BRUCE MONROE AT PARKVIEW ELEMENTARY SCHOOL MODERNIZATION FINAL SCHEMATIC DESIGN SUBMISSION

Size: px
Start display at page:

Download "BRUCE MONROE AT PARKVIEW ELEMENTARY SCHOOL MODERNIZATION FINAL SCHEMATIC DESIGN SUBMISSION"

Transcription

1 BRUCE MONROE AT PARKVIEW ELEMENTARY SCHOOL MODERNIZATION FINAL SCHEMATIC DESIGN SUBMISSION MARCH 23, 202 submitted to: District of Columbia Public Schools Department of General Services ARCHITECTS

2 TABLE OF CONTENTS TABLE OF CONTENTS A. Executive and Phasing Summaries B. Architectural Narrative C. Engineering and Information Technology Narrative D. Site. Existing Aerial Site Plan 2. Existing Photos -- Exterior 3. Proposed Site Plan 4. Site Improvements E. Building and Programming. Existing Blocking and Stacking 2. Existing Photos -- Interior 3. Proposed Blocking and Stacking F. Building Sections and Elevations. East Elevation 2. South and North Elevations 3. West Elevation 4. Section at Auditorium 5. Section at Welcome Center 6. Section at Entry G. Typical Furniture and Equipment Plan. Classroom 2. Library / Media Center H. Interior Finishes. Dining / Gym / Pre-K and Kindergarten 2. Media Center / Grades -5 / Rest Rooms 3. Auditorium / Welcome Center / Corridor I. Renderings. Exterior Main Entry 2. Interior Welcome Center 3. Classroom 4. Cafeteria 5. Media Center J. Plan-to-Space Comparison K. Engineering Schematic Drawings

3 EXECUTIVE SUMMARY EXECUTIVE SUMMARY Bruce Monroe at Park View Elementary School is among the schools included in the Department of General Services (DGS) FY 202 Phase Schools. These schools - all existing facilities - will be modernized to comply with the DC Public Schools (DCPS) criteria aimed to improve the learning environment, improve student performance, and advance educational outcomes within five years. The modernization of this school will be completed in a 3 phase process. This phasing allows the school to be occupied throughout the modernization process and provides an improved physical environment within the core learning areas at the earliest possible time. Because of the existing conditions at the Bruce Monroe at Park View Elementary School, the work that is to be completed under the Phase portion of the renovation will be supplemental to the typical Phase modernization projects. This Phase work is to be completed during the Summer of 202. This work is to be done under a modified design-build process where the builder is assigned to the project team during the Concept/Schematic Design phase. At the Design Development stage, the builder will develop a GMP at which time the architect s contract will be taken over by the builder from the DGS. PHASING SUMMARY The following is a preliminary outline of the project phasing: Phase : Core Academic Spaces including Classrooms, Corridors, Stairs, Restrooms, and Administrative Areas. New MEP/IT systems for these spaces. Phase 2: Academic Support Spaces including Cafeteria, Auditorium, Gymnasium, and Media Center. Complete ADA accessibility renovations. Phase 3: Remaining MEP/IT elements and outstanding site improvements. As stated in the Master Facilities Plan, the first priority is to improve the classroom learning spaces - the place the children spend most of their time. The Phase Modernization (Summer 202) will seek to provide improved lighting, environmental, acoustic, and technological qualities of the Core Academic Spaces. Where required, non-load bearing walls will be removed to create spaces that comply with the requirements of the Educational Specifications. In an effort to retain all historic elements possible the removal of existing elements will be limited in scope. En suite bathrooms, sinks, and storage areas will be included as required per the Education Specifications. In addition to the Phase modernization effort there are a number of stabilization issues that are to be addressed during this initial phase of construction. These issues have been identified by the school staff and include proper food storage in the Cafeteria, water infiltration, and potential air quality issues. According to the Education Specifications, the planned student capacity for Bruce Monroe at Park View Elementary School will be approximately 450 Pre-school through 5th Grade students. The original portion of this building was originally constructed in 96 with the addition of two wings in 93. The original composition of the school is largely intact however many modern codes (including ADA accessibility) and much of the building systems are beyond their useful life-spans. In addition to the code issues and the building systems, the historic interior finishes and exterior envelope have become covered up with the addition of modern building elements. The goal of this modernization will be to provide a fully modernized educational environment while maintaining the integrity of the historic context. In addition to the modernization of the school, we are proposing a restoration of this unique architectural structure to return it to its original glory. The full school modernization will include: Interior improvements: According to DCPS Five Priority Areas - Lighting, Environmental/Air Quality, Acoustics, Technology, and Furnishings. Re-Programming of Spaces as required: According to the Educational Specifications for 450 students Pre-School through 5th Grades. Building Envelope Restoration and Improvements. ADA Accessibility Site Improvements

4 ARCHITECTURAL NARRATIVE The original portion of the Bruce Monroe at Park View Elementary School was constructed in 96 with two additional academic wings added in 93. This historic architectural structure is built of brick with limestone ornamentation in the way of decorative quoins, window and door trim,and crenellation along the parapet. The 93 addition was built to match the original portion of the building and included educational spaces and spaces that were originally built as separate boy s and girl s gyms. A unique element of this school is the full sized Auditorium with stage that was built along with the 96 construction. Typically Elementary Schools were built with singular large spaces that served as Cafeteria, Gymnasium, and Auditorium. The overall building organization is symmetrical leading to a highly formalized building. An application which is still pending has been filed with the National Register of Historic Places for inclusion of the Bruce Monroe at Park View Elementary School. The design team will work with the DC Historic Preservation Office, the Commission of Fine Arts and all other historic preservation bodies to ensure that all renovation efforts maintain the integrity of this historic structure. The building is situated in the middle of the block so that the front and side setbacks are similar, with the main entrance in the middle of the block facing Warder Street. The overall building site is elevated from the adjacent sidewalk with the site sloping away from Warder Street with all site entries consisting of a series of steps. The main building entrance leads from a paved terrace centered on Warder Street, while the remainder of the site is bordered by a brick and stone retaining wall. This elevated building site poses considerable challenges when considering the requirements of ADA accessibility. The design team proposes a combination of re-grading a portion of the site with the introduction of stone walls and a ramp to provide an ADA accessible entrance at the southeast corner of the building site. The southeast corner of the site is being proposed because this is the portion of the site with the smallest difference in grade between the adjacent public sidewalk and school walkway. It is not feasible to alter the historic Warder Street entrance to the school as would be required to install the ramp. Instead the building entrance facing 6th Street NW is being proposed as the accessible entrance. While this entrance is not the formal main entrance, its prominent location on the site and direct access to the main corridor make this a reasonable ADA accessible entry point. The rear of the site contains a small parking area and a paved area immediately adjacent to the school. The design team is proposing that the parking area be expanded and that a loading area be created adjacent to the new kitchen. The remainder of the paved area at the rear of the building may be revised to include additional play areas once the loading requirement is accommodated. This reconfiguration of the parking and loading areas at the rear of the school will serve to separate the pedestrian/student circulation from the vehicular site access. The building is a split-level configuration with the entrance midway between the Ground and First Floors. In order to achieve the required ADA accessibility, the design team is proposing the introduction of a new elevator adjacent to the existing stairwell so that the any of the floors may be accessed from this entry. This split level design also leads to some confusion upon entering the school s main entrance. It is unclear upon entering where the building administration and security are located. The introduction of a welcome center flanked by the principal s office and the security office to the first floor at the top of the entry stairs will alleviate this confusion. This new welcome center will have an all glass wall and door facing the main entrance providing a visual connection to the reception area and creating a dynamic space upon entering the school. The existing building contains a large centrally located space on the second floor directly above the main entrance. Because of its location adjacent to the peak of the Auditorium roof, this is the only space within the building with both an eastern and a western exposure. This space is currently used in part as a classroom and in part as a larger meeting area. Under the proposed layout this space would become a state of the art Media Center centrally located at the heart of the building, accessible to students and the community. The addition of monitor type skylights would create a dynamic, brightly lit Media Center that would become a focal point for the school and could be used by the larger community. The proposed reorganization of the classrooms would provide groupings of classrooms by grade with the pre-k and Kindergarten classrooms located on the Ground Floor adjacent to the play structures that are appropriate for their specific age groups. The older children would be located on the second floor along with the Computer Lab for their use. This grouping of classrooms by age is conducive to the bi-lingual curriculum employed by this school. The reorganization also places the administrative and common functions of the school at the main floor where they are easily accessible to all portions of the school without disrupting the educational spaces. The existing interior finishes are largely the original plaster walls and ceilings with new fixtures and flooring throughout. The modernized spaces would include the installation of new acoustical ceilings to conceal the MEP components that are currently surface mounted. The existing corridors include marble base and aging VCT flooring. Research into the original building drawings indicates the possibility that terrazzo flooring may be under the VCT flooring in the corridors. Restoring this terrazzo flooring and removing the surface mounted elements would restore the original design to the school public spaces. The renovation of the Bruce Monroe at Park View Elementary School is an opportunity to restore this historic building to its original glory while providing a state of the art environment to the school and the overall community. Some highlights of the proposed renovation include the following: ARCHITECTURAL NARRATIVE An accessible site and building using a combination of a re-graded site, stone walls and ramp, a new elevator and the introduction of H/C lifts at the Cafeteria and Gymnasium. The reconfiguration of the rear of the site to provide additional parking and a dedicated loading area, separating the vehicular and play areas. New age-appropriate play structures located adjacent to the corresponding classrooms. A revised entry to the Cafeteria and Gymnasium with new interior windows linking these spaces to the adjacent Corridors. A new kitchen that is separate from the Cafeteria space with direct access to an exterior loading area. The introduction of a new welcome center at the main entrance to provide a clear path upon entry. A centrally located Media Center with natural light that will become a focal point of the school and can be used by the larger community. Replacement of the exterior doors and windows with modern components that meet DCPS efficiency standards, while retaining the original building elements style. Restoration of exterior building components to the original building materials. Removal of the roof addition to the two first floor offices on either side of the main entry.

5 MECHANICAL, ELECTRICAL, PLUMBING AND TECHNOLOGY SYSTEMS SCHEMATIC DESIGN NARRATIVE INTRODUCTION Allen &Shariff Engineering has been selected to perform the design of the mechanical, electrical, plumbing and technology systems for the modernization of the Bruce Park View Elementary School. The modernization will occur in phases as follows: Phase Classroom Modernization The first phase of the modernizations will focus on the Academic Components of the schools-the classrooms, where students spend the majority of their time. Improvements to the classroom shall be comprised of HVAC modifications/upgrades, interior finishes, lighting and electrical improvements, daylighting, technology enhancements, and FF&E. In addition to the modernization of the classrooms, consisting of new entries, flooring and wall coverings, wayfinding, and ceilings. Only with the proposed base system will the new HVAC be operational at the end of phase one. All alternates require the existing heating and cooling to remain in use for the renovated phase one areas. The spaces would not be able to utilize the new cooling/heating plants until the end of phase three. Phase 2 Support Spaces The second phase of the modernization effort will address support components, which may include bathrooms, art and music rooms, gymnasium, cafeteria, kitchen, media center, and health suite. Phase 3 Base Building System Components The final phase of the modernization will target the school s Systems Components, including - HVAC system (if required based on system chosen), plumbing system and fixtures, electrical system, the building s exterior envelope, including roof and windows, as well as technology system. Under the proposed base system, there will be no HVAC work to be accomplished under this phase. The following is the concept narrative for the mechanical, electrical, plumbing and technology systems for the school in it s fully modernized condition. MECHANICAL SYSTEMS General Mechanical Narrative: The building will be heated and cooled by a variable refrigerant flow (VRF) heat pump system, which will consist of multiple indoor units and outdoor condensing units. The VRF system will allow for maximum flexibility for phasing of the project and maintaining existing systems during the complete renovation schedule, while also providing a premium efficiency system. The distributed load on the roof will help to minimize any structural modifications, and the system will be operational at the end of phase one. The mechanical systems will be designed in accordance with the codes, guides and references listed below and to meet the energy performance requirements of the project. The mechanical systems will be designed and sized based on the design conditions listed below. We have estimated a building cooling load of 275 tons, based on a cooling requirement of one ton per 300 square feet of building area (82,000 gross). The cooling load for the renovated building takes into account energy recovery systems, recently completed fenestration replacement and no additional wall insulation. The existing building consists of a central steam heating plant and individual window A/C units. Ventilation, in the original wing of the building, is provided by a heating-only air handling unit in the basement mechanical room. The built-up AHU is original to the building. Individual ducts lead off of this AHU to the individual classrooms. This is a similar design to Cardozo High School. Per OPEFM, the ductwork was replaced in ASE will investigate reusing this ductwork in the new design. With the exception of the ventilation ductwork, all existing mechanical systems will be removed in their entirety by the end of phase three. The building will be designed with a fully integrated, direct digital control (DDC), energy management system (EMS). The EMS will control and/or monitor all mechanical equipment in order to maintain indoor design conditions during occupied periods. The EMS will also modulate mechanical equipment to maintain unoccupied set points. Control strategies will be implemented via the EMS to minimize the energy consumption of the MEP systems such as static pressure reset in VAV systems and Demand Control Ventilation. Additional HVAC systems will be designed for specialized areas in the school. Supplemental HVAC systems will be provided for areas requiring cooling over a 24-hour period. General exhaust systems will be provided as required by code, and for odor control, in areas such as locker rooms, kitchenettes, garbage rooms, janitor s closets, printing labs, art room, scene shop room and electrical closets (supplemental A/C units will be provided where the transformer load is over 6,000 Btu/h). Code required toilet exhaust systems will be provided for all toilet rooms. Specialized exhaust systems will be provided for fume hoods, kitchen hoods, and dishwasher hoods. Applicable Codes, Guides and References Air Conditioning and Refrigeration Institute (ARI) Air Movement and Control Association, Inc. (AMCA) American National Standards Institute (ANSI) American Society of Heating, Refrigeration and Air Conditioning Engineers, Inc. (ASHRAE) American Society of Mechanical Engineers (ASME) ASME CSD Controls & Safety Devices for Automatically Fired Boilers American Society of Testing and Materials (ASTM) Standards Associated Air Balance Council (AABC) Standards Environmental Protection Agency (EPA) Regulations ENGINEERING AND INFORMATION TECHNOLOGY NARRATIVE

6 2006 International Building Code 2009 International Mechanical Code (upgrade code to be consistent with LEED/ASHRAE) 2006 International Energy Conservation Code National Fire Protection Association (NFPA) Occupational Safety and Health Administration (OSHA) Sheet Metal and Air Conditioning Contractors National Association (SMACNA) Underwriters Laboratories, Inc. (UL) 2006 District of Columbia Public Schools Design Guidelines 2008 DCMR 2 RFP including addendums Educational Specifications HVAC Design Conditions: The design parameters will be in accordance with the RFP and Educational Specifications for Bruce- Monroe at Park View Elementary School. Outdoor Conditions: Summer: 94 F DB Winter: 76 F WB 6 F DB Indoor Conditions: The HVAC system for the classrooms will be designed to provide 75 F DB and 50% RH (plus or minus 0%) during summer months and 70 F DB, during winter in all areas that require air conditioning. HVAC background noise level to attain RC(N) Mark II level of 37. Acoustics shall comply with RFP requirements. Base System: Variable Refrigerant Flow (VRF) Heat Pump Cooling/Heating System with Dedicated Outside Air Units Cooling/Heating Equipment: Variable refrigerant flow heat pumps with multiple fan-coil units tied to each outdoor heat pump, and dedicated outside air units (DOAS) with energy recovery Piping System: Refrigerant piping between indoor and outdoor units with branch controllers to regulate flow Air Distribution: DX fan-coil units tied to VRF system for classrooms and offices, Split-system AHUs for larger spaces Ventilation: Through variable air volume DOAS air-handling units with energy recovery and shutoff VAV boxes for each zone The classroom and office areas cooling/heating load will be satisfied by outdoor, air-cooled heat pump units (approximately sixteen tons each) providing refrigerant for simultaneous heating and cooling to the indoor fan-coil units. The refrigerant for the heat pumps will be R-40a. Air distribution for the building will be accomplished using DX fan coil units. One unit will be provided for each classroom. Units may be located in closets adjacent to the classroom or in the ceiling with ductless ceiling cassette units. Smaller spaces (offices) with similar load characteristics may be served from one unit and multiple units may be utilized to serve larger areas. Cooling/heating for the larger areas such as the gym, cafeteria, and auditorium will be satisfied by split systems comprising of DX AHUs mated to air-cooled heat pump units. The refrigerant for the heat pumps will be R-40a. Air distribution for these spaces will be ducted to the AHUs. One or more units will be provided for each space. Units may be located in closets adjacent to the space or in the ceiling. Ventilation for the building will be accomplished utilizing air-cooled DOAS units. The outside air will be delivered to each space as required through demand control ventilation. Demand control ventilation will be accomplished through CO2 sensors in the spaces tied to shutoff VAV boxes on the ventilation supply duct. The ventilation air will be routed through the chases in the walls between the classrooms and the corridors. Return and relief air will be required to be ducted back to unit for energy recovery purposes. If a DOAS unit can be placed in the main mechanical room, utilization of the existing ventilation ducts in the tunnel for return/relief air will be considered. For units on the roof, it is anticipated that the new horizontal duct runs would be located in the attic and connect to risers located in the existing shaft walls. It is anticipated that three to four units will be required. One or two will be required for the original wing of the building. The original wing comprises classrooms, offices, and the auditorium. The unit(s) will be located on the roof and/or in the main mechanical room. Two additional units will be required for the cafeteria and gym wings, and one unit will be located on the roof of each wing. The cafeteria kitchen hood will be exhausted through a dedicated exhaust fan with variable speed drive. This will be interlocked with a direct-fired makeup air unit. ELECTRICAL SYSTEMS General Electrical Narrative: The proposed electrical system shall consist of incoming secondary services, lighting, power, and fire alarm systems. These systems shall comply with the latest applicable codes and program requirements of the modernization project for the school. All existing electrical systems will be removed in their entirety. Applicable Codes, Guides and References The electrical system will comply with the latest editions including amendments and revision of the following codes and regulations NFPA 70, National Electrical Code (NEC) ENGINEERING AND INFORMATION TECHNOLOGY NARRATIVE

7 2005 NFPA 72, National Fire Alarm Code 2006 NFPA 0, Life Safety Code 2006 International Building Code 2006 International Energy Code Conservation National Electrical Manufacturers Associations (NEMA) Institute of Electrical and Electronics Engineers (IEEE) Electronic Industries Application (EIA) Insulated Power Cable Engineers Association (IPCEA) Certified Ballast Manufacturers Association (CBM) American National Standards Institute (ANSI) American Society of Mechanical Engineers (ASME) American Concrete Institute (ACI) Illuminating Engineering Society of North America (IES) ANSI/ASME Elevators and Escalators Safety Code A7. EPA Regulations 2006 District of Columbia Public Schools Design Guidelines 2008 District of Columbia Public Schools Design Guidelines LEED for Schools Review 2008 DCMR 2 Electrical Service Under any mechanical alternates one new 3,000A, 208Y/20V, 3-phase, 4 wire, electric service will be required. This service shall be derived from a PEPCO transformer. Coordination with PEPCO will determine if the existing transformer has enough power for the new electric service. If a new transformer is required, a new vault inside the school property will be required to house the PEPCO transformer. The utility transformer will feed a new 3,000A rated switchboard, with utility metering cabinets, and distribution sections via a new6-way underground duct bank. Power Distribution System A new 3,000A switchboard will be located in boiler room at the location of the existing incoming electric service. This switchboard will feed two,200a Main Distribution Panelboards, MDP-, and MDP-2. This switchboard will have a pull section for incoming service lateral, Current Transformer section, Emergency Tap section, Main Breaker section, and two distribution sections. The building electric loads will be divided into two nearly equal loads. The,200A Main Distribution Panel MDP- will feed all lighting, eneral power, computer receptacles, kitchen, cafeteria, and low voltage miscellaneous loads via down stream panelboards inside the ground floor electric rooms. The,200A Main Distribution Panel MDP-2 will feed all mechanical loads via down stream panelboards inside the ground floor electric rooms. Large mechanical equipment such as chillers, DOAS units, and cooling towers, based on different alternates, will be feed from the switchboard directly. The intent is to have the main electric service and switchboard at the location of the existing boiler room. Ground floor in the building will have three electric rooms to house the panelboards which will feed lighting, computers, general receptacles, mechanical loads, emergency life safety lighting, standby loads such as IT room loads, elevator loads. In addition, these rooms will house Fire Alarm Supply Panel (FASP), and Lighting Control Panel (LCP). Emergency and stand by power distribution systems, as specified under Emergency Power Distribution System section, will be fed from the switchboard directly. The feeder voltage drop will be less than 2% and the branch circuit voltage drop will be less than 3%. Emergency Power Distribution System An emergency power distribution system will be provided to serve the emergency electrical loads throughout the building. A 250 KW gas fired standby generator will feed for safety loads such as emergency lights and the fire alarm system, and legally required loads such as the elevator and fire pump, and optional loads such as IT room loads, walk in freezer and refrigerator, security system, and any other loads per Owner s direction. The generator will be in the location of the existing boiler room. A dedicated room near the generator will house the emergency electric power distribution system, which includes 208V life safety and standby panels, disconnect switches, and automatic transfer switches. own stream panelboards will be in floor electric rooms to feed the local loads. The feeder voltage drop will be less than 2% and the branch circuit voltage drop will be less than 3%. DC Rectifier Power System (DCPS) Two 50A, 208V special receptacles will be provided in each IT room for the DC power system provided by the school. Wiring Methods ENGINEERING AND INFORMATION TECHNOLOGY NARRATIVE Incoming utility service conductors shall be installed in 4 PVC ducts encased in a concrete ductbank from the utility source to the switchboard. Interior Distribution feeder conductors shall be installed in Electrical Metallic Tubing (EMT). Interior Branch circuits installed in exposed dry areas shall be installed in EMT. Exterior Branch circuits exposed to the weather shall be installed in Intermediate Metal Conduit (IMC). Interior Branch circuits installed concealed in ceiling or wall spaces, shall generally be EMT. Metal-Clad or MC cable with an insulated green grounding conductor will be used for branch circuits 30A or less. All fire alarm system wiring shall be required to be installed in conduit and subject to the constraints of

8 ENGINEERING AND INFORMATION TECHNOLOGY NARRATIVE he installation applications noted above. Equipment Connections Disconnect switches will be provided for all electrical connections to mechanical equipment. Power connections will be provided for technology equipment. Lighting: The lighting systems for interior and exterior spaces will be energy efficient and will comply with IES recommendations, NEC and the OPEFM Educational Program. Fluorescent lighting will be provided in most interior spaces as follows: Classrooms, labs - linear direct/indirect suspended fixtures. Offices - 2 x 4 Recessed high efficient parabolic fixtures. Kitchen areas - 2 x 4 recessed fluorescent fixtures for clean area. Gymnasium - 2 x 4 high bay fluorescent fixture with (8) 32W lamps. General music room with high ceiling - 2 x 4 high bay fluorescent fixture with (4) 32W lamps or suspended linear fixtures, and recessed can combinations with dimming system. Auditorium and stage (Multi Purpose room) Electrical design will include power and lighting control details for auditorium and Stage lighting designed by the architect s sub consultant. Metal halide fixtures will be used for exterior parking lot lighting. Compact fluorescent fixture will be used for exterior wall sconces, and dimmable fluorescent fixture will be used where dimming is required. Light Design Parameters: Classrooms 50 f.c. at 30 above finished floor Art and computer Labs 50 f.c. at 30 above finished floor Corridor/lobby 0 f.c. at 0 above finished floor Storage Rooms 5 f.c. at 30 above finished floor Offices Gymnasium General music room 50 f.c. at 30 above finished floor 50 f.c. at 0 above finished floor 50 f.c. at 0 above finished floor Emergency Egress Lights Emergency egress lights will be provided in all corridors, main egress paths, multi-purpose rooms, gymnasium, reading rooms, etc., in order to comply with ADA, NFPA, IBC and NEC codes. Exit lights will be LED type. All emergency and exit lighting will be connected to the emergency generator system. Lighting Control System Lighting control devices will be local one way, three way or four way switches and occupancy sensors to meet the energy code requirements. For larger spaces like the gymnasium, multi purpose room etc., low voltage relays inside the lighting control panel(s) and time clock or EMS interface will schedule the lights and shut them off per schedule. Exterior lighting will control via photocell/time clock part of the lighting control panel(s). Corridor lighting will control by time clock, contactor combination. There will be two lighting control panels with Min. 42 low voltage relays to control lights in gymnasium, multi purpose room, media center, cafeteria, corridors, and exterior lighting. Multi switching will be required for classrooms, labs, multi purpose rooms, gymnasium, media center, and any large areas where the light controls by relays for automatic lighting shut down system to meet IECC requirements. Receptacles Each group of two computers in classrooms will have one quad receptacle, and each two quad receptacles will have a dedicated circuit. Maximum four receptacles, combination of computer receptacle and general receptacle will have a dedicated circuit. Wire size to be #2 for circuit length 70 or less, #0 for circuit length between 70 to 0, and #8 with junction box to reduce the wire size to #2, for proper connection to the receptacles will be designed, for circuit longer than 0. Dedicated receptacles will be specified per requirements. Day acre will have tamper resistance receptacle per IBC requirements. Fire Alarm The Fire Alarm and Detection system will be a fully addressable, non-interfering, multiplex system with an auto-dialer and/or Digital Alarm Communicator Transmitter (or DACT), to transmit alarms to the designated central station. All devices including; manual stations, smoke and heat detectors, duct smoke detectors, flow alarms and tamper switches shall be completely addressable. Manual Stations shall be provides with audible alarm stopper covers to dissuade false alarm tripping. Fire Alarm System Wiring: Initiating circuits will be Class A, Style D; signaling line circuits will be Class A, Style 2; and notification appliance circuits will be Class A, Style Z. In each electric room, there will be one fire alarm power supply panel, and one terminal cabinet. Building Grounding System A complete grounding system for the entire building, from service entrances to low voltage panel board, will be provided in compliance with the NEC.

9 PLUMBING SYSTEMS General Plumbing Narrative: Plumbing for this project includes sanitary systems, domestic water systems, storm water systems, natural gas systems, and plumbing fixtures and equipment. General plumbing system testing and warranties shall be included in the contract specifications. The entire plumbing system shall be designed in accordance with the latest applicable local codes and regulations. The existing plumbing systems, piping, and equipment will be demolished in their entirety. Applicable Codes, Guides and References American National Standards Institute American Society of Mechanical Engineers (ASME) American Society of Testing and Materials (ASTM) Standards 2006 International Building Code 2006 International Plumbing Code 2006 International Fire Code 2006 International Fuel Gas Code District of Columbia Construction Code Supplement (latest edition) District of Columbia Public Schools Design Guidelines (2008 Ed.) District of Columbia Water and Sewer Authority (DC WASA) District of Columbia Department of Health Environmental Protection Agency (EPA) Regulations National Fire Protection Association (NFPA) Occupational Safety and Health Administration (OSHA) Underwriters Laboratories, Inc. (UL) Plumbing and Drainage Institute (PDI) Sanitary Systems The existing building has multiple combined sanitary and storm sewer laterals including: two eight inch combined sewer laterals at the East and one eight inch combined sewer lateral at the South of the building which discharge into the existing public sewers. As the existing combined sanitary and storm laterals are nearly eighty to one hundred years old, all new sanitary laterals shall be provided. It is anticipated that three new sanitary laterals are expected, with two laterals located on the East and one at the South of the building preferably in the same location of the existing laterals. It is anticipated that each laterals shall be either four or six inches depending on the final fixture counts and sanitary demand. Grease waste from all grease-laden fixtures and all three compartment sinks in the food service area shall be piped to an exterior below grade,500-gallon grease interceptor, located in an area that is convenient for cleaning preferably in the West parking lot adjacent to the existing cafeteria per DCPS Design Guidelines. All plumbing fixtures, floor drains, and equipment shall be piped for gravity flow to the public sanitary sewer system. Interior below grade piping within the structure shall be service weight, hub and spigot cast-iron with cast iron fittings and compression type neoprene gaskets or lead and oakum joints at contractor option. Interior sanitary, waste and vent piping above the lowest level within the structure shall be service weight, no-hub cast iron with cast iron heavy-duty fittings and neoprene gaskets with stainless steel clamp and shield assemblies or DWV copper at contractor option. Elevator sump pumps shall be provided in each elevator pit and shall be tied-in to the sanitary system if required. Domestic Water Systems ENGINEERING AND INFORMATION TECHNOLOGY NARRATIVE A fire flow test with the available static and residual pressure from the existing public water main shall be required in determining if a fire pump, with possibly a water storage tank system, and domestic water booster pump will be required for this building. The existing service shall be removed and replaced with new four-inch domestic water service depending on final fixture counts and domestic water demands. Domestic water service shall include a new fourinch double check valve backflow preventer assembly and a duplex-domestic booster system with hydro-pneumatic tank as required. If required, booster pump package shall consist of duplex, vertical close-coupled, centrifugal, cast iron, bronze mounted pumps with all required piping and controls. The package shall include a hydro-pneumatic expansion tank. A minimum water pressure of thirty PSI shall be provided at the highest most remote fixture. The incoming water piping material below grade shall be either type K copper or ductile iron. All interior above grade piping material shall be type L copper. All interior cold, hot, and hot water recirculation piping shall be insulated in accordance with applicable standards. All piping shall be run within concealed spaces or above the ceiling. Water piping to island sinks shall be fed from the floor below or in an accessible trench in the floor with a removable cover for access. Where subject to freezing, piping shall be heat traced and insulated. Domestic hot water shall be supplied from two new high efficiency natural gas-fired, 200-gallon storage type, water heaters. Estimated gas input for each water heater shall be 300 CFH with a recovery rate of 40 GPH at 00 F. Hot water calculation shall be based on District of Columbia Public Schools design guideline maximum consumption rate of 0.6 gallon per student per hour. Domestic hot water shall be heated to and stored at a temperature of not less than 40 F. 0 F. hot water shall be supplied to all plumbing fixtures and equipment via piping utilities tunnels with vertical riser within the building. Public hand washing lavatories and sinks shall be supplied with a point-of-use mixing valve complying with ASSE070. Food service equipment requiring higher temperature water shall be provided with 40 F.

