVAGED. G. REMOVE EXISTING DOOR WALL STOPS WHERE DOORS NO LONGER EXIST. H. REMOVE ALL (E) HOOKS, ANHORS AND OTHER WALL-MOUNTED APPURTENANES NOT TO BE REUSED. I. PROTET (E) FLOORS, WALLS, EILINGS & FINISHES TO REMAIN. J. REMOVE AND STORE MATERIAL AND EQUIPMENT WHERE INDIATED TO BE SALVAGED OR RELOATED. K. WHEN REMOVING FLOOR FINISHES REMOVE ALL ADHESIVE, GROUT, RESIDUE AND DEBRIS. L. UNLESS NOTED OTHERWISE REMOVE ALL EXISTING ARPET AND ARPET BASE WITHIN WORK AREA. M. REMOVE ANY WALL, FLOOR, OR EILING BOLTS OR ANHORS NOT BEING USED. N. REMOVE PORTIONS OF THE EXISTING SUSPENDED EILING GRID SHOWN TO REMAIN IN ORDER TO AESS ABOVE EILING AREAS AS NEEDED TO AOMPLISH WORK OF THIS ONTRAT. O. AT EILINGS SHEDULED FOR REMOVAL, REMOVE EILING SYSTEM INLUDING BUT NOT LIMITED TO GRID, TILE, AND SUPPORT SYSTEM IF NOT REUSABLE, TO ALLOW FOR NEW ONSTRUTION. P. OORDINATE WITH ELETRIAL FOR ITEMS TO BE DEMOLISHED, REMOVED, AND/OR SALVAGED. Q. OORDINATE WITH MEHANIAL/PLUMBING FOR ITEMS TO BE DEMOLISHED, AND/OR SALVAGED. R. DASHED LINES ON DEMOLITION PLAN REPRESENT ITEMS TO BE REMOVED. D8 D9 A D D D8 70 D D D D KEYNOTES 6/7/08 :8:3 PM FROM FILE: :\Pivot_Architecture\Revit_08\644_WV_DD_Pretec_R8_entral_sslack.rvt PRINTED ON: SALE OF x 7 SHEETS IS HALF OF SALE INDIATED D D D 70 D8 D0 D8 D8 D8 D8 D8 D4 D D D6 D8 D4 D8 D8 60 D D3 D8 D8 D ADD 0 D8 D9 D9 D6 D6 D D4 ADDITIONAL STORAGE D9 D9 OVEN ROOM 4 UP OFFIE 38 WH WOMEN'S RR 4 STORAGE 40 TOOL ROOM 39 MEN'S RR 43 7 UP 3 (E) SPRAY BOOTH DEMO PLAN - FIRST FLOOR N 3/3" = '-0" 0' 8' 6' 3' GRAPHI SALE 80' - 0" 40' - 0" D9 4 B D E F G (E) HAIN LINK FENE 4 PROPERTY LINE (E) FIRE SPRINKLER RISER & TREE (VERIFY LOATION) TO REMAIN 7 (E) RESTROOM TO REMAIN 3 (E) RAISED JIB RANE BASE TO REMAIN. RANE REMOVED BY OWNER 60 (E) ONRETE OLUMN PROTETION TO REMAIN 70 (E) WINDOWS TO REMAIN, TYP (E) ATH BASIN D6 DEMO EXISTING ONRETE PROTETION AROUND STEEL OLUMN TO BARE STEEL. DEMO EXISTING WALL D8 DEMO EXISTING WINDOW D0 SAW UT OPENING FOR NEW WINDOW OR DOOR. SEE FLOOR PLAN AND ELEVATIONS FOR DIMENSIONS D DEMO EXISTING ASEWORK D REMOVE EXISTING PLUMBING FIXTURES IN THIS AREA D4 DEMO EXISTING STAIRASE D8 DEMO EXISTING DOOR D REMOVE EXISTING WINDOW BLINDS D DEMO (E) EYE WASH D3 DEMO (E) SINK SAWUT FOR NEW FOOTINGS D9 SAW UT SLAB FOR NEW SERVIES. SEE PLUMBING AND ELETRIAL DEMO WALL FILL PATTERNS: - EXISTING WALL ASSEMBLY - DEMO EXISTING WALL, DOOR, DOORFRAME ONSTRUTION DOUMENTS PAKAGE RESEARH & DEVELOPMENT FAILITY SHEET TITLE: DEMOLITION FIRST FLOOR PLAN REVISIONS: ISSUE DATE: WILLAMETTE VALLEY OMPANY 0//08 D0 67 MKINLEY ST. EUGENE, OR 9740 # DESRP. DATE ADD 0 06/08/8

