1 Summary Specification (Issue 02) Client EPISO 3 Westside S.a.r.l Project Westside (Blocks C and D) Property Report Date 04 April 2016 File Reference Prepared By Westside, London Road, Hemel Hempstead, Hertfordshire, HP3 9TD 43269/12/JAH/AWB 1. Project Introduction James Hodge BSc (Hons) MRICS & Adam Wlodarczyk-Black BSc (Hons) MRICS Westside is a purpose built commercial office building constructed in 1990 and comprises four separate blocks, A, B, C and D. The building is set within a large site of approximately 9 acres which includes a large car park providing 730 car parking spaces in addition to soft landscaping. The building is linked by the three separate atrium spaces The proposed works relate to Blocks C and D, associated common parts, including the atriums, the security lodge site, repair and improvement to the external building fabric and hard and soft landscaping The total net internal area of blocks C and D is approximately 91,262 sq ft. A key objective of the project is to increase the net internal area of the floors to enhance the layout of the floor plate. This will be achieved through removing three staircores, and infilling terraces, balconies and external, under cover ground floor areas. This will increase the net internal area by approximately 8,012 sq ft to 99,274 sq ft. 2. Summary of Works The proposed works include a full CAT A refurbishment of the office floors, common parts, reception and toilets. The mechanical, electrical and public health infrastructure will be substantially replaced, to the extent necessary. The 6 passenger lifts which serve Block C and D will be completely overhauled and modernised The occupancy provision for the base build refurbishment will be 1:10 sq m There will be the ability to sub-divide each floor in each block on a front-to-rear basis The project will include an external works package incorporating the replacement of any damaged cladding panels, glazing panes and renewing sealant where required to put the fabric in the correct repair and condition and aesthetical appearance. The external works will include proactive maintenance works to improve the longevity of the building fabric as well as refurbishment works to the hardstandings, planting, trees and soft landscaping generally, including site signage, way finding and illumination The proposed works provide for a new lightweight entrance screen and canopy in place of the existing pitched entrance canopy, to modernise and improve the prominence of the front entrance The security lodge will be removed to bring the security operation into the main building and to provide additional car parking. Summary Specification 1 Ref /12/JAH/AWB

2 2.1.7 The key targets of the project are: Enhance the quality and feel of the building throughout the reception, atriums, WCs and common parts through careful architectural design. This will focus on strong interior design complimented by an integrated lighting scheme. Create open, regularised floorplates by removal of stair cores, infilling of balconies, under cover areas and 3 rd floor roof terraces and rationalising service risers. To provide high quality Grade A office accommodation The key CAT A dimensions are as follows: Floor to Ceiling Height: Approximately 3.0m (Floor Finish to False Ceiling). Raised Access Floor Void at Ground Floor: Approximately 380mm (inc tile thickness). Raised Access Floor Void at upper floors: Approximately 175mm-200mm (inc tile thickness). Suspended Ceiling void: Approximately mm. Slab to Slab height: Approximately mm. Suspended Ceiling Grid: 600mm x 600mm. Typical Planning Grid: 7500mm x 7500mm. 3. Programme The target is to complete the works by October Sectional Completion has been incorporated under the building contract to facilitate the phased refurbishment of the lifts and WCs as well as the early hand over of the third floor. The following target and forecast milestone dates are highlighted below: Section: Date of Possession Date for Completion: Section 1 (Lifts 1 and 2) 29 February July 2016 Section 2 (Front Foyer Toilets) 29 February July 2016 Section 3 (Office Block C and D 3rd Floor, and Block D Toilets) Section 4 (Ground, First and Second Floors to Blocks C and D, including both Atriums, Lifts 3 6 and Shower Blocks) 29 February September February October 2016 Section 5 (Rear Toilets in Block C) 11 July November Form of Construction The foundations comprise a ground bearing slab with pile caps to support the structural frame. The building s form of construction comprises a reinforced concrete frame which supports insitu reinforced concrete floors and a reinforced concrete roof deck with steel framed pitched glazed roofs to each of the three atriums The elevations comprise high quality proprietary glazed curtain walling and granite cladding panels. The surrounding structural grid of columns and beams are clad with granite. Summary Specification 2 Ref /12/JAH/AWB