10 Hot water recirculation systems shall be provided to maintain a temperature drop of not more than 5 F. for both temperature systems. The recirculation system shall include a pre-packaged mixing valve and dual recirculation pump system pre-assembled in a cabinet for installation. Refer to LEED Construction Option at the end of this narrative for rainwater harvesting, treatment and reuse system. System may be used to flush water closets and urinals. Refer to LEED Construction Option at the end of this narrative for Solar Water Heating for Kitchen. System may be used for hot water demand for school cafeteria kitchen. Storm Water Systems Roof drainage shall be provided by exterior roof drains with internal rain leaders and/or exterior gutters with downspouts. Storm water will be collected and piped by gravity to the site storm water sewer laterals. An emergency secondary roof drainage system will also be provided by means of exterior parapet scuppers and/or emergency exterior overflow roof drains with internal emergency overflow rain leaders. Internal emergency overflow drain piping shall extend through building exterior wall and spill to a splash block eighteen inches above grade. Based on roof square footage, two eight or three twelve inch storm water laterals are anticipated. New storm water rain leaders shall be located in the location of the existing leaders were possible. Interior below grade piping shall be hub and spigot cast-iron, and above grade piping shall be no-hub cast-iron with heavy-duty fittings. All horizontal roof drainage and secondary roof drainage piping and roof drain bodies shall be insulated. Refer to LEED Construction Option at the end of this narrative for rainwater harvesting, treatment and reuse system. System may be used to flush water closets and urinals. Natural Gas Systems Natural gas distribution system will be designed for domestic water heating, food service equipment and the emergency generator. The local gas company shall determine if the existing service piping and meter can handle the new building demand capacity. It is anticipated that the existing gas service piping, gas meter and regulator shall remain in service. However, a new separate natural gas service, meter and pressure regulator will need to be installed next to the existing gas meter at exterior face of the building to serve the new natural gas emergency generator. This meter shall connect to the existing highpressure gas service before the gas meter servicing the building. A gas pressure regulator shall be provided for each piece of equipment, and gas pressure regulator vents shall be provided as required. Gas supply in the cafeteria kitchen equipment shall be interlocked with the Ansul fire protection system and mechanical fume hood exhaust fan as required. The piping materials will be selected based on longevity. All interior gas piping shall be Schedule 40 black steel with welded fittings. Plumbing Fixtures and Equipment Fixtures shall include water closets, urinals, lavatories, showers, drinking fountains, and sinks. ADA fixtures and trim shall be provided as required. Water conserving fixtures shall be installed throughout the facility. All water closets shall be wall hung, white vitreous china, and have a.28 gallon per flush valves or.6 /. gallon per flush dual flush valves (average of.28 gallon per flush per LEED calculation). All urinals shall be wall hung and white vitreous china and shall have an ultra low water consumption flush valve of either a pint gallon per flush or half gallon per flush. All lavatories shall have push button metering faucets with a half gallon per minute flow rates. Sinks will be made of 8gauge,302 or 304 stainless steel. All shop and art sinks shall have gooseneck style faucets to facilitate cleaning. Showers shall be designed with pressure-balanced low flow heads. Low flow shower head flow rate shall be one and a half gallon per minute and shall be control with a metering system. Drinking fountains or electric water coolers will be provided throughout the facility as required per code. A minimum of one mop/service sink per floor will be designed in the facility as required. Recessed box type exterior wall hydrants shall be provided no more than one hundred feet apart around the perimeter of the building. Wall hydrants shall be freeze proof and provided with individual shut-off valves. Hose bibs will be provided in each large restroom, locker room, and mechanical room and shall be feed from the domestic cold water piping as required. Floor drains shall be required in all toilet rooms, janitor s closets, shower areas, food service preparation areas, and mechanical/plumbing rooms. All drains not receiving a constant discharge from equipment shall have trap primer connections. Fire Protection Systems ENGINEERING AND INFORMATION TECHNOLOGY NARRATIVE The installation of the fire protection system shall be determined by the DCPS owner s representative or by DCRA Fire Marshall. The entire new facility shall be protected in accordance with NFPA and designed with a complete automatic wet sprinkler system, utilizing the available water pressure and supply from the public mains and a five hundred gallon per minute fire pump. A new six-inch fire service will be provided. The sixinch fire service will be provided with an approved double check detector assembly. A water storage system may be required as a result of insufficient water flow and pressure from the existing street main. Estimated required storage tank sized shall be based on supplying the system demand of one five hundred gallon per minute for thirty minutes; therefore, a fifteen thousand gallon tank will be required. The fifteen thousand gallon fire protection water storage tank shall be installed underground and a five hundred gallon per minute vertical turbine fire pump shall be located above the tank in a fire pump house. A five hundred gallon per minute horizontal split case fire pump shall be used in lieu of the five hundred vertical turbine pump if approved by DCRA. If the results of the fire flow test indicate adequate flow and pressure form the existing street main, the fire pump will be located inside the building. Sprinkler risers will be designed in each egress stairwell as required. All sprinkler risers will be interconnected at the ground or basement level and shall be provided with control valves with tamper switches and flow alarm switches. A sprinkler system control valve with tamper switch, flow alarm switch

11 ENGINEERING AND INFORMATION TECHNOLOGY NARRATIVE and check valve will be provided at each connection to the sprinkler riser. Sprinklers shall be quick response type and located in the center of ceiling tiles. Areas subject to freezing will be protected with dry sprinkler systems or dry pendent type sprinkler heads. A water curtain with rated sprinklers shall be provided as required by NFPA 3 for enclosed courtyards and atrium areas. Sprinklers systems at these locations shall be fed from an independent sprinkler control valve assembly and all atrium systems shall be interlocked with the fire alarm and mechanical smoke control system as required by code. Elevator shafts shall be provide with fire sprinklers in accordance with NFPA 3. A double-interlock preaction system and/or FM200 system shall be provided as required by the owner in rooms subject to severe equipment damage or property loss in the event of a sprinkler system activation. A new siamese connection will provided with two 2-/2 connections at the address side of the building, within one hundred feet of a fire hydrant. A new fire pump test manifold will be provided in order to facilitate fire pump testing. The piping materials will be selected based on longevity. Material to be used shall be Schedule 40 standard weight black steel pipe. Dry pipe systems shall use Schedule 40 standard weight galvanized steel pipe. SUSTAINABLE SYSTEMS OPTIONS Rainwater Harvesting System A rainwater harvesting, treatment and reuse system shall be designed to capture and reuse rainwater collected from available roof surfaces. Rainwater shall be collected, pre-filtered, stored, filtered, treated, and used for flushing water closets and urinals and/or the landscaping irrigation water supply. The system shall include a field fabricated cistern of between twenty and thirty thousand gallons located within the subbasement or basement, multiple storm water pre-filters, duplex sump pumps within cistern, dual filtration housings, a UV treatment system, a break tank, a duplex booster pump package with a dye injection system, and all necessary controls and valves. The cistern and storm water pre-filters shall have an overflow drain to the city storm water main. A building cold-water bypass connection, with a reduced pressure backflow preventer and a sub-meter, shall be provided in the event that the cistern does not have enough rainwater to meet the building demand. Solar Water Heating for Kitchen A solar water heating system shall be designed and installed to handle the complete hot water system demand for the school cafeteria kitchen. The system shall include multiple solar panel or multiple vacuum tube collector kits with roof mounting hardware, copper or stainless steel pipe, solar panel temperature sensors, expansion tank, solar storage tank with temperature sensor, solar control unit, fast air vent, air separator, pressure relief valve and pressure gauge, pumping station and system fill manifold. TECHNOLOGY SYSTEMS General Technology Narrative: The proposed technology system shall consist of incoming data, phone, and cable services, and communication, security, audio visual, sound, and intercommunication and program systems. These systems shall comply with the latest applicable codes and program requirements of the modernization project for the school. All existing technology systems will be removed in their entirety. Communication Systems Communications systems shall include the infrastructure to support voice and data communications within the building and connectivity to available communications service providers. This infrastructure shall include communication equipment spaces, cabling pathways, and cabling within the building. This infrastructure will be designed utilizing the current and accepted industry standards, as well as input from the end-user. The design shall accommodate active equipment to be specified and provided by others. A dedicated Communications space in ground floor will be provided as demarcation to support the workspaces within the building. A dedicated Min. 9-0 by 8-6 at the ground floor, near demarcation room, should be considered for Main Distribution Frame (MDF), and two more dedicated 9-0 by 8-6 on ground floor northeast, and northwest wing, should be considered for Intermediate Distribution Frame (IDF). Horizontal cabling from outlet locations will be routed to these rooms via designated pathways for termination. Floor plan details and wall elevations will be developed for this space to reflect the location of items such as equipment, racks, termination fields, cable tray, and grounding systems. The design will provide building communications (voice and data) service access from the outside plant duct bank into the Communications space. Designated pathways (using conduits, J-hooks and/or cable tray) will be provided to distribute horizontal cabling from the communications room to the Work Area Outlets (WAO s). Fiber optic and copper cabling will be provided to the Communications space from the duct bank to provide connection to the customer premise systems. This entrance cabling will also support security system (CCTV and access control) interfaces within and around the building perimeter. Horizontal distribution to workspace outlets will be designed to comply with current industry standards and enduser requirements. A dedicated grounding system will be provided to allow compliant grounding of communications equipment per EIA/TIA 607 and NEC standards. One telephone drop will be in all classrooms and learning areas, offices, teacher prep rooms, conference rooms and workrooms, to provide internal and external communications. The system shall accommodate voice mail and have analog lines for faxes, modems, and security system. The data drops for each independent computers and other electronic equipment shall communicate over a shared medium. Each classroom shall have a minimum of five data drops with RJ-45 jacks for student

12 computers and one data drop with RJ-45 jack for the teacher station computer, and one drop for printer. A wireless system will be provided in the corridors. Network Electronics Network switches, Hubs, Routers, Servers, etc., are furnished and installed by Owner s representative (OCTO). Security Systems Security systems will be comprised of IP Based CCTV Cameras, access control components and intrusion detection, and will have local monitoring capabilities, and be interfaced with remote monitoring provided by an independent security contractor. The building perimeter will incorporate surveillance cameras to allow central monitoring of all activity immediately surrounding the building as well as the adjacent streetscape. Points of ingress and egress will be equipped with cameras allowing local monitoring of activity/traffic. Additional cameras may be added, as the program develops, to provide monitoring of additional areas as designated by the end-user. Motion detectors will be provided to provide intrusion detection in corridors and large spaces. computer room, and special education rooms. ENGINEERING AND INFORMATION TECHNOLOGY NARRATIVE Also, a sound system will be provided for events in and around the gym. This system will consist of components, to include microphone jacks, speakers, and cabling, to provide adequate sound distribution throughout these areas. Individual controls will be provided in each space/zone. Intercommunications and Program Systems (Paging and Clock System) A school wide central processor controlled public address and clock system will be provided. Specific requirements, as provided by the end-user, shall include a building-wide system capable of providing announcements and paging, as well as music. This system should be provided as an overhead paging system, with tie in capabilities to the facility phone system. This system would be controlled locally within the admin area. A fully programmable Master Clock system with automatic corrections for daylight savings and leap year will be proivded. The system shall have automatic and manual correction of all slave Clocks. Clocks shall be provided in all corridors, classrooms, cafeteria, Conference and Meeting Rooms, and other spaces where students or faculty congregate. Proximity card readers and required door hardware/accessories will be provided to control all exterior doors and interior doors as need is identified. Monitoring of facility CCTV, access control status, and a panic button, will be provided at the main office and at any transaction points. Audio Visual Systems A television signal will be provided from a private CATV service provider and distributed to TV outlets located in areas designated by the end-user, such as classrooms, art lab room, computer lab, and so on, to satisfy the Education Specification. Consideration should be given to providing digital announcement boards to identify and locate events being held throughout the building. These displays would be located at the main entrance points, lounge areas, and other high traffic areas. Mobile Projector on cart, and screen for all pre school kindergarten classrooms, to 5 classrooms, special education rooms, general music rooms and art lab rooms will be provided. Ceiling mounted digital projector or digital white board will be provided in computer lab. Conference/meeting rooms will be provided with plasma displays or projection screens and ceiling projectors per OPEFM request. Special AV Requirements: It should be noted that all audiovisual sound systems will be designed to provide ADAcompliantassisted listening in all assembly spaces. Sound Systems Local sound systems to be used for presentations or lectures will be provided. A typical system would consist of ceiling mounted speakers, a local amplifier, and input capability from microphones and AV devices (projector, laptop, VCR, CD/DVD player, TV set) will be designed for all classrooms, art lab room,

13 EXISTING AERIAL SITE PLAN 6TH STREET NW PEDESTRIAN ACCESS School access to existing alley leads students through vehicular path CHAIN LINK ENCLOSED PARKING Limited number of parking spaces. No designate loading area. OTIS PLACE NW STREET VIEW NEWTON PLACE NW ALLEY ACCESS Poor visibility to main roadway for joint vehicular and pedestrian traffic FLAT ROOF Areas of ponding water. Repair or replacement needed SCHOOL BUILDING Approximately 85,000 sq. ft. SECONDARY ENTRY SECONDARY ENTRY EXISTING PLAY STRUCTURE WARDER STREET NW MAIN ENTRY No ADA accessible entry

14 EXISTING PHOTOS - EXTERIOR ACCESSIBLE ENTRANCE Inaccessible raised entrance from street level HISTORIC MAIN ENTRY To be restored to original condition BUILDING EXTERIOR Exposed piping, electrical conduit and window A/C units to be removed REAR PAVED AREA Existing conflict between vehicular and pedestrian traffic PARKING Damaged paving and inadequate parking ROOF Condition and remaining life span of roof to be determined

15 PROPOSED SITE PLAN 6TH STREET NW ADDITIONAL PARKING With kitchen loading area and secured with new fencing IMPROVED PAVED AREA Varied materials and play graphics, separation between vehicular service & student play area. ADDITIONAL PLAY AREAS Sized to accommodate 3 distinct age group play structures NEWTON PLACE NW OTIS PLACE NW NEW STAIR Provides pedestrian access from Improved Play Area to sidewalk ADDITIONAL PLAY AREAS Sized to accommodate 3 distinct age group play structures NEW ADA RAMP Accessible ramp & sloped walk WARDER STREET NW ENTRY POINT

16 SITE IMPROVEMENTS PLAY AREA SITE FENCING PLAY STRUCTURE SITE ACCESSIBLE PATH RUBBERIZED OR PERVIOUS PAVINGS LANDSCAPING / STORMWATER MANAGEMENT IMPROVED PARKING / SHADE AREAS BICYCLE RACKS

17 EXISTING BLOCKING AND STACKING Stage T. LEGEND Administration/Health Health Suite Multi-Purpose / Cafeteria Physical Education Coach Office Auditorium Physical Education Storage Stor. Girls Auditorium Boys Stor. Cafeteria Pre-School/Pre-K Kindergarten Classroom -5 Pre-K Pre-K Computer Lab Media Center Stor. Music/Art Other Core Academic Areas Special Ed Pre-School S. T. T. Stor. Pre-School Office S. Pre-K S. T. Pre-K Stor. Teacher Support/Workroom Restrooms Building Support Unassigned EXISTING GROUND FLOOR PLAN

18 EXISTING BLOCKING AND STACKING Teacher s Workroom LEGEND st Grade st Grade Music Room Art Room 2nd Grade Administration/Health Auditorium Physical Education T. Teacher Support Toilet Upper Auditorium 2nd Grade Cafeteria Pre-School/Pre-K Kindergarten Classroom -5 Kindergarten Storage Computer Lab Principal Office Parent Resource st Grade st Grade Toilet Computer Lab Media Center Music/Art Other Core Academic Areas Special Ed Teacher Support/Workroom Admin Kindergarten Kindergarten Kindergarten Restrooms Building Support Unassigned EXISTING FIRST FLOOR PLAN

19 EXISTING BLOCKING AND STACKING LEGEND Special Ed 3rd Grade 3rd Grade Library Office 5th Grade Administration/Health Auditorium Physical Education Cafeteria Special Ed Toilet 5th Grade Pre-School/Pre-K Kindergarten 3rd Grade 3rd Grade Special Ed 4th Grade Toilet Classroom -5 Computer Lab Media Center Storage T. Multipurpose Music/Art Other Core Academic Areas Special Ed Teacher Support/Workroom 4th Grade 4th Grade 5th Grade 5th Grade Restrooms Building Support Unassigned EXISTING SECOND FLOOR PLAN

20 EXISTING PHOTOS - INTERIOR MAIN ENTRY No clear indication where the administrative area is located and no obvious security presence GYM/CAFETERIA ENTRY Narrow entry stair with no visual link to space CAFETERIA No existing kitchen separate from cafeteria MULTI-PURPOSE AREA Location of inefficient under utilized space. TOILET FACILITIES Non-ADA, non-code compliant fixtures. Outdated, exposed plumbing. INTERIOR FINISH Exposed conduit and piping AUDITORIUM Exposed HVAC elements

21 PROPOSED BLOCKING AND STACKING Dry Storage Kitchen Multi-Purpose / Cafeteria Stage Physical Education Supply / Receive I.T. LEGEND Administration/Health Auditorium Physical Education Freezer / Cooler Toilet Food Service Office Electrical Room M.E.R. Auditorium M.E.R. Engineer s Office P.E. Office Cafeteria Pre-School/Pre-K Kindergarten Classroom -5 Chair and Table Storage Pre-K Pre-K Book Storage Computer Lab Media Center Music/Art Other Core Academic Areas Special Ed Head End S. Teacher Support/Workroom Pre-K S. Pre-K Pre-K Pre-K Restrooms Building Support Unassigned Teacher s Work Room Before and After Care PROPOSED GROUND FLOOR PLAN

22 PROPOSED BLOCKING AND STACKING Resource Rooms Speech Room Student Services Offices st Grade st Grade st Grade I.T. Resource Class LEGEND Administration/Health Auditorium Boys Boys Physical Education Kindergarten Upper Auditorium (Open to Below) Resource Class Cafeteria Pre-School/Pre-K Kindergarten Girls Art Music Head End Administrative Work Area Welcome Center Parent Resource Kindergarten Kindergarten Girls Classroom -5 Computer Lab Media Center Music/Art Other Core Academic Areas Special Ed Data Couns. Lounge Records Conf. Kindergarten Kindergarten Mail Teacher Support/Workroom Restrooms Building Support Unassigned Office Exam Cots Principal PROPOSED FIRST FLOOR PLAN

23 PROPOSED BLOCKING AND STACKING 2nd Grade 2nd Grade 2nd Grade Computer Lab 5th Grade 5th Grade LEGEND Administration/Health Auditorium Boys Boys Physical Education Cafeteria 2nd Grade 5th Grade Pre-School/Pre-K Kindergarten Classroom -5 Girls 3rd Grade 3rd Grade Office 4th Grade 4th Grade Girls Computer Lab Media Center Music/Art Media Center Other Core Academic Areas Special Ed Work Teacher Support/Workroom 3rd Grade 3rd Grade 4th Grade 4th Grade Restrooms Building Support Unassigned PROPOSED SECOND FLOOR PLAN

24 EXISTING ELEVATION SIDE ENTRY ROOFS Restoration of original flat roof at either side of main entry. EXISTING MASONRY Clean and repoint stone and brick as required - typical throughout MEP ELEMENTS Existing piping and conduit to be removed and concealed within the building - typical throughout EXISTING WINDOWS Replace existing windows with new low-e windows per DCPS guidelines and historic photos, typical throughout. EXISTING STONE Clean existing stone and repoint as necessary - typical throughout EXISTING SECURITY GRILLE Replace existing metal grille and windows with new security glazing at lower two floors, per DCPS guidelines, typical throughout. EXISTING EXTERIOR DOORS Replace existing metal doors with new paneled doors per DCPS guidelines and historic photographs, typical throughout. ELECTRICAL Replace existing exterior lighting and conceal conduit - typical throughout EAST ELEVATION

25 EXISTING ELEVATION EXISTING STONE Clean existing stone and repoint as necessary - typical throughout EXISTING SECURITY GRILLE Replace existing metal grille and windows with new security glazing at lower two floors, per DCPS guidelines, typical throughout EXISTING WINDOWS Replace existing windows with new low-e windows per DCPS guidelines and historic photos, typical throughout. EXISTING MASONRY Clean and repoint stone and bricks as required - typical throughout ROOF DRAINAGE Replace existing downspouts with new metal downspouts to match existing metal flashing - typical throughout EXISTING EXTERIOR DOORS Replace existing metal doors with new paneled doors per DCPS guidelines and historic photographs, typical throughout. SECURITY Replace security cameras and conceal conduit - typical throughout HVAC Replace existing window units with new central system - typical throughout SOUTH AND NORTH ELEVATIONS

26 EXISTING ELEVATION EXISTING STONE Replace damaged existing stone as required - typical throughout EXISTING WINDOWS Replace existing windows with new low-e windows per DCPS guidelines and historic photos, typical throughout. MASONRY CRACK Repair cracked brick at exterior wall. EXISTING STONE Clean existing stone and repoint as necessary - typical throughout EXISTING SECURITY GRILLE Replace existing metal grille and windows with new security glazing at lower two floors, per DCPS guidelines, typical throughout. EXISTING EXTERIOR DOORS Replace existing metal doors with new paneled doors per DCPS guidelines and historic photographs, typical throughout. MASONRY CRACK Repair cracked brick at exterior wall. WEST ELEVATION

27 PROPOSED FULL BUILDING SECTIONS Second Floor First Floor Gym. / Cafeteria New interior windows from corridor into gymnasium All interior doors to be replaced with new paneled wood doors with vision panels New floor-to-ceiling glass entry and free-standing metal stair New interior windows from corridor into cafeteria Excavated Kitchen Area New sound-attenuating Tectum panels. New glass enclosure behind existing railing to remain Existing wood paneling and railing to remain New fabric-wrapped sound attenuating panels All interior doors to be replaced with new paneled wood doors with vision panels

28 PROPOSED FULL BUILDING SECTIONS New sound-attenuating Tectum panels Second Floor First Floor Ground Floor Media Center New drywall floating ceiling New glass enclosure behind existing railing to remain New interior window from office to main entry stair Welcome Center Second Floor First Floor Ground Floor All interior doors to be replaced with new paneled wood doors with vision panels

29 PROPOSED FULL BUILDING SECTIONS Full height glass enclosure at Media Center Office Second Floor First Floor Ground Floor All interior doors to be replaced with new paneled wood doors with vision panels Full height glass enclosure at Welcome Center

30 TYPICAL CLASSROOM FURNITURE AND EQUIPMENT PLAN PRIMARY TEACHING WALL With tack space, marker board, and smart wall technology NEW ACOUSTIC TILES AND LINEAR LIGHTING Improves acoustic and light qualities of teaching space NEW CASEWORK Furniture and casework to meet DCPS standards SMART BOARD New interactive whiteboards installed in all classrooms to enhance learning activities. TEACHER S WORKSPACE Desk and chair provide a work environment and personal storage for teachers. CUBBIES New casework storage for students. COMPUTER WORKSTATIONS Continuous counter with computers, printer station and chairs. CLOSET Dedicated storage for teaching materials TABLES AND CHAIRS Furniture for various learning activities. EXISTING CLASSROOMS SINK New plumbing fixtures and counters with additional storage RUG For group instruction and play per DCPS guidleines

31 LIBRARY / MEDIA CENTER FURNITURE AND EQUIPMENT PLAN CASE WORK New casework throughout to meet DCPS guidelines TABLES Variety of table sizes for multi-use space GLASS ENCLOSURE Office with glass enclosure to allow view of entire media center SKYLIGHT New skylights to be installed at media center to provide natural light COMPUTER STATIONS Continuous counter with computer and printer stations STAFF OFFICE Office with work station and large table MILLWORK Custom millwork at reception desk COMPUTER STATIONS State of the art media with computer stations EXISTING MEDIA CENTER FURNITURE New furniture to create various seating opportunities CASEWORK Storage display along exterior walls

32 INTERIOR FINISHES - PHASE BBT flooring tile BBT flooring tile BBT flooring tile BBT flooring tile BBT flooring tile BBT flooring tile GROUND FLOOR Terrazzo tile FIRST FLOOR Terrazzo tile SECOND FLOOR CORRIDOR Accent corridor wall paint colors / wall tile Dining / Gym / Music, Art / Resource (Typ. wall paint) 2 Pre-K 3 Kindergarten 4 st Grade 5 2nd Grade 6 3rd Grade 7 4th Grade 8 8 5th 5th Grade Typical floor Typical base Terrazzo Floor FIRST GRADE CORRIDOR ELVATION INTERIOR FINISH TYPES AND LOCATIONS LOCATION FLOORING BASE WALLS CEILING Corridor Resilient Tile / Terrazzo Tile Resilient Base / Existing Base Tile / Painted ACT

33 INTERIOR FINISHES - PHASE CLASSROOMS RESTROOMS Typical wall paint Typical wall tile (white) & tile accents Toilet partition Tackable wall Wall Accent - Wall Accent - 2 Typical floor Floor accent - Floor accent - 2 Floor accent - 3 Rug Accessories Mosaic tile floor Wall Accent - 3 Wall Accent - 4 INTERIOR FINISH TYPES AND LOCATIONS LOCATION FLOORING BASE WALLS CEILING Classrooms Resilient Tile Resilient Base Painted/ Tackable wall ACT Restrooms Ceramic Tile Porcelain Tile Painted/ Ceramic Tile ACT

34 INTERIOR FINISHES - PHASE WELCOME CENTER / ADMINISTRATIVE MEDIA CENTER Broadloom carpet Wrapped panel fabric opt. Wrapped panel fabric opt. 2 Tile carpet Terrazzo Floor Typical base Typical wall paint Typical clg. paint INTERIOR FINISH TYPES AND LOCATIONS LOCATION FLOORING BASE WALLS CEILING Welcome Center / Administrative Terrazzo / Broadloom Carpet Resilient Base Painted ACT Media Center Tile Carpet Resilient Base Painted / Wrapped Panel Paint

35 INTERIOR FINISHES - PHASE 2 & PHASE 3 AUDITORIUM DINING AREA Acoustic ceiling tile GYMNASIUM Typical floor Proposed paneling & existing wood floor Wrapped fabric panel Wall Ceramic Tile Acoustic panel color Athletic rubber flooring Floor accent - Floor accent - 2 Broadloom Carpet Velvet curtain INTERIOR FINISH TYPES AND LOCATIONS LOCATION FLOORING BASE WALLS CEILING Auditorium Existing Wood / Broadloom Carpet Isle Existing wood base Painted / Wrapped Panel / Wood Panel Dining Area Resilient Tile Resilient Base Glazed Tile ACT Gymnasium Rubber Sport Flooring Vented Resilient Base Painted Acoustic Treatment Paint Painted/Acoustic Deck

36 PROPOSED MAIN ENTRY - EXTERIOR RENDERING

37 PROPOSED WELCOME CENTER - INTERIOR RENDERING

38 PROPOSED TYPICAL CLASSROOM - INTERIOR RENDERING

39 PROPOSED CAFETERIA - INTERIOR RENDERING

40 PROPOSED MEDIA CENTER - INTERIOR RENDERING

41 PLAN TO SPACE COMPARISON Bruce Monroe at Parkview ELEMENTARY SCHOOL Final Concept Design Submission PLAN TO SPACE COMPARISON February, 202 Bruce Monroe at Parkview ELEMENTARY SCHOOL Final Concept Design Submission PLAN TO SPACE COMPARISON February, 202 DCPS Guidelines Provided Existing DCPS Sorg Space Qty SF Area Qty SF Area Qty SF Area Notes Notes TOTAL PROGRAM AREAS E AC Core Academic Area 38 28, , ,826 E MC Additional Core Academic Area 7 3, , E MC Media Center 3, ,058 2,494 E PE Physical Education / Performance 3 3, ,78 6 8,690 E AD Administration 8 2, , ,654 E SD Student Dining & Food Service 9 3, ,77 2 2,379 E EC Engineering and Custodian Total Net 8 42, , ,36 E AC Core Academic Area E ACA A Pre Kindergarten Classroom 6,000 6, , ,654 See Note E ACA A Kindergarten Classroom 4,000 4, , ,49 See Note E ACA 2 Grade Classroom , , ,266 E ACA 2 Grade 2 Classroom , , ,454 E ACA 2 Grade 3 Classroom , , ,026 E ACA 2 Grade 4 Classroom , , ,279 E ACA 2 Grade 5 Classroom , , ,009 E ACA 7 Special Needs Classroom 2 800, ,25 See Note A E ACA 2 Workroom/Teacher Office See Note 2 See Note B E ACA 0 Storage ,026 Additional Instructional Space E MC 3 Computer Lab E VA Art Lab E MU Music Room Core Academic Space Total 37 30, , ,826 E AC Additional Core Academic Area E ACA 4 Resource Classroom 2 800, ,457 See Note F E ACA 4 Resource Rooms See Note 4 See Note A E ACA 5 Student Services Offices See Note 5 E ACA 6 Speech Room/OT/PT See Note F Additional Core Academic Space Total 7 3, , E MC MEDIA CENTER Bruce Monroe at Parkview Elementary School Modernization Summary of Spaces. When this project is complete, the following spaces are to be provided, based upon the Education Specifications. 2. Capacity after modification is to be 450 students. 3. All areas given are approximate program space (net). 4. DCPS master facilities plan stated 82,200 sf total building area (gross) 5. Per the Education Specifications a range of up to 5% of the prescribed square footage is acceptable. E MC Reading/Learning/Circulation,250,250,78,78,049,049 E MC 6 Office/Workroom/Storage E MC 5 Telecom Head End Room See Note F MEDIA CENTER Space Total 3, ,058 2,494 E PE Physical Education / Performance E PE PE Classroom/Gym 3,400 As is 2,385 2,385 2,385 2,385 See Note C E PE 2 Office/Storage ,239 See Note Auditorium/Stage As is 4,998 4,998 5,066 5,066 See Note C PE / Performance Space Total ,78 6 8,690 DCPS Guidelines Provided Existing DCPS Sorg Space Qty SF Area Qty SF Area Qty SF Area Notes Notes E AD Administration E AD Welcome Center See Note 6 E AD 2 Security Area w/ Locking Storage See Note 7 See Note D E AD 3 Conference Room E AD 4 Principal's Office See Note 8 E AD 6 Data Entry Office See Note F E AD 7 Administrative Workroom E AD 8 Mailroom E AD 9 Records Room See Note 9 E AD 0 Parent Resource Center See Note 0 E AD Toilet Student Services Suite E AD 2 Counselor See Note F Health Suite E AD 5 Office/Waiting E AD 6 Treatment Area E AD 7 Cots E AD 8 Storage See Note F E AD 9 Toilet E AD 20 Before/After School Office/Storage See Note F E AD 2 Staff Lounge See Note Administration Space Total 8 2, , ,654 E SD Dining and Food Services E SD Student Dining Area/Multi purpose,600,600 2,378 2,378,98,98 See Note C E SD 2 Chair and Table Storage See Note F E SD 3A Food Preparation See Note G E SD 3B Server See Note G E SD 3C Dry Storage See Note G E SD 3D Freezer & Cooler See Note G E SD 6 Toilet See Note F E SD 4 Cleaning Storage See Note F E SD 7 Food Service Office See Note F Dining and Food Services Space Total 9 3, ,77 2 2,379 E EC Engineering and Custodial E EC Supply Storage / Receiving See Note F E EC 2 Toilet / Shower See Note F E EC 3 Custodial / Engineer Office Engineering and Custodian Space Total Note : Note 2: Note 3: Note 4: Note 5: Note 6: Note 7: Note 8: Note 9: Note 0: Note : Note A: Note B: Note C: Note D: Note E: Note F: Note G: Includes 50 sf toilet May be one room Intermediate, Middle Instructional coaches Psychologist, social worker, testing Welcoming Area, Work Area for Administrative Asst. & Business Manager May be in front entryway or incorporated into Welcome Center Including toilet Needs to be a secure space Near the front door Includes staff toilet with shower. Could be divided among floors. Area revised per S.I.T comments Additional Teacher Office/Workroom added per existing configuration. Use is provided in an existing space previously dedicated to this use. Proposed security area included in Proposed Welcome Center Use added per S.I.T. requirements. Use unavailable or undocumented in existing facility configuration. Includes Food Storage and Server Area for existing facility SORG Architects Page of 2 SORG Architects Page 2 of 2