7 07 PIVOT ARHITETURE M30 LAB EQUIPMENT SEE ARHITETURAL M30 FE EA EA F--3 F-- F--9 "x0" TG "x0" TG EA M30 6x6 PSD 400 FM 6"x6" 0/0/08 6"x6" 6" x " SA UP THRU EQUIPMENT PLATFORM ABOVE 6x6 PSD 400 FM 6"x6" D Innovative Air, Inc. 0 Franklin Blvd. Ste. 7 Eugene, OR 9740 Ph Fax B 674 M30 6"x6" 6/8/08 :48:9 PM FROM FILE: P:\08\08 Projects\W\Willamette Valley ompany R & D Remodel\0 Drawings\REVIT\Willamette Valley ompany R & D Remodel_HVA.rvt PRINTED ON: SALE OF x 7 SHEETS IS HALF OF SALE INDIATED EF-4 EF-6 DN EF-3 LAB EQUIPMENT SEE ARHITETURAL F--4 ' - /4" MIN. EF- EF- DN EF-7 EF-0 F-- EF-9 REFRIGERANT PIPING ONNETIONS -REFER TO SHEET M03 FOR ROUTING NORTH HVA ENLARGED FIRST FLOOR LOWER LAB PLAN /4" = '-0" F--0 6"x" 6x6 PSD 400 FM ONSTRUTION DOUMENTS PAKAGE SHEET TITLE: REVISIONS: RESEARH & DEVELOPMENT FAILITY HVA FIRST FLOOR LOWER LAB PLAN ISSUE DATE: WILLAMETTE VALLEY OMPANY ADD # /08/08 M00 67 MKINLEY ST. EUGENE, OR 9740 # DESRP. DATE

8 07 PIVOT ARHITETURE M303 4'-0" LONG LINEAR SLOT DIFFUSER () " SLOTS 00 FM/L.F. 400 FM TOTAL A 6/8/08 :49:8 PM FROM FILE: P:\08\08 Projects\W\Willamette Valley ompany R & D Remodel\0 Drawings\REVIT\Willamette Valley ompany R & D Remodel_HVA.rvt PRINTED ON: SALE OF x 7 SHEETS IS HALF OF SALE INDIATED 3 M "x8" 0"x8" 0"x8" 4'-0" LONG LINEAR SLOT DIFFUSER () " SLOTS 7 FM/L.F. 300 FM TOTAL (TYP. ) 0"x8" 0"x0" 70 FM F--6 EA "x0" TG PHYSIAL TESTING 8 EF-9 FUTURE OPEN OFFIE 6"x6" PSD 400 FM (TYP. -4) 0"x0" RG 000 FM EA M30 F--4 (ABOVE) EA EF- 8"x8" "x0" 00 FM "x0" TG 3 M30 4'-0" LONG LINEAR SLOT DIFFUSER () " SLOTS 7 FM/L.F. 300 FM TOTAL (TYP. ) OFFIE 8 "x0" TG F--6 7"ø 4 M30 EA DW DW "ø 30"ø 3"ø 3 36"x36" M30 EF-0 x RG EA UP THRU EA UP THRU 6"x" SA DN THRU FLOOR 670 FM ROOF ROOF (TYP.-6) SW HALL EF-4 LAB SUPPORT EA EA UP 3 M303 SE HALL 0 "x0" "x0" FM 380 FM EA "x" 400 FM 0"x0" RG 8"X8" 6 FM RG 0X0 00 FM OFFIE RG 60 FM 09 "ø F-- OPEN OFFIE OFFIE '-0" LONG LINEAR SLOT DIFFUSER () " SLOTS 67. FM/L.F. 70 FM TOTAL (TYP. 4) ANALYTIAL TESTING 7 F-- (BELOW) OFFIE 6 M303 EXTRATION ARM REFER TO & M-304 FOR SIM. DETAIL EF- ELETRIAL ONTROL BOX VERIFY LOATION W/ARHITET & OWNER OFFIE OA UP 4'-0" LONG LINEAR SLOT DIFFUSER () " SLOTS 7 FM/L.F. 300 FM TOTAL (TYP. ) "x0" TG OFFIE 4 DIRETOR 3 7"ø 8"x8" EGW 40 FM HEM STORAGE 6 "x0" TG N LAB ENTRY LAB UH- IT F--7 BREAK ROOM 03 OA UP F- OA UP "x0" TG PHONE 0 F--8 M30 UP ALONG HALF HIGH WALL 8"x8" 0 FM 36"x36" ONFERENE F--3 "x6" ADDITIONAL STORAGE 0 EF-3 MAU- "x" M30 8x8 40 FM M30 UP ALONG HALF HIGH WALL "x0" TG B-HP- 4'-0" LONG LINEAR