3 5. Précis of Works Grounds Removal of existing security building to introduce additional car park spaces, and retention of the existing entrance barriers Significant vegetation clearance and tree pruning/thinning throughout the whole site Reinstate existing routes (currently boarded up) for cyclists and pedestrians Jet washing, cleaning and all de minimus repairs to paving and dwarf walls etc in areas around the front and rear entrances Existing planters cleaned and new sculptural planting introduced to provide natural contrast against the building New potted specimen trees on rear car park deck and main entrance Improve the connection between the canal and car park to encourage people to use the canal path at lunch and after work Create a Garden Space in line with the main building entrance next to the canal with furniture, lighting, paved areas etc Establish new way finding signage New delineation to main approach road and car park delineation (extent to be defined) Overhaul and servicing of existing lighting. Building External Envelope Repairs to roof fabric where required Repairs to perimeter parapet cappings Repairs to rainwater goods Cladding and glazing repairs Repairs to louvered panels to car park elevations Cleaning of elevations External decorations. Building Fabric Alterations for Net Internal Area Gains Third floor glass box extensions to incorporate existing roof terraces into internal lettable area Infilling of perimeter balconies to building elevations bringing the space into the internal lettable area using new contrast glazing and bronze colour aluminium framework Infilling of perimeter ground floor undercover areas to building elevations bringing the space into the internal lettable area using new contrast glazing and bronze colour aluminium framework Removal of three internal staircases and infilling the floor slab at each level to increase the Summary Specification 3 Ref /12/JAH/AWB

4 internal net lettable area. External Entrance Areas New Gull-Wing style canopy with lightweight frit finished glass and metal frame to the main entrance to block C/D New seating by main entrance New signage for entrance into Westside One & Two Feature lighting on new canopy to aid wayfinding in main entrance New lighting around entrances to Westside One & Two including recessed downlights in existing porticos, uplights to columns and floor mounted uplights to pathways leading up to entrance (externally) New granite paving to entrance areas of Westside One & Two entrances. Atrium Areas New revolving entrance door and automated pass doors New entrance metal bar barrier matting Replace polished stone infills throughout with new granite to match but contrast with main granite tiling New reception desk in both Westside One & Two Cupboards for reception staff printers, coats, keys, etc New building entrance sign including a tenant directory Feature horizontal US Ash wall cladding Business lounge areas with new seating, tables, carpet and feature lighting New planting utilising existing plant boxes on first floor at back of main atrium New trees to both atriums Paint existing steelwork supporting front curtain walling and surrounding lifts anthracite grey to give contrast All joinery, handrails, internal timber fenestration and doors to be re-finished in a fumed oak effect colour and refurbished New brushed stainless steel ironmongery to all doors New illumination to comprise high bay lights, linear up lights within existing heat troughs, feature linear LED lights in timber cladding, floor standing lamps in business lounge, feature LED lights on spiral staircase and lift structures, LED lighting in planters, LED lights in reception desk, LED lighting on main entrance building/tenant sign All electrical faceplates to be replaced The lift car interiors will be refurbished with finishes to match the complete interior design scheme. Summary Specification 4 Ref /12/JAH/AWB

5 Atrium Bridge Decks New plasterboard cladding to underside of all existing bridge decks New woven vinyl floor finish to decks, corridors and spiral staircase treads Strip and stain existing timber handrails a fumed oak colour to provide contrast New perimeter LED light troughs. Staircores Existing timber handrails to be stripped and stained to a fumed oak colour to provide contrast New woven vinyl floor finish to landings, treads and risers including new contrasting stair nosings New floor numbers to coordinate with new ironmongery and branding Existing stringers and skirting boards to be painted redecorated/re-finished to match surrounding finishes grey to create contrast New wall lights to all landings to increase lighting levels Existing fire rated timber framed glazed partitions to be stripped and stained in a fumed oak Existing fire rated timber framed partitions to be removed and replaced with new fire rated plasterboard partitions to Block C. WC s New porcelain 600mm x 600mm floor tiles with R10 slip rating and matching skirting New full height WC cubicles to match fumed oak theme in common parts Painted white plasterboard ceilings Painted plaster finish walls New modern vitreous sanitaryware New Corian (or similar) vanity counter tops with seamlessly integrated basins New taps, mirrors, hand dryers, toilet roll holders, hooks, bins, etc All doors to be re-finished in a fumed oak effect colour and refurbished with new brushed stainless steel ironmongery New recessed LED slot lights in plasterboard ceilings. Bike Store/Showers (within Rear Ground Floor Undercover Car Park) Blockwork constructed accommodation Painted concrete floor in bike store Bike store room with PVC wall cladding, fluorescent tube lighting and Cyclepods bike racks. Summary Specification 5 Ref /12/JAH/AWB