42 I l ASC JOB#: 76 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION % SD SUBMISSION EQUIPMENT DESIGNATIONS AHU-# AIR HANDLING UNIT EF-# EXHAUST FAN RR-# RETURN REGISTER AC-# AIR CURTAIN UNIT UH-# UNIT HEATER SR-# SPLY REGISTER CD-# CEILING DIFFUSER RG-# RETURN GRILLE ER-# EXHAUST REGISTER VAV-# VARIABLE AIR VOLUME BOX (SINGLE DUCT) DOAS-# DEDICATED OUTSIDE AIR SPLY UNIT HP-# HEAT PUMP UNIT VFD-# VARIABLE FREQUENCY DRIVE HX-# HEAT EXCHANGER ET-# EXPANSION TANK SEF-# SMOKE EXHAUST FAN ERU-# ENERGY RECOVERY UNIT EWH-# ELECTRIC WALL HEATER B-# BOILER P-# PUMP DACU-# DUCTLESS AIR CONDITIONING UNIT CRAC-# COMPUTER ROOM A/C UNIT SS-# SOLIDS SEPARATOR DG-# DOOR GRILLE CUH-# CABINET UNIT HEATER FHEF-# FUME HOOD EXHAUST FAN AS-# AIR SEPARATOR WSHP-# WATER SOURCE HEAT PUMP CT-# COOLING TOWER ERV-# ENERGY RECOVERY VENTILATOR NDHU-# NATATORIUM DEHUMIDIFICATION UNIT MAU-# MAKE- AIR UNIT KEF-# KITCHEN HOOD EXHAUST FAN SYMBOL B.D.D. FSD DD CO2 S M U SA RA EA VAV-2-3 E ABRV. FSD MDD U/D LEGEND DESCRIPTION NEW RECTANGULAR DUCTWORK MECHANICAL SYMBOLS AND ABBREVIATIONS NEW RECTANGULAR DUCTWORK - SINGLE LINE EXISTING EQUIPMENT OR DUCTWORK TO BE REMOVED. UNLESS OTHERWISE NOTED PIPE CAPPED OFF 90º RADIUS ELBOW 90º ELBOW WITH TURNING VANES SOUNDLINED DUCTWORK DRAWING NOTE DEMOLITION DRAWING NOTE SPLY DUCT SPLY DUCT DOWN RETURN DUCT RETURN DUCT DOWN EXHAUST DUCT EXHAUST DUCT DOWN BACKDRAFT DAMPER CEILING REGISTER OR GRILLE ARROW INDICATES FLOW OF AIR TOP REGISTER OR GRILLE ARROW INDICATES FLOW OF AIR COMBINATION FIRE & SMOKE DAMPER DUCT SMOKE DETECTOR CO2 SENSOR SENSOR MOTORIZED DAMPER UNDER CUT DOOR SPLY AIR RISER RETURN AIR RISER EXHAUST AIR RISER VAV DESIGNATION. FLOOR LEVEL VAV TAG EQUIPMENT SIZE TAG. SEE EQUIPMENT SCHEDULE. MIN. CFM MAX. CFM 24/24 PERFORATED FACE DIFFUSER WITH ROUND NECK, CFM AS INDICATED. SEE SCHEDULE FOR NECK SIZE. M7 SYMBOL 3 M3 3 CS D OR CR M9 PIPING LEGEND ABRV. DESCRIPTION PG CONDENSATE DRAIN SLOPE IN DIRECTION OF ARROW PIPE TURNED DOWN PIPE TURNED PIPE TEE DOWN CAPPED PIPE PIPE UNION PRESSURE GAUGE WITH COCK THERMOMETER BALL VALVE OR SHUTOFF VALVE W/ MEMORY STOP 2-WAY MODULATING CONTROL VALVE 3-WAY MODULATING CONTROL VALVE GATE VALVE FLEXIBLE PIPE CONNECTION STRAINER WITH DRAIN VALUE SHUT-OFF/ BALANCING VALVE BUTTERFLY VALVE CONDENSER WATER SPLY PIPING CONDENSER WATER RETURN PIPING PIPING PITCHED IN DIRECTION OF FLOW CHECK VALVE DETAIL OR DIAGRAM NO. 3 SHOWN ON DRAWING M-3 SECTION NO.3 FROM DRAWING M-7 SHOWN ON DRAWING M-9 (ARROW DENOTES SECTION) A B C D E F ABV A/C AC AD AFF AFM AGA ALUM AMB AMCS AMP AP APD APPROX ARCH ARI AS ASHRAE ASPE ASTM ATC AUX AVG AWG AWS BEL BHP BLDG BOB BOD BSMT BTUH CENT CFH CFM CLG CL cm cm 3 CO COL COMP COND CONN CONT COP CO2 CPS CU FT CU IN. CV db DB DC DDC DEMO DFU DIA DN DOM DWDI DWG DWV DX (E) EXIST. EA EAT EDB EER EFF ELEV ELEC EMER ENGR EPDM EQ EQUIP ESP EWB EWT EXH FACP ABOVE AIR CONDITIONING ALTERNATING CURRENT ACCESS DOOR ABOVE FINISHED FLOOR AIRFLOW MONITORING STATION AMERICAN GAS ASSOCIATION ALUMINUM AMBIENT AUTOMATED MONITORING AND CONTROL SYSTEM AMPERE(S) ACCESS PANEL AIR PRESSURE DROP APPROXIMATELY ARCHITECT/ARCHITECTURAL AIR-CONDITIONING AND REFRIGERATION INSTITUTE AIR SEPARATOR AMERICAN SOCIETY OF HEATING REFRIGERATING & AIR CONDITIONING ENGINEERS, INC. AMERICAN SOCIETY OF PLUMBING ENGINEERS AMERICAN SOCIETY FOR TESTING AND MATERIALS AUTOMATIC TEMPERATURE CONTROLS AUXILIARY AVERAGE AMERICAN WIRE GUAGE AMERICAN WELDING SOCIETY BELOW BRAKE HORSEPOWER BUILDING BOTTOM OF BEAM BOTTOM OF DUCT BASEMENT BRITISH THERMAL UNIT/HOUR CENTRIFUGAL CUBIC FEET PER HOUR CUBIC FEET PER MINUTE CEILING CENTERLINE CENTIMETERS CUBIC CENTIMETERS CARBON MONOXIDE COLUMN COMPRESSOR CONDENSATE CONNECTION CONTINUATION COEFFICIENT OF PERFORMANCE CARBON DIOXIDE CYCLES PER SECOND CUBIC FEET CUBIC INCH CONSTANT VOLUME DECIBEL(S) DRY BULB TEMPERATURE DIRECT CURRENT DIRECT DIGITAL CONTROL DEMOLITION DRAIN FIXTURE UNIT DIAMETER DOWN DOMESTIC DOUBLE WIDTH DOUBLE INLET DRAWING DRAIN, WASTE, VENT DIRECT EXPANSION EXISTING TO REMAIN EXISTING EACH ENTERING AIR TEMPERATURE ENTERING DRY BULB TEMPERATURE ENERGY EFFICIENCY RATIO EFFICIENCY ELEVATION ELECTRIC EMERGENCY ENGINEER ETHYLENE PROPYLENE DIENE TERPOLYMER EQUAL EQUIPMENT EXTERNAL STATIC PRESSURE ENTERING WET BULB TEMPERATURE ENTERING WATER TEMPERATURE EXHAUST FIRE ALARM CONTROL PANEL G H K L M N O FDC FDV FHC FIN FLR FLG FLA FLEX FOB FOT FP FPM FPS FPM FPS FT FU GA GAL GALV GPH GPM HGT HOA HP HTR HVAC HZ I=B=R IN. IN. WG INV KVA KW l/hr l/min. l/s LAT LBS LB/HR LDB LF LRA LWB LWT m 3 MAX MBH MCC MECH MER MFR MIN MISC 3 m /hr 3 m /min MTD N/A N.C. NC NEMA NIC N.O. NO. NPSH NTS OA OED OPNG OV ABBREVIATIONS FIRE DEPARTMENT CONNECTION FIRE DEPARTMENT VALVE FIRE HOSE CABINET FINISH FLOOR FLANGED FULL LOAD AMPERE(S) FLEXIBLE FLAT ON BOTTOM FLAT ON TOP FIRE PROTECTION FEET PER MINUTE FEET PER SECOND FEET PER MINUTE FEET PER SECOND FEET FIXTURE UNITS GAUGE GALLON(S) GALVANIZED GALLONS PER HOUR GALLONS PER MINUTE HEIGHT HAND-OFF-AUTOMATIC HORSEPOWER HEATER HEATING, VENTILATING, & AIR CONDITIONING FREQUENCY, HERTZ INSTITUTE OF BOILER & RADIATOR MANUFACTURERS INCH(ES) INCHES OF WATER GAUGE INVERT KILOVOLT AMPERE(S) KILOWATT(S) LITERS LITERS PER HOUR LITERS PER MINUTE LITERS PER SECOND LEAVING AIR TEMPERATURE POUND(S) POUNDS/HOUR LEAVING DRY BULB TEMPERATURE LINEAR FEET LOCKED ROTOR AMPERES LEAVING WET BULB TEMPERATURE LEAVING WATER TEMPERATURE CUBIC METERS MAXIMUM ONE THOUSAND BTUH MOTOR CONTROL CENTER MECHANICAL MECHANICAL EQUIPMENT ROOM MANUFACTURER MINIMUM MISCELLANEOUS CUBIC METERS PER HOUR CUBIC METERS PER MINUTE MOUNTED NOT APPLICABLE NORMALLY CLOSED NOISE CRITERIA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION NOT IN CONTRACT NORMALLY OPEN NUMBER NET POSITION SUCTION HEAD NOT TO SCALE OUTDOOR AIR OPEN END DUCT OPENING OUTLET VELOCITY x P Q R S T U V W Z PCF PD PH PNL PPM PRESS PSF PSI PSIA PSIG QTY RA REQ'D RH RLA RM RPM REV SA SENS SHT SMACNA SO SP SPEC SQ SQ FT SQ m SS STD STRUCT SWP SWSI SYMB TAD TOT TD TDH TEMP TYP UNO V VAV VB VEL VERT VFD VTR W/ W/O WB WG WOG WPD WTR ZVB POUNDS PER CUBIC FOOT PRESSURE DROP PHASE PANEL PARTS PER MILLION PRESSURE POUNDS PER SQUARE FOOT POUNDS PER SQUARE INCH POUNDS PER SQUARE INCH ABSOLUTE POUNDS PER SQUARE INCH GAUGE QUANTITY RETURN AIR REQUIRED RELATIVE HUMIDITY RUNNING LOAD AMPERES ROOM REVOLUTIONS PER MINUTE REVISION SPLY AIR SENSIBLE SHEET SHEET METAL AND AIR- CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION SCREENED OPENING STATIC PRESSURE SPECIFICATION SQUARE SQUARE FOOT SQUARE METERS STAINLESS STEEL STANDARD STRUCTURE STANDARD WORKING PRESSURE SINGLE WIDTH SINGLE INLET SYMBOL TRANSFER AIR DUCT TOTAL TEMPERATURE DIFFERENCE TOTAL DYNAMIC HEAD TEMPERATURE TYPICAL UNLESS NOTED OTHERWISE VOLT(S) VARIABLE AIR VOLUME VACUUM BREAKER VELOCITY VERTICAL VARIABLE FREQUENCY DRIVE VENT THROUGH ROOF WITH WITHOUT WET BULB TEMPERATURE WATER GAUGE WATER, OIL, AND GAS WATER PRESSURE DROP WATER TEMPERATURE RISE ZONE VALVE BOX REVISIONS 225 PERIMETER SLOT DIFFUSER, CFM AS INDICATED NOTE: NOT ALL ABBREVIATIONS SHOWN ARE USED ON THIS PROJECT. 24/24 PERFORATED FACE RETURN AIR GRILLE SPIN TAP WITH VOLUME CONTROL DAMPER V.C.D. VOLUME CONTROL DAMPER F.D. F.D. FIRE DAMPER Key Plan DD DUCT SMOKE DETECTOR T T-STAT THERMOSTAT H AFS SP HUMIDISTAT AIRFLOW STATION STATIC PRESSURE SENSOR NOTE: NOT ALL SYMBOLS SHOWN ARE USED ON THIS PROJECT. Seal Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title DATA SHEET MECHANICAL Discipline MECH Drawing Number ' 0 4' 8' 2' 6' N Scale AS NOTED Date 30 DEC 20 Drawn by MCAB M0.00 GRAPHIC SCALE /8" = '-0" Checked by DSMI Sorg Project Number 8