SLOT DIFFUSER () " SLOTS 00 FM/L.F. 400 FM TOTAL (TYP. ) NE HALL QA 08 F-- OA UP "x" 4"x8" OA "x" EA 8x8 0 FM OVEN ROOM 4 0B "x0" TG 8"X8" RG 30 FM 8"x8" 0 FM E HALL 3 F--7 M300 0"x8" 9"x9" 9"x9" 3"x7" FLEX SPAE 7 3 WAITING/REEPTION 9"x9" EF- EF- M300 9x9 RG F-- FLEX SPAE 3 0 8"x" SRG MAIL 0 MEN'S 06 EA WOMEN'S 07 "x0" GAS WATER HEATER -REFER TO PLUMBING DWGS. PROVIIDE 3" DIA. PV INTAKE & EXHAUST PIPES W/ SINGLE FATORY SUPPLIED ONENTRI VENT KIT 4 OA UP VAUUM PUMP -REFER TO PLUMBING DWGS NORTH HVA FIRST FLOOR PLAN - SETOR A /8" = '-0" EF-8 3 (E) SUSPENDED UNIT HEATERS TO REMAIN UP ALONG WALL B D E F G NOTE: FOR OUTDOOR AIR VENTILATION REQUIREMENTS FOR SYSTEMS, REFER TO SPLIT SYSTEM SHEDULE, SHEET M00 & OUTDOOR AIR VENTILATION SHEDULES, SHEET M003 A B KEYPLAN ONSTRUTION DOUMENTS PAKAGE SHEET TITLE: REVISIONS: ISSUE DATE: 0/0/08 Innovative Air, Inc. 0 Franklin Blvd. Ste. 7 Eugene, OR 9740 Ph Fax B 674 RESEARH & DEVELOPMENT FAILITY WILLAMETTE VALLEY OMPANY HVA FIRST FLOOR PLAN - SETOR A ADD # /08/08 M0 67 MKINLEY ST. EUGENE, OR 9740 # DESRP. DATE

9 07 PIVOT ARHITETURE EF-7 EF-4 3 3' - 0" (BEYOND) (BEYOND) EF- M303 M30 MIN. (BEYOND) EF-3 EF-6 REFRIGERANT LINE REFER TO M03 FOR ROUTING F-- 6"x" EF-3 43"x0" 0/0/08 "x0" TG F--3 F-- F--9 "x" "x" "x0" TG Innovative Air, Inc. 0 Franklin Blvd. Ste. 7 Eugene, OR 9740 Ph Fax B 674 6/8/08 ::0 PM FROM FILE: P:\08\08 Projects\W\Willamette Valley ompany R & D Remodel\0 Drawings\REVIT\Willamette Valley ompany R & D Remodel_HVA.rvt PRINTED ON: SALE OF x 7 SHEETS IS HALF OF SALE INDIATED VAUUM PUMP REFER TO PLUMBING DWGS HVA LAB SETION -NORTH VIEW /4" = '-0" M "x36" "x6" HVA LAB SETION -SOUTH VIEW /4" = '-0" 9 8 REFRIGERANT LINE REFER TO M03 FOR ROUTING 36"x36" 3 3"ø 7 EF "ø EF-0 EF-7 EA W/GOOSENEK "ø EF- EF- 4 EA W/GOOSENEK EF-3 3 EF-6 EF-4 ONSTRUTION DOUMENTS PAKAGE SHEET TITLE: HVA SETIONS REVISIONS: RESEARH & DEVELOPMENT FAILITY ISSUE DATE: WILLAMETTE VALLEY OMPANY ADD # /08/08 M30 67 MKINLEY ST. EUGENE, OR 9740 # DESRP. DATE

10 07 PIVOT ARHITETURE MA W/GOOSENEK EF-7 D E 7' - 0" MIN. M30 EF-6 EA W/GOOSENEK EA W/GOOSENEK REFRIGERANT LINE REFER TO M03 FOR ROUTING M30 "X" EA DUT D M30 B-HP- REFRIGERANT LINE REFER TO M03 FOR ROUTING F-- "x" GAS WATER HEATER REFER TO PLUMBING DWGS VAUUM PUMP REFER TO PLUMBING DWGS F--4 0" ø 0" ø EF-6 "x" 0"x43" 6"x6" 0/0/08 F-- F--3 F--4 EXTRATION ARM REFER TO SETIONS / & / F--6 "x0" TG 6"x6" 0" ø 6"x6" 6"x6" 0" ø 6"x6" "x0" TG 6"x" 6"x6" Innovative Air, Inc. 0 Franklin Blvd. Ste. 7 Eugene, OR 9740 Ph Fax B 674 6/8/08 :3:00 PM FROM FILE: P:\08\08 Projects\W\Willamette