6 White metal shower trays with glass screens and electrically heated packaged shower units Painted plasterboard ceilings Painted plaster finish walls Porcelain floor and wall tiling Sinks, hand dryers, paper towel dispensers, bins, full height mirrors, lockers, hair dryers Changing area with benches and hooks, etc Laminate finish doors with new brushed stainless steel ironmongery Recessed LED downlights. CAT A Office Floors Fabric Works x 600 perforated metal tile suspended ceiling system with central and perimeter plasterboard margins All suite entrance timber doors to be replaced and finished in a fumed oak effect colour with new brushed stainless steel ironmongery New doors to new risers. Refurbished doors to existing mechanical and electrical risers Replace all raised access floors with Kingspan RG3 steel encapsulated raised access panels New profiled skirting to match existing where required Re-spray all glazing framework and metal skirting boards white (RAL 9003) All existing riser doors to be re-decorated in RAL Decorate all joinery and plastered surfaces in RAL Small power to the office floors to comprise cleaner s sockets and supplies to plant Refurbishment and modification of existing ADT system to provide L2 coverage New VRF heating and cooling LED light fittings laid into the suspended ceiling grid in the offices. Mechanical, Electrical, Public Health and Vertical Transportation Mechanical fresh air ventilation with heat recovery Toilet extract installation VRF (two pipe system) for office floors Localised electric heating to the staircases, corridors, WCs and reception desk Automatic controls system Distributed potable and cold water system Soil & waste management system. Summary Specification 6 Ref /12/JAH/AWB

7 Rainwater disposal system Landlords packaged transformer/lv switchboard LV mains power and distribution system Part L Metering requirements Building management system (BMS) Earthing system Lighting and lighting controls to common parts and plant areas Emergency lighting system Small power systems to service common areas and mechanical systems Full fire alarm detection system to provide L2 coverage Lightning protection system Security system wire ways only Modernised lifts incorporating Equality Act (DDA) requirements Local electric water heating. Roof Plant will Comprise Tenants office condensers Future space for tenants DX split units Toilet extract fans AHU fresh air plant Lightning protection roof termination network Fire Alarm and detection system Water storage tanks Existing roof drainage VRF FCU s. On-Floor Plant will Comprise WC ventilation Hot and cold water and drainage services to WCs Fresh air distribution ductwork Office general extract spigots Capped cold water and drainage connections for tenant extension to tea points. Summary Specification 7 Ref /12/JAH/AWB

8 Tenant s distribution boards IT/Telecoms distribution cable tray Security distribution cable tray Fire Alarm and detection system Cat A office lighting. Ground - Common Parts Plant will Comprise BMS head end Trench heating in ground floor atrium/reception area VRF FCU s to lift waiting areas Localised reception heating to reception desks Lighting control head end Main fire alarm panel Fire Alarm and detection system Security CCTV and access control head end by others Refuge alarm panel Disabled alarm panel Disabled WC toilet alarm panel WC, core, stair and lift lobby lighting and small power WC, core, stair and lift lobby fire alarm installation. Staircase Plant will Comprise New electric heating New lighting incorporating emergency light fittings Reconfigured fire alarm layouts to provide L2 layout. Ground Floor Plant will Comprise: Refurbished Transformers Refurbished High voltage switchboard New low voltage switchgear. Summary Specification 8 Ref /12/JAH/AWB