43 ASC JOB#: 76 0 GRAPHIC SCALE /8" = '-0" ' 4' 8' 2' 6' N 30 DEC 20 8 Checked by Sorg Project Number Drawing Title Drawn by Date Scale Discipline Drawing Number Seal REVISIONS DATE DESCRIPTION Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Key Plan % SD SUBMISSION IDENTIFICATION. ALL PIPING SYSTEMS, VALVES, DAMPERS AND EQUIPMENT SHALL BE PROPERLY IDENTIFIED. ALL DAMPERS AND VALVES SHALL HAVE THEIR NORMAL (IN OPERATION) POSITION IDENTIFIED, SUCH AS "NORMALLY OPEN" OR "NORMALLY CLOSED". 2. IDENTIFICATION SHALL BE IN ACCORDANCE WITH ANSI STANDARD A3.. PRESSURE SENSITIVE MARKERS SHALL BE MANUFACTURED BY THE BRADY CO., OR APPROVED EQUAL. MARKERS SHALL BE MANUFACTURER S STANDARD PRODUCT. CONTROLS. PROVIDE COMPLETE TEMPERATURE CONTROLS FOR ALL HVAC SYSTEMS. PROVIDE NEW CONTROL DEVICES INCLUDING DAMPER OPERATORS, TEMPERATURE SENSORS, STAGING RELAYS AND OTHER REQUIRED DEVICES TO PROVIDE A COMPLETE OPERATIONAL SYSTEM PER THE FOLLOWING OPERATING SEQUENCE. MOUNT ALL CONTROLS FURNISHED AS ACCESSORIES TO EQUIPMENT AND PROVIDE ALL CONTROL WIRING REQUIRED FOR PROPER OPERATION WHERE NOT SPECIFICALLY SHOWN ON ELECTRICAL PLANS. ALL WIRING SHALL BE IN CONDUIT PER N.E.C. AND LOCAL CODE REQUIREMENTS. STANDARD MOUNTING HEIGHT TO TOP OF THERMOSTAT IS 48" ABOVE FINISHED FLOOR OR AS INDICATED ON THE ARCHITECTURAL DRAWINGS. DO NOT INSTALL THERMOSTATS NEAR DIMMER SWITCHES. WIRING OF ALL MOTORIZED OPERATORS AND THERMOSTATS (REGARDLESS OF VOLTAGE) ARE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR. 2. PROVIDE RETURN AND SPLY DUCT SMOKE DETECTOR AT EACH HVAC UNIT 2000 CFM AND HIGHER TO PROVIDE IMMEDIATE SHUT DOWN OF FAN ON ACTIVATION. DETECTOR SHALL BE MOUNTED PRIOR TO ANY BRANCH CONNECTIONS. PROVIDE LOCAL VISUAL INDICATOR AND RESET FOR EACH DETECTOR IF CENTRAL FIRE ALARM IS NOT INCLUDED IN PROJECT. 3. PROVIDE ONE YEAR SERVICE. SERVICE SHALL INCLUDE SOFTWARE GRADES, REPROGRAMMING, SETPOINT ADJUSTMENTS, REVISIONS TO SEQUENCE OF OPERATION (NOT REQUIRING NEW CONTROL POINTS) AND REGULAR MAINTENANCE. ANY SYSTEMS WITH LOGINS WILL BE PROVIDED WITH A MINIMUM OF 2 LOGIN GROS; ONE SHALL PERMIT REGULAR DAY TO DAY ACCESS TO TYPICAL SETPOINTS; THE SECOND SHALL PERMIT 00% UNRESTRICTED ACCESS TO ALL PROGRAMMING POINTS AND SEQUENCES FOR CURRENT AND FUTURE SERVICE PERSONNEL DESIGNATED BY THE OWNER. NO ACCESS SHALL BE RESTRICTED FROM OWNER DESIGNATED SERVICE PERSONNEL OR CONTRACTORS BY INSTALLER OR SPLIER. CUTTING, PATCHING AND DRILLING. ALL CUTTING AND PATCHING OF THE BUILDING CONSTRUCTION REQUIRED FOR THIS WORK SHALL BE BY THIS CONTRACTOR UNLESS SHOWN ON ARCHITECTURAL DRAWINGS AND CONFIRMED AS TO SIZE AND LOCATION PRIOR TO NEW CONSTRUCTION. CUTTING SHALL BE IN A NEAT AND WORKMANLIKE MANNER. 2. NEATLY SAW CUT ALL RECTANGULAR OPENINGS, SET SLEEVE THROUGH OPENING, AND FINISH PATCH OR PROVIDE TRIM FLANGE AROUND OPENING. CORE DRILL AND SLEEVE ALL ROUND OPENINGS. 3. DO NOT CORE DRILL OR CUT ANY CONCRETE SLABS OR OTHER STRUCTURAL COMPONENTS FOR ANY REASON WITHOUT THE KNOWLEDGE AND WRITTEN CONSENT OF THE STRUCTURAL ENGINEER, ARCHITECT AND THE OWNER. 4. PATCH AND FINISH TO MATCH ADJACENT AREAS THAT HAVE BEEN CUT, DAMAGED OR MODIFIED AS A RESULT OF THE INSTALLATION OF THE MECHANICAL OR ELECTRICAL EQUIPMENT. FIRESTOPPING/FIREDAMPERS. THE GENERAL CONTRACTOR SHALL BRING TO THE ATTENTION OF THE MECHANICAL CONTRACTOR ANY SLAB-TO-SLAB PARTITIONS IN ORDER TO PRESERVE RETURN AIR PATHWAYS. ALL PENETRATIONS OF SLAB-TO-SLAB PARTITIONS SHALL BE SEALED AIRTIGHT. CONTRACTOR SHALL VERIFY PARTITION RATING AND PROVIDE FIRE DAMPER AND ACCESS DOOR AS REQUIRED. INSTALL FIRE DAMPERS WITH ACCESS DOORS AT ALL FIRE RATED WALLS, PARTITIONS AND CEILINGS. DAMPERS SHALL HAVE RATING EQUIVALENT TO BARRIER. CURTAIN TYPE DAMPERS SHALL BE W/ THE CURTAIN OUT OF THE AIR STREAM. 2. WHEREVER FIRE RATED PARTITIONS ARE PENETRATED FOR WIRE, DUCT, OR PIPE PASSAGE, SEAL PASSAGES WITH CODE APPROVED, LABORATORY TESTED AND LABELED SEALANT OF FIRE RESISTANCE RATING NOT LESS THAN THAT OF PENETRATED ASSEMBLY THAT WILL PREVENT PASSAGE OF FIRE AND SMOKE. ALL FIRE STOPPING SYSTEM SHALL MEET THE REQUIREMENTS OF ASTM E 84,UL 479, AND BE FACTORY MUTUAL APPROVED. ALL FIRESTOPPING AND/OR SMOKE STOPPING MATERIAL AND INSTALLATION SHALL BE AS MANUFACTURED BY HILTI OR APPROVED EQUAL. ACCESS DOORS. ACCESS DOORS SHALL BE PROVIDED IN WALLS AND CEILINGS WHERE REQUIRED TO PERMIT PROPER ACCESS TO VALVES AND ANY OTHER SUCH DEVICES WHICH REQUIRE MAINTENANCE OR SERVICE. DOORS PLACED IN WALLS, PARTITIONS OR OTHER FIRE-RATED CONSTRUCTION SHALL HAVE A LABEL SIGNIFYING THAT THE DOOR HAS THE SAME FIRE RATING AS THE FIRE-RATED CONSTRUCTION. 2. ACCESS PANELS SHALL BE CONSTRUCTED OF 4 GAUGE STEEL, WITH 6 GAUGE STEEL FRAMES. DOORS SHALL FINISH FLUSH WITH THE SURROUNDING SURFACE. FRAMES SHALL HAVE 3 WIDE EXPANDED METAL FOR PLASTERED SURFACES AND PLAIN FLANGED TYPE FRAME FOR TILE, MASONRY OR GYPSUM BOARD SURFACES. DOORS AND FRAMES SHALL BE FURNISHED PRIME COATED. DOORS INSTALLED IN CERAMIC TILE OR OTHER NON-PAINTED SURFACES SHALL BE STAINLESS STEEL. HINGES SHALL BE CONCEALED SPRING TYPE, TO ALLOW DOORS TO BE OPENED 75 DEGREES. LOCKS SHALL BE FLUSH SCREWDRIVER TYPE WITH STEEL CAMS. ACCESS PANELS SHALL BE 6 X 6 OR LARGER AS MAY BE REQUIRED FOR PROPER ACCESS TO THE DEVICE BEING SERVED. 3. ACCESS PANELS ARE NOT REQUIRED IN COMPLETELY ACCESSIBLE LIFT OUT TILE CEILINGS. CONTRACTOR SHALL REVIEW THE ROOM FINISH SCHEDULE ON THE ARCHITECTURAL DRAWINGS IN ORDER TO VERIFY THE NEED FOR ACCESS PANELS. PROVIDE ACCESS PANELS TO GENERAL CONTRACTOR FOR INSTALLATION. BALANCING, START AND INSTRUCTIONS. AFTER INSTALLATION, CHECK ALL EQUIPMENT, AND PERFORM START IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. PLACE ALL SYSTEMS INTO OPERATION. 2. AIR AND WATER BALANCING SHALL BE PERFORMED BY AN AABC CERTIFIED CONTRACTOR. THIS CONTRACTOR SHALL BE ACCEPTABLE ON APPROVAL OF THE ENGINEER. ADJUST AND BALANCE THE AIR SYSTEMS BEFORE HYDRONIC, STEAM, AND REFRIGERANT SYSTEMS. TESTING AND BALANCING SHALL BE DONE IN ACCORDANCE WITH THE MOST RECENT AABC NATIONAL STANDARDS FOR TOTAL SYSTEM BALANCE. GPM'S SHALL BE BALANCED WITHIN 0% OF DESIGN. AFTER ALL AIR SYSTEMS ARE INSTALLED, EACH SPLY AIR OUTLET SHALL BE AIR BALANCED TO WITHIN 0% OF THE CFM SHOWN WITH AIR PATTERNS SET AS INDICATED ON DRAWINGS (OR WITHIN 0 CFM WHEN BELOW 00 CFM). FAN RPMS AND ZONE DAMPERS SHALL BE ADJUSTED AND SHEAVES SHALL BE REPLACED AS REQUIRED TO ACHIEVE AIR BALANCE. ALL ZONES OR PORTIONS THEREOF SERVING OTHER SPACES AND WHICH MAY BE AFFECTED BY THE PROJECT SHALL BE TRAVERSED PRIOR TO CONSTRUCTION. THE FINAL AIR BALANCE SHALL RESTORE THESE AIR QUANTITIES. BEFORE AND AFTER AIR QUANTITIES SHALL BE LISTED IN THE AIR BALANCE REPORT 3. SHOULD THE AIR BALANCE REPORT INDICATE UNACCEPTABLE DUCT LEAKAGE, AS DETERMINED BY THE ENGINEER, THEN DUCT LEAKAGE TEST SHALL BE PERFORMED IN ACCORDANCE WITH AABC STANDARDS. DUCT SHALL BE RESEALED AND/OR REPAIRED AS REQUIRED TO MEET DESIGN REQUIREMENTS. ALL, OR PORTIONS OF THE SYSTEM SHALL BE REBALANCED AS REQUIRED UNTIL ALL SYSTEMS ARE WITHIN THE PERFORMANCE STANDARDS LISTED ABOVE. 4. CLEAN ALL MECHANICAL EQUIPMENT AND DUCTWORK OF ALL CONSTRUCTION DUST AT PROJECT COMPLETION. REPLACE ALL FILTERS PRIOR TO AIR BALANCING. PROVIDE ONE SPARE SET OF FILTERS FOR EACH PIECE OF EQUIPMENT TO THE OWNER. 5. PROVIDE OWNER TRAINING AND DEMONSTRATION OF ALL MECHANICAL SYSTEMS AND EQUIPMENT. INSTRUCT OWNER ON PROPER OPERATION AND PREVENTATIVE MAINTENANCE OF SYSTEM. SUBMIT OPERATING AND MAINTENANCE MANUAL ON ALL EQUIPMENT AND SYSTEMS. 6. AIR QUALITY TESTING SHALL BE PERFORMED BY AN AABC CERTIFIED CONTRACTOR, THIS CONTRACTOR SHALL BE ACCEPTABLE ON APPROVAL OF THE ENGINEER. CONDUCT BASELINE INDOOR AIR QUALITY TESTING AFTER CONSTRUCTION ENDS AND BEFORE OCCANCY. TESTING PROCEDURES SHALL BE PER THE U.S. E.P.A. COMPENDIUM OF METHODS FOR THE DETERMINATION OF AIR POLLUTANTS IN INDOOR AIR AND AS DETAILED BY THE U.S.G.B.C. IN THE LEED-NC VERSION 3.0 REFERENCE GUIDE. CONTRACTOR SHALL DEMONSTRATE THAT THE CONTAMINANT MAXIMUM CONCENTRATIONS LISTED UNDER EQ CREDIT 3.2 IN THE LEED REFERENCE GUIDE ARE NOT EXCEEDED. CONTRACTOR SHALL INCLUDE ONE ADDITIONAL SAMPLING / RE-TESTING OF EACH BUILDING AREA IN HIS BID COMMISSIONING (CX). PROJECT IS TO BE COMMISSIONED BY OTHERS PER LEED NC 3.0 FUNDAMENTAL COMMISSIONING. THE COMMISSIONING AUTHORITY (CA) ACTS ON BEHALF OF THE OWNER AND SHALL LEAD THE COMMISSIONING PROCESS. THE COMMISSIONING AUTHORITY AND COMMISSIONING TEAM IS RESPONSIBLE FOR QUALITY CONTROL OF ENERGY RELATED EQUIPMENT OR OTHER MEP EQUIPMENT AS PER THE PROJECT DESIGN AND SPECIFICATIONS. THE MEP CONTRACTORS ARE TO HAVE A FULL UNDERSTANDING OF THE REQUIREMENTS FOR LEED NC EA 3.0 PREREQUISITE FUNDAMENTAL COMMISSIONING. THE CONTRACTORS ARE RESPONSIBLE FOR ASSIGNING QUALIFIED PERSONNEL TO PERFORM THOSE DUTIES AND BE A PART OF THE CX TEAM. THE MEP CONTRACTOR S BASE BID IS TO INCLUDE ALL LABOR HOURS FOR HVAC, PLUMBING, AND ELECTRICAL ITEMS TO BE COMMISSIONED AS PER LEED PROJECT REQUIREMENTS. THE COMMISSIONING TEAM SHALL ATTEND ALL COMMISSIONING MEETINGS, PERFORM ALL SYSTEM VERIFICATION CHECKS, HELP IN THE CREATION OF THE START DOCUMENTS, DOCUMENT START OF EACH PIECE OF EQUIPMENT DURING START, AND PERFORM AND DEMONSTRATE FUNCTIONAL TESTS OF THE SYSTEMS TO THE SATISFACTION OF THE CA. THE CONTRACTOR SHALL ALSO PROVIDE TRAINING FOR THE BUILDING PERSONNEL ON THESE SYSTEMS AS SPECIFIED. IN THE EVENT SYSTEMS FAIL THE APPROVAL PROCESS TWICE, AS DESIGNATED BY THE CA DURING THE FUNCTIONAL COMMISSIONING TESTING, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COST OF RE-COMMISSIONING THE FAILED SYSTEMS. THE TAB AND BAS CONTRACTORS ARE AN INTEGRAL PART OF THE CX PROCESS AND ARE TO COORDINATE DUTIES WITH THE MEP CONTRACTORS. THE CONTRACTOR IS RESPONSIBLE FOR SPLYING ALL NECESSARY TOOLS, LADDERS AND TEST EQUIPMENT REQUIRED TO PERFORM THE COMMISSIONING PROCESS AND ALL DOCUMENTS IN REFERENCE TO THE PROJECT COMMISSIONING. A COMMISSIONING PLAN WILL BE ISSUED DURING THE EARLY STAGES OF THE CONSTRUCTION PROCESS FOR ALL EQUIPMENT, WHICH IS TO BE COMMISSIONED PER LEED REQUIREMENTS. THE ELECTRICAL CONTRACTOR IS TO ASSIST AS NEEDED IN THE COMMISSIONING OF THE MECHANICAL SYSTEMS, AND IS RESPONSIBLE FOR CX OF THE ELECTRICAL SYSTEMS AS OUTLINED IN THE CX PLAN AND AS NOTED ON THE DRAWINGS. WARRANTY. FULLY WARRANT ALL MATERIALS, EQUIPMENT AND WORKMANSHIP FOR ONE () YEAR FROM DATE OF ACCEPTANCE. EXTEND ALL MANUFACTURER'S WARRANTIES TO OWNER, INCLUDING ALL EXTENDED WARRANTIES. 2. REPAIR OR REPLACE WITHOUT CHARGE TO THE OWNER ALL ITEMS FOUND DEFECTIVE DURING THE WARRANTY PERIOD. IN THE CASE OF REPLACEMENT OR REPAIR DUE TO FAILURE WITHIN THE WARRANTY PERIOD, THE WARRANTY ON THAT PORTION OF THE WORK SHALL BE EXTENDED FOR A MINIMUM PERIOD OF ONE () YEAR FROM THE DATE OF SUCH REPLACEMENT OR REPAIR. MECHANICAL SPECIFICATIONS. PRODUCTS AND INSTALLATION SHALL COMPLY WITH ALL APPLICABLE LAWS, CODES, GOVERNMENT REGULATIONS, UTILITY COMPANY REQUIREMENTS, ETC. OF ALL AUTHORITIES HAVING JURISDICTION. WORK SHALL COMPLY WITH THE FOLLOWING CODES, STANDARDS AND ORGANIZATIONS: 2006 INTERNATIONAL MECHANICAL CODE 2006 INTERNATIONAL PLUMBING CODE 2006 INTERNATIONAL ENERGY CODE 2008 NATIONAL ELECTRIC CODE NFPA UNDERWRITERS LABORATORY (UL), IRI, FM SMACNA HVAC DUCT CONSTRUCTION STANDARDS GUIDELINES, DETAILS, & MODEL SPECIFICATION ASHRAE WHERE CONFLICTS EXIST BETWEEN CODES, STANDARDS OR THIS SPECIFICATION THE HIGHER REQUIREMENT SHALL APPLY. DEVIATIONS FROM THE CONTRACT DOCUMENTS REQUIRED BY THE ABOVE AUTHORITIES SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW. OBTAIN PERMITS AND PAY ALL FEES. ARRANGE FOR ALL REQUIRED INSPECTIONS AND APPROVALS. CONFIRM ALL UTILITY COMPANY REQUIREMENTS AND CONNECTION POINTS IN FIELD, PRIOR TO STARTING WORK. 2. ALL SPECIFICATIONS AND DRAWINGS, I.E., ARCHITECTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ARE COMPLIMENTARY AND MUST BE USED IN COMBINATION TO OBTAIN COMPLETE CONSTRUCTION INFORMATION. ANY INFORMATION CONFLICTS WITHIN THE SPECIFICATIONS AND DRAWINGS SHALL BE BROUGHT TO THE ENGINEER'S ATTENTION. DRAWINGS ARE DIAGRAMMATIC. CONFIRM ALL DIMENSIONS BY FIELD MEASUREMENT. THE EXACT LOCATIONS FOR APPARATUS, FIXTURES, EQUIPMENT AND PIPING WHICH IS NOT COVERED BY DRAWINGS, SHALL BE OBTAINED FROM THE ARCHITECT OR HIS REPRESENTATIVE IN THE FIELD, AND THE WORK SHALL BE LAID OUT ACCORDINGLY. 3. WORK SHALL BE EXECUTED IN A GOOD WORKMANLIKE MANNER USING MECHANICS SKILLED IN THEIR RESPECTIVE TRADES. ALL EQUIPMENT AND MATERIALS SHALL BE NEW, FREE OF DEFECTS. SYSTEMS ARE TO BE COMPLETE AND WORKABLE IN ALL RESPECTS, PLACED IN OPERATION AND PROPERLY ADJUSTED. 4. MAINTAIN THE CONSTRUCTION PREMISES IN A NEAT AND ORDERLY CONDITION AT THE END OF EACH WORKING DAY. CLEAN-, REMOVE AND LEGALLY DISPOSE OF ALL RUBBISH DAILY. CONTRACTOR SHALL PROTECT THEIR WORK AND EXISTING OR ADJACENT PROPERTY AGAINST WEATHER, TO MAINTAIN THEIR WORK, MATERIALS, APPARATUS AND FIXTURES FREE FROM INJURY OR DAMAGE. ANY WORK DAMAGED BY FAILURE TO PROVIDE PROTECTION REQUIRED, SHALL BE REMOVED AND REPLACED WITH NEW WORK AT THE CONTRACTOR'S EXPENSE. 5. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE SAFETY OF HIS WORKERS, ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES FOR COORDINATING THE WORK UNDER THIS CONTRACT. CONFORM TO ALL GENERAL AND SPECIAL CONDITIONS OF CONTRACT AS SPECIFIED BY ARCHITECT AND/OR OWNER. 6. IN CASES OF DOUBT AS TO THE WORK INTENDED, OR IN THE EVENT OF NEED FOR EXPLANATION THEREOF, THE CONTRACTOR SHALL REQUEST SPLEMENTARY INSTRUCTIONS FROM THE ENGINEER. NO CHANGES ARE TO BE MADE TO THE WORK OF THIS CONTRACT WITHOUT PRIOR KNOWLEDGE AND APPROVAL OF THE ENGINEER. THE CONTRACTOR SHALL HOLD THE OWNER AND ITS CONSULTANTS HARMLESS AGAINST ALL CLAIMS AND JUDGMENTS ARISING OUT OF THE CONTRACTORS PERFORMANCE OF THE WORK OF THIS CONTRACT. THE CONTRACTOR SHALL NOT PROCEED WITH ANY WORK, WHICH HE EXPECTS ADDITIONAL COMPENSATION BEYOND THE CONTRACT AMOUNT, WITHOUT WRITTEN AUTHORIZATION FROM THE APPROPRIATE AUTHORITY. FAILURE TO OBTAIN SUCH AUTHORIZATION SHALL INVALIDATE ANY CLAIM FOR EXTRA COMPENSATION. 7. ALL PRODUCTS SHALL COMPLY WITH 25/50 FLAME AND SMOKE HAZARD RATINGS PER ASTM E-84, NFPA 255 AND UL IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO INSTALL THE HEATING, VENTILATION AND AIR CONDITIONING SYSTEM SO AS TO INSURE QUIET OPERATION. NO VIBRATION OR SOUND SHALL BE TRANSMITTED TO THE BUILDING, STRUCTURE OR OCCIED AREAS. THE DECISION OF THE ENGINEER AS TO THE QUIETNESS OF THE SYSTEM AND EQUIPMENT SHALL BE FINAL. IT SHALL BE THIS CONTRACTORS RESPONSIBILITY TO CORRECT OR REPLACE ANY NOISY SYSTEM OR EQUIPMENT AS REQUIRED. WORK IN EXISTING BUILDINGS. EXISTING BUILDING IS TO REMAIN OCCIED AND ACCESSIBLE AT ALL TIMES. PROTECT THE BUILDING PREMISES AND ALL OCCANTS ON THE PROJECT SITE. THE CONTRACTOR IS RESPONSIBLE FOR ALL DAMAGES CAUSED BY IMPROPER PROTECTION AND SHALL MAKE ALL NECESSARY REPLACEMENTS OR REPAIRS WITHOUT ANY ADDITIONAL COST. MAKE ALL ARRANGEMENTS, MAINTAIN AND PAY ALL COSTS FOR TEMPORARY WATER, PLUMBING, POWER, LIGHTING, AND HEATING OR VENTILATION AS REQUIRED TO PROPERLY CONDUCT THE WORK OF THIS CONTRACT AND MAINTAIN SERVICES. PROVIDE AND MAINTAIN FOR THE ENTIRE LENGTH OF THIS CONTRACT ALL EXITS, EXIT LIGHTING, FIRE PROTECTION DEVICES AND ALARMS TO CONFORM TO LOCAL BUILDING CODE REQUIREMENTS. 2. CONFORM WITH THE CURRENT EDITION OF THE SMACNA IAQ GUIDELINES FOR OCCIED BUILDINGS UNDER CONSTRUCTION. 3. CONTRACTOR SHALL VERIFY ALL POINTS OF CONNECTION BEFORE COMMENCING WORK. CONTRACTOR SHALL COORDINATE WORK WITH EXISTING WORK AND OTHER TRADES. ALL UNUSED EQUIPMENT SERVING THIS AREA SHALL BE REMOVED AND RETURNED TO THE OWNER. 4. EXISTING EQUIPMENT TO REMAIN, BE REUSED, OR RELOCATED WITHIN OR SERVING THE SPACE, WHICH IS DAMAGED OR DOES NOT COMPLY WITH THE SPECIFICATIONS, SHALL BE RESTORED TO LIKE NEW CONDITION SUBJECT TO REVIEW BY THE ARCHITECT AND ENGINEER, OR SHALL BE REPLACED WITH NEW MATERIALS MEETING THE SPECIFICATION REQUIREMENTS. 5. SOME WORK SHOWN MAY REQUIRE PREMIUM TIME INCLUDING NOISE PRODUCING ACTIVITIES, ACCESS INTO ADJOINING SPACES & ACTIVITIES DISRTING MEP SERVICES. CONFIRM THE REQUIREMENTS FOR PREMIUM TIME OR SPECIAL PROCEDURES WITH THE OWNER/LANDLORD AND INCLUDE THE COST IN BID PROPOSAL. WORK RELATED TO THE EXISTING BUILDING SHALL BE COORDINATED TO MINIMIZE INTERFERENCE OR INTERRTION OF NORMAL BUILDING USE BY OWNER. REFER TO ARCHITECTURAL PLANS FOR ANY PHASING REQUIREMENTS. ARRANGE FOR AND OBTAIN OWNER'S PERMISSION FOR ANY SERVICE SHUTDOWNS. 6. THE CONTRACTOR, BY SUBMITTING HIS BID PROPOSAL AGREES TO ACCEPT ALL EXISTING SITE CONDITIONS NOT SPECIFICALLY EXCEPTED. ALL EXCEPTIONS SHALL BE PROVIDED IN WRITING TO THE ARCHITECT AND ENGINEER. 7. PERFORM ROUTINE SERVICE INSPECTION OF ALL EXISTING HVAC UNITS TO BE REUSED FOR THIS PROJECT. LUBRICATE BEARINGS, SERVICE CONTROL SYSTEMS, REPLACE FAN BELTS AND INSTALL NEW FILTERS IN EACH UNIT. FIELD VERIFY REFRIGERANT CHARGE AND NOTIFY OWNER IF THE CHARGE IS LESS THAN MANUFACTURER'S SPECIFICATIONS. SUBMIT SERVICE REPORT TO OWNER/TENANT INDICATING CONDITION OF UNIT AND REPORT ANY MAJOR COMPONENT FAILURES OR MALFUNCTIONS. REPORT SHALL INCLUDE COST TO SERVICE ALL ITEMS ABOVE AND BEYOND THE ITEMS LISTED ABOVE. COST SHALL INCLUDE PARTS AND LABOR. EQUIPMENT SHALL BE PLACED IN FULL OPERATION WITH CONTROLS CALIBRATED ON COMPLETION OF PROJECT. DEMOLITION. DISCONNECT, DISASSEMBLE, CAP, PLUG AND REMOVE ALL MEP ELEMENTS (PIPING, DUCTS, ELECTRICAL DEVICES, WIRING, CONDUIT, EQUIPMENT, HANGERS, SPORTS, ETC) INDICATED ON THE DRAWINGS OR NOT OTHERWISE REQUIRED FOR COMPLETED PRODUCT. NO MEP ELEMENTS ARE TO BE ABANDONED INPLACE UNLESS SPECIFICALLY NOTED. NOT ALL ITEMS TO BE REMOVED ARE INDICATED ON DRAWING. 2. ALL OPENINGS ON PIPING AND DUCTS THAT REMAIN SHALL BE CAPPED AND PROPERLY SECURED. WIRING SHALL BE DISCONNECTED AT CIRCUIT BREAKERS AND REMOVED AND BREAKERS MARKED "SPARE." REMOVE AND RECLAIM ANY REFRIGERANT IN EXISTING SYSTEMS PRIOR TO DEMOLITION OF ANY EQUIPMENT ACCORDING TO FEDERAL REQUIREMENTS. 3. ANY EQUIPMENT DESIGNATED BY OWNER TO BE SALVAGED SHALL BE PROTECTED AND DELIVERED TO AN OWNER DESIGNATED AREA ON SITE. 4. ALL ASBESTOS REMOVAL (IF REQUIRED) WILL BE HANDLED BY THE OWNER AND IS NOT A PART OF THIS WORK. IF MATERIALS SUSPECTED OF CONTAINING HAZARDOUS MATERIALS ARE ENCOUNTERED, DO NOT DISTURB; NOTIFY ARCHITECT AND OWNER IMMEDIATELY. BASIS OF DESIGN AND SUBSTITUTIONS. MANUFACTURERS LISTED ARE BASIS OF DESIGN. SUBSTITUTIONS ARE SUBJECT TO THE APPROVAL OF THE OWNER, ARCHITECT & ENGINEER. IF SUBSTITUTION IS SUBMITTED, IT IS THE CONTRACTOR'S RESPONSIBILITY TO EVALUATE IT AND CERTIFY THAT THE SUBSTITUTION IS EQUIVALENT IN ALL RESPECTS TO THE BASIS OF DESIGN. WHERE SUBMITTALS VARY FROM THE CONTRACT REQUIREMENTS, THE CONTRACTOR SHALL CLEARLY INDICATE ON SUBMITTAL OR ACCOMPANYING DOCUMENTS THE NATURE AND REASON FOR VARIATIONS. IF SUBSTITUTIONS ARE APPROVED, NOTIFY ALL OTHER CONTRACTORS, SUBCONTRACTORS OR TRADES AFFECTED BY SUBSTITUTION AND FULLY COORDINATE. ANY COSTS RESULTING FROM SUBSTITUTION, WHETHER BY CONTRACTOR OR OTHERS, SHALL BE RESPONSIBILITY OF AND PAID FOR BY SUBSTITUTING CONTRACTOR. APPROVED SHOP DRAWINGS DOES NOT ABSOLVE THIS CONTRACTOR FROM THIS RESPONSIBILITY. APPROVAL OF SUBSTITUTIONS IS AT THE DISCRETION OF THE ARCHITECT & ENGINEER AND IF SUBMITTED AFTER THE BID, AT THE RISK OF THE CONTRACTOR. SHOP DRAWING SUBMITTALS. COORDINATE, PREPARE AND SUBMIT SHOP DRAWINGS TO THE ARCHITECT AND ENGINEER FOR THEIR REVIEW. CONTRACTOR SHALL REVIEW AND INDICATE HIS APPROVAL OF EACH SHOP DRAWING PRIOR TO SUBMITTAL FOR REVIEW. DO NOT ORDER, START WORK OR FABRICATION UNTIL SHOP DRAWINGS HAVE BEEN REVIEWED BY THE ENGINEER AND RETURNED TO THE CONTRACTOR. SHOP DRAWINGS TO BE SUBMITTED INCLUDE BUT NOT LIMITED TO: SHEETMETAL DIFFUSERS, GRILLES & REGISTERS FIRE DAMPERS VALVES & PIPING ALL EQUIPMENT 2. INDICATE THE OPERATING CHARACTERISTICS FOR EACH REQUIRED ITEM. PROVIDE ADEQUATE DETAILS AND SCALES TO CLEARLY SHOW CONSTRUCTION. CLEARLY IDENTIFY EACH ITEM ON THE SUBMITTAL AS TO MARK, LOCATION AND USE, USING SAME IDENTIFICATION AS PROVIDED ON DESIGN DRAWINGS. ELECTRONIC SUBMITTALS SHALL BE PRESENTED WITH ALL SHEETS IN ALPHANUMERIC ORDER AND ALL SHEETS ORIENTED WITH TOP OF SHEET. 3. SHEETMETAL SHOP DRAWINGS SHALL BE FULLY DIMENSIONED BASED ON FIELD VERIFIED DIMENSIONS AND ARCHITECTURAL CEILING LAYOUTS. DRAWINGS SHALL BE COORDINATED WITH ALL DISCIPLINES AND SHOW DUCT ELEVATIONS. INDICATE STRUCTURAL, LIGHTING, DUCTWORK AND PIPING AT ALL CRITICAL LOCATIONS. PROVIDE RISES, DROPS AND OFFSETS AS REQUIRED. BRING AREAS OF POTENTIAL CONFLICT TO THE ENGINEERS ATTENTION. 4. SUBMITTALS WILL BE REVIEWED ONLY FOR GENERAL COMPLIANCE WITH THE CONTRACT DOCUMENTS AND NOT FOR DIMENSIONS OR QUANTITIES. THE SUBMITTAL REVIEW SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR PURCHASE OF ANY ITEM IN FULL COMPLIANCE WITH THE CONTRACT DOCUMENTS OR ITS COMPLETE AND PROPER INSTALLATION. 5. COORDINATE HVAC EQUIPMENT WITH ELEVATOR EQUIPMENT INSIDE THE ELEVATOR MACHINE ROOM. SUBMIT COORDINATION DRAWING FOR EACH ELEVATOR MACHINE ROOM FOR FINAL APPROVAL PRIOR TO INSTALLATION. RECORD DRAWINGS. A SET OF MEP RECORD/COORDINATION DRAWINGS SHALL BE MAINTAINED IN THE GENERAL CONTRACTORS OFFICE AT THE JOB SITE. PRINTS SHALL INDICATE ADDITIONS, DELETIONS, VARIATIONS IN LOCATION, VARIATIONS IN NUMBERING ETC. ALTERATIONS SHALL BE MARKED IN RED AND DELETIONS ALL BE MARKED IN GREEN AND SHALL BE ON THE LATEST CONTRACT DRAWING ISSUED. RECORD DRAWINGS SHALL BE KEPT CLEAN AND UNDAMAGED AND SHALL NOT BE USED FOR ANY PURPOSE OTHER THAN RECORDING DEVIATIONS FROM WORKING DRAWINGS. AFTER THE PROJECT IS COMPLETED, THESE SETS OF DRAWINGS SHALL BE DELIVERED TO THE ARCHITECT IN GOOD CONDITION, AS A PERMANENT RECORD OF THE INSTALLATION AS ACTUALLY CONSTRUCTED 2. OCEAN CITY REQUIRES STAMPED AS-BUILT DRAWINGS PRIOR TO ISSUING A CERTIFICATE OF OCCANCY. PER THE MD STATE ATTORNEY'S OFFICE "UNDER THE CODE OF ETHICS GOVERNING PROFESSIONAL ENGINEERS, A PROFESSIONAL ENGINEER MAY NOT SIGN OR SEAL DRAWINGS UNLESS HE OR SHE PERSONALLY PREPARED THEM OR APPROVED THEM. THE CODE OF ETHICS DEFINES THE TERM "APPROVED" AS "() HAVING TECHNICAL KNOWLEDGE AND RESPONSIBLE CONTROL OVER THE CONTENT OF TECHNICAL SUBMISSIONS DURING THEIR PREPARATION AND (2) PERFORMING SUBSTANTIVE REVIEW AND HAVING AUTHORITY TO MAKE REVISIONS WITH REGARD TO THE PREPARATION OF SUBMISSIONS... THEREFORE ALL SUBSTANTIVE CHANGES IN THE DESIGN OR INSTALLATION OF MEP SYSTEMS SHALL BE DISCUSSED AND APPROVED BY OUR OFFICE PRIOR TO INSTALLATION. IF THE CONTRACTOR FAILS TO DO SO OUR OFFICE WILL NOT STAMP THE AS-BUILT DRAWINGS FOR THE CERTIFICATE OF OCCANCY. DUCTWORK. ALL NEW (INTERIOR) RECTANGULAR DUCTWORK SHALL BE W.G. CONSTRUCTION, CONSTRUCTED OF LOCK FORMING No. GALVANIZED STEEL. VOLUME DAMPERS SHALL BE PROVIDED IN ALL BRANCH TAKE OFFS, SPIN-INS OR OTHER CONNECTIONS TO INDIVIDUAL AIR DISTRIBUTION DEVICES. ALL 90 DEGREE ELBOWS SHALL BE RADIUS, OR RECTANGULAR WITH TURNING VANES. DUCTWORK SHALL BE HUNG FROM THE BUILDING STRUCTURE WITH HANGER ASSEMBLIES IN ACCORDANCE WITH "SMACNA" REQUIREMENTS. ALL DUCTWORK SHALL BE SEALED USING HARDCAST TAPE AND ADHESIVE (2 PART SYSTEM). IRON GRIP MAY BE USED AS AN ALTERNATE FOR SEALING INDOOR DUCTWORK. TAPES AND MASTICS FOR DUCT SEALING SHALL BE UL-8A RATED AND LABELED AS SUCH. WHERE FLEXIBLE DUCT OR PORTIONS OF SHEET METAL DUCT ARE SHOWN TO BE REMOVED, BUT ADJACENT SHEET METAL DUCT REMAINS, PATCH REMAINING SHEET METAL AIRTIGHT. DUCTWORK SHALL MEET SMACNA LOW PRESSURE CONSTRUCTION 2" STATIC PRESSURE RATING AND SEALED PER SMACNA CLASS B REQUIREMENTS. DUCTWORK STREAM OF VAV AND FPVAV TERMINALS SHALL BE SMACNA MEDIUM PRESSURE CONSTRUCTION 3" STATIC PRESSURE RATING AND BE SEALED PER SMACNA CLASS "A" REQUIREMENTS. ALL BRANCH CONNECTION FITTINGS IN RECTANGULAR DUCTWORK SHALL BE 45 DEGREE TRANSITION TYPE, CONICAL FITTINGS OR SPIN-IN FITTINGS WITH INTEGRAL AIR SCOOPS. BUTT FITTINGS ARE NOT ACCEPTABLE. 2. ALL FLEXIBLE DUCTWORK SHALL BEAR THE UL 8 LABEL (CLASS AIR DUCT) AND SHALL BE FACTORY INSULATED (-/2, 0.6 LB., FIBERGLASS) ATCO C #076 I OR EQUAL. FLEXIBLE DUCTWORK SHALL COMPLY W/ NFPA 90A, AND NFPA 90B. ALL FLEXIBLE DUCTWORK CONNECTED TO DIFFUSERS SHALL NOT BE LESS THAN THE NECK SIZE OF THE DIFFUSER. MINIMUM FLEXIBLE DUCT BEND RADIUS OF CURVATURE SHALL BE 3 DUCT DIAMETERS, MAXIMUM LENGTH SHALL BE 8-0", NO MORE THAN THE EQUIVALENT OF TWO (2) 90 DEGREE BENDS WILL BE ACCEPTABLE. FLEXIBLE DUCTS SHALL BE INDEPENDENTLY SPORTED FROM THE STRUCTURE AND CONNECTED WITH PLASTIC DRAW BANDS TIGHTENED WITH MANUFACTURER'S TOOL. FLEXIBLE DUCTS ARE NOT PERMITTED IN ROOMS WITHOUT CEILINGS. 3. ALL NEW ROUND SHEET METAL DUCTWORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH FIGURES 3- THROUGH 3-56 AND TABLE 3-2 OF THE "SMACNA" MANUAL. SNAP LOCK LONGITUDINAL SEAMS AND DRAW BAND JOINT CONNECTIONS ARE NOT ACCEPTABLE. 4. KITCHEN HOOD EXHAUST DUCT SHALL BE CONSTRUCTED OF 6 GA. BLACK STEEL (STAINLESS STEEL IN EXPOSED AREAS) WITH CONTINUOUS, LIQUID TIGHT, EXTERNAL WELDED JOINTS AND SHALL BE FABRICATED IN ACCORDANCE WITH NFPA 96. PROVIDE ENTIRE DUCT WITH 3" THICK (TWO /2" LAYERS) 2 HR RATED PYROSCAT DUCT WRAP OR APPROVED EQUAL SPECIFICALLY EVALUATED FOR SUCH PURPOSE IN ACCORDANCE WITH ASTM E WRAP SHALL HAVE FLAME SPREAD = 5 AND SMOKE DEVELOPED = 5 AND BE INSTALLED ON ALL FOUR SIDES OF EXHAUST DUCT. CONTRACTOR SHALL SUBMIT CUT SHEETS FOR THE INSTALLATION OF THE WRAP TO THE BUILDING DEPT. EXTEND WRAP THRU THE ROOF TO THE TOP OF THE CURB. FIRE RATED ASSEMBLIES BEING PENETRATED SHALL UTILIZE A SYSTEM CLASSIFIED IN ACCORDANCE WITH ASTM E 84 OR UL 479. WELDS SHALL BE INSPECTED AS WELL AS INSTALLATION OF EACH LAYER OF WRAP. ELBOWS SHALL BE RADIUS TYPE. SLOPE HORIZONTAL DUCT RUNS /4" PER FOOT TOWARDS HOOD. PROVIDE RESIDUE TRAP AT BASE OF VERTICAL RISER WITH PROVISION FOR CLEANOUT. PROVIDE ACCESS DOORS FOR INSPECTION AND CLEANING PURPOSES. CLEANOUT OPENINGS SHALL BE PROVIDED IN SIDE OF HORIZONTAL DUCT RUNS EVERY 20 FEET AND AT EVERY CHANGE IN DIRECTION. 5. DRYER VENT ROUND DUCTWORK SHALL BE 22 GAUGE (MINIMUM) ALUMINUM CONSTRUCTION WITH DIESTAMPED OR FABRICATED FITTINGS. DUCTS SHALL BE CONSTRUCTED FOR LOW PRESSURE OPERATION WITH LONGITUDINAL SEAM. FABRICATED ELBOWS SHALL BE THE MULTI-PIECE TYPE WITH EACH SEGMENT NOT EXCEEDING 22-/2 DEGREES. THROAT RADIUM OF ALL ELBOWS SHALL BE EQUAL TO THE DUCT DIAMETER. TEES SHALL BE THE CONCEALED TYPE. JOINTS SHALL BE THE SLIP OF FLANGED TYPE. DO NOT USE DRIVE SLIP COLING BANDS. MAKE- SLIP JOINTS WITH DUCT SEALER. DUCTS FOR EXHAUSTING CLOTHES DRYERS SHALL NOT BE ASSEMBLED WITH SCREWS OR OTHER FASTENING MEANS THAT EXTEND INTO THE DUCT AND THAT WOULD CATCH LINT. PROVIDE NFPA 90 A APPROVED FLEXIBLE DUCT SECTION AT CONNECTION OF DRYER TO DUCTWORK. PROVIDE AND INSTALL EXTRUDED ALUMINUM DRYER FLAPPER VENT AT TERMINATION OF EACH DRYER VENT. WHERE CLOTHES DRYER VENT DUCTS PASS THROUGH WALLS, FLOORS, OR PARTITIONS, THAT SPACE AROUND THE DUCT SHALL BE SEALED WITH NON-COMBUSTIBLE MATERIAL AND FIRESTOPPED. SIGNAGE INDICATING EQUIVALENT LENGTH SHALL BE POSTED WITHIN 6 OF THE DRYER CONNECTION IN ACCORDANCE WITH IMC INCLUDE ALL ACOUSTIC; AIRFOIL SHAPED PERFORATED ALUMINUM TURNING VANES, MANUAL DAMPERS, FLEXIBLE CONNECTORS, GRILLES AND DIFFUSERS, ACOUSTIC LINING, AND OTHER SHEET METAL ACCESSORIES FOR THE PROJECT. VOLUME DAMPERS TO BE OF OPPOSED BLADE TYPE CONSTRUCTED IN ACCORDANCE WITH "SMACNA" STANDARDS. 7. ALL EXPOSED ROUND SPLY AND RETURN DUCTWORK SHALL BE SPIROSAFE AS MANUFACTURED BY LINDAB, INC (800) OR APPROVED EQUAL. THE DUCT SYSTEM SHALL CONSIST OF FITTING THAT ARE FACTORY FITTED WITH A SEALING GASKET AND SPIRAL DUCT WHICH, WHEN INSTALLED ACCORDING TO THE MANUFACTURER'S INSTRUCTIONS, WILL SEAL THE DUCT JOINTS WITHOUT THE USE OF DUCT SEALER. ALL DUCT AND FITTINGS SHALL BE A MINIMUM OF G-60 GALVANIZED STEEL IN ACCORDANCE WITH ASTM A-653 AND A-924. ALL DUCT AND FITTINGS SHALL BE CONSTRUCTED PER SMACNA'S DUCT CONSTRUCTION STANDARDS. ALL FITTING ENDS SHALL COME FACTORY EQUIPPED WITH A DOUBLE LIPPED, U-PROFILE, EPDM RUBBER GASKET. GASKET SHALL BE CLASSIFIED BY UNDERWRITER'S LABORATORIES TO CONFORM TO ASTM E84-9A AND NFPA 90A. ALL FITTING ENDS FROM 3" TO 2" DIAMETER SHALL HAVE ROLLED OVER EDGES FOR ADDED STRENGTH AND RIGIDITY. ALL ELBOWS FROM 3" TO 2" DIAMETER SHALL BE 2 PIECE DIE STAMPED AND CONTINUOUSLY STITCH WELDED. ALL ELBOWS 4" DIAMETER AND LARGER SHALL BE STANDING SEAM GORELOCK CONSTRUCTION AND INTERNALLY SEALED. THE RADIUS OF ALL 90 AND 45 ELBOWS SHALL BE.0 TIMES THE ELBOW DIAMETER. ALL FITTINGS THAT ARE OF EITHER SPOT WELDED OR BUTTON PUNCHED CONSTRUCTION SHALL BE INTERNALLY SEALED. ALL SPIRAL DUCT 4" DIAMETER AND LARGER SHALL BE CORRUGATED FOR ADDED STRENGTH AND RIGIDITY. SPIRAL SEAM SLIPPAGE SHALL BE PREVENTED BY MEANS OF A FLAT SEAM AND A MECHANICALLY FORMED INDENTATION EVENLY SPACED ALONG THE SPIRAL SEAM. DUCT SYSTEM PERFORMANCE SHALL MEET SMACNA'S LEAKAGE CLASS 3 REQUIREMENTS AT THE SYSTEM DESIGN STATIC PRESSURE. SPLY AND RETURN REGISTERS SHALL BE LINDAB'S SPIROCOMFORT MODEL RGS-3 FOR DIRECT MOUNTING ON SPIRAL DUCTS OF SIZES SHOWN ON THE PLANS. THE REGISTER IS TO BE MOUNTED WITHOUT THE USE OF A RECTANGULAR REGISTER TAP. THE TOP AND BOTTOM FLANGES ARE TO MEET FLUSH WITH THE SPIRAL DUCT WALL REGARDLESS OF DUCT DIAMETER. END CAPS SHALL BE PROVIDED THAT CONFORM TO THE VARYING DUCT DIAMETER. THE REGISTER SHALL BE MANUFACTURED OF 20 OR 22 GAUGE GALVANIZED STEEL WITHOUT FURTHER SURFACE TREATMENT. WELDS OR OTHER SURFACE DISCOLORATIONS ON THE REGISTER ARE UNACCEPTABLE. THE REGISTER SHALL HAVE DOUBLE DEFLECTION ADJUSTABLE BLADES WITH THE FRONT BLADES PARALLEL TO THE SHORT DIMENSION OF THE REGISTER. BLADES SHALL BE PLACED ON 3/4" CENTERS AND SHALL HAVE STEEL FRICTION PIVOTS ON BOTH ENDS TO ALLOW FOR INDIVIDUAL BLADE ADJUSTMENT WITHOUT LOOSENING OR RATTLING. SCREW HOLES SHALL BE COUNTERSUNK FOR A FLUSH, NEAT APPEARANCE. VOLUME DAMPER SHALL BE OF THE SINGLE BLADE TYPE MANUFACTURED FROM 20 GAUGE ELECTRO-GALVANIZED STEEL. VOLUME DAMPER SHALL BE OPERABLE FROM THE FACE OF THE REGISTER VIA A VOLUME CONTROL ROD. NOTCHED ROD SHALL BE FIXED IN PLACE BY A TENSION LOCK LOCATED AT THE FRONT OF THE REGISTER. 8. ALL FABRIC DUCTWORK SHALL BE COATED, 00% POLYESTER, WOVEN, FIRE RETARDANT MATERIAL, UL AND NFPA APPROVED, NON-POROUS AND MACHINE WASHABLE. DISPERSION ORIFICE SIZE, SPACING AND QUANTITY TO BE SELECTED BY THE MANUFACTURER FOR THE REQUIRED CFM AND DIFFUSER LENGTH OF EACH APPLICATION. COLOR TO BE SELECTED BY THE ARCHITECT. PROVIDE GALVANIZED SUSPENSION HARDWARE AND ACCESSORIES. SIMILAR TO DUCTSOX DURATEX HIGH THROW MODEL. 9. EXTERIOR DUCTWORK SHALL BE ALUMINUM CONSTRUCTION. ALUMINUM SHEETS SHALL BE ASTM B 209, ALLOY 3003, TEMPER H4, WITH MILL FINISH. TOP SHALL BE FABRICATED TO PROVIDE A? PER FOOT SLOPE FROM CENTERLINE TO EDGE. RECTANGULAR DUCT REQUIREMENTS COVERED IN DUCTWORK SPECIFICATION NO. SHALL APPLY. 0. INSTALL OUTSIDE AIR AND FLUE FOR CONDENSING FURNACE TO EXTERIOR OF SCH. 40 PVC MATERIAL. COMPLY WITH ALL MANUFACTURER REQUIREMENTS. INSULATE VENTS THROUGH ATTIC SPACE WITH /2" FIBERGLASS INSULATION. EQUIPMENT. ALL PACKAGED EQUIPMENT SHALL BE INDEPENDENTLY THIRD PARTY LABELED AS A SYSTEM FOR ITS INTENDED USE BY A NATIONALLY RECOGNIZED TESTING LABORATORY (NRTL) IN ACCORDANCE WITH OSHA FEDERAL REGULATIONS 29CFR AND.399, AS WELL AS NFPA PAMPHLET NO. 70, AND THE NATIONAL ELECTRICAL CODE (NEC), ARTICLE MAKE ALL FINAL EQUIPMENT CONNECTIONS AND PROVIDE THE NECESSARY ADAPTORS, FITTINGS, VALVES, DEVICES, ETC. FOR A COMPLETE AND OPERABLE SYSTEM. PROVIDE COMPLETE WITH BASES, ISOLATORS, SPORTS AND OTHER REQUIRED ACCESSORIES. 3. EQUIPMENT SHALL BE INSTALLED IN FULL ACCORDANCE WITH THE MANUFACTURER'S DATA AND INSTALLATION INSTRUCTIONS, INCLUDING CLEARANCES; LUBRICATE AND ADJUST AS REQUIRED. IT IS THIS CONTRACTOR'S RESPONSIBILITY TO CHECK AND CONFORM TO THESE REQUIREMENTS PRIOR TO STARTING WORK. FURNISH AND INSTALL CLEAN SET OF FILTERS PRIOR TO BALANCING. 4. THE CONTRACTOR SHALL COORDINATE ELECTRICAL CHARACTERISTICS OF ALL MECHANICAL EQUIPMENT PRIOR TO ORDERING OF EQUIPMENT. COORDINATE REQUIREMENT FOR PROVISION OF MOTOR STARTERS, DISCONNECTS, CONTACTORS, CONTROL WIRING, ETC. AS REQUIRED FOR PROPER FUNCTIONING SYSTEM WITH ELECTRICAL CONTRACTOR. NO ADDITIONAL PAYMENT WILL BE MADE FOR LACK OF CONTRACTOR COORDINATION OF ELECTRICAL CHARACTERISTICS. 5. ALL FLOOR MOUNTED EQUIPMENT SHALL BE INSTALLED ON CONCRETE HOUSEKEEPING PADS. MINIMUM PAD THICKNESS SHALL BE NOMINAL 4. PAD SHALL EXTEND BEYOND THE EQUIPMENT A MINIMUM OF 4 ON EACH SIDE. CONCRETE PADS SHALL BE PROVIDED BY THIS CONTRACTOR. IT SHALL BE THE RESPONSIBILITY OF THE THIS CONTRACTOR TO COORDINATE THE SIZE AND LOCATION OF THE CONCRETE HOUSEKEEPING PADS WITH THE GENERAL CONTRACTOR. 6. ALL EQUIPMENT SHALL BE MOUNTED ON VIBRATION ISOLATORS TO PREVENT THE TRANSMISSION OF VIBRATION AND MECHANICALLY TRANSMITTED SOUND TO THE BUILDING STRUCTURE. 7. ISOLATION EQUIPMENT SHALL BE THE PRODUCT OF A SINGLE MANUFACTURER, AND SHALL BE DESIGNED SPECIFICALLY FOR THE APPLICATION REQUIRED. THIS INCLUDES, BUT IS NOT LIMITED TO, PIPING DUCTWORK, PUMPS, COMPRESSORS. VIBRATION ISOLATORS SHALL BE RATED FOR THE WEIGHT AND SPACING REQUIRED FOR THE EQUIPMENT REQUIRING ISOLATION. 8. ALL CONDENSATE DRAINS SHALL BE TRAPPED TO A DEPTH EQUAL TO 4 TIMES THE TOTAL STATIC PRESSURE OF THE SYSTEM. PROVIDE CLEANOUT. PROVIDE AUXILIARY DRAIN PANS AT ALL EQUIPMENT WHERE DAMAGE TO ANY BUILDING COMPONENT COULD OCCUR AS A RESULT OF OVERFLOW OR STOPPAGE OF THE PRIMARY SYSTEM. WATER LEVEL DETECTION SHALL BE PROVIDED IN AUXILIARY PAN TO PROVIDE SHUT DOWN OF EQUIPMENT. 9. PROVIDE CURBS FOR ALL ROOF OPENINGS FOR DUCTS, FLUES, PIPING AND EQUIPMENT. CURBS SHALL BE FURNISHED AS ACCESSORIES TO THE EQUIPMENT OR 8" HIGH PATE OR EQUAL EQUIPMENT SPORTS SPANNING STRUCTURE AND FLASHED INTO ROOFING. ALL CUTTING, FLASHING, AND PATCHING OF ROOF SHALL BE BY OWNER'S ROOFING CONTRACTOR AND PAID FOR BY MECHANICAL CONTRACTOR. PIPING SYSTEMS. INSTALL PIPING SYSTEMS TO PERMIT FREE MOVEMENT FOR EXPANSION. SPORT ALL PIPING FROM STRUCTURE WITH UL LISTED HANGERS AND SPORTS SUITABLE FOR THE INTENDED INSTALLATION. DESIGN, SELECTION, SPACING, AND APPLICATION OF HANGERS AND SPORTS SHALL COMPLY WITH ANSI B3. AND MSS SP PROVIDE INSULATION HANGER WITH PROTECTIVE SHIELDS ON SYSTEMS REQUIRING A VAPOR BARRIER. PIPING AT EACH LEVEL. HANGER SHALL BE PROVIDED AT EACH CHANGE OF DIRECTION. HANGERS AND SPORTS SHALL BE SPACED AT INTERVALS WHICH WILL PREVENT SAGGING AND REDUCE STRAIN ON VALVES AND SPECIALTIES. HANGERS SHALL ALLOW FOR EXPANSION AND CONTRACTION. 3. RISER CLAMPS SHALL BE INSTALLED ABOVE THE FLOOR AT EACH LEVEL. RISER CLAMPS MAY BE SUSPENDED BELOW FLOOR LEVEL, WITH HANGER RODS AND INSERTS, WHERE THE INSTALLATION OF ESCUTCHEON PLATES IS REQUIRED. 4. PROVIDE VALVES AND UNIONS WHERE NEEDED TO PERMIT DISCONNECTIONS OF EACH PIECE OF EQUIPMENT FOR REPAIRS. MAKE CONNECTIONS TO EQUIPMENT WITH SHUT-OFF VALVES ON SPLY AND BALANCE VALVES ON RETURNS. INSTALL UNIONS IN PIPES 2 AND SMALLER, ADJACENT TO EACH VALVE, AT FINAL CONNECTIONS EACH PIECE OF EQUIPMENT, AND ELSEWHERE AS INDICATED. UNIONS ARE NOT REQUIRED ON FLANGED DEVICES. 5. LEVER TYPE HANDLE OPERATORS SHALL BE PROVIDED ON VALVES TO 4. GEAR OPERATORS SHALL BE PROVIDED ON VALVES OVER 4, AND ON VALVES REQUIRING CHAIN OPERATION. VALVES USED FOR BALANCING SHALL HAVE INFINITE POSITION LEVER OR GEAR OPERATORS WITH ADJUSTABLE, OPEN POSITION "MEMORY" STOP. PROVIDE 2 EXTENSION NECKS ON ALL VALVES INSTALLED IN INSULATED LINES. 6. CONNECTIONS BETWEEN DISSIMILAR PIPING MATERIALS SHALL BE MADE WITH SUITABLE DIELECTRIC INSULATING UNIONS. ISOLATE COPPER PIPING FROM DISSIMILAR METALS, SUCH AS METAL STUDS AND VENT PIPING. 7. HYDRONIC SYSTEMS SHALL BE PRESSURE TESTED AND THOROUGHLY CLEANED WITH LOW FOAMING DETERGENT CLEANSER, PRIOR TO ANY BALANCING OR CHEMICAL TREATMENT. REFRIGERANT PIPING. REFRIGERANT PIPING SHALL BE NITROGENIZED ACR HARD DRAWN COPPER TUBE - ASTM B280 WITH WROUGHT COPPER, SOLDER JOINT FITTINGS MADE WITH SILVER-COPPER-CDMIUM-ZINC BRAZING ALLOY ( ) TYPE SOLDER.FILL THE PIPE AND FITTINGS DURING BRAZING, WITH NITROGEN OR CARBON DIOXIDE TO PREVENT FORMATION OF SCALE. PIPE PER MANUFACTURER'S PIPING DIAGRAMS, SIZING SPECIFICATIONS AND INSTALLATION INSTRUCTIONS. INSTALL PIPING IN AS SHORT AND DIRECT ARRANGEMENT AS POSSIBLE TO MINIMIZE PRESSURE DROP 2. INSTALL UNIONS TO ALLOW REMOVAL OF SOLENOID VALVES, PRESSURE REDUCING VALVES, EXPANSION VALVES, AND AT CONNECTIONS TO COMPRESSORS AND EVAPORATORS. INSTALL FLEXIBLE CONNECTORS AT INLET AND DISCHARGE CONNECTION OF COMPRESSORS. BALL VALVES SHALL BE TWO PIECE, CONVENTIONAL PORT, FORGED BRASS BODY, 500 PSIG WORKING PRESSURE, AS MANUFACTURED BY HENRY VALVE COMPANY. CHARGING AND PURGE VALVES SHALL BE HENRY VALVE COMPANY TYPE 643. MOISTURE LINE INDICATORS SHALL BE HENRY VALVE COMPANY MODEL FILTER-DRIERS SHALL BE HENRY VALVE COMPANY MODEL 87-C CARTRIDGE WITH TYPE 77, 78, OR 79 UNIT SHELL AS APPLICABLE. 3. AFTER COMPLETION, PRESSURE TEST PIPING, PURGE AND EVACUATE SYSTEM TWICE AND CHARGE SYSTEM WITH REFRIGERANT AND OIL. HVAC WATER & CONDENSATE PIPING. AT THE CONTRACTORS OPTION HVAC WATER & CONDENSATE PIPING SHALL BE TYPE "L" COPPER TUBING, HARD DRAWN, WITH CAST BRASS OR WROUGHT COPPER FITTINGS MADE WITH 95-5 TYPE SOLDER, OR SCHEDULE 40, WELDED BLACK STEEL (ASTM A53) WITH BLACK WROUGHT STEEL, BUTT WELDING TYPE (ASTM B6.9) FITTINGS, OR SCHEDULE 40, GROOVED BLACK STEEL (ASTM A53) WITH GROOVED FITTINGS SIMILAR TO VICTAULIC OR APPROVED EQUAL MAY BE UTILIZED. 2. PROVIDE VENTS AT HIGH POINTS AND DRAIN VALVES AT LOW POINTS. INCLUDE OFFSETS TO SUIT THE BUILDING CONSTRUCTION. INSTALL PIPING TO ALLOW CLEARANCE FOR EXPANSION AND CONTRACTION. INSTALL PIPING AT A UNIFORM SLOPE OF IN 40 FEET WARD IN THE DIRECTION OF FLOW. MAKE REDUCTIONS IN PIPE SIZES USING ECCENTRIC REDUCER FITTING INSTALLED WITH THE LEVEL SIDE. INSULATION. ALL RIGID SPLY, RETURN, AND OUTSIDE AIR DUCTWORK WITHIN THE INSULATED BUILDING ENVELOPE SHALL BE INSULATED WITH 2 THICK (3/4 TO /2LB/FT3) FIBERGLASS DUCT WRAP (MINIMUM R-5 INSTALLED). ALL RIGID SPLY, RETURN, EXHAUST AND OUTSIDE AIR DUCTWORK OUTSIDE THE INSULATED BUILDING ENVELOPE (CRAWL SPACE, UNINSULATED ATTIC OR SIMILAR) SHALL BE INSULATED WITH 3 THICK (3/4 TO /2LB/FT3) FIBERGLASS DUCT WRAP (MINIMUM R-8 INSTALLED). 2. FIBERGLASS DUCT WRAP SHALL HAVE FACTORY FOIL JACKET. SEAL ALL SEAMS AND JOINTS WITH PRESSURE SENSITIVE TAPE MATCHING THE FACING, CLOTH DUCT TAPE IS NOT ACCEPTABLE. WHERE RECTANGULAR DUCTS ARE 24 IN WIDTH OR GREATER, DUCT WRAP SHALL BE ADDITIONALLY SECURED TO THE BOTTOM OF THE DUCT WITH PUSH PINS AND SPEED WASHERS, SPACED ON 8" CENTERS. EXTERNAL INSULATION IS NOT REQUIRED WHERE DUCTWORK IS INTERNALLY LINED. 3. THE FIRST 5 FEET OF SPLY AND RETURN DUCTWORK DOWN & STREAM FROM AIR HANDLING EQUIPMENT SHALL BE INTERNALLY LINED. THE FIRST 0 FEET DOWNSTREAM OF VAV BOXES SHALLL BE INTERNALLY LINED. ALL EXTERIOR SPLY AND RETURN DUCTWORK SHALL BE LINED. ALL DUCTORK EXPOSED IN FINISH SPACES SHALL BE INTERNALLY LINED. LINER SHALL BE NON-FLAKING COATED FIBERGLASS. DUCT DIMENSIONS INDICATED ON THE DRAWINGS ARE CLEAR INSIDE DIMENSIONS. 4. DUCTLINER WITHIN THE INSULATED BUILDING ENVELOPE SHALL BE -/2 THICK, 2LB/FT3 DENSITY OR THICK, 3LB/FT3 DENSITY (MINIMUM R-5 INSTALLED). DUCTLINER OUTSIDE THE INSULATED BUILDING ENVELOPE (CRAWLSPACE, UNINSULATED ATTIC, EXTERIOR OR SIMILAR) SHALL BE 2 THICK, 2LB/FT3 DENSITY (MINIMUM R-8 INSTALLED). 5. INSULATE DUCTWORK IN MACHINE, FAN, AND EQUIPMENT ROOMS WHERE NOT LINED WITH 2" THICK RIGID FIBERGLASS INSULATION (MINIMUM R-5 INSTALLED). 6. INSULATE ALL REFRIGERANT PIPING, VALVES, FITTINGS, AND FLEXIBLE CONNECTIONS WITH THICK FLEXIBLE FOAMED PLASTIC INSULATION WITH JOINTS AND SEAMS SEALED VAPOR TIGHT. 7. CHILLED WATER PIPING -/2 AND SMALLER SHALL BE INSULATED WITH A MINIMUM FIBERGLASS INSULATION. CHILLED WATER PIPING GREATER THEN -/2 SHALL BE INSULATED WITH A MINIMUM -/2 FIBERGLASS INSULATION. 8. HOT WATER PIPING -/2 AND SMALLER SHALL BE INSULATED WITH A MINIMUM FIBERGLASS INSULATION. HOT WATER PIPING GREATER THEN -/2 SHALL BE INSULATED WITH A MINIMUM 2 FIBERGLASS INSULATION. 8. STEAM SYSTEMS PIPING -/2 AND SMALLER SHALL BE INSULATED WITH A MINIMUM -/2 FIBERGLASS INSULATION. STEAM SYSTEM PIPING GREATER THEN -/2 SHALL BE INSULATED WITH A MINIMUM 3 FIBERGLASS INSULATION. 9. CONDENSER WATER PIPING SHALL BE INSULATED WITH A MINIMUM FIBERGLASS INSULATION. 0. CONDENSATE PIPING SHALL BE INSULATED WITH THICK FIBERGLASS INSULATION WITH STANDARD VAPOR BARRIER JACKET OR WITH THICK FLEXIBLE UNICELLULAR ("ARMAFLEX").. FIBERGLASS PIPE INSULATION SHALL BE WITH STANDARD VAPOR BARRIER JACKET AND HAVE A MAXIMUM CONDUCTIVITY OF 0.27 BTU PER /HR-FT2- F. ALL INSULATION TO BE APPLIED IN FULL ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. 2. INSULATE FITTINGS, JOINTS, AND VALVES WITH INSULATION OF LIKE MATERIAL AND THICKNESS AS ADJOINING PIPE. PROVIDE REMOVABLE INSULATION SECTIONS TO COVER PARTS OF EQUIPMENT WHICH MUST BE OPENED PERIODICALLY FOR MAINTENANCE; INCLUDE METAL VESSEL COVERS, FASTENERS, FLANGES, CHILLED WATER PUMPS, FRAMES AND ACCESSORIES. FINISH WITH GLASS CLOTH OR PVC FITTING COVERS. MECH M0.0 MECHANICAL AS NOTED MCAB DSMI DATA SHEET x BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS

44 ASC JOB#: 76 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION % SD SUBMISSION REVISIONS A B C D Key Plan GAS S/A FAN DX CLEARANCE RELIEF AIR DUCT WHEEL TYPICAL EQUIPMENT REQUIRED CLEARANCES E/A FAN, FILTER OUTDOOR AIR INTAKE DUCT Seal DOAS- area way CEILING SUSPENDED CEILING SUSPENDED area way VRF INDOOR UNIT TYPES Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com CEILING SUSPENDED HIGH-WALL BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES M.00 BASEMENT FLOOR MECHANICAL PLAN SCALE: /8" = '-0" Drawing Title BASEMENT FLOOR MECHANICAL PLAN Discipline MECH Drawing Number ' 0 4' 8' 2' 6' N Scale /8" = '-0" Date 30 DEC 20 Drawn by MCAB M.00 GRAPHIC SCALE /8" = '-0" Checked by DSMI Sorg Project Number 8

45 E E ASC JOB#: 76 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION % SD SUBMISSION REVISIONS HIGH-WALL HIGH-WALL AHU-2 5 TON AUDITORIUM 002 AHU- 7.5 TON MULTIPURPOSE / CAFETERIA 0 GYMNASIUM 02 CUSTODIAL & ENGINEERING AHU-3 20 TON DN 020 DN KITCHEN 00 TOILET 009 AUDITORIUM 00 TOILET 08 P.E. OFFICE 09 MUSIC 007 SLOP SLOP PRE-K 07 VRF INDOOR UNIT TYPES PRE-K 006 SPECIAL NEEDS 06 CEILING SUSPENDED HIGH-WALL AHU-4 5 TON AHU-5 5 TON Key Plan HEAD END 008 HIGH-WALL TEACHER'S WORK AREA 003 DN TEACHER'S OFFICE 02 STORAGE 05 PRE-SCHOOL 005 PRE-SCHOOL 004 PRE-K 03 PRE-K 04 L-. RELIEF AIR LOUVER L-. OUTDOOR AIR INTAKE LOUVER Seal Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com M.0 GROUND FLOOR MECHANICAL PLAN SCALE: /8" = '-0" BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title GROUND FLOOR MECHANICAL PLAN Discipline MECH Drawing Number ' 0 4' 8' 2' 6' N Scale /8" = '-0" Date 30 DEC 20 Drawn by MCAB M.0 GRAPHIC SCALE /8" = '-0" Checked by DSMI Sorg Project Number 8

46 ASC JOB#: 76 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION % SD SUBMISSION REVISIONS STUDENT SERVICES 29 KINDERGARTEN 4 KINDERGARTEN 5 KINDERGARTEN 6 RESOURCE 32 RESOURCE 3 SPEECH 30 STUDENT SERVICES 28 RESOURCE 27 KINDERGARTEN 3 DN HIGH-WALL TOILET 2 TOILET 25 DN RESOURCE 26 THIS AREA SHOWS ALTERNATE ARRANGEMENT OF VRF INDOOR UNITS IN CLASSROOMS. UNITS SHOWN AS DUCTLESS CEILING MOUNTED TYPE IN LIEU OF DUCTED CLOSET TYPE. ST GRADE 0 ST GRADE SPECIAL NEEDS 23 HEALTH 24 VRF INDOOR UNIT TYPES CEILING SUSPENDED COT 25 HIGH-WALL PARENT RESOURCE 02 WELCOME CENTER 0 CONFERENCE 03 STOR. 27 EXAM 26 Key Plan DN DN DN DN ADMIN WORK AREA 06 PRINCIPAL 04 SECURITY 05 LOUNGE 7 MAIL 22 DN ST GRADE 09 RECORDS 08 ST GRADE 07 COUNSELOR 8 BEFORE / AFTER CARE 9 DATA 20 HIGH-WALL ART 2 Seal Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com M.02 FIRST FLOOR MECHANICAL PLAN SCALE: /8" = '-0" BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title FIRST FLOOR MECHANICAL PLAN Discipline MECH Drawing Number ' 0 4' 8' 2' 6' N Scale /8" = '-0" Date 30 DEC 20 Drawn by MCAB M.02 GRAPHIC SCALE /8" = '-0" Checked by DSMI Sorg Project Number 8

47 ASC JOB#: 76 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION % SD SUBMISSION REVISIONS 2ND GRADE 2 2ND GRADE 22 COMPUTER LAB 222 5TH GRADE 22 2ND GRADE 20 5TH GRADE 220 DN 2ND GRADE 209 DN TOILET 208 TOILET 28 DN 5TH GRADE 29 3RD GRADE 206 3RD GRADE 207 4TH GRADE 27 VRF INDOOR UNIT TYPES CEILING SUSPENDED 4TH GRADE 26 OFFICE 202 Key Plan HIGH-WALL DN MEDIA CENTER 20 DN WORK 203 STORAGE 25 3RD GRADE 205 3RD GRADE 204 4TH GRADE 23 4TH GRADE 24 Seal Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com M.03 SECOND FLOOR MECHANICAL PLAN SCALE: /8" = '-0" BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title SECOND FLOOR MECHANICAL PLAN Discipline MECH Drawing Number ' 0 4' 8' 2' 6' N Scale AS NOTED Date 30 DEC 20 Drawn by MCAB M.03 GRAPHIC SCALE /8" = '-0" Checked by DSMI Sorg Project Number 8

48 0 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION % SD SUBMISSION REVISIONS KEF- (KITCHEN EXHAUST FAN) CU- (AHU- OUTDOOR UNIT) MUA- (KITCHEN MAKE- AIR UNIT) TYPICAL EQUIPMENT REQUIRED CLEARANCES CU-3 (AHU-3 OUTDOOR UNIT) 6-TONS TOTAL CU-2 (AHU-2 OUTDOOR UNIT) 6-TONS TOTAL TWINNED VRF HEAT PUMPS 6-TONS TOTAL TWINNED VRF HEAT PUMPS 6-TONS TOTAL TWINNED VRF HEAT PUMPS TWINNED VRF HEAT PUMPS EF-2 (TOILET EXHAUST FAN) EF- (TOILET EXHAUST FAN) DOAS-2 DOAS-3 CU-4 (AHU-4 OUTDOOR UNIT) 2 2 CU-5 (AHU-5 OUTDOOR UNIT) ACCU- (DOAS- OUTDOOR UNIT) Key Plan 6-TONS TOTAL TWINNED VRF HEAT PUMPS 6-TONS TOTAL 6-TONS TOTAL TWINNED VRF HEAT PUMPS GAS FIRED WATER HEATER FLUE VENT TYPICAL EQUIPMENT REQUIRED CLEARANCES 2 6-TONS TOTAL TWINNED VRF HEAT PUMPS 6-TONS TOTAL TWINNED VRF HEAT PUMPS 6-TONS TOTAL PLAN NOTES: #. MAIN SPLY AND RETURN DUCT ROUTE DOWN THROUGH EXISTING DUCT CHASE. 2. ROUTE REFRIGERANT PIPING TO MATCHING INDOOR UNIT. TWINNED VRF HEAT PUMPS TWINNED VRF HEAT PUMPS Seal Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com M.04 ROOF MECHANICAL PLAN SCALE: /8" = '-0" BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title ROOF MECHANICAL PLAN Discipline MECH Drawing Number ' 4' 8' 2' 6' N Scale AS NOTED Date 30 DEC 20 Drawn by MCAB M.04 GRAPHIC SCALE /8" = '-0" Checked by DSMI

49 ASC JOB#: 76 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION % SD SUBMISSION REVISIONS AC UNIT UNION (TYP.) SLOPE DOWN NOTE NOTE 2 EQUAL TO FAN TRAP TOTAL STATIC PRESSURE IN. W.C. (" MINIMUM) NOTES:. DRAIN LINE SHALL BE FULL SIZE OF AC UNIT CONNECTION. 2. EXTEND TO NEAREST FLOOR DRAIN UNLESS NOTED OTHERWISE. 3. ARRANGEMENT SHOWN IS SUITABLE FOR DRAW-THROUGH UNITS ONLY. AIR TRANSFER DUCT. (REFER TO DRAWINGS FOR SIZES) " SOUND LINING (ALL SIDES OF DUCT) SHEET METAL SCREWS (TYP.) 20 GAUGE x " METAL STRAP CONNECTED TO STRUCTURE ABOVE (TYP.) BLOCK OR STUD WALL CONSTRUCTION (DUCT OPENING THROUGH DRYWALL PARTITION TO BE FRAMED WITH STUDS) MANUFACTURED BREAKAWAY CONNECTION EACH SIDE OF FIRE DAMPER (TYPICAL) STEEL BLADES (OUT OF AIRSTREAM) FUSIBLE LINK SHEET METAL DUCT DOUBLE WALL, HINGED, GASKETED AND INSULATED ACCESS PANEL (LABEL "FIRE DAMPER ACCESS DOOR") MOTOR DOME MOTOR VIBRATION ELIMINATORS HOUSING COOLING TUBE DRAINAGE AREA THRU BOLT TO WOOD NAILER HIGH TEMPERATURE GASKET SINGLE PLY ROOFING MATERIAL ROOF (REFER TO ARCHITECTURAL) BELT DRIVE WITH SHEAVES CENTRIFUGAL FAN WHEEL ANCHOR 4 GAUGE STAINLESS STEEL CURB EXTENSION WITH PRIMER & ALUMINUM FINISH COAT 6 GAUGE GALVANIZED WELDED STEEL DUCT SHELL 8" HIGH ROOF CURB HANGER ROD HEAVY DUTY CLEVIS HANGER VAPOR BARRIER INSULATION 8 M5.0 COOLING COIL CONDENSATE DRAIN DETAIL SINGLE HORIZONTAL RUNS WITH VAPOR BARRIER INSULATION CLEVIS HANGER ATTACH FLEXIBLE DUCT W/BAND AND SECURE AIRTIGHT LOW PRESSURE RECTANGULAR SPLY DUCT SPIN-IN COLLAR W/VOLUME DAMPER FLEXIBLE DUCT SIZE SHOWN ON PLAN, MAX. LENGTH 3'-0". 9 M5.0 2 M5.0 LOCKING NUT SPORT NUT 6 GAGE ZINC COATED SHEET STEEL SADDLE AT LEAST 2" LONG. HANGER DETAILS INSULATION SPORT RODS FROM BUILDING STRUCTURE STEEL SPRING AND RUBBER IN SHEAR TYPE VIBRATION ISOLATORS DIFFUSER PANEL CLG. PANEL PIPE OR EQUIPMENT HANGER DETAIL DIFFUSER CONNECTION DETAIL OPPOSED BLADE VOLUME DAMPER. BALANCE SYSTEM W/DAMPER FULL OPEN ELASTOMERIC PAD ISOLATOR SPRING AIR TRANSFER GRILLE WITH FIXED LOUVERS (TYP.) BLOCK OR STUD WALL CONSTRUCTION SPLY AIR FLOW SPLITTER DAMPER REGULATOR WITH LOCK NUT 5 MAXIMUM TRANSITION (TYPICAL FOR ALL DUCT TRANSITIONS) 3 M5.0 AIR TRANSFER DUCT DETAIL SHEET METAL EXTENSION COLLAR CEILING GRID CEILING NOTES:. FOR TRANSFER DUCTS THRU RATED PARTITIONS, REFER TO FIRE DAMPER DETAIL. 2. DETAIL FOR TRANSFER DUCT WITH PERFORATED GRILLES IS SIMILAR. R=A A 45 R= W * D D MAXIMUM 5 TRANSITION ANGLE BRANCH TAKE OFF DETAIL 5 A&B 5 A B SPLY AIRFLOW MAIN DUCT (REFER TO DRAWINGS FOR SIZES) STRAIGHT OUT VOLUME DAMPER REGULATOR WITH LOCK NUT FOR SPLY, RETURN AND EXHAUST AIR AS REQUIRED SIZE AS INDICATED ON FLOOR PLANS MAIN DUCT (REFER TO DRAWINGS FOR SIZES) HINGED SPLITTER DAMPER (SPLY AIR ONLY) R= B STEEL ANGLES FASTENED TO SLEEVE AND WALL FIRE DAMPER U.L. LABELED FOR HOUR, UNLESS OTHER WISE NOTED STAINLESS STEEL NEGATOR CLOSURE SPRING MANUFACTURED BREAKAWAY CONNECTION EACH SIDE OF FIRE DAMPER (TYPICAL) STEEL ANGLES FASTENED TO SLEEVE AND WALL BOLTS 0 M5.0 " X " REMOVABLE MESH SCREEN METAL SCREEN FRAME M5.0 NOTE: GENERAL DETAIL SHOWN, CONTRACTOR SHALL INSTALL FIRE DAMPER PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. DOUBLE WALL, HINGED, GASKETED AND INSULATED ACCESS PANEL (LABEL "FIRE DAMPER ACCESS DOOR") SHEET METAL DUCT FUSIBLE LINK STEEL BLADES CONCRETE OR STEEL FRAME FLOOR CONSTRUCTION SLEEVE BLADE LOCK DUCT THROUGH FLOOR WITH FIRE DAMPER DETAIL SLEEVE NOTE: GENERAL DETAIL SHOWN, CONTRACTOR SHALL INSTALL FIRE DAMPER PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. FIRE DAMPER U.L. LABELED FOR -HOUR, UNLESS OTHERWISE NOTED DUCT THROUGH WALL WITH FIRE DAMPER DETAIL ANGLE IRON REINFORCING WHERE REQUIRED WATERPROOF ALL SEAMS AND JOINTS ROOF INSULATION METAL DECK BEAM CLAMP SUSPENSION TYPE VIBRATION ISOLATORS DISCHARGE DUCT FLEXIBLE DUCT CONNECTION FAN OUTLET WITH BACKDRAFT DAMPER CENTRIFUGAL FAN WHEEL WITH DIRECT DRIVE LOW RPM MOTOR BEAM CLAMP SUSPENSION TYPE VIBRATION ISOLATORS 2 M5.0 BLAST EXHAUST FAN DETAIL NOTE: ALIGN TOP OF FAN LEVEL WITH TOP OF SLOPING ROOF. PROVIDE 2"x2" HINGED AND GASKETED CLEAN OUT DOOR AT 90 ELBOW IN DUCT. CEILING MOUNTED EXHAUST FAN DETAIL NOTE: BACKDRAFT DAMPER CONCRETE CONCRETE INSERT ANCHOR TO STRUCTURE ABOVE /4"Ø PLATED ALL THREAD ROD INSULATED FAN HOUSING SPORT ANGLES CEILING TILE, WHERE APPLICABLE GRILLE SPORT SCREWS (TYP.) INLET GRILLE SPLIED WITH FAN ) PROVIDE VARIABLE SPEED SWITCH ON THE SIDE OF THE CASING FOR FINAL AIR BALANCE. CONCRETE CONCRETE INSERT ANCHOR TO STRUCTURE ABOVE /4"Ø PLATED ALL THREAD ROD FLEXIBLE DUCT CONNECTION Key Plan LOW PRESSURE RECTANGULAR SPLY DUCT SPIN-IN COLLAR W/VOLUME DAMPER FLEXIBLE DUCT SIZE SHOWN ON PLAN, MAX. LENGTH 4'-0" ATTACH FLEXIBLE DUCT W/BAND & SECURE AIR TIGHT SOUND LINED PLENUM INSULATION CLASS "" FLEX. DUCT CEILING A VOLUME DAMPER WITH LOCK NUT (TYP. AS REQUIRED) DUCT TEE WITH RADIUS ELBOW DETAIL B ANGLE RIVETED OR TACK WELDED AS REQUIRED DUCT SIZE +25% 8" ABOVE ROOF MINIMUM SHINGLED ROOF ROOFING SHEATHING 35 MIN. R R = W/2 2" MIN. ROOFING MEMBRANE SHELL FLEXIBLE DUCT CONNECTION FAN OUTLET WITH BACKDRAFT DAMPER CENTRIFUGAL FAN WHEEL WITH DIRECT DRIVE LOW RPM MOTOR IN-LINE EXHAUST FAN DETAIL SOUND LINING SPORT ANGLES INSULATED FAN HOUSING NOTE: ) PROVIDE VARIABLE SPEED SWITCH ON THE SIDE OF THE CASING FOR FINAL AIR BALANCE. 3 M5.0 SLOT DIFFUSER CONNECTION DETAIL CHOOSE CONDENSER/CONDENSING/ HEAT PUMP UNIT ROOFING STRUCTURE FLASH AND SEAL INTO NEW / EXISTING ROOF SYSTEM GOOSENECK THROUGH SLOPED ROOF DETAIL FACTORY WIRED, FROM MOTOR TO DISCONNECT Seal ROUND SPIRAL DUCT COMPRESSOR ACCESS PANEL. MAINTAIN PROPER CLEARANCE PROTECTIVE COIL COVER SHEET FLASHING MOP IN WITH ROOFING MATERIAL LOUVERED GRILLE OR DRUM LOUVER DUCT TAP DIMENSIONS SHALL MATCH OUTER EDGE OF GRILLE, FOLD IN DUCT FOR GRILLE MOUNTING. DUCT MOUNTED GRILLE DETAIL REFRIGERANT PIPING AND ELECTRICAL CONDUIT PER MANUFACTURERS RECOMMENDATION CHOOSE GRADE MOUNTED CONDENSER/CONDENSING/ HEAT PUMP UNIT DETAIL 6" "PUMP-" MOUNTS SPLIED BY UNIT MANUFACTURER 4" CONCRETE PAD WITH MITRED CORNERS GRADE 4 M5.0 ROOFING MIN. 2" MIN. 2" ROOF CONSTRUCTION SLEEVE ROOF CONSTRUCTION AS REQUIRED SEE PLANS FOR PIPING SIZE AND LOCATION PIPE PENETRATION THROUGH ROOF DETAIL WIRING 8" MIN BACKDRAFT DAMPER ROOF DECK ROOF DECK DUCT AND /4" /4" DAMPER SIZE ROOF OPENING BELT DRIVE EXHAUST FAN DETAIL M5.0 Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title DETAIL SHEET MECHANICAL Discipline MECH Drawing Number ' 0 4' 8' 2' 6' N Scale AS NOTED Date 30 DEC 20 Drawn by MCAB M5.0 GRAPHIC SCALE /8" = '-0" Checked by DSMI Sorg Project Number 8