Valley ompany R & D Remodel\0 Drawings\REVIT\Willamette Valley ompany R & D Remodel_HVA.rvt PRINTED ON: SALE OF x 7 SHEETS IS HALF OF SALE INDIATED HVA LAB SETION -EAST VIEW /4" = '-0" /4" = '-0" EA W/GOOSENEK EF-9 REFRIGERANT LINE REFER TO M03 FOR ROUTING F--6 F EA W/GOOSENEK F-- REFRIGERANT LINE REFER TO M03 FOR ROUTING ARM INLET EF- G EXTRATION ARM HVA MEHANIAL SETION REFRIGERANT LINE REFER TO M03 FOR ROUTING "x0" 380 FM HVA PHYSIAL TESTING SETION 4 HVA ANALYTIAL TESTING SETION -EAST VIEW HVA FLEX SPAE SETION -NORTH VIEW /4" = '-0" /4" = '-0" /4" = '-0" "x0" 380 FM 7 ONSTRUTION DOUMENTS PAKAGE SHEET TITLE: HVA SETIONS REVISIONS: RESEARH & DEVELOPMENT FAILITY ISSUE DATE: WILLAMETTE VALLEY OMPANY ADD # /08/08 M30 67 MKINLEY ST. EUGENE, OR 9740 # DESRP. DATE

11 07 PIVOT ARHITETURE STRUTURAL SUPPORT REFER TO STRUTURAL DRAWINGS & EXTRATION ARM SUPPORT DETAIL /403 EA W/GOOSENEK M30 D M300 TRUE ROOF W/GOOSENEK G ABOVE EILING NOTE: FOR EXTRATION ARM SYSTEM EQUIPMENT, SEE /M403 ARM INLET EXTRATION ARM BELOW EILING EXTRATION ARM SUPPORT REFER TO DETAIL /M403 D 3 SA DUT BEYOND 36" x 36" SA DUT ENTRIFUGAL EA EXHAUST FAN INSTALLED ON WALL BELOW MAIN DUT EXTRATIOIN ARM SUPPORT REFER TO DETAIL /M403 REFRIGERANT LINE REFER TO M03 FOR ROUTING F-- EF-8 ABOVE EILING W/GOOSENEK DN. THRU EILING - REFER TO EXTRATION ARM SUPPORT DETAIL /M403 FOR WALL MOUNTED SUPPORT PLATFORM REFER TO DETAIL 7/M40 ENTRIFUGAL EA EXHAUST FAN INSTALLED ON WALL BELOW MAIN DUT FOR WALL MOUNTED SUPPORT PLATFORM REFER TO DETAIL 7/M40 ARM INLET EXTRATION ARM 7"x3" 0"x" OA DUT REFER TO M40- FOR FAN OIL MOUNTING DETAIL 0/0/08 Innovative Air, Inc. 0 Franklin Blvd. Ste. 7 Eugene, OR 9740 Ph Fax B 674 6/8/08 :3:7 PM FROM FILE: P:\08\08 Projects\W\Willamette Valley ompany R & D Remodel\0 Drawings\REVIT\Willamette Valley ompany R & D Remodel_HVA.rvt PRINTED ON: SALE OF x 7 SHEETS IS HALF OF SALE INDIATED ' - 0" MIN. EF-8 ELETRIAL ONTROL BOX VERIFY LOATION W/ARHITET & OWNER TYPIAL FOR EF-9 THRU 4 HVA ENLARGED LAB EXTRATION ARM PLAN HVA LAB EXTRATION ARM SETION 3 HVA RESTROOM SETION -NORTH VIEW OVEN ROOM SETION -EAST VIEW 4 /4" = '-0" /4" = '-0" /4" = '-0" /4" = '-0" 4 3 EF- 3' - 0" MIN. 7' - 0" MIN. EF-8 HALF HIGH WALL BEYOND OVEN ROOM SETION - SOUTH VIEW 6 ANALYTIAL TESTING SETION - NORTH VIEW HVA FLEX SPAE/OVEN ROOM SETION - WEST VIEW 7 /4" = '-0" /4" = '-0" /4" = '-0" F--7 F M30 E ONSTRUTION DOUMENTS PAKAGE SHEET TITLE: HVA SETIONS REVISIONS: RESEARH & DEVELOPMENT FAILITY ISSUE DATE: WILLAMETTE VALLEY OMPANY ADD # /08/08 67 MKINLEY ST. EUGENE, OR 9740 # DESRP. DATE