50 ASC JOB#: 76 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION % SD SUBMISSION REVISIONS DX PACKAGE TYPE HEAT PUMP - DEDICATED OUTSIDE AIR SYSTEM SCHEDULE (WITH ENERGY RECOVERY WHEEL) SPLY FAN MOTOR EXHAUST FAN MOTOR HEATWHEEL HEATING MODE HEATWHEEL COOLING MODE REFRIGERANT / AIR COIL (COOLING) UNIT TAG AREA SERVED OA [CFM] CFM SP [IN WG] FPM MOTOR CFM SP [IN WG] RPM MOTOR OA EAT OA LAT EXH. AIR EAT EXH. LAT OA EAT OA LAT EXH. EAT EXH. LAT MBH EER TYPE EAT LAT EXT. TOTAL QTY HP EXT. TOTAL QTY HP DB [ F] DB [ F] DB [ F] DB [ F] DB [ F] WB [ F] DB [ F] WB [ F] DB [ F] WB [ F] DB [ F] TOTAL SENSIBLE DB [ F] WB [ F] DB [ F] WB [ F] DOAS-2 NORTH WING R-40A DOAS-3 SOUTH WING R-40A DX PACKAGE TYPE HEAT PUMP - DEDICATED OUTSIDE AIR SYSTEM SCHEDULE (WITH ENERGY RECOVERY WHEEL) UNIT TAG MBH TOTAL COP REFRIGERANT / AIR COIL (HEATING) HEAT PUMP REFRIGERATION SYSTEM (CONTINUED) OMPRESSORS / HEAT PUMP COIL HOT GAS REHEAT COIL (HEAT RECLAIM) EAT LAT NOM. COMPRESSORS EAT [ F] MBH TONS DB [ F] DB [ F] QTY DB/WB HEATWHEEL LAT [ F] QTY AAON MODEL BASIS OF DESIGN - AOON DOAS-2 25 ERC-5245 RN E60Y,2 DOAS-3 30 ERC-5245 RN E60Y,2 REMARKS. PROVIDE MERV 3 FILTERS. 2. PROVIDE SPLY AND RETURN UNIT MOUNTED PHOTOELECTRIC DUCT SMOKE DETECTORS INTERLOCKED WITH UNIT TO PROVIDE IMMEDIATE SHUT DOWN REMARKS FAN SCHEDULE UNIT SERVES AREA LOCATION CFM E.S.P. RPM MOTOR HP INTERLOCKED CONTROLLED FAN TYPE BASIS OF DESIGN MODEL APPROX. REMARKS TAG SERVING IN W.G. (WATTS) WITH BY NUMBER WEIGHT, LB EF- BOYS TOILET 0.50 EXHAUST ROOF 800 EF-2 EXHAUST GIRLS TOILET ROOF EF-3 EXHAUST ELECTRICAL RM - KEF- EXHAUST KITCHEN ON ROOF DWE- EXHAUST DISHWASHER ON ROOF REMARKS. ALL BELT DRIVE FANS TO BE EQUIPPED WITH ADJUSTABLE SHEAVE. 2. FAN CONNECTED TO EMERGENCY POWER. 3. FAN SHALL RUN CONTINUOUSLY. 4. INTERLOCK FAN WITH SMOKE DETECTION DEVICES AND DOAS UNIT SERVING AS MAKE- AIR. PROVIDE INTERLOCKS, CONTROLS AND RELAYS. 5. INTERLOCK FAN WITH GAS SOLENOID VALVE UNDER KITCHEN HOOD. PROVIDE INTERLOCKS, CONTROLS AND RELAYS. 6. INTERLOCK FAN WITH DISWASHER EQUIPMENT. PROVIDE INTERLOCKS, CONTROLS AND RELAYS. 7. REFER TO KITCHEN EQUIPMENT MANUFACTURER FOR ADIDITIONAL TIE-IN REQUIREMENTS. ABBREVIATIONS SWC SIDE WALL CENTRIFUGAL (MD) MOD MOTORIZED DAMPER GD GRAVITY DAMPER SWP SIDE WALL PROPELLER D DISCONNECT EMS ENERGY MANAGEMENT SYSTEM (BAS) P PROPELLER I.G. INLET GUARD BIG BUILT IN GRILLE B.D. BELT DRIVE O.G. OUTLET GUARD CF CEILING FAN D.D. DIRECT DRIVE I.L. IN LINE WHG WALL HOUSING PRC PREFABRICATED ROOF CURB F.A. FIRE ALARM AAR ADJUSTABLE AT REST CAB. CABINET VA VANE AXIAL SC SPEED CONTROLLER PRV POWER ROOF VENTILATOR VI VIBRATION ISOLATOR WH WEATHER HOOD US UTILITY SET BDD BACK DRAFT DAMPER DC DRAIN CONNECTION SF SPLY FAN OS OUTLET SHUTTER AD ACCESS DOOR EF EXHAUST FAN TA TUBE AXIAL GT GREASE TRAP CF CIRCULATING FAN C CENTRIFUGAL FAN VFD VARIABLE FREQUENCY DRIVE SCP SMOKE CONTROL PANEL DW DISHWASHER FH FUME HOOD WS WALL SWITCH SPLIT SYSTEM HEAT PUMP SCHEDULE UNIT AREA SENS. TOTAL E.A.T. REVERSE CYCLE INDOOR UNIT OUTDOOR UNIT ELEC. TAG SERVING CAP CAP DB/WB HEAT CAP. E.S.P. HP UNIT NOM. VOLTS CFM O.A. HEATER MODEL MODEL / REMARKS MBH MBH MBH CFM IN. W.G. KW TAG TONS PHASE CU AHU-2 KITCHEN AHU-3 CAFETERIA CU-3 5 AHU-4 GYM CU-4 20 REMARKS: VARIABLE REFRIGERANT FLOW SYSTEM DESCRIPTION The variable capacity, heat pump heat recovery air conditioning system shall be a Mitsubishi Electric CITY MULTI VRFZ (Variable Refrigerant Flow Zoning). The CITY MULTI VRFZ systems shall be the R2-Series (simultaneous cooling and heating) split system heat pump. Mitsubishi shall be Basis of Design. Alternate manufacturers shall be Daikin and Sanyo. Key Plan The R2-Series system shall consist of a PURY outdoor unit, BC (Branch Circuit) Controller, multiple indoor units (-E models), and M-NET DDC (Direct Digital Controls). Each indoor unit or group of indoor units shall be capable of operating in any mode independently of other indoor units or groups. System shall be capable of changing mode (cooling to heating, heating to cooling) with no interruption to system operation. Each indoor unit or group of indoor units shall be independently controlled. The sum of connected capacity of all indoor air handlers shall range from 50% to 50% of outdoor rated capacity. R40A refrigerant shall be required. Indoor units shall consist of the PKFY wall-mounted unit, PLFY 4-way ceiling cassette unit, PCFY ceiling-suspended unit, and PVFY ducted vertical air handler located in a closet. Plans note the types of units anticipated in each zone. Seal Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title SCHEDULES MECHANICAL Discipline MECH Drawing Number ' 0 4' 8' 2' 6' N Scale AS NOTED Date 30 DEC 20 Drawn by MCAB M6.0 GRAPHIC SCALE /8" = '-0" Checked by DSMI Sorg Project Number 8

51 ASC JOB#: 76 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION % SD SUBMISSION REVISIONS ROOF??? CFM??? CFM DOAS-2?/???? CFM??? CFM?/? DUCT THROUGH EXISTING CHASE (TYPICAL)?/???? CFM DOAS-3?/???? CFM ROOF EF?/? EF 2?/? MAIN SPLY & RELIEF DUCT TYPICAL INDOOR VRF UNITS. OUTDOOR UNIT LOCATED ON ROOF. FCU- (CEILING MOUNTED) OR FCU- (FLOOR MOUNTED) 2ND FLOOR??? CFM??? CFM CLASSROOM CLASSROOM CLASSROOM 2ND FLOOR BOYS TOILET GIRLS TOILET RELIEF DUCT SPLY REGISTER IN BULKHEAD (TYPICAL) WALL MOUNTED RETURN GRILLE (TYPICAL) CLASSROOM??? CFM??? CFM CLASSROOM??? CFM??? CFM CLASSROOM BOYS TOILET GIRLS TOILET SPLY DUCT CLOSET SINGLE DUCT VAV BOX T CO2 CLASSROOM ST FLOOR ST FLOOR GND FLOOR??? CFM?/???? CFM?/? CLASSROOM??? CFM??? CFM CLASSROOM??? CFM??? CFM CLASSROOM GND FLOOR??? CFM BOYS TOILET??? CFM GIRLS TOILET DOAS UNIT AIRFLOW MONITORING STATION (TYPICAL) DOAS- 2 M9.0 EXHAUST AIR RISER DIAGRAMS INTAKE & RELIEF DUCT TO LOUVER BOILER ROOM M9.0 OUTSIDE AIR RISER DIAGRAMS VRF INDOOR UNIT WITH DEDICATED OUTDOOR AIR UNIT SCHEMATIC DIAGRAM NOT TO SCALE Key Plan Seal Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title SCHEMATIC RISER DIAGRAM MECHANICAL Discipline MECH Drawing Number ' 0 4' 8' 2' 6' N Scale AS NOTED Date 30 DEC 20 Drawn by MCAB M9.0 GRAPHIC SCALE /8" = '-0" Checked by DSMI Sorg Project Number 8

52 ASC JOB#: 76 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION % SD SUBMISSION ELECTRICAL ABBREVIATIONS % PERCENT DIA DIAMETER (E) EXISTING TO REMAIN DISC DISCONNECT KVA KW KILOVOLT AMPERES KILOWATT QUAD RCPT QUADRAPLEX RECEPTACLE SYMBOL ELECTRICAL SYMBOLS DESCRIPTION 2X2 FLUORESCENT LIGHTING FIXTURE. NUMBER OR LETTER INDICATES TYPE, REFER TO LIGHTING FIXTURE SCHEDULE J J SINGLE RECEPTACLE FOR SPECIAL APPLICATION. NEMA 5-20R UNO SPECIFICATION FOR NEMA RATING. MOUNT +8" AFF UNO. JUNCTION BOX SD E EMERGENCY POWER-OFF (EPO) SWITCH WITH PALM ACTIVATED-MUSHROOM HEAD SWITCH. SMOKE DETECTOR, INSTALLED IN ELEVATOR LOBBY OR ELEVATOR MACHINE ROOM. REVISIONS (D) EXISTING TO BE DEMOLISHED DISP (N) NEW DIV (R) RELOCATED EXISTING DN (RL) EXISTING TO BE RELOCATED DW (RR) REMOVE AND RELOCATE DWG A AMPS OR AMPERES EC ABBREV ABBREVIATION EDH ABV ABOVE EF AC ALTERNATING CURRENT EL A/C AIR CONDITIONING ELEC ADA AMERICANS W/ DISABLITIES ACT ELEV COMPLIANCE EM ARCHITECTURAL AND ENGINEERING; EMS AE OR ARCHITECT AND ENGINEER ENCL AF AMPERES FRAME EX AFCI ARC-FAULT CIRCUIT INTERRTER EXH AFF ABOVE FINISHED FLOOR FA DISPOSAL DIVISION DOWN DISHWASHER DRAWING ELECTRICAL CONTRACTOR ELECTRIC DUCT HEATER EXHAUST FAN ELEVATION ELECTRICAL ELEVATOR; ELEVATION EMERGENCY ENERGY MANAGEMENT SYSTEM ENCLOSURE EXISTING EXHAUST FIRE ALARM LTG LRA MANUF MAX MCA MCB MECH MEP MFR MFS MH MIN MLO MO MOCP MTD MTG LIGHTING REF LOCKED ROTOR AMPS REQD MANUFACTURER RES MAXIMUM RLA MINIMUM CIRCUIT AMPACITY RM MAIN CIRCUIT BREAKER RTU MECHANICAL S/N MECHANICAL, ELECTRICAL, PLUMBING SCH MANUFACTURER SD MAXIMUM FUSE SIZE SEF MOUNTING HEIGHT; MANHOLE SF MINIMUM SHT MAIN LUG ONLY SPEC MOTOR OPERATOR STD MAXIMUM OVERCURRENT PROTECTION SWBD MOUNTED SWGR MOUNTING SYM REFRIGERATOR; REFERENCE REQUIRED; REQUIREMENT RESISTANCE RUNNING LOAD AMPERES ROOM ROOF TOP UNIT SOLID NEUTRAL SCHEDULE SMOKE DAMPER; SMOKE DETECTOR SMOKE EXHAUST FAN SPLY FAN SHEET SPECIFICATION STANDARD SWITCHBOARD SWITCHGEAR SYMBOL F X4 FLUORESCENT LIGHTING FIXTURE. NUMBER OR LETTER INDICATES TYPE, REFER TO LIGHTING FIXTURE SCHEDULE 2X4 FLUORESCENT LIGHTING FIXTURE. NUMBER OR LETTER INDICATES TYPE, REFER TO LIGHTING FIXTURE SCHEDULE 2 STRIP FLUORESCENT LIGHTING FIXTURE. NUMBER OR LETTER 2 INDICATES TYPE, REFER TO LIGHTING FIXTURE SCHEDULE INDICATES LIGHTING FIXTURE ON EMERGENCY CIRCUIT OR FIXTURE PROVIDED WITH BATTERY BACK- FIXTURE BALLAST 2 DOWNLIGHT TYPE LIGHT FIXTURE, OPEN OR WALLWASH TYPE. NUMBER OR LETTER INDICATES TYPE. REFER TO LIGHTING FIXTURE SCHEDULE. WALL MOUNTED SCONCE OR BRACKET TYPE LIGHT FIXTURE. NUMBER OR LETTER INDICATES TYPE. REFER TO LIGHTING FIXTURE SCHEDULE. EMERGENCY BATTERY BACK- TYPE FIXTURE WITH MINIMUM 90 MINUTES OF RUN TIME. NUMBER OF FIXTURE HEADS AS SHOWN. REFER TO LIGHTING FIXTURE SCHEDULE. EXIT LIGHTING FIXTURE, SINGLE OR DOUBLE FACE, CONNECTED TO EMERGENCY POWER SOURCE OR PROVIDED WITH BATTERY POWER UNIT. S TD BRANCH CIRCUIT HOMERUN. NUMBER OF ARROWHEADS INDICATE NUMBER OF CIRCUITS. NUMBER OF SLASHES INDICATES NUMBER OF CONDUCTORS IF MORE THAN 2#2, #2G - 3/4" CONDUIT MINIMUM. BRANCH CIRCUIT CONCEALED IN CEILING OR WALL. BRANCH CIRCUIT OR FEEDER INSTALLED IN CONCRETE SLAB OR INSTALLED BELOW GRADE. SECURITY CONDUIT. 3/4" E.C. WITH PULL LINE UNO. TELEPHONE/DATA CONDUIT 3/4" E.C. WITH PULL LINE UNO. CONDUIT TURNED CONDUIT TURNED DOWN TELEPHONE OUTLET. PROVIDE BACKBOX AND " CONDUIT WITH PULL CORD TO CEILING SPACE OR BACK TO INTERFACE. MOUNT +8" AFF UNO. SD DD 5 V 5 V A 0 AV 0 AV FACP SMOKE DETECTOR. DUCT MOUNTED SMOKE DETECTOR. FURNISHED & CONNECTED BY DIV. 6 CONTRACTOR, INSTALLED BY DIV. 5 CONTRACTOR. WALL MOUNTED VISUAL ALARM (OR FLASHING STROBE), NUMBER INDICATES CANDELA RATING. MOUNT +80" AFF OR 6" BELOW CEILING, WHICHEVER IS LOWER CANDELA PER UL 97. SEMI-FLUSH CEILING MOUNTED VISUAL ALARM (OR FLASHING STROBE), NUMBER INDICATES CANDELA RATING AS SHOWN, PER UL 97. RECESSED CEILING MOUNTED AUBIBLE DEVICE (VOICE ALARM SPEAKER). WALL MOUNTED COMBINATION AUDIBLE/VISUAL ALARM, NUMBER INDICATES CANDELA RATING. MOUNT +80" TO 96" AFF. (VOICE) CANDELA PER UL 97 SEMI-FLUSH CEILING MOUNTED COMBINATION AUDIBLE/VISUAL ALARM, NUMBER INDICATES CANDELA RATING. (VOICE) CANDELA PER UL 97 FIRE ALARM CONTROL PANEL. AFG ABOVE FINISHED GRADE FAAP AHU AIR HANDLING UNIT FACP AIC AMPERES INTERRTING CAPACITY FATP APPROX APPROXIMATE FCU FIRE ALARM ANNUNCIATOR PANEL FIRE ALARM CONTROL PANEL FIRE ALARM TERMINAL PANEL FAN COIL UNIT N N/A NC NEC NEUTRAL NOT APPLICABLE NURSE CALL NATIONAL ELECTRICAL CODE SYS TC TELE TS SYSTEM TIME CLOCK TELEPHONE TAMPER SWITCH EXIT LIGHTING FIXTURE-SINGLE OR DOUBLE FACE WITH DIRECTIONAL ARROWS AS INDICATED. CONNECT TO EMERGENCY POWER SOURCE OR PROVIDED WITH BATTERY POWER UNIT. POLE MOUNTED LIGHTING FIXTURE WITH SINGLE FIXTURE HEAD. REFER TO LIGHTING FIXTURE SCHEDULE. DATA OUTLET. PROVIDE BACK BOX AND " CONDUIT WITH PULL CORD TO CEILING SPACE OR BACK TO INTERFACE. MOUNT +8" AFF UNO. COMBINATION TELEPHONE/DATA OUTLET. PROVIDE PLASTER RING & PULL CORD TO CEILING SPACE. MOUNT +8" AFF UNO. FAAP FATP FIRE ALARM ANNUNCIATOR PANEL. FIRE ALARM TERMINAL PANEL. ARCH ARCHITECT, ARCHITECTURAL FLA FULL LOAD AMPS NEMA AT AMPERES TRIP FLR FLOOR ATC AUTOMATIC TEMPERATURE CONTROL FS FLOAT SWITCH NFPA ATS AUTOMATIC TRANSFER SWITCH FSS FUSED SAFETY SWITCH AUX AUXILIARY FT FOOT OR FEET NFSS AV AUDIO VISUAL FVNR FULL VOLTAGE NON REVERSING NIC AVE AVERAGE G; GRD GROUND NO.; # AWG AMERICAN WIRE GAUGE GEN GENERATOR NOM. BLDG BUILDING GFI GROUND FAULT CIRCUIT INTERRTER NTS BLW BELOW H; HGT HEIGHT DOOR HOLDER OH C CONDUIT; CONDUCTOR HD HEAT DETECTOR P CAD COMPUTER-AIDED DESIGN HORIZ HORIZONTAL PB CATV CABLE TELEVISION HP HORSEPOWER PC CKT CIRCUIT HTR HEATER PH; Ø CL CLASS IG ISOLATED GROUND PLBG CLG CEILING IN INCHES PNL COMM COMMUNICATION IS INFORMATION SYSTEMS PS CONC CONCRETE IT INFORMATION TECHNOLOGY PV COND CONDUCTOR J, JB JUNCTION BOX QTY CONN CONNECTION, CONNECT THOUSAND AMPERES INTERRTING KAIC CONT CONTINUATION CAPACITY CT CURRENT TRANSFORMER KCMIL THOUSAND CIRCULAR MILS DC DIRECT CURRENT KV KILOVOLTS DD DUCT SMOKE DETECTOR * SOME ABBREVIATIONS AND/OR ELECTRIC SYMBOLS MIGHT NOT BE USED AT THIS SUBMISSION. NATIONAL ELECTRICAL MANUFACTURER'S ASSOC. NATIONAL FIRE PROTECTION ASSOCIATION NON-FUSED SAFETY SWITCH NOT IN CONTRACT NUMBER NOMINAL NOT TO SCALE OVER HEAD PUMP; POLES PUSHBUTTON; PULLBOX PHOTOCELL PHASE PLUMBING PANELBOARD PRESSURE SWITCH PHOTOVOLTAIC QUANTITY TRANSIENT VOLTAGE SURGE TVSS SPRESSION TYP TYPICAL UG UNDERGROUND UH UNIT HEATER UL UNDERWRITER'S LABORATORY UNO UNLESS NOTED OTHERWISE S UNINTERRTABLE POWER SPLY V VOLTS VA VOLT AMPERE VFD VARIABLE FREQUENCY DRIVE W WATT(S); WIRE W/ WITH W/O WITHOUT WG WIRE GUARD WH WATER HEATER WF WATER FLOW SWITCH WP WEATHERPROOF XFMR TRANSFORMER POLE MOUNTED LIGHTING FIXTURE WITH DOUBLE FIXTURE HEADS. REFER TO LIGHTING FIXTURE SCHEDULE. LIGHTING CONTROL TOGGLE SWITCHES, SINGLE POLE, THREE-WAY OR S a S3a S4a FOUR-WAY, 20AMP RATED, 2-POLE, 3-WIRE. MOUNT +48" AFF UNO. LETTER ADJACENT SWITCH INDICATES FIXTURE GRO CONTROLLED. LINEAR SLIDE TYPE DIMMER SWITCH, SINGLE POLE OR THREE-WAY TYPE. SD S3D DIMMER SWITCH RATED FOR LOAD CONTROLLED (INCAND, FLUOR AND LV). MOUNT +48" AFF UNO. KEYED TYPE LIGHTING SWITCH, SINGLE POLE, 20AMP RATED. SK MOUNT +48" AFF UNO. SINGLE POLE, LIGHTING SWITCH WITH PILOT LIGHT, SP 20AMP RATED. MOUNT +48" AFF UNO. LOW VOLTAGE, MOMENTARY CONTACT TYPE LIGHTING SLV CONTROL SWITCH. MOUNT +48" AFF UNO. WALL MOUNTED OCCANCY SENSOR, MOUNT +48" AFF UNO. S O REFER TO DRAWING NOTES OR SPECIFICATION FOR TYPE REQUIRED. CEILING MOUNTED OCCANCY SENSOR. REFER TO DRAWING OS NOTES OR SPECIFICATION FOR TYPE REQUIRED. PHOTOCELL, EXTERIOR MOUNTED. DEVICE PC SHALL BE UL LISTED FOR WET LOCATION. TIME CLOCK. PROVIDE 24-HOUR, MECHANICAL UNIT WITH ASTRONOMIC TC FUNCTION. DEVICE SHALL BE PROVIDED IN A NEMA ENCLOSURE. SEE DRAWING NOTES OR SPECIFICATION FOR EXACT TYPE REQUIRED. CONTACTOR IN NEMA ENCLOSURE. DEVICE SHALL BE RATED FOR TYPE OF C LOAD CONTROLLED (I.E. LIGHTING, MOTORS, ETC.). SEE DRAWING NOTES OR SPECIFICATIONS FOR EXACT TYPE REQUIRED. DLEX RECEPTACLE, 20AMP, NEMA 5-20R (WHERE APPLICABLE IN APARTMENT UNITS, PROVIDE 5AMP RATED DEVICE, NEMA 5-5R). MOUNT +8" AFF UNO. DLEX RECEPTACLE, GROUND FAULT CIRCUIT INTERRTER TYPE (GFCI), 20AMP RATED. MOUNT +6" ABOVE COUNTER OR BACKSPLASH. DOUBLE DLEX RECEPTACLE (QUAD). PROVIDE TWO (2) 20AMP, NEMA 5-20R IN A COMMON BACKBOX. MOUNT +8" AFF. W TV T VAV FCU RTU F VFD WALL MOUNTED TELEPHONE OUTLET. PROVIDE PLASTER RING & PULL CORD TO CEILING SPACE. MOUNT +54" AFF UNO. FLUSH FLOOR BOX, FLUSH FLOOR BOX WITH DLEX RECEPTACLE AND TELE/DATA OUTLET. PROVIDE BARRIER BETWEEN DEVICE GANGS. CATV (CABLE TELEVISION) OUTLET. PROVIDE PLASTER RING AND PULL CORD TO THE CEILING UNO. MOUNT +8" AFF UNO. FLUSH FLOOR MOUNTED COMMUNICATION OUTLET. PROVIDE " CONDUIT AND TURN- CLOSEST WALL TO ACCESS ACCESSIBLE CEILING SPACE. PROVIDE PULL STRING IN CONDUIT. ELECTRICAL PANELBOARD, SURFACE OR RECESSED MOUNTED 208Y/20V. ELECTRICAL PANELBOARD SURFACE MOUNTED 480Y/277V OR AS INDICATED. DRY-TYPE TRANSFORMER ON NOMINAL 4" CONCRETE HOUSEKEEPING PAD. AUTOMATIC TRANSFER SWITCH. SEE DRAWING FOR TYPE AND RATING REQUIRED. MOTOR CONNECTION MECHANICAL UNIT CONNECTION VAV BOX, FAN COIL UNIT, ROOF TOP UNIT. COORDINATE EXACT LOCATION WITH MECHANICAL DRAWINGS. DISCONNECT SWITCH, NFSS OR FSS. FULL VOLTAGE NON-REVERSING (FVNR) MAGNETIC MOTOR STARTER. RATED FOR MOTOR HORSEPOWER. COMBINATION FULL VOLTAGE NON-REVERSING (FVNR) MAGNETIC MOTOR STARTER/DISCONNECT SWITCH. RATED FOR MOTOR HORSEPOWER. VARIABLE FREQUENCY DRIVE STARTER UNIT. JB HT TS DH L A HD F WF FS CR Sos Sos2 JUNCTION BOX FOR CONNECTION TO HEAT TRACING. HEAT TRACING FURNISHED AND INSTALLED UNDER DIV. 5 CONTRACTOR, CONNECTED BY DIV. 6 CONTRACTOR. RANGE RECEPTACLE SPRINKLER SYSTEM VALVE TAMPER SWITCH. MAGNETIC DOOR HOLD OPEN DEVICE. STAIRWELL DOOR LOCKS, SPECIFIED BY ARCHITECT. CONTROLLED VIA THE FIRE ALARM SYSTEM. WALL MOUNTED FIRE ALARM AUDIBLE DEVICE (VOICE ALARM SPEAKER). MOUNT +80" AFF OR 6" BELOW CEILING, WHICHEVER IS LOWER. HEAT DETECTOR. FIRE ALARM MANUAL STATION. MOUNT +46" AFF UNO. SPRINKLER SYSTEM WATER FLOW SWITCH. SPRINKLER SYSTEM FLOW SWITCH. CARD READER. DUAL TECHNOLOGY WALL SENSOR SWITCH WITH SINGLE BUTTON. DUAL TECHNOLOGY WALL SENSOR SWITCH WITH DOUBLE BUTTON. 4' BOLLARD LIGHT FLUSH FLOOR MOUNTED DLEX RECEPTACLE, 20AMP, NEMA 5-20R (5AMP IN APARTMENT UNITS, NEMA 5-5R). SM MANUAL MOTOR STARTER (TOGGLE SWITCH TYPE) WITH THERMAL OVERLOAD PROTECTION. WP WEATHERPROOF DISCONNECT/ STARTER COMBINATION FLUSH FLOOR MOUNTED DOUBLE-DLEX RECEPTACLE, 20AMP, NEMA 5-20R. M UTILITY OR SUB-METER SYMBOL. Key Plan Seal Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title DATA SHEET ELECTRICAL Discipline ELEC Drawing Number ' 0 4' 8' 2' 6' N Scale /8" = '-0" Date 30 DEC 20 Drawn by AARS E0.00 GRAPHIC SCALE /8" = '-0" Checked by DSMI Sorg Project Number 8

53 F F F ASC JOB#: 76 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION % SD SUBMISSION REVISIONS Key Plan LCP3 PNL BDL FACP PNL BS FASP4 F ATS PNL BE PNL BDL ATS2 F Seal DIST DIST DIST 2 E.00 ENLARGED PLAN - ELECTRICAL EM ROOM SCALE: /4" = '-0" E.00 BASEMENT FLOOR ELECTRICAL PLAN SCALE: /8" = '-0" MAIN EM TAP C.T. REFER TO ENLARGED PLAN - ELECTRICAL EM RM 900A WIRE TROUGH PNL BDM PNL BDM PULL F FIRE PUMP DISCONNECT Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title BASEMENT FLOOR ELECTRICAL PLAN Discipline ELEC Drawing Number ' 0 4' 8' 2' 6' N Scale /8" = '-0" Date 30 DEC 20 Drawn by AARS E.00 GRAPHIC SCALE /8" = '-0" Checked by DSMI Sorg Project Number 8

54 E E ASC JOB#: 76 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION % SD SUBMISSION REVISIONS AUDITORIUM 002 MULTIPURPOSE / CAFETERIA 0 GYMNASIUM 02 DN CUSTODIAL & ENGINEERING 020 DN KITCHEN 00 TOILET 009 AUDITORIUM 00 TOILET 08 P.E. OFFICE 09 MUSIC 007 SLOP SLOP 2 SEC PNL GK PRE-K 006 SPECIAL NEEDS 06 LCP2 FASP FASP2 LCP 3 SEC PNL GL2 DACU AT CEILING GE2 GS2 3 SEC PNL GM2 3 SEC PNL GM GS GE DACU AT CEILING 3 SEC PNL GL L6-50 FOR DC RECTIFIER L6-50 FOR DC RECTIFIER IT IT CAB CAB HEAD END 008 TEACHER'S WORK AREA 003 DN TEACHER'S OFFICE 02 STORAGE 05 L6-50 FOR DC RECTIFIER IT IT CAB CAB L6-50 FOR DC RECTIFIER Key Plan PRE-SCHOOL 005 PRE-K 03 PRE-SCHOOL 004 PRE-K 04 Seal 3 SEC PNL GL3 FASP3 DACU AT CEILING GE3 GS3 3 SEC PNL GM3 E.0 GROUND FLOOR ELECTRICAL PLAN SCALE: /8" = '-0" Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com L6-50 FOR DC RECTIFIER L6-50 FOR DC RECTIFIER IT IT CAB CAB BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title GROUND FLOOR ELECTRICAL PLAN Discipline ELEC Drawing Number ' 0 4' 8' 2' 6' N Scale /8" = '-0" Date 30 DEC 20 Drawn by AARS E.0 GRAPHIC SCALE /8" = '-0" Checked by DSMI Sorg Project Number 8

55 ASC JOB#: 76 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION DRAWING NOTES: #. 3 SETS OF (4 #350 KCMIL + #2/0 G MI CABLE IN 3 /2"C). WIRE TROUGH SHALL BE WITHIN 0' OF THE GENERATOR TO MAKE THE LENGTH OF THIS FEEDER VERY SHORT. REVISIONS % SD SUBMISSION 2. 2 WAY PRIMARY DUCTBANK SHALL BE ROUTED ' PAST THE PROPERTY LINE. SEE DETAIL ON THIS SHEET. PRIMARY CABLE BY PEPCO. 3. NEW XFMR VAULT SHALL BE PROVIDED PER PEPCO STANDARD. TRANSFORMER BY PEPCO WAY CONCRETE ENCASED DUCTBANK PER PEPCO STANDARD. SEE DETAIL ON THIS SHEET. SECONDARY CABLE BY PEPCO INSIDE ELECTRIC ROOM, USE METAL WIRE TROUGH A, AT 208Y / 20V, 3PH, 4 WIRE SWITCHBOARD MOUNTED ON 4" CONCRETE HOUSE PAD KW, 208Y / 20V, 3 PH, 4 WIRE, GAS FIRED INDOOR GENERATOR PER UL A WIRE TROUGH, FULLY WIRES PER NOTE #, WITH THREE FUSED DISCONNECT SWITCHES. 300A FUSES FOR FIRE PUMP, AND DISCONNECT SHALL BE LOCKED IN "ON" POSITION. 500A FUSES FOR STAND BY LOADS. 200A FUSED FOR LIFE SAFETY LOADS #/0 MULTICONDUCTOR MI CABLE WITH HEAVY METAL SHEET FOR GROUNDING, DIRECT BURIED #3/0, #4G MI CABLE IN 2 /2" C SETS OF (4 #250 KCMIL + #/0 IN 3" C.). 600A, 240V, 3 POLE DISCONNECT. NORMAL SIDE DISCONNECT SHALL HAVE 500A SERIES RATED FUSES A, 240V, 3 POLE DISCONNECT. NORMAL SIDE DISCONNECT SHALL HAVE 200A SERIES RATED FUSES. 3. MIN 600A, 240V, 3 POLE AUTOMATIC TRANSFER SWITCH. 4. MIN 200A, 240V, 3 POLE AUTOMATIC TRANSFER SWITCH #/0 MULTICONDUCTOR MI CABLE WITH HEAVY METAL SHEET FOR GROUNDING, IN CONCRETE ENCASED PER NEC (A) A, 240V, 3 POLE SERVICE RATED FUSED DISCONNECT SWITCH LOCKED IN "ON" POSITION SETS OF (4 #350 KCMIL + #3/0G IN 3 /2" C) #500 KCMIL + #3G IN 4" C #3, #8G IN /2" C #2/0, #6G IN 2 /2" C #2 + #2G IN 3/4" C #0 + #0G IN 3/4" C #4/0 + #4G IN 2 /2"C #4/0 + #4G IN 2 /2"C #3/0 + #6G IN 2"C #/0 + #6G IN 2"C #250 KCMIL + #4G IN 2 /2" C. 2ND FLOOR DOAS-3 WP 400A ACCU- WP DOAS-2 WP 200A ROOF ND FLOOR ST FLOOR ST FLOOR PNL GL4 DIMMING PNL PNL GS3 PNL GE3 PNL GM3 PNL GL3 FASP3 PNL GK PNL GS2 PNL GE2 PNL GM2 PNL GL2 LCP2 FASP2 PNL GS PNL GE PNL GM PNL GL LCP FASP Key Plan GROUND FLOOR GROUND FLOOR METAL WIRE TROUGH 2 CONCRETE DUCT BANK HP, 208V, 3PH 40 HP, 208V, 3PH BOILER ROOM JP FP 5 2 JP CONTROLLER TO PNL BE FASP4 8 FP CONTROLLER W/ ATS TO GEN TO SWBD FACP 26 DOAS- TO PNL BE J BE- BATTERY CHARGER J BLOCK HEATER G KW GAS FIRED INDOOR GENERATOR BE-2,4 8 TO FP F F F F ATS2 N E L 3 F N 4 PNL L BS 2 E MAIN EMERGENCY ROOM ATS PNL BE PNL BDM 8 PNL BDM LCP3 2 8 PNL BDL PNL BDL TO FP F DIST DIST DIST MAIN EM C.T. PULL SEC SEC SEC TAP MIN 3/0 5 BOILER ROOM 4 3 PEPCO T NEW VAULT OUTSIDE PRIMARY 2 Seal E-5.00 POWER RISER DIAGRAM SCALE: NTS Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title POWER RISER DIAGRAM ELECTRICAL Discipline ELEC Drawing Number ' 0 4' 8' 2' 6' N Scale /8" = '-0" Date 30 DEC 20 Drawn by AARS E5.00 GRAPHIC SCALE /8" = '-0" Checked by DSMI Sorg Project Number 8

56 ASC JOB#: 76 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION % SD SUBMISSION REVISIONS BRUCE MONROE ELEMENTARY - FIRE ALARM MATRIX DEVICE - SYSTEM INITIATING DEVICES FUNCTION NOTIFY CENTRAL STATION SEND SERVISORY SIGNAL TO CENTRAL STATION AND THE FIRE ALARM CONTROL PANEL IN THE MAIN ELECTRICAL ROOM. SEND TROUBLE SIGNAL TO CENTRAL STATION, FACP AND ALL ANNUNICIATOR PANELS SEND SIGNAL TO ANNUNCIATOR PANELS. SIGNALS SHALL BE ISSUED BY FLOOR, ZONE, TYPE OF DEVICE AND DEVICE ADDRESS ISSUE GENERAL ALARM OR ALL CALL SIGNAL ON CONFIRMATION BY AHJ ISSUE SIGNAL TO VISUAL AND AUDIBLE ALARMS ON ENTIRE BUILDING INITIATE ELEVATOR RECALL INITIATE TRIPPING SIGNAL TO AFFECTED ELEVATOR BANK CIRCUIT BREAKER(S) SHUT DOWN ASSOCIATED AHU(S) AND ISSUE TROUBLE SIGNAL AT ANNUNCIATOR PANELS SEND SIGNAL TO SECURITY SYSTEM TO UNLOCK ALL EGRESS DOORS. REMARKS MANUAL PULL STATION ELEVATOR LOBBY/MACHINE ROOM SMOKE DETECTOR SMOKE DETECTOR - GENERAL SPRINKLER FLOW SWITCH STANDPIPE FLOW SWITCH HEAT DETECTOR FIRE SERVICE LINE VALVE TAMPER SWITCH DUCT SMOKE DETECTOR FIRE PUMP - RUNNING FIRE PUMP - FAULT FIRE PUMP - PHASE REVERSAL GENERATOR - RUNNING GENERATOR - FAULT SITE HYDRANT (WATERFLOW) 2 E5.02 FIRE ALARM MATRIX GENERAL FIRE ALARM NOTES. REFER TO PLUMBING FLOOR PLANS FOR EXACT LOCATIONS OF ALL SPRINKLER FLOW AND TAMPER SWITCHES, AS WELL AS DRY PIPE SPRINKLER SYSTEM HI-LO AIR PRESSURE SWITCHES. 2. COORDINATE DUCT SMOKE DETECTORS AND AREA SMOKE DETECTORS UTILIZED IN RETURN AIR DUCT OPENINGS WITH MECHANICAL DRAWINGS. 3. THE ENTIRE FIRE ALARM SYSTEM SHALL MEET ALL APPLICABLE FIRE ALARM AND BUILDING CODES. UNDER FIRE CONDITION - ELEVATOR EMERGENCY OPERATION SHALL BE AS FOLLOWS: A. ELEVATOR SHAFT SMOKE DETECTORS SHALL ACTIVATE RECALL OF AL ELEVATORS WITHIN SHAFT, SOUND GENERAL ALARM, AND ANNUNCIATE APPROPRIATE LAMPS AT ANNUNCIATOR PANELS. B. ELEVATOR MACHINE ROOM SMOKE DETECTOR SHALL ACTIVATE RECALL OF ALL ELEVATORS SERVED BY THAT MACHINE ROOM, SOUND GENERAL ALARM, ANNUNCIATE APPROPRIATE LAMPS AT ANNUNCIATOR PANEL. 4. MAXIMUM FIRE ALARM ZONE SHALL BE 20,000 SQUARE FEET, WITH THE LONGEST DIMENSION IN A ZONE NOT EXCEEDING 200, AND SHALL BE WITHIN FIRE PROTECTION ZONE, AND SHALL BE AT THE SAME LEVEL. 5. ELEVATOR SMOKE AND HEAT DETECTORS; EACH ELEVATOR SHAFT SHALL HAVE HEAT DETECTORS AND SMOKE DETECTORS INSTALLED AT THE TOP AND BOTTOM OF SHAFT. C. ELEVATOR SHAFT HEAT DETECTORS SHALL DISCONNECT POWER TO ALL ELEVATOR MOTORS WITHIN THAT SHAFT AND ANNUNCIATE TROUBLE AT ANNUNCIATOR PANELS. D. ELEVATOR CLOSET HEAT DETECTORS SHALL DISCONNECT POWER TO ALL ELEVATORS SERVED BY THAT MACHINE ROOM AND ANNUNCIATE TROUBLE AT ANNUNCIATOR PANELS. ROOF Key Plan 6. THE FINAL SEQUENCE OF OPERATION SHALL BE APPROVED BY THE AHJ E. ELEVATOR CLOSET SPRINKLER FLOW SWITCH SHALL SOUND GENERAL ALARM AND ANNUNCIATE APPROPRIATE LAMPS AT ANNUNCIATOR PANELS. 7. PROVIDE VOICE ALARM SPEAKERS FOR THIS PROJECT. HEAT DETECTORS ASSOCIATED WITH THE ASMEI 7. ELEVATOR SHUNT TRIP ARRANGEMENT SHALL BE CONNECTED TO THE FIRE ALARM SYSTEM. PROVIDE EMERGENCY CIRCUIT TO MONITOR THE SHUNT TRIP CIRCUIT. SECOND FLOOR FIRST FLOOR FASP3 FIRE ALARM SPLY POWER PANEL (TYPICAL) FASP2 FASP GE3- GE2- GE- GROUND FLOOR MAIN EMERGENCY ELECTRICAL ROOM Seal SD DD TS FS V AV A TO ADDITIONAL DEVICES TO ADDITIONAL DEVICES F SD HD FASP FIRE ALARM SPLY POWER PANEL TYPICAL FIRE ALARM POWER SPLY PANEL DEVICE CONNECTION DETAIL DIAL OUT TWO LINES FASP4 DACT BE-5 FACP FAAP BE-3 2 BATTERY BASEMENT FLOOR * - THIS DETAIL REPRESENTS A TYPICAL DEVICE INITIATING, SERVISORY AND NOTIFICATION CIRCUIT CONNECTIONS. SEE FLOOR PLANS FOR EXACT NUMBER AND TYPES OF DEVICES TO BE CONNECTED TO THE FASP E5.0 FIRE ALARM RISER DIAGRAM RISER NOTES: #. EXISTING SYSTEM SHALL BE TIED TO NEW SYSTEM VIA TELECOM MODULE. 2. GRAPHIC TYPE FAAP SHALL BE INSTALLED AT THE MAIN ENTRANCE, WEST SIDE OF BUILDING. Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title FIRE ALARM RISER ELECTRICAL Discipline ELEC Drawing Number ' 0 4' 8' 2' 6' N Scale /8" = '-0" Date 30 DEC 20 Drawn by AARS E5.0 GRAPHIC SCALE /8" = '-0" Checked by DSMI Sorg Project Number 8

57 ASC JOB#: 76 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION % SD SUBMISSION REVISIONS MINIMUM PAIR SHIELDED (22 GA.) A/V, PAGING & CLOCK SYSTEM LEGEND IP INTERCOM HEADEND DATA NETWORK. FLOOR-MOUNTED IP INTERCOM/MASTER CLOCK HEADEND. 2. CATEGORY 6 PATCH CABLE FROM IP INTERCOM MODULE TO DATA SWITCH DATA NETWORK IP INTERCOM MODULE. WALL-MOUNTED IP INTERCOM MODULE. 2. CATEGORY 6 PATCH CABLE FROM IP INTERCOM MODULE TO DATA SWITCH SP CLOCK. CEILING MOUNTED DROP-IN TILE SPEAKER. 2. WALL MOUNTED ADMINISTRATIVE INTERCOM HANDSET. 3. FLUSH MOUNTED 2" ANALOG 84" AFF. SP CLOCK. CEILING MOUNTED DROP-IN TILE SPEAKER. 2. DESK MOUNTED ADMINISTRATIVE INTERCOM HANDSET. 3. FLUSH MOUNTED 2" ANALOG 84" AFF. SP CLOCK. CEILING MOUNTED DROP-IN TILE SPEAKER. 2. DESK MOUNTED ADMINISTRATIVE INTERCOM HANDSET. 3. FLUSH MOUNTED 2" ANALOG 84" AFF. SP SP SP. NO MORE THAN 8 SPEAKERS IN SERIES. FLUSH MOUNTED CALL 48" AFF. SP CLOCK CLOCK CLOCK CLOCK MINIMUM PAIR (4 GA.). CLOCKS SHALL BE ANALOG STYLE CLOCKS. 2. CORRIDOR CLOCKS SHALL BE 2" DOUBLE-SIDED, WALL-MOUNTED CLOCKS. 3. GYMNASIUMS SHALL HAVE TWO 5" ROUND, RECESSED ANALOG CLOCKS WITH WIRE GUARDS. 4. MEDIA CENTER SHALL HAVE TWO 2" FLUSH-MOUNTED ROUND ANALOG CLOCKS SYMBOL ABRV. DESCRIPTION MOUNT REMARKS ANALOG SYSTEM CLOCK INTERCOM HANDSET SP PAGING SYSTEM SPEAKER MAIN TELECOM ROOM TYPICAL TELECOM ROOM TYPICAL PRINCIPAL, VICE PRINCIPAL AND SECRETARY OFFICE TYPICAL CLASSROOM TYPICAL OFFICE TYPICAL SPEAKER ONLY LOCATION TYPICAL CLOCK ONLY LOCATION NOTES. NO MORE THAN 8 CLOCKS RUN IN SERIES 2. NO MORE THAN 8 INDOOR SPEAKERS RUN IN SERIES 3. CLASSROOM INTERCOM SPEAKERS MUST EACH BE CONNECTED DIRECTLY TO INTERCOM IP MODULES LOCATED IN TELECOM ROOMS (NO DAISY CHAINS) 4. HEADEND AND MASTER CLOCK EQUIPMENT LOCATED IN TELECOMMUNICATIONS EQUIPMENT ROOM. 5. ADMINISTRATIVE PHONES LOCATED IN PRINCIPAL, VICE PRINCIPAL AND MAIN SECRETARIAL OFFICES. 6. INTERCOM AND MASTER CLOCK SYSTEMS INTERCONNECTED WITH EMERGENCY POWER AND PHONE SYSTEM. COORDINATE AMONG TRADES DURING INSTALLATION. 7. CABLE GAUGE SHOWN IN SCHEMATIC FOR INFORMATIONAL PURPOSES ONLY. FOLLOW MANUFACTURER RECOMMENDATION FOR CABLE GAUGE BASED ON DISTANCES. 8. NO MORE THAN 6 OUTDOOR SPEAKERS RUN IN SERIES 9. CLOCK WIRES AND COMMUNICATIONS WIRES CANNOT BE RUN IN THE SAME CONDUIT. 0. ALL CLOCKS SHALL HAVE HOUR, MINUTE AND SECOND HANDS. 4 E5.02 IP INTERCOM/CLOCK SYSTEM WIRING DIAGRAM SCALE: NTS AUXILARY INPUTS AUX HORN TYPE LOUDSPEAKERS WALL-MOUNTED MICROPHONE M M M PATCH BAY R MIXER EQUALIZER FROM INTERCOM SYSTEM. ALL CALL SIGNAL 2. MUTING COMMAND AMP HEARING ASSISTANCE TRANSMITTER S S S S S S RG-6U COAX ANTENNA WALL-MOUNTED MICROPHONE M M M AUX PATCH BAY AUXILARY INPUTS MIXER EQUALIZER AMP R S S S FROM INTERCOM SYSTEM. ALL CALL SIGNAL 2. MUTING COMMAND INTERCOM SPEAKERS S CEILING-MOUNTED MICROPHONE WALL-MOUNTED MICROPHONE M M M M M AUX PATCH BAY AUXILARY INPUTS MIXER EQUALIZER AMP S S S S HORN TYPE LOUDSPEAKERS Key Plan SOUND EQUIPMENT RACK SOUND EQUIPMENT RACK SOUND EQUIPMENT RACK GYMNASIUM SOUND SYSTEM WIRING DIAGRAM CAFETERIA SOUND SYSTEM WIRING DIAGRAM MUSIC ROOM SOUND SYSTEM WIRING DIAGRAM 3 3 E5.0 SCALE: NTS SCALE: NTS E5.02 E5.02 SCALE: NTS Seal Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title TECHNOLOGY DETAILS Discipline ELEC Drawing Number ' 0 4' 8' 2' 6' N Scale /8" = '-0" Date 30 DEC 20 Drawn by AARS E5.02 GRAPHIC SCALE /8" = '-0" Checked by DSMI Sorg Project Number 8

58 ASC JOB#: 76 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION % SD SUBMISSION REVISIONS GENERAL NOTES. ALL SPECIFICATIONS AND DRAWINGS, I.E. ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL, ARE COMPLIMENTARY AND MUST BE USED IN COMBINATION TO OBTAIN COMPLETE CONSTRUCTION INFORMATION. 2. ANY INFORMATION CONFLICTS WITHIN THE SPECIFICATIONS AND/OR DRAWINGS SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION. THE CONTRACTOR SHALL NOT PROCEED WITH ANY WORK UNTIL ALL CONFLICTS ARE RESOLVED AND THE CLARIFYING INFORMATION IS ISSUED. 3. ALL SANITARY AND STORM SEWER PIPING LESS THAN 3" SHALL BE INSTALLED WITH A /4" PER FT. GRADE AND NOT LESS THAN /8" PER FT. GRADE FOR PIPING 3" AND LARGER UNLESS NOTED OR INDICATED OTHERWISE. PROVIDE CLEANOUTS ON ALL SEWER PIPING (HORIZONTAL AND VERTICAL) WHERE INDICATED AND/OR REQUIRED BY CODE. 4. COORDINATE ALL PIPING TO BE INSTALLED WITH ALL OTHER TRADES, I.E. MECHANICAL, FIRE PROTECTION, AND ELECTRICAL TO ENSURE THAT ALL PIPING SYSTEMS ARE INSTALLED ABOVE FINISHED CEILING OR IN A CONCEALED SPACE. ALL CEILING HEIGHTS INDICATED ON ARCHITECTURAL AND/OR INTERIOR DESIGN DRAWINGS AS WELL AS MINIMUM CLEARANCES REQUIRED BY LOCAL CODES SHALL BE MAINTAINED THROUGHOUT THE BUILDING. 5. ALL CUTTING, DRILLING, AND PATCHING OF WALLS, FLOORS, AND/OR STRUCTURAL MEMBERS FOR THE INSTALLATION OF PLUMBING SYSTEMS SHALL BE PROVIDED. STRUCTURAL COMPONENTS SHALL NOT BE CUT, DRILLED, OR MODIFIED IN ANY WAY WITHOUT THE STRUCTURAL ENGINEER'S REVIEW AND PRIOR APPROVAL. 6. PIPING OR EQUIPMENT SHALL NOT BE SPORTED FROM STRUCTURAL MEMBER WITHOUT PRIOR REVIEW AND APPROVAL FROM THE STRUCTURAL ENGINEER. 7. ALL BACKFLOW PREVENTER ASSEMBLIES SHALL BE INSTALLED IN AN ACCESSIBLE LOCATION. PIPE RELIEF OUTLET, IF APPLICABLE, SHALL DISCHARGE TO NEAREST FLOOR DRAIN. DO NOT INSTALL ABOVE FINISHED CEILING UNLESS NOTED OR INDICATED OTHERWISE. 8. PROVIDE FLOAT TYPE BACKWATER VALVE (SIZED FOR ANTICIPATED FLOW RATE) IN ALL OPEN SITE DRAINS AND FLOOR RECEPTORS RECEIVING A/C CONDENSATE, AND/OR CLEAR WATER WASTE SUCH AS SPRINKLER FLOW TESTING. 9. ALL PIPING SYSTEMS, VALVES, AND EQUIPMENT SHALL BE PROPERLY IDENTIFIED. 0. ALL PLUMBING SHALL CONFORM TO ALL REQUIREMENTS OF THE LOCAL ENERGY CONSERVATION AND PLUMBING CODES OF THE AUTHORITY HAVING JURISDICTION.. HOT, COLD, AND RECIRCULATION WATER SPLY MAINS AND BRANCHES SHALL BE INSULATED IN ACCORDANCE WITH THE LOCAL ENERGY CODE. 2. ALL PIPING, VALVES, AND ACCESSORIES SERVING EQUIPMENT SHALL BE INSTALLED TO ALLOW SERVICING AND/OR REMOVAL WITHOUT DISCONNECTING ALL PIPING AND ACCESSORIES. 3. ALL VALVES SHALL HAVE THEIR NORMAL (IN OPERATION) POSITION IDENTIFIED, SUCH AS "NORMALLY OPEN" OR "NORMALLY CLOSED." 4. EXPANSION LOOPS AND ANCHORS SHALL BE PROVIDED ON ALL PIPING SYSTEMS WHICH CROSS BUILDING EXPANSION JOINTS AND ALL HORIZONTAL PIPING LENGTHS EXCEEDING 00 FT. OR EACH PORTION THEREOF. 5. ALL NECESSARY EQUIPMENT SHALL BE PROVIDED ON ALL PIPING, UNIONS, VALVES, VACUUM BREAKERS, STRAINERS, ETC. AS REQUIRED TO CONNECT EQUIPMENT AT LOCATION SHOWN, AND TO MAKE FULLY OPERABLE IN ACCORDANCE WITH ALL LOCAL CODES AND REGULATIONS. FIRE PROTECTION NOTES. PROVIDE A COMPLETE FULLY AUTOMATIC SPRINKLER/STANDPIPE SYSTEM, HYDRAULICALLY CALCULATED IN ACCORDANCE WITH NFPA AND ALL LOCAL CODES AND REGULATIONS OF THE AUTHORITY HAVING JURISDICTION. 2. ALL FIRE PROTECTION EQUIPMENT, I.E. PIPING, VALVES, FITTINGS, ACCESSORIES, ETC., SHALL BE RATED FOR A MAXIMUM WORKING PRESSURE OF 75 PSI. 3. ALL SPRINKLER PIPING SHALL BE INSTALLED SO THAT ALL PORTIONS CAN BE DRAINED BACK THROUGH A DRAIN VALVE. 4. ALL FIRE EQUIPMENT SHALL CONFORM TO LOCAL STANDARDS. 5. SPRINKLER SYSTEM ZONES SHALL BE COORDINATED WITH FIRE ALARM ZONES. 6. ALL CONTROL VALVES AND FLOW ALARM SWITCHES LOCATED ABOVE FINISHED CEILING SHALL BE ACCESSIBLE AND HAVE NOTIFICATION MARKING TAG FOR THE INSPECTOR. 7. ALL ELECTRICAL EQUIPMENT AND TELEPHONE ROOMS SHALL BE SPRINKLERED. 8. ELEVATOR MACHINE ROOM AND SHAFT: SPRINKLER CONTRACTOR SHALL PROVIDE HIGH TEMPERATURE HEADS IN CONJUNCTION WITH HEAT/SMOKE DETECTION SYSTEM. CONTRACTOR SHALL COORDINATE REQUIREMENTS WITH NFPA AND AUTHORITIES HAVING JURISDICTION, SUBJECT TO APPROVAL AND ACCEPTANCE. 9. ALL FIRE EQUIPMENT THREADS SHALL CONFORM TO LOCAL STANDARDS. 0. TAMPER SWITCHES SHALL BE PROVIDED ON ALL FIRE PROTECTION SYSTEM CONTROL VALVES. ANNUNCIATE TAMPER SWITCHES IN ACCORDANCE WITH LOCAL CODES AND REGULATIONS.. FLOW ALARM SWITCHES SHALL BE PROVIDED WHERE INDICATED ON PLANS AND/OR REQUIRED BY LOCAL CODES. ANNUNCIATE FLOW SWITCHES IN ACCORDANCE WITH LOCAL CODES AND REGULATIONS. DEMOLITION NOTES:. FIELD VERIFY THE EXACT SIZES AND LOCATIONS OF ALL EXISTING PIPING PRIOR TO DEMOLITION OF ANY EXISTING WORK. THE DEMOLITION WORK SHALL BE COORDINATED WITH THE NEW WORK OF ALL DIVISIONS TO ASSURE PROPER LIMITS OF DEMOLITION. 2. REMOVE ALL EXISTING EQUIPMENT AND ASSOCIATED PIPING, WHETHER SPECIFICALLY INDICATED OR NOT, THAT IS NO LONGER REQUIRED. 3. REMOVE AND CAP EXISTING BRANCH PIPING, NO LONGER REQUIRED TO REMAIN AS PART OF AN ACTIVE SYSTEM, AT THE APPROPRIATE MAIN. 4. ANY PIPING AND DUCTWORK WHICH MUST REMAIN AS PART OF AN ACTIVE SYSTEM AND IS IN CONFLICT WITH THE NEW LAYOUT SHALL BE RELOCATED AT NO ADDITIONAL COST OVER THE CONTRACT AMOUNT. 5. EXISTING FIXTURES, EQUIPMENT AND PIPING REMOVED DURING CONSTRUCTION SHALL REMAIN THE PROPERTY OF THE OWNER AND SHALL BE STORED, REMOVED FROM THE JOB SITE, OR DISPOSED OF AS DIRECTED BY THE OWNER'S REPRESENTATIVE. 6. OPENINGS REMAINING IN WALLS/FLOORS AS A RESULT OF DEMOLITION SHALL BE SEALED WITH AN AIRTIGHT SHEET METAL CAP, UNLESS OTHERWISE NOTED ON THE DRAWINGS. PLUMBING ABBREVIATIONS % PERCENT GC GENERAL CONTRACTOR (D) DEMOLISH GI GREASE INTERCEPTOR (E) EXISTING TO REMAIN GPD GALLONS PER DAY (N) NEW GPM GALLONS PER MINUTE (R) RELOCATED EXISTING GPR GAS PRESSURE REGULATOR (RL) EXISTING TO BE RELOCATED HD HEAD (RR) REMOVE AND RELOCATE HORIZ HORIZONTAL (RX) REMOVE EXISTING HP HORSEPOWER ABV ABOVE HR HOUR(S) AD ACCESS DOOR / AREA DRAIN HTR HEATER ADA AMERICANS W/ DISABLITIES ACT COMPLIANCE HW DOMESTIC HOT WATER AFF ABOVE FINISHED FLOOR HWR DOMESTIC HOT WATER RETURN AFG ABOVE FINISHED GRADE HWRP HOT WATER RECIRCULATION PUMP AHJ AUTHORITY HAVING JURISDICTION HZ HERTZ ANSI AMERICAN NATIONAL STANDARDS INST. IN INCHES AP ACCESS PANEL J, JB JUNCTION BOX APPROX APPROXIMATE JP JOCKEY PUMP ARCH ARCHITECT, ARCHITECTURAL K.E.C. KITCHEN EQUIPMENT CONTRACTOR ATS AUTOMATIC TRANSFER SWITCH KW KILOWATT AVG AVERAGE LBS POUNDS BAS BUILDING AUTOMATION SYSTEM LAV LAVATORY BFP BACKFLOW PREVENTER LI LINT INTERCEPTOR BWV BACKWATER VALVE LIN FT LINEAR FEET B BOILER LWT LEAVING WATER TEMPERATURE BLDG BUILDING MACH MACHINE BLW BELOW MANU MANUFACTURER BTU BRITISH THERMAL UNIT MAX MAXIMUM BTUH BTU PER HOUR MECH MECHANICAL C CONDUIT MEP MECHANICAL, ELECTRICAL, PLUMBING C TO C CENTER TO CENTER MH MOUNTING HEIGHT CAD COMPUTER-AIDED DESIGN MIN MINIMUM CI CAST IRON MTD MOUNTED CLG CEILING MTG MOUNTING CO CLEAN OUT MV MIXING VALVE COL COLUMN N.C. NORMALLY CLOSED COMP COMPRESSOR N.O. NORMALLY OPEN CONC CONCRETE N/A NOT APPLICABLE CONN CONNECTION, CONNECT NFPA NATIONAL FIRE PROTECTION ASSOCIATION SYMBOL GW A VAC ST (E) ST OFD NP NP MECH DWS DWR F SP PD (E) (E) PLUMBING LEGEND ABRV. DESCRIPTION SAN., SANITARY PIPING W. GW GREASE WASTE PIPING A COMPRESSED AIR PIPING VAC VACUUM PIPING V VENT PIPING ST STORM WATER PIPING ST EXISTING STORM WATER PIPING OFD OVERFLOW DRAIN PIPING CW COLD WATER PIPING NP NONPOTABLE WATER TO WC's & U's IN BLDG's SECTIONS 'B', 'C', & 'D' (REFER TO GENERAL NOTE #28) NP MECH NONPOTABLE WATER TO MECHANICAL EQUIPMENT DIRECTIONAL FLOW ARROW DWS CHILLED DRINKING WATER SPLY DWR CHILLED DRINKING WATER RETURN HW HOT WATER PIPING HWR HOT WATER RETURN PIPING F FIRE PROTECTION PIPING SP SPRINKLER PIPING PD PUMP DISCHARGE E EXISTING PIPING (LINE TYPE INDICATES PIPE TYPE UNO.) EXISTING PIPING TO BE REMOVED (LINE TYPE INDICATES PIPE TYPE UNO.) PIPE PIPE DOWN 6. DRAINS AND CLEANOUTS SHALL BE INSTALLED AS SPECIFIED AND IN LOCATIONS SHOWN ON DRAWINGS. REFER TO THE DRAIN SCHEDULE, IF APPLICABLE. 7. THESE DRAWINGS ARE SCHEMATIC AND ARE INTENDED TON CONVEY A FUNCTIONAL PLUMBING SYSTEM AND TO DEPICT THE GENERAL LOCATION OF THE PLUMBING COMPONENTS. 8. THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF PLUMBING WORK WITH THE WORK OF OTHER TRADES. MINOR DEVIATIONS FROM THE PLANS MAY BE MADE TO AVOID MINOR CONFLICTS. WHEN MAJOR CONFLICTS ARE APPARENT, THE CONTRACT OFFICER SHALL BE ADVISED IMMEDIATELY AND AFFECTED WORK SHALL NOT BE CONSIDERED UNTIL THE CONFLICT HAS BEEN RESOLVED. 9. THE CONTRACTOR SHALL VERIFY ALL VOLTAGE AND POWER REQUIREMENTS FOR ALL EQUIPMENT AND COORDINATE WITH THE CONTRACT DRAWINGS PRIOR TO ISSUANCE OF SHOP DRAWINGS AND PURCHASE OF EQUIPMENT. 20. ALL SYSTEMS SHALL BE CLEAN OF FOREIGN MATERIAL AND ROUGH SPOTS PRIOR TO BEING PLACED IN SERVICE AND BEFORE OPERATIONAL TESTS ARE PERFORMED. 2. INSTALLATION OF ALL EQUIPMENT AND THEIR ACCESSORIES SHALL BE PER MANUFACTURER'S PUBLISHED RECOMMENDATIONS. 22. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO INSTALL THE PLUMBING SYSTEM SO AS TO ENSURE QUIET OPERATION. NO VIBRATION OF SOUND SHALL BE TRANSMITTED TO THE BUILDING STRUCTURE. THE DECISION OF THE CONTRACT OFFICER AS TO QUIETNESS OF THE SYSTEM AND EQUIPMENT SHALL BE FINAL. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CORRECT OR REPLACE ANY NOISY SYSTEMS OR EQUIPMENT AS REQUIRED. 23. PROVIDE ACCESS DOORS AND/OR PANELS NECESSARY TO SERVICE ALL EQUIPMENT AND ACCESSORIES THAT REQUIRE SERVICE AND/OR MAINTENANCE AND ARE LOCATED ABOVE INACCESSIBLE CEILINGS OR WALLS. ACCESS DOOR SIZES SHALL PERMIT FULL ACCESSIBILITY TO EQUIPMENT AND/OR ACCESSORIES, BUT NOT LESS 8" X 8". ACCESS DOORS SHALL MATCH THE WALL OF CEILING RATING AT THE LOCATION WHERE THEY ARE PLACED. 24. ALL PIPING SHALL BE INSTALLED TIGHT TO UNDERSIDE OF STRUCTURAL CONSTRUCTION UNLESS OTHERWISE NOTED. 25. THE CONTRACTOR IS RESPONSIBLE FOR ALL ROUGH-IN, FINAL CONNECTIONS, AND PROPER INSTALLATION OF FIXTURES INCLUDING ASSOCIATED PIPING. MOUNT FAUCETS, SPLY ANY TRAPS, VALVES, FITTINGS, VACUUM BREAKERS, PRESSURE GAGES, OR PRESSURE REGULATORS FOR A COMPLETE INSTALLATION WHICH MEETS THE APPLICABLE CODES. 26. ALL WORK ON THIS PROJECT SHALL BE INSTALLED IN ACCORDANCE WITH APPLICABLE CODES, REGULATIONS, AND THE AUTHORITY HAVING JURISDICTION. 27. PROVIDE TRAP PRIMER VALVES FOR ALL DRAINS WHICH REQUIRE A SOURCE OF WATER SPLY TO MAINTAIN TRAP SEAL. PRIMER VALVES SHALL BE CONNECTED TO THE NEAREST COLD WATER LINE SERVING A FIXTURE. 28. NON POTABLE TREATED RAINWATER PIPING SHALL SPLY WATER CLOSETS AND URINALS IN BUILDING SECTIONS B, C, AND D. PIPING SHALL BE CHARLOTTE PIPING ReUze OR APPROVED EQUAL. PIPING SHALL MEET 25/50 FLAME SPREAD RATING AS PER ASTM E 84 AND SHALL BE STENCILED IN WHITE WITH A PURPLE BACKGROUND AND LABELED NON POTABLE. 29. DOMESTIC WATER PIPING SHALL BE COPPER TYPE 'L' UNLESS OTHERWISE NOTED. 7. WHERE EXISTING EQUIPMENT IS TO BE RELOCATED, EXTREME CARE SHALL BE TAKEN TO PREVENT DAMAGE DURING THE REMOVAL AND REINSTALLATION. WHERE DAMAGE OCCURS,THE EQUIPMENT SHALL BE REPLACED OR REPAIRED TO THE SATISFACTION OF THE ARCHITECT, AND OWNERS REPRESENTATIVE AT NO ADDITIONAL COST OVER THE CONTRACT AMOUNT. DETAIL # X X X SHEET ORIGIN PLAN DETAIL (DIFFERENT FLOOR) SHEET REFERENCE DETAIL # X X-X SHEET REFERENCE PLAN DETAIL (IF TYPICAL FLOOR) SECTION # X SECTION CUT X-X SHEET REFERENCE ELEVATION # 2 X 4 3 ELEVATION SYMBOL X-X X-X SHEET REFERENCE REVISION DELTA REVISION CLOUD CONT CONTINUATION CTMU COOLING TOWER MAKE CRV CORROSIVE RESISTANT VENT CRW CORROSIVE RESISTANT WATER CW DOMESTIC COLD WATER DEG DEGREE DEMO DEMOLITION DESIG DESIGNATION DIA DIAMETER DISC DISCONNECT DBP DOMESTIC BOOSTER PUMP DN DOWN DCDA DOUBLE CHECK DETECTOR ASSEMBLY DCVA DOUBLE CHECK VALVE ASSEMBLY DW DISHWASHER DWG DRAWING DWS CHILLED DRINKING WATER SPLY DWR CHILLED DRINKING WATER RETURN EL ELEVATION ELEC ELECTRICAL ELEV ELEVATOR EM EMERGENCY ETR EXISTING TO REMAIN EWC ELECTRIC WATER COOLER EWH ELECTRIC WATER HEATER EWT ENTERING WATER TEMPERATURE EXP EXPANSION ED EXPRESS DRAIN F; ºF DEGREES FARENHEIT FDHV FIRE DEPARTMENT HOSE VALVE FDHR FIRE DEPARTMENT HOSE RACK FDVC FIRE DEPARTMENT VALVE CABINET FD FLOOR DRAIN; FIRE DAMPER FFE FINISHED FLOOR ELEVATION FLR FLOOR FP FIRE PUMP OR FIRE PROTECTION FT FOOT OR FEET NO.; # NUMBER NTS NOT TO SCALE OS&Y OUTSIDE STEM AND YOKE OFD OVERFLOW DRAIN OSD OPEN SITE DRAIN PD PRESSURE DROP OR PUMP DISCHARGE PH; Ø PHASE PLBG PLUMBING PRESS PRESSURE PRV PRESSURE REDUCING VALVE PS PRESSURE SWITCH PSI(G) POUNDS PER SQUARE INCH (GAGE) PSIA POUNDS PER SQUARE INCH ABSOLUTE PVC POLYVINYL CHLORIDE QTY QUANTITY RAD RADIUS RPZA REDUCED PRESSURE ZONE ASSEMBLY RE RELOCATED EXISTING RECIRC RECIRCULATE REF REFRIDGERATOR REQ'D REQUIRED RFI REQUEST FOR INFORMATION RFP REQUEST FOR PROPOSAL RFS REQUEST FOR SUBMITTAL RO REVERSE OSMOSIS RPM REVOLUTIONS PER MINUTE RD ROOF DRAIN SD SCPER DRAIN SP SUMP PUMP SQ FT SQUARE FEET ST STORM WATER THRU THROUGH U URINAL(S) VAC VACUUM WC WATER CLOSET(S) WC0 WALL CLEANOUT WHA WATER HAMMER ARRESTOR M PIPE TEE DOWN CO CLEAN OUT, FLOOR CO CLEAN OUT, EXPOSED OR WALL CLEANOUT CAPPED PIPE PIPE UNION PG PRESSURE GAUGE THERMOMETER BFP BACK FLOW PREVENTER DCDA DOUBLE CHECK DETECTOR ASSEMBLY (FIRE BACK FLOW PREVENTER) DCVA DOUBLE CHECK VALVE ASSEMBLY (DOMESTIC WATER BACK FLOW PREVENTER) RPZ REDUCED PRESSURE ZONE ASSEMBLY RPZA (AT MECH AND RAINWATER SYSTEM CONNECTIONS) BALL VALVE OR SHUTOFF VALVE BV BALANCING VALVE GAS COCK P&TRV PRESSURE AND/OR TEMPERATURE RELIEF VALVE MIXING VALVE GAS SOLENOID VALVE PRESSURE REDUCING VALVE CV CHECK VALVE CHECK VALVE WITH AUTO DRIP VALVE GATE VALVE OS&Y OS&Y VALVE T.S. OS&Y VALVE WITH TAMPER SWITCH Key Plan 30. ABOVE GRADE SANITARY PIPING SHALL BE CAST IRON UNLESS OTHERWISE NOTED. # DRAWING NOTES GAL GALLON GALV GALVANIZED W/ WITH FIRE DEPARTMENT SIAMESE CONNECTION FDHV FIRE DEPARTMENT HOSE VALVE ED FIRE DEPARTMENT HOSE VALVE WITH EXPRESS DRAIN RISER HOT WATER RECIRC. PUMP Seal OPEN SITE DRAIN FLOOR DRAIN FLOOR SINK ROOF DRAIN, PROMENADE DRAIN, AREA DRAIN NON-FREEZE RECESSED WALL HYDRANT FLOW ALARM CONNECT NEW TO EXISTING EXTENT OF DEMOLITION T B HARDWIRE POWER CONVERTER FOR FLUSH VALVES BATTERY BACK MODULE FOR FLUSH VALVES Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com TP I.E. BWV TRAP PRIMER LINE FIRE PUMP TEST MANIFOLD BACKWATER VALVE INVERT ELEVATION BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title DATA SHEET PLUMBING Discipline PLUM Drawing Number ' 0 4' 8' 2' 6' N Scale /8" = '-0" Date 30 DEC 20 Drawn by JHOR P0.00 GRAPHIC SCALE /8" = '-0" Checked by DSMI Sorg Project Number 8

59 ASC JOB#: 76 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION % SD SUBMISSION GENERAL NOTES: A. REFER TO DATA SHEET FOR PLUMBING SYMBOLS AND ABBREVIATIONS. B. REFER TO RISER DIAGRAMS FOR ADDITIONAL INFORMATION. C. REFER TO SCHEDULES SHEET FOR PLUMBING FIXTURES AND EQUIPMENT. REVISIONS DRAWING NOTES: # 4" SANITARY SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION A 4" STORM SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION B C D 4" STORM SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION 4" STORM SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION 6" STORM SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION 6" STORM SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION 4" STORM SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION 4" STORM SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION 4" STORM SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION,500 GALLON GREASE INTERCEPTOR BELOW GRADE ST ST BELOW GRADE (TYP) 4" ST TO 4" AD ST ST 4" ST TO DOWNSPOUT 4" ST TO DOWNSPOUT 4" ST TO DOWNSPOUT 4" GREASE WASTE TO KITCHEHN EQUIPMENT 4" SAN TO KITCHEN ST 4" ST TO 4" AD 2 ST 3 4 4" TO CO 4" ST TO DOWNSPOUT 6" STORM SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION 4" SANITARY SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION 6" ST TO DOWNSPOUT ST BELOW GRADE 4" SANITARY SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION 6" TO CO 6" ST TO DOWNSPOUT 6" ST TO DOWNSPOUT ST Key Plan 6" STORM SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION 6" ST TO DOWNSPOUT ST BELOW GRADE 3" ST TO DOWNSPOUT ST 3" ST TO DOWNSPOUT 3" ST TO DOWNSPOUT (E) SEWAGE EJECTION TO REMAIN Seal ST ST ST 4" ST TO DOWNSPOUT ST BELOW GRADE (TYP) 4" ST TO 4" AD ST ST ST 4" ST TO DOWNSPOUT 4" ST TO DOWNSPOUT 4" ST TO 4" AD BELOW GRADE BELOW GRADE 4" ST TO DOWNSPOUT 4" TO CO BELOW GRADE ST BELOW GRADE 6" ST TO DOWNSPOUT 6" ST TO DOWNSPOUT 6" TO CO 4" SANITARY SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION 6" ST TO DOWNSPOUT ST BELOW GRADE 6" STORM SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION 6" STORM SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION BELOW SLAB BELOW SLAB ST 4" SANITARY SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION 3" ST TO DOWNSPOUT 6" ST TO DOWNSPOUT ST BELOW GRADE 6" STORM SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION BELOW GRADE BELOW GRADE ST BELOW GRADE LOCATION OF DOMESTIC WATER HEATER ST 3" STORM SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION 4" SANITARY SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION 3" ST TO 3" AD 3" ST TO 3" AD 4" SANITARY SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com 6" STORM SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION 6" STORM SEWER INV. EL. XXX SEE CIVIL DRAWINGS FOR CONTINUATION P.00 BASEMENT FLOOR PLUMBING PLAN SCALE: /8" = '-0" BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title BASEMENT FLOOR PLUMBING PLAN Discipline PLUM Drawing Number ' 0 4' 8' 2' 6' N Scale /8" = '-0" Date 30 DEC 20 Drawn by JHOR P.00 GRAPHIC SCALE /8" = '-0" Checked by DSMI Sorg Project Number 8

60 F E E F ASC JOB#: 76 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION % SD SUBMISSION GENERAL NOTES: REVISIONS A. REFER TO DATA SHEET FOR PLUMBING SYMBOLS AND ABBREVIATIONS. B. REFER TO RISER DIAGRAMS FOR ADDITIONAL INFORMATION. C. REFER TO SCHEDULES SHEET FOR PLUMBING FIXTURES AND EQUIPMENT. DRAWING NOTES: # LOCATION OF 500 GALLON GREASE INTERCEPTOR BELOW GRADE EXTERIOR DOWNSPOUT BY ARCHITECT 4" AD EXTERIOR DOWNSPOUT BY ARCHITECT EXTERIOR DOWNSPOUT BY ARCHITECT EXTERIOR DOWNSPOUT BY ARCHITECT EXTERIOR DOWNSPOUT BY ARCHITECT 4" AD EXTERIOR DOWNSPOUT BY ARCHITECT 2 P4.0 MULTIPURPOSE / CAFETERIA 0 STAGE AREA AND BELOW STAGE AREA SHALL BE PROTECTED BY AUDITORIUM A HYDRAULICALLY DESIGNED FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH 002 NFPA AND THE LOCAL AUTHORITY HAVING JURISDICTION (AHJ.) GYMNASIUM 02 4" AD 4" AD CUSTODIAL & ENGINEERING SP DN SP 2 DN 020 KITCHEN 00 6" F AUDITORIUM SHALL BE PROTECTED BY A HYDRAULICALLY DESIGNED FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA AND THE LOCAL AUTHORITY HAVING JURISDICTION (AHJ.) F 6" SP SP TOILET 009 EXTERIOR DOWNSPOUT BY ARCHITECT AUDITORIUM 00 EXTERIOR DOWNSPOUT BY ARCHITECT SP TOILET 08 SP P.E. OFFICE 09 P4.0 3 P4.0 MUSIC 007 SLOP SLOP PRE-K 07 4 P4.0 EXTERIOR DOWNSPOUT BY ARCHITECT EXTERIOR DOWNSPOUT BY ARCHITECT PRE-K 006 SPECIAL NEEDS 06 SP- EXTERIOR DOWNSPOUT BY ARCHITECT Key Plan F 6" F EXTERIOR DOWNSPOUT BY ARCHITECT HEAD END 008 TEACHER'S WORK AREA 003 DN TEACHER'S OFFICE 02 STORAGE 05 PRE-SCHOOL 005 PRE-K 03 EXTERIOR DOWNSPOUT BY ARCHITECT PRE-SCHOOL 004 PRE-K 04 Seal EXTERIOR DOWNSPOUT BY ARCHITECT (E) NATURAL GAS METER & REGULATOR TO REMAIN P.0 GROUND FLOOR PLUMBING PLAN SCALE: /8" = '-0" Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title GROUND FLOOR PLUMBING PLAN Discipline PLUM Drawing Number ' 0 4' 8' 2' 6' N Scale /8" = '-0" Date 30 DEC 20 Drawn by JHOR P.0 GRAPHIC SCALE /8" = '-0" Checked by DSMI Sorg Project Number 8

61 DN BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION % SD SUBMISSION GENERAL NOTES: REVISIONS A. REFER TO DATA SHEET FOR PLUMBING SYMBOLS AND ABBREVIATIONS. B. REFER TO RISER DIAGRAMS FOR ADDITIONAL INFORMATION. C. REFER TO SCHEDULES SHEET FOR PLUMBING FIXTURES AND EQUIPMENT. DRAWING NOTES: # STUDENT SERVICES 29 KINDERGARTEN 4 KINDERGARTEN 5 KINDERGARTEN 6 STAGE AREA AND BELOW STAGE AREA SHALL BE PROTECTED BY A HYDRAULICALLY DESIGNED FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA AND THE LOCAL AUTHORITY HAVING JURISDICTION (AHJ.) RESOURCE 32 RESOURCE 3 SPEECH 30 STUDENT SERVICES 28 RESOURCE 27 SP SP 2 ED SP AUDITORIUM SHALL BE PROTECTED BY A HYDRAULICALLY DESIGNED FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA AND THE LOCAL AUTHORITY HAVING JURISDICTION (AHJ.) ED SP KINDERGARTEN 3 DN RESOURCE 26 TOILET 2 TOILET 25 P4.02 ST GRADE SPECIAL NEEDS 23 HEALTH 24 2 P4.02 ST GRADE 0 COT 25 PARENT RESOURCE 02 WELCOME CENTER 0 CONFERENCE 03 STOR. 27 EXAM 26 Key Plan DN DN DN DN ADMIN WORK AREA 06 PRINCIPAL 04 SECURITY 05 LOUNGE 7 MAIL 22 DN ST GRADE 09 DATA 20 RECORDS 08 ST GRADE 07 COUNSELOR 8 ART 2 BEFORE / AFTER CARE 9 Seal P.02 FIRST FLOOR PLUMBING PLAN SCALE: /8" = '-0" Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title FIRST FLOOR PLUMBING PLAN Discipline PLUM Drawing Number ' 0 4' 8' 2' 6' N Scale /8" = '-0" Date 30 DEC 20 Drawn by JHOR P.02 GRAPHIC SCALE /8" = '-0" Checked by DSMI Sorg Project Number 8 ASC JOB#: 76

62 ASC JOB#: 76 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION % SD SUBMISSION GENERAL NOTES: REVISIONS A. REFER TO DATA SHEET FOR PLUMBING SYMBOLS AND ABBREVIATIONS. B. REFER TO RISER DIAGRAMS FOR ADDITIONAL INFORMATION. C. REFER TO SCHEDULES SHEET FOR PLUMBING FIXTURES AND EQUIPMENT. DRAWING NOTES: # 2ND GRADE 2 2ND GRADE 22 COMPUTER LAB 222 5TH GRADE 22 2ND GRADE 20 5TH GRADE 220 SP SP 2 SP SP ED ED 2ND GRADE 209 DN TOILET 208 TOILET 28 DN 5TH GRADE 29 3 P4.02 3RD GRADE 207 4TH GRADE 27 4 P4.02 3RD GRADE 206 OFFICE 202 LOCATION OF DRY-PIPE SPRINKLER SYSTEM FOR ATTIC SPACE 4TH GRADE 26 Key Plan DN MEDIA CENTER 20 DN WORK 203 STORAGE 25 3RD GRADE 205 4TH GRADE 23 3RD GRADE 204 4TH GRADE 24 Seal P.03 SECOND FLOOR PLUMBING PLAN SCALE: /8" = '-0" Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title SECOND FLOOR PLUMBING PLAN Discipline PLUM Drawing Number ' 0 4' 8' 2' 6' N Scale /8" = '-0" Date 30 DEC 20 Drawn by JHOR P.03 GRAPHIC SCALE /8" = '-0" Checked by DSMI Sorg Project Number 8

63 ASC JOB#: 76 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION % SD SUBMISSION GENERAL NOTES: REVISIONS A. REFER TO DATA SHEET FOR PLUMBING SYMBOLS AND ABBREVIATIONS. B. REFER TO RISER DIAGRAMS FOR ADDITIONAL INFORMATION. C. REFER TO SCHEDULES SHEET FOR PLUMBING FIXTURES AND EQUIPMENT. DRAWING NOTES: # LOCATION OF SOLAR PANELS SERVING DOMESTIC WATER HEATER FOR KITCHEN Key Plan Seal P.04 ROOF PLUMBING PLAN SCALE: /8" = '-0" Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title ROOF PLUMBING PLAN Discipline PLUM Drawing Number ' 0 4' 8' 2' 6' N Scale /8" = '-0" Date 30 DEC 20 Drawn by JHOR P.04 GRAPHIC SCALE /8" = '-0" Checked by DSMI Sorg Project Number 8

64 F ASC JOB#: 76 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION % SD SUBMISSION REVISIONS KITCHEN 00 Key Plan 4" DOMESTIC WATER SERVICE. SEE CIVIL DWG'S FOR CONTINUATION LOCATION OF SOLAR DOMESTIC WATER HEATER SERVING KITCHEN DCVA- RPZ (ASSE 05) PER DC WATER REQUIREMENTS 3" OSD PUMP ROOM FP- 3" FD- 6" FIRE SERVICE. SEE CIVIL DWG'S FOR CONTINUATION. F JP- Seal SERVICE VALVE DCDA- (ASSE 048A) PER DC WATER REQUIREMENTS P4.0 PART PLAN - PUMP ROOM/KITCHEN SCALE: /4" = '-0" Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title PART PLANS PLUMBING Discipline PLUM Drawing Number 0 ' 4' 2' 8' 4' 2' 6' ' 6' 8' N Scale /4" = '-0" Date 30 DEC 20 Drawn by JHOR P4.0 GRAPHIC SCALE /8" /4" = '-0" Checked by DSMI Sorg Project Number 8

65 D G D G ASC JOB#: 76 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION SPRINKLER RISER WELDED TEE OUTLET UNION (TYP.) OS & Y VALVE TAMPER SWITCH CHECK VALVE FLOW SWITCH TO SPRINKLERS TEE " GLOBE VALVE (SYSTEM DRAIN) " GLOBE VALVE (INSP TEST) 8" FIRE SERVICE FROM DOUBLE CHECK DETECTOR ASSEMBLY CHECK VALVE (TYPICAL) GAUGE O S&Y VALVE W/ TAMPER SWITCH (TYP) FULL SIZE BY-PASS GATE VALVE (TYPICAL) 8" FIRE TO BUILDING COMBINED STANDPIPE/SPRINKLER SYSTEM. SEE RISER AND PLANS FOR FIRE DEPT CONNECTION UNION (TYPICAL) TO FIRE PUMP TEST HEADERS, PROVIDE AUTO BALL DRIP WATER HEATER FLUE IN ACCORDANCE W/ MANUFACTURERS RECOMMENDATIONS. SEE MECH. DWGS FOR ADDITIONAL INFORMATION (TYP) CONTROL PANEL (TYP) TANK INSPECTION OPENING (TYP) TANK DRAIN (TYP) 40º 0º 40º THERMOMETER (TYP) BALL VALVE (TYP) A.S.M.E. APPROVED PRESSURE & TEMPERATURE RELIEF VALVE (TYP) FULL SIZE DRAIN LINE SPILL INDIRECTLY OVER FLOOR DRAIN (TYP) 40º 0º 0º 0º 40º 0º REVISIONS % SD SUBMISSION 2" COMMON EXPRESS DRAIN " SIGHT GLASS " UNION W/ CORROSION RESISTANT ORIFICE GIVING FLOW EQUIVALENT TO THE SMALLEST SPRINKLER ORIFICE IN THE SYSTEM. JOCKEY PUMP FLOOR CONCRETE PAD (TYPICAL) DISCHARGE GAUGE STRAINER ECCENTRIC REDUCER 2" HOUSEKEEPING PAD CASE RELIEF VALVE JOCKEY PUMP CONTROLLER CHECK VALVE (TYPICAL) CONCENTRIC REDUCER SUCTION GAUGE FIRE PUMP ATS CONTROLLER CONTROLLER POWERED GAS BURNER (TYP) HOUSE KEEPING PAD FLOOR D D GAS COCK (TYP) GAS REGULATOR (TYP) DIRT LEG (TYP) SEE DETAIL # 4 MANIFOLD HOTWATER RECIRC SYSTEM THIS SHEET FOR ADDITIONAL INFORMATION FLOOR P5.0 DETAIL - SPRINKLER CONNECTION 2 P5.0 DETAIL - ELECTRIC FIRE AND JOCKEY PUMP DETAIL 3 P5.0 DETAIL - NATURAL GAS WATER HEATER CAULK ON BOTH SIDES (TYP) NOTES - NOISE CONTROL DETAILS: 0 0 HOT WATER TO BUILDING SYSTEM 40 RETURN PIPE CAULK PIPE SLEEVE INSULATION. THE NOISE CONTROL DETAILS ON THIS SHEET APPLY TO ALL PIPING THAT PENETRATES THE WALLS AND FLOORS (ABOVE AND BELOW) OF SOUND SENSITIVE SPACES. THE DETAILS ALSO APPLY TO PIPING INSTALLED ABOVE CEILINGS IN SOUND SENSITIVE SPACES AND WITHIN WALLS ADJACENT TO SOUND SENSITIVE SPACES. 2. SOUND SENSITIVE SPACES INCLUDE: CLASSROOMS, LABS, INSTRUCTION ROOMS, MEDIA ROOMS, MEDIA CENTER, AUDITORIUM, CHORAL ROOMS, MUSIC ROOMS, BAND ROOMS, GYMNASIUM AND LIBRARY. ACCESS COVER FINISH FLOOR CEILING TILE CONCRETE SLAB MV-3 CAULK CLEANOUT BRANCH DEPTH VARIES. 60 MAX.-45 MIN. DRAINAGE PIPE CAULK ON BOTH SIDES 40 NOTES:. PROVIDE EXTRA HEAVY POLISHED BRONZE OR NICKEL BRONZE ACCESS COVER, FINISHED AREAS ONLY. CAST IRON IN UNFINISHED AREAS. 2. FLOOR CLEANOUT SHOWN. CLEANOUT AT GRADE SIMILAR EXCEPT PROVIDE 2"X2"X6" CONC. BLOCK AT GRADE. PIPE GYPSUM BOARD WALL DETAIL 4 P5.0 DETAIL - MANIFOLD HOT WATER RECIRC SYSTEM 5 P5.0 TYPICAL FLOOR CLEANOUT DETAIL 6 P5.0 NOISE CONTROL DETAIL - 5 S.S. BAFFLE " SQ. TUBE (CAST-IN) PIPE 4 /2" O.D. 4" SCHED 40PVC CONDUIT WITH LONG RADIUS BENDS OIL MINDER CONTROL 3 RECEPTACLE SHALL BE NEMA 6-5R POWER SPLY OIL-MINDER POWER CABLE, PROBE CABLE, AND HIGH LIQUID ALARM CABLE, LENGTHS AS REQUIRED, IN CONDUIT Key Plan /3 /3 /3 2' - 9" PLAN 6" MIN. BAFFLE DETAIL OPEN GRATING WITH CUT-OUT FOR DISCHARGE & ELECTRICAL CONDUIT 5 ELEVATOR MACHINE ROOM FLOOR PIPE (TYP.) CONVENTIONAL PIPE CLAMP INLET 47" 24" 24" 24" APPROX. APPROX. 8" APPROX. 8" OUTLET INLET/OUTLET 32" (TYP.) BAFFLE 24" INLET BAFFLE 44" 6" 48" OUTLET BAFFLE TO 3" OFF BOTTOM ELEVATION RAISED BAFFLE WALLS, 3" OFF BOTTOM, /2" - " FROM TOP LOWER BAFFLE WALLS SHALL BE STRUCTURAL CONCRETE ONLY, TERMINATE 6" BELOW LIQUID LEVEL 24" APPROX. 57" CROSS SECTION 8" 64 /2" ANGLE IRON SPORT OIL-MINDER PROBE 7 2 PUMP ON-OFF FLOAT ) SP-: STANCOR MODEL SE-00 SUBMERSIBLE EFFLUENT PUMP HP. 5 VOLT, 3600 RPM, 2" DISCHARGE CONNECTION 2) STANCOR CHECK VALVE 3) STANCOR OIL MINDER 5V, PHASE CONTROL SYSTEM WITH OPTIONAL BUILT-IN AUDIBLE AND VISUAL ALARM WHEN PUMP DOES NOT RUN DUE TO OIL IN PIT OR HIGH LIQUID CONDITION. PROVIDE SIILENCING BUTTON FOR AUDIBLE ALARM BUILT INTO PANEL. PANEL SHALL HAVE ADDITIONAL CONTACT FOR A REMOTE ALARM LOCATION. 4) WATERTIGHT SLEEVE 5) PROVIDE BYPASS SHUTOFF VALVE AND HOSE BIB, TO TEMPORARILY PUMP LIQUIDS. HOSE BIB TO BE NORMALLY CLOSED, AND VALVE TO BE NORMALLY OPEN. 6) OIL MINDER POWER CABLE, PROBE, AND HIGH LIQUID ALARM CABLE 7) HIGH LIQUID ALARM FLOAT WITH CLAMP DEVICE TO MOUNT TO PUMP DISCHARGE PIPING 8) PROVIDE A MINIMUM OF 5 FT. EXTRA OF EACH CABLE (SLACK) ROLLED AND CLAMPED TO THE DISCHARGE PIPE TO ALLOW FOR THE REMOVAL OF THE PUMP FROM THE PIT. 9) SEE PLANS FOR CONTINUATION OF DISCHARGE PIPING 2" x 2" x /8" THICK STEEL BEARING PLATE CONCRETE SLAB 2" x 2" x 3/4" THICK NEOPRENE PAD (50 lbs/sq in) METAL SLEEVE PACK WITH FIBROUS MATERIAL ALL AROUND SEAL TOP AND BOTTOM WITH NON HARDENING RESILIENT SEALANT Seal 7 P5.0 DETAIL - GREASE INTERCEPTOR,500 GALLON 8 P5.0 ELEVATOR SUMP AND PUMP DETAIL 9 P5.0 NOISE CONTROL DETAIL - 2 SPRING ISOLATOR MFG: KINETICS MODEL: SHR/SH. " OR 2" THICK PIPE LAGGING MATERIALS (KNM-00 ALQ) NOTE: CLEVIS HANGER CEILING HANGER LOAD CALCULATIONS MUST BE SPLIED BY THE MECHANICAL / STRUCTURAL ENGINEER. PIPE SPRING ISOLATOR ISOMETRIC VIEW COLD WATER SPLY LINE TRAP PRIMER VALVE MINIMUM 2" ABOVE FINISHED FLOOR. COMPRESSION FITTING AVOID DIRECT INSTALLATION TO PREVENT FOREIGN MATERIAL FROM ENTERING THE PRIMER VALVE TRAP PRIMER METAL SLEEVE NEOPRENE FOAM PIPE (TYP.) METAL STUD PIPE CLAMP RESILIENT SLEEVE Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title DETAIL SHEET PLUMBING /2" SPLY TO FLOOR DRAINS Discipline PLUM Drawing Number 0 P5.0 NOISE CONTROL DETAIL - 4 P5.0 TRAP PRIMER DETAIL 2 P5.0 NOISE CONTROL DETAIL - 3 P5.0 NOISE CONTROL DETAIL - 3 ' 0 4' 8' 2' 6' GRAPHIC SCALE /8" = '-0" N Scale Date Drawn by Checked by /8" = '-0" 30 DEC 20 JHOR DSMI P5.0 Sorg Project Number 8

66 ASC JOB#: 76 BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION ENGINEERING SCHEMATIC DRAWINGS DATE DESCRIPTION % SD SUBMISSION REVISIONS 2" STORM WATER FROM BLDG SECTIONS B, C & D ST FLOOR EXTERIOR BUILDING WALL ST ST GROUND FLOOR BLDG C ROOM C00, PROVIDE 4" CONCRETE BASE FOR ALL EQUIPMENT 4 DYE INJECTION SYTEM CW SPLY METER RPZ- M SOLENOID VALVE, SHALL OPEN ATBREAK TANK LOW WATER LEVEL M 3" 3" 9 NP 3" CW - SPLY TO BREAK TANK FOR USE WHEN CISTERN WATER LEVEL IS LOW 2" 5 (TYP. OF 2) GRADE 2" STORM WATER FROM BUILDING B, C & D ROOF DRAINS 6 GROUND FLOOR ST ST BWV 7 4" CONCRETE PAD 8 DBP-2 3" STPD ST 0 RAINWATER TREATMENT SYSTEM NOTES: # 2" 2. 2" STORM WATER PRE-FILTER. BACKWATER VALVE (BWV) 2. 20,000 FIBERGLASS RAINWATER COLLECTION CISTERN. 3. DLEX SUMP PUMP. BASIS OF DESIGN: WEIL, 20 GPM, 70 FT. OF HD, 5 HP. PROVIDE PIPING, VALVES & GUARDRAILS DUAL FILTRATION HOUSINGS WITH MICRO BAG FILTER. 5. UV TREATMENT SYSTEM, 20 GPM UNIT. 6. SOLENOID VALVE FROM SYSTEM RECIRCULATION GALLON BREAK TANK. 8. DLEX PACKAGED BOOSTER PACKAGE (DBP-2), FT. OF HD. 9. 3" NONPOTABLE TREATED WATER TO WATER CLOSETS & URINALS IN BUILDING SECTIONS B, C & D. 0. PRE-FILTER OVERFLOW TO STORM WATER MAIN, COORDINATE WITH CIVIL. SOLAR WATER HEATING SYSTEM CONCEPT. 24" MANWAY FOR ACCESS. P5.02 DETAIL - STORM WATER TREATMENT & REUSE SYSTEM CONCEPT 2. 2" CISTERN HIGH WATER LEVEL OVERFLOW TO STORM WATER MAIN. 2 P5.02 DETAIL - SOLAR WATER HEATING SYSTEM CONCEPT Key Plan Seal Sorg Architects 98 U Street NW, Washington DC 2000 T F sorgarchitects.com BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION DISTRICT OF COLUMBIA PUBLIC SCHOOLS DEPARTMENT OF GENERAL SERVICES Drawing Title DETAIL SHEET PLUMBING Discipline PLUM Drawing Number ' 0 4' 8' 2' 6' N Scale /8" = '-0" Date 30 DEC 20 Drawn by JHOR P5.02 GRAPHIC SCALE /8" = '-0" Checked by DSMI Sorg Project